Brass Reminders Co., Inc. v. RT Engineering Corp. ( 2021 )


Menu:
  •                          NOT RECOMMENDED FOR PUBLICATION
    File Name: 21a0073n.06
    Case No. 20-5671
    UNITED STATES COURT OF APPEALS
    FOR THE SIXTH CIRCUIT
    FILED
    Feb 04, 2021
    BRASS REMINDERS CO., INC.,                          )                    DEBORAH S. HUNT, Clerk
    )
    Plaintiff-Appellant,
    )
    )       ON APPEAL FROM THE UNITED
    v.
    )       STATES DISTRICT COURT FOR
    )       THE EASTERN DISTRICT OF
    RT ENGINEERING CORP.,
    )       KENTUCKY
    Defendant-Appellee.                          )
    )
    BEFORE: BOGGS, SUTTON, and NALBANDIAN, Circuit Judges.
    BOGGS, Circuit Judge. This case concerns man and machine, miscommunication, and the
    doctrine of incorporation by reference. But above all, it concerns one man’s failure to read the
    terms and conditions of his contract. Those terms required him to correctly specify variations on
    manufacturing materials, and he failed to do so. There is no genuine dispute that this failure was
    the ongoing and ultimate source of this contractual breach. Thus, the district court did not err in
    granting summary judgment against the suit by Brass Reminders, and we affirm.
    I. FACTS AND PROCEDURE
    A. Facts
    Brent Durham, the president and co-owner of Brass Reminders, a Kentucky company,
    founded the company twenty-nine years ago. Named for its original mission to make engraved
    brass products, Durham shifted the company’s focus to make—now almost exclusively—small
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    car decals sold in retail stores such as tourist shops and college bookstores. Until 2016, Brass
    Reminders had packaged its decals by hand. When done by humans, this is a simple task: Putting
    the decal in front of a cardboard “chipboard” (a piece of cardstock that provides rigidity to the
    package) to protect it from creasing, placing the decal into a small plastic bag, and stapling the
    package with a cardboard header card that also hangs the package on retail hooks.
    In April 2016, Durham asked RT Engineering, a Massachusetts corporation, if it would
    build a custom machine to package his decals at five hundred units an hour. In May, RT sent Brass
    Reminders a price quote detailing the project and costs. The quote contains multiple pages along
    with a table of contents that lists many items, including “Item I,” which is entitled “Customer
    Responsibility,”1 and “Item P,” which references RT’s “Terms & Conditions.” But instead of
    including the full text of the terms and conditions, Item P refers the reader to RT’s website (“See
    our website for 2016 Terms & Conditions”) and provides a hyperlink. The terms and conditions
    require the customer to provide the dimensional tolerances of the product that will be fed through
    RT’s custom machines:
    Customer will be responsible for providing engineering drawings and sample parts
    during the design, debug, and testing phases of the project. Sample parts and
    documentation furnished will need to be a true and complete representation of the
    product to be processed with the Seller’s equipment. Typical parts and tolerances
    or variations of the parts need to be identified. This will ensure that the Product is
    designed to accommodate the variances from part to part and to include the control
    features . . . . Specifically, dimensional tolerances of each product shall be provided
    1
    The term “Customer Responsibility” is set out directly, not merely incorporated by reference:
    The customer is responsible for supplying all listed materials (if applicable) to RT
    prior to the due date. This date will be developed by the Project Manager and
    communicated to the customer far in advance of the on-site requirement. Failure
    to supply the services or materials listed may change the delivery date of your
    machine.
    • Decal samples representing all sizes to be processed
    • Chip board samples representing all sizes to be processed
    • Header samples representing all product sizes
    2
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    along with all process specifications which will in any manner effect [sic] the
    performance of the Seller’s equipment . . . . Failure on the part of the Customer to
    meet any of its responsibilities may lead to delays in RT Engineering’s performance
    or Seller’s inability to perform, for which RT Engineering will not be responsible.
    On May 20, RT forwarded an invoice for $108,426 to Brass Reminders (approximately
    forty percent of the $279,083 quoted total price). Within days, Brass Reminders made the initial
    payment in a purchase order referencing the quote. The district court found that the contract was
    formed at the time Brass Reminders made the initial payment.
    The remaining relevant facts span several years. In the main: The conflict involves Brass
    Reminders’s and RT’s miscommunication about the dimensional variations and consistency of the
    materials (decal, chipboard, plastic bag, and header card) that the machine was purposed to
    package. The sample materials that Brass Reminders supplied to RT during the initial design phase
    did not have significant variations, likely because they were of limited quantity and cut from the
    same batch of cardstock. RT believed this is why the early samples did not have significant
    variances. It was not until RT had nearly finished the machine and needed to test it on a large bulk
    of materials that it learned that the general run of materials had significant, and fatal, variations.
    These variations came from two primary sources: Brass Reminders’s decision to save costs by
    shear-cutting its materials, as opposed to using the more precise die-cutting method, and its
    decision to store its materials in a non-climate-controlled warehouse. Throughout the machine
    project, different components presented different problems. While some problems were resolved,
    others remained a continued source of concern.
    In June 2016, less than a month after contract formation, RT and Brass Reminders held an
    “on boarding” meeting. Before the meeting, RT sent Durham relevant documents. One of the
    documents, discussing the Factory Acceptance Test (the final live demonstration where the
    customer approves and accepts the product), stated: “Please supply the exact materials/product
    3
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    that you will be running in the machine for [Factory Acceptance Test] . . . . Machine performance
    with material other than specified for it, that results in a failed acceptance test will be the customers
    [sic] responsibility.”
    After the on-boarding meeting, Durham signed a copy of RT’s Customer Introduction
    Agenda. The signature page signed by Durham contains an acknowledgement that his signature
    represents “acceptance and approval of the process and delivery,” as well as a specified
    acknowledgment of RT’s terms and conditions. The terms and conditions were identified in bold
    immediately above (not below) the signature line.
    Near the end of June, an RT engineer asked Durham to forward information needed to
    write the Functional Specification Document (FSD). The next day, Durham emailed RT the
    dimension specifications of the decal, chipboard and header-cards including the principal lengths
    and widths of “mini,” “small,” and “standard” size decals, as well as the various chipboard and
    header cards that Brass Reminders used. But the specifications only listed the principal sizes of
    each packaging piece used, not any tolerances or dimensional variances of those principal sizes.
    For example, Durham wrote that the “standard” decal size had a maximum of 36 square inches
    overall, with a length of 7.75” maximum and 1.5” minimum and a height of 5.75” maximum and
    0.75” minimum. Durham then wrote below, “Decals will always be square or rectangular but can
    be ANY dimension subject to the above minimums and maximums.” RT wrote the FSD based on
    the dimension specifications Durham provided, and Durham signed the FSD in July, which
    authorized RT to continue to develop the machine.
    According to lead RT engineer Darren LaBonne, RT understood the dimension
    specifications to abide by the American Society of Mechanical Engineers (ASME) industry
    standard for how to write tolerances, and so it designed the machine accordingly. According to
    4
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    RT, a figure written with a “two-place decimal point . . . indicates it is going to be plus or minus
    ten thousandths of the length” or height (or other dimension), and a figure written with one-place
    decimal point (e.g. 1.5”) will be “plus or minus twenty thousandths” of the listed dimension. But
    RT would later learn, after the machine was nearly finished, that Durham was unaware of the
    ASME standards and that Brass Reminders’s materials exceeded those tolerances.
    In September, Durham reviewed and approved the design of the machine. RT began to test
    the machine at a higher capacity in December 2016. RT asked Durham to supply larger quantities
    of the materials for the December test, as well as for the Factory Acceptance Test scheduled for
    early the following year. Durham flew to Massachusetts to attend the December test in person.
    LaBonne testified, and Brass Reminders does not dispute, that until the December test, the
    materials Brass Reminders had supplied to RT “were a consistent thickness.” Previously, Brass
    Reminders had supplied RT a relatively small quantity of sample materials. RT relied on these
    samples for the design of the machine. It was not until RT needed larger quantities of materials to
    test the machine’s high-output capacity that RT noticed variations in the materials that hampered
    machine performance.
    In late February 2017, RT emailed Durham and told him that “some of the parts” Durham
    brought in December and shipped after “have issues the machine cannot process. If the chip board
    [sic] are severely bowed they will not feed through the friction feeders. Also we noticed that the
    board materials vary and the print quality suffers. Some of the boards are more porous and absorb
    the ink.” RT emailed Durham again in March, writing that “We have been dealing with material
    issues right along and it is really slowing progress down . . . . We need to be able to get these issues
    corrected in order to be able to cycle the machine at the output rate desired.” RT also requested a
    5
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    call with Durham to discuss how to fix the issues. Durham responded, noting that he was aware of
    product variances and that the curling issue was because of humid storage conditions:
    I spoke with our die cutter regarding the issues we discussed today. 1. He said, yes
    we get all gauges of material because we do not specify and they run whatever is
    convenient. This was fine for hand packaging, and we went that way to get the
    lowest cost. It is not a problem to always use the same material for us and give us
    consistent thickness going forth. I asked what that thickness is and he was not sure,
    will be getting back to me on. 2. Regarding curl, he seems to think that the material
    is “very flat” coming off his equipment, and that the problem is that we [Brass]
    store it in a non-climate controlled warehouse for up to 2-3 months. He says it is
    very susceptible to humidity and that we can solve the problem by storing it at 50%
    humidity . . . I discussed getting frequent deliveries of small quantities, which he
    says he can do. I’m sure my bill will go up for that . . . .
    March 23, 2017, email from Durham.
    Durham testified that he expected RT to resolve the problems with the variations in the
    materials because “[t]he product was no different than the product that was submitted to them at
    the beginning of the process.” Brass Reminders had its “die cutter,” Jourdan Graphic Services,
    specially shear cut material of the same thickness and sent the new batch to RT. These materials
    fed through the machine without error. But when Brass Reminders sent another batch for the June
    Factory Acceptance Test, the materials again varied and slowed the machine during the
    Acceptance Test. Durham ignored RT’s recommendation for him to spend an additional $1,500 to
    buy equipment to remove the humidity-induced static that was one of the problems slowing the
    machine. Through the summer and in the fall of 2017, RT tweaked the machine to resolve issues
    from the Acceptance Test, but it could not fix the machine to accommodate the wide variation in
    Brass Reminders’s materials. When RT informed Durham that “[d]owntime related to product
    variation or product inconsistency will not be counted against the 500 piece run rate,” Durham
    testified that he never agreed to that because Brass Reminders’s product “never changed.” But
    6
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    Durham admitted in the same deposition that Brass Reminders’s product did vary. Durham’s
    deposition appears contradictory:
    Q. The second page of Exhibit 34, the response from RT Engineering about
    humidity is, “In terms of the humidity, if the chipboards bow or out of dimensional
    spec and do not feed properly, this is something RT can’t control and can’t be
    counted against throughput.”
    A. I respectfully disagree with that. There were no dimensional specs on the—on
    the thing other than just the size of the cardstock. And, really, we didn’t even put a
    spec on that. You know, they knew what they had to create a machine to feed. And
    they did not create a machine to feed. And they did not create a machine that could
    feed them. So it does count against rated time. . . . I never agreed to a spec on a
    cardstock.
    Q. You never agreed to provide specifications on your products for RT Engineering
    . . . to design the machine? . . .
    A. Other than the specs that we provided, it was part of one of your attachments
    that said these were the decal size, can be this long—you know, anywhere from this
    long to this long, this short to this short. I forget what attachment it was, but we did
    go over it. So I did provide specifications on the size of the product. I listed the
    nominal size of the cardstocks that would be used and—and those are sheered [sic]
    within probably five to six thousandths of an inch, you know, but there is variation
    on the sizes there.
    In November 2017, RT requested that Brass Reminders send a new batch of materials for
    another machine test. Brass Reminders did not respond until RT asked again in January 2018.
    Brass Reminders sent a partial shipment of materials the next day and another batch in mid-
    February. After running the machine successfully using these new materials, RT Engineering
    emailed Durham a video of the machine running and wrote: “What we have found is that the
    machine will run fine when the [Brass Reminders] product is not bent, stuck together or
    oversize/undersize. RT feels confident the machine will run consistently if good product is used.”
    Durham did not respond until RT Engineering followed up over a week later. On March 2, Durham
    wrote that while “[t]he video was promising,” he expressed frustration that the project was “now
    about 1.5 years late.” Durham also wrote that “should the machine fail this time, I will ask for a
    full refund of all monies paid and cancel the order. It needs to work this time . . . so that it takes a
    7
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    ‘perfect storm’ to stop the machine, not a perfect storm for it to run.” On March 7, RT responded
    that the machine would work so long as it was not fed “bad product that the machine was not
    designed to handle: 1. Product that stick together either by static or poor slitting; 2. Product that is
    curled.” RT’s email also provided variance specifications that either increased the tolerances from
    the original Functional Specification Document (to better accommodate the variations in Brass
    Reminders’s materials) or added tolerances for parameters that Durham had never given (e.g. decal
    thickness, static-induced curling). RT thought it was helping Brass Reminders by modifying the
    tolerances and adding new specifications. But Durham took umbrage at the changes and grew
    suspicious, handwriting on a printed copy of RT’s email, “They are now specifying tolerances for
    parts. Trying to get machine to pass test, but it has to run our parts, not an artificial set of
    specifications they created.” (emphasis in original).
    Ahead of the second Factory Acceptance Test scheduled for May 2018, Brass Reminders
    shipped RT a new batch of material to feed through the machine during the Acceptance Test. In
    April, RT notified Durham by email that, although the chipboards were fine, the decals had
    significant variances that would present problems for the machine. In particular, the decals were
    bent and bowed, even beyond the new tolerances RT had set to accommodate this issue. RT
    attached pictures of the problem. Durham responded:
    The slight curve is the way these are, and they cannot be changed. Your job was to
    design a machine that can insert them. If the current design won’t do the job, you
    will have to change the machine so it will. . . . If the machine does not do these jobs
    flawlessly after 2 years of having my money tied up we will request a full refund.
    RT responded that “the machine was designed and built based on samples that were not
    curved to the extreme we have seen.” RT assured Durham that it would “sort and straiten [sic] [the
    material] to the best of our ability” but asked Durham to bring more consistent materials to the
    Factory Acceptance Test.
    8
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    The Factory Acceptance Test in May 2018 did not go well. The machine jammed and
    Durham therefore refused delivery of the machine. RT believed that the jamming occurred, yet
    again, because of Brass Reminders’s inconsistent materials. In the aftermath of the failed
    Acceptance Test, Durham emailed cutter Jourdan Graphic Services and acknowledged that the
    materials caused the jamming: “[A]t the last trial, variation in the size of the backer cards from
    shearing became an issue. We need to look at die cutting the backer cards for consistency.” In an
    email to RT in June, Durham wrote that RT engineer “Darren [LaBonne] was saying the looseness
    of tolerance on a sheared product was causing him problems and he was suggesting having the
    cards die cut . . . . I think the expense of that would be prohibitive.”
    RT proposed that it would purchase, at its own cost, die-cut materials from Brass
    Reminders’s vendor “to prove that there was nothing wrong with the machine.” But Durham
    ordered his vendor not to sell die-cut materials to RT because, as Durham testified, “I didn’t want
    the machine to prove itself out on something that we couldn’t continue to use. It had to prove itself
    on the stock that we could afford to use.” In an email to RT in June, Durham again acknowledged
    that “consistency” of the materials was an “issue” and said that Brass Reminders “did not specify
    tolerances [at the outset of the project] because it simply did not matter to us” when it had hand-
    packaged the decals. Brass Reminders sent RT a new set of sheared materials in July. Brass
    Reminders’s cutter told Durham that he would endeavor to shear-cut the materials as close to the
    dimensional tolerances as possible. RT received the materials in July but misplaced them and did
    not respond until Brass Reminders’s email message in November, cancelling the project and
    demanding a full refund because “RT is not capable of producing a machine to meet the agreed on
    specifications[.]” RT’s president responded, apologizing for misplacing the materials, and offered
    to forego the final balance of $40,659.75 “due to the significant delay.” RT also asked for the
    9
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    opportunity to test the misplaced materials. Apparently, Durham rejected this proposal, and Brass
    Reminders filed suit. The suit sought a refund of all the money it has paid to RT, and damages.
    B. Procedure
    Brass Reminders filed its complaint in Kentucky state court on April 29, 2019. RT removed
    the case to federal district court on June 6, 2019. After discovery, RT moved for summary
    judgment on Brass Reminders’s claims and its own counterclaim for breach of contract, and the
    district court granted summary judgment in favor of RT.
    II. ANALYSIS
    A. Standard of Review
    We review the district court’s grant of summary judgment de novo. Donald v. Sybra, Inc.,
    
    667 F.3d 757
    , 760 (6th Cir. 2012). A federal court must grant summary judgment if, viewing the
    facts in the light most favorable to the non-moving party, “there is no genuine dispute as to any
    material fact and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a); see
    also Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 
    475 U.S. 574
    , 585–87 (1986).
    B. The Terms and Conditions Were Incorporated by Reference
    Neither party disputes the district court’s determination that a contract was formed when
    Brass Reminders accepted RT’s offer (the quote) by paying RT the required “40% due with
    placement of the order.” But Brass Reminders argues that RT’s hyperlinked terms and conditions
    were not incorporated by reference into their contract. That is the chief question of the case. If the
    terms were incorporated, Brass Reminders breached its contract. The district court held that the
    terms and conditions were properly incorporated by reference. We agree.
    We apply Kentucky law. The lower court determined that Kentucky law applies to the
    incorporation question and neither party disputes that determination on appeal. Brass Reminders
    relies on Dixon v. Daymar Colleges Group, LLC, 
    483 S.W.3d 332
     (Ky. 2015), to argue that RT’s
    10
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    terms and conditions were not incorporated by reference into the contract because RT “cannot
    prove express assent by Brass Reminders to be bound” to those terms. Dixon, however, has
    significant differences from this case.
    In Dixon, the Kentucky Supreme Court held that a for-profit university’s arbitration clause
    placed on the back of the “Student Enrollment Agreement” contract was not a valid part of the
    contract. Because the arbitration clause came after the signature line, it could only become part of
    the contract if some language before the signature line incorporated the clause. 483 S.W.3d at 345–
    46; Ky. Rev. Stat. § 446.060(1). The court found that the contract failed to incorporate the
    arbitration clause because the text of the student-enrollment agreement merely asked students to
    acknowledge that they “read both pages of” and “received a copy of” the enrollment agreement.
    Id. at 346. “Assent to be bound by the terms of an agreement must be expressed, and simply
    acknowledging the receipt of the document does not constitute assent to be bound.” Ibid (quoting
    Ally Cat, LLC v. Chauvin, 
    274 S.W.3d 451
    , 456 (Ky. 2009)). And the only “true incorporating
    language in the Agreement” applied only to “any applicable amendment,” a category that did not
    include the arbitration clause. Id. at 345.
    Much of Dixon’s analysis, which concerns the language and location of the arbitration
    clause after the signature line, does not provide an immediate answer here. Although Durham did
    sign the Customer Introduction Agenda (which referenced the terms and conditions) and the
    Functional Specification Document, the district court found that the contract was formed earlier,
    without Durham’s signature, when Brass Reminders placed its order and paid RT forty percent of
    the total price listed in RT’s quote.
    Yet despite these differences, Dixon provides general guidance: “[I]t must be clear that the
    parties to the agreement had knowledge of and assented to the incorporated terms.” Id. at 344
    11
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    (quoting 11 Williston on Contracts § 30.25 (4th ed. 2014)). Further, “there must be ‘clear language
    expressing the incorporation of other terms and conditions.’” Ibid. (alterations removed) (quoting
    Bartelt Aviation, Inc. v. Dry Lake Coal Co., 
    682 S.W.2d 796
    , 797 (Ky. Ct. App. 1985)). The parties
    dispute whether Brass Reminders had knowledge of, and assented to, the incorporated terms and
    conditions, and that clear language incorporated the terms and conditions.
    Unlike in Dixon, here there is no misleading language. The quote, for example, did not ask
    Durham to merely acknowledge receipt of the terms and conditions, as the student enrollment
    agreement did in Dixon. The terms and conditions are listed in the quote as “Item P,” along with
    other alphabetized items that both parties agree are binding contract terms. The terms and
    conditions are not referenced in any appendix or supplemental document, but in the quote’s table
    of contents and at the end of the quote. This provided the required clear language of incorporation
    and notice that the contract in Dixon lacked.
    A more recent Kentucky Supreme Court case involving a contested arbitration clause
    emphasized the importance of notice in determining questions of incorporated terms: “[A] person
    is presumed to know those things which reasonable diligence on his part would bring to his
    attention.” LP Louisville East, LLC v. Patton, 
    605 S.W.3d 300
    , 315 (Ky. 2020). Describing “well
    settled principles of contract law,” Patton quoted an earlier case:
    It is the settled law in Kentucky that one who signs a contract is presumed to know
    its contents, and that if he has an opportunity to read the contract which he signs he
    is bound by its provisions, unless he is misled as to the nature of the writing which
    he signs or his signature has been obtained by fraud.
    
    Ibid.
     (quoting Hathaway v. Eckerle, 
    336 S.W.3d 83
    , 89–90 (Ky. 2011)).
    To be sure, this case does not involve a signed contract. But that does not alter the
    applicability of Patton’s logic or the principles of well-settled contract law: Notice of a contract’s
    terms is presumed when a person has the opportunity to read the contract and accepts the contract
    12
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    offer. A party cannot abrogate the terms it dislikes after the fact, unless terms are misleading, as
    they were in Dixon. There is no dispute that Brass Reminders accepted the contract. The language
    of the quote was not misleading. The presumption that Durham and Brass Reminders knew the
    terms and conditions of the contract applies. The terms and conditions were plainly listed in the
    quote, and a hyperlink to them was provided. Reasonable diligence required that Durham or one
    of his employees click the hyperlink (or ask RT for a hard copy) and read the terms and conditions.
    Unlike the students in Dixon, Durham is a reasonably sophisticated businessman who has run a
    successful company for decades. He even told RT Engineering that he had some familiarity in
    ordering automated machine equipment.2 Engineer LaBonne testified that Durham represented that
    “he knew about automation and tolerancing and dimensioning” that would be necessary for the
    design of the machine.
    Further, there is no allegation that RT in any way attempted to deceive Brass Reminders
    about the terms and conditions, or that the terms and conditions were in any way concealed from
    Durham’s consideration. Rather, Durham admits he did not read the terms and conditions because
    he did not want to read them. He testified in his deposition that he viewed many of the details of
    the quote as “minutiae” that he “[did not] care” about, and that he reviewed only “the parts that I
    felt were germane to me.” He testified that he did not look up RT’s terms and conditions:
    “I probably didn’t notice that at the time. . . . I don’t think I went to that website. . . . I remember
    skipping in the airport to the part of here’s the price; here’s how long it’s going to take and probably
    never read all of this.”
    2
    “I’m somewhat familiar with automation. About 20 years ago I sold industrial metals. Several of
    my clients did automation work. I specced out and purchased a lights-out running LSR mold, but
    never ordered custom automation equipment.”
    13
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    Durham was given further notice of the terms and conditions when he signed RT’s
    Customer Introduction Agenda after the “on boarding” meeting in June 2016. See Cent. Adjustment
    Bureau, Inc. v. Ingram Assocs., Inc., 
    622 S.W.2d 681
    , 686 (Ky. Ct. App. 1981) (“By signing the
    covenants and continuing their employment . . . [the individuals] must be deemed to have assented
    to be bound by them. They cannot be heard to deny their validity.”). The terms and conditions
    were explicitly referenced directly above the Customer Introduction Agenda’s signature line. This
    was the second time an RT document referenced the terms and conditions (they were first
    referenced in the quote), and the second time Durham failed to question or object to them. This
    suggests he knew he agreed to the terms and conditions at formation. We need not determine if
    Durham “ratified” the contract through this subsequent signing. What matters is that Durham again
    had notice of the terms and conditions and had notice early in the process. The agenda explicitly
    referred, in bold, to the terms and conditions directly above the signature line, noting that “[a] copy
    [of] [t]he T&C’s for RT Engineering are [sic] available for review on our website.” Not once did
    Durham inquire about the terms and conditions.
    Therefore, the terms and conditions were incorporated by reference and became part of the
    parties’ agreement.
    C. Brass Reminders Breached Its Contract with RT Engineering
    The lower court determined that Massachusetts law applies to the breach-of-contract issue
    and neither party disputes that determination on appeal.
    Brass Reminders argues that it did not breach the contract and that the district court granted
    summary judgment in error because there is a genuine issue of material fact as to whether the
    materials it provided to RT Engineering contained “variances.” The record does not demonstrate
    a genuine dispute of material fact. Even after viewing the facts in the light most favorable to Brass
    14
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    Reminders, the undisputed record leaves no doubt that variations in Brass Reminders’s materials
    caused ongoing problems with the machine. Therefore, Brass Reminders breached its obligation
    under the contract.
    Brass Reminders contends that “the Dimension Specifications provided by Brass
    Reminders early in the relationship with RTE clearly set out the range of sizes of its decal product
    (i.e., tolerances) that RTE’s machine was contracted to package.” But this is contradicted by
    Durham’s testimony. He said he listed the “nominal size of the cardstocks that would be used . . .
    but there is variation on the sizes there.” Durham also testified, “There were no dimensional specs
    on the—on the thing other than just the size of the cardstock. And, really, we didn’t even put a
    spec on that.”
    Brass Reminders emphasizes that the dimensions listed for the decals (not the other
    materials) said that they “will always be square or rectangular but can be ANY dimension subject
    to the above minimums and maximums.” But the internal decal size-ranges Brass Reminders
    describes were not a source of machine error. A persistent problem was that the decals bent and
    bowed, causing the machine to slow or jam. Brass Reminders did not specify curvature as a
    variability in its original dimension specification, nor did it specify the thickness of its cardstock.
    Durham also acknowledged in an email to RT that the curling of the materials came from storing
    them in Brass Reminders’s non-climate-controlled warehouse.
    Another problem was that the materials exceeded the original tolerances Brass Reminders
    had provided. As discussed, a significant point of miscommunication was that RT understood
    Brass Reminders’s dimension specifications to use the ASME industry standard for tolerances
    even though Durham had no such intention and only intended to write the principal dimensions of
    the materials. But the terms and conditions required that Brass Reminders provide “dimensional
    15
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    tolerances of each product . . . along with all process specifications which will in any manner effect
    [sic] the performance of the Seller’s equipment . . . .” (emphasis added).
    Brass Reminders also asserts that “it is quite apparent that the District Court and RTE
    confuse the Brass Reminders product for which the Dimension Specifications were provided—the
    novelty decal—with other packaging materials (plastic bags, header cards and ‘chipboard’ backer
    cards).” But the header cards and chipboard cards also caused problems with the machine. For
    example, Durham acknowledged in his email to his cutter that, “at the last trial variation in the size
    of the backer cards from shearing became an issue. We need to look at die cutting the backer cards
    for consistency.” RT initially did not know the materials were shear-cut (and instead believed they
    were die-cut) because Durham “constantly” referred to his shear-cutter as his “die cutter.”
    Brass Reminders argues that Durham’s testimony “regarding the product samples provided
    throughout the relationship with RTE” is “consistent and clear.” Brass Reminders cites the
    following excerpts of Durham’s deposition:
    I don’t feel like there’s been any variability in our product. The product that I gave
    them as samples is the product I have today. It can’t change. It is what it is. That’s
    the product they had to package.
    [I]t’s the same material that we provided at the quote.
    The product was no different than the product that was submitted to them at the
    beginning of the process.
    I cannot change what the product is. The product is the product.
    Reading these carefully selected quotes in context, however, shows that Durham uses the
    term “variability” in different ways throughout his deposition and communications. At one level
    of generality, Brass Reminders supplied RT the “same” product, in that the principal dimensions
    of the materials did not change (though the tolerances did) and in that Brass Reminders used the
    same cutter and material sources as it had in the past. But at a more specific level, the level that
    affected the machine, Durham admitted that the product had variations. For example, “variation in
    16
    Case No. 20-5671, Brass Reminders Co. v. RT Engineering Corp.
    the size of the backer cards from shearing became an issue.” In an email to RT, Durham
    acknowledged that, as his cutter told him, “we get all gauges of material because we do not specify
    and they run whatever is convenient. This was fine for hand packaging, and we went that way to
    get the lowest cost. It is not a problem to always use the same material for us and give us consistent
    thickness going forth.” Durham admitted that even though he did “provide specifications on the
    size of the product. I listed the nominal size of the cardstocks that would be used . . . but there is
    variation on the sizes there.” Durham also admitted that the product was variable in the samples
    Brass Reminders provided.
    Brass Reminders was required under the terms and conditions to specify the dimensional
    variations that would affect the machine. There is no genuine dispute of material fact that it failed
    to do so and failed to provide consistent materials to RT Engineering. Thus, the district court
    properly found that Brass Reminders breached the contract, and so its claim against RT for breach
    of contract failed. To the extent that Brass Reminders also challenges the district court’s ruling on
    RT’s counterclaim for breach of contract, that argument fails in light of Brass Reminders’s own
    breach. Summary judgment for defendant RT was properly granted.
    III. CONCLUSION
    For these reasons, we AFFIRM.
    17