AR Elec Engy Consum v. FERC ( 2002 )


Menu:
  •                   United States Court of Appeals
    FOR THE DISTRICT OF COLUMBIA CIRCUIT
    Argued April 8, 2002       Decided May 17, 2002
    No. 94-1461
    Arkansas Electric Energy Consumers, et al.,
    Petitioners
    v.
    Federal Energy Regulatory Commission,
    Respondent
    Arkansas Public Service Commission, et al.,
    Intervenors
    Consolidated with Nos.
    94-1469, 94-1480, 94-1495, 94-1508, 94-1509
    On Petitions for Review of Orders of the
    Federal Energy Regulatory Commission
    Mary W. Cochran argued the cause for petitioners.  With
    her on the briefs were Paul R. Hightower, Zachary David
    Wilson, Brian Donahue, Mitchell F. Hertz, George M. Flem-
    ing and Frank Spencer.  William B. McKinley and James D.
    Senger entered appearances.
    David H. Coffman, Attorney, Federal Energy Regulatory
    Commission, argued the cause for respondent.  With him on
    the brief were Cynthia A. Marlette, General Counsel, and
    Dennis Lane, Solicitor.
    Michael R. Fontham argued the cause for intervenors
    Entergy Services, Inc. and Louisiana Public Service Commis-
    sion.  With him on the brief were Noel J. Darce and John N.
    Estes III.
    Before:  Edwards, Rogers and Tatel, Circuit Judges.
    Opinion for the Court filed by Circuit Judge Rogers.
    Rogers, Circuit Judge:  Arkansas Electric Energy Consum-
    ers and others1 petition for review of Opinion Nos. 385 and
    385-A of the Federal Energy Regulatory Commission.  In
    those opinions the Commission approved the merger of the
    Entergy and Gulf States systems under s 203 of the Federal
    Power Act ("FPA"), 16 U.S.C. s 824b, and an amendment to
    the Entergy System Agreement under FPA s 205, 16 U.S.C.
    s 824d, to add Gulf States as an Entergy Operating Company
    upon approval and consummation of the merger.  See Enter-
    gy Servs., Inc., Opinion No. 385, 65 FERC p 61,332 (1993)
    ("Opinion No. 385");  Entergy Servs., Inc., Opinion No. 385-
    A, 67 FERC p 61,192 (1994) ("Opinion No. 385-A").  Peti-
    tioners principally contend that Opinion No. 385 violates
    s 205's prohibition against undue discrimination because the
    System Agreement treats Gulf States, which has no history of
    cost-sharing with respect to the Entergy system generating
    facilities, similarly to the four electric operating companies
    ("EOCs")--Arkansas Power & Light Company, Louisiana
    Power & Light Company, Mississippi Power & Light Compa-
    ny, and New Orleans Public Service, Inc.--which have long
    cost-sharing histories. Petitioners also contend that the Com-
    __________
    1  Other petitioners are Arkansas Cities and Cooperatives, Ar-
    kansas Public Service Commission, Mississippi Public Service Com-
    mission, and the State of Mississippi.
    mission erred in not holding an evidentiary hearing on whole-
    sale electric competition before approving the merger.  We
    deny the petition.
    I.
    Opinion Nos. 385 and 385-A respond to the 1992 filing by
    Entergy and Gulf States of a joint application under s 203 for
    authorization to merge their adjacent systems.  Entergy
    simultaneously filed, pursuant to s 205, a proposed amend-
    ment to the System Agreement to add Gulf States as an EOC
    upon approval and consummation of the merger.  The back-
    ground to these proceedings need not be repeated.  See City
    of New Orleans v. FERC, 
    875 F.2d 903
     (D.C. Cir. 1989);
    Mississippi Power & Light Co. v. Mississippi ex rel. Moore,
    
    487 U.S. 354
     (1988);  Mississippi Indus. v. FERC, 
    808 F.2d 1525
     (D.C. Cir. 1987), on rehearing, 
    822 F.2d 1104
     (D.C. Cir.
    1987);  Louisiana Pub. Serv. Comm'n v. FERC, 
    688 F.2d 357
    (5th Cir. 1982).  We therefore turn directly to the Commis-
    sion's threshold contention that petitioners have waived their
    s 205 challenge to Opinion Nos. 385 and 385-A.
    II.
    The FPA provides for rehearing of a Commission order,
    provided the request is filed within 30 days of the order.  16
    U.S.C. s 825l(a).  Thereafter, a party or other person ag-
    grieved has 60 days from the denial of rehearing to seek
    judicial review.  
    Id.
     s 825l(b).  Application for rehearing by
    the Commission is a prerequisite to seeking judicial review.
    
    Id.
     s 825l(a).  No objection to the Commission's order may
    be raised on appeal to the court unless it was urged before
    the Commission on rehearing "unless there is reasonable
    ground for failure to do so."  
    Id.
     s 825l(b).  See FPC v.
    Colorado Interstate Gas Co., 
    348 U.S. 492
    , 497-98 (1955).
    The Commission contends that petitioners have waived their
    undue discrimination challenges to Opinion Nos. 385 and
    385-A by failing to raise them on reconsideration of the
    Hearing Order.  Upon review of the record of the proceed-
    ings, we conclude that, pursuant to s 825l(b), petitioners
    preserved their contentions for judicial review.
    In the order setting forth the issues to be addressed at an
    evidentiary hearing, the Commission stated, in relevant part,
    that the s 205 inquiry would "focus solely on whether the
    Operating Companies and their customers will be adversely
    affected by Gulf States' integration into the existing System
    Agreement...."  Entergy Servs., Inc., Order on Applica-
    tions, 62 FERC p 61,073, 61,378 (1993) ("Hearing Order").
    The order also stated that the effect of the merger on rates
    and costs would be taken into account.  
    Id.
      At this point,
    petitioners properly could rely on the Commission's adher-
    ence, following the evidentiary hearing, to the requirements
    of ss 203 and 205 in addressing the merits of the System
    Agreement amendment.  Because a party may be adversely
    affected if it suffers undue discrimination and the term "ad-
    versely affected" has a rather indeterminate meaning in the
    abstract, it would be unreasonable to expect petitioners to
    have challenged the standard established in the Hearing
    Order before the standard had been applied.  Put otherwise,
    petitioners had "reasonable ground[s]" to refrain from raising
    their contentions regarding undue discrimination until a deci-
    sion on the merits was rendered.  16 U.S.C. s 825l(b).
    Upon determining that, in petitioners' view, the opinion of
    the Administrative Law Judge ("ALJ") following the eviden-
    tiary hearing, Initial Decision, 64 FERC p 63,026 ("Initial
    Decision"), had blurred the distinction between ss 203 and
    205, and failed to protect them against undue discrimination
    in ratemaking, petitioners raised appropriate objections in an
    initial post-hearing brief and in a brief on exceptions to the
    Initial Decision.  Similarly, petitioners raised these conten-
    tions in seeking rehearing by the Commission of Opinion No.
    385.  Indeed, on rehearing the Commission addressed peti-
    tioners' undue discrimination contentions on the merits, never
    suggesting that petitioners had waived their contentions by
    failing to raise them in seeking rehearing of the Hearing
    Order.  See, e.g., Opinion No. 385-A, 67 FERC at p 61,583.
    In now contending that petitioners are making an imper-
    missible collateral attack on the "adverse effects" test estab-
    lished in the Hearing Order, the Commission relies on Blue-
    stone Energy Design, Inc. v. FERC, 
    74 F.3d 1288
    , 1293-94
    (D.C. Cir. 1996).  The waiver issue in Bluestone, however,
    was not decided under s 825l(b);  the petitioner in that case
    conceded that judicial review was foreclosed under s 825l(b)
    for failure to file a timely petition for rehearing and sought
    review under 16 U.S.C. s 823b(d)(2)(B), which provides for
    judicial review of Commission orders assessing penalties.
    The court held that s 823b(d)(2)(B) prohibited collateral at-
    tacks on findings in prior Commission orders unless the
    petitioner had raised an appropriate challenge in a petition
    for rehearing.  See Bluestone, 
    74 F.3d at 1293-94
    .  Although
    the Hearing Order at issue here was a final order, unlike the
    liability determination in Bluestone, it did not constitute a
    ruling on the merits as to the issues that petitioners pursued
    in their request for rehearing of Opinion No. 385.  Similarly,
    the Commission's reliance on ASARCO, Inc. v. FERC, 
    777 F.2d 764
     (D.C. Cir. 1985), is misplaced, for the petitioner in
    that case failed to raise on rehearing the principal issue for
    which it sought judicial review and did not argue that it had
    reasonable grounds for failing to do so.  See 
    id. at 773-74
    .
    Because petitioners have argued throughout the proceed-
    ings before the Commission, on the appropriate occasions,
    that its members will be "adversely affected" unless intrasys-
    tem adjustments are made, we hold that petitioners have
    preserved their ss 203 and 205 contentions for judicial review
    under 16 U.S.C. s 825l(b).
    III.
    Section 205(a) of the FPA provides that "[a]ll rates and
    charges made, demanded, or received by any public utility for
    or in connection with the sale of electric energy subject to the
    jurisdiction of the Commission ... shall be just and reason-
    able, and any such rate or charge that is not just or reason-
    able is hereby declared unlawful."  16 U.S.C. s 824d(a).
    Section 205(b) provides that it shall be unlawful for a public
    utility, with respect to any transmission or sale subject to the
    jurisdiction of the Commission, to "(1) make or grant any
    undue preference or advantage to any person ... or (2)
    maintain any unreasonable difference in rates, charges, ser-
    vices, facilities, or in any other respect, either as between
    localities or as between classes of service."  
    Id.
     s 824d(b).
    Petitioners contend that in approving the addition of Gulf
    States to the System Agreement without modifying the
    Agreement's rate formulas to reflect Gulf State's lack of prior
    contribution to the costs of the Entergy system, the Commis-
    sion acted unlawfully in violation of s 205.  Petitioners point
    to Opinion Nos. 234 and 2922 where, they maintain, the
    Commission set forth the principle that prevention of undue
    discrimination requires attention to historical patterns of cost-
    bearing on the Entergy system. Because the EOCs share a
    common history of planning and cost-sharing for system
    generation facilities, petitioners maintain that to avoid undue
    discrimination Gulf States should not be permitted to benefit
    from the advantageous rate schedules in the System Agree-
    ment after most of the depreciation costs have been paid.
    Specifically, petitioners proposed to the Commission that Gulf
    States be required to make MSS-13 payments to the "long"
    EOCs4 of approximately $80 million while receiving fuel bene-
    fits from the EOCs' coal units of approximately $115-223
    __________
    2  Middle South Energy, Inc. and Middle South Services, Inc.,
    31 FERC p 61,305 (1985) ("Opinion 234"), reh'g denied, Opinion
    234-A, 32 FERC p 61,425 (1993);  System Energy Resources, Inc.,
    Opinion No. 292, 41 FERC p 61,238 (1987), reh'g denied, Opinion
    292-A, 42 FERC p 61,091(1988).  See also, City of New Orleans v.
    FERC, 
    875 F.2d 903
    , 905-06 (D.C. Cir. 1989);  Mississippi Indus.,
    
    808 F.2d 1525
    .
    3  MSS-1 is the rate schedule in the System Agreement govern-
    ing capacity equalization payments.
    4  A company is deemed "long" when "its share of the system's
    capacity is greater than its share of energy actually generated and
    distributed by the system as a whole...."  Mississippi Indus., 
    808 F.2d at 1530
     (citation omitted).
    million, and that the EOCs, as to MSS-3,5 be given first
    priority to low-cost energy in the system pool.  In sum,
    petitioners contend that in rejecting this proposal, the Com-
    mission arbitrarily disregarded its precedent and the relevant
    historical setting.
    In reviewing the Commission's decisions, the court's role is
    limited to determining whether the Commission complied
    with the relevant FPA standards and demonstrated that it
    has made a reasonable decision based on substantial evidence
    in the record.  See Sithe/Independence Power Partners, LP
    v. FERC, 
    165 F.3d 944
    , 948 (D.C. Cir. 1999).  Section 205(b)
    prohibits only "undue" preferences and "unreasonable" differ-
    ences in rates.  16 U.S.C. s 824d(b);  Borough of Chambers-
    burg v. FERC, 
    580 F.2d 573
    , 580 (D.C. Cir. 1978).  A rate is
    not "unduly" preferential or "unreasonably" discriminatory if
    the utility can justify the disparate effect.  Metropolitan
    Edison Co. v. FERC, 
    595 F.2d 851
    , 857 (D.C. Cir. 1979).  In
    light of the Commission's reasoning in Opinion Nos. 385 and
    385-A, we conclude that petitioners fail to show that the
    Commission contravened s 205 in determining that the
    amended System Agreement was not unduly discriminatory.
    The Commission found, and petitioners do not dispute, that
    the merger would produce net benefits to all of the EOCs and
    to Gulf States, including significant savings of net production
    costs and non-fuel operations and management expenses.
    Opinion No. 385, 65 FERC at p p 62,475, 62,491-92.  The
    Commission explained that "immediate rough production cost
    equalization, as outlined in Opinion No. 234, is not required in
    this proceeding" for two reasons.  First, there is no agency
    precedent requiring it, and second, the "[a]pplicants have no
    history of joint planning and construction and, therefore,
    there has been no historic practice of maintaining rough
    production cost equalization between Gulf States and the
    [EOCs]."  Id. at p 62,497.  On rehearing, the Commission
    rejected the argument that the amended System Agreement
    resulted in undue discrimination against the four existing
    EOCs, noting that "[petitioners] ignore the substantial bene-
    __________
    5  MSS-3 is the rate schedule in the System Agreement govern-
    ing intrasystem energy exchanges.
    fits Gulf States now brings to the System" and that accrue to
    each operating company.  Opinion No. 385-A, 67 FERC at
    p 61,583 (citation omitted);  see also id. at p 61,587.  Citing
    American Elec. Power Serv. Corp., 44 FERC p 61,206, 61,745,
    reh'g denied, 45 FERC p 61,408 (1988) ("AEP"), the Commis-
    sion explained that "rates for transactions among the operat-
    ing company subsidiaries of a holding company are not undu-
    ly discriminatory merely because they fail to exactly reflect
    the benefits contributed by various participants."  Opinion
    No. 385-A, 67 FERC at p 61,587.  Responding to petitioners'
    argument that Gulf States should not be allowed to benefit
    from Entergy's MSS-1 formula for capacity equalization pay-
    ments because Gulf States had not contributed in the past
    toward system generating costs, the Commission rejected
    such a "narrow view" of s 205's requirements.  Id. at
    p 61,583.  The Commission observed that "carrying [petition-
    er]s' logic to its conclusion, the Commission could never
    permit any utility that merged with the Entergy System to
    come under the System Agreement because the new company
    had never made historical contributions to the System."  Id.
    Further, the Commission explained, petitioners' "arguments
    contain one more important flaw:  No one has argued that the
    actual formulas in the System Agreement are themselves, or
    will become, unjust or unreasonable as a result of the merg-
    er."  Id.  Finally, observing that "[t]he fact that an individual
    operating company will, post merger, experience cost increas-
    es is not dispositive of whether the merger is consistent with
    the public interest," id., the Commission rejected petitioners'
    argument that they should not be forced to bear an increase
    in costs post-merger as being "untenable" absent a showing
    "that [a]pplicants' charges under the System Agreement,
    post-merger, are unjust or unreasonable."  Id.
    Petitioners rely on Alabama Elec. Coop. v. FERC, 
    684 F.2d 20
    , 27 (D.C. Cir. 1982), for the "central legal proposition" that
    applying the same rate to two groups of dissimilarly situated
    customers may violate s 205's prohibition against undue dis-
    crimination.  However, in that case the court recognized that
    "even under a purely cost-based rate scheme, absolute equiv-
    alence of overall rates of return among similar customer
    groups is little more than an ideal."  Id. at 28.  Further, the
    court was addressing discriminatory treatment where a utility
    sought to charge identical rates even though its costs to serve
    each group of customers markedly differed, resulting in sig-
    nificant disparities in rates of return.  Id. at 27-28.  No such
    circumstances are present here.  To the extent petitioners
    contend that the Commission misapplied its precedents in
    approving the amended System Agreement, their contention
    is meritless.  They make no response in their Reply Brief to
    the Commission's statements in its brief that the precedents
    have little bearing on the issues.  Thus, the Commission
    points out that its reference in Opinion No. 385-A, 67 FERC
    at p 61,587, to AEP was for the proposition that whether a
    system-wide rate is unduly discriminatory turns on whether
    the rate fairly allocates costs among subsidiaries, not whether
    the rate properly reflects the share of services contributed.
    The Commission further points out that in Mississippi In-
    dus., 
    808 F.2d at 1565-66
    , the court rejected the proposition
    urged by petitioners that AEP's approval of a cost allocation
    supports mandating such an allocation here.  Any suggestion
    by petitioners that the Commission's quotation from Utah
    Power & Light Co., 45 FERC p 61,095 (1988), indicates
    confusion about whether it was resolving or deferring the
    s 205 issue for the amended System Agreement, see Opinion
    No. 385, 65 FERC at p p 62,474-75, is belied by the Commis-
    sion's findings on the s 205 issue.  E.g., id. at p 62,464.
    Finally, as the Commission notes, Northeast Utils. Serv. Co.,
    50 FERC p 61,266 (1990), suspending a proposed rate, pro-
    vides no guidance here.
    As evidence of undue discrimination, petitioners point to
    their lost opportunity to benefit from open market sales of
    excess capacity, instead of being obligated under the System
    Agreement to afford Gulf States access to such capacity
    through the system pool at below-market rates.  They also
    point to the loss of their ability to take advantage of deprecia-
    tion avoidance, whereby, for example, Arkansas Electric En-
    ergy Consumers asserts that it has fully depreciated generat-
    ing plants, the front-end costs of which have been borne by
    the EOCs' ratepayers.  Yet these circumstances do not dem-
    onstrate unduly disparate treatment between Gulf States and
    the Entergy EOCs with respect to intrasystem energy ex-
    changes or capacity equalization payments.  As the ALJ
    pointed out, petitioners ignore the generation that Gulf States
    brings to the Entergy power pool.  Initial Decision, 64
    FERC at p p 65,102-03.  The merger also gives the EOCs
    access to Gulf States' facilities without their having to pay
    equalization charges related to prior depreciation expense.
    Nor do petitioners show exceptional cost circumstances
    here (namely, enormous disparities in per-megawatt costs) as
    were at issue in Opinion Nos. 234 and 292, when the Commis-
    sion imposed a rough equalization of each operating compa-
    ny's investment in the system's nuclear generating facilities
    due to exorbitant and unforeseen cost overruns at the Grand
    Gulf facility.  See Mississippi Indus., 
    808 F.2d at 1530
    .  The
    Commission was not confronted here with the undue discrimi-
    nation that it sought to remedy in Opinion Nos. 234 and 292,
    when Arkansas Power & Light Co. sought exemption from
    Grand Gulf's costs.
    Nor, contrary to petitioners' contention, does the Commis-
    sion's rejection of petitioners' proposed modifications to the
    amended System Agreement indicate that the Commission
    unlawfully applied a s 203 standard to a s 205 issue.  Al-
    though the Commission's rationale in Opinion No. 385 for
    rejecting petitioners' MSS-1 and MSS-3 proposals is at times
    turgid, see, e.g., Opinion No. 385, 65 FERC at p p 62,475,
    62,504, the Commission's explanation on rehearing provides
    sufficient support for its conclusions.  As the Commission
    stated on rehearing, petitioners initially framed the MSS-1
    issue in s 203 terms by contending during the administrative
    proceedings that "because they would have to bear an in-
    crease in costs (which, in their view is unjust and unreason-
    able), the Commission could not approve the merger as
    consistent with the public interest without [petitioner]s' re-
    spective so-called 'hold-harmless' provisions."  Opinion No.
    385-A, 67 FERC at p 61,586 (emphasis in original).  Hence,
    in addressing this concern, the Commission understandably
    explained that petitioners' proposed modifications were not
    required to ensure that the merger complied with the public
    interest.  
    Id.
      Petitioners made similar contentions with re-
    spect to a proposed "hold-harmless" provision for the MSS-3
    schedule.  The Commission properly rejected this modifica-
    tion on the ground that it would unduly discriminate against
    Gulf States "because it requires Gulf States to contribute to
    the MSS-3 energy pool on the same basis as the existing
    Operating Companies, but it ranks Gulf States last in line of
    priority for taking energy from the MSS-3 pool."  Opinion
    No. 385, 65 FERC at p 62,506.  More generally, given the
    simultaneous and related filing of the Entergy merger appli-
    cation under s 203, the Commission could reasonably evalu-
    ate the merits of the System Agreement amendment "in the
    context of the merger," Opinion No. 385-A, 67 FERC at
    p 61,586, such that the fact that all parties would experience
    net benefits from the merger provided substantial evidence
    for finding that there would be no undue discrimination under
    s 205.
    Therefore, because the Commission adhered to established
    practice on the Entergy System in subjecting Gulf States to
    virtually the same System Agreement terms as the EOCs,
    and petitioners fail to show, given the relationship of the
    System Agreement amendment to the merger, that the Com-
    mission's decision was unreasonable, not based on substantial
    evidence in the record, or otherwise unclear in the path of its
    reasoning, see Sithe, 
    165 F.3d at 948
    , their contentions under
    ss 203 and 205 fail.
    IV.
    Petitioners' contention that the Commission improperly
    disposed of the competition issue without an evidentiary
    hearing is also unavailing.  Petitioners identify no material
    issue of fact that could not be properly resolved by the
    Commission on the written record and thus fail to show that
    its decision to forego an evidentiary hearing was an abuse of
    discretion.  See Moreau v. FERC, 
    982 F.2d 556
    , 568 (D.C.
    Cir. 1993).
    Consistent with the public interest standard for mergers,
    16 U.S.C. s 824b(a);  Wabash Valley Power Ass'n v. FERC,
    
    268 F.3d 1105
    , 1108 (D.C. Cir. 2001), the Commission identi-
    fied the merger's benefits as including the expansion of
    Entergy's third-party open access tariff ("OATT") to Gulf
    States' service territory in perpetuity.  Opinion No. 385, 65
    FERC at p 62,464.  In the Hearing Order, the Commission
    stated that expansion of Entergy's OATT would "adequately
    mitigate any increase in market power in the relevant geo-
    graphic and product market" that might result from the
    merger.  Hearing Order, 62 FERC at p 61,374.  The Com-
    mission explained on rehearing of the Hearing Order that
    extension of the OATT to Gulf States' service territory could
    be expected to allow competitors access to additional generat-
    ing capacity to serve petitioner Arkansas Cities and Coopera-
    tive's market.  See Order Denying Rehearing of Hearing
    Order, 64 FERC at p 61,011.  As the court stated in Louisi-
    ana Energy and Power Auth. v. FERC, 
    141 F.3d 364
    , 370
    (D.C. Cir. 1998), "[t]his is the kind of reasonable agency
    prediction about the future impact of its own regulatory
    policies to which we ordinarily defer."  The Commission's
    reasonable conclusion regarding the expansion of Entergy's
    OATT is also dispositive of petitioners' contention that the
    Commission failed to give appropriate consideration to the
    Herfendahl-Hirschmann Index of Concentration Ratios
    ("HHI").6 See Hearing Order, 62 FERC at p p 61,374-75.
    Given the ease of market entry provided by the expansion of
    the Entergy OATT, the Commission need not have held a
    hearing because, as petitioners contend, the merger would
    result in an increased HHI.7  See Order Denying Rehearing
    __________
    6  The Herfindahl-Hirschman Index refers to a measurement of
    market concentration that "is calculated by summing the squares of
    the individual market shares of all the participants."  Hearing
    Order, 62 FERC at 61,374 (referring to s 1.5 of the 1992 Merger
    Guidelines of the Department of Justice and the Federal Trade
    Commission).
    7  The Commission states in its brief that defects in Entergy's
    OATT that were identified in Cajun Elec. Power Coop. v. FERC, 
    28 F.3d 173
     (D.C. Cir. 1994), have been eliminated, citing Entergy
    Servs. Inc., 85 FERC p 61,163, 61,647 (1998).  We express no
    opinion on the matter.
    of Hearing Order, 64 FERC at p 61,011.  The Commission's
    finding that no petitioner had demonstrated pre-merger com-
    petition between Gulf States and Entergy Systems to be
    more than de minimus, see Opinion No. 385-A, 62 FERC at
    p 61,374, is supported by the record, further indicating that
    the Commission did not abuse its discretion in declining to
    conduct an evidentiary hearing on the wholesale competition
    issue.
    Accordingly, we deny the petitions for review.