Gates Corp. v. Bando Chemical Industries, Ltd. , 4 F. App'x 676 ( 2001 )


Menu:
  •                                                                              F I L E D
    United States Court of Appeals
    Tenth Circuit
    UNITED STATES COURT OF APPEALS
    FEB 16 2001
    TENTH CIRCUIT
    __________________________                   PATRICK FISHER
    Clerk
    THE GATES CORPORATION, d/b/a The Gates
    Rubber Company; THE GATES RUBBER
    COMPANY, a Colorado corporation,
    Plaintiffs-Appellants,                                 No. 99-1272
    (D. Colo.)
    v.                                                          (D.Ct. No. 92-S-136)
    BANDO CHEMICAL INDUSTRIES, LTD., a
    Japanese company; BANDO AMERICAN, INC.,
    an Illinois corporation; BANDO
    MANUFACTURING OF AMERICA, INC., a
    Kentucky corporation; BANDO, U.S.A., INC., a
    Delaware corporation; STEVEN R. PIDERIT, an
    individual; RON NEWMAN, an individual; JOHN
    DOES 1-94; GARY KESSINGER,
    Defendants-Appellees.
    ____________________________
    ORDER AND JUDGMENT *
    Before BRORBY, McKAY, and KELLY, Circuit Judges.
    After years of contentious litigation dating back to 1992, representatives of
    *
    This order and judgment is not binding precedent except under the doctrines of
    law of the case, res judicata and collateral estoppel. The court generally disfavors the
    citation of orders and judgments; nevertheless, an order and judgment may be cited under
    the terms and conditions of 10th Cir. R. 36.3.
    the parties   1
    met to discuss settlement of this case. During their second day of
    meetings, they signed a one-page Memorandum of Understanding
    (“Memorandum”).          Defendants filed a motion to enforce the purported settlement
    agreement. Defendants claimed the Memorandum represented a binding
    agreement to settle this case and argued the essential terms were sufficiently
    definite to constitute an enforceable contract. Plaintiffs responded the
    Memorandum was unenforceable, because it contained indefinite material terms
    and was merely an agreement to agree. Applying Colorado law, the district court
    granted the motion to enforce without holding an evidentiary hearing. This
    appeal followed.
    1
    Plaintiff The Gates Corporation, a Delaware corporation, is doing business as
    plaintiff The Gates Rubber Company, a Colorado corporation. The Gates Corporation
    became a wholly owned subsidiary of Tomkins PLC in 1996.
    Defendant Bando Chemical Industries, Ltd. is the parent of defendant Bando
    U.S.A., Inc., which in turn is the parent of defendants Bando American, Inc. and Bando
    Manufacturing of America, Inc. Individual defendants Steven R. Piderit, Ron Newman,
    and Gary Kessinger were formerly employed by plaintiffs and subsequently employed by
    one of the corporate defendants. See Gates Rubber Co. v. Bando Chem. Indus., Ltd., 
    167 F.R.D. 90
    , 99, 116 (D. Colo. 1996) (noting Mr. Piderit and Mr. Newman were hired away
    from plaintiff Gates Rubber by the chief executive officer of Bando American, and
    describing Mr. Kessinger as an employee of plaintiff Gates Rubber who left to go work
    for one of the corporate defendants); see also Gates Rubber Co. v. Bando Chem. Indus.,
    Ltd., 
    9 F.3d 823
    , 830 (10th Cir. 1993) (identifying Messrs. Newman and Piderit as
    former employees of plaintiffs).
    -2-
    I. Background
    Plaintiffs and the corporate defendants compete in the manufacture and
    sale of rubber belts for use in industrial machinery.       See Gates Rubber Co. , 
    9 F.3d at 830
    . The focus of this lawsuit, which was filed over eight years ago,
    appears to be two computer programs created by plaintiffs called “Design Flex
    4.0” and “Life in Hours.”     See Gates Rubber Co. , 167 F.R.D. at 99. Design Flex
    4.0 handles complicated calculations involving numerous variables to determine
    the proper belt for a customer’s machine, thereby increasing the efficiency and
    accuracy of belt selection.   See 
    9 F.3d at 830
    . Similarly, Life in Hours identifies
    the expected number of performance hours for a particular belt.         See 167 F.R.D.
    at 99. Plaintiffs consider these two programs highly valuable, because they
    significantly reduce the human error involved in belt selection and performance
    expectation, as well as speed the sales process.        See 
    9 F.3d at 830
    ; see also 167
    F.R.D. at 99. Plaintiffs claim,   inter alia , the individual defendants took copies of
    these programs with them to the corporate defendants, which in turn created
    substantially similar computer programs for use by their sales forces.
    Specifically, plaintiffs state defendants’ “Chauffeur” and “AADD” computer
    programs are substantially similar to “Design Flex 4.0” and “Life in Hours,”
    respectively. In their Fifth Amended Complaint, plaintiffs bring causes of action
    for copyright infringement, Lanham Act violations, patent infringement, Paris
    -3-
    Convention for the Protection of Industrial Property violations, Colorado
    Consumer Protection Act violations, unfair competition, misappropriation of
    trade secrets, breach of contract, and rights in stolen property.
    II. Procedural History   2
    The district court described this case as having “a long and difficult
    history” resulting in “millions of dollars in litigation expenses.” Order dated
    May 18, 1999, at 1. In an effort to settle the case, Ian Duncan, Deputy Chairman
    and Managing Director, Finance, of Tomkins PLC representing plaintiffs, and
    Shogo Sasabe, President of Bando Chemical Industries, Ltd. representing
    defendants, met in London, England and engaged in two days of settlement
    discussions. Messrs. Duncan and Sasabe ultimately signed the Memorandum,
    which: (1) lists the nine terms as to which they “have reached agreement”; and
    (2) states they “have agreed in principle to settle” this case, have the authority to
    settle this case, and “intend this Memorandum to be a binding, legally
    2
    Because this appeal focuses on the district court’s analysis in enforcing the
    purported settlement agreement, we refer the reader to the four published opinions in this
    case for further detail regarding the procedural history of the underlying litigation. See
    Gates Rubber Co. v. Bando Chem. Indus., Ltd., 
    9 F.3d 823
     (10th Cir. 1993), aff’g in part
    and vacating in part, Gates Rubber Co. v. Bando Am., Inc., 
    798 F. Supp. 1499
     (D. Colo.
    1992); Gates Rubber Co. v. Bando Chem. Indus., Ltd., 
    167 F.R.D. 90
     (D. Colo. 1996);
    Gates Rubber Co. v. Bando Chem. Indus., Ltd., 
    855 F. Supp. 330
     (D. Colo. 1994).
    -4-
    enforceable agreement.”
    Over a year later, defendant Bando Chemical Industries, Ltd. filed its
    motion to enforce the purported settlement agreement on behalf of all defendants.
    Defendants stated the Memorandum reflected the parties’ unambiguous
    agreement to the two essential elements of a settlement agreement: (1) exchange
    of money, and (2) a release. In their response, plaintiffs claimed the
    Memorandum was unenforceable because it contained indefinite material terms
    (i.e. , “3. Future technology issues”), and its language reflected it was merely an
    agreement to agree. The district court heard oral argument on the motion, but,
    with the parties’ consent, did not conduct an evidentiary hearing.
    Utilizing Colorado law, the district court stated in its May 18, 1999 Order:
    “The primary determination that must be made is whether the terms are specific
    enough to constitute a contract and if the parties intended it to be a binding
    contract.” Order dated May 18, 1999, at 2 (citing     New York Life Ins. Co. v. K N
    Energy, Inc. , 
    80 F.3d 405
    , 410 (10th Cir. 1996) (applying Colorado law)). The
    district court concluded the Memorandum constituted an enforceable contract the
    “purpose of [which] is to settle this case,” and granted defendants’ motion to
    enforce it. Order dated May 18, 1999, at 3;     see id. at 2-5.
    -5-
    Specifically, the district court held the Memorandum contained a
    settlement agreement with seven “essential terms,” paraphrased as follows:
    1. Each individual signing the [Memorandum] has authority
    to sign for the party he is representing.
    2. The individuals, on behalf of the parties they represent,
    have reached an agreement.
    3. Mutual, general releases shall be drafted in the broadest
    legal terms possible.
    4. Consideration will be paid for the release of claims.
    5. This case, including all counterclaims, will be dismissed.
    6. [Bando Chemical Industries, Ltd.] will acknowledge this
    Court’s prior ruling regarding the misappropriation of intellectual
    property belonging to Gates [Rubber Company].
    7. The [Memorandum] is a binding legally enforceable
    agreement.
    Id. at 2; see id. at 3. The district court concluded:
    [These] essential terms are sufficiently specific and they indicate
    clear evidence of the intent to be bound by this contract. The detail
    in those elements also belie [plaintiffs’] argument that the
    [Memorandum] is only an agreement to agree....
    In addition, it is undisputed that, pursuant to the terms of the
    [Memorandum], [Bando Chemical Industries, Ltd.] began
    performance by depositing payment of the sum required by the
    [Memorandum] into an escrow agreement. This is also evidence of
    intent to be bound by the [Memorandum].
    Id. at 3.
    -6-
    In reaching its decision, the district court concluded the Memorandum’s
    third “term” – “[f]uture technology issues” – was not essential to the settlement
    agreement:
    As a preliminary matter, the future technology issue is not essential
    to this agreement. The purpose of the [Memorandum] is to settle
    this case. That means that it must dispose of all claims in the Fifth
    Amended Complaint. The [Memorandum] need not determine all
    issues that may arise between these parties in perpetuity. Indeed it
    does not in any way purport to control the future business dealings
    between the parties. That is not necessary to settle this case. With
    that understanding, the phrase “future technology issues” can be
    examined in two ways. If it means issues about future technology
    that are covered by claims in the Fifth Amended Complaint, they will
    be dismissed pursuant to this settlement agreement. Those issues
    will therefore be moot due to the dismissal of the case.
    The phrase can also mean issues about future technology
    which will arise sometime in the future and are unrelated to the Fifth
    Amended Complaint. Those issues, while they may be important in
    the future relationship between these parties, are not relevant to
    settlement of this case. Consequently, the future technology issue,
    while it may be ambiguous in relation to those future issues not
    covered by the Fifth Amended Complaint, is not ambiguous as it
    relates to settlement of the present case. In other words, it is only
    ambiguous to the extent that it is not essential to the purpose of the
    [Memorandum], settling this case.
    Id. at 3-4.
    On appeal, plaintiffs claim the district court erred in three ways: (1)
    determining the term “[f]uture technology issues” was not essential to the
    -7-
    settlement agreement; (2) failing to find the term “[f]uture technology issues”
    indefinite after finding it uncertain; and (3) concluding the Memorandum was not
    an agreement to agree. Defendants claim the “[f]uture technology” term is not
    essential to the settlement agreement, which moots the issue whether it is
    indefinite. Defendants argue the Memorandum reflects the parties’ unequivocal
    intent to be bound by its terms, which means it is not an agreement to agree.
    III. Jurisdiction
    We have “jurisdiction of appeals from all final decisions of the district
    courts.” 
    28 U.S.C. § 1291
    . This court issued a show cause order questioning our
    appellate jurisdiction, because the district court did not enter a judgment or
    dismissal order in this case.   See Fed. R. Civ. P. 58.   3
    The issue is whether the
    district court’s order granting defendants’ motion to enforce is a final decision
    under § 1291. After briefing, the jurisdictional issue was referred to this panel
    for disposition. The parties argue the district court’s order is final and we have
    appellate jurisdiction. We agree.
    3
    “To eliminate uncertainty as to the finality of district court decisions and ease
    appellate jurisdictional review, we encourage all district courts to comply with Rule 58’s
    separate document requirement in every proper instance.” Burlington N. R.R. Co. v.
    Huddleston, 
    94 F.3d 1413
    , 1416 n.3 (10th Cir. 1996).
    -8-
    A final decision ends the litigation and “leaves nothing for the court to do
    but execute the judgment.”      Catlin v. United States , 
    324 U.S. 229
    , 233 (1945);
    see Albright v. UNUM Life Ins. Co.       , 
    59 F.3d 1089
    , 1092 (10th Cir. 1995). In
    other words, it reflects “the termination of all matters as to all parties and causes
    of action.” D&H Marketers, Inc. v. Freedom Oil & Gas, Inc.             , 
    744 F.2d 1443
    ,
    1444 (10th Cir. 1984) (en banc). Our analysis is governed by “the substance of
    the district court’s decision, not its label or form.”       Albright , 
    59 F.3d at 1092
    .
    The absence of a Rule 58 judgment will not prohibit appellate review if the
    district court decision is unquestionably final.         See Burlington N. R.R. , 
    94 F.3d at
    1416 n.3.
    In its order, the district court: (1) held the Memorandum constituted an
    enforceable contract, which reflected the parties’ agreement to dismiss this case,
    including all counterclaims; and (2) granted defendants’ motion to enforce the
    agreement. In other words, the district court ordered the enforcement of a
    settlement agreement requiring dismissal of the instant case. Although it would
    have been preferable for the district court to enter judgment dismissing plaintiff’s
    action as settled based on its order,    see Heuser v. Kephart , 
    215 F.3d 1186
    , 1189
    (10th Cir. 2000), the order terminated all matters as to all parties and causes of
    action for all practical purposes, and it left nothing for the district court to do but
    -9-
    execute judgment.         See Catlin , 
    324 U.S. at 233
    ; D&H Marketers , 
    744 F.2d at 1444
    . Accordingly, the district court’s May 18, 1999 Order is a final decision,
    and we have appellate jurisdiction.
    IV. Standard of Review
    “A trial court has the power to summarily enforce a settlement agreement
    entered into by the litigants while the litigation is pending before it.”      United
    States v. Hardage , 
    982 F.2d 1491
    , 1496 (10th Cir. 1993). We review the district
    court’s enforcement of a purported settlement agreement for an abuse of
    discretion. See Heuser , 
    215 F.3d at 1190
    ; Hardage , 982 F.2d at 1495. An abuse
    of discretion occurs when the district court “based its decision on an erroneous
    conclusion of law or where there is no rational basis in the evidence for the
    ruling.” Wang v. Hsu , 
    919 F.2d 130
    , 130 (10th Cir. 1990) (quotation marks and
    citations omitted).   4
    4
    Plaintiffs argue for a de novo standard of review with no deference to the district
    court’s order in light of the Memorandum and this court’s statement in Valley Nat’l Bank
    v. Abdnor, 
    918 F.2d 128
     (10th Cir. 1990) “the appellate court is in as good a position as
    the trial court to interpret a written document.” 
    Id. at 130
    . Valley Nat’l Bank is
    inapposite, because, as we discuss in more detail infra note 6, the question here is not one
    of contract interpretation, but one of contract formation. See I.M.A., Inc. v. Rocky
    Mountain Airways, Inc., 
    713 P.2d 882
    , 888 & n.6 (Colo. 1986) (en banc).
    -10-
    V. Discussion
    Issues involving the formation and construction of a purported settlement
    agreement are resolved by applying state contract law,       see United States v.
    McCall , 
    235 F.3d 1211
    , 1215 (10th Cir. 2000), even when there are federal
    causes of action in the underlying litigation.     See United Commercial Ins. Serv.,
    Inc. v. Paymaster Corp. , 
    962 F.2d 853
    , 856 (9th Cir. 1992).        But see Snider v.
    Circle K Corp. , 
    923 F.2d 1404
    , 1407 (10th Cir. 1991) (holding settlement
    agreements in Title VII cases are governed by federal common law because the
    agreements and the statute are “inextricably linked”). Colorado public and
    judicial policies favor voluntary agreements to settle legal disputes.      See
    Colorado Ins. Guar. Ass’n v. Harris      , 
    827 P.2d 1139
    , 1142 (Colo. 1992) (en
    banc); Davis v. Flatiron Materials Co.     , 
    511 P.2d 28
    , 32 (Colo. 1973) (en banc).
    However, a court may enforce a settlement agreement only if it constitutes an
    enforceable contract.    See H.W. Houston Constr. Co. v. District Ct.     , 
    632 P.2d 563
    , 565 (Colo. 1981) (en banc);     Recreational Dev. Co. of Am. v. American
    Constr. Co. , 
    749 P.2d 1002
    , 1005 (Colo. Ct. App. 1987).
    This is a contract formation case presenting the issue whether the
    Memorandum created an enforceable contract between the parties to settle this
    case or is merely an agreement to agree. As the district court held, our task is to
    -11-
    appraise the Memorandum to determine: (1) if the parties intended it to be a
    binding contract; and (2) if its terms are specific enough to constitute a contract.
    See New York Life , 
    80 F.3d at 409
     (applying Colorado law).
    A. Intent of the Parties
    In the case of a writing, courts must look primarily to the face of the
    writing itself to determine the parties’ intent.    See New York Life , 
    80 F.3d at
    409-
    11. A written document reflects the parties’ intent to contract when it identifies
    the consideration for which the parties bargained and contains their signatures.
    See Pierce v. St. Vrain Valley Sch. Dist.     , 
    981 P.2d 600
    , 603 (Colo. 1999) (en
    banc) (noting the written settlement agreement satisfied the basic elements of
    contract formation when it identified the consideration for which the parties
    bargained and contained the parties’ signatures). In contrast, a written document
    is characterized as an agreement to agree when the parties were “only settling the
    terms of an agreement into which they formally proposed to enter after all its
    particulars had been adjusted, and by which alone they intended to be bound.”
    Pierce v. Marland Oil Co. , 
    278 P. 804
    , 806 (Colo. 1929). However, an intention
    to reduce an agreement to a more formal writing “‘is not of itself sufficient to
    show that the parties intended that until such formal writing was executed the ...
    informal contract should be without binding force.’”       I.M.A. , 713 P.2d at 888
    -12-
    (quoting Coulter v. Anderson , 
    357 P.2d 76
    , 80 (Colo. 1960)). “Whether or not
    the parties have completed their negotiations, or whether they designed that their
    agreement should be expressed in a formal written contract, is always dependent
    upon the circumstances of the particular case.”         Marland Oil , 278 P. at 806.
    Upon consideration of the Memorandum’s language and the circumstances
    of this case, the district court concluded the parties intended to enter a binding
    contract, the “purpose of the [Memorandum] is to settle this case,” and the
    Memorandum does not constitute an agreement to agree. We hold the district
    court did not abuse its discretion in reaching these conclusions, because there is a
    rational basis in the evidence for the ruling.      See Wang , 
    919 F.2d at 130
    .
    First, the Memorandum identifies nine terms as the consideration for which
    the parties bargained, and it clearly states “the parties have reached agreement”
    on them. See St. Vrain Valley Sch. Dist. RE-1J          , 981 P.2d at 603. Second, the
    Memorandum explicitly states Messrs. Duncan and Sasabe “have the authority to
    settle” this lawsuit, and they both signed the Memorandum. This indicates their
    mutual assent to the nine terms listed.     See id. 5
    5
    These two reasons remove this case from the agreement to agree paradigm,
    which usually involves: (1) correspondence, (2) written and signed by only one of the
    parties, and (3) containing open terms. See New York Life, 
    80 F.3d at 409
    ; Marland Oil,
    278 P. at 805-06. For example, in New York Life, this court held a letter regarding the
    -13-
    Third, the statements in the Memorandum indicating the parties “have
    agreed in principle to settle” this case and intend to prepare and execute a more
    formal writing in the form of a “final settlement agreement” does not prevent the
    Memorandum from having binding force without some other indication the
    parties did not intend it to have such force.          See I.M.A. , 713 P.2d at 888. There is
    no such other indication. To the contrary, the Memorandum explicitly states
    “[t]he parties intend this Memorandum to be a binding, legally enforceable
    agreement.” We must abide by this statement of intent.             See id. ; Marland Oil ,
    278 P. at 806. Finally, the district court’s conclusion was informed by the
    circumstances before it, specifically: (1) the December 1997 London meetings
    were pursuant to an agreement between the parties to attempt to settle this case,
    and (2) defendants began performance by depositing settlement funds into escrow
    as required by the Memorandum.        See Order dated May 18, 1999, at 1-3 (holding
    this evidenced an intent to be bound by the Memorandum). We will not
    substitute our judgment for that of the district court under the abuse of discretion
    standard of review, see Florida v. Kerr-McGee Corp., (In re Coordinated
    Pretrial Proc.) , 
    669 F.2d 620
    , 623 (10th Cir. 1982), especially when the district
    sale of corporate notes constituted an unenforceable agreement to agree. See New York
    Life, 
    80 F.3d at 410-11
    . Specifically, the letter left open the interest rate and maturity
    date of the notes (i.e., “__% Senior Note(s) due __”), and was phrased in the future
    subjunctive (i.e., it stated the sale of the notes remained subject to approval by one of the
    parties). See 
    id. at 411
    . In this case, none of these problems exists.
    -14-
    court’s familiarity with the parties and their efforts to settle this case is based on
    over seven years of supervising this lawsuit.     See Order dated May 18, 1999, at 1.
    B. Specificity of the Memorandum’s Terms
    The Memorandum must be “definite” in its essential terms to be an
    enforceable contract.   See New York Life , 
    80 F.3d at 409
    . The Colorado Supreme
    Court explained:
    A contract is an agreement ‘to do or not to do a particular thing.’
    If essentials are unsettled, and no method of settlement is
    agreed upon, there is no contract.
    ....
    If the writing leaves the agreement of the parties vague and
    indefinite as to an essential element thereof, it is no contract and
    cannot be made one by parol.
    If subject matter and consideration be not clearly defined, a
    contract is void for indefiniteness ....
    Greater Serv. Homebuilders’ Inv. Ass’n v. Albright      , 
    293 P. 345
    , 348-49 (Colo.
    1930) (en banc) (quotation marks and citations omitted).      6
    Essential terms are
    6
    These rules are distinguishable from those applicable to contract interpretation
    cases. See I.M.A., 713 P.2d at 888 & n.6. A contract interpretation case is predicated on
    the existence of an established contract, and, where a written contract is at issue, focuses
    on whether there exists any ambiguity in its terms. See Ad Two, Inc. v. City & County of
    Denver, 
    9 P.3d 373
    , 376 (Colo. 2000) (en banc) (“Written contracts that are complete
    and free from ambiguity will be found to express the intention of the parties and will be
    enforced according to the their plain language.... Terms used in a contract are ambiguous
    when they are susceptible to more than one reasonable interpretation.”). The question in
    -15-
    “determined from the intention of the parties as disclosed upon consideration of
    all surrounding facts and circumstances there prevailing.”        American Mining Co.
    v. Himrod-Kimball Mines Co. , 
    235 P.2d 804
    , 807 (Colo. 1951) (en banc).
    In this case, the Memorandum’s nine terms are settled and definite in that
    none are left open, none are inherently contradictory, and each addresses a unique
    subject matter.   See Greater Serv. Homebuilders’ Inv.       , 293 P. at 348-49. Even
    so, to the extent a dispute arises regarding one of the nine terms, the
    Memorandum provides a method of settlement in that such disputes will be
    referred to Messrs. Duncan and Sasabe for resolution.         See id. at 348 (stating an
    unsettled essential term is of itself insufficient to find there is no contract; the
    writing must also lack a method of settlement).
    Plaintiffs focus on the district court’s recitation of two different potential
    meanings to the “[f]uture technology issues” term as proof this term is indefinite.
    We disagree with this argument and believe plaintiffs are confusing definiteness,
    a contract formation question, with ambiguity, a contract interpretation question.
    this case is whether a contract was formed, so any potential ambiguity in one of the
    Memorandum’s terms is immaterial to our resolution of this appeal. See Greater Serv.
    Homebuilders’ Inv. Ass’n, 293 P. at 349. Rather, we are concerned with whether any of
    the Memorandum’s terms are indefinite, and, if so, whether the indefinite term is
    essential. See id. at 348-49.
    -16-
    See supra note 6. The Colorado Supreme Court has drawn a distinction between
    indefiniteness and ambiguity as to a term, specifically holding parol evidence
    cannot cure the former but can explain the latter.    See Greater Serv.
    Homebuilders’ Inv. , 293 P. at 348-49. Therefore, a term’s susceptibility to more
    than one reasonable interpretation simply means it is ambiguous,       see Ad Two , 9
    P.3d at 376, which does not prevent the formation of an enforceable contract.
    See Greater Serv. Homebuilders’ Inv.     , 293 P. at 348-49. In this case, the parties
    reached agreement as to “[f]uture technology issues,” and should be required to
    perform accordingly.   7
    7
    We note the affidavits of Messrs. Duncan and Sasabe on the meaning of the
    term and their intent in including it in the Memorandum are not necessarily different or
    inconsistent. In pertinent part, Mr. Duncan’s affidavit states “[t]he term was intended to
    address what [plaintiffs’] technology the [defendants] could use, if any, what amount of
    compensation [defendants] would pay for any future use, and how [defendants’] use or
    nonuse of [plaintiffs’] technology would be policed.” Mr. Sasabe’s affidavit states
    defendants were “not intending to use any technology obtained either through the
    [former] employees [of plaintiffs] or other discovery information. Mr. Duncan suggested
    that a committee could meet and discuss this issue. I agreed to that suggestion. On the
    morning of December 11, 1997, we confirmed this agreement. Paragraph 3 of the
    [Memorandum] is a reference to this agreement. We did not discuss paragraph 3 as a
    way to calculate future royalties. All payment of money was covered by [two other terms
    in the Memorandum].” Nonetheless, should either party subsequently question the
    “[f]uture technology” term’s meaning, we note the issue whether a term is ambiguous is a
    question of law, while the interpretation of an ambiguous term is a question of fact to be
    resolved by the district court after an evidentiary hearing. See Republic Res. Corp. v. ISI
    Petroleum West Caddo Drilling Program 1981, 
    836 F.2d 462
    , 465-66 (10th Cir. 1987)
    (holding the issue whether a contract term is ambiguous is a question of law, but the
    interpretation of an ambiguous contract is a question of fact); Chicano Police Officer’s
    Ass’n v. Stover, 
    624 F.2d 127
    , 131-32 (10th Cir. 1980) (requiring the district court to
    conduct an evidentiary hearing to address the ambiguity concerning the intended scope
    of a payment term in an established settlement agreement); Pepcol Mfg. Co. v. Denver
    -17-
    Plaintiffs also argue this court should impose a “no reasonable doubt” from
    the face of the Memorandum standard, as identified in Mestas v. Martini, 
    155 P.2d 161
    , 166-67 (Colo. 1944) (en banc), to determine whether the “[f]uture
    technology issues” term is indefinite. Although Mestas is factually
    distinguishable in that it addressed the rules surrounding an action for “the
    specific performance of a parol contract for the sale of land,” Mestas, 155 P.2d at
    164, application of this standard would not change the result in this case. Even
    assuming for purposes of argument the “[f]uture technology issues” term is
    indefinite under this standard, we hold the district court did not abuse its
    discretion in concluding this term is not essential.
    We have already upheld the district court’s conclusion the Memorandum
    was intended by the parties to be a binding agreement to settle this case. The
    essential elements of an agreement to settle a case are a manifestation of
    agreement (an offer and acceptance) on payment, release, and case dismissal
    terms (the consideration) between parties who have the capacity and authority to
    agree. See Worthy v. McKesson Corp. , 
    756 F.2d 1370
    , 1373 (8th Cir. 1985)
    (holding the parties’ agreement on defendant’s payment of a sum certain in
    Union Corp., 
    687 P.2d 1310
    , 1314 (Colo. 1984) (en banc) (“Whether an ambiguity exists
    is also a question of law.... Once a contract is determined to be ambiguous, the meaning
    of its terms is generally an issue of fact to be determined in the same manner as other
    disputed factual issues.”) (quotation marks and citation omitted).
    -18-
    exchange for plaintiff’s general release of all claims and dismissal of the lawsuit
    constituted an enforceable settlement contract);     Citywide Bank of Denver v.
    Herman , 
    978 F. Supp. 966
    , 977 (D. Colo. 1997) (“The essential elements of a
    settlement agreement are a definitive offer and acceptance, consideration and
    parties who have the capacity and authority to agree.”) (quotation marks and
    citation omitted).
    Upon consideration of the surrounding facts and circumstances, the district
    court concluded seven of the Memorandum’s terms – not including the “[f]uture
    technologies” term – met these essential elements.      See supra Part II. There is a
    rational basis in the evidence for this ruling. First, the Memorandum and the
    parties’ signatures reflects their manifestation of agreement to settle this case.
    Second, regarding consideration, the seven terms identified by the district court
    provide for the payment of money in exchange for the execution of mutual,
    general releases and dismissal of the case, including all counterclaims. Third, in
    the Memorandum, Messrs. Duncan and Sasabe state they have the authority to
    sign for the plaintiffs and defendants, respectively, they reached agreement on the
    terms listed, and they intended it to be a binding, legally enforceable agreement.
    We simply will not derail a settlement agreement expressly resolving payment,
    release, and dismissal terms because of alleged disputes over additional terms.
    -19-
    See Sheng v. Starkey Lab., Inc.     , 
    117 F.3d 1081
    , 1083 (8th Cir. 1997) (“The fact
    that the parties left some details for counsel to work out during later negotiations
    cannot be used to abrogate an otherwise valid agreement.”).
    Finally, we note some language in plaintiffs’ briefs indicating their belief
    the district court’s ruling means defendants need only perform the essential terms
    of the Memorandum. This is incorrect. “Parties to a contract ... may agree on
    whatever terms they see fit so long as such terms do not violate statutory
    prohibitions or public policy.”     Fox v. I-10, Ltd. , 
    957 P.2d 1018
    , 1022 (Colo.
    1998) (en banc). Neither party claims the Memorandum’s nine specifically
    enumerated terms violate any Colorado statute or public policy, which means
    courts must respect their decision to settle on these terms.   See 
    id.
     Accordingly,
    the parties must perform each of the Memorandum’s nine terms.         See generally
    St. Vrain Valley Sch. Dist. RE-1J     , 981 P.2d at 603-607 (enforcing the
    confidentiality provisions of a settlement agreement after holding they did not
    violate the First Amendment or Colorado public policy).
    VI. Conclusion
    We AFFIRM the district court’s May 18, 1999 Order concluding the
    -20-
    Memorandum constitutes an enforceable settlement agreement under Colorado
    law.
    Entered by the Court:
    WADE BRORBY
    United States Circuit Judge
    -21-
    

Document Info

Docket Number: 99-1272

Citation Numbers: 4 F. App'x 676

Judges: Brorby, Kelly, McKAY

Filed Date: 2/16/2001

Precedential Status: Non-Precedential

Modified Date: 8/3/2023

Authorities (19)

United States v. McCall , 235 F.3d 1211 ( 2000 )

Frances Snider, Plaintiff-Appellee/cross-Appellant v. ... , 923 F.2d 1404 ( 1991 )

Francis S.L. Wang v. Paul Hsu C v. Chen Kwan Tao Li Lee and ... , 919 F.2d 130 ( 1990 )

Heuser v. Kephart , 215 F.3d 1186 ( 2000 )

valley-national-bank-a-banking-corporation-v-james-abdnor-in-his , 918 F.2d 128 ( 1990 )

L. Joseph Albright v. Unum Life Insurance Company of ... , 59 F.3d 1089 ( 1995 )

Morris G. WORTHY, Appellant, v. McKesson CORPORATION D/B/A ... , 756 F.2d 1370 ( 1985 )

New York Life Insurance v. K N Energy, Inc. , 80 F.3d 405 ( 1996 )

The Gates Rubber Co. v. Bando Chemical Industries, Ltd. , 9 F.3d 823 ( 1993 )

23-fair-emplpraccas-151-23-empl-prac-dec-p-31036-chicano-police , 624 F.2d 127 ( 1980 )

in-re-coordinated-pretrial-proceedings-in-petroleum-products-antitrust , 669 F.2d 620 ( 1982 )

burlington-northern-railroad-company-v-mary-huddleston-in-her-capacity-as , 94 F.3d 1413 ( 1996 )

republic-resources-corporation-an-oklahoma-corporation-v-isi-petroleum , 836 F.2d 462 ( 1987 )

dh-marketers-inc-an-oklahoma-corporation-joe-lee-investors-a , 744 F.2d 1443 ( 1984 )

Beihua Sheng, Appellant/cross-Appellee v. Starkey ... , 117 F.3d 1081 ( 1997 )

Catlin v. United States , 65 S. Ct. 631 ( 1945 )

united-commercial-insurance-service-incorporated-dba-united-checkwriter , 962 F.2d 853 ( 1992 )

Citywide Bank of Denver v. Herman , 978 F. Supp. 966 ( 1997 )

Gates Rubber Co. v. Bando Chemical Industries, Ltd. , 855 F. Supp. 330 ( 1994 )

View All Authorities »