Jeff Simmons v. Sabine River Authority, et , 732 F.3d 469 ( 2013 )


Menu:
  •      Case: 12-30494    Document: 00512402572      Page: 1   Date Filed: 10/09/2013
    IN THE UNITED STATES COURT OF APPEALS
    FOR THE FIFTH CIRCUIT  United States Court of Appeals
    Fifth Circuit
    FILED
    October 9, 2013
    No. 12-30494                    Lyle W. Cayce
    Clerk
    JEFF SIMMONS; ALICE SIMMONS; JEANNE SIMMONS; GERALD
    EDWARD MCBRIDE; EDWARD BRYANT BONNER; ET AL,
    Plaintiffs-Appellants,
    v.
    SABINE RIVER AUTHORITY STATE OF LOUISIANA; LOUISIANA
    DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT; LINDA
    CURTIS SPARKS; ENTERGY GULF STATES LOUISIANA L.L.C.;
    ENTERGY CORPORATION; ENTERGY SERVICES INCORPORATED;
    ENTERGY LOUISIANA, L.L.C.,
    Defendants-Appellees.
    Appeal from the United States District Court
    for the Western District of Louisiana
    Before STEWART, Chief Judge, and SMITH and WIENER, Circuit Judges.
    CARL E. STEWART, Chief Judge:
    This case asks us to resolve whether the Federal Power Act preempts
    property damage claims under state law where the claim alleges negligence for
    failing to act in a manner FERC expressly declined to mandate while operating
    a FERC-licensed project. We hold that it does, and so we AFFIRM the district
    court’s dismissal of Plaintiffs’ case with prejudice.
    Case: 12-30494       Document: 00512402572         Page: 2    Date Filed: 10/09/2013
    No. 12-30494
    I. BACKGROUND
    A.     Facts
    The Sabine River meanders between Texas and Louisiana. Two state
    agencies jointly regulate the Sabine River’s waterways: the Sabine River
    Authority of Louisiana and the Sabine River Authority of Texas (collectively,
    “Authorities”).     Upon application by the Authorities, the Federal Power
    Commission1 granted a fifty-year license (the “License”), commencing October
    1, 1963, to the Authorities for the “construction, operation and maintenance” of
    Project Number 2305 (the “Project”). The Project included the construction of a
    dam (the “Toledo Bend Dam” or the “Dam”), a large reservoir, a spillway, and a
    hydroelectric plant. The Dam spans the Texas/Louisiana state line and is
    located in the southern part of the reservoir.
    Under a Power Sales Agreement (the “Agreement”), the Authorities
    granted Defendant-Appellant Entergy2 the right to oversee the generation of
    power and to purchase the generated power. Under the terms of the Agreement,
    Entergy is subject to the terms and conditions of the License. The License
    requires the Authorities to maintain a normal maximum reservoir elevation of
    172 feet mean sea level (“msl”). To generate power, a minimum reservoir
    elevation of 162.2 feet msl is required. To maintain the required reservoir levels,
    water is released through the spillway gates, the power turbines, or both.
    Entergy and the Authorities operate the spillway gates, which are located in
    Louisiana.
    1
    In 1977, the Federal Power Commission was reorganized and renamed the Federal
    Energy Regulatory Commission (“FERC”). References to FERC herein encompass both the
    Federal Power Commission and FERC.
    2
    The Agreement was entered into with Entergy’s predecessors, but we refer simply to
    “Entergy” for ease of understanding. For purposes of this appeal, Entergy includes all of the
    named Entergy defendants.
    2
    Case: 12-30494      Document: 00512402572        Page: 3     Date Filed: 10/09/2013
    No. 12-30494
    Between 2000 and 2003, pursuant to Article 43 of the License, FERC
    considered several requests to modify the Project’s operations.3 FERC conducted
    an analysis of historical floods and found that the Dam had not had “any
    significant effect” on flooding. FERC ultimately denied most of the requests,
    including a request to raise the Project’s minimum reservoir elevation, and
    issued a report explaining its reasoning. In declining to order changes to project
    operations during floods, FERC observed that the Project “cannot provide any
    significant flood control benefits.” However, FERC did require improvements to
    the Project’s Emergency Action Plan.
    B.     Procedural History
    Plaintiffs-Appellants (“Plaintiffs”) are 28 individuals who allege that their
    properties were flooded and eroded after the Authorities and Entergy opened the
    spillway gates from October 30, 2009 through November 2009.4
    In October 2010, Plaintiffs filed suit in Louisiana state court, alleging
    negligence, nuisance, trespass, unconstitutional taking, damage of property
    without just compensation, and due process violations under the Louisiana and
    United States constitutions.        Plaintiffs sought, inter alia, damages and a
    permanent injunction “enjoining [Defendants] from opening the flood gates of
    the Toledo Bend Dam in such a manner as will cause the inundation of the
    downstream properties of the Plaintiffs.”
    Defendants thereafter removed the action under 16 U.S.C. § 825p, which
    provides federal courts with jurisdiction over duties and liabilities created by the
    Federal Power Act (“FPA”), and under 
    28 U.S.C. § 1331
    . Plaintiffs subsequently
    3
    Article 43 states, “The Licensees shall install additional capacity or make other
    changes in the project as directed by the Commission, to the extent that it is economically
    sound and in the public interest to do so, after notice and opportunity for hearing.”
    4
    Plaintiffs have not specified the precise date in November 2009 on which the gates
    were closed.
    3
    Case: 12-30494      Document: 00512402572         Page: 4    Date Filed: 10/09/2013
    No. 12-30494
    filed a motion to remand, arguing, inter alia, that their complaint did not
    present a federal question. While Plaintiffs’ motion to remand was pending,
    Defendants filed a motion to dismiss the suit under Federal Rules of Civil
    Procedure 12(b)(6) and 12(b)(7). Plaintiffs then filed an opposed motion for leave
    to amend their complaint; the motion sought to delete references to the United
    States Constitution. Plaintiffs’ amendments, if granted, would have left only
    state causes of action, but would have left undisturbed their request for a
    permanent injunction. Six months later, without any action having been taken
    on any of the pending motions, Plaintiffs filed an opposed motion for leave to
    amend their complaint a second time. This amendment sought to remove
    Plaintiffs’ requests for injunctive relief.
    Subsequently, without ruling on any of Plaintiffs’ pending motions, the
    district court held a hearing on the pending motion to dismiss. The district court
    then granted Defendants’ motion to dismiss under Federal Rule of Civil
    Procedure 12(b)(6), finding that Plaintiffs’ state law-based property damage
    claims were preempted by the FPA and the License, and entered judgment
    dismissing Plaintiffs’ case with prejudice. This appeal followed.5
    II. STATE TORT CLAIMS
    Plaintiffs argue that the district court improperly dismissed Plaintiffs’
    claims based on preemption.
    A.     Standard of Review
    We review the district court’s grant of a motion to dismiss de novo. Bass
    v. Stryker Corp., 
    669 F.3d 501
    , 506 (5th Cir. 2012) (citation omitted). Well-
    pleaded facts are viewed in the light most favorable to the plaintiff. Castro v.
    5
    Plaintiffs have abandoned any challenge to the district court’s holding that the FPA
    preempts their injunctive relief claim by failing to brief any argument and by continuing to
    press their attempt to amend their complaint to excise this claim. See Soadjede v. Ashcroft,
    
    324 F.3d 830
    , 833 (5th Cir. 2003) (citation omitted).
    4
    Case: 12-30494         Document: 00512402572         Page: 5    Date Filed: 10/09/2013
    No. 12-30494
    Collecto, Inc., 
    634 F.3d 779
    , 783 (5th Cir. 2011) (citation and internal quotation
    marks omitted).
    B.     Preemption
    “Federal preemption is an affirmative defense that a defendant must plead
    and prove.” Fisher v. Halliburton, 
    667 F.3d 602
    , 609 (5th Cir. 2012) (citations
    omitted). Defendants did so plead. If the complaint establishes the applicability
    of a federal preemption defense, it can properly be the subject of a Federal Rule
    of Civil Procedure 12(b)(6) motion to dismiss. 
    Id.
     (citation omitted).
    As is well known, federal preemption is based on the Supremacy Clause,
    which provides that federal law “shall be the supreme Law of the Land.” U.S.
    Const. art. VI, cl. 2.          There are three types of preemption: (1) express
    preemption,6 (2) field preemption, and (3) conflict preemption. Kurns v. R.R.
    Friction Prods. Corp., 
    132 S. Ct. 1261
    , 1265-66 (2012). Field preemption occurs
    when
    [t]he intent to displace state law altogether can be
    inferred from a framework of regulation so
    pervasive . . . that Congress left no room for the States
    to supplement it or where there is a federal interest . . .
    so dominant that the federal system will be assumed to
    preclude enforcement of state laws on the same subject.
    Arizona v. United States, 
    132 S. Ct. 2492
    , 2501 (2012) (citation and internal
    quotation marks omitted). Conflict preemption occurs “where compliance with
    both federal and state regulations is a physical impossibility, and those
    instances where the challenged state law stands as an obstacle to the
    accomplishment and execution of the full purposes and objectives of Congress.”
    
    Id.
     (citations and internal quotation marks omitted).
    6
    Express preemption is not implicated here, so we do not discuss it further.
    5
    Case: 12-30494    Document: 00512402572     Page: 6   Date Filed: 10/09/2013
    No. 12-30494
    The district court was not explicit as to which type of preemption it found
    applicable. However, we may affirm the district court’s judgment for any reason
    supported by the record. United States v. Gonzalez, 
    592 F.3d 675
    , 681 (5th Cir.
    2009) (citation omitted).
    C.    Federal Power Act
    In order to understand whether the FPA preempts state property damage
    claims, we look to the text of the Act, its history, and the way in which the
    Supreme Court, our circuit, and our sister circuits have interpreted it. We note
    that this is a question of first impression in this circuit. Our analysis leads us
    to conclude that the FPA preempts property damage claims based in state tort
    law where the alleged damage is the result of “negligently” operating in
    compliance with a FERC-issued license.
    The Federal Power Act of 1935 indicates congressional intent for “a broad
    federal role in the development and licensing of hydroelectric power.” California
    v. FERC, 
    495 U.S. 490
    , 496 (1990). There are several FPA sections relevant to
    the claims at issue here. First, Section 4(e) of the Act authorizes FERC to issue
    licenses for projects “necessary or convenient . . . for the development,
    transmission, and utilization of power across, along, from, or in any of the
    streams . . . over which Congress has jurisdiction.” 
    16 U.S.C. § 797
    (e). Second,
    Section 10(a)(1) of the Act requires FERC to issue licenses that the Commission
    determines are “best adapted” for power development and other public uses of
    the waters, including flood control. 
    16 U.S.C. § 803
    (a).
    Third, Section 10(c) of the Act is central to Plaintiffs’ arguments and our
    analysis. First, it requires the licensee to maintain the project and conform to
    Commission rules. 
    16 U.S.C. § 803
    (c). Importantly, it also states that “[e]ach
    licensee hereunder shall be liable for all damages occasioned to the property of
    others by the construction, maintenance, or operation of the project works or of
    6
    Case: 12-30494    Document: 00512402572      Page: 7   Date Filed: 10/09/2013
    No. 12-30494
    the works appurtenant or accessory thereto, constructed under the license, and
    in no event shall the United States be liable therefor.” 
    Id.
    Finally, Section 27 of the Act is a savings clause:
    Nothing contained in this chapter shall be construed as
    affecting or intending to affect or in any way to
    interfere with the laws of the respective States relating
    to the control, appropriation, use, or distribution of
    water used in irrigation or for municipal or other uses,
    or any vested right acquired therein.
    
    16 U.S.C. § 821
    .
    The Act “careful[ly] preserv[ed] separate interests of the states throughout
    the Act, without setting up a divided authority over any one subject.” First Iowa
    v. Hydro-Elec. Coop. v. Fed. Power Comm’n, 
    328 U.S. 152
    , 174 (1946) (footnote
    omitted). As several cases recount, members of Congress who were involved in
    formulating the FPA emphasized that the state retained some water rights. For
    example, Representative William L. LaFollette of Washington stated, “The
    property rights are within the State. It can dispose of the beds, or parts of them,
    regardless of the riparian ownership of the banks, if it desires to[.]” 
    Id.
     (citing
    56 Cong. Rec. 9810) (other citation omitted); see also Skokomish Indian Tribe v.
    United States, 
    410 F.3d 506
    , 519 (9th Cir. 2005) (citations omitted) (holding that
    the FPA “does not create a federal private right of action, but instead preserves
    only existing state-law claims against licensees”); DiLaura v. Power Auth. of
    N.Y., 
    982 F.2d 73
    , 78 (2d Cir. 1992) (citation omitted) (concluding that “[t]he
    floor debate on the FPA . . . indicates that property damage caused by licensees
    was to be determined by reference to state law”).
    D.    Supreme Court Precedent and Other Persuasive Authority
    The district court relied on First Iowa and California v. FERC for its
    preemption determination. Both cases concern state water permitting schemes
    rather than state tort law, as is at issue here; thus while neither is directly on
    7
    Case: 12-30494      Document: 00512402572        Page: 8    Date Filed: 10/09/2013
    No. 12-30494
    point, we find them both informative, as is Federal Power Commission v.
    Niagara Mohawk Power Corp., 
    347 U.S. 239
     (1954).
    In First Iowa, the Supreme Court considered whether a proposed federal
    hydroelectric project was required to obtain a state permit, as mandated by Iowa
    law, in addition to its federal license. 
    328 U.S. at 161
    . The Court held that such
    a state permit was not required because it would allow the state agency a “veto
    power over the federal project” and thereby subvert the comprehensive control
    of the project granted to the federal government. 
    Id. at 164
    . The Court also held
    that the savings clause, 
    16 U.S.C. § 821
    , was “limited to laws as to the control,
    appropriation, use or distribution of water in irrigation or for municipal or other
    uses of the same nature” and therefore focused on state property rights. 
    Id. at 175-76
    . Accordingly, the Court held that the state regulation was not among the
    category of rights reserved to the states in the FPA’s savings clause and that the
    FPA preempted the state permit requirement at issue. 
    Id. at 175-76, 182
    .
    In Niagara Mohawk, the Supreme Court held that the Federal Water
    Power Act of 19207 did not eliminate preexisting water rights, grounded in state
    law, on navigable streams. 
    347 U.S. at 248
    . In so holding, the Court recognized
    the United States’s “dominant servitude . . . under which private persons hold
    physical properties obstructing navigable waters of the United States and all
    rights to use the waters of those streams,” but it also recognized “that the
    exercise of that servitude, without making allowances for preexisting rights
    under state law, requires clear authorization.” 
    Id. at 249
     (internal footnote
    omitted). Moreover, the Court concluded that while the Act reserves the ability
    to “exercise . . . the federal servitude and . . . federal rights of purchase or
    condemnation, there is no purpose expressed to seize, abolish or eliminate water
    rights without compensation merely by force of the Act itself.” 
    Id.
     at 251-52
    7
    The Federal Water Power Act, as amended, is now part of the Federal Power Act. See
    Niagara Mohawk, 
    347 U.S. at
    241 n.1 (citations omitted).
    8
    Case: 12-30494     Document: 00512402572       Page: 9   Date Filed: 10/09/2013
    No. 12-30494
    (footnote omitted). Importantly for the issue here, the Court noted that the Act
    “merely imposes” on the owners of state-based property rights “the additional
    obligation of using them in compliance” with the Act. 
    Id. at 252
    . The Court
    expressed disbelief that the Act abolished “preexisting water rights on a
    nationwide scale,” stating that such action would require “a convincing
    explanation of that purpose,” which the Court did not find. 
    Id. at 252-53
    .
    If that were the end of our inquiry, the issue before us would present a
    closer question. However, California v. FERC, decided over four decades after
    First Iowa, indicated that the FPA has occupied the field of “power development
    and other public uses of the waters,” with the exception of a narrow carve-out for
    water use rights. California v. FERC, 
    495 U.S. at 494
    , 506 (citing 
    16 U.S.C. § 803
    (a)). In California v. FERC, the Supreme Court considered whether FERC
    had the exclusive authority to set minimum stream flow rates, thereby
    preempting California’s regulation of the same. 
    Id. at 493
    . Relying on First
    Iowa, the Court concluded that California’s regulations were preempted because
    Section 27 of the FPA, 
    16 U.S.C. § 821
    , was a limited savings clause, exempting
    only requirements that “reflect [or] establish ‘proprietary rights’ or ‘rights of the
    same nature as those relating to the use of water in irrigation or for municipal
    purposes.’” 
    495 U.S. at 498
     (quoting First Iowa, 
    328 U.S. at 176
    ) (other citations
    omitted).
    The language in California v. FERC indicates that the Supreme Court has
    interpreted the FPA as occupying the field of public water use and power
    generation except for water use rights. Thus, we agree with the Ninth Circuit’s
    statement that First Iowa and its progeny have “read the broadest possible
    negative pregnant into [the FPA’s] savings clause,” exempting only “a state
    property law regime [that] enables users of streams and wells to obtain
    proprietary rights in a continuing quantity of water.” Sayles Hydro Assocs. v.
    9
    Case: 12-30494      Document: 00512402572          Page: 10     Date Filed: 10/09/2013
    No. 12-30494
    Maughan, 
    985 F.2d 451
    , 454-55 (9th Cir. 1993) (also discussing California v.
    FERC’s interpretation of First Iowa).
    The importance of a single federal agency controlling public water use and
    dam operations is underscored by the factual scenario presented by the instant
    case. The Dam spans the Texas and Louisiana state lines, and the FERC license
    was granted to an entity comprised of both state agencies. Yet, Plaintiffs assert
    claims only under Louisiana law and only against Louisiana state agencies, in
    addition to the private defendants. That each state may have different causes
    of action and different standards of conduct that it could impose on the FERC
    licensee is problematic when states are jointly involved in such a project.
    E.     Property Damage Claims Under FPA § 10(c)
    California v. FERC’s interpretation of Section 27’s general savings clause
    is instructive for our interpretation of Section 10(c)’s limited savings clause. The
    latter cannot be interpreted so broadly as to allow state tort law to supplant
    FERC’s exclusive control of dam operations.8
    Because the state law property damage claims at issue here infringe on
    FERC’s operational control, we hold that they are conflict preempted.
    Essentially, Plaintiffs allege that Defendants were negligent because they failed
    to act in a manner FERC had expressly declined to require. But FERC, not state
    tort law, must set the appropriate duty of care for dam operators. See 16 U.S.C.
    8
    Although neither party cites it, this circuit previously considered whether licensees
    were exempt from property damage claims when operating projects pursuant to a FERC-
    issued license. Seaboard Air Line R.R. v. Cnty. of Crisp, Ga., 
    280 F.2d 873
     (5th Cir. 1960).
    There, we held that a railroad was able to seek damages from the operator of a FERC-licensed
    dam, noting that in the FPA, “Congress contemplated damage inflicted after as well as at the
    time of construction.” 
    Id. at 876-77
    . Seaboard presented a minority view that the FPA itself
    creates a cause of action for damages. As the case before us concerns claims for damages
    under state law, and Plaintiffs have not argued an FPA-created cause of action, Seaboard does
    not bear on the question before us. Furthermore, Seaboard is doubtful authority as it
    predated the Court’s four-factor test for “determining whether a private remedy is implicit in
    a statute not expressly providing one,” Cort v. Ash, 
    422 U.S. 66
    , 78 (1975).
    10
    Case: 12-30494       Document: 00512402572          Page: 11     Date Filed: 10/09/2013
    No. 12-30494
    § 803(c) (“[T]he licensee . . . shall conform to such rules and regulations as the
    Commission may from time to time prescribe.”).
    The Supreme Court has recognized that damages claims can serve the
    same effect as regulations. See Kurns, 
    132 S. Ct. at 1269
     (“[S]tate regulation can
    be . . . effectively exerted through an award of damages, and [t]he obligation to
    pay compensation can be, indeed is designed to be, a potent method of governing
    conduct and controlling policy.” (second alteration in original) (citation and
    internal quotation marks omitted)). Plaintiffs attempted, through the proper
    administrative procedure channels, to impose changes on Dam operations.
    FERC considered these requests and issued a report denying most of the
    requested changes. Plaintiffs have not asserted that this administrative decision
    was improper. Nonetheless, failing to achieve their objective, Plaintiffs now seek
    to use state law to accomplish the same aims, alleging that Defendants were
    negligent for not changing their operations. Permitting such state property
    damage claims in an attempt to force changes to a FERC-issued license would
    “constitute a veto of the project that was approved and licensed by FERC.”
    California v. FERC, 
    495 U.S. at 507
     (citations and internal quotation marks
    omitted); see also City of Lowell v. ENEL N. Am., Inc., 
    796 F. Supp. 2d 225
    , 231
    (D. Mass. 2011) (citation omitted) (holding that a “negligence claim is preempted
    by the FERC license because [the plaintiff] cannot use state tort law to prevent
    [the FERC licensee] from doing something that FERC has sanctioned” and
    describing the negligence claim as a “collateral attack on the FERC license”).9
    9
    We do not hold that all state property damage claims are preempted by the FPA. For
    example, a claim alleging negligence for failure to conform to FERC’s guidelines would not
    conflict with FERC’s operational control. Nor does our holding conflict with the cases cited by
    Plaintiffs. The D.C. Circuit, for example, held that “Congress intended for § 10(c) merely to
    preserve existing state laws governing the damage liability of licensees,” so FERC could not
    impose strict liability on dam operators. S.C. Pub. Serv. Auth. v. FERC, 
    850 F.2d 788
    , 795
    (D.C. Cir. 1988). That does not imply that Congress intended for § 10(c) to enable state tort
    law to replace FERC’s determination of the appropriate duty of care.
    11
    Case: 12-30494     Document: 00512402572        Page: 12    Date Filed: 10/09/2013
    No. 12-30494
    Applying state tort law to set the duty of care for the operation of FERC-
    licensed projects would “stand[] as an obstacle to the accomplishment and
    execution of the full purposes and objectives” of the FPA. See Arizona, 
    132 S. Ct. at 2501
     (citations and internal quotation marks omitted). We therefore hold that
    the district court properly concluded that the FPA preempts Plaintiffs’ claim for
    negligence.10
    III. MOTIONS TO AMEND AND REMAND
    After Defendants filed their motion to dismiss, Plaintiffs filed two motions
    to amend their complaint. The first motion to amend sought to delete references
    to the United States Constitution, which Plaintiffs characterized as “mistaken”
    additions to their complaint. The second motion to amend sought, without
    explanation, to remove the complaint’s claim for injunctive relief. The district
    court did not explicitly rule on these motions before granting Defendants’ motion
    to dismiss. Plaintiffs argue the district court abused its discretion in failing to
    permit them to amend their complaint. Plaintiffs also argue that the district
    court erred when it implicitly denied their motion to remand.
    A.     Standard of Review
    A district court’s denial of leave to amend is reviewed for an abuse of
    discretion. Ballard v. Devon Energy Prod. Co., 
    678 F.3d 360
    , 364 (5th Cir. 2012)
    (citation omitted). Similarly, a district court’s failure to remand state law claims
    to the state court from which the case was removed is reviewed for abuse of
    discretion. Enochs v. Lampasas Cnty., 
    641 F.3d 155
    , 158 (5th Cir. 2011) (citation
    omitted).
    10
    As we are able to affirm the district court’s judgment on preemption grounds, we
    need not address Defendants’ argument that the doctrine of primary jurisdiction further
    supports the district court’s ruling.
    12
    Case: 12-30494    Document: 00512402572       Page: 13    Date Filed: 10/09/2013
    No. 12-30494
    B.     Motions to Amend
    Although the district court did not explicitly deny Plaintiffs’ motions to
    amend, it implicitly did so when it entered its ruling in favor of Defendants’
    motion to dismiss and dismissed the case with prejudice. See Norman v. Apache
    Corp., 
    19 F.3d 1017
    , 1021 (5th Cir. 1994) (citation omitted).
    “[A] party may amend its pleading only with the opposing party’s written
    consent or the court’s leave. The court should freely give leave when justice so
    requires.”   Fed. R. Civ. P. 15(a)(2).     “Whether to grant leave to amend a
    complaint is entrusted to the sound discretion of the district court[.]” Ballard,
    
    678 F.3d at 364
     (citation and internal quotation marks omitted).
    “Denial of leave to amend may be warranted for undue delay, bad faith or
    dilatory motive on the part of the movant, repeated failure to cure deficiencies,
    undue prejudice to the opposing party, or futility of a proposed amendment.” 
    Id.
    (citation and internal quotation marks omitted). Where, as here, the district
    court has not “engage[d] in a formal recitation of reasons[, the] reason for denial
    must be clear . . . either from the findings of the district court or elsewhere in the
    record.” Lone Star Ladies Inv. Club v. Schlotzsky’s Inc., 
    238 F.3d 363
    , 367 (5th
    Cir. 2001) (citations omitted).
    Defendants argue that Plaintiffs’ proposed amendments were futile in
    light of the district court’s holding that the FPA preempted their state law
    claims. We agree. “Clearly, if a complaint as amended is subject to dismissal,
    leave to amend need not be given.” Pan-Islamic Trade Corp. v. Exxon Corp., 
    632 F.2d 539
    , 546 (5th Cir. 1980), abrogated on other grounds by Associated Gen.
    Contractors of Cal., Inc. v. Cal. State Council of Carpenters, 
    459 U.S. 519
    , 536
    n.33 (1983) (citation omitted). Here, the complaint as amended would have left
    only state law claims for property damage. As we have determined that the
    district court correctly dismissed these claims, Plaintiffs’ motions to amend were
    13
    Case: 12-30494   Document: 00512402572      Page: 14   Date Filed: 10/09/2013
    No. 12-30494
    futile. Accordingly, the district court did not abuse its discretion in implicitly
    denying Plaintiffs’ motions to amend.
    C.     Motion to Remand
    Because we have concluded that the district court properly granted
    Defendants’ motion to dismiss, we need not consider whether the district court
    abused its discretion in denying Plaintiffs’ motion to remand.
    IV. CONCLUSION
    For the foregoing reasons, the judgment of the district court is
    AFFIRMED.
    14
    

Document Info

Docket Number: 12-30494

Citation Numbers: 732 F.3d 469

Judges: Smith, Stewart, Wiener

Filed Date: 10/9/2013

Precedential Status: Precedential

Modified Date: 8/7/2023

Authorities (20)

j-gary-dilaura-individually-and-as-president-of-waterfront-homeowners , 982 F.2d 73 ( 1992 )

Seaboard Air Line Railroad Company v. County of Crisp of ... , 280 F.2d 873 ( 1960 )

Lone Star Ladies Investment Club v. Schlotzsky's Inc. , 238 F.3d 363 ( 2001 )

Norman v. Apache Corp. , 19 F.3d 1017 ( 1994 )

Ballard v. Devon Energy Production Co., LP , 678 F.3d 360 ( 2012 )

Pan-Islamic Trade Corporation v. Exxon Corporation , 632 F.2d 539 ( 1980 )

South Carolina Public Service Authority v. Federal Energy ... , 850 F.2d 788 ( 1988 )

First Iowa Hydro-Electric Cooperative v. Federal Power ... , 66 S. Ct. 906 ( 1946 )

United States v. Gonzalez , 592 F.3d 675 ( 2009 )

Castro v. Collecto, Inc. , 634 F.3d 779 ( 2011 )

sayles-hydro-associates-a-california-general-partnership-joseph-m-keating , 985 F.2d 451 ( 1993 )

skokomish-indian-tribe-a-federally-recognized-indian-tribe-in-its-own , 410 F.3d 506 ( 2005 )

Soadjede v. Ashcroft , 324 F.3d 830 ( 2003 )

City of Lowell v. ENEL NORTH AMERICA, INC. , 796 F. Supp. 2d 225 ( 2011 )

Cort v. Ash , 95 S. Ct. 2080 ( 1975 )

Federal Power Commission v. Niagara Mohawk Power Corp. , 74 S. Ct. 487 ( 1954 )

California v. Federal Energy Regulatory Commission , 110 S. Ct. 2024 ( 1990 )

Kurns v. Railroad Friction Products Corp. , 132 S. Ct. 1261 ( 2012 )

Arizona v. United States , 132 S. Ct. 2492 ( 2012 )

Associated General Contractors of California, Inc. v. ... , 103 S. Ct. 897 ( 1983 )

View All Authorities »