Black Warrior Riverkeeper, Inc. v. Black Warrior Minerals, Inc. , 734 F.3d 1297 ( 2013 )


Menu:
  •                 Case: 12-15409       Date Filed: 11/13/2013       Page: 1 of 19
    [PUBLISH]
    IN THE UNITED STATES COURT OF APPEALS
    FOR THE ELEVENTH CIRCUIT
    ________________________
    No. 12-15409
    ________________________
    D.C. Docket No. 7:11-cv-03307-SLB
    BLACK WARRIOR RIVERKEEPER, INC.,
    FRIENDS OF HURRICANE CREEK,
    NELSON BROOKE,
    JOHN WATHEN,
    Plaintiffs - Appellants,
    versus
    BLACK WARRIOR MINERALS, INC.,
    Defendant - Appellee.
    ________________________
    Appeal from the United States District Court
    for the Northern District of Alabama
    ________________________
    (November 13, 2013)
    Before PRYOR, ANDERSON, Circuit Judges, and RESTANI, ∗ Judge.
    PRYOR, Circuit Judge:
    ∗
    Honorable Jane A. Restani, Judge for the United States Court of International Trade, sitting by
    designation.
    Case: 12-15409      Date Filed: 11/13/2013    Page: 2 of 19
    This appeal presents the issue whether an exception can swallow the general
    rule about the limited role of citizen suits under the Clean Water Act: that is,
    whether a citizen can evade the requirements of notice and a 60-day waiting
    period, 33 U.S.C. § 1365(b), by suing a discharger of pollutants for violations of
    the “new source” standards of the Act, 
    id. § 1316,
    instead of violations of that
    discharger’s state-issued permit, even when that permit incorporates those
    standards. Congress has provided citizens a limited role in the enforcement of the
    Act, and ordinarily a citizen must provide notice of alleged violations to a
    discharger and federal and state authorities and wait 60 days before filing suit
    against a discharger. The 60-day waiting period serves as a “mandatory condition
    precedent to the filing of a citizen suit under the Clean Water Act.” Nat’l Envtl.
    Found. v. ABC Rail Corp., 
    926 F.2d 1096
    , 1097 (11th Cir. 1991). If a federal or
    state authority files suit to remedy the alleged violations before a citizen files suit,
    the Act bars a citizen from filing suit, 33 U.S.C. § 1365(b), because Congress
    intended for citizen suits “to supplement rather than to supplant governmental
    action,” Gwaltney of Smithfield, Ltd. v. Chesapeake Bay Found., Inc., 
    484 U.S. 49
    , 60, 
    108 S. Ct. 376
    , 383 (1987). But the Act provides an exception to this
    general rule when a citizen complains about at least some violations of new source
    performance standards. See 33 U.S.C. § 1365(b). The wrinkle in this appeal
    concerns whether that exception applies when a discharger has a permit that
    2
    Case: 12-15409     Date Filed: 11/13/2013    Page: 3 of 19
    incorporates the standards for new sources, but a citizen refrains from alleging any
    violation of that permit. We have described the national permitting system as the
    “centerpiece” of the Clean Water Act, Friends of the Everglades v. S. Fla. Water
    Mgmt. Dist., 
    570 F.3d 1210
    , 1225 (11th Cir. 2009), and the Supreme Court has
    explained that a citizen suit against a permit holder “will necessarily” be for
    violations of a permit, EPA v. Cal. ex rel. State Water Res. Control Bd., 
    426 U.S. 200
    , 223, 
    96 S. Ct. 2022
    , 2033 (1976). A citizen suit that alleges that a discharger
    violated its permit is subject to the general rule of notice and a 60-day waiting
    period.
    Several citizens of Alabama—Black Warrior Riverkeeper, Inc., Friends of
    Hurricane Creek, John Wathen, and Nelson Brooke—sued Black Warrior
    Minerals, Inc., which operates a coal mine in Alabama, for violations of the new
    source performance standards, but the citizens refrained from alleging that Black
    Warrior Minerals had violated its permit. The citizens filed their suit before the
    60-day waiting period expired. Alabama later sued Black Warrior Minerals for the
    violations of its permit. In the citizens’ suit, the district court granted summary
    judgment in favor of Black Warrior Minerals. Because the Act requires a citizen
    who sues a permit holder to sue for a violation of that permit and wait 60 days after
    giving notice of that violation before filing suit, we affirm.
    I. BACKGROUND
    3
    Case: 12-15409    Date Filed: 11/13/2013   Page: 4 of 19
    With the approval of the Environmental Protection Agency, the Alabama
    Department of Environmental Management administers a program that issues
    permits for dischargers of pollutants, as part of the National Pollutant Discharge
    Elimination System, under the Clean Water Act. Approval of Alabama’s NPDES
    Program, 44 Fed. Reg. 61,452 (Oct. 25, 1979). The Department issues permits that
    satisfy the new source performance standards promulgated by the Environmental
    Protection Agency under the Act. Ala. Admin. Code r. 335-6-6-.14(3)(a); see 33
    U.S.C. § 1342(b) (Oct. 9, 1985). In 2008, the Department issued Black Warrior
    Minerals permit No. AL0071358 for its Fleetwood coal mine to discharge into
    Hurricane Creek and an unnamed tributary to that creek. The permit incorporates
    the performance standards for “new source coal mines” and requires Black Warrior
    Minerals to submit monitoring reports to the Department on a quarterly basis that
    are available for inspection by the public on the website of the Department. See
    Coal Mining Point Source Category; Effluent Limitations Guidelines & New
    Source Performance Standards, 50 Fed. Reg. 41,296-01 (Oct. 9, 1985).
    On September 2, 2011, several citizens—Black Warrior Riverkeeper, Inc.,
    Friends of Hurricane Creek, John Wathen, and Nelson Brooke—served Black
    Warrior Minerals and federal and state authorities with notice of alleged violations
    of the Clean Water Act and other statutes. The notice listed violations of both the
    new source performance standards and the permit for the Fleetwood mine. The
    4
    Case: 12-15409     Date Filed: 11/13/2013    Page: 5 of 19
    allegations about the violations of the new source performance standards and the
    violations of the permit were identical, except where the conditions of the permit
    were more stringent than the new source performance standards.
    Eleven days after the citizens provided Black Warrior Minerals and the
    federal and state authorities with notice of the alleged violations, they filed a
    citizen suit against Black Warrior Minerals. The complaint alleged violations of
    only the new source performance standards. See 33 U.S.C. § 1316. The complaint
    made no mention of any violation of the permit that regulated Fleetwood mine.
    Black Warrior Minerals moved to dismiss the complaint because the citizens had
    failed to wait 60 days after providing notice of the alleged violations, 
    id. § 1365(b),
    and because the citizens had failed to allege a violation of the permit issued to
    Black Warrior Minerals for the Fleetwood mine.
    The district court granted summary judgment in favor of Black Warrior
    Minerals on the ground that the liability of a discharger that holds a permit must be
    determined in the light of the conditions of its permit. The district court relied on
    EPA v. California ex rel. State Water Resources Control Board, for the proposition
    that “a suit against a permit holder will necessarily be brought under the definition
    [found in section 1365(f)(6) for violations of a discharger’s 
    permit].” 426 U.S. at 223
    , 96 S. Ct. at 2033. Because the permit controls the discharger’s liability, the
    district court held that the “plaintiffs cannot proceed under the exception to
    5
    Case: 12-15409     Date Filed: 11/13/2013    Page: 6 of 19
    § 1365(b) for violations of [the new source performance standards] when the
    discharger has a [state-issued] permit.” The district court then concluded that the
    failure of the citizens to comply with the 60-day waiting period barred their
    complaint. After the citizens filed their suit based on violations of the new source
    performance standards, the Department sued Black Warrior Minerals in an
    Alabama court based on violations of its permit.
    II. STANDARD OF REVIEW
    We review the “grant of summary judgment de novo, applying the same
    legal standards as the district court.” Sierra Club, Inc. v. Leavitt, 
    488 F.3d 904
    ,
    911 (11th Cir. 2007). We review questions of “pure statutory interpretation” de
    novo. Burlison v. McDonald’s Corp., 
    455 F.3d 1242
    , 1245 (11th Cir. 2006).
    III. DISCUSSION
    Whether a citizen may evade the 60-day waiting period and sue a permit
    holder for violations of the new source performance standards when those
    standards are incorporated in the permit is an issue of first impression before this
    Court. The citizens argue that the plain language of the citizen suit provision, 33
    U.S.C. § 1365, allows them to elect to sue a permit holder for violations of the new
    source performance standards, for violations of the permit conditions, or for both
    kinds of violations, see 
    id. § 1365(f)(3),
    (f)(6). Black Warrior Minerals responds
    that a permit defines a discharger’s obligations under the Clean Water Act, and a
    6
    Case: 12-15409     Date Filed: 11/13/2013    Page: 7 of 19
    citizen must sue a permit holder for violations of the conditions of the permit. See
    
    id. § 1365(f)(6).
    We agree with Black Warrior Minerals. When read in the context of the
    entire Clean Water Act, the citizen suit provision requires a citizen to sue a permit
    holder for violations of its permit if the permit covers the alleged effluent
    discharges. In this circumstance, a citizen complainant cannot evade the 60-day
    waiting period.
    The National Pollutant Discharge Elimination System provides the primary
    means of enforcing the effluent limitations of the Clean Water Act, and every
    discharger of pollutants must obtain a permit as part of that system. EPA v. Nat’l
    Crushed Stone Ass’n, 
    449 U.S. 64
    , 71, 
    101 S. Ct. 295
    , 301 (1980); State Water
    Res. Control 
    Bd., 426 U.S. at 205
    , 96 S. Ct. at 2025. The Act empowers the
    Administrator of the Environmental Protection Agency either to issue permits or to
    approve a permit program established by a state so long as the program conforms
    to federal guidelines. 33 U.S.C. § 1342(a)(1), (b). All permits, whether issued
    directly by the Administrator or through a state system, must meet all “applicable
    requirements of sections 1311, 1312, 1316, 1317, [1318,] and 1343.” 
    Id. § 1342(b)(1)(A),
    (b)(2); see 
    id. § 1343(a)(3)
    (“The permit program of the
    Administrator under paragraph (1) of this subsection, and permits issued
    thereunder, shall be subject to the same terms, conditions, and requirements as
    7
    Case: 12-15409     Date Filed: 11/13/2013     Page: 8 of 19
    apply to a State permit program and permits issued thereunder under subsection (b)
    of this section.”). Permits “serve[] to transform generally applicable effluent
    limitations and other standards . . . into the obligations . . . of the individual
    discharger.” State Water Res. Control 
    Bd., 426 U.S. at 205
    , 96 S. Ct. at 2025.
    “[Section 1342] itself does not mandate either the Administrator or the States to
    use permits as the method of prescribing effluent limitations,” E.I. du Pont de
    Nemours & Co. v. Train, 
    430 U.S. 112
    , 120, 
    97 S. Ct. 965
    , 971 (1977) (emphasis
    added), but the Act provides that “[c]ompliance with a permit issued pursuant to
    [section 1342] shall be deemed compliance, for purposes of sections 1319 and
    1365 of this title, with sections 1311, 1312, 1316, 1317, and 1343 of this title,
    except any standard imposed under section 1317 of this title for a toxic pollutant
    injurious to human health.” 33 U.S.C. § 1342(k). Because compliance with a
    permit affords dischargers an “absolute defense” to most enforcement actions
    under the Clean Water Act, Inland Steel Co. v. EPA, 
    574 F.2d 367
    , 370 (7th Cir.
    1978), permit holders are not governed by intervening changes in regulations for
    the duration of their permits and need not relitigate whether their permits are strict
    enough, E.I. du Pont de Nemours & 
    Co., 430 U.S. at 138
    n.28, 97 S. Ct. at 980
    
    n.28.
    The Clean Water Act enables citizens to commence a civil action against
    “any person . . . who is alleged to be in violation of . . . an effluent standard or
    8
    Case: 12-15409     Date Filed: 11/13/2013    Page: 9 of 19
    limitation under this chapter.” 33 U.S.C. § 1365(a)(1). For citizen suits, the Act
    defines “effluent standard or limitation” in the following seven ways:
    (1) effective July 1, 1973, an unlawful act under subsection (a) of
    section 1311 of this title; (2) an effluent limitation or other limitation
    under section 1311 or 1312 of this title; (3) standard of performance
    under section 1316 of this title; (4) prohibition, effluent standard or
    pretreatment standards under section 1317 of this title; (5)
    certification under section 1341 of this title; (6) a permit or condition
    thereof issued under section 1342 of this title, which is in effect under
    this chapter (including a requirement applicable by reason of section
    1323 of this title); or (7) a regulation under section 1345(d) of this
    title.
    
    Id. § 1365(f).
    For our purposes, the most relevant subsections are subsection (3),
    which concerns the new source performance standards, and subsection (6), which
    concerns conditions of a permit.
    Although the Act provides for citizen suits, it erects two hurdles for citizens
    to overcome before they commence a civil action against a discharger. First, a
    citizen must provide notice of the alleged violation to the discharger and federal
    and state authorities and then wait 60 days before filing suit:
    No action may be commenced—
    (1) under subsection (a)(1) of this section—
    (A) prior to sixty days after the plaintiff has given notice
    of the alleged violation (i) to the Administrator, (ii) to the
    State in which the alleged violation occurs, and (iii) to
    any alleged violator of the standard, limitation, or order[.]
    9
    Case: 12-15409     Date Filed: 11/13/2013    Page: 10 of 19
    
    Id. § 1365(b).
    Second, the Act bars a citizen from filing suit against a discharger if
    a federal or state authority sues the discharger first, although the citizen may
    intervene in that suit:
    No action may be commenced . . . if the Administrator or State has
    commenced and is diligently prosecuting a civil or criminal action in a
    court of the United States, or a State to require compliance with the
    standard, limitation, or order, but in any such action in a court of the
    United States any citizen may intervene as a matter of right.
    
    Id. “[T]he purpose
    of § 1365(b) is to give the alleged violator an opportunity to
    bring itself into compliance with the Act, and thus make the citizen suit
    unnecessary[,]” and “to effectuate Congress’s preference that the Act be enforced
    by governmental prosecution.” ABC Rail 
    Corp., 926 F.2d at 1099
    .
    Congress created two exceptions to the 60-day waiting period for citizen
    suits against a discharger for violations of the new source performance standards
    and for citizen suits against the Administrator for failure to establish a list of toxic
    pollutants and effluent limitations:
    No action may be commenced . . . prior to sixty days after the plaintiff
    has given notice of the alleged violation . . . except that such action
    may be brought immediately after such notification in the case of an
    action under this section respecting a violation of sections 1316 and
    1317(a) of this title.
    33 U.S.C. § 1365(b); see also ABC Rail 
    Corp., 926 F.2d at 1098
    . But Congress
    provided no exception to the 60-day waiting period for citizen suits about
    violations of permit conditions. See 33 U.S.C. § 1365(f)(6).
    10
    Case: 12-15409      Date Filed: 11/13/2013    Page: 11 of 19
    Because statutory construction is a “holistic endeavor,” United Sav. Ass’n of
    Tex. v. Timbers of Inwood Forest Assocs., Ltd., 
    484 U.S. 365
    , 371, 
    108 S. Ct. 626
    ,
    630 (1988), we must interpret the citizen suit provision in the context of the entire
    Act to determine whether a citizen may avoid the 60-day waiting period by suing a
    permit holder for violations of the new source performance standards when those
    standards are incorporated into the permit. See Wachovia Bank, N.A. v. United
    States, 
    455 F.3d 1261
    , 1266–67 (11th Cir. 2006); In re Int’l Admin. Servs., Inc.,
    
    408 F.3d 689
    , 707 n.7 (11th Cir. 2005); United States v. Rigel Ships Agencies,
    Inc., 
    432 F.3d 1282
    , 1288 (11th Cir. 2005) (“In any question of statutory
    interpretation, ‘[w]e do not look at one word or term in isolation, but instead we
    look to the entire statutory context.’” (quoting United States v. DBB, Inc., 
    180 F.3d 1277
    , 1281 (11th Cir. 1999) (alteration in original))). The Supreme Court has
    instructed that the “fundamental canon of statutory construction [is] that the words
    of a statute must be read in their context and with a view to their place in the
    overall statutory scheme” and that a court should “fit, if possible, all parts into a
    harmonious whole.” FDA v. Brown & Williamson Tobacco Corp., 
    529 U.S. 120
    ,
    132–33, 
    120 S. Ct. 1291
    , 1301 (2000) (internal quotation marks omitted). As Sir
    Edward Coke explained, “If any section [of a law] be intricate, obscure, or
    doubtful, the proper mode of discovering its true meaning is by comparing it with
    the other sections, and finding out the sense of one clause by the words or obvious
    11
    Case: 12-15409     Date Filed: 11/13/2013    Page: 12 of 19
    intent of the other.” Antonin Scalia & Bryan A. Garner, Reading Law: The
    Interpretation of Legal Texts 167 (2012) (alteration in original) (quoting 1 Edward
    Coke, The First Part of the Institutes of the Laws of England, or a Commentary
    upon Littleton § 728, at 381a (14th ed. 1791) (1628)).
    A related principle of statutory interpretation is that a court should also
    avoid interpreting a provision in a way that would render other provisions of the
    statute superfluous. See, e.g., Circuit City Stores, Inc. v. Adams, 
    532 U.S. 105
    ,
    114–15, 
    121 S. Ct. 1302
    , 1308–09 (2001); Lowe v. SEC, 
    472 U.S. 181
    , 208 n.53,
    
    105 S. Ct. 2557
    , 2572 n.53 (1985) (“[W]e must give effect to every word that
    Congress used in the statute.”). If two possible meanings exist for a provision, we
    should interpret the statute in a manner that gives all provisions independent
    operation. See Scalia & 
    Garner, supra
    , 176. Yet, if the text surrounding the
    provisions could lend support for two independent meanings, but that interpretation
    would lead to a strained reading of at least one provision, we need not force
    independent meanings. See Gutierrez v. Ada, 
    528 U.S. 250
    , 254–55, 
    120 S. Ct. 740
    , 744 (2000).
    Standing alone, the citizen suit provision, 33 U.S.C. § 1365, “is not a
    provision of which Congress’ limpid prose puts an end to all dispute,” see
    
    Gwaltney, 484 U.S. at 57
    , 108 S. Ct. at 381, about whether a citizen may proceed
    against a permit-holding discharger for violations of the new source performance
    12
    Case: 12-15409   Date Filed: 11/13/2013   Page: 13 of 19
    standards, 33 U.S.C. § 1316. The provision exempts a citizen from the 60-day
    waiting period for suits based on violations of the new source performance
    standards, but it does not exempt suits based on violations of permit conditions. 
    Id. § 1365(b).
    The section defining an “effluent standard or limitation,” 
    id. § 1365(f),
    provides seven alternative definitions, including both a “standard of performance
    under section 1316” and “a permit or condition thereof issued under section 1342,”
    
    id. § 1365(f)(3),
    (6). The citizen suit provision does not delineate whether a citizen
    may file a suit for violations of the new source performance standards when the
    discharger holds a permit that incorporates those standards. See 
    id. § 1342.
    But
    section 1365(b) does prefer governmental enforcement of permit conditions to
    citizen suits.
    When we read sections 1365 and 1342 together, the correct reading of the
    Act becomes clear. Section 1342 establishes that the permitting scheme controls
    the vast majority of enforcement proceedings against a permit holder. Section
    1342(k) affords an absolute defense to a permit holder that complies with the
    conditions of its permit against citizen suits based on violations of sections 1311,
    1312, 1316, 1317, and 1343. This absolute defense evidences the central role of
    the permitting system under the Act. See Inland Steel 
    Co., 574 F.2d at 370
    –71,
    373 (“The entire function of paragraph (k), as we read it, is to qualify the
    enforcement rights and authority granted by [the citizen suit provision] of the Act
    13
    Case: 12-15409     Date Filed: 11/13/2013   Page: 14 of 19
    . . . .”). And permits, whether issued by the Administrator directly or by an
    approved state program, must incorporate all of the new source performance
    standards. 33 U.S.C. § 1342(a), (b); State Water Res. Control 
    Bd., 426 U.S. at 224
    n.38, 96 S. Ct. at 2033
    –34 n.38. “Thus, the principle means of enforcing the
    pollution control and abatement provision of the [Clean Water Act] is to enforce
    compliance with a permit” because a permit is tailored to the specific discharger.
    See id. at 
    223, 96 S. Ct. at 2033
    .
    This citizen suit against a permit holder, if allowed, would disrupt the
    statutory scheme for the enforcement of permits. To allow a citizen to evade the
    60-day waiting period by suing a permit holder for alleged violations of the new
    source performance standards without regard to the conditions of the discharger’s
    permit would both undermine the overarching permitting scheme and nullify the
    statutory preference for governmental enforcement. The novel complaint filed in
    this case is a thinly veiled attempt to beat the State of Alabama to the courthouse.
    The Department has sued Black Warrior Minerals for violations of its permit, and
    the citizens are now barred from bringing suit based on those violations. See 33
    U.S.C. § 1365(b)(1)(B).
    The citizens argue that requiring a citizen to sue a permit holder based only
    on section 1365(f)(6), which governs violations of permits, renders section
    1365(f)(3) superfluous because the broad prohibition in section 1365(f)(1) covers
    14
    Case: 12-15409   Date Filed: 11/13/2013    Page: 15 of 19
    all non-permitted dischargers, but section 1365(f)(3) remains operative in at least
    two situations. First, a citizen may sue for violations of section 1316 when the
    alleged violator, although a permit holder, discharges pollutants that were not
    disclosed to the permit-issuing authority. Those discharges would not be
    contemplated by the permit and would not come within the absolute defense
    provided by section 1342(k). Cf. Piney Run Pres. Ass’n v. Cnty. Comm’rs of
    Carroll Cnty., Md., 
    268 F.3d 255
    , 269 (4th Cir. 2001) (stating that the permit shield
    not only protects against liability for compliance, but also prevents liability from
    attaching to “all discharges adequately disclosed to the permitting authority”).
    Second, a citizen may sue for violations of section 1316 when the discharger does
    not have a permit. In that case, the discharger would be subject to the otherwise
    governing new source performance standards. Our interpretation also does not
    render superfluous the definition contained in section 1365(f)(1), which allows
    citizens to sue for “an unlawful act under subsection (a) of section 1311,” because
    section 1316 applies only to new sources and section 1311(a) applies to all
    dischargers.
    The decision of the Supreme Court in State Water Resources Control Board
    confirms our interpretation of the citizen suit provision: citizen suits against
    permit holders must proceed under section 1365(f)(6) instead of under section
    1365(f)(3) when the discharges are covered by the permit. In that decision, the
    15
    Case: 12-15409     Date Filed: 11/13/2013    Page: 16 of 19
    Supreme Court explained in unequivocal terms that a citizen suit against a permit
    holder must be filed under section 1365(f)(6) and allege a violation of the
    discharger’s permit:
    Of the six subdivisions of [section 1365(f)] defining “effluent
    standard or limitation,” only [section 1365(f)(6)] refers to any of the
    standards or limitations as translated into the conditions of an NPDES
    permit. Thus, while [sections 1365(f)(2)–(4)] permit suits for
    violation of effluent standards or limitations promulgated under
    [sections 1311, 1312, 1316, and 1317], a suit against a permit holder
    will necessarily be brought under the definition in [section
    1365(f)(6)]; unless the plaintiff can show violation of the permit
    condition, violation of the [Act] cannot be established.
    426 U.S. at 
    223, 96 S. Ct. at 2033
    . Because Black Warrior Minerals is a permit
    holder, any suit against it for violations of the conditions of its permit must
    “necessarily be brought under” section 1365(f)(6). 
    Id. The parties
    dispute whether the above-quoted explanation of how a citizen
    suit against a permit holder must proceed under section 1365(f)(6) is part of the
    holding of that decision or only dicta. The holding of a decision includes both the
    result and “those portions of the opinion necessary to that result by which we are
    bound.” United States v. Kaley, 
    579 F.3d 1246
    , 1253 n.10 (11th Cir. 2009)
    (internal quotation marks omitted). Dicta, on the other hand, includes the portions
    of an opinion that are not necessary to deciding the case. 
    Id. Either way,
    the result
    is the same here.
    16
    Case: 12-15409     Date Filed: 11/13/2013   Page: 17 of 19
    We are persuaded that the relevant discussion is part of the holding. In State
    Water Resources Control Board, the Supreme Court reversed the decision of the
    Ninth Circuit that had incorrectly held that federal dischargers must obtain state-
    issued permits under the Clean Water 
    Act. 426 U.S. at 210
    –11, 96 S. Ct. at 2027–
    28. The Supreme Court rejected each of the grounds relied upon by the Ninth
    Circuit, and the dismantling of each ground was necessary to the result the Court
    reached. The discussion of the citizen suit provision arose in the context of
    refuting the assertion of the Ninth Circuit that the term “requirement” in section
    1365(f)(6) means “any permit or condition thereof” of a federal discharger
    imposed by a state. 
    Id. at 222–23,
    96 S. Ct. at 2033. The Ninth Circuit interpreted
    the term “requirement” in section 1365(f)(6) to mean something different from the
    terms “standard” and “limitation” in sections 1365(f)(2)–(4), which would
    arguably give independent support for a holding that federal dischargers must
    obtain a state-issued permit. The Supreme Court ruled that the correct meaning of
    the term “requirement” was any condition imposed, whether “from standards and
    limitations promulgated by the Administrator or from stricter standards established
    by the State.” 
    Id. at 224,
    96 S. Ct. at 2033. The Court explained that the “salient
    feature [of section 1365(f)(6)] is not distinguishing standards from requirements,
    but distinguishing standards and limitations, on the one hand, from the permit
    conditions embodying those standards on the other.” 
    Id. at 224
    n.38, 96 S. Ct. at
    17
    
                  Case: 12-15409     Date Filed: 11/13/2013    Page: 18 of 19
    2034 n.38. And, to make sense of these terms, the Supreme Court concluded that
    section 1365(f)(6) means that a suit against a permit holder must necessarily be for
    a violation of its permit.
    The citizens contend that a footnote in Parker v. Scrap Metal Processors,
    Inc., suggests that we have read this language as dicta, but we disagree. 
    386 F.3d 993
    , 1006–07 n.15 (11th Cir. 2004). In Parker, we concluded that the Act grants
    subject-matter jurisdiction over citizen suits for violations of state or federal
    standards incorporated into a permit. 
    Id. at 1019.
    We stated, “On this question,
    the Supreme Court, although in dicta, has appeared to say yes, suggesting that
    citizens can sue under § 1365 regardless of whether the suit is based on standards
    promulgated by the EPA, or more stringent state standards that have received EPA
    approval.” 
    Id. at 1007
    n.15 (citing State Water Res. Control 
    Bd., 426 U.S. at 224
    ,
    96 S. Ct. at 2022). We did not address the reasoning of the Supreme Court that a
    citizen suit against a permit holder must necessarily proceed under section
    1365(f)(6).
    But, even if the relevant portion of the opinion in State Water Resources
    Control Board is dicta, it is “well thought out, thoroughly reasoned, and carefully
    articulated analysis by the Supreme Court” and “is not something to be lightly cast
    aside.” See Schwab v. Crosby, 
    451 F.3d 1308
    , 1325 (11th Cir. 2006) (internal
    quotation marks omitted). As we have stated, “[T]here is dicta and then there is
    18
    Case: 12-15409     Date Filed: 11/13/2013    Page: 19 of 19
    dicta, and then there is Supreme Court dicta.” 
    Id. The Supreme
    Court carefully
    considered the structure and meaning of the definitions contained in section
    1365(f) of the citizen suit provision, and it concluded that suits against permit
    holders to enforce regulations incorporated into a permit must proceed under
    section 1365(f)(6).
    IV. CONCLUSION
    Because the citizens failed to wait the required 60 days before they filed suit
    against Black Warrior Minerals, we AFFIRM the summary judgment in favor of
    Black Warrior Minerals.
    AFFIRMED.
    19
    

Document Info

Docket Number: 12-15409

Citation Numbers: 734 F.3d 1297

Judges: Anderson, Pryor, Restani

Filed Date: 11/13/2013

Precedential Status: Precedential

Modified Date: 8/31/2023

Authorities (20)

IBT International, Inc. v. Northern (In Re International ... , 408 F.3d 689 ( 2005 )

United States v. Rigel Ships Agencies, Inc. , 432 F.3d 1282 ( 2005 )

Carolyn Burlison v. McDonald's Corporation , 455 F.3d 1242 ( 2006 )

Mark Dean Schwab v. James v. Crosby, Jr. , 451 F.3d 1308 ( 2006 )

National Environmental Foundation v. Abc Rail Corporation , 926 F.2d 1096 ( 1991 )

Wachovia Bank, N.A. Ex Rel. George C. Nunamann Trust v. ... , 455 F.3d 1261 ( 2006 )

Inland Steel Company v. Environmental Protection Agency , 574 F.2d 367 ( 1978 )

Sierra Club Inc. v. Michael O. Leavitt , 488 F.3d 904 ( 2007 )

Quebell P. Parker v. Scrap Metal Processors , 386 F.3d 993 ( 2004 )

United States v. Kaley , 579 F.3d 1246 ( 2009 )

the-piney-run-preservation-association-v-county-commissioners-of-carroll , 268 F.3d 255 ( 2001 )

Environmental Protection Agency v. National Crushed Stone ... , 101 S. Ct. 295 ( 1980 )

Environmental Protection Agency v. California Ex Rel. State ... , 96 S. Ct. 2022 ( 1976 )

E. I. Du Pont De Nemours & Co. v. Train , 97 S. Ct. 965 ( 1977 )

Lowe v. Securities & Exchange Commission , 105 S. Ct. 2557 ( 1985 )

Gwaltney of Smithfield, Ltd. v. Chesapeake Bay Foundation, ... , 108 S. Ct. 376 ( 1987 )

United Sav. Assn. of Tex. v. Timbers of Inwood Forest ... , 108 S. Ct. 626 ( 1988 )

Gutierrez v. Ada , 120 S. Ct. 740 ( 2000 )

Food & Drug Administration v. Brown & Williamson Tobacco ... , 120 S. Ct. 1291 ( 2000 )

Circuit City Stores, Inc. v. Adams , 121 S. Ct. 1302 ( 2001 )

View All Authorities »