Mario Amaya v. DGS Construction, LLC ( 2023 )


Menu:
  • USCA4 Appeal: 22-1189    Doc: 71         Filed: 04/21/2023   Pg: 1 of 20
    UNPUBLISHED
    UNITED STATES COURT OF APPEALS
    FOR THE FOURTH CIRCUIT
    No. 22-1189
    MARIO ERNESTO AMAYA; JOSE NORLAND GONZALEZ,
    Plaintiffs – Appellees,
    and
    JOSE AMADEO CASTILLO,
    Plaintiff,
    v.
    DGS CONSTRUCTION, LLC, d/b/a Schuster Concrete Construction,
    Defendant – Appellant,
    and
    WHITING-TURNER CONTRACTING COMPANY,
    Defendant.
    No. 22-1232
    MARIO ERNESTO AMAYA; JOSE NORLAND GONZALEZ,
    Plaintiffs – Appellants,
    and
    USCA4 Appeal: 22-1189      Doc: 71         Filed: 04/21/2023    Pg: 2 of 20
    JOSE AMADEO CASTILLO,
    Plaintiff,
    v.
    DGS CONSTRUCTION, LLC, d/b/a Schuster Concrete Construction,
    Defendant – Appellee,
    and
    WHITING-TURNER CONTRACTING COMPANY,
    Defendant.
    Appeals from the United States District Court for the District of Maryland at Greenbelt.
    Theodore D. Chuang, District Judge. (8:16−cv−03350−TDC)
    Argued: March 10, 2023                                            Decided: April 21, 2023
    Before WILKINSON, HARRIS, and RUSHING, Circuit Judges.
    Affirmed by unpublished opinion. Judge Wilkinson wrote the opinion, in which Judge
    Harris and Judge Rushing joined.
    ARGUED: Christopher Curtis Dahl, BAKER DONELSON, Baltimore, Maryland, for
    Appellant/Cross-Appellee. Steven Michael Pavsner, JOSEPH GREENWALD AND
    LAAKE, P.A., Greenbelt, Maryland, for Appellees/Cross-Appellants. ON BRIEF:
    Stephen M. Silvestri, Mary M. McCudden, JACKSON LEWIS P.C., Baltimore, Maryland;
    Jennifer L. Curry, BAKER, DONELSON, BEARMAN, CALDWELL & BERKOWITZ,
    PC, Baltimore, Maryland, for Appellant/Cross-Appellee. Erika Jacobsen White, Brian J.
    Markovitz, JOSEPH GREENWALD AND LAAKE, P.A., Greenbelt, Maryland, for
    Appellees/Cross-Appellants.
    Unpublished opinions are not binding precedent in this circuit.
    2
    USCA4 Appeal: 22-1189         Doc: 71       Filed: 04/21/2023     Pg: 3 of 20
    WILKINSON, Circuit Judge:
    Mario Ernesto Amaya and Jose Norland Gonzalez represent a class of construction
    workers who sued DGS Construction, LLC, also known as Schuster Concrete Construction
    (Schuster). They alleged that Schuster unlawfully withheld benefit payments on overtime
    hours the class worked while constructing the MGM Grand Hotel and Casino in Prince
    George’s County, Maryland. A jury found that Schuster was unjustly enriched under
    Maryland law by withholding these payments. Schuster appeals, arguing primarily that the
    district court committed reversible error in denying its motion for judgment as a matter of
    law because the evidence was insufficient to establish unjust enrichment. Schuster
    additionally asserts that the district court erred in certain evidentiary rulings and its jury
    instructions. Amaya and Gonzalez cross-appeal, positing that the district court erred in
    granting summary judgment to Schuster on the class’s claim alleging a violation of the
    Maryland Wage Payment and Collection Law. For the reasons that follow, we shall affirm
    the district court.
    I.
    A.
    DGS Construction, LLC, is a Maryland-based concrete contractor doing business as
    Schuster Concrete Construction. Schuster entered into a subcontract with the Whiting-
    Turner Construction Company, which had received a general contract to build the MGM
    resort.
    As the general contractor on the MGM project, Whiting-Turner executed a Project
    Labor Agreement (PLA) with various trade unions whose members would work on the
    3
    USCA4 Appeal: 22-1189      Doc: 71           Filed: 04/21/2023   Pg: 4 of 20
    construction of the resort. The PLA sought to have all subcontractors who worked on the
    project denote their agreement with the PLA and agree to be bound by its terms. The PLA,
    however, also allowed non-union subcontractors to work on the MGM project and
    exempted them from its requirements if less than three qualified union subcontractors bid
    on any aspect of the construction.
    Even those subcontractors exempted from the PLA had certain baseline
    requirements. The PLA provided that:
    Exemption from this Agreement shall not automatically relieve the
    successful bidder from complying with Project based requirements . . . . For
    all contractors working on the project, payment of prevailing wages and
    fringe benefit rates of the project as indicated on the Maryland Department
    of Labor, Licensing, and Regulation Informational Wage Rate for Prince
    George’s County determined at the commencement of the Project, which
    Developer has voluntarily adopted for the Project, shall be a minimum
    requirement and contractors are free to provide wages and fringe benefits at
    rates in excess of such prevailing rates.
    J.A. 5483. The PLA therefore incorporated as a floor for all contractors the wage rates set
    by the Maryland Department of Labor, Licensing and Regulation (DLLR) for state-funded
    projects for Prince George’s County. 1
    In December 2014, when Schuster executed a subcontract with Whiting-Turner to
    perform concrete work on the MGM project, it did not assent to the PLA because only one
    union subcontractor had bid on that aspect of the work. Schuster, however, agreed within
    1
    In 2019, the DLLR was renamed the Maryland Department of Labor. For purposes
    of this appeal, we will refer to the agency as the DLLR.
    4
    USCA4 Appeal: 22-1189      Doc: 71         Filed: 04/21/2023      Pg: 5 of 20
    its subcontract to be bound by a “Project Manual” from Whiting-Turner, which outlined
    additional requirements.
    The Project Manual included a wage rate schedule, labeled as “S.3: Project Labor
    Minimum Wage Rates” (S.3). J.A. 5389–91. The S.3 stated that, consistent with the PLA,
    Schuster must pay its workers pursuant to a designated schedule consisting of wage rates
    that “were voluntarily adopted for the Project by [the] Developer” and were “derived from
    those listed by the [DLLR] for Prince George’s County.” J.A. 5389. The S.3 further
    required Schuster to certify that the wages paid to its employees were “not less than those
    established as set forth in the Contract Documents.” Id. Importantly, the S.3 clearly stated
    that the MGM project was “not subject to State law regarding the payment of prevailing
    wages or the Davis-Bacon Act.” Id.
    The S.3 thus listed wages which mirrored those set by the DLLR. It had two columns
    labeled as “Basic Hourly Rate” and “Fringe Benefit Payment.” J.A. 5390. Workers earned
    fringe benefit payments only if they opted to receive cash in lieu of actual fringe benefits,
    such as health insurance. For example, a carpenter who opted to take the fringe benefit
    payment in lieu of in-kind benefits would receive the “Basic Hourly Rate” of $26.81 and
    the “Fringe Benefit Payment” of $8.19. Id.
    This appeal involves the lack of fringe benefit payments on overtime hours. The S.3
    did not specify whether fringe benefit payments were due for overtime hours. Whereas the
    “Basic Hourly Rate” was calculated at time and a half after 40 hours worked, Schuster took
    the position that it was not required to make fringe benefit payments on overtime hours.
    Thus, the carpenter would earn $40.22 for each overtime hour worked but zero dollars in
    5
    USCA4 Appeal: 22-1189      Doc: 71          Filed: 04/21/2023     Pg: 6 of 20
    fringe benefits. Schuster’s reasoning for not making benefit payments on overtime was that
    the costs it pays for in-kind benefits, like health insurance premiums, are fixed at monthly
    levels and do not increase when an employee works overtime. Moreover, it did not read
    the project documents as requiring fringe benefit payments on overtime. It therefore
    concluded that it need not pay Appellees fringe benefits for overtime hours.
    B.
    Mario Ernesto Amaya and Jose Norland Gonzalez were at-will employees of
    Schuster who worked on the MGM project and chose to receive cash in lieu of in-kind
    benefits. Like other Schuster employees, they received no written employment contract but
    were repeatedly told that the MGM project was a “scale” job. See, e.g., J.A. 165, 167–73.
    According to Gonzalez, he understood “scale” to mean “the highest rate paid by the state
    or federal government.” J.A. 4322.
    Amaya and Gonzalez later sued Schuster and Whiting-Turner for the lack of fringe
    benefit payments on overtime hours on behalf of a class of approximately 1,600 similarly
    situated employees. 2 They asserted five causes of action, but relevant to this appeal are the
    claims against Schuster for violations of the Maryland Wage Payment and Collection Law
    (MWPCL), 
    Md. Code Ann., Lab. & Empl. §§ 3-501
    – 3-509, and unjust enrichment under
    Maryland law.
    2
    This case was initially filed in state court in Prince George’s County, Maryland,
    but was removed to federal court by Schuster and Whiting-Turner. The district court
    asserted jurisdiction over this case pursuant to 
    28 U.S.C. § 1331
     because it involved
    questions concerning section 301 of the Labor Management Relations Act, 
    29 U.S.C. § 185
    .
    6
    USCA4 Appeal: 22-1189        Doc: 71       Filed: 04/21/2023      Pg: 7 of 20
    1.
    In August 2019, the district court granted summary judgment to Whiting-Turner on
    all claims and granted summary judgment to Schuster in part and denied it for the unjust
    enrichment claim. For the MWPCL claim, the district court noted that a “violation of the
    MWPCL occurs when an employer fails to pay ‘all wages due for work that the employee
    performed before the termination of employment,’ including overtime pay and fringe
    benefits.” J.A. 3628 (quoting 
    Md. Code Ann., Lab. & Empl. § 3-505
    (a)).
    Appellee workers insisted that Schuster had promised to make fringe benefit
    payments on overtime hours based on the Project Manual “voluntarily adopt[ing]”
    government-listed wage rates. J.A. 3629. According to Appellees, “Maryland prevailing-
    wage law . . . requires payment of fringe benefits for all hours worked,” and that
    requirement was embedded in the Project Manual. 
    Id.
     (emphasis added) (internal
    quotations omitted). Schuster was allegedly aware of this requirement, according to the
    class, and thus the S.3 constituted an enforceable promise by Schuster to pay fringe benefits
    on overtime hours.
    The district court, however, found a salient difference between wage rates and wage
    law. According to the court, “the Project Manual not only fail[ed] to explicitly incorporate
    the requirements of the Maryland prevailing wage law, but also specifically disavow[ed]
    the applicability of the Maryland prevailing wage law to the Project[.]” 
    Id.
     Moreover, the
    court noted that the Project Manual never stated whether the “Fringe Benefit Payment”
    would be made on overtime hours. Thus, the court found that Schuster had not made an
    7
    USCA4 Appeal: 22-1189       Doc: 71         Filed: 04/21/2023      Pg: 8 of 20
    explicit promise to pay its employees fringe benefits on overtime hours worked, and
    Appellees had no viable claim under the MWPCL.
    The district court distinguished the MWPCL claim, which relied on an express
    agreement to make fringe benefit payments on overtime hours, from the unjust enrichment
    claim, which does not require any existing contract. It allowed the latter to proceed to trial,
    reasoning that even without an express promise to pay fringe benefits on overtime hours,
    there remained questions of fact over whether “it would be unjust for Schuster to be
    allowed to benefit from paying lower wages to [Appellees] on a project for which it was
    agreed that all workers would receive the prevailing wage rate.” J.A. 3633.
    2.
    The unjust enrichment claim thus proceeded to a jury trial. The district court
    conducted a pre-trial conference, during which it denied Schuster’s motion in limine to
    preclude Appellees from offering evidence that Schuster’s subcontract with Whiting-
    Turner required it to make fringe benefit payments on overtime. At that time, Schuster also
    objected to the district court’s proposed jury instructions on unjust enrichment.
    The trial took place over four days in June 2021. Schuster raised further objections
    during trial to the district court’s proposed jury instructions. At the end of both Appellees’
    case-in-chief and the presentation of the evidence, Schuster moved for judgment as a matter
    of law under Fed. R. Civ. P. 50(a). The district court denied these motions. The jury later
    returned a verdict in favor of Appellees on unjust enrichment. Schuster then filed a renewed
    motion for judgment as a matter of law under Fed. R. Civ. P. 50(b). The district court
    8
    USCA4 Appeal: 22-1189        Doc: 71        Filed: 04/21/2023      Pg: 9 of 20
    denied this motion, finding there was sufficient evidence for a jury to conclude that
    Schuster was unjustly enriched under Maryland law.
    Schuster timely appealed. It now argues that the district court erred in denying its
    motions for judgment as a matter of law, as Appellees did not introduce sufficient evidence
    to establish the elements of their unjust enrichment claim. Schuster additionally renews its
    arguments regarding the denial of its motion in limine and the court’s allegedly erroneous
    jury instructions. Appellees lodge a conditional cross-appeal, arguing that if we find that
    their unjust enrichment claim fails, then we should rule that the district court erroneously
    granted Schuster summary judgment on the MWPCL claim. We need not address this
    conditional cross-appeal for we affirm the district court on the unjust enrichment issue. We
    thus focus on Schuster’s unjust enrichment arguments, taking each of its contentions in
    turn.
    II.
    The gravamen of Schuster’s argument on appeal is that the district court erred in
    concluding that there was sufficient evidence to support the jury’s verdict against it on
    unjust enrichment.
    The trial court denied Schuster’s Rule 50(b) motion on this issue below. We review
    this holding de novo. First Union Com. Corp. v. GATX Cap. Corp., 
    411 F.3d 551
    , 556 (4th
    Cir. 2005). We consider the evidence in the light most favorable to Amaya and Gonzalez
    as the prevailing parties. 
    Id.
     Schuster “bears a hefty burden in establishing that the evidence
    is not sufficient” to support the jury’s verdict. Price v. City of Charlotte, N.C., 
    93 F.3d 1241
    , 1249 (4th Cir. 1996). Though we cannot merely “rubber stamp” a jury verdict, “we
    9
    USCA4 Appeal: 22-1189       Doc: 71         Filed: 04/21/2023      Pg: 10 of 20
    are compelled to accord the utmost respect to jury verdicts and tread gingerly in reviewing
    them.” 
    Id. at 1250
    . In sum, “[e]ntry of judgment as a matter of law is appropriate only if
    the evidence is legally insufficient to support the jury’s verdict.” Bresler v. Wilmington Tr.
    Co., 
    855 F.3d 178
    , 196 (4th Cir. 2017).
    A.
    To prevail on a claim of unjust enrichment under Maryland law, a plaintiff must
    show:
    1. A benefit conferred upon the defendant by the plaintiff; 2. [a]n
    appreciation or knowledge by the defendant of the benefit; and 3. [t]he
    acceptance or retention by the defendant of the benefit under such
    circumstances as to make it inequitable for the defendant to retain the benefit
    without the payment of its value.
    Hill v. Cross Country Settlements, LLC, 
    936 A.2d 343
    , 351 (Md. 2007). As Maryland
    courts recognize, however, a claim for unjust enrichment “may not be reduced neatly to a
    golden rule.” 
    Id.
     In general, a “successful unjust enrichment claim serves to deprive the
    defendant of the benefits that in equity and good conscience he ought not to keep, even
    though he may have received those benefits quite honestly in the first instance, and even
    though the plaintiff may have suffered no demonstrable losses.” 
    Id. at 352
     (internal
    quotations omitted).
    Unjust enrichment, moreover, is a remedy “to provide relief for a plaintiff when an
    enforceable contract does not exist but fairness dictates that the plaintiff receive
    compensation for services provided.” Cnty. Comm’rs of Caroline Cnty. v. J. Roland
    Dashiell & Sons, Inc., 
    747 A.2d 600
    , 607 (Md. 2000) (internal quotations omitted). In an
    unjust enrichment case, “there has been no agreement, the defendant has no prior
    10
    USCA4 Appeal: 22-1189       Doc: 71         Filed: 04/21/2023      Pg: 11 of 20
    expectations either as to value or as to risk, and so the law of restitution simply returns the
    defendant to the status quo by disgorging the value of the benefit actually received.” Dolan
    v. McQuaide, 
    79 A.3d 394
    , 403 (Md. App. 2013). Accordingly, a defendant may be
    unjustly enriched even if “a plaintiff is mistaken as to the duties or rights that he or she
    owes another and because of his mistake confers a benefit upon another[.]” Hill, 936 A.2d
    at 355 (internal quotations omitted).
    B.
    With these principles in mind, we conclude there was sufficient evidence for the
    jury to determine that Schuster was unjustly enriched by failing to pay Appellees fringe
    benefits on overtime hours worked.
    1.
    We start with the evidence presented as to the “benefit conferred” on Schuster. A
    benefit “denotes any form of advantage,” including the “advantage for which a person
    ordinarily must pay” or where a plaintiff “saves” a defendant “from expense or loss.”
    Restatement (First) of Restitution § 1 cmt. b (1937); see also Hill, 936 A.2d at 353 (citing
    the First Restatement with approval). A benefit can be, inter alia, money or the
    performance of a service. See, e.g., Hill, 936 A.2d at 354 (paying a debt is a benefit
    conferred); Dolan, 
    79 A.3d at
    403–04 (genuine dispute of material fact over whether
    consultant, who had allegedly helped plan opening of a gas station, provided a benefit to
    owner); Everhart v. Miles, 
    422 A.2d 28
    , 31 (Md. App. 1980) (making repairs and
    improvements on defendant’s property constituted a benefit).
    11
    USCA4 Appeal: 22-1189      Doc: 71         Filed: 04/21/2023     Pg: 12 of 20
    Appellees presented sufficient evidence at trial that they conferred a benefit on
    Schuster in the form of their services as workers on the MGM project. Although they
    received a basic hourly wage for overtime hours, they did not receive fringe benefits on
    those hours. Schuster conceded that the company “did not pay the fringe rate for any
    overtime hours worked by the plaintiffs or class members on the project.” J.A. 4470. This
    concession shows a benefit conferred.
    Schuster also admitted that “no member of the overtime fringe benefit class worked
    2,080 or more regular straight time hours in a year.” 
    Id.
     This shows a benefit conferred, as
    Schuster computed the hourly benefit payments by calculating the annual value of the
    premiums it normally pays an employee’s in-kind benefits, and then dividing that value by
    2,080 hours—or 52 weeks of 40 regular time hours. Therefore, for an employee to receive
    the full annualized value of the cash benefit payments in lieu of in-kind benefits, he would
    had to have worked all 2,080 regular hours across the year. Given that none of the class
    worked 2,080 regular time hours, a jury could reasonably conclude that the class saved
    Schuster an expense it would otherwise bear—the normal cost of paying premiums on its
    employees’ benefits. Thus, there was sufficient evidence of a benefit conferred.
    2.
    As for the second element—whether a defendant has “appreciation or knowledge”
    of the benefit conferred—the “essence” of this requirement is that “the defendant ha[s] an
    opportunity to decline the benefit.” Hill, 936 A.2d at 354. Thus, the defendant need not
    have had knowledge of the benefit precisely at the time it was received if he could still
    decline or return the benefit when he became aware of it. See id. at 354–55. Moreover,
    12
    USCA4 Appeal: 22-1189       Doc: 71         Filed: 04/21/2023      Pg: 13 of 20
    even if a plaintiff confers a benefit by mistake, this element can be satisfied as long as that
    mistake at some point dawns on the defendant and he “retains a choice of keeping or
    returning it.” Id. at 355 (internal quotations omitted).
    Appellees presented sufficient evidence that Schuster had knowledge and
    appreciation of the benefit conferred in multiple respects. First, we reiterate that Schuster
    conceded that its payments to workers did not include fringe benefit payments. Schuster
    was therefore aware that it had received the benefits of Appellees’ services without having
    included the overtime fringe benefit amounts. Indeed, Schuster’s Chief Financial Officer
    and its corporate designee, Lorraine Burns, testified that Schuster pays fringe benefit
    amounts on overtime hours for federal prevailing wage projects. As the district court noted,
    Schuster was thus “fully aware that contractors, under certain circumstances, pay overtime
    fringe benefit amounts, and that being able to refrain from paying overtime fringe benefit
    amounts reduces its labor costs and thus provides it with a financial benefit.” J.A. 3723.
    Second, a jury also reasonably could have concluded that Schuster knew or
    appreciated the benefit conferred upon it by Appellees because it tried to justify the lack of
    fringe benefit payments on overtime hours to Whiting-Turner. Burns testified that in March
    2016, while the project was ongoing, a Whiting-Turner representative asked why Schuster
    was not paying fringe benefits on overtime hours worked. In response, Burns provided
    several supporting documents for Schuster’s position that it was not required to pay fringe
    benefits on overtime. As Burns put it, “I was trying to indicate that what we do is a
    reasonable practice.” J.A. 4594. Based on this evidence, a reasonable jury could conclude
    that Schuster would not have tried to justify its practice of denying fringe benefit payments
    13
    USCA4 Appeal: 22-1189      Doc: 71         Filed: 04/21/2023      Pg: 14 of 20
    on overtime if it did not know or appreciate that it was retaining some benefit by avoiding
    these payments.
    Third, there was further evidence presented that, even if they did not constitute an
    enforceable promise, the PLA and the Project Manual contemplated the payment of fringe
    benefits on overtime, and that Schuster knew this. As discussed above, these documents
    established that Whiting-Turner had committed to pay all contractors working on the MGM
    project the prevailing wage rates for Prince George’s County set by the DLLR. The S.3
    schedule then mirrored those rates. James Tudor, a DLLR Program Administrator
    responsible for the enforcement of state prevailing wage laws, testified at trial that it was
    the long-standing interpretation of the DLLR that on state prevailing wage projects,
    Maryland law requires the payment of fringe benefits on all hours worked, including
    overtime.
    Even if Schuster was unaware of the DLLR’s interpretation at the commencement
    of the project, evidence presented raises a plausible inference that it became aware while
    the project was ongoing. Burns attended a presentation during the MGM project in which
    Tudor discussed the requirement to pay fringe benefits on overtime hours. Although Burns
    vociferously denied during her testimony that she learned this information, a jury
    reasonably could have found that, in light of all the evidence, she knew of the requirement
    to pay fringe benefits on overtime. Such “credibility determinations” are the jury’s to make.
    Reeves v. Sanderson Plumbing Prod., Inc., 
    530 U.S. 133
    , 150 (2000).
    14
    USCA4 Appeal: 22-1189      Doc: 71          Filed: 04/21/2023     Pg: 15 of 20
    3.
    The last element of unjust enrichment—whether it would be inequitable for
    defendants to retain the benefit conferred without payment—necessitates “a fact-specific
    balancing of the equities.” Hill, 936 A.2d at 355. “The balancing of equities and hardships
    looks at the conduct of both parties and the potential hardships that might result from a
    judicial decision either way.” Royal Inv. Grp., LLC v. Wang, 
    961 A.2d 665
    , 685 (Md. App.
    2008) (internal quotations and alteration omitted). Though any misconduct or fault by one
    of the parties may be considered under this element, a finding of fault is unnecessary to
    find a defendant unjustly enriched. See Hill, 936 A.2d at 352. Whether a party is legally or
    otherwise entitled to the benefit may also factor into the weighing of the equities. See Plitt
    v. Greenberg, 
    219 A.2d 237
    , 241 (Md. 1966).
    There was sufficient evidence for a reasonable jury to conclude that Schuster’s
    failure to pay fringe benefits on overtime hours was inequitable. We begin by noting that
    such an inherently fact-specific question is the province of the jury, for the “very essence”
    of a jury’s fact-finding function “is to select from among conflicting inferences and
    conclusions that which it considers most reasonable.” Tennant v. Peoria & P. U. Ry. Co.,
    
    321 U.S. 29
    , 35 (1944). We highlight some of the evidence below.
    First, and as discussed above, evidence was presented that Schuster’s failure to
    make fringe benefit payments to certain employees deprived them of the full value of their
    benefits when compared to those employees who received their benefits in-kind. Whereas
    employees who received their benefits in-kind gained the total value of their benefits
    irrespective of how their hours were split between regular and overtime hours, none of the
    15
    USCA4 Appeal: 22-1189       Doc: 71        Filed: 04/21/2023     Pg: 16 of 20
    class members received the full value of their benefits. A reasonable jury could have found
    this disparity inequitable.
    Second, a jury could have believed that the overall context of Schuster’s subcontract
    made it inequitable for Schuster to withhold fringe benefit payments. The S.3 shows that
    Schuster agreed to pay the wage rates “voluntarily adopted” for the MGM project by
    Whiting-Turner, which mirrored the “Informational Wage Rates for Prince George’s
    County” established by the DLLR. J.A. 5389. Moreover, testimony presented at trial
    showed that Schuster was aware of the PLA when it bid on the MGM project. Schuster
    therefore knew that it was working on a project which explicitly tied its wage rates for all
    contractors, both union and non-union, to that of the state prevailing wage. That state
    prevailing wage, according to Tudor, requires fringe benefits to be paid on overtime hours.
    Third, there was evidence presented throughout trial that Schuster advertised that
    the MGM project was “scale” to its workers and touted the S.3 as exemplative of the wages
    being “scale.” Nothing on the S.3 denoted to employees that fringe benefits would not be
    paid on overtime hours. As Appellee Gonzalez testified, he understood “scale” to mean
    “the highest rate paid by the state or federal government.” J.A. 4322. Schuster employees
    recognized that the terms “scale” and “prevailing wage” are “interchangeable.” J.A. 4130.
    And, as discussed, Tudor testified that the DLLR believed the state prevailing wage to
    include fringe benefit payments on overtime, a requirement which Burns and Schuster
    arguably learned during the MGM project. A jury could reasonably have concluded that
    Schuster gave workers the false impression that they would receive fringe benefits on
    16
    USCA4 Appeal: 22-1189       Doc: 71         Filed: 04/21/2023      Pg: 17 of 20
    overtime by repeatedly advertising it as a “scale” project, and thus it was unjust for Schuster
    to have refused to make such payments.
    In response, Schuster primarily argues that it could not have been unjustly enriched
    because Appellees had no legal entitlement to fringe benefits on overtime. It cites the
    Supreme Court of Maryland’s recent decision in a sister case to this action, Amaya v. DGS
    Constr., LLC, 
    278 A.3d 1216
    , 1250–51 (Md. 2022), to argue that “Appellees’ claim would
    be viable only to the extent that they were entitled to be compensated for fringe benefits on
    overtime.” Appellant’s Response and Reply Br. at 5.
    We do not think Maryland Supreme Court’s decision in Amaya worked a sea-change
    in the law of unjust enrichment. Although entitlement to compensation may well factor
    into the weighing of the equities, see Plitt, 219 A.2d at 241, unjust enrichment under
    Maryland law contemplates a situation “when an enforceable contract does not exist but
    fairness dictates that the plaintiff receive compensation for services provided.” Dashiell,
    747 A.2d at 607 (internal quotations omitted). A jury must therefore consider the
    reasonable expectations of the parties and its own sense of fairness in determining whether
    a defendant was unjustly enriched. As the district court noted, the “fact that there was no
    contractual agreement” between Schuster and Appellees on the fringe benefit payments for
    overtime hours “does not bar recovery” nor does it serve as a “complete defense” to such
    an action. J.A. 3729.
    Ultimately, there was evidence that Schuster benefitted from a contract which
    incorporated the state prevailing wage rates as a floor for non-union employees. It assented
    to those wage rates by agreeing to abide by the Project Manual, and it then advertised those
    17
    USCA4 Appeal: 22-1189      Doc: 71         Filed: 04/21/2023     Pg: 18 of 20
    wage rates to prospective employees in the S.3. It repeatedly touted the project as “scale,”
    and there was evidence to suggest that “scale” would include fringe benefit payments on
    overtime. Schuster then unilaterally withheld such payments despite evidence that it knew
    of and appreciated the benefit it was receiving. It also reaped cost savings from employees
    in the class who opted for cash benefits payments when compared to those employees who
    elected to receive benefits in-kind. A jury could thus conclude that it would be inequitable
    for Schuster not to make fringe benefit payments on overtime. We cannot conclude that
    the evidence was legally insufficient to prove unjust enrichment. Accordingly, we shall
    uphold the jury’s verdict.
    III.
    Schuster also argues that the district court erred in instructing the jury on unjust
    enrichment and in denying its motion in limine to exclude testimony that the S.3 obligated
    Schuster to pay fringe benefits on overtime hours. We review both contentions under an
    abuse of discretion standard. See Noel v. Artson, 
    641 F.3d 580
    , 586 (4th Cir. 2011) (jury
    instructions); United States v. Hornsby, 
    666 F.3d 296
    , 309 (4th Cir. 2012) (motions in
    limine).
    A.
    The district court instructed the jury on each of the three elements of unjust
    enrichment. Schuster’s primary argument is that the instructions did not account for the
    nature of its relationship with Appellees—namely, that Appellees were at-will
    employees—which Schuster argues changes the nature of their unjust enrichment claim. It
    faults the district court for charging the jury “with little more than the hornbook elements
    18
    USCA4 Appeal: 22-1189       Doc: 71         Filed: 04/21/2023      Pg: 19 of 20
    of an unjust enrichment claim,” which neglected the different nature of its relationship with
    Appellees. Opening Br. at 36.
    Schuster’s argument boils down to little more than a disagreement with the law of
    unjust enrichment. The district court was not required to address the at-will nature of the
    parties, but, even so, it did instruct the jury to consider “whether one party was legally or
    otherwise entitled to” the benefit under the third element. J.A. 4741. Schuster’s primary
    issue seems to be that the district court did not go far enough in massaging the elements of
    unjust enrichment to suit its theory of the case.
    The refusal to give a requested jury instruction is reversible error only if the
    instruction “(1) was correct, (2) was not substantially covered by the charge that the district
    court actually gave to the jury, and (3) involved some point so important that the failure to
    give the instruction seriously impaired the defendant’s defense.” Ward v. AutoZoners, LLC,
    
    958 F.3d 254
    , 272 (4th Cir. 2020) (internal quotations omitted). Schuster makes no effort
    to argue that its requested instructions fit these criteria. The instructions tendered by the
    district court correctly explained the applicable law and related that law to the
    circumstances of the case. See United States v. Lewis, 
    53 F.3d 29
    , 34 (4th Cir. 1995). We
    thus see no merit in this assignment of error.
    B.
    Schuster also argues that the district court abused its discretion by denying
    Schuster’s motion in limine to preclude testimony that the S.3 obliged it to pay fringe
    benefits on overtime hours. According to Schuster, this ruling was inconsistent with the
    court’s summary judgment conclusion that the S.3 “not only fails to explicitly incorporate
    19
    USCA4 Appeal: 22-1189      Doc: 71          Filed: 04/21/2023     Pg: 20 of 20
    the requirements of Maryland prevailing wage law, but actually specifically disavows the
    applicability of the Maryland prevailing wage law.” J.A. 3629.
    We disagree. As the lower court summarized, though the S.3 may not have created
    a contractual right to fringe benefit payments on overtime hours, the S.3 was clearly
    relevant to determining the “intentions and expectations of the plaintiffs and other relevant
    actors” and “whether the failure of Schuster to pay was inequitable.” J.A. 3775. And in an
    action for unjust enrichment, such evidence is admissible. District courts are necessarily
    closer to the evidence at trial, and we accordingly respect their discretion in regulating its
    admissibility. See Sprint/United Mgmt. Co. v. Mendelsohn, 
    552 U.S. 379
    , 384 (2008). We
    decline to disturb the district court’s sound judgment here.
    IV.
    Last, the class cross-appeals the district court’s grant of summary judgment to
    Schuster on their claim under the MWPCL. At oral argument, Appellees conceded that the
    cross-appeal was conditional and only viable to the extent that we reversed the jury’s
    verdict on unjust enrichment. See Oral Arg. at 2:50:12. Because we affirm the jury’s unjust
    enrichment verdict, we likewise shall not disturb the district court’s grant of summary
    judgment to Schuster on the MWPCL claim.
    V.
    For the foregoing reasons, the judgment of the district court is affirmed.
    AFFIRMED
    20