Barclay v. United States , 443 F.3d 1368 ( 2006 )


Menu:
  • Error: Bad annotation destination
    United States Court of Appeals for the Federal Circuit
    05-1255
    JOHN BARCLAY, CONSTANCE BARCLAY, ROYER BARCLAY, ALTHEA BARCLAY,
    JOHN AMOS, MARCIA J. BACON, RONALD J. BARTEL, MELVIN BERGEN,
    JOHN E. BOYLE, JONATHAN EHRLICH, FLORENCE EHRLICH,
    DONALD GRAUMANN, RUBEN KLIEWER, ALVIN KROUPA, BARBARA KROUPA,
    BURDETT LEDELL, LEE DALE MILLER, VERNON MINNS, FRANK A. MITCHELL,
    MID KANSAS COOPERATIVE ASSOCIATION, JOHN F. OPAT, ROBERT PRESNELL,
    JANET REGIER, SONJA REGIER, DON REINHARDT, JANICE REINHARDT,
    MARY J. RODGERS, DARRELL THOMPSON, ROBERT TURNER,
    GENEVA TURNQUIST, DONALD TURNQUIST, CLARK E. WIEBE,
    and MARLENE J. WEBER,
    Plaintiffs-Appellants,
    v.
    UNITED STATES,
    Defendant-Appellee.
    05-5109
    RENEWAL BODY WORKS, INC.,
    Plaintiff-Appellant,
    v.
    UNITED STATES,
    Defendant-Appellee.
    Cecilia Fex, Ackerson Kauffman Fex, PC, of Washington, DC, argued for
    plaintiffs-appellants John Barclay, et al. With her on the brief was Nels Ackerson.
    Robert J. Rosati, of Fresno, California, argued for plaintiff-appellant Renewal
    Body Works, Inc.
    Lane M. McFadden, Attorney, Appellate Section, Environment & Natural
    Resources Division, United States Department of Justice, of Washington, DC, argued
    for defendant-appellee in 05-1255. With him on the brief were Kelly A. Johnson, Acting
    Assistant Attorney General, and Kathryn E. Kovacs and John E. Arbab, Attorneys.
    John E. Arbab, Attorney, argued for defendant-appellee in 05-5109. With him on the
    brief were Kelly A. Johnson, Acting Assistant Attorney General, and Kathryn E. Kovacs,
    Attorney.
    Mark F. (Thor) Hearne II, Lathrop & Gage L.C., of St. Louis, Missouri, for amici
    curiae Sarah Illig, et al. in appeal 05-1255. With him on the brief were J. Robert Sears
    and Alok Ahuja. Of counsel on the brief were Charles J. Cooper, David H. Thompson,
    and David M. Lehn, Cooper & Kirk, PLLC, of Washington, DC.
    05-1255 appealed from: United States District Court for the District of Kansas
    Senior Judge Wesley E. Brown
    05-5109 appealed from: United States Court of Federal Claims
    Judge George W. Miller
    United States Court of Appeals for the Federal Circuit
    05-1255
    JOHN BARCLAY, CONSTANCE BARCLAY, ROYER BARCLAY, ALTHEA BARCLAY,
    JOHN AMOS, MARCIA J. BACON, RONALD J. BARTEL, MELVIN BERGEN,
    JOHN E. BOYLE, JONATHAN EHRLICH, FLORENCE EHRLICH,
    DONALD GRAUMANN, RUBEN KLIEWER, ALVIN KROUPA, BARBARA KROUPA,
    BURDETT LEDELL, LEE DALE MILLER, VERNON MINNS, FRANK A. MITCHELL,
    MID KANSAS COOPERATIVE ASSOCIATION, JOHN F. OPAT, ROBERT PRESNELL,
    JANET REGIER, SONJA REGIER, DON REINHARDT, JANICE REINHARDT,
    MARY J. RODGERS, DARRELL THOMPSON, ROBERT TURNER,
    GENEVA TURNQUIST, DONALD TURNQUIST, CLARK E. WIEBE,
    and MARLENE J. WEBER,
    Plaintiffs-Appellants,
    v.
    UNITED STATES,
    Defendant-Appellee.
    -----------------------------------------
    05-5109
    RENEWAL BODY WORKS, INC.,
    Plaintiff-Appellant,
    v.
    UNITED STATES,
    Defendant-Appellee.
    ___________________________
    DECIDED: April 11, 2006
    ___________________________
    Before NEWMAN, DYK, and PROST, Circuit Judges.
    Opinion for the court filed by Circuit Judge DYK. Dissenting opinion filed by Circuit
    Judge NEWMAN.
    The United States District Court for the District of Kansas and the Court of
    Federal Claims dismissed several landowners’ Fifth Amendment takings claims
    challenging the operation of the National Trail Systems Act (the “Trails Act”), 
    16 U.S.C. § 1247
    (d). Barclay, et al. v. United States, 
    351 F. Supp. 2d 1169
     (D. Kan. 2004);
    Renewal Body Works, Inc. v. United States, 
    64 Fed. Cl. 609
     (2005). Applying our
    decision in Caldwell v. United States, 
    391 F.3d 1226
     (Fed. Cir. 2004), cert. denied 
    126 S. Ct. 366
     (2005) (mem.), both the district court and the Court of Federal Claims held
    that the claims were time-barred because they were filed more than six years after the
    Surface Transportation Board (“STB”) issued the Notices of Interim Trail Use or
    Abandonment (“NITU”). We agree that Caldwell governs, and we affirm.
    BACKGROUND
    I
    By 1990, the nation’s interstate railway system had shrunk from its peak of
    272,000 miles of track in 1920 to about 141,000 miles of track, and railroads continue
    abandoning track each year. Preseault v. Interstate Commerce Comm’n, 
    494 U.S. 1
    , 5
    (1990) (“Preseault I”). As the Supreme Court explained in Preseault I, the purpose of
    the Trails Act was to preserve unused railroad rights-of-way by converting them into
    recreational trails.   
    Id.
       The mechanism is a STB order (a NITU) staying railroad
    abandonment during the pendency of trail use.
    As described in detail in Preseault I, 
    494 U.S. at 7-8
    , Preseault v. United States,
    
    100 F.3d 1525
    , 1537-40 (Fed. Cir. 1996) (en banc) (“Preseault II”), and Caldwell, 
    391 F.3d at 1228-30
    , in order to abandon a line that is subject to STB jurisdiction, a railroad
    must apply to the STB under either 
    49 U.S.C. § 10903
     (standard abandonment), or 49
    05-1255, 05-5109 
    2 U.S.C. § 10502
     (abandonment by exemption).1           All proceedings involved in these
    appeals were exemption proceedings. Under the Trails Act, the STB may issue a NITU,
    suspending exemption proceedings for 180 days to allow a third party to enter into an
    agreement with the railroad to use the right-of-way as a recreational trail. 
    49 C.F.R. § 1152.29
    (b)(2) and (d) (2005).       If the railroad and the trail operator reach an
    agreement, “the NITU extends indefinitely to permit interim trail use . . . .” Caldwell, 
    391 F.3d at 1230
    ; see 
    49 C.F.R. § 1152.29
    (d)(1). If no trail use agreement is reached, the
    NITU converts into an effective notice of exemption, allowing the railroad to “abandon
    the line entirely and liquidate its interest.” Preseault I, 
    494 U.S. at 7
    ; see Caldwell, 
    391 F.3d at 1230
    . While it retains jurisdiction over the right-of-way, the STB may reopen
    exemption proceedings to substitute a new trail operator, 
    49 C.F.R. § 1152.29
    (f), to
    accept late-filed trail use requests, 
    49 C.F.R. § 1152.29
    (e)(1), or to vacate a notice of
    exemption and issue a NITU when a railroad late files its statement of willingness to
    negotiate, 
    49 C.F.R. § 1152.29
    (g).
    In Preseault I, the Court noted but did not resolve the claim that “Congress . . .
    violated the Fifth Amendment by precluding reversion of state property interests.” 
    494 U.S. at 9
    ; see also 
    id. at 22
     (O’Connor, J., concurring) (operation of the Trails Act “may
    delay property owners’ enjoyment of their reversionary interests,” which “burdens and
    defeats the property interest”). In Preseault II, we established that the elimination of
    adjacent landowners’ state law reversionary interests when abandonment is suspended
    under the Trails Act constitutes a Fifth Amendment taking. 
    100 F.3d at 1550-52
    . In
    1
    On January 1, 1996, the STB succeeded the Interstate Commerce
    Commission as the agency with authority to regulate the interstate rail system. 
    49 U.S.C. § 702
     (2000). We use “STB” to refer to both agencies.
    05-1255, 05-5109                             3
    Caldwell, we held that such a claim accrues for statute-of-limitations purposes when
    railroad abandonment proceedings are suspended by the STB’s issuance of a NITU.
    Caldwell, 
    391 F.3d at 1235
    . The Barclay appellants (the appellants in No. 05-1255) and
    Renewal (the appellant in No. 05-5109) challenge both the correctness of the Caldwell
    decision and its applicability to the particular facts of their takings claims.
    II
    The Barclay appellants filed their Trails Act takings claims in the United States
    District Court for the District of Kansas on April 7, 2004. The complaint alleged that
    railroad rights-of-way running across the Barclay appellants’ property in Kansas were
    converted into three different recreational trails (the Meadowlark, Sunflower, and Flint
    Hills trails) pursuant to the Trails Act, and that these conversions constituted Fifth
    Amendment takings.        The government moved to dismiss on the ground that the
    complaint was not filed within the six year statute of limitations. We decided Caldwell
    while the government’s motion was pending. Because the initial NITUs for all three
    trails were issued prior to the cutoff date for the statute of limitations,2 the district court
    dismissed the complaint.
    The district court found that the Supreme Court’s decisions in American Pipe &
    Construction Co. v. Utah, 
    414 U.S. 538
     (1974), and Crown Cork & Seal Co., Inc. v.
    Parker, 
    462 U.S. 345
     (1983), required tolling the statue of limitations for eleven months,
    three weeks, and one day, during the pendency of Swisher v. United States, 
    189 F.R.D. 638
     (D. Kan. 1999), a class action alleging Trails Act takings in which the Barclay
    2
    The relevant NITUs were issued on September 28, 1995 (Meadowlark
    trail), April 12, 1996 (Sunflower trail), and March 31, 1995, and May 24, 1996 (Flint Hills
    trail). As noted the complaint was filed on April 7, 2004.
    05-1255, 05-5109                               4
    appellants were class members. The district court nevertheless concluded that the
    action was not timely filed, applying our holding in Caldwell that the claims accrued on
    issuance of the original NITUs. The district court rejected contentions that replacement
    NITUs, rather than the initial NITUs, triggered the accrual of their claims for the Flint
    Hills and Sunflower trails, holding that subsequently issued NITUs covering the same
    rights of way “merely continued in effect the blocking of the reversionary interests begun
    by the first NITU” and “could not amount to a separate taking of the property triggering a
    new claim . . . .” Barclay, 
    351 F. Supp. 2d at 1179
    . The Barclay appellants timely
    appealed, and we have jurisdiction pursuant to 
    28 U.S.C. § 1295
    (a)(2).
    III
    Renewal’s complaint in the Court of Federal Claims alleged that Trails-Act
    conversion of a railroad right-of-way running across Renewal’s property in California
    constituted a taking. The STB authorized abandonment effective May 28, 1995, and the
    putative trail operator filed a trail use request on May 23, 1995.      The railroad had
    removed most of the track and equipment by July 1995, though abandonment had not
    been consummated under federal law.         The STB subsequently issued a NITU on
    October 23, 1995, and the right-of-way was converted into a trail.
    Renewal filed its complaint in the Court of Federal Claims on December 11,
    2003. The Court of Federal Claims dismissed the complaint, relying on Caldwell to
    conclude that “Renewal’s claim accrued on October 23, 1995, the day the NITU was
    issued,” well outside the six-year limitations period.   Renewal, 64 Fed. Cl. at 615.
    Renewal timely appealed, and we have jurisdiction pursuant to 
    28 U.S.C. § 1295
    (a)(3).
    05-1255, 05-5109                            5
    DISCUSSION
    We review both the district court’s dismissal for want of jurisdiction and the legal
    conclusions of the Court of Federal Claims without deference. Lion Raisins, Inc. v.
    United States, 
    416 F.3d 1356
    , 1362 (Fed. Cir. 2005); Applegate v. United States, 
    25 F.3d 1579
    , 1581 (Fed. Cir. 1994). We agree with the district court and the Court of
    Federal claims that these actions are time-barred under our decision in Caldwell.3
    I
    We explained in Caldwell that “[t]he taking, if any, when a railroad right-of-way is
    converted to interim trail use under the Trails Act occurs when state law reversionary
    property interests that would otherwise vest in the adjacent landowners are blocked
    from so vesting.” Caldwell, 
    391 F.3d at 1233
    . Abandonment is suspended and the
    reversionary interest is blocked “when the railroad and trail operator communicate to the
    STB their intention to negotiate a trail use agreement and the agency issues an NITU
    that operates to preclude abandonment under section 8(d)” of the Trails Act. 
    Id.
     We
    concluded that “[t]he issuance of the NITU is the only government action in the
    railbanking process that operates to prevent abandonment of the corridor and to
    preclude the vesting of state law reversionary interests in the right of way.” 
    Id.
     at 1233-
    34 (emphasis in original). Thus, a Trails Act taking begins and a takings claim accrues,
    if at all, on issuance of the NITU. We explicitly held in Caldwell that “[w]hile the taking
    may be abandoned . . . by the termination of the NITU[,] the accrual date of a single
    taking remains fixed.” 
    Id. at 1235
    . The issuance of the NITU is the only event that must
    3
    Because we agree with the district court that the Barclay appellants’
    claims were time-barred even assuming that the Swisher action tolled the limitations
    period, we do not decide here whether the Swisher action required tolling.
    05-1255, 05-5109                            6
    occur to “entitle the plaintiff to institute an action.” Creppel v. United States, 
    41 F.3d 627
    , 631 (Fed. Cir. 1994). Accrual is not delayed until a trail use agreement is executed
    or the trail operator takes physical possession of the right-of-way.
    II
    The Barclay appellants and Renewal first argue that Caldwell was wrongly
    decided and should be overruled.         Panels of this court are bound by previous
    precedential decisions until overturned by the Supreme Court or by this court en banc.
    Kimberly-Clark Corp. v. Fort Howard Paper Co., 
    772 F.2d 860
    , 863 (Fed. Cir. 1985).
    The court declined to rehear Caldwell en banc, and the Supreme Court denied
    certiorari. Caldwell v. United States, 
    126 S. Ct. 366
     (2005) (mem.). In any event, the
    majority of these arguments were rejected in Caldwell. To the extent that they are new,
    they are without merit.
    The appellants and amicii contend that Caldwell was wrongly decided insofar as
    it relied on federal rather than state law to determine when abandonment and reversion
    of railroad rights-of-way occur.
    Renewal argues that because the railroad had removed its track and equipment
    from the right-of-way by June 1995, effectively abandoning it under California law and
    granting Renewal “full and exclusive, undisturbed, and uncontested possession and
    use” of the property until trail use began, App. Br. of Renewal at 17, the issuance of the
    NITU in October, 1995 did not block Renewal’s reversionary interest. Thus, Renewal
    concludes that its claim did not accrue until it was physically ousted from the property
    when trail use began.
    05-1255, 05-5109                             7
    While state law generally creates the property interest in a railroad right-of-way,
    Preseault I, 
    494 U.S. at 8, 16
    ,4 “the disposition of reversionary interests [is] subject . . .
    to the [STB’s] ‘exclusive and plenary’ jurisdiction to regulate abandonments” of railroad
    rights of way. 
    Id. at 8
     (quoting Chi. & N. W. Transp. Co. v. Kalo Brick Y Tile Co., 
    450 U.S. 311
    , 321 (1981)).       Federal law dictates when abandonment occurs.             Thus,
    Renewal is incorrect that state law governs the timing of the abandonment.
    Abandonment cannot occur until authorized by federal law, and the NITU precludes
    abandonment and the reversion that would follow if abandonment were consummated.
    
    16 U.S.C. § 1247
    (d) (2000); 
    49 C.F.R. § 1152.29
    (d)(1); Caldwell, 
    391 F.3d at 1229
    ;
    Preseault v. Interstate Commerce Comm’n, 
    853 F.2d 145
    , 151 (2d Cir. 1988) (“Until the
    [STB] issues a certificate of abandonment, the railway property remains subject to the
    [STB’s] jurisdiction, and state law may not cause a reverter of the property.”); Nat’l
    Wildlife Fed’n v. Interstate Commerce Comm’n, 
    850 F.2d 694
    , 704 (D.C. Cir. 1988)
    (“Nor may state law cause a reverter of a right-of-way prior to an [STB]-approved
    abandonment.”). Thus, there could be no abandonment until authorized by federal law.
    The NITU barred the abandonment; abandonment cannot occur after issuance of a
    NITU while the NITU is in effect. The barrier to reversion is the NITU, not physical
    ouster from possession. As Renewal itself admits, after issuance of the NITU, “the
    4
    In Toews v. United States, 
    376 F.3d 1371
     (Fed. Cir. 2004), we reiterated
    that state law controls the basic issue of whether trail use is beyond the scope of the
    right-of-way. 
    Id. at 1376-77
    . This merits question is distinct from the issue of claim
    accrual. See also Hash v. United States, 
    403 F.3d 1308
    , 1319-23 (Fed. Cir. 2005)
    (applying Idaho law to determine whether reversionary interests existed).
    05-1255, 05-5109                              8
    easement continued in existence beyond the time when it otherwise would have been
    abandoned.” Reply Br. of Renewal, at 4. Thus, the NITU triggers accrual. 5
    The Barclay appellants’ state law argument is also without merit. In the case of
    the Meadowlark trail, they insist that the NITU would not itself block a reversion if the
    railroad continued to use the right-of-way for railroad purposes after the NITU was
    issued. They argue that under Kansas law (which assertedly is different from California
    law), the taking can occur only after federal law authorized abandonment – that is, when
    the railroad ceases operations and the trail operator assumes physical possession.
    They thus urge that the trail operator’s physical occupation, and not the Meadowlark
    trail NITU, blocked the reversion.6 But even if under Kansas law the reversion would
    not occur until after federal authorization of abandonment, that state law reversion was
    still delayed by the issuance of the NITU, and the claim still accrued with the issuance of
    the NITU. It similarly makes no difference that railroad use may have continued after
    the NITU issued. The termination of railroad use was still delayed by the NITU.
    III
    The Barclay appellants also contend that Caldwell is distinguishable on a number
    of grounds.
    A
    The Barclay appellants argue that the original NITUs issued for the Flint Hills trail
    were vacated and that a second taking occurred when a new NITU was issued.
    5
    Renewal also appears to argue that the railroad conferred rights on
    Renewal to use the right-of-way for parking during the period of railroad use, and that
    the conversion to trail use ousted Renewal from the right to use the right-of-way for
    parking. Whether or not this is correct, the alleged ouster was not a consequence of
    actions taken under the Trails Act.
    6
    Amicii Sarah and Gale Illig also advance this same argument.
    05-1255, 05-5109                             9
    Although issuance of a NITU requires that at least one trail operator file a statement of
    willingness to assume responsibility for the trail before issuance of the NITU, and that
    trail operator is listed in the NITU, the ordering clause of a NITU is not typically limited to
    a particular trail operator7 and a railroad is free to negotiate a trail use agreement with
    any party. See Rail Abandonments – Use of Rights-of-Way as Trails, Ex Parte No. 274
    (Sub. No. 13), 
    2 I.C.C.2d 591
    , 605-06, 608, 
    1986 WL 68617
     (1986) (“Rail
    Abandonments”); Neb. Trails Council v. Surface Transp. Bd., 
    120 F.3d 901
    , 906 (8th
    Cir. 1997); Goos v. Interstate Commerce Comm’n, 
    911 F.2d 1283
    , 1293 (8th Cir. 1990).
    Nonetheless, it is common that, if after issuance of the NITU the trail operator named in
    the original NITU becomes unwilling or unable to assume responsibility for the trail, a
    new operator will be able to be formally substituted by issuance of a new NITU before
    an agreement with the railroad is reached.         It is also common for the original trail
    operator to become unwilling or unable to serve after an agreement is reached with the
    railroad, and for the original trail operator to propose to transfer trail use rights and
    responsibilities to a new trail operator. See Rail Abandonments, 2 I.C.C.2d at 606-08
    (recognizing such “serial trail use” as appropriate).
    The regulations provide a mechanism for substituting trail operators and updating
    NITUs without abandonment. The original and replacement trail operators file a notice
    7
    See, e.g., Cent. Kan. Ry., LLC – Abandonment Exemption – In Marion &
    McPherson Counties, KS, STB Docket No. AB-406 (Sub. No. 6X), 
    1996 WL 169774
    (1996) (original Sunflower Trail NITU) (imposing no limitations on negotiating parties,
    referring only to “the trail user” in specifying the requirements for interim trail use); Mo.
    Pac. R.R. Co. – Abandonment Exemption – In Morris & Dickinson Counties, KS, STB
    Docket No. AB-3 (Sub. No. 121X), 
    1995 WL 137149
     (1995) (Flint Hills trail, Dickinson
    Segment original NITU) (same); Union Pac. R.R. Co. – Abandonment Exemption – In
    McPherson County, KS, STB Docket No. AB-33 (Sub. No. 89X), 
    1995 WL 569357
    (1995) (same).
    05-1255, 05-5109                              10
    in accordance with 49 C.F.R § 1152.29(f)(1). Then, a new NITU (naming the new trail
    operator) is substituted for the original NITU (naming the original trail operator). As the
    regulation provides, “[t]he board will reopen the abandonment or exemption proceeding,
    vacate the existing NITU or CITU; and issue an appropriate replacement NITU or CITU
    to the new trail user.” 
    49 C.F.R. § 1152.29
    (f)(2). There is no gap between the original
    and replacement NITUs.      Though formally “vacat[ing]” the original NITUs, the STB
    makes clear that, in substance, it is “substituting” trail users “in the [same]
    proceedings.”8
    Under these circumstances, we agree with the district court’s conclusion that the
    series of STB NITU orders must be viewed as part of a single and continuous
    government action rather than as new takings. Any other approach would result in
    multiple potential takings of the same reversionary interest. In Caldwell, we rejected
    that approach, following United States v. Dow, 
    357 U.S. 17
    , 24 (1958), where the
    Supreme Court dismissed as “bizarre” the contention that there could be “two different
    ‘takings’ of the same property, with some incidents of the taking determined as of one
    date and some as of the other.” So long as abandonment was not consummated, the
    STB retained jurisdiction over the right-of-way. See Baros v. Tex. Mexican Ry. Co., 
    400 F.3d 228
    , 236 (5th Cir. 2005); Birt v. Surface Transp. Bd., 
    90 F.3d 580
    , 585 (D.C. Cir.
    1996). Thus, any extensions or modifications of the original NITU were not separate
    potential takings.
    8
    See Mo. Pac. R.R. – Abandonment Exemption – In Osage, Lyon, & Morris
    Counties, KS, STB Docket No. Ab-3 (Sub. No. 111X), Mo. Pac. R. Co. – Abandonment
    Exemption – In Miami, Franklin, & Osage Counties, KS, STB Docket No. AB-3 (Sub.
    No. 115), Mo. Pac. R. Co. – Abandonment Exemption – In Morris & Dickinson Counties,
    KS, STB Docket No. AB-3 (Sub. No. 121X), 
    1997 WL 414314
     (1997).
    05-1255, 05-5109                            11
    B
    No different result is required for the Sunflower Trail NITU. The initial Sunflower
    Trail NITU was set to expire on June 6, 1997. Although a new trail operator filed a
    request to be substituted and for the issuance of a new NITU on June 6, the STB did
    not issue the NITU until 10 days later, on June 16, 1997. The Barclay appellants argue
    that under these circumstances the original NITU became inoperative, abandonment
    occurred, and the landowners’ interest reverted. The replacement NITU in their view
    was a distinct government action that affected a new taking. Here again, however, the
    new NITU in substance merely extended the original NITU9 and listed a new potential
    trail operator. Moreover, it is clear that the STB had authority to extend the NITU and
    that abandonment did not occur in the interim. See Birt, 
    90 F.3d at 585-87
    . In Birt, a
    landowner argued that the STB abused its discretion by retroactively extending a CITU
    (the version of the NITU issued in standard abandonment proceedings rather than
    exemption proceedings) eight days after the CITU expired. The District of Columbia
    Circuit disagreed, concluding that the STB retained jurisdiction over the right-of-way,
    and thus had authority to issue the extension, because the railroad did not consummate
    abandonment while the CITU was expired. 
    Id. at 585-87
    . The new CITU became
    merely a continuation of the old.    We agree with the District of Columbia Circuit’s
    decision in Birt. Here, the railroad did not consummate abandonment of the Sunflower
    Trail right-of-way or file a notice of consummation with the STB between June 6, 1997,
    9
    Cent. Kan. Ry., LLC – Abandonment Exemption – In Marion & McPherson
    Counties, KS, STB Docket No. AB-406 (Sub. No. 6X), 
    1997 WL 323576
     (1997) (“Upon
    reconsideration, the notice of exemption served . . . on March 13, 1996, exempting the
    abandonment of the line described above is modified to the extent necessary to
    implement interim trail use/rail banking . . . until December 13, 1997.”).
    05-1255, 05-5109                          12
    the day the initial NITU expired, and June 16, 1997, the day the replacement NITU was
    issued.10 Thus the new NITU was not a separate taking.
    C
    The Barclay appellants also insist that the Meadowlark Trail NITU did not block
    their reversionary interest because, unlike the NITU at issue in Caldwell, it contained a
    180-day public use condition issued pursuant to 
    49 U.S.C. § 10905
    . The public use
    condition requires offering rights-of-way for sale to parties interested in using the
    property for, inter alia, “highways, other forms of mass transportation, conservation,
    energy production or transmission, or recreation.” 
    49 U.S.C. § 10905
     (2000). Here, at
    the time of the issuance of the NITU, a trail operator was named and the railroad had
    stated its willingness to negotiate a trail use agreement. The trail operator alternatively
    requested the issuance of the public use condition, apparently on the theory that a
    public use condition would preserve the right-of-way for trail use. In accordance with its
    policy, the STB issued both conditions simultaneously. The STB in the NITU made
    clear that the public use condition was “subject to the execution of a trail agreement,”
    and that “[i]f an interim trail use/rail banking agreement is executed within the 180-day
    period specified above, the public use condition will expire to the extent the trail use/rail
    banking agreement covers the same line segment.” Union Pac. R. Co. – Abandonment
    Exemption – In McPherson County, KS, STB Docket No. AB-33 (Sub. No. 89X), 1995
    10
    As of December 24, 1996, the railroad must file a notice of consummation
    of abandonment with the STB within one year of the effective date of the notice of
    exemption permitting abandonment. 
    49 C.F.R. § 1152.29
    (e)(2); 
    61 Fed. Reg. 67876
    -
    01, 67896-97 (Dec. 24, 1996) (adding § 1152.29(e)(2)). The STB retains jurisdiction
    over the right-of-way until the notice of consummation is filed. See Baros, 
    400 F.3d at 236
    .
    05-1255, 05-5109                             
    13 WL 569357
    , (1995) (“Meadowlark NITU”). No agreement was reached under the public
    use condition, and it expired after 180 days.
    The Barclay appellants’ theory appears to be that if the right-of-way were
    purchased under the public use condition for a use that was within the scope of the
    right-of-way, for example, continued rail use for mass transit, reversion might not have
    occurred under state law, and hence that the blockage of the reversion did not occur
    until the public use condition expired.
    We do not think that Caldwell can be distinguished on this basis. The primary
    object of the NITU was to preclude abandonment and thus to enable a trail use
    agreement. But for the NITU’s trail use condition, the railroad could abandon the line
    immediately and trigger the reversion, since the public use condition did not itself
    preclude abandonment. See Fritsch v. Interstate Commerce Comm’n, 
    59 F.3d 248
    , 252
    (D.C. Cir. 1995) (section 10906 precludes sale or other disposal of the right-of-way, but
    not abandonment); Nat’l Wildlife Fed’n, 
    850 F.2d at 701-02
     (what is now section 10905
    “has no rail banking provision that would preempt state laws that could otherwise result
    in reversion of rights-of-way to abutting landowners upon a cessation of rail service”).
    The bar on abandonment effected by the NITU’s trail use condition triggered accrual of
    the cause of action here just as it did in Caldwell.
    D
    Finally, the Barclay appellants argue that their Sunflower Trail claims did not
    accrue when the initial NITU was issued on April 12, 1996, because after the
    replacement NITU was issued on June 16, 1997, a group of landowners petitioned to
    reopen the exemption proceeding and vacate both the initial NITU and the replacement
    05-1255, 05-5109                             14
    NITU. The petitioners argued that the railroad omitted material facts in its notice of
    exemption and that CKC was financially unfit to serve as trail operator. The STB denied
    the petition to reopen on December 18, 1998. The petitioners appealed to the District of
    Columbia Circuit, which affirmed in part and reversed in part on October 22, 1999. See
    Jost v. Surface Transp. Bd., 
    194 F.3d 79
     (D.C. Cir. 1999). On remand, the STB further
    explained its reasoning and again denied the petition on May 8, 2001. That denial was
    not appealed.
    The Barclay appellants contend that their claim did not accrue until the petition to
    reopen was finally denied on May 8, 2001, even though the original NITU as extended
    by the replacement NITU never ceased to be effective. This is merely another version
    of the argument -- rejected in Caldwell -- that the original NITU should not be viewed as
    the taking because subsequent events might render the NITU only temporary. The
    Sunflower Trail claims accrued when the original NITU issued, regardless of the petition
    to reopen.
    IV
    In summary, we adhere to Caldwell and hold that the issuance of the original
    NITU triggers the accrual of the cause of action. The appellants’ arguments in these
    cases urging a different trigger, depending on when abandonment occurred under state
    law, when the last NITU in a series was issued, or when the NITU was no longer subject
    to collateral attack, merely emphasize the correctness of the Caldwell rule. Appellants’
    arguments lead potentially to multiple takings of a single reversionary interest and
    endless litigation concerning the appropriate date for accrual, thus leaving landowners
    and the government in a state of great uncertainty as to their respective rights and
    05-1255, 05-5109                           15
    obligations. Here, as in Caldwell, we conclude that takings law supplies a single bright-
    line rule for accrual that avoids these adverse consequences.
    CONCLUSION
    The decisions of the district court and Court of Federal Claims dismissing the
    appellants’ complaints are
    AFFIRMED.
    COSTS
    No costs.
    05-1255, 05-5109                           16
    United States Court of Appeals for the Federal Circuit
    05-1255
    JOHN BARCLAY, CONSTANCE BARCLAY, ROYER BARCLAY, ALTHEA BARCLAY,
    JOHN AMOS, MARCIA J. BACON, RONALD J. BARTEL, MELVIN BERGEN,
    JOHN E. BOYLE, JONATHAN EHRLICH, FLORENCE EHRLICH,
    DONALD GRAUMANN, RUBEN KLIEWER, ALVIN KROUPA, BARBARA KROUPA,
    BURDETT LEDELL, LEE DALE MILLER, VERNON MINNS, FRANK A. MITCHELL,
    MID KANSAS COOPERATIVE ASSOCIATION, JOHN F. OPAT, ROBERT
    PRESNELL,JANET REGIER, SONJA REGIER, DON REINHARDT, JANICE REINHARDT,
    MARY J. RODGERS, DARRELL THOMPSON, ROBERT TURNER,
    GENEVA TURNQUIST, DONALD TURNQUIST, CLARK E. WIEBE,
    and MARLENE J. WEBER,
    Plaintiffs-Appellants,
    v.
    UNITED STATES,
    Defendant-Appellee.
    ----------------------------------------
    05-5109
    RENEWAL BODY WORKS, INC.,
    Plaintiff-Appellant,
    v.
    UNITED STATES,
    Defendant-Appellee.
    NEWMAN, Circuit Judge, dissenting.
    The panel majority holds that a Fifth Amendment taking occurs in a rails-to-
    trails case, and is actionable for compensation, on the date the government issues a Notice
    of Interim Trail Use or Abandonment ("NITU"). Such Notice announces the railroad's right
    to abandon railway use and negotiate with a potential trail operator. If an agreement for
    interim trail use is reached, the right-of-way is rail-banked for possible future railway use.
    
    16 U.S.C. §1247
    (d). If such an agreement is not reached within 180 days, or an extension
    thereof, the right-of-way is deemed abandoned and any easements therefor are
    extinguished in accordance with the applicable state law. See Preseault v. Interstate
    Commerce Comm'n, 
    494 U.S. 1
    , 7 n.5 (1989) ("If agreement [for interim trail use with a
    qualified trail operator] is reached, interim trail use is thereby authorized. If not, the CITU or
    NITU automatically converts into an effective certificate or notice of abandonment."). Thus,
    the statute and the NITU do not make trail use mandatory, and if trail use is not achieved,
    the statute effects abandonment of railway use and reversion of the right-of-way easement.
    A Fifth Amendment taking cannot occur simply upon issuance of a NITU, because
    the deprivation of the reversion has not yet occurred, and may never occur. If railway use
    is simply abandoned, the easement is extinguished, the property is unburdened, and no
    taking occurs. Thus the issuance of a Notice of Interim Trail Use or Abandonment is not a
    per se taking, and no right of compensation arises on issuance of the Notice. My
    colleagues err in holding that the period of limitations for Fifth Amendment compensation
    starts to accrue, and that an action can be brought, immediately upon issuance of the
    NITU. As explained in Hair v. United States 
    350 F.3d 1253
     (Fed. Cir. 2003), a period of
    limitations does not accrue until an issue is actionable:
    The basic rule is that the clock of a statute of limitations begins to run from
    the date the plaintiff's cause of action "accrues," . . . A cause of action
    "accrues" when the plaintiff has a complete and present cause of action.
    "The earliest opportunity for a complete and present cause of action is that
    moment when the plaintiff has suffered a legally recognizable harm at the
    hands of the defendant, such as the time of contract breach or the
    commission of a tortious wrong."
    
    Id. at 1260
     (quoting 1 Calvin W. Corman, Limitation of Actions §6.1 (1991)).
    05-1255, 05-5109                                2
    As discussed in Preseault v. United States, 
    100 F.3d 1525
     (Fed. Cir. 1996), the
    conversion of a railroad right-of-way to a recreational trail can constitute a Fifth Amendment
    taking. However, the cause of action and right to compensation do not vest until the claim
    accrues. In Boling v. United States, 
    220 F.3d 1365
     (Fed. Cir. 2000) this court reiterated
    that: "In general, a takings claim accrues when 'all events which fix the government's
    alleged liability have occurred and the plaintiff was or should have been aware of their
    existence.'") 
    Id. at 1370
     (quoting Hopland Band of Pomo Indians v. United States, 
    855 F.2d 1573
    , 1577 (Fed. Cir. 1988)). From my colleagues' ruling that a taking occurred as soon as
    the possibility arose for trail conversion as an alternative to abandonment of the right-of-
    way, I must, respectfully, dissent.
    The general rule in physical takings cases is that the taking is actionable when the
    property is taken and liability is fixed, not when it is suggested to be taken. In United States
    v. Clark, 
    445 U.S. 253
     (1980) the Court stated that "physical takings by governmental
    bodies that may entitle a landowner to sue for compensation," 
    445 U.S. at 256
    , occur with
    the occupation of the property: "Condemnation proceedings, depending on the applicable
    statute, require various affirmative action on the part of the condemning authority. To
    accomplish a taking by seizure, on the other hand, a condemning authority need only
    occupy the land in question." 
    445 U.S. at 257
    . In Nollan v. California Coastal Comm’n, 
    483 U.S. 825
    , 832 (1987) the Court made clear that it is the permanent occupation or
    permanent right of traversal that triggers the owner's right to compensation, not the
    commencement of negotiations. See generally Dow v. United States, 
    357 U.S. 17
     (1958)
    (the taking occurred when the property was occupied, not when the deed was transferred
    some time later). In Loretto v. Teleprompter Manhattan CATV Corp., 
    458 U.S. 419
     (1982)
    the Court focused on the permanent physical occupation of the property in determining
    05-1255, 05-5109                               3
    whether a taking had occurred, not the legislative or administrative events that authorized
    that occupation.
    The NITU is prospective, and requires additional steps by the rail carrier and others
    before either of the two options authorized by the NITU will take legal effect. See 
    49 C.F.R. §1152.29
    . The NITU does not require that the railroad must consummate an agreement for
    rails-to-trails conversion. 
    48 C.F.R. §§1152.29
    (d), (e)(2); see National Wildlife Federation
    v. Interstate Commerce Comm'n, 
    850 F.2d 694
    , 700-02 (D.C. Cir. 1988). As discussed in
    the context of whether the issuance of a NITU must be preceded by an environmental
    impact study, the tentative aspect of the NITU is stressed:
    [I]ssuance of an NITU or CITU is not only incidental to the abandonment, but
    also is itself not a guarantee of eventual trail use. The NITU or CITU serves
    only "to provide an opportunity for the railroad and prospective trail users to
    negotiate an agreement; thus, when [the STB issues] a NITU or CITU there
    is only a possibility that a particular right-of-way actually will be used as a
    recreational trail."
    Goos v. Interstate Commerce Comm'n, 
    911 F.2d 1283
    , 1293 (8th Cir. 1990) (emphasis in
    original).
    When the government issued the NITU herein, it was not known whether the right-
    of-way would be converted to a recreational trail. If the ensuing negotiations had failed,
    such that the trail did not come into being, there could be no taking based on trail use. A
    suit for compensation is not ripe until the taking occurs. The panel majority states that "the
    termination of railroad use was still delayed by the NITU," maj. op. at 9, producing the
    incongruity whereby despite the delay in abandonment, the majority holds that the cause of
    action had already accrued. A "delay" of possible conversion to trail use, while it remains
    unknown whether trail use will occur at all, is not a per se taking with already vested
    entitlement to compensation. A taking claim does not accrue until "all events have
    05-1255, 05-5109                              4
    occurred that fix the alleged liability of the Government and entitle the plaintiff to institute an
    action." Seldovia Native Ass'n v. United States, 
    144 F.3d 769
    , 774 (Fed. Cir. 1998). The
    plaintiffs herein could not have sued for compensation while the trail use negotiations were
    ongoing; the period of limitations cannot accrue before suit could have been brought. Hair,
    
    350 F.3d at 1260
    .
    Indeed, the panel majority reinforces this view in its recognition that "So long as
    abandonment was not consummated, the STB retained jurisdiction over the right-of-way."
    Maj. op. at 11. Yet the "key date for accrual purposes is the date on which the plaintiff's
    land has been clearly and permanently taken." Boling, 220 F.2d at 1370 (citing Seldovia).
    A taking claim cannot accrue any earlier than when the indispensable event required to
    establish the government's liability has occurred. See Hash v. United States, 
    403 F.3d 1308
    , 1318 (Fed. Cir. 2005) ("On the railway's abandonment of its right-of-way these
    owners were disencumbered of the railway easement, and upon conversion of this land to a
    public trail, these owners' property interests were taken for public use, in accordance with
    the principles set forth in the Preseault cases.")
    The panel majority errs in holding that the railroad's "willingness to negotiate a trail
    use agreement," maj. op. at 13, is an actionable Fifth Amendment taking. Although my
    colleagues extol the virtues of a "bright line" for accrual of the period of limitations, citing
    Caldwell v. United States, 
    391 F.2d 1226
     (Fed. Cir. 2004), their choice of bright line would
    vest compensation rights although no taking may ever occur. The issuance of a Notice of
    Interim Trail Use is not a taking, whether or not railway use has already been abandoned,
    and independent of when trail use is successfully consummated. For a taking, "the alleged
    harm must be actual or imminent, not conjectural or hypothetical." Whitmore v. Kansas,
    
    495 U.S. 149
    , 155 (1990). As elaborated in Preseault, 
    100 F.3d at 1530
     ("We find no
    05-1255, 05-5109                                5
    support in Vermont law for the proposition, propounded by the defendants and accepted by
    the dissent, that the scope of an easement limited to railroad purposes should be read to
    include public recreational hiking and biking trails."), liability for a taking is based on the
    change in use of the easement from railroad use to recreational trail. Until that change is
    fixed and its occurrence firm, there is no accrual of the right to recover compensation for
    such taking.
    To the extent that Caldwell is construed to hold otherwise, as does the panel
    majority, Caldwell warrants review. We should sit en banc for this purpose, for the
    government advises that there are some twenty-two pending cases arising from the
    National Trails System Act. It is appropriate and necessary for this court to clarify the
    inconsistencies in our precedent.
    05-1255, 05-5109                              6
    

Document Info

Docket Number: 2005-1255

Citation Numbers: 443 F.3d 1368

Judges: Dyk, Newman, Prost

Filed Date: 4/11/2006

Precedential Status: Precedential

Modified Date: 8/3/2023

Authorities (30)

j-paul-preseault-and-patricia-preseault-v-interstate-commerce-commission , 853 F.2d 145 ( 1988 )

Baros v. Texas Mexican Railway Co. , 400 F.3d 228 ( 2005 )

Janet Fritsch v. Interstate Commerce Commission and United ... , 59 F.3d 248 ( 1995 )

Kevin Jost,petitioners v. Surface Transportation Board and ... , 194 F.3d 79 ( 1999 )

nebraska-trails-council-rails-to-trails-coalition-of-kansas-iowa-trails , 120 F.3d 901 ( 1997 )

todd-goos-v-interstate-commerce-commission-and-united-states-of-america , 911 F.2d 1283 ( 1990 )

Lion Raisins, Inc. v. United States , 416 F.3d 1356 ( 2005 )

Hash v. United States , 403 F.3d 1308 ( 2005 )

Kimberly-Clark Corporation v. Fort Howard Paper Company , 772 F.2d 860 ( 1985 )

Don Applegate and Gayle Applegate (For Themselves and a ... , 25 F.3d 1579 ( 1994 )

Seldovia Native Association, Inc. v. United States , 144 F.3d 769 ( 1998 )

Menno Toews, Evelyn Toews, and Norman Meachum v. United ... , 376 F.3d 1371 ( 2004 )

Melinda Birt v. Surface Transportation Board, Union Pacific ... , 90 F.3d 580 ( 1996 )

national-wildlife-federation-v-interstate-commerce-commission-and-united , 850 F.2d 694 ( 1988 )

Jacques J. Creppel, Harold L. Molaison, Lloyd James ... , 41 F.3d 627 ( 1994 )

Hopland Band of Pomo Indians v. The United States , 855 F.2d 1573 ( 1988 )

Gilbert M. Hair and Ethel Blaine Millett (On Behalf of ... , 350 F.3d 1253 ( 2003 )

j-paul-preseault-and-patricia-preseault-individually-and-as-partners-of , 100 F.3d 1525 ( 1996 )

Caldwell, Iii v. United States , 391 F.3d 1226 ( 2004 )

w-frank-boling-we-gore-jr-george-rayford-vereen-hope-willard-in , 220 F.3d 1365 ( 2000 )

View All Authorities »