Reliable Contracting Group v. DVA , 779 F.3d 1329 ( 2015 )


Menu:
  •   United States Court of Appeals
    for the Federal Circuit
    ______________________
    RELIABLE CONTRACTING GROUP, LLC,
    Appellant
    v.
    DEPARTMENT OF VETERANS AFFAIRS,
    Appellee
    ______________________
    2014-1326
    ______________________
    Appeal from the Civilian Board of Contract Appeals in
    No. 3048, Administrative Judge Anthony S. Borwick,
    Administrative Judge Patricia J. Sheridan, Administra-
    tive Judge Stephen M. Daniels.
    ______________________
    Decided: March 6, 2015
    ______________________
    REGINALD ASHTON WILLIAMSON, Kilpatrick Townsend
    & Stockton LLP, Atlanta, GA, argued for appellant. Also
    represented by WILLIAM E. DORRIS; THURSTON
    HOLDERNESS WEBB, Winston-Salem, NC.
    WILLIAM JAMES GRIMALDI, Commercial Litigation
    Branch, Civil Division, United States Department of
    Justice, Washington, DC, argued for appellee. Also
    2                      RELIABLE CONTRACTING GROUP    v. DVA
    represented by STUART F. DELERY, ROBERT E. KIRSCHMAN,
    JR., KIRK T. MANHARDT.
    ______________________
    Before NEWMAN, CLEVENGER, and DYK, Circuit Judges.
    Opinion for the court filed by Circuit Judge DYK. Dissent-
    ing opinion filed by Circuit Judge NEWMAN.
    DYK, Circuit Judge.
    Reliable Contracting Group, LLC (“Reliable”) appeals
    from a decision by the Civilian Board of Contract Appeals
    (“Board”). The Board denied Reliable’s claim for an
    equitable adjustment of a Department of Veterans Affairs
    (“VA”) contract which required the installation of three
    backup generators for a VA medical center. Reliable
    contends that the VA improperly rejected the generators
    on the ground that they were not “new” as required by the
    contract. Because we hold that the Board erred in its
    interpretation of the contract, we vacate the Board’s
    decision and remand for further proceedings.
    BACKGROUND
    On February 10, 2003, the VA awarded a contract to
    Echo Construction Company (“Echo”) for the design and
    construction of electrical improvements at a VA medical
    center. On March 31, 2003, Echo, the VA, and Reliable
    entered into a novation agreement, effectively replacing
    Echo with Reliable.
    The contract required that three backup generators be
    installed.   Section 1.47 of the contract, entitled
    “MATERIAL AND WORKMANSHIP,” required that “[a]ll
    equipment, material, and articles incorporated into the
    work covered by this contract shall be new and of the
    most suitable grade for the purpose intended, unless
    otherwise specifically provided in this contract.” J.A. 79.
    RELIABLE CONTRACTING GROUP   v. DVA                        3
    That section did not define “new.” Separately, § 1.79
    incorporated Federal Acquisition Regulation (“FAR”)
    52.211-5 by reference. FAR 52.211-5 contained a separate
    requirement that supplies called for by the contract be
    “new, reconditioned, or remanufactured,” and it defined
    “new” to require that the supplies be “composed of previ-
    ously unused components.” See 48 C.F.R. § 52.211-5.
    Reliable sub-contracted the procurement of the elec-
    trical generators to Fisk Electric Company (“Fisk”), which
    in turn contracted with DTE Energy Technologies, Inc.
    (“DTE”) to provide the generators. On June 26 and 27 of
    2004, DTE delivered two Cummins Power Generation
    (“Cummins”) generators to the construction site. Upon
    delivery, the VA’s senior resident engineer, Leonard
    Romano, inspected the two generators and determined
    that they were, in his view, not “new.” He wrote to Relia-
    ble, stating:
    I am concerned that [the two generators that were
    delivered] are not “new” as required by [§ 1.47(a)].
    They show a lot of wear and tear including field
    burns to enlarge mounting holes. Are they new
    and will you certify them as such? I cannot pay
    you for these as planned in this month’s payment
    without that certification.
    J.A. 2.
    This letter initiated a flurry of letters between Roma-
    no, Reliable, Fisk, and DTE, with Fisk and Reliable
    initially expressing agreement that the generators did not
    meet the contract specification. For example, on June 28,
    Fisk wrote to DTE, stating: “[m]y foreman noted that the
    units were in ‘BAD CONDITION’ and proceeded to install
    the units.” J.A. 102. Similarly, on June 29, Reliable
    wrote to Fisk, stating: “[a]s we discussed with you, the
    equipment on site is clearly unacceptable by anyone’s
    4                       RELIABLE CONTRACTING GROUP   v. DVA
    standards . . . .” J.A. 109.   On that same day, Reliable
    wrote to Romano, stating:
    Representatives of Fisk have assured us that they
    were as surprised as anyone at the condition of
    the equipment delivered to the site. We have been
    working closely with Fisk personnel to investigate
    the matter and per our conversation have directed
    them to remove the nonconforming generators
    from the project site.
    J.A. 303. Both Fisk and Reliable personnel continued to
    investigate the matter, and Romano continued to assert
    his belief that the generators were not conforming.
    After investigation, Reliable and Fisk came to the
    conclusion that the generators, which were manufactured
    in 2000, had been previously purchased by others but
    never used. Reliable presented this information to Roma-
    no on July 9, but Romano nonetheless rejected the gener-
    ators, asserting that “[p]revious ownership makes them
    used.” J.A. 6. Subsequently, Fisk obtained different
    generators, which were accepted by the VA and installed.
    On April 3, 2007, Reliable submitted a claim to the
    VA, alleging that the VA had violated the contract and
    seeking roughly $1,100,000 for additional costs incurred
    as a result of the VA’s rejection of the three original
    generators. The VA failed to timely respond, so Reliable
    appealed to the Board. On November 27, 2013, the Board
    denied Reliable’s claim, finding that the generators were
    not “new” because they were not capable of being factory
    tested. Reliable appealed to this court.
    We have jurisdiction        pursuant   to   41   U.S.C.
    § 7107(a)(1)(A).
    RELIABLE CONTRACTING GROUP   v. DVA                       5
    DISCUSSION
    We review questions of law, including interpretations
    of contracts, de novo. Rockies Express Pipeline LLC v.
    Salazar, 
    730 F.3d 1330
    , 1335–36 (Fed. Cir. 2013). We
    review factual questions for substantial evidence. 
    Id. at 1335.
        The parties’ dispute centers around the contract’s
    requirement that the generators be “new.” The Board
    held, and the VA presently argues, that “new” requires
    that each generator be “capable of being tested at the
    factory.” J.A. 8. This definition comes from the language
    of § 1.79, which incorporates FAR 52.211-5’s requirement
    that the generators’ supplies “meet contract require-
    ments” to be considered “new,” 48 C.F.R. § 52.211-5, and
    § 16208, which requires that the generators be capable of
    factory testing. 1 Because the generators left the factory
    in 2000, the Board reasoned, they were incapable of being
    factory tested in 2004 and therefore not “new.” On the
    1   Section 16208.1.3(E) provides, in relevant part:
    Factory Test: The government shall have the op-
    tion of witnessing the following tests at the facto-
    ry. . . .
    1. Load Test: Shall include six hours of continu-
    ous operation; four hours while the set is deliv-
    ering 100 percent of the specified KW and two
    hours while delivering 110 percent of the speci-
    fied KW. . . .
    2. Quick Start Test: Record time required for the
    engine generator set to develop specified volt-
    age, frequency and KW load from a standstill
    condition.
    J.A. 301–02.
    6                       RELIABLE CONTRACTING GROUP    v. DVA
    other hand, Reliable argues that the contract is clear on
    its face because § 1.79 provides an express definition of
    “new”: “new” means comprised of unused parts. Accord-
    ing to Reliable, because the generators had never been
    used, they were “new” even though previously owned and
    damaged by improper storage. We reject both interpreta-
    tions.
    We reject the VA’s and the Board’s interpretation for
    two reasons. First, the VA never contemporaneously
    argued that the generators were non-conforming because
    they were incapable of being factory tested. Generally,
    evidence of contemporaneous beliefs about the contract is
    particularly probative of the meaning of a contract. See
    Blinderman Constr. Co. v. United States, 
    695 F.2d 552
    ,
    558 (Fed. Cir. 1982) (“It is a familiar principle of contract
    law that the parties’ contemporaneous construction of an
    agreement, before it has become the subject of a dispute,
    is entitled to great weight in its interpretation.”); Max
    Drill, Inc. v. United States, 
    427 F.2d 1233
    , 1240 (Ct. Cl.
    1970) (en banc) (per curiam) (expressly adopting Commis-
    sioner Stone’s view that “[t]he interpretation of a contract
    by the parties to it before the contract becomes the subject
    of controversy is deemed by the courts to be of great, if not
    controlling[,] weight”). Second, the contract required that
    the generators be capable of a “factory test” but did not
    expressly require testing be done at the factory at the
    time the generators were manufactured, nor did it require
    that testing be done at the factory if the government did
    not request it. Here, the Board found that that the gen-
    erators were subsequently tested by Cummins factory-
    certified technicians, and the VA declined to observe the
    testing. There is no showing the generators were incapa-
    ble of being tested at the factory if actual testing at the
    factory had been requested by the government—which it
    had not in fact requested.
    RELIABLE CONTRACTING GROUP    v. DVA                        7
    On the other hand, we reject Reliable’s interpretation
    because it is incomplete. While we agree that generators
    that had been used would not comply with the contract, 2
    we think that the mere fact that the generators were not
    used does not make them “new.” Reliable, aided by the
    July 8, 2013, affidavit of Fisk’s Executive Vice President
    James Muhl, argues that the generators were “new”
    because they were not used, and in the industry, “genera-
    tors are not ‘used’ until the generators are commissioned[,
    at which point] the manufacturer pushes out the new
    equipment warranty and the unit is put into ‘service.’”
    J.A. 234. While Muhl’s affidavit speaks to the industry
    definition of “used,” he does not provide an industry
    definition of “new,” 3 and dictionaries do not define “new”
    as simply being the opposite of “used.” 4 Reliable relies on
    § 1.79, which incorporated FAR 52.211-5 and defines
    “new” to mean “composed of previously unused compo-
    nents.” 48 C.F.R. § 52.211-5(a). But, by its own terms,
    that definition is expressly limited to FAR 52.211-5 itself. 5
    2    There is no contention here that the generators
    were used. The run times demonstrated only that the
    generators had been tested.
    3   Muhl’s statement that, “[i]f the unit has not be[en]
    ‘used’, then the unit is ‘new,’” was his conclusion with
    respect to these “particular generator[s],” not a general
    statement about industry practice. See J.A. 234.
    4   If anything, the opposite of “new” tends to be
    “old,” not “used.” See, e.g., Random House Webster’s
    Unabridged Dictionary 1293 (2d ed. 1999) (“New, fresh,
    novel describe something that is not old.”); see also Web-
    ster’s Third New International Dictionary 1522 (2002).
    5   FAR 52.211-5, incorporated by reference into
    § 1.79, provides in relevant part:
    8                      RELIABLE CONTRACTING GROUP    v. DVA
    As noted above, there are two separate “new” re-
    quirements, one found in § 1.47 and one found in § 1.79.
    Section 1.79’s “new” requirement focuses on the quality of
    the components in the generator—the components must
    be unused. Section 1.47 sets forth a different require-
    ment. Under § 1.47, the generator itself must be “new.”
    And, in that section, “new” is undefined. Reading the
    contract in this manner—that § 1.47 and § 1.79 set forth
    separate and distinct “new” requirements—is reinforced
    by the rule of construction disfavoring surplusage and
    redundancy. See Mass. Bay Transp. Auth. v. United
    States, 
    129 F.3d 1226
    , 1231 (Fed. Cir. 1997) (“It is a
    fundamental rule of contract interpretation that the
    provisions are viewed in the way that gives meaning to all
    parts of the contract, and that avoids conflict, redundan-
    cy, and surplusage among the contract provisions.”).
    Reliable’s interpretation is incomplete because the “new”
    requirement under § 1.47 focuses on the generator as a
    whole, not the component parts. While the parties agree
    that “new” requires no prior use, there is no justification
    for treating a generator as new solely because it has not
    been used.
    Because “new,” as used in § 1.47, is not defined by the
    contract and there is no single plain meaning of the word
    (a) Definitions. As used in this clause—
    New means composed of previously unused compo-
    nents, whether manufactured from virgin material,
    recovered material in the form of raw material, or ma-
    terials and by-products generated from, and reused
    within, an original manufacturing process . . . .
    ...
    48 C.F.R. § 52.211-5 (emphasis added).
    RELIABLE CONTRACTING GROUP    v. DVA                       9
    “new,” it is ambiguous. It is therefore appropriate to look
    both to the dictionary definitions of “new” and to industry
    definitions, standards, and practices. See C.A. Acquisition
    Newco, LLC v. DHL Express (USA), Inc., 
    696 F.3d 109
    ,
    113–14 (Fed. Cir. 2012) (noting that the trial court
    “should also consider any relevant industry practices”
    when resolving ambiguous terms in a contract and look-
    ing to dictionary definitions to resolve ambiguities); Hunt
    Constr. Grp. v. United States, 
    281 F.3d 1369
    , 1373 (Fed.
    Cir. 2002) (industry meaning can be used as an interpre-
    tative aid in understanding terms in a contract); see also
    Nat’l Union Fire Ins. Co. v. Lumbermens Mut. Cas. Co.,
    
    385 F.3d 47
    , 55 (1st Cir. 2004) (vacating a district court
    decision interpreting a contract and remanding for fur-
    ther consideration in light of industry practices).
    One possible meaning is the one initially put forth by
    Romano but subsequently dropped, i.e., that “new” means
    not previously owned by another. This definition was
    disputed by Muhl’s affidavit. In it, he described that, “[i]n
    the electrical contracting and construction business,
    simply being owned and kept in storage by an intermedi-
    ary does not make a generator ‘used’ . . . .” J.A. 238. The
    record evidence shows that generators are not-
    uncommonly sold through various intermediaries, and, as
    here, are still entitled to a manufacturer’s warranty. In
    such circumstances, an interpretation that “new” requires
    that the generators not be previously owned is incorrect.
    Indeed, the VA no longer argues that this is the meaning
    of “new” in this context.
    “New” could require that the generators be recently
    manufactured. This has some support in the dictionaries.
    See Black’s Law Dictionary 1204 (10th ed. 2014) (“recently
    come into being ”); Webster’s Third New International
    Dictionary 1522 (2002) (“having existed or having been
    10                      RELIABLE CONTRACTING GROUP    v. DVA
    made but a short time; having originated or occurred
    lately”). We do not think that this is what the parties
    intended when they required that the generators be
    “new.” Neither party argues for this meaning, and no
    evidence was put forth with respect to the average life
    expectancy of a backup generator, the speed at which
    generator technology is improving, or the like. Recent
    manufacture is not a requirement.
    “New” could require a fresh condition. Dictionary
    definitions support this interpretation. See Webster’s
    Third New International Dictionary 1522 (2002) (defining
    “new” to mean: “usu[ally] of superior quality;”
    “[f]reshness;” “[f]resh in this connection applies to what is
    new and still retaining a first liveliness, energy, virginal
    quality, and so on”). We think this definition is appropri-
    ate for purposes of § 1.47. There is no testimony as to
    how, in the industry, a generator can be “new” if it has
    been severely damaged. It defies logic to conclude that
    the parties intended to treat seriously damaged genera-
    tors as “new.”
    In interpreting “new” to require the generators be
    “fresh,” we do not mean that the generators were required
    to be entirely free of cosmetic defects. It is entirely fore-
    seeable that slight, superficial damage might occur during
    shipment or storage, and there is no evidence put forth by
    either party that the contract intended to define “new” to
    exclude damage such as paint scratches or light and
    easily fixable rusting. See, e.g., Groban v. S.S. Pegu, 
    331 F. Supp. 883
    , 887, 890–91 (S.D.N.Y. 1971) (explaining
    that tractors exposed to heavy tropical rains during
    shipment, which resulted in surface damage to the trac-
    tors, were still “new”). In our view, “new” requires that
    the generators must not be used and also must be free of
    significant damage, i.e., damage that is not cosmetic.
    RELIABLE CONTRACTING GROUP    v. DVA                       11
    The record evidence before us is conflicting with re-
    spect to the extent of the damage, and there was no
    express finding by the Board on the issue.
    While, as noted above, there are unequivocal admis-
    sions by Reliable that the generators were significantly
    damaged and not in conformity with the contract, these
    statements are not binding judicial admissions. Although
    this circuit has had limited opportunities to address the
    doctrine, it is clear from other circuits that judicial admis-
    sions, which “have the effect of withdrawing a fact from
    issue and dispensing wholly with the need for proof of the
    fact,” are limited to formal admissions made in, for exam-
    ple, a complaint, answer, or pretrial order. See Am. Title
    Ins. Co. v. Lacelaw Corp., 
    861 F.2d 224
    , 226 (9th Cir.
    1988) (quoting Dery v. Gen. Motors Corp. (In re Fordson
    Eng’g Corp.), 
    25 B.R. 506
    , 509 (Bankr. E.D. Mich. 1982)).
    Although not formal judicial admissions and therefore
    not binding, contemporaneous admissions by Reliable are
    nonetheless probative evidence that the generators did
    not comply with the contract. See 3M Co. v. Mohan, 482
    F. App’x 574, 579 (Fed. Cir. 2012) (citing a party’s apolo-
    gies to customers for causing confusion as support for the
    factual finding that the party did cause confusion); Sutton
    v. Calhoun, 
    593 F.2d 127
    , 128 (10th Cir. 1979) (affirming
    the trial court’s submission to the jury of the question of
    how much probative weight should be assigned to an
    admission of mistake by a doctor in a case alleging negli-
    gence on the part of the doctor); Becton v. Starbucks
    Corp., No. 2:05-CV-1143, 
    2007 WL 2688128
    , at *3 (S.D.
    Ohio Sept. 6, 2007) (admitting a contemporaneous state-
    ment by a Starbucks manager apologizing for an improp-
    erly secured lid because it was probative of whether the
    lid was properly secured). It is also significant that
    Reliable was unwilling at the time of delivery to certify
    12                       RELIABLE CONTRACTING GROUP   v. DVA
    that the generators were “new” or to characterize them as
    new.
    On the other hand, Muhl, in his July 9, 2013, affida-
    vit, concluded that the damage to the generators was
    entirely cosmetic. He asserted that the damage to the
    generators was superficial, consisting of rust, scraped
    paint, disconnected hoses, and dust, dirt, and grime.
    According to him, the damage was easily remedied with a
    “buff and puff” and did not affect the quality of the gener-
    ators.
    There was thus conflicting evidence as to the extent of
    the damage. There were admissions that the damage to
    the generators was substantial, but the affidavit from
    Muhl asserts it was not. In light of the conflicting evi-
    dence and lack of fact-finding by the Board on this issue,
    we remand for the Board to determine whether the dam-
    age to the generators during the four-year period between
    the original manufacture and the date of delivery to the
    VA site was significant enough to render the generators
    not “new.”
    Because our interpretation of “new” includes an anal-
    ysis of the extent of the damage and whether it can be
    fully and easily cured, there is no need to address Relia-
    ble’s economic waste theory, as that doctrine substantially
    overlaps with whether the generators at issue are “new”
    under the contract. See Granite Constr. Co. v. United
    States, 
    962 F.2d 998
    , 1007–08 (Fed. Cir. 1992) (explaining
    that rejecting performance of a contract in which the
    performance is entirely adequate for the purpose of the
    project is economic waste).
    VACATED AND REMANDED
    COSTS
    Costs to neither party.
    United States Court of Appeals
    for the Federal Circuit
    ______________________
    RELIABLE CONTRACTING GROUP, LLC,
    Appellant
    v.
    DEPARTMENT OF VETERANS AFFAIRS,
    Appellee
    ______________________
    2014-1326
    ______________________
    Appeal from the Civilian Board of Contract Appeals in
    No. 3048, Administrative Judge Anthony S. Borwick,
    Administrative Judge Patricia J. Sheridan, Administra-
    tive Judge Stephen M. Daniels.
    ______________________
    NEWMAN, Circuit Judge, dissenting.
    The Department of Veterans Affairs (“VA”) and Relia-
    ble Contracting Group (“Reliable”) entered into a contract
    for construction of a veterans’ medical center in Miami,
    Florida. The contract included the provision and installa-
    tion of three new backup electrical generators.
    The prime contractor Reliable, through a subcontrac-
    tor and supplier, provided previously owned, rusted,
    grime-encrusted, four-year-old generators with mounting
    holes and field burns. The VA on-site engineer observed
    their condition and objected to their installation. Reliable
    agreed, and wrote that the generators were “nonconform-
    ing” and “clearly unacceptable by anyone’s standards,”
    2                        RELIABLE CONTRACTING GROUP   v. DVA
    and chastised the subcontractor.      The subcontractor
    described the generators as in “bad condition” and chas-
    tised the supplier.
    Reliable refused to certify the generators as “new” and
    the VA refused to accept them. Reliable instructed the
    subcontractor to remove the generators and provide
    “conforming equipment.” The claim here is $1.1 million
    for the cost of providing the replacement generators. The
    contracting officer, affirmed by the Civilian Board of
    Contract Appeals, denied the claim, stating that the
    generators were not new and that no additional compen-
    sation was warranted.
    My colleagues on this panel now fault the VA for re-
    jecting the generators without ascertaining whether they
    might be cleaned up and refurbished. On this reasoning,
    my colleagues remand to the Board with instructions to
    determine whether the damage to the generators during
    the four-year period in which they were improperly stored
    was “significant enough” to render the generators not
    new. Maj. op. at 12.
    I respectfully dissent.
    DISCUSSION
    The Board’s findings of fact are final unless they are
    “fraudulent, or arbitrary, or capricious, or so grossly
    erroneous as to necessarily imply bad faith, or if such
    decision is not supported by substantial evidence.” 41
    U.S.C. § 609(b) (1982).
    No error has been shown in the Board’s determination
    that the generators were not new and that an adjustment
    was not warranted. The Board noted Reliable’s state-
    ments that the generators were “nonconforming” and
    “clearly unacceptable by anyone’s standards.” The con-
    tract is explicit as to the requirement for new generators.
    Section 1.47 of the contract states:
    RELIABLE CONTRACTING GROUP   v. DVA                      3
    (a) all equipment, material, and articles incorpo-
    rated into the work covered by this contract
    shall be new and of the utmost suitable grade
    for the purpose intended, unless otherwise
    specifically provided in this contract.
    The Board observed that neither Reliable nor its subcon-
    tractor characterized the generators as new, and that
    both refused to so certify.
    My colleagues on this panel hold that “new” includes
    previously owned generators if they are in “fresh condi-
    tion,” unused, and free of “significant damage.” Maj. op.
    at 10. Whatever may be the applicability of such a stand-
    ard to other facts, these generators showed more than
    “slight, superficial damage.” 
    Id. The absence
    of “fresh-
    ness” of these begrimed, four-year-old, “inadequately
    stored,” previously owned generators was not plausibly
    disputed. No error in fact or law has been shown in the
    Board’s determination that these generators were not
    new, on any reasonable standard of newness.
    Indeed, the panel majority refers to the “unequivocal
    admissions by Reliable that the generators were signifi-
    cantly damaged and not in conformity with the contract.”
    
    Id. at 11.
    However, the majority relieves the contractor of
    these admissions because they were not “binding judicial
    admissions” in formal court documents, but were made
    only in contemporaneous written records. 
    Id. No basis
    has been shown for excluding this evidence.
    The panel majority further errs in ruling that the cor-
    rect interpretation of “new” in government contracts or
    under the FAR includes previously owned and damaged
    equipment if the damage “can be fully and easily cured.”
    
    Id. at 12.
    Old and damaged equipment does not become
    new if the damage can be cured. There was no obligation,
    in law or equity, for the VA to determine whether these
    admittedly “nonconforming” generators could be cleaned
    4                      RELIABLE CONTRACTING GROUP   v. DVA
    up and refurbished. The additional costs of contract
    compliance are not the obligation of the agency.
    The Board’s denial of the requested adjustment is cor-
    rect, and is well supported in fact and law. There is no
    reasonable basis for further proceedings on this claim.
    From my colleagues’ contrary ruling, I respectfully dis-
    sent.