Barkley, Inc. v. Gabriel Brothers, Inc. , 829 F.3d 1030 ( 2016 )


Menu:
  •  United States Court of Appeals
    For the Eighth Circuit
    ___________________________
    No. 15-2307
    ___________________________
    Barkley, Inc.
    lllllllllllllllllllll Plaintiff - Appellant
    v.
    Gabriel Brothers, Inc.; Rugged Wearhouse, Inc.
    lllllllllllllllllllll Defendants - Appellees
    ___________________________
    No. 15-2308
    ___________________________
    Barkley, Inc.
    lllllllllllllllllllll Plaintiff - Appellee
    v.
    Gabriel Brothers, Inc.; Rugged Wearhouse, Inc.
    lllllllllllllllllllll Defendants - Appellants
    ____________
    Appeals from United States District Court
    for the Western District of Missouri - Kansas City
    ____________
    Submitted: January 13, 2016
    Filed: July 25, 2016
    ____________
    Before WOLLMAN, MELLOY, and COLLOTON, Circuit Judges.
    ____________
    WOLLMAN, Circuit Judge.
    Gabriel Brothers, Inc. and Rugged Wearhouse, Inc. (Gabriel Brothers), two
    commonly owned discount clothing and apparel chains that are headquartered in West
    Virginia, entered into a master services agreement (the Agreement) with Barkley, Inc.
    (Barkley), a marketing company located in Missouri, for marketing and advertising
    services. The Agreement provided the general terms governing the companies’
    relationship, while the specific services and fees were to be negotiated later as
    project-specific contracts, called statements of work. The Agreement permitted either
    party to terminate the contract after providing 90 days’ notice. Gabriel Brothers
    terminated the Agreement before a written 2013 statement of work had been
    executed, but after Barkley had begun work on 2013 projects.
    Barkley sued, claiming that Gabriel Brothers breached the Agreement or, in the
    alternative, that Gabriel Brothers breached a subsequent agreement to pay “actual
    costs” and that Gabriel Brothers was unjustly enriched. Gabriel Brothers filed
    counterclaims, alleging that Barkley breached the Agreement and that Barkley was
    unjustly enriched by Gabriel Brothers’s partial payment of the amount for which
    Barkley had submitted invoices. The district court granted summary judgment in
    favor of Gabriel Brothers on Barkley’s claim that Gabriel Brothers breached the
    Agreement, and a jury awarded damages to Barkley on its actual-costs claim. As
    relevant here, the district court denied Barkley’s post-trial motion for prejudgment
    -2-
    interest and Gabriel Brothers’s motions for judgment as a matter of law or, in the
    alternative, a new trial, and for attorney’s fees.
    Barkley appeals from the district court’s grant of summary judgment to Gabriel
    Brothers on Barkley’s breach-of-the-Agreement claim, as well as from the court’s
    denial of prejudgment interest on the jury award. Gabriel Brothers cross-appeals
    from the district court’s alleged sua sponte grant of partial summary judgment to
    Barkley, in which it concluded that the parties had formed a separation-agreement
    contract. Gabriel Brothers also appeals from the district court’s evidentiary rulings
    and jury instructions, the district court’s denial of Gabriel Brothers’s post-trial
    motions for judgment as a matter of law or for a new trial, and the district court’s
    order denying attorney’s fees. We reverse the district court’s order denying
    prejudgment interest and affirm in all other respects.
    I. Background
    Gabriel Brothers hired Barkley in September 2012 to be its advertising agent
    for a term of eighteen months. Gabriel Brothers and Barkley entered into the
    Agreement in October 2012 and made its terms retroactive to September. The
    Agreement provided the general terms for the relationship between the two
    companies, and subsequent statements of work would specify the projects that
    Barkley would complete and the fees that Gabriel Brothers would pay. The
    Agreement contained an incorporation clause, which stated:
    Barkley shall perform for [Gabriel Brothers] certain services which shall
    be agreed to by the parties on a project-by-project basis . . . . The
    Services agreed to for each Project shall be designated in a written
    Statement of Work (“Statement of Work”). Each Statement of Work
    shall contain the following provision:
    -3-
    “This Statement of Work is incorporated into, and made a part of, that
    certain Master Services Agreement . . . between the parties dated
    [October 5,] 2012, which Agreement governs the relationship of the
    parties. All terms and conditions provided in the Agreement shall apply
    to this Statement of Work.”
    The Agreement also contained the following termination clause: “Either party may
    terminate this Agreement at any time and without cause with ninety (90) days written
    notice to the other party. Termination in this manner shall not affect any Projects then
    in effect.” Finally, the Agreement entitled the prevailing party in any future lawsuit
    to recover attorney’s fees, if the litigation was initiated “to construe or enforce this
    Agreement.”
    In November 2012, Barkley and Gabriel Brothers executed a statement of work
    (2012 statement) that covered the time period of September 2012 through December
    25, 2012. In December 2012, Barkley began working on projects that were not
    included in the 2012 statement, but were undertaken at Gabriel Brothers’s request
    while the companies negotiated a statement of work for 2013.
    On January 31, 2013, representatives from the companies discussed a statement
    of work for 2013. Barkley presented its proposed budget, and Gabriel Brothers
    described its marketing plans for 2013, explaining that its “budgets [were] very tight.”
    Barkley agreed to submit a “revised staffing plan.”
    On February 13, 2013, Dan Fromm, Barkley’s President and Chief Operations
    Officer, sent an email to Richard Pesce, Gabriel Brothers’s Senior Vice President,
    Operations, with the subject “Follow Up” and a document attached that was titled
    “2013 Gabes SOW (1).pdf” (draft 2013 statement of work). In the email, Fromm
    referred to a conversation that he had had with Pesce one week earlier and explained
    that the attachment was a “revised budget proposal” based on that conversation. The
    email stated that under the revised proposal, “the fee will drop to $58,333.33 per
    month (Feb-Dec),” and that “[w]e have tightened our fees to work with your budget,
    -4-
    and feel we can accomplish this with a disciplined approach to the pre-scheduled
    events.”
    The draft 2013 statement of work included three tiers of services. The first tier
    (Tier 1) listed the services that Barkley would provide for Gabriel Brothers’s planned
    marketing events under the $58,333.33 monthly fee. The list of services was not
    complete on February 13, 2013, however, and indicated that the Tier 1 services
    Barkley would provide later in the year were yet to be determined. The second tier
    (Tier 2) listed services that were not covered by the monthly fee but which Barkley
    would provide at Gabriel Brothers’s request. The fees associated with each Tier 2
    service were set forth in the draft 2013 statement of work. The third tier (Tier 3)
    included services that were to be negotiated on a project-by-project basis because
    they were of a “greater scale” than the Tier 2 services. Fromm’s email concluded,
    “We would like to set up a call to walk through the attachment together and get our
    agreement finalized.”
    Pesce responded later that day, writing, “Thank you for providing this proposal,
    this is more in-line with our needs. As I mentioned last week we were able to put
    fabric on the skeleton for the second half and we’re now finished (attached).” Pesce’s
    email included an attached document titled                                       “2013
    Marketing_MediaStrategy_Updated 2 12 13.xlsx,” which outlined Gabriel Brothers’s
    schedule of planned marketing events for the second half of 2013. Pesce indicated
    that the companies were nearing a final agreement, and a February 21, 2013,
    conference call was scheduled so that the companies could discuss Gabriel Brothers’s
    updated schedule and Barkley’s draft 2013 statement of work.
    Jerrod Mitchell, Barkley’s Account Supervisor for the Gabriel Brothers
    account, sent a pre-call email with a revised draft 2013 statement of work that
    included the projects listed in Gabriel Brothers’s marketing schedule to Fromm,
    Pesce, and others involved with the negotiations. The email stated that the “[updated]
    -5-
    budget now includes all of the latest information that has been provided to [Barkley]
    on upcoming work for the year.”
    Following the conference call, Mitchell sent an email expressing his
    “excite[ment] about the progress that was made and . . . [his] confiden[ce that] this
    will set us up for a successful partnership in 2013.” Mitchell outlined the “next
    steps” that the companies planned to take, as he understood them from the
    information shared during the call. Those steps included verifying the accuracy of
    the list of projects set forth under Tier 1, updating the prices and services set forth
    under Tier 2, and adding more information about the services that would be included
    under Tier 3.
    On March 1, 2013, Barkley sent an email to Gabriel Brothers with the subject
    “Updated 2013 Gabes SOW.” Attached to the email was a revised draft 2013
    statement of work that reflected the changes Mitchell had outlined. That draft
    included changes to Tiers 2 and 3, while Tier 1 remained unchanged and listed the
    same $58,333.33 monthly fee that Fromm had proposed in the first draft 2013
    statement of work. The email concluded, “If you feel good about this, we will get a
    contract drafted so we can get this finalized and keep moving on our events.”
    On March 7, Staci Strickler Shane, Gabriel Brothers’s Director of Customer
    Experience and Mitchell’s primary contact, requested that additional services be
    added to Tier 1. The following day, Mitchell sent Strickler Shane a revised draft
    2013 statement of work, which added the services Strickler Shane had requested and
    increased the monthly fee to $60,000. Mitchell’s email concluded, “Please let me
    know if you have any questions on these changes. I am hopeful we can get this
    approved soon.” He further noted that “I am starting to draft the contract now based
    on this latest agreement. Once it is finished, we will send it over to you for final
    approval.” Strickler Shane did not respond to Mitchell’s email.
    -6-
    On March 19, Gabriel Brothers notified Barkley that it was terminating
    Barkley’s services, to “bring marketing communications in house and to begin that
    process at once.” The parties never drafted a contract for the draft 2013 statement of
    work that included the Agreement’s incorporation clause.
    Fromm sent an email to Pesce the same day, noting that he had been “caught
    off guard” by Gabriel Brothers’s decision. He wrote:
    While we obviously didn’t have a signed agreement in place, we were
    working in good faith to run things according to the scope we had
    agreed to in principle. That means we’ve got people dedicated to your
    account in order to keep up with the workload, some of whom we’ve
    just recently hired. In a standard client agreement, we would have a 90-
    day termination clause. That is in place to allow for effective transition
    as well as to allow us to either re-deploy the team or give them a
    reasonable notice period upon termination.
    Fromm asked, “Would you consider an extension to the notice? Even an extra 30
    days would help us provide the team a little bit of severance. Honestly, if I want them
    to work for the next two weeks on a transition, I think we need at least that much.”
    Fromm thereafter entered into negotiations with Ken Seipel, Gabriel Brothers’s
    Chief Executive Officer, and Lori Paletta-Davis, Gabriel Brothers’s General Counsel,
    over a potential separation agreement. On March 27, Fromm informed Paletta-Davis,
    “We are more than happy to simply have Gabriel Brothers pay us for the work that
    we have done this year (and continue to do) up through the time that all of the assets
    are transferred over.” He added, “If you agree, we will send over a new invoice for
    [January] and [February] and should be able to get a final bill based on March time
    to you by the end of next week.” On April 3, Paletta-Davis requested invoices from
    Barkley, noting, “The key then is for you to get the invoices to us as soon as possible.
    Everything will hinge on that.”
    -7-
    On April 5, Fromm spoke with Seipel on the phone and proposed an agreement
    under which Gabriel Brothers would pay Barkley’s actual costs. Seipel agreed, and
    Fromm submitted more than two hundred pages of invoices that set forth fees of
    $418,996.76. This amount included fees owed to third-party vendors. The invoices
    set forth the fees associated with each project, but did not list the number of hours
    worked or the hourly rate charged for the services. Fromm also offered to “prepare
    a simple separation agreement . . . to include us waiving any additional fees for
    separation and to appropriately transfer creative rights.”
    Gabriel Brothers questioned the invoices, asserting that some of the charges
    were for services that Gabriel Brothers had not requested and that others constituted
    double billing. On April 24, at Strickler Shane’s request, Mitchell submitted
    documents that provided additional information about the invoices. After reviewing
    the invoices and additional materials Mitchell had sent, Gabriel Brothers continued
    to dispute the invoices and requested more documentation verifying the charges,
    including a spreadsheet that provided more details about the items set forth in the
    invoices. When Barkley did not provide that information, Gabriel Brothers identified
    those line items that it determined had not been requested or were not attributable to
    any particular project. Ultimately, Gabriel Brothers paid the third-party vendors
    directly and paid Barkley $228,677.13. In total, Gabriel Brothers refused to pay
    $138,223.52 of the invoiced amount.
    Barkley sued, alleging breach of the Agreement and, in the alternative, breach
    of the April 5 agreement to pay “actual costs” and unjust enrichment. Gabriel
    Brothers counterclaimed, alleging breach of the Agreement and unjust enrichment.
    Gabriel Brothers also asserted several affirmative defenses, including accord and
    satisfaction.
    As set forth earlier, the district court granted Gabriel Brothers’s motion for
    summary judgment in part and dismissed the claim that Gabriel Brothers had
    -8-
    breached the Agreement. In denying summary judgment on Barkley’s claim that
    Gabriel Brothers had breached the April 5 agreement, the district court noted, “In this
    case, there was an agreement that Gabriel Brothers would pay Barkley’s ‘actual
    costs.’” Although Barkley had not moved for summary judgment on that claim and
    the district court’s order merely denied Gabriel Brothers summary judgment on the
    claim, the evidence at trial and the jury instructions were limited to whether Gabriel
    Brothers breached the actual-costs agreement and the amount of damages, if any, that
    Gabriel Brothers owed to Barkley.
    Before the case was submitted to the jury, the district court determined that no
    evidence supported Gabriel Brothers’s counterclaims or its accord-and-satisfaction
    defense and accordingly rejected Gabriel Brothers’s proposed jury instructions on
    those issues.
    Based on its conclusion that the focus of the trial would be the amount of the
    actual costs that Gabriel Brothers owed to Barkley, the district court granted in part
    Barkley’s motions in limine to exclude testimony from Timothy Hanlon, Gabriel
    Brothers’s expert witness, and Shari Rudolph, its corporate representative, who had
    been hired as Vice President and Chief Marketing Officer in January 2014.
    The jury awarded Barkley $138,223.52 in damages. Both parties filed post-
    trial motions. Barkley moved for prejudgment interest. Gabriel Brothers moved for
    judgment as a matter of law or, in the alternative, for a new trial. It also moved to
    alter or amend the summary judgment ruling, arguing that the district court
    improperly granted summary judgment sua sponte to Barkley on the formation of an
    actual-costs contract. Gabriel Brothers requested attorney’s fees. The district court
    denied the motions, and this appeal followed.
    -9-
    II. Barkley’s Appeal
    A. Summary Judgment
    Barkley argues that the district court erred in granting summary judgment
    against it on its claim that Gabriel Brothers breached the Agreement, because Barkley
    had presented sufficient evidence for a reasonable jury to conclude that the companies
    had formed a 2013 statement of work on February 21, 2013. We review de novo a
    district court’s grant of summary judgment, viewing the evidence “in the light most
    favorable to the nonmoving party.”1 Beverly Hills Foodland, Inc. v. United Food &
    Commercial Workers Union, Local 655, 
    39 F.3d 191
    , 194 (8th Cir. 1994). In a
    diversity action, we apply state substantive law and federal procedural law. See
    FutureFuel Chem. Co. v. Lonza, Inc., 
    756 F.3d 641
    , 646 (8th Cir. 2014) (citing Erie
    R.R. Co. v. Tompkins, 
    304 U.S. 64
    , 78 (1938)). The parties agree that Missouri law
    controls in this case.
    Barkley argues that the Agreement did not condition the formation of a
    statement of work on the execution of a formal contract, but merely contemplated that
    1
    Gabriel Brothers argues that Barkley failed to preserve its appeal of the
    summary judgment order because Barkley did not file post-trial motions under
    Federal Rules of Civil Procedure 50, 59, or 60. The requirement that a party preserve
    arguments raised at summary judgment “through subsequent motions for judgment
    as a matter of law” applies, however, only to “argument[s] denied at summary
    judgment.” N.Y. Marine & Gen. Ins. Co. v. Cont’l Cement Co., 
    761 F.3d 830
    , 838
    (8th Cir. 2014) (quoting White Consol. Indus., Inc. v. McGill Mfg. Co., 
    165 F.3d 1185
    , 1189 (8th Cir. 1999)). Barkley’s appeal addresses an adverse grant of summary
    judgment, and it raises the same arguments here that it raised at summary judgment,
    and so we conclude that it has preserved its arguments. Cf. Eagle Technology v.
    Expander Americas, Inc., 
    783 F.3d 1131
    , 1138 n.3 (8th Cir. 2015) (declining to
    consider an argument raised for the first time on appeal because the plaintiff had not
    raised the argument in response to the defendant’s motion for summary judgment or
    in any post-trial motions).
    -10-
    any statement of work would eventually be reduced to a writing and would include
    the incorporation clause. The interpretation of a contract is a question of law.
    Crestwood Shops, L.L.C. v. Hilkene, 
    197 S.W.3d 641
    , 648 (Mo. Ct. App. 2006).
    “When interpreting a contract, the overriding concern of the appellate court is to give
    effect to the intentions of the parties.” 
    Id. In determining
    the intentions of the
    parties, “the court first looks to the plain language of the agreement.” See TAP
    Pharm. Prods. Inc. v. State Bd. of Pharmacy, 
    238 S.W.3d 140
    , 143 (Mo. 2007) (en
    banc). The Agreement states that “[t]he services agreed to for each Project shall be
    designated in a written Statement of Work” and that “[e]ach Statement of Work shall
    contain” the Agreement’s incorporation clause. The use of the word “shall” indicates
    that a written statement of work is required and that any statement of work must
    contain the incorporation clause. Accordingly, because the alleged February 21,
    2013, draft 2013 statement of work was not part of a written contract and the
    document did not contain the Agreement’s incorporation clause, the district court did
    not err in granting summary judgment to Gabriel Brothers on Barkley’s breach-of-the-
    Agreement claim.
    B. Prejudgment Interest
    Barkley argues that the district court improperly denied prejudgment interest.
    Under Missouri Revised Statutes, section 408.020, “Creditors shall be allowed to
    receive interest at the rate of nine percent per annum, when no other rate is agreed
    upon, for all moneys after they become due and payable, . . . and on accounts after
    they become due and demand of payment is made.” Missouri courts award
    prejudgment interest if three elements are met: “(1) the expenses must be due; (2) the
    claim must be liquidated or the amount of the claim reasonably ascertainable; and (3)
    the obligee must make a demand on the obligor for the amount due.” Jablonski v.
    Barton Mut. Ins. Co., 
    291 S.W.3d 345
    , 350 (Mo. Ct. App. 2009). “We review the
    statutory right to prejudgment interest pursuant to section 408.020 de novo.” Mitchell
    v. Residential Funding Corp., 
    334 S.W.3d 477
    , 508 (Mo. Ct. App. 2010). “Interest
    -11-
    has traditionally been used to compensate for the use of or loss of use of money to
    which a person is entitled.” Travelers Prop. Cas. Ins. Co. of Am. v. Nat’l Union Ins.
    Co. of Pittsburgh, Pa., 
    735 F.3d 993
    , 1004-05 (8th Cir. 2013) (quoting Catron v.
    Columbia Mut. Ins. Co., 
    723 S.W.2d 5
    , 7 (Mo. 1987) (en banc)). The denial of
    prejudgment interest for unliquidated claims “is based, generally, on the idea that
    where the person liable does not know the amount he owes he should not be
    considered in default because of failure to pay.” Fohn v. Title Ins. Corp. of St. Louis,
    
    529 S.W.2d 1
    , 5 (Mo. 1975) (en banc). The district court denied prejudgment interest
    on the ground that the claim was neither liquidated nor reasonably ascertainable in
    amount. The parties agree that the other elements are satisfied.
    In denying prejudgment interest to Barkley, the district court relied on the
    Missouri Court of Appeals’s statement in Children International v. Ammon Painting
    Co., 
    215 S.W.3d 194
    , 205 (Mo. Ct. App. 2006), that “[a] bona fide dispute as to the
    amount of damages owed will result in the damages being classified as unliquidated.”
    The district court thus concluded that because the amount of damages “was a
    legitimately disputed issue between the parties that ultimately required a jury to
    determine the amount left owing to Barkley,” prejudgment interest was not
    appropriate. Missouri’s case law, however, indicates some tension over whether a
    dispute over the amount of damages—as opposed to disputes over liability or the
    method used to calculate damages—precludes prejudgment interest. Compare
    Comens v. SSM St. Charles Clinic Med. Grp., Inc., 
    335 S.W.3d 76
    , 82 (Mo. Ct. App.
    2011) (“The mere fact that a party denies liability or defends a claim against [it], or
    even the existence of a bona fide dispute as to the amount of the indebtedness, does
    not preclude recovery of interest.” (quoting Columbia Mut. Ins. Co. v. Long, 
    258 S.W.3d 469
    , 480 (Mo. Ct. App. 2008))) with Children 
    Int’l, 215 S.W.3d at 205
    .
    The facts of Children International are distinguishable, for that case involved
    a claim for outsourcing costs, the benefits of which were “variable, speculative, and
    uncertain,” and the estimate of which was prospective in nature. Children Int’l, 215
    -12-
    S.W.3d at 204. Unlike in Children International, Barkley’s invoices were not
    prospective or based on estimates. And while Gabriel Brothers raised an accord-and-
    satisfaction defense, the district court entered judgment as a matter of law rejecting
    that defense, concluding that the evidence did not justify submitting the issue to the
    jury.
    Missouri courts have held that damages claims are not liquidated when the
    method used to calculate damages was a genuinely disputed issue. See 
    Fohn, 529 S.W.2d at 4
    , 5 (concluding that a claim for the diminished value of property was
    unliquidated where the proper measure of damages was a question “of first
    impression” in the state); see also Ritter Landscaping, Inc. v. Meeks, 
    950 S.W.2d 495
    ,
    497 (Mo. Ct. App. 1997) (noting that the parties disputed liability, as well as “the
    amount of damages to be applied and the method used to calculate those damages”).
    Missouri courts have also held damages claims to be unliquidated where the
    resolution of a claim or defense is necessary before damages can be calculated, as is
    true in the case of a failure-to-mitigate defense, or when the jury decides whether
    goods are salvageable. See Children 
    Int’l, 215 S.W.3d at 205
    (failure-to-mitigate
    defense); Swift Transp. Co. v. Swearengin, 
    709 S.W.2d 130
    , 137 (Mo. Ct. App. 1986)
    (noting that whether cheese could “have been restored to marketable condition by
    placing it in cold storage” had to be resolved before damages could be calculated).
    But Missouri courts have granted prejudgment interest despite a dispute over the
    measure of damages, where the alternative measures offered by the defendant were
    not supported by evidence at trial, 
    Comens, 335 S.W.3d at 81-82
    (noting that the
    defendant’s arguments for alternative measures of damages were unsupported by
    evidence); where the amount of damages was disputed but the parties agreed on the
    proper method for calculating damages, McNeill v. City of Kansas City, 
    459 S.W.3d 509
    , 517 (Mo. Ct. App. 2015) (fair-market value); and where the parties disputed
    liability but the amount of damages was “readily determinable and ascertainable by
    simple computation,” Watters v. Travel Guard Int’l, 
    136 S.W.3d 100
    , 104-05, 111
    (Mo. Ct. App. 2004); see also Travelers Prop. Cas. Ins. Co. of 
    Am., 735 F.3d at 1006
    -
    -13-
    07 (concluding that prejudgment interest was available where “there was no
    uncertainty surrounding the amount of [the] claim,” “[n]o uncertain measurements of
    damage existed and no framework for assessing liability or calculating damages was
    missing,” and “this case involved a run-of-the-mill liability dispute”).
    Here, Barkley made a fixed demand for payment, and the method used to
    calculate damages was never in dispute; both parties agreed that the proper measure
    was the number of hours worked multiplied by the hourly rate. As earlier recounted,
    the district court dismissed Gabriel Brothers’s accord-and-satisfaction defense, along
    with its two counterclaims because they were unsupported by the evidence. And
    although the jury was given both liability and amount-of-damages instructions,
    Gabriel Brothers’s evidence and arguments at trial were that Barkley was not entitled
    to damages because its invoices did not include information about hours and rates,
    because Barkley charged for work it had not performed to Gabriel Brothers’s
    satisfaction, and because the invoices included work that Gabriel Brothers had not
    requested. In other words, Gabriel Brothers disputed whether it had breached the
    agreement to pay actual costs, which, because they were determinable and
    ascertainable by simple calculation, were liquidated, thus entitling Barkley to
    prejudgment interest.
    Accordingly, we hold that Barkley’s damages claim was liquidated and that the
    district court should have awarded prejudgment interest.
    III. Gabriel Brothers’s Cross-Appeal
    A. Sua Sponte Summary Judgment
    Gabriel Brothers’s first cross-appeal claim is that the district court erroneously
    granted partial summary judgment in Barkley’s favor on the actual-costs contract
    claim, notwithstanding the absence of any motion by Barkley for such relief.
    -14-
    Although the summary judgment order denied Gabriel Brothers’s motion, the district
    court stated:
    In this case, there was an agreement that Gabriel Brothers would pay
    Barkley’s “actual costs.” Keeping in mind that every agreement is
    overlain with implied duties of good faith and fair dealing, the Court
    concludes that there is a legitimate jury question as to the exact amount
    of what Barkley’s “actual costs” were, and whether Gabriel Brothers’
    partial payment covered such costs (i.e., whether Gabriel Brothers in
    fact breached any agreement to pay actual costs).
    Thereafter, the district court limited the evidence at trial and the jury instructions to
    whether Gabriel Brothers had breached the actual-costs contract and the amount of
    damages, if any, resulting therefrom. Following the trial, Gabriel Brothers moved to
    amend the summary judgment order, arguing that it was entitled to present facts
    showing that there was a genuine dispute over whether the parties reached an
    agreement to pay actual costs. The district court rejected Gabriel Brothers’s
    interpretation of its order:
    Gabriel Brothers reads the Court’s language as making a final
    determination that there was an agreement reached between the parties
    on April 5, 2013. To the contrary, the Court—in response to Gabriel
    Brothers’ argument that there was no meeting of [the] minds—found
    that there was evidence of a meeting of the minds sufficient to defeat a
    motion for summary judgment. . . . If Gabriel Brothers chose to be
    bound [by] the language of the summary judgment order in . . . its
    presentation of evidence, jury argument, and instructions, that was its
    litigation strategy.
    The court and the parties treated the actual-costs issue as if it had been settled.
    For example, Gabriel Brothers submitted proposed preliminary jury instructions that
    stated, “The Court has determined the parties formed an agreement that called for
    Defendants to pay Plaintiff for services that Plaintiff furnished Defendants at
    -15-
    Defendants’ request, from January 2013 through March 2013.” It did not propose an
    instruction on whether the parties had reached an agreement for Gabriel Brothers to
    pay Barkley’s actual costs.
    Gabriel Brothers argues that the district court procedurally erred when it, in
    effect, decided to enter summary judgment on the actual-costs contract-formation
    issue without providing Gabriel Brothers with sufficient notice and an opportunity
    to respond. “Federal district courts have power to grant summary judgment sua
    sponte when the losing party is given sufficient advance notice and an adequate
    opportunity to submit evidence in opposition.” Chrysler Credit Corp. v. Cathey, 
    977 F.2d 447
    , 449 (8th Cir. 1992) (per curiam); see also Fed. R. Civ. P. 56(f). Gabriel
    Brothers raised the actual-costs contract-formation issue in its own motion for
    summary judgment and presented its evidence at that time. The arguments that
    Gabriel Brothers now asserts it would have made to establish that there was a genuine
    dispute are the same arguments that it raised before the district court in its own
    motion for summary judgment. Assuming that the district court’s statement
    constituted a sua sponte summary judgment on the actual-costs contract claim, we
    conclude that Gabriel Brothers was given adequate notice and that the district court
    therefore did not err in ruling as it did. See Am. Red Cross v. Cmty. Blood Ctr. of the
    Ozarks, 
    257 F.3d 859
    , 863 (8th Cir. 2001) (reversing where “[t]he district court in
    effect granted . . . summary judgment sua sponte, because the three claims [decided
    in the summary judgment order] were never raised” in the defendant’s motion).
    B. Evidentiary Rulings and Jury Instructions
    We review a district court’s evidentiary rulings “for clear abuse of discretion,
    and reverse[] ‘only when an improper evidentiary ruling affected the defendant’s
    substantial rights or had more than a slight influence on the verdict.’” Am. Bank of
    St. Paul v. TD Bank, N.A., 
    713 F.3d 455
    , 464 (8th Cir. 2013) (quoting Chism v. CNH
    Am. LLC, 
    638 F.3d 637
    , 640 (8th Cir. 2011)). We review the district court’s jury
    -16-
    instructions for abuse of discretion. Graham Constr. Servs., Inc. v. Hammer & Steel
    Inc., 
    755 F.3d 611
    , 618 (8th Cir. 2014).
    Gabriel Brothers argues the district court abused its discretion by excluding
    testimony of its expert witness, Tim Hanlon, who would have testified about the
    “value and reasonableness” of Barkley’s services and “the reasonable practices by
    which that value should be demonstrated.” The district court excluded Hanlon’s
    testimony, noting that “the issue before the jury is not whether Gabriel [Brothers] was
    justified in not paying these invoices at the time they received them,” but rather
    whether Barkley had actually provided the services for which it charged Gabriel
    Brothers. Given that narrow question, the district court concluded that the only
    expert opinion that Hanlon could offer the jury involved “industry standard[s] and
    practice[s] in terms of preparing an invoice” and what invoices look like, which the
    court concluded would not be helpful to the jury, and that the testimony was therefore
    irrelevant. The district court did not abuse its discretion in so holding.
    Gabriel Brothers argues that the district court abused its discretion by
    excluding testimony from Shari Rudolph, its corporate representative. Having
    reviewed the argument we conclude that it does not merit further discussion, for we
    are satisfied that the district court’s decision to limit Rudolph’s testimony as it did
    was not an abuse of discretion.
    Gabriel Brothers argues that the district court improperly excluded its proposed
    jury instructions. “In reviewing instructions, this court must determine whether the
    instructions, ‘taken as a whole and viewed in light of the evidence and the applicable
    law, fairly and adequately submitted the issues in the case to the jury.’” Fogelbach
    v. Wal-Mart Stores, Inc., 
    270 F.3d 696
    , 699 (8th Cir. 2001) (quoting B & B
    Hardware, Inc. v. Hargis Indus., Inc., 
    252 F.3d 1010
    , 1012 (8th Cir. 2001)). Having
    reviewed the instructions as given by the district court, we conclude that they
    -17-
    satisfied this standard of review and that the district court did not err in excluding the
    proposed instructions.
    C. Motions for Judgment as a Matter of Law and for a New Trial
    We review de novo a district court’s denial of a motion for judgment as a
    matter of law, viewing the evidence in the light most favorable to the verdict. Estate
    of Pepper v. Whitehead, 
    780 F.3d 856
    , 861 (8th Cir. 2015). We review a motion for
    a new trial for abuse of discretion. 
    Id. Gabriel Brothers
    contends that Barkley failed to present evidence sufficient for
    a reasonable jury to find that the parties had entered into an actual-costs contract.
    Under Missouri law, a contract requires “mutuality of agreement” among the
    contracting parties over the contract’s essential terms. See Ketcherside v. McLane,
    
    118 S.W.3d 631
    , 635-36 (Mo. Ct. App. 2003) (“Mutuality of agreement is determined
    by looking to the intentions of the parties as expressed or manifested in their words
    or acts.”). Fromm testified that he and Seipel agreed on April 5, 2013, that Gabriel
    Brothers would pay Barkley’s actual costs, which both parties understood to mean
    Barkley’s actual hours worked on projects for Gabriel Brothers. Barkley also
    presented evidence that Barkley sent invoices to Seipel on that same day and that
    Seipel sent an email on April 16, 2013, stating, “Dan and I have agreed we are paying
    for actual costs versus the monthly fee, and he will waive the cancellation fees on the
    backside.” We conclude that a reasonable jury could find from this evidence that the
    parties had formed a contract on April 5 for Gabriel Brothers to pay Barkley’s actual
    costs.
    Gabriel Brothers also contends that Barkley failed to present evidence that
    Barkley’s services were of value to Gabriel Brothers, that Barkley charged only for
    work that was requested, that the charges reflected properly done work that met
    Gabriel Brothers’s deadlines, and that the charges were accurate and reasonable.
    -18-
    Under its actual-costs contract, Barkley was required to prove only that Gabriel
    Brothers had not fully paid for the time Barkley spent on projects for Gabriel
    Brothers, its sufficient evidence of which was presented through its 225 pages of
    itemized invoices and testimony from Fromm and Mitchell about Barkley’s time-
    keeping practices, and from which a jury could reasonably find that Barkley was
    entitled to $138,223.52.
    D. Attorney’s Fees
    Finally, Gabriel Brothers argues that it was entitled to attorney’s fees under the
    terms of the Agreement, which provided for the recovery of attorney’s fees to the
    prevailing party in a lawsuit brought “to construe or enforce [the Agreement].” We
    review de novo a district court’s “prevailing-party determination in a contractual
    context.” DocMagic, Inc. v. Mortg. P’ship of Am., L.L.C., 
    729 F.3d 808
    , 812 (8th
    Cir. 2013). “A prevailing party is the party prevailing on the main issue in dispute.”
    Flamingo Pools, Spas, Sunrooms & More Store, Inc. v. Penrod, 
    993 S.W.2d 588
    , 590
    (Mo. Ct. App. 1999). Although Gabriel Brothers contends that it prevailed because
    it was awarded summary judgment on Barkley’s breach-of-the-Agreement claim, both
    parties raised and lost their respective claims to enforce the Agreement, and we thus
    agree with the district court that neither was the prevailing party.
    The judgment is affirmed in part and reversed in part, and the case is remanded
    for the entry of an award of prejudgment interest.
    ______________________________
    -19-
    

Document Info

Docket Number: 15-2307

Citation Numbers: 829 F.3d 1030

Filed Date: 7/25/2016

Precedential Status: Precedential

Modified Date: 1/12/2023

Authorities (19)

Chism v. CNH AMERICA LLC , 638 F.3d 637 ( 2011 )

Ronald J. Fogelbach v. Wal-Mart Stores, Inc. , 270 F.3d 696 ( 2001 )

chrysler-credit-corporation-v-jim-cathey-doris-cathey-david-ross-darlene , 977 F.2d 447 ( 1992 )

Beverly Hills Foodland, Inc., a Missouri Corporation v. ... , 39 F.3d 191 ( 1994 )

B&b Hardware, Inc. v. Hargis Industries, Inc., Doing ... , 252 F.3d 1010 ( 2001 )

white-consolidated-industries-inc-doing-business-as-wci-freezer , 165 F.3d 1185 ( 1999 )

Watters v. Travel Guard International , 136 S.W.3d 100 ( 2004 )

Comens v. SSM St. Charles Clinic Medical Group, Inc. , 335 S.W.3d 76 ( 2011 )

Children International v. Ammon Painting Co. , 215 S.W.3d 194 ( 2006 )

Catron v. Columbia Mutual Insurance Co. , 723 S.W.2d 5 ( 1987 )

Crestwood Shops, L.L.C. v. Hilkene , 197 S.W.3d 641 ( 2006 )

Fohn v. Title Insurance Corp. of St. Louis , 529 S.W.2d 1 ( 1975 )

TAP Pharmaceutical Products Inc. v. State Board of Pharmacy , 238 S.W.3d 140 ( 2007 )

american-red-cross-a-not-for-profit-corporation-v-community-blood-center , 257 F.3d 859 ( 2001 )

Columbia Mutual Insurance Co. v. Long , 258 S.W.3d 469 ( 2008 )

Ritter Landscaping, Inc. v. Meeks , 950 S.W.2d 495 ( 1997 )

Jablonski v. Barton Mutual Insurance Co. , 291 S.W.3d 345 ( 2009 )

Ketcherside v. McLane , 118 S.W.3d 631 ( 2003 )

Erie Railroad v. Tompkins , 58 S. Ct. 817 ( 1938 )

View All Authorities »