James Hefren v. Murphy Expl & Prodn Co., USA, et a ( 2016 )


Menu:
  •                        REVISED JUNE 6, 2016
    IN THE UNITED STATES COURT OF APPEALS
    FOR THE FIFTH CIRCUIT
    United States Court of Appeals
    Fifth Circuit
    No. 15-30980                             FILED
    Summary Calendar                       April 25, 2016
    Lyle W. Cayce
    Clerk
    JAMES HEFREN,
    Plaintiff - Appellant
    v.
    MCDERMOTT, INC.,
    Defendant - Appellee
    Appeal from the United States District Court
    for the Western District of Louisiana
    Before KING, CLEMENT, and OWEN, Circuit Judges.
    PER CURIAM:
    Plaintiff–Appellant James Hefren filed suit in state court against
    Defendant–Appellee McDermott, Inc., alleging personal injuries from
    McDermott’s design and construction of the Front Runner Spar, an offshore
    drilling and production platform in the Gulf of Mexico. Following removal of
    the case to federal court, McDermott filed a motion for summary judgment,
    arguing that Hefren’s claims were perempted under Louisiana state law and
    could no longer be brought. The district court granted the motion for summary
    No. 15-30980
    judgment, and Hefren now appeals. For the following reasons, we AFFIRM
    the judgment of the district court.
    I. FACTUAL AND PROCEDURAL BACKGROUND
    The instant case arises out of personal injuries allegedly sustained by
    Plaintiff–Appellant James Hefren while he was employed by Murphy
    Exploration & Production Company, USA (Murphy), as a lead operator on the
    Front Runner Spar. In March 2002, Murphy contracted with Defendant–
    Appellee McDermott, Inc. (McDermott) to have McDermott design and
    construct the Front Runner Spar, an offshore facility to be used by Murphy for
    removing and processing petroleum from the seabed of the Gulf of Mexico. 1 In
    May 2004, Murphy accepted delivery of the Front Runner Spar and affixed it
    to the seafloor at the outer continental shelf adjacent to the State of Louisiana
    where it has remained since, operating as a platform facility with three decks
    used for crew quarters, drilling, and production.
    According to Hefren, he suffered significant injury on or about June 6,
    2011, on the Front Runner Spar when a flange of a valve struck him in the
    face. Following his injury, Hefren filed suit against Murphy and McDermott
    in the 16th Judicial District Court for the Parish of St. Mary in Louisiana on
    June 4, 2012. 2 In his complaint, Hefren invoked jurisdiction under the Jones
    Act and general maritime law and asserted claims for negligence. Hefren
    alleged that both Murphy and McDermott failed to take precautions for
    Hefren’s safety and specifically alleged that McDermott failed to properly
    1  As previously described by this court, “[a] spar is a nautical structure designed to
    float with the bulk of the hull below waves—something akin to a giant buoy,” and spars have
    increasingly been used “to exploit oil and gas resources in deeper ocean waters.” Fields v.
    Pool Offshore, Inc., 
    182 F.3d 353
    , 355 (5th Cir. 1999).
    2 Hefren’s initial complaint improperly named J. Ray McDermott Gulf Contractors,
    Inc., as a defendant rather than McDermott, Inc. Hefren later supplemented and amended
    his original complaint, substituting McDermott as a defendant.
    2
    No. 15-30980
    design and construct the Front Runner Spar.                    Murphy then removed the
    matter to the United States District Court for the Western District of
    Louisiana on July 12, 2012, asserting diversity jurisdiction under 28 U.S.C.
    § 1332 and jurisdiction under the Outer Continental Shelf Lands Act (OCSLA).
    Hefren subsequently filed a motion to remand his case to state court on August
    13, 2012, arguing that he was a seaman under the Jones Act and that Jones
    Act claims could not be removed to federal court on the basis of diversity
    jurisdiction. 3 However, the motion was denied on October 25, 2012, by a
    magistrate judge who concluded that Hefren could not maintain a claim under
    the Jones Act because the Front Runner Spar was not a vessel and therefore
    Hefren was not a seaman. On May 2, 2013, the district court entered summary
    judgment for Murphy, dismissing Hefren’s tort claims against Murphy as
    barred by the exclusive remedy provisions of the Longshore & Harbor Workers’
    Compensation Act.
    On February 17, 2014, McDermott filed its own motion for summary
    judgment, seeking the dismissal of Hefren’s claims against it with prejudice.
    McDermott argued that Hefren’s claims were barred or perempted under La.
    Stat. Ann. § 9:2772, which provides that no action arising out of deficiencies in
    the design or construction of immovable property can be brought five years
    after the date on which the property is accepted by the owner. 4 Because
    3 Under the Jones Act, “[a] seaman injured in the course of employment . . . may elect
    to bring a civil action at law, with the right of trial by jury, against the employer.” 46 U.S.C.
    § 30104. Because the Jones Act incorporates “[l]aws of the United States regulating recovery
    for personal injury . . . of a railway employee,” 
    id., it also
    incorporates those laws’ prohibition
    against removal of actions filed in state court. See 28 U.S.C. § 1445(a) (“A civil action in any
    State court against a railroad or its receivers or trustees, arising under [federal laws
    applicable to the liability of railroads], may not be removed to any district court of the United
    States.”).
    4 The applicable Louisiana statute provides, in relevant part:
    A. Except as otherwise provided in this Subsection, no action, whether ex
    contractu, ex delicto, or otherwise, including but not limited to an action for
    3
    No. 15-30980
    Hefren’s claims—relating to deficiencies in the Front Runner Spar—were
    brought in 2013 and Murphy took possession of the Front Runner Spar in 2004,
    McDermott argued that Hefren’s claim was perempted and that McDermott
    was entitled to judgment as a matter of law. In response, Hefren argued that
    La. Stat. Ann. § 9:2772 did not apply to his claims against McDermott because
    the Front Runner Spar was not immovable as only its mooring system was
    failure to warn, to recover on a contract, or to recover damages, or otherwise
    arising out of an engagement of planning, construction, design, or building
    immovable or movable property which may include, without limitation,
    consultation, planning, designs, drawings, specification, investigation,
    evaluation, measuring, or administration related to any building, construction,
    demolition, or work, shall be brought against any person performing or
    furnishing land surveying services, as such term is defined in R.S. 37:682,
    including but not limited to those services preparatory to construction, or
    against any person performing or furnishing the design, planning, supervision,
    inspection, or observation of construction or the construction of immovables, or
    improvement to immovable property, including but not limited to a residential
    building contractor as defined in R.S. 37:2150.1:
    (1)(a) More than five years after the date of registry in the mortgage office of
    acceptance of the work by owner.
    ...
    B. (1) The causes which are perempted within the time described above include
    any action:
    (a) For any deficiency in the performing or furnishing of land
    surveying services, as such term is defined in R.S. 37:682,
    including but not limited to those preparatory to construction or
    in the design, planning, inspection, or observation of
    construction, or in the construction of any improvement to
    immovable property, including but not limited to any services
    provided by a residential building contractor as defined in R.S.
    37:2150.1(9).
    (b) For damage to property, movable or immovable, arising out
    of any such deficiency.
    (c) For injury to the person or for wrongful death arising out of
    any such deficiency.
    (d) Brought against a person for the action or failure to act of his
    employees.
    (2) Deficiency, as used in this Section, includes failure to warn the owner of
    any dangerous or hazardous condition, regardless of when knowledge of the
    danger or hazard is obtained or should have been obtained.
    La. Stat. Ann. § 9:2772.
    4
    No. 15-30980
    attached to the seabed, allowing it to be unmoored and transported across the
    ocean. Hefren also argued that he asserted claims outside of the scope of that
    statute when he claimed that McDermott failed to identify safety hazards to
    Murphy employees.
    The district court granted McDermott’s motion for summary judgment
    and dismissed Hefren’s claims against McDermott with prejudice on April 9,
    2014. Examining the undisputed facts, the court noted that the Front Runner
    Spar was “a structure permanently affixed to the seabed and not a vessel.” The
    district court then noted that, although Louisiana courts and the Fifth Circuit
    had never concluded whether spars were immovable property, these courts had
    held that fixed, offshore platforms permanently affixed to the sea floor were
    immovable property and that spars were akin to offshore platforms. Based on
    these cases and certain features of the Front Runner Spar, the court held that
    the Spar was a “building” and constituted immovable property under La. Stat.
    Ann. § 9:2772. Among other features, the court noted that the Spar’s mooring
    system was permanently attached to the seabed, the Spar was intended to be
    at its location for a twenty-year lifetime, it would take months of planning and
    work to remove the Spar from its anchored position in the Gulf of Mexico, and
    the Spar had remained fixed in its original location since being attached—even
    remaining there through several hurricanes. Regarding Hefren’s assertion
    that some of his claims were not within La. Stat. Ann. § 9:2772, the court held
    that these claims were essentially failure to warn claims and were perempted
    by the statute. Hefren timely appealed the judgment.
    II. STANDARD OF REVIEW
    We review a grant of summary judgment de novo, applying the same
    standard as the district court. Rogers v. Bromac Title Servs., L.L.C., 
    755 F.3d 347
    , 350 (5th Cir. 2014). Summary judgment is proper “if the movant shows
    that there is no genuine dispute as to any material fact and the movant is
    5
    No. 15-30980
    entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a). A genuine
    dispute of material fact exists “if the evidence is such that a reasonable jury
    could return a verdict for the nonmoving party.” Anderson v. Liberty Lobby,
    Inc., 
    477 U.S. 242
    , 248 (1986). However, “[a] mere scintilla of evidence will not
    preclude granting of a motion for summary judgment.” Schaefer v. Gulf Coast
    Reg’l Blood Ctr., 
    10 F.3d 327
    , 330 (5th Cir. 1994) (per curiam). “We construe
    all facts and inferences in the light most favorable to the nonmoving party
    when reviewing grants of motions for summary judgment.” Dillon v. Rogers,
    
    596 F.3d 260
    , 266 (5th Cir. 2010) (quoting Murray v. Earle, 
    405 F.3d 278
    , 284
    (5th Cir. 2005)).
    III. PEREMPTION UNDER LOUISIANA STATE LAW
    In determining whether Hefren’s suit is barred, we look to Louisiana law
    under OCSLA because the Front Runner Spar is located on the outer
    continental shelf adjacent to the State of Louisiana. See Fruge ex rel. Fruge v.
    Parker Drilling Co., 
    337 F.3d 558
    , 560 (5th Cir. 2003) (“OCSLA adopts the law
    of the adjacent state . . . as surrogate federal law, to the extent that it is not
    inconsistent with other federal laws and regulations.”). 5 Under the applicable
    Louisiana law, any action relating to a deficiency “in the design, planning,
    inspection, or observation of construction, or in the construction of any
    improvement to immovable property,” and alleging personal injury or “failure
    5   The applicable provision of OCSLA provides, in relevant part:
    To the extent that they are applicable and not inconsistent with this
    subchapter or with other Federal laws and regulations of the Secretary now in
    effect or hereafter adopted, the civil and criminal laws of each adjacent State,
    now in effect or hereafter adopted, amended, or repealed are declared to be the
    law of the United States for that portion of the subsoil and seabed of the outer
    Continental Shelf, and artificial islands and fixed structures erected thereon,
    which would be within the area of the State if its boundaries were extended
    seaward to the outer margin of the outer Continental Shelf.
    43 U.S.C. § 1333(a)(2)(A).
    6
    No. 15-30980
    to warn,” is perempted if brought “[m]ore than five years after . . . acceptance
    of the work by [the] owner.” La. Stat. Ann. § 9:2772. Rather than simply
    “barr[ing] the remedy to be enforced” like a statute of limitations, this
    “peremptive statute . . . totally destroys the previously existing right so that,
    upon expiration of the statutory period, a cause of action or substantive right
    no longer exists to be enforced.” KSLA-TV, Inc. v. Radio Corp. of Am., 
    732 F.2d 441
    , 443 (5th Cir. 1984) (per curiam). The parties here disagree over whether
    the Front Runner Spar is immovable property under Louisiana law. If it is,
    then Hefren’s claims against McDermott fall within the Louisiana statute of
    peremption and no longer exist because they were brought more than five years
    after Murphy accepted delivery of the Front Runner Spar. 6
    As the district court properly concluded, the Front Runner Spar is
    immovable property and Hefren’s claims are extinguished under La. Stat. Ann.
    § 9:2772. In Olsen v. Shell Oil Co., 
    365 So. 2d 1285
    , 1290 (La. 1978), the
    Supreme Court of Louisiana recognized that a fixed offshore drilling platform
    constituted an immovable “building” within the meaning of a separate
    Louisiana statute. In particular, the court explained that, in determining
    whether an object was a building, there was “[a]n inherent requirement . . .
    that there be a structure of some permanence.” 
    Id. at 1289.
    Relying on Olsen,
    a Louisiana appellate court later found that a “fixed drilling platform was a
    separate immovable,” within the meaning of La. Stat. Ann. § 9:2772.
    Bruyninckx v. Bratten, 
    554 So. 2d 247
    , 249 (La. Ct. App. 1989). Although spars
    are not the same as fixed drilling platforms, we have previously noted that a
    6 Hefren argues that his claims against McDermott for failing to instruct Murphy
    employees on how to operate the equipment are not subject to the statute of peremption
    because he is alleging a failure to provide adequate instruction rather than a failure to warn.
    However, under Louisiana law, instructions and warnings are considered part of the design
    of an object, and both are subject to the statute of peremption as to design defect claims in
    La. Stat. Ann. § 9:2772. Smith v. Arcadian Corp., 
    657 So. 2d 464
    , 469 (La. Ct. App. 1995).
    7
    No. 15-30980
    spar can resemble a fixed drilling platform because it “serve[s] as a work
    platform in a specific, fixed location for the foreseeable future,” and is “secured
    to the ocean floor . . . using an elaborate system that guarantees movement
    will be a difficult and expensive undertaking.” 
    Fields, 182 F.3d at 358
    ; see also
    Mendez v. Anadarko Petroleum Corp., 466 F. App’x 316, 317 (5th Cir. 2012)
    (per curiam) (unpublished) (noting that a spar’s “features [we]re . . . consistent
    with a fixed structure permanently moored far offshore”).
    While both Fields and Mendez were Jones Act cases that ultimately
    concluded that spars were not vessels for the purpose of the Jones Act, their
    discussion of spars illustrates the similarity of spars to fixed offshore drilling
    platforms that are considered immovable property under Louisiana law. This
    caselaw and the specific facts found by the district court lead us to conclude
    that the Front Runner Spar is immovable property. Like a “building” under
    Louisiana law, there is “some permanence” to the Front Runner Spar as it has
    not moved from its present location, is intended to remain there for its twenty
    year life, and has a permanent mooring system. 
    Olsen, 365 So. 2d at 1289
    .
    And while Hefren argues that the Front Runner Spar cannot be immovable
    because it could be moved, he fails to address the district court’s finding that
    it would take planning, work, and deconstruction of the Front Runner Spar in
    order to move it from its anchored position, a feature that gives the Spar “some
    permanence.” 7 
    Id. 7 In
    the alternative, Hefren suggests that the question of whether the Front Runner Spar is
    immovable property should be certified to the Louisiana Supreme Court. We decline this
    invitation. Although Louisiana courts do not appear to have answered the question of
    whether spars are immovable property, we find sufficient guidance in the existing caselaw to
    decide the instant matter. See Transcon. Gas Pipeline Corp. v. Transp. Ins. Co., 
    958 F.2d 622
    , 623 (5th Cir. 1992) (per curiam) (“Certification is not a panacea for resolution of those
    complex or difficult state law questions which have not been answered by the highest court
    of the state. Neither is it to be used as a convenient way to duck our responsibility in OCSLA
    or diversity jurisdiction.”).
    8
    No. 15-30980
    IV. CONCLUSION
    For the foregoing reasons, the judgment of the district court is
    AFFIRMED.