    UNITED STATES COURT OF APPEALS
    FOR THE FOURTH CIRCUIT
    No. 20-1871
    DRUMMOND COAL SALES, INC.,
    Plaintiff - Appellee,
    v.
    NORFOLK SOUTHERN RAILWAY COMPANY,
    Defendant - Appellant.
    No. 20-1920
    DRUMMOND COAL SALES, INC.,
    Plaintiff - Appellant,
    v.
    NORFOLK SOUTHERN RAILWAY COMPANY,
    Defendant - Appellee.
    Appeals from the United States District Court for the Western District of Virginia, at
    Roanoke. Michael F. Urbanski, Chief District Judge. (7:16−cv−00489−MFU)
    Argued: May 6, 2021                                           Decided: June 29, 2021
    Before GREGORY, Chief Judge, HARRIS, and QUATTLEBAUM, Circuit Judges.
    Affirmed by published opinion. Judge Quattlebaum wrote the opinion, in which Chief
    Judge Gregory and Judge Harris joined.
    ARGUED: Carter Glasgow Phillips, SIDLEY AUSTIN LLP, Washington, D.C., for
    Appellant/Cross-Appellee. Huey Thomas Wells, III, STARNES DAVIS FLORIE LLP,
    Birmingham, Alabama, for Appellee/Cross-Appellant. ON BRIEF: R. Braxton Hill, IV,
    Michael W. Smith, Roman Lifson, CHRISTIAN & BARTON, LLP, Richmond, Virginia;
    Raymond A. Atkins, Tobias S. Loss-Eaton, Cody L. Reaves, SIDLEY AUSTIN LLP,
    Washington, D.C., for Appellant/Cross-Appellee. William A. Davis, III, Benjamin T.
    Presley, STARNES DAVIS FLORIE LLP, Birmingham, Alabama; Monica T. Monday,
    W. David Paxton, GENTRY LOCKE, LLP, Roanoke, Virginia, for Appellee/Cross-
    Appellant.
    2
    QUATTLEBAUM, Circuit Judge:
    After a six-day trial, a jury returned a special verdict finding Norfolk Southern
    Railway Company materially breached its contract with Drummond Coal Sales, Inc. Based
    on that finding of material breach, the district court entered a declaratory judgment for
    Drummond and awarded limited equitable relief. In this consolidated appeal, we examine
    those two related issues—the district court’s decision that the jury’s finding of material
    breach was supported by substantial evidence and the equitable relief that flowed from that
    decision. On appeal, Norfolk Southern takes issue with the jury’s finding of material
    breach, while Drummond challenges the district court’s award of equitable relief. For
    reasons set forth below, we affirm the district court on both issues.
    I.
    This case arises out of a contract to ship coal to utility companies. Traditionally,
    when a utility company buys coal, it involves two separate contracts—one for the purchase
    of coal (between the utility company and the coal supplier) and another for the shipment
    of coal (between the utility company and the railroad). Drummond, an international
    supplier of coal mined in Colombia, sought to change that paradigm by offering a one-
    stop-shop contract for utility companies to both purchase and ship their coal with
    Drummond.
    3
    To make this possibility a reality, Drummond entered into a contract with Norfolk
    Southern for guaranteed shipping services at fixed rates (the “Agreement”). 1 The primary
    benefit of the Agreement to Drummond was that it could price a one-stop-shop contract
    because the shipping cost, previously unknown to Drummond, was now a known quantum.
    Article 13 of the Agreement set out the rates Norfolk Southern would charge Drummond
    to deliver the coal from the port to the utility. 2 In exchange for Norfolk Southern’s
    promised rates, Drummond promised to ship a certain amount of coal each year under the
    Agreement with Norfolk Southern. If Drummond did not meet its annual quota, it agreed
    to pay Norfolk Southern shortfall fees.
    The Agreement did not prohibit Norfolk Southern from entering into or shipping
    coal under other third-party utility contracts. In fact, it expressly allowed it to do so. Behind
    the scenes, however, Norfolk Southern had contracts with certain utilities that
    confidentially precluded those utilities from purchasing and shipping coal via the
    Agreement without incurring liquidated damages.
    After Drummond and Norfolk Southern entered into the Agreement, the coal
    industry in the United States experienced significant change. Federal regulation of the
    1
    The Agreement was entered into on January 20, 2006, and was to run through July
    31, 2016. It was amended on January 12, 2010, and the term was extended three more years
    through December 31, 2019. Additionally, the Agreement provided that Virginia law
    controlled.
    2
    “The base transportation rate for each net ton of Commodity transported under this
    Contract shall be based upon Origin, Destination and shipment characteristics, all as more
    particularly set forth in Appendices A-H (the ‘Base Rates’).” J.A. 487.
    4
    industry forced many utilities to close or substantially reduce or eliminate their use of coal.
    In contrast, the absence of such regulations in other countries made those markets more
    attractive for coal suppliers.
    From 2010 to 2014, Drummond did not ship any coal under the Agreement. Why it
    did not do so goes to the heart of the dispute here. Norfolk Southern claims Drummond
    made a business choice. According to Norfolk Southern, Drummond elected to ship coal
    to customers outside the United States where the market was more lucrative. Drummond,
    on the other hand, claims that Norfolk Southern’s confidential contracts with utilities
    sabotaged its ability to use the one-stop-shop rates bargained for in the Agreement.
    Regardless of the reason Drummond did not ship under the Agreement, Drummond
    paid Norfolk Southern the required shortfall fees from 2010 to 2014. Then again, in years
    2015 and 2016, Drummond did not ship any coal under the Agreement. But Drummond
    did not pay the required shortfall fees for those two years.
    In anticipation of Norfolk Southern’s next move—a likely claim for the 2015 and
    2016 shortfall fees—Drummond preemptively filed suit seeking a declaration of its rights
    and a variety of equitable relief. After summary judgment, only two theories remained:
    declaratory relief excusing Drummond’s performance due to Norfolk Southern’s breach of
    the Agreement and rescission based on Norfolk Southern’s breach.
    At trial, Drummond argued that its obligation to pay shortfall fees under the
    Agreement should be excused because Norfolk Southern breached the Agreement based
    on three theories—express material breach, prevention and breach of the implied duty of
    good faith and fair dealing. The district court issued a special verdict form covering these
    5
    theories. In pertinent part, the jury was asked to decide whether (1) “Norfolk Southern
    actively work[ed] to prevent Drummond from shipping coal using the rates set forth in
    [Article 13 of the Agreement]”; (2) Norfolk Southern’s conduct constituted a breach of
    Article 13 of the Agreement, “either expressly or under the implied covenant of good faith
    and fair dealing”; and (3) the breach of the Agreement was material and precluded
    Drummond from “receiv[ing] the benefit of its bargain.” J.A. 1660–61. As to all these
    questions, the jury answered yes. Based on that, the jury was then asked when the first
    material breach occurred and answered July 1, 2010. J.A. 1661.
    Following those factual findings, Drummond moved under Federal Rule of Civil
    Procedure 58, for “entry of judgment which (i) states that Drummond is excused from
    paying any further shortfall fees under the contract; (ii) orders Norfolk Southern to pay
    Drummond $49,239,107.03, which represents the amount of shortfall fees paid by
    Drummond since July 1, 2010 . . . and an award of 6% prejudgment interest on those
    payments[;] . . . and (iii) provides that post-judgment interest will accrue on the entire
    amount owed by Norfolk Southern.” J.A. 2451–52. At the same time, Norfolk Southern
    moved for judgment as a matter of law under Federal Rule of Civil Procedure 50(b), or in
    the alternative, a new trial under Federal Rule of Civil Procedure 59(a).
    The district court began by rejecting Norfolk Southern’s Motion for Judgment as a
    Matter of Law. Norfolk Southern first argued there was insufficient evidence for the jury
    to find that it materially breached the Agreement under any of the three theories presented
    6
    at trial. But the district court found sufficient evidence of express material breach. 3
    Focusing on Article 13 of the Agreement, the district court found that a reasonable jury
    could determine that the Article 13 rates were the primary benefit of the Agreement and
    that Norfolk Southern’s conduct defeated an essential purpose of the Agreement—
    Drummond’s ability to use those rates.
    The district court then turned to Norfolk Southern’s statute-of-limitations argument.
    Rejecting this argument as well, the district court explained that, although more than five
    years had passed after the first breach, the five-year Virginia statute of limitations did not
    bar the action because Norfolk Southern’s actions did not constitute a continuous breach.
    Rather, Norfolk Southern breached the contract “at discrete intervals – specifically, each
    time the shortfall fees came due.” J.A. 2457. As such, according to the district court,
    “Norfolk Southern breached the contract within the five-year statute of limitations period
    and Drummond’s claims were timely filed.” J.A. 2458. Therefore, the court denied Norfolk
    Southern’s Rule 50(b) Motion. 4
    As to Drummond’s Motion for Entry of Judgment, the district court granted
    Drummond’s Motion in part as it related to Drummond being excused from paying shortfall
    fees for 2015 and 2016 and in future years. The district court, however, declined to rescind
    3
    Having found one theory of relief supported by substantial evidence, the court
    declined to address the two additional theories: prevention or breach of the implied duty of
    good faith and fair dealing.
    4
    The district court also denied Norfolk Southern’s Rule 59(a) Motion, a ruling not
    at issue on appeal.
    7
    the Agreement entirely, thus denying Drummond the ability to recoup shortfall fees already
    paid.
    Drummond then moved to alter or amend judgment under Federal Rule of Civil
    Procedure 59(e) seeking complete rescission to recoup the shortfall fees paid from 2010 to
    2014. Drummond argued the district court’s partial denial of its Motion for Entry of
    Judgment was error because it was “fundamentally inconsistent” to find Norfolk Southern
    materially breached the Agreement beginning in 2010 but then prevent Drummond from
    recouping shortfall fees paid from 2010 to 2014. J.A. 2542. The district court disagreed,
    declining to rescind the Agreement. Among factors militating against rescission, the district
    court cited partial performance by Norfolk Southern, the partial release of claims between
    the parties and Drummond’s coal sales overseas.
    Norfolk Southern appealed, and Drummond then filed a cross-appeal. The district
    court had jurisdiction under 
    28 U.S.C. § 1332
    , and we have jurisdiction under 
    28 U.S.C. § 1291
    .
    II.
    First, we address Norfolk Southern’s appeal. Norfolk Southern insists, as it did
    below, that the jury’s finding was not supported by the evidence, and, therefore, the district
    court’s denial of its Rule 50(b) Motion was improper.
    “The denial of a Rule 50(b) [motion] is reviewed de novo.” First Union Com. Corp.
    v. GATX Cap. Corp., 
    411 F.3d 551
    , 556 (4th Cir. 2005). “When a jury verdict has been
    returned, judgment as a matter of law may be granted only if, viewing the evidence in a
    8
    light most favorable to the non-moving party (and in support of the jury’s verdict) and
    drawing every legitimate inference in that party’s favor, the only conclusion a reasonable
    jury could have reached is one in favor of the moving party.” Int’l Ground Transp. v.
    Mayor & City Council of Ocean City, MD, 
    475 F.3d 214
    , 218–19 (4th Cir. 2007). To
    prevail, Norfolk Southern must show that there could be no breach of the Agreement under
    any reasonable theory. See Atlas Food Sys. & Servs., Inc. v. Crane Nat’l Vendors, Inc., 
    99 F.3d 587
    , 599 (4th Cir. 1996) (“An appeals court is abjured to determine whether a jury
    verdict can be sustained, on any reasonable theory.” (internal quotation marks omitted)).
    With this standard in mind, we turn to Norfolk Southern’s two arguments.
    A.
    Norfolk Southern first contends there was no evidence from which a reasonable jury
    could find that Norfolk Southern breached the Agreement. To assess this argument, we
    return to the jury’s finding. Recall that it found “Norfolk Southern actively work[ed] to
    prevent Drummond from shipping coal using the rates set forth in [the Agreement] . . . and
    such conduct constitute[d] a breach . . . either expressly or under the implied covenant of
    good faith and fair dealing[.]” J.A. 1660. The jury also determined that Norfolk Southern’s
    breach, “either individually or in combination with any other breaches,” was material “such
    that Drummond did not receive the benefit of its bargain.” J.A. 1661. Because the special
    verdict form did not require the jury to specify whether Norfolk Southern’s conduct
    violated an express provision of the Agreement or the implied duty of good faith and fair
    dealing, we address both theories. Under our standard of review, if there is evidentiary
    support for either, we must affirm. See Atlas Food Sys. & Servs., Inc., 
    99 F.3d at 599
    .
    9
    To show an express material breach, Virginia law requires evidence that the
    opposing party failed to perform an express obligation “that is so fundamental to the
    contract that the failure to perform that obligation defeats an essential purpose of the
    contract.” Va. Elec. & Power Co. v. Bransen Energy, Inc., 
    850 F.3d 645
    , 655 (4th Cir.
    2017) (quoting Horton v. Horton, 
    487 S.E.2d 200
    , 204 (Va. 1997)). The obligation on
    which the district court relied was Article 13, which, as set forth above, refers to appendices
    containing shipping rates. But no evidence suggests Norfolk Southern actually charged
    Drummond different rates than those promised under the Agreement. Rather, the evidence
    shows that during the relevant time periods, Drummond never shipped coal under the
    Agreement. Thus, our review of the record comports with Norfolk Southern’s. We see no
    evidence from which a jury could reasonably conclude that Norfolk Southern expressly
    breached Article 13 of the Agreement.
    We next consider whether there was sufficient evidence to support the jury’s finding
    of breach based on the implied covenant of good faith and fair dealing. “Every contract
    imposes an obligation of good faith and fair dealing between the parties in its performance
    and its enforcement . . . .” 23 WILLISTON ON CONTRACTS § 63:22 (4th ed. 2021). This
    obligation means “neither party will do anything to injure or destroy the right of the other
    party to receive the benefits of the agreement. Violation of the duty of good faith and fair
    dealing constitutes a breach of contract.” Id. (footnotes omitted). Moreover, this obligation
    contemplates that while “the duty of good faith does not prevent a party from exercising
    its explicit contractual rights, a party may not exercise contractual discretion in bad faith,
    10
    even when such discretion is vested solely in that party.” Va. Vermiculite, Ltd. v. W.R.
    Grace & Co.- Ct., 
    156 F.3d 535
    , 542 (4th Cir. 1998).
    Importantly, however, this duty does not permit us to write into the Agreement
    obligations that do not exist. See ACA Fin. Guar. Corp. v. City of Buena Vista, Va., 
    917 F.3d 206
    , 216 (4th Cir. 2019) (“[T]he implied covenant of good faith and fair dealing
    ‘cannot be the vehicle for rewriting an unambiguous contract in order to create duties that
    do not otherwise exist.’” (quoting Ward’s Equip., Inc. v. New Holland N. Am., Inc., 
    493 S.E.2d 516
    , 520 (Va. 1997))). And it does not relieve a party of the economic consequences
    of the terms to which it agreed. Otherwise, this duty would undercut the principle that
    parties “are to be bound by the plain and unambiguous terms of their contracts.” 
    Id.
    Here, Drummond introduced evidence at trial showing the benefit of the Agreement
    was obtaining known shipping rates so that it could offer utilities a one-stop-shop contract
    for coal. Drummond also introduced evidence that Norfolk Southern then entered into or
    amended confidential third-party contracts imposing millions of dollars in liquidated
    damages on utilities that elected to ship under the Agreement. Thus, Drummond argues the
    sum of this evidence indicates that Norfolk Southern sought to penalize utilities from
    shipping under the Agreement, thereby depriving Drummond of the benefit of its bargain
    with Norfolk Southern—shipping rates to create a viable one-stop-shop contract for
    utilities.
    Responding to this evidence, Norfolk Southern protests that no reasonable jury
    could find for Drummond on the matter of breach because the Agreement expressly
    contemplated the continued existence and use of third-party contracts and, therefore,
    11
    Norfolk Southern was merely exercising its discretionary ability to continue contracting
    with utilities. We agree, as does Drummond, that the express terms of the Agreement
    permit Norfolk Southern to enter into third-party contracts. Response Brief of Appellee at
    26 (stating Norfolk Southern’s “contracts with the utilities, in isolation, are not a
    problem.”). According to Drummond, however, the problem was the confidential nature of
    the contracts and the liquidated damages provisions they contained. Drummond’s
    argument was that, based on those provisions, Norfolk Southern deprived Drummond of
    the benefit of its bargain. In effect, Drummond negotiated for and purchased something
    from Norfolk Southern that Norfolk Southern then turned around and rendered valueless.
    We agree that a reasonable jury could find that Norfolk Southern’s conduct, not in entering
    into third-party utility contracts, but in imposing liquidated damages on utilities for
    shipping under the Agreement, amounted to a bad faith exercise of its contractual
    discretion. Therefore, this conduct supports a finding of a breach of the implied duty of
    good faith and fair dealing. 5
    Admittedly, this is not the only possible conclusion the jury could have reached.
    Norfolk Southern put forth competing evidence explaining that these contracts were
    typical. Moreover, there was evidence these contracts may have been “reasonable.” J.A.
    2260. But our standard requires a much higher showing—that no reasonable jury could
    find for Drummond. And that is simply not met here. There was sufficient evidence for a
    5
    Because we affirm the district court based on the implied duty of good faith and
    fair dealing, we need not discuss the third theory of breach presented, prevention.
    12
    reasonable jury to find that Norfolk Southern breached the implied duty of good faith and
    fair dealing.
    B.
    Norfolk Southern, however, raises an additional argument. Even if there was
    sufficient evidence to support a finding of a breach, Norfolk Southern maintains there was
    no evidence that such breach caused any damages to Drummond. It claims Drummond was
    not damaged because Norfolk Southern’s third-party contracts with utilities had no causal
    connection to Drummond not shipping under the Agreement. According to Norfolk
    Southern, Drummond did not ship under the Agreement because it made a business
    decision to pursue customers abroad where the market was more lucrative than in the
    United States.
    But we need not decide the issue of whether or not there was evidence that
    Drummond suffered any damages caused by Norfolk Southern’s breach of the Agreement
    because of the nature of the relief Drummond sought. In seeking declaratory relief,
    Drummond sought a statement of its rights and responsibilities based on its belief that
    Norfolk Southern breached the Agreement. 6 Drummond, in effect, sought a shield by
    6
    A declaratory judgment is only “[a] binding adjudication that establishes the rights
    and other legal relations of the parties without providing for or ordering enforcement.”
    JUDGMENT, Black’s Law Dictionary (11th ed. 2019). The purpose of a declaratory
    judgment “is usually the prevention of a wrong, but . . . it commands nothing, and
    authorizes no administrative officer to take action under it.” 11 CORBIN ON CONTRACTS
    § 55.2 (2020). Declaratory relief can be sought to resolve contract disputes in the following
    matters: validity of the contract, construction of disputed contract terms, the right to
    terminate the contract and the right to compel arbitration. See 12 MOORE’S FEDERAL
    PRACTICE - CIVIL § 57.80 (2021). Based on a declaratory judgment, a court may grant
    13
    which to protect itself should Norfolk Southern seek payment of the 2015 and 2016
    shortfall fees. And in order for the district court to grant Drummond a shield, the jury was
    asked a series of factual questions: whether Norfolk Southern breached the Agreement,
    whether that breach was material and when the first breach occurred.
    Importantly, Drummond did not seek a sword—it neither alleged a breach of
    contract claim nor sought declaratory relief on all the elements of such a claim. If it had, it
    would have been required to offer evidence on all the elements of an action for breach of
    contract, which are “(1) a legally enforceable obligation of a defendant to a plaintiff; (2)
    the defendant’s violation or breach of that obligation; and (3) injury or damage to the
    plaintiff caused by the breach of obligation.” Va. Elec. & Power Co., 850 F.3d at 655
    (quoting Navar, Inc. v. Fed. Bus. Council, 
    784 S.E.2d 296
    , 299 (2016)). While Norfolk
    Southern would have us analyze whether the jury properly found all elements met for a
    breach of contract claim, that is not the question the jury was asked because that is not the
    claim Drummond brought. Rather, the jury was only asked whether Norfolk Southern
    materially breached its agreement with Drummond and, if so, when. Thus, whether or not
    there was evidence of damages is beside the point. Accordingly, we find no error in the
    district court’s order on this basis either. 7
    “[f]urther necessary or proper relief . . . after reasonable notice and hearing[] against any
    adverse party whose rights have been determined by such judgment.” 
    28 U.S.C. § 2202
    .
    7
    And this same reasoning renders Norfolk Southern’s statute-of-limitations defense
    equally inapplicable. Here, if the shoe were on the other foot and Norfolk Southern had
    sued Drummond for breach of contract for failure to pay the 2015 and 2016 shortfall fees,
    Drummond’s assertion of a first material breach defense would not be subject to a five-
    14
    III.
    We next turn to Drummond’s appeal. Drummond argues that the district court’s
    denial of its Rule 59(e) Motion was error because it was inconsistent to conclude there was
    evidence supporting Norfolk Southern’s material breach of the Agreement in 2010 but then
    refuse to award Drummond the amount of shortfall fees it paid from 2010 to 2014. “We
    review a district court’s decision on a motion to alter or amend the judgment
    under Rule 59(e) for abuse of discretion.” Pac. Ins. Co. v. Am. Nat. Fire Ins. Co., 
    148 F.3d 396
    , 402 (4th Cir. 1998).
    But in addition to our abuse of discretion standard of review, Virginia law makes
    clear that courts are afforded wide latitude in granting or denying equitable relief. Callison
    v. Glick, 
    826 S.E.2d 310
    , 318 (Va. 2019) (finding that “awarding or denying equitable
    remedies in contract is within the sound discretion of the [trial] court”). “Equitable
    rescission is a remedy which calls for the highest and most drastic exercise of the power of
    a court of chancery—to annul and set at naught the solemn contracts of parties.” Young-
    Allen v. Bank of Am., N.A., 
    839 S.E.2d 897
    , 900 (Va. 2020) (internal quotation marks
    omitted). “Ordinarily, rescission will not be granted for breach of a contract which is not
    year statute of limitations. Moreover, even if the statute of limitations did apply, Norfolk
    Southern waived it by failing to plead its existence as to any theory except restitution,
    which did not survive summary judgment, and by failing to so much as mention the defense
    again until the close of evidence after the jury was excused. See Foodbuy, LLC v. Gregory
    Packaging, Inc., 
    987 F.3d 102
    , 118 (4th Cir. 2021) (“As a general matter, the defense of
    limitations must be raised by an affirmative defense presented in the answer or an
    amendment to the answer or it will be forfeited. And the defense may be waived by
    conscious and deliberate conduct indicating the wish not to present the defense or by the
    conscious and deliberate failure to present the defense.”) (cleaned up).
    15
    of such substantial character as to defeat the object of the parties in making the contract . .
    . .” Neale v. Jones, 
    349 S.E.2d 116
    , 119 (Va. 1986).
    With that legal background in mind, we turn to the reasoning of the district court
    below. According to the district court, “[t]here are several reasons why it would be
    inequitable for Drummond to recoup the shortfall fees it paid during 2010–2014.” J.A.
    2547. First, even though Drummond bargained for the ability to ship coal, it never did so.
    Additionally, Drummond never gave notice to Norfolk Southern that it anticipated not
    being able to ship the guaranteed volume under the Agreement from 2010 to 2014 or
    worked together with Norfolk Southern to identify transport alternatives. Taken together,
    according to the district court, these findings suggest “Drummond made the business
    decision to sell the bulk of its Colombian coal overseas, and paid shortfall fees to Norfolk
    Southern under [the Agreement] to keep its option open to ship its coal to domestic
    southeast utilities should market conditions make it favorable to do so.” J.A. 2548–49.
    On top of that, the district court emphasized that Drummond released Norfolk
    Southern from any liability for certain utility contracts. To grant rescission would, in effect,
    nullify that bargained-for release. Moreover, the district court cited Norfolk Southern’s
    partial performance in the form of infrastructure upgrades contemplated under the
    Agreement as cutting against rescission. In summary, the district court stated, “given
    Drummond’s business decision to pay the shortfall fees and ship its coal to more lucrative
    overseas markets, Norfolk Southern’s part performance . . . , and the parties’ prior mutual
    release, rescission of the contract would be inequitable.” J.A. 2553–54. As such, “the
    16
    drastic equitable remedy is not appropriate under the unique facts of this case.” J.A. 2557–
    58.
    Given our standard of review, the discretion afforded to courts under Virginia law
    in making decisions about equitable relief and the district court’s expansive reasoning
    assessing equities unique to this case, we decline to find the district court abused its
    discretion in denying Drummond complete rescission. 8
    IV.
    The district court properly denied Norfolk Southern’s Rule 50(b) Motion and did
    not abuse its discretion in denying Drummond’s Rule 59(e) Motion seeking complete
    rescission. For all the foregoing reasons, the judgment of the district court is
    AFFIRMED.
    8
    In addition, it is not all clear that, based on the allegations of the complaint, the
    remedy of rescission is legally available. As noted above, only Drummond’s theories for
    declaratory relief excusing Drummond’s performance due to Norfolk Southern’s breach of
    the Agreement and for rescission based on Norfolk Southern’s breach survived summary
    judgment. But in seeking such relief, Drummond did not allege that it suffered harm or
    damages caused by Norfolk Southern’s breach. In other words, Drummond sought both
    declaratory relief and rescission without alleging all the elements of a breach of contract
    claim. As described above, there was no problem with Drummond’s allegations given the
    limited declaratory judgment it was seeking. But there appears to be a big problem with
    those allegations as they relate to rescission. The Virginia Supreme Court “has never held
    that equitable rescission is available in cases where a plaintiff fails to plead that he or she
    incurred any damages or suffered any harm caused by an alleged breach . . . . Rescission
    based upon a breach of contract is not a cause of action in itself, but rather a remedy.” See
    Young-Allen v. Bank of Am., N.A., 
    839 S.E.2d 897
    , 900 (Va. 2020). For the same reasons
    it did not have to prove all the elements of a breach of contract claim to obtain declaratory
    relief, Drummond cannot now support the remedy of rescission. But even if such relief
    were legally available, the district court did not abuse its discretion here in denying it.
    17