Nextera Energy, Inc. v. United States , 893 F.3d 1353 ( 2018 )


Menu:
  •             Case: 17-12304    Date Filed: 06/28/2018   Page: 1 of 16
    [PUBLISH]
    IN THE UNITED STATES COURT OF APPEALS
    FOR THE ELEVENTH CIRCUIT
    ________________________
    No. 17-12304
    ________________________
    D.C. Docket No. 9:15-cv-80484-RLR
    NEXTERA ENERGY, INC.,
    and Affiliated Subsidiaries
    f.k.a. FPL Group, Inc.,
    FLORIDA POWER & LIGHT COMPANY,
    separately and as parent of Florida Power & Light Company
    and Affiliated Subsidiaries,
    Plaintiffs - Appellants,
    versus
    UNITED STATES OF AMERICA,
    Defendant - Appellee.
    ________________________
    Appeal from the United States District Court
    for the Southern District of Florida
    ________________________
    (June 28, 2018)
    Case: 17-12304       Date Filed: 06/28/2018      Page: 2 of 16
    Before MARTIN, JULIE CARNES, and GILMAN, ∗ Circuit Judges.
    MARTIN, Circuit Judge:
    Plaintiff NextEra Energy, Inc., and its subsidiaries Florida Power & Light
    Company and NextEra Energy Resources, LLC (collectively “NextEra”) operate
    five nuclear power plants. NextEra seeks a sizeable tax refund for net operating
    losses resulting from fees it paid to the Nuclear Waste Fund for the disposal of
    radioactive waste. The District Court denied NextEra’s claims and granted
    summary judgment in favor of the United States. After careful review, and with
    the benefit of oral argument, we affirm.
    I. BACKGROUND
    A.     THE FACTS
    NextEra operates two nuclear power plants in Florida and one each in Iowa,
    New Hampshire, and Wisconsin. All five plants are now in operation.
    Nuclear reactors are generally powered by hundreds of “fuel assemblies”
    that contain rods of enriched uranium. In the core of the reactor, these rods
    undergo a sustained nuclear fission reaction. This fission reaction produces heat,
    which creates steam to rotate turbines. The rotation of the turbines generates
    electricity. Over time, fuel assemblies become less efficient in producing energy,
    ∗
    Honorable Ronald Lee Gilman, United States Circuit Judge for the Sixth Circuit, sitting
    by designation.
    2
    Case: 17-12304        Date Filed: 06/28/2018      Page: 3 of 16
    so they need to be replaced. 1 Used fuel assemblies continue to emit dangerous
    radiation for thousands of years.
    Spent nuclear fuel can be stored on-site for years, but ultimately needs to be
    transferred to a permanent storage site. See Pac. Gas & Elec. Co. v. State Energy
    Res. Conservation & Dev. Comm’n, 
    461 U.S. 190
    , 195–96, 
    103 S. Ct. 1713
    , 1717–
    18 (1983) (detailing pileup of temporarily stored spent nuclear fuel and possibility
    that reactors will shut down due to lack of on-site storage space); New York v.
    Nuclear Regulatory Comm’n, 
    681 F.3d 471
    , 474 (D.C. Cir. 2012) (“[On-site]
    storage, optimistically labeled ‘temporary storage,’ has been used for decades
    longer than originally anticipated.”).
    B.     GOVERNING STATUTES AND REGULATIONS
    1.     Commissioning and Decommissioning a Nuclear Power Plant
    The Atomic Energy Act authorizes the Nuclear Regulatory Commission
    (“NRC”) to issue licenses for the operation of nuclear power plants. 42 U.S.C.
    § 2131. Those licensed to run nuclear power plants must adhere to strict regulatory
    guidelines promulgated by the NRC. See 
    id. § 2133(a),
    (b). For example, the
    NRC will not terminate a license until a nuclear facility is free of radioactive
    contamination. See 10 C.F.R. § 50.2 (“Decommission means to remove a facility
    1
    It was initially believed that spent nuclear fuel could be reprocessed and used again.
    However, “expectations for reprocessing remained unfulfilled,” and current operational plans
    require storage and disposal of spent nuclear fuel. See Pac. Gas & Elec. Co. v. State Energy Res.
    Conservation & Dev. Comm’n, 
    461 U.S. 190
    , 195, 
    103 S. Ct. 1713
    , 1717–18 (1983).
    3
    Case: 17-12304        Date Filed: 06/28/2018     Page: 4 of 16
    or site safely from service and reduce residual radioactivity to a level that permits
    . . . [r]elease of the property . . . and termination of the license.”).
    Over time, our nation began to see a buildup of spent nuclear fuel. In
    response, Congress enacted the Nuclear Waste Policy Act of 1982 (“NWPA”),
    Pub. L. No. 97-425, 96 Stat. 2201 (1983), to provide for permanent disposal of the
    spent fuel. See 42 U.S.C. § 10131(b)(1). Under the NWPA, the Department of
    Energy (“DOE”) is responsible for depositing spent nuclear fuel in a permanent
    disposal site. See Nat’l Ass’n of Regulatory Util. Comm’rs v. Dep’t of Energy,
    
    680 F.3d 819
    , 821 (D.C. Cir. 2012). However, even now, no such storage site
    exists in the United States. 
    Id. To fund
    its disposal of spent nuclear fuel, the DOE enters into contracts with
    nuclear facilities that obligate the facilities to pay a fee of 1.0 mil 2 per kilowatt-
    hour of electricity generated. 3 42 U.S.C. § 10222(a)(1)–(2); see also 10 C.F.R.
    § 961.11 (codifying standard NWPA contract). These fees do not go directly to the
    DOE, but instead are paid to the Treasury and placed into the Nuclear Waste Fund.
    2
    A “mil” is 1/10 of a cent.
    3
    The NWPA requires the DOE to periodically re-evaluate the fee amount to avoid
    collecting “either insufficient or excess revenues.” 42 U.S.C. § 10222(a)(4). The DOE has
    continuously maintained the fee at $1.0 mil per kilowatt-hour and has never suggested any
    alternatives. Ala. Power Co. v. U.S. Dep’t of Energy, 
    307 F.3d 1300
    , 1303–04 (11th Cir. 2002);
    see also Nat’l Ass’n of Regulatory Util. Comm’rs v. Dep’t of Energy, 
    851 F.2d 1424
    , 1426 (D.C.
    Cir. 1988) (“Each year since 1983, the Secretary has published an annual ‘Fee Adequacy Report’
    concluding, not unlike Goldilocks, that the statutory fee is not too high, and not too low, but just
    right.”).
    4
    Case: 17-12304    Date Filed: 06/28/2018    Page: 5 of 16
    42 U.S.C. § 10222(a)(3), (c). The DOE is then authorized to pay from the Nuclear
    Waste Fund for the disposal of radioactive waste. 
    Id. § 10222(d).
    “In paying such
    a fee, the person delivering spent fuel . . . to the Federal Government shall have no
    further financial obligation to the Federal Government for the long-term storage
    and permanent disposal of such spent fuel . . . .” 
    Id. § 10222(a)(3).
    NextEra entered into NWPA contracts with the DOE. It paid approximately
    $200 million in contract fees to the Nuclear Waste Fund during the years of 2003–
    05 and 2008–10.
    2.     Net Operating Losses and Carryback Provisions
    NextEra makes its claims for a tax refund based on the tax code’s treatment
    of net operating losses. A net operating loss exists whenever a taxpayer has more
    available deductions in a given year than the taxpayer is allowed to take. See 26
    U.S.C. § 172(c) (2012). The tax code allows a taxpayer to “carryover” those extra
    deductions to a future tax year, or to “carryback” the deductions to a previous tax
    year. See 
    id. § 172(b)(1)(A).
    Ordinarily a carryback is limited to the two tax years
    preceding the year of the net operating loss. 
    Id. § 172(b)(1)(A)(i).
    But certain
    types of net operating losses are allowed a longer carryback period.
    5
    Case: 17-12304       Date Filed: 06/28/2018       Page: 6 of 16
    At all times relevant to this case, Section 172(f) of the tax code provided for
    one of the extended carryback periods.4 This section defined a “specified liability
    loss,” which had a carryback period of ten years. See 
    id. § 172(b)(1)(C),
    (f).
    Section 172(f) allowed these longer carryback periods for certain liabilities,
    including “[a]ny amount allowable as a deduction under this chapter . . . which is
    in satisfaction of a liability under a Federal or State law requiring . . . the
    decommissioning of a nuclear power plant (or any unit thereof).” 
    Id. § 172(f)(1)(B)(i)(II).
    This type of liability could be considered a specified liability
    loss only if “the act (or failure to act) giving rise to such liability occurs at least 3
    years before the beginning of the taxable year.” 
    Id. § 172(f)(1)(B)(ii)(I).
    Yet another provision of the Internal Revenue Code provided an even longer
    carryback period for “that portion of a specified liability loss which is attributable
    to amounts incurred in the decommissioning of a nuclear power plant (or any unit
    thereof).” 
    Id. § 172(f)(3).
    This type of loss could be carried back to “the taxable
    year in which such plant (or unit thereof) was placed in service.” 
    Id. § 172(f)(3)(A).
    Section 172 does not define the term “decommissioning of a nuclear power
    plant.”
    4
    In 2017, this provision was removed from the tax code. This change in the tax code has
    no bearing on how we decide this case. See Sorenson v. Sec’y of the Treasury, 
    475 U.S. 851
    ,
    855 & n.4, 
    106 S. Ct. 1600
    , 1604 & n.4 (1986) (evaluating refund claim under tax code in effect
    at time the tax was paid).
    6
    Case: 17-12304    Date Filed: 06/28/2018    Page: 7 of 16
    C.    PROCEDURAL BACKGROUND
    In June 2012, NextEra’s tax filings sought a refund of approximately $97
    million from their tax payments made between 1969 and 1995. NextEra sought
    this refund based on net operating losses from NWPA fees paid during 2003–05
    and 2008–10. By April 2015, when the IRS had still made no decision on the
    validity of its refund claims, NextEra brought this action in federal court. Each
    count of NextEra’s complaint makes the same argument: that fees paid under an
    NWPA contract qualify as specified liability losses under Section 172(f).
    NextEra and the United States filed cross-motions for summary judgment.
    The parties agreed to present only the legal issues regarding the carryback
    provisions for NWPA contract fees—in other words, whether NextEra was entitled
    to any amount of refund. The computation of the refund amount would be decided
    only if NextEra prevailed at the initial summary-judgment stage.
    The District Court granted summary judgment to the United States. It began
    by evaluating the varying definitions of “decommissioning” offered by the parties.
    In the process, the District Court found that spent nuclear fuel was neither
    “commissioned” nor “decommissioned” under the plain meaning of those terms.
    Next, the District Court considered regulations invoked by the parties, and found
    they either did not apply or did not support NextEra’s claims. Ultimately, the
    7
    Case: 17-12304     Date Filed: 06/28/2018   Page: 8 of 16
    District Court found the NWPA contract fees paid by NextEra do not qualify as
    specified liability losses under Section 172(f).
    The District Court then considered the government’s alternative argument:
    that even if disposal of spent nuclear fuel qualified as “decommissioning,” NextEra
    is still not entitled to a refund because federal law requires the DOE, not NextEra,
    to actually dispose of the spent nuclear fuel. The District Court agreed with this
    argument as well. It found that the DOE was the body with the actual “liability
    under a Federal . . . law” to dispose of the radioactive material. The District Court
    observed that the NWPA contract fees do not go directly to the task of disposing of
    radioactive material. Those fees instead go to the Nuclear Waste Fund, which the
    DOE draws from to support its obligation to permanently dispose of civilian
    radioactive waste nationwide.
    NextEra filed this appeal.
    II. STANDARD OF REVIEW
    This Court reviews de novo the District Court’s grant of summary judgment,
    viewing the facts and drawing all reasonable inferences in the light most favorable
    to the non-moving party. Rioux v. City of Atlanta, 
    520 F.3d 1269
    , 1274 (11th Cir.
    2008). Summary judgment is appropriate where there is no genuine dispute as to
    any material fact and the moving party is entitled to judgment as a matter of law.
    Celotex Corp. v. Catrett, 
    477 U.S. 317
    , 322–23, 
    106 S. Ct. 2548
    , 2552 (1986). The
    8
    Case: 17-12304     Date Filed: 06/28/2018    Page: 9 of 16
    District Court’s interpretation of the tax code is reviewed de novo. Batchelor-
    Robjohns v. United States, 
    788 F.3d 1280
    , 1284 (11th Cir. 2015).
    III. DISCUSSION
    There are no facts in dispute in this appeal. It presents only the legal
    question of whether the NWPA contract fees paid by NextEra qualify as specified
    liability losses under Section 172(f). There are two components to this question:
    (1) whether the disposal of spent nuclear fuel qualifies as “decommissioning of a
    nuclear power plant (or any unit thereof)”; and (2) whether NextEra’s fees paid to
    the Nuclear Waste Fund are incurred as a “liability under a Federal or State law
    requiring [nuclear decommissioning].” NextEra must prevail on both components
    to be entitled to a refund. See INDOPCO, Inc. v. Comm’r, 
    503 U.S. 79
    , 84, 112 S.
    Ct. 1039, 1043 (1992) (“[T]he burden of clearly showing the right to the claimed
    deduction is on the taxpayer.” (quotation omitted)).
    A.    DEFINITION OF DECOMMISSIONING
    Under Section 172(f), the extended carryback period applies only when costs
    were incurred under a law requiring the “decommissioning of a nuclear power
    plant (or any unit thereof).” NextEra argues that disposing of spent nuclear fuel is
    “essential to commissioning and decommissioning a nuclear power plant.”
    Primarily, NextEra argues that because its plants cannot be fully decommissioned
    9
    Case: 17-12304     Date Filed: 06/28/2018     Page: 10 of 16
    until all radioactive material is removed, the term “decommissioning” must
    encompass the removal of spent nuclear fuel.
    This argument is flawed. Spent nuclear fuel must be periodically disposed
    of, just as trash must be removed from a home. But the regular removal of
    household trash does not mean the occupants of the home are closing it down. In
    the same way, the ordinary disposal of spent nuclear fuel is an operational
    necessity for running a nuclear power plant. It is not an indication that the facility
    is being “remove[d] . . . safely from service.” See 10 C.F.R. § 50.2. Although the
    removal of radioactive material is a necessary step for decommissioning, every
    removal of spent nuclear fuel during the life of the facility is not itself an act of
    decommissioning. After all, if a nuclear plant operated in perpetuity—and never
    decommissioned—spent nuclear fuel would still need to be removed because the
    fuel “will remain dangerous for time spans seemingly beyond human
    comprehension.” New 
    York, 681 F.3d at 474
    (quotation omitted).
    NextEra points to various federal regulations to support its argument that
    “[d]ecommissioning a nuclear power plant is about ridding the site of radioactive
    waste and spent nuclear fuel so the license can be terminated.” The government
    answers with its own regulations, and in particular the parties have argued whether
    26 C.F.R. § 1.468A-1 is instructive in answering this question. This regulation
    defines “nuclear decommissioning costs” to include “expenses to be incurred in
    10
    Case: 17-12304    Date Filed: 06/28/2018    Page: 11 of 16
    connection with the entombment, decontamination, dismantlement, removal and
    disposal of the structures, systems and components of a nuclear power plant,
    whether that nuclear power plant will continue to produce electric energy or has
    permanently ceased to produce electric energy.” 26 C.F.R. § 1.468A-1(b)(6).
    However, that regulation expressly excludes “expenses to be incurred in
    connection with the disposal of spent nuclear fuel under the [NWPA].” 
    Id. NextEra argues
    that the exclusionary language is insignificant because the NRC
    had already promulgated other regulations dealing with that issue and didn’t need
    to duplicate funding regulations.
    Parsing these definitions is unnecessary. Even if we accept these regulatory
    definitions as relevant, NextEra would have succeeded only in showing again that
    removing spent nuclear fuel is a necessary part of decommissioning. NextEra has
    yet to demonstrate that removing spent nuclear fuel is itself an act of removing a
    part of a nuclear power plant from service, i.e., “decommissioning.” In our view,
    disposing of spent nuclear fuel is best thought of as a periodic operational expense
    and does not qualify as “decommissioning” all or part of a nuclear power plant.
    NextEra also argues that the cost of permanent disposal of spent nuclear fuel
    should be treated the same as costs incurred to temporarily store spent nuclear fuel
    pending delivery of that fuel to the DOE for permanent disposal. Such temporary
    storage costs are considered “nuclear decommissioning costs” under 26 C.F.R.
    11
    Case: 17-12304     Date Filed: 06/28/2018    Page: 12 of 16
    § 1.468A-1(b)(6). However, permanent storage costs have typically been treated
    differently than temporary storage costs. Permanent storage costs are funded on a
    collective basis through the payment of NWPA contract fees, and the amount of
    those fees is based on the amount of electricity produced each quarter. See 42
    U.S.C. § 10222(a)(1)–(2); see also 10 C.F.R. § 961.11. In that sense, NWPA
    contract fees are akin to a tax on nuclear energy production for the purpose of
    funding the DOE’s total cost of permanently storing all civilian spent nuclear fuel.
    In contrast, temporary storage costs are borne on an individual basis by each power
    plant and are incurred not when energy is produced, but when spent fuel is
    removed from the reactor and stored in preparation for eventual removal from the
    plant. If the plant were decommissioned, it would still bear the costs of temporary
    on-site storage, even though it would no longer incur any costs for permanent
    storage. Given these differences, we are not convinced that permanent storage
    costs must be treated the same as temporary storage costs under Section 172(f).
    B.    OBLIGATIONS UNDER FEDERAL LAW
    Even if we assume NextEra could prevail on the first prong of its argument,
    it would not qualify for a refund because Section 172(f) requires that losses be
    incurred “in satisfaction of a liability under a Federal or State law requiring
    [nuclear decommissioning].” Our review has disclosed no law requiring NextEra
    or any nuclear facility to engage in decommissioning.
    12
    Case: 17-12304       Date Filed: 06/28/2018      Page: 13 of 16
    NextEra argues it bears the burden of decommissioning because, as a matter
    of law, decommissioning cannot take place until all spent nuclear fuel is removed.
    Perhaps, but no law requires NextEra to ever decommission its plants. Granted,
    every nuclear plant operator must provide the NRC with a decommissioning plan
    and must maintain funds sufficient for decommissioning. See 10 C.F.R.
    § 50.75(a). But currently, nuclear plants may lawfully remain operational in
    perpetuity, and any operational plant needs to dispose of spent nuclear fuel on an
    ongoing basis. Therefore NextEra’s NWPA contract fee payments are not made
    pursuant to a “law requiring . . . the decommissioning of a nuclear power plant.”
    26 U.S.C. § 172(f)(1)(B)(i)(II) (2012) (emphasis added).
    NextEra also argues it is ultimately responsible for the decommissioning of a
    plant because it pays the costs of permanent disposal of spent nuclear fuel. In
    support, NextEra relies on this circuit’s only case that addressed the NWPA in any
    detail: Alabama Power Co. v. U.S. Department of Energy, 
    307 F.3d 1300
    (11th
    Cir. 2002). In Alabama Power, this Court ruled on an amendment to the standard
    NWPA contract, which allowed the DOE to settle outstanding claims with nuclear
    facilities by offsetting their fee amounts. 
    Id. at 1306.
    The Court held that the
    amendment exceeded the DOE’s statutory authority. 5 
    Id. at 1312–13,
    1316.
    5
    The Court also struck down the “legislative veto” provision of the NWPA, 42 U.S.C.
    § 10222(a)(4), after similar regulatory provisions were found unconstitutional in INS v. Chadha,
    
    462 U.S. 919
    , 
    103 S. Ct. 2764
    (1983). Ala. 
    Power, 307 F.3d at 1307
    –08, 1316.
    13
    Case: 17-12304     Date Filed: 06/28/2018    Page: 14 of 16
    While the core holding of Alabama Power is not at issue here, the opinion
    included a general discussion of the regulatory scheme of the NWPA. In two
    instances, the Alabama Power opinion described the NWPA’s apportionment of
    responsibility for disposing of nuclear waste. It said: “[Under the NWPA,] the
    U.S. Government would take responsibility for disposing of the waste, and the
    utilities that produced the waste would bear the cost. The NWPA thus established
    a quid pro quo; the Government would provide a valuable service and utilities
    would pay money for this service.” 
    Id. at 1302.
    The opinion also described how
    “[t]he NWPA provides that the entities owning and operating nuclear power plants,
    as generators and owners of nuclear waste, will pay the full cost of disposing of
    the waste.” 
    Id. at 1303.
    NextEra relies on this language to argue that it fully pays for the permanent
    disposal of the spent nuclear fuel, meaning it is responsible for the
    decommissioning. But funding is only part of the responsibility of
    decommissioning. Alabama Power recognized that the “responsibility for
    disposing of the waste” belongs to the DOE. 
    Id. at 1302.
    As the District Court
    noted, the DOE’s obligation to dispose of nuclear waste and the plant’s obligation
    to pay funds to the Nuclear Waste Fund are “two separate legal obligations.”
    Despite NextEra’s arguments to the contrary, Alabama Power offers only a general
    overview of the NWPA. The things the opinion said about the Nuclear Waste
    14
    Case: 17-12304      Date Filed: 06/28/2018    Page: 15 of 16
    Fund were not necessary to decide the case before it. Thus, our ruling here that
    fees paid to the Nuclear Waste Fund do not place the burden of disposing of spent
    nuclear fuel on the power plants—even if those fees constitute the “full cost of
    disposing of the waste,” 
    id. at 1303—is
    not in conflict with Alabama Power.
    The District Court also correctly held that NWPA fees are tied to the
    production of electricity and not to the direct cost of nuclear waste disposal.
    NextEra argued the “act” giving rise to the liability for decommissioning was
    either the initial start-up of the nuclear power plant or the “insertion and irradiation
    of the nuclear fuel assemblies in the reactor core.” However, the NWPA contracts
    determine the fee based on the amount of electricity generated in the preceding
    quarter. See 42 U.S.C. § 10222(a)(1)–(2); see also 10 C.F.R. § 961.11. If NextEra
    had constructed nuclear power plants, but never produced electricity, then it would
    have incurred no NWPA contract fees. The NWPA contract fees were therefore
    incurred for the production of electricity, as opposed to any law requiring
    decommissioning. And because the acts giving rise to the liability happened in the
    quarters immediately preceding the months in which the fees were paid, those acts
    did not occur more than three years prior to the claimed loss. See 26 U.S.C.
    § 172(f)(1)(B)(ii)(I) (2012).
    For these reasons, NextEra’s NWPA fee payments were not made pursuant
    to a law that requires nuclear decommissioning.
    15
    Case: 17-12304    Date Filed: 06/28/2018   Page: 16 of 16
    IV. CONCLUSION
    Under Section 172(f), NextEra would be entitled to a refund only if it could
    show that its payment of NWPA fees was for an act that qualified as nuclear
    decommissioning, was done pursuant to a law that required nuclear
    decommissioning, and that the act occurred more than three years prior to the
    claimed loss. It has shown none of these. Therefore, the judgment of the District
    Court is
    AFFIRMED.
    16