Kivel v. McInerney CA4/1 ( 2021 )


Menu:
  • Filed 3/17/21 Kivel v. McInerney CA4/1
    NOT TO BE PUBLISHED IN OFFICIAL REPORTS
    California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
    publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication
    or ordered published for purposes of rule 8.1115.
    COURT OF APPEAL, FOURTH APPELLATE DISTRICT
    DIVISION ONE
    STATE OF CALIFORNIA
    SCOTT KIVEL et al.,                                                  D074173
    Plaintiffs, Cross-defendants and                                (Super. Ct. No. 37-2016-
    Appellants,                                                          00028099)
    v.
    PATRICK MCINERNEY et al.,
    Defendants, Cross-complainants
    and Appellants.
    APPEALS from judgment and orders of the Superior Court of San
    Diego County, Katherine Bacal, Judge. Affirmed in part, reversed in part,
    and remanded with directions.
    Scott N. Kivel, in pro. per., and for Plaintiff, Cross-defendant, and
    Appellant Lia Lund.
    1
    Schwerdtfeger Law Group, Sean D. Schwerdtfeger and Catherine L.
    Coughlin for Defendants, Cross-complainants, and Appellants.
    Defendants Patrick McInerney (Patrick), McInerney & Co, Inc. (M&C),
    McInerney & Associates, Inc. (M&A), and McInerney Architects (together
    Defendants) appeal a judgment finding M&C and Patrick liable for
    reimbursement under Business and Professions Code section 7031,
    subdivision (b)1 (§ 7031(b)) for amounts plaintiffs Scott Kivel and Lia Lund
    (Plaintiffs) paid to M&C for construction of a single family residence, and a
    postjudgment order adding M&A as a judgment debtor. The trial court found
    that M&C was not a licensed contractor at all times when it performed
    services for Plaintiffs that required a contractor’s license. On appeal,
    Defendants contend that the trial court erred by: (1) granting Plaintiffs’
    motion for summary adjudication of their section 7031(b) cause of action
    against M&C; (2) granting Plaintiffs’ motion for a nonsuit on Defendants’
    cross-claims for compensation for architectural services provided to Plaintiffs
    by M&C and Patrick and instructing the jury that Patrick was not a licensed
    architect when he performed services for Plaintiffs that required an
    architect’s license; (3) finding that Patrick was liable for the judgment
    amount as an alter ego of M&C; (4) granting Plaintiffs’ request to add, and
    amending the judgment to add, M&A as a judgment debtor, as a successor
    corporation to M&C; and (5) awarding Plaintiffs attorney fees pursuant to
    Code of Civil Procedure section 1029.8 (§ 1029.8). Plaintiffs cross-appeal,
    contending that the court erred by denying their request for an award of
    1     All statutory references are to the Business and Professions Code
    unless otherwise specified.
    2
    prejudgment interest pursuant to Civil Code section 3287, subdivision (a)
    (§ 3287(a)).
    We conclude that the trial court erred by awarding Plaintiffs attorney
    fees pursuant to section 1029.8 and denying Plaintiffs’ request for
    prejudgment interest pursuant to section 3287(a). Accordingly, we reverse
    the judgment and orders to that extent, affirm them in all other respects, and
    remand the matter with directions that the court issue a new order and enter
    a new judgment reflecting our decision.
    FACTUAL AND PROCEDURAL BACKGROUND
    In June 2013, Plaintiffs hired M&C, a corporation wholly owned by
    Patrick, to design a new single-family residence for a property that Plaintiffs
    had recently purchased in La Jolla. At that time, neither M&C nor Patrick
    was licensed in California to perform architectural services.2
    In March 2014, Plaintiffs and M&C agreed that M&C would serve as
    Plaintiffs’ general contractor in the construction of their new residence. At
    that time, neither M&C nor Patrick was licensed in California to perform
    contractor services. M&C then began performing general contractor services,
    including soliciting bids from subcontractors, hiring a subcontractor, and
    filing a permit application for the demolition or deconstruction of the existing
    residence on the property. In the fall of 2015, with construction of the new
    residence not yet complete, a dispute arose between Plaintiffs and M&C,
    which led to M&C’s discontinuation of its general contractor services on
    Plaintiffs’ new residence.
    2    Patrick was apparently registered at that time as an architect in the
    United Kingdom.
    3
    In August 2016, Plaintiffs filed the instant action against Defendants,
    alleging causes of action for: (1) disgorgement of architect’s fees;
    (2) disgorgement of contractor’s fees; (3) breach of architect contract;
    (4) breach of construction contract; (5) negligence; (6) intentional
    misrepresentation; (7) breach of fiduciary duties; and (8) accounting. In
    September, Defendants filed a cross-complaint against Plaintiffs. In October,
    Defendants filed their operative amended cross-complaint, alleging causes of
    action for: (1) breach of oral design contract; (2) breach of oral construction
    contract; (3) quantum meruit - design services; and (4) quantum meruit -
    construction contract.
    Plaintiffs filed a motion for summary adjudication on the second cause
    of action of their complaint as to only M&C and on the second and fourth
    causes of action of Defendants’ amended cross-complaint. The court issued
    an order granting Plaintiffs’ motion for summary adjudication, finding that
    there were no triable issues of material fact regarding whether M&C was
    licensed as a contractor at all times during its performance of contractor
    services and that M&C was not so licensed at all times. The court therefore
    found that under section 7031(b), Plaintiffs were entitled to reimbursement
    (or disgorgement) of all amounts that they had paid to M&C for construction
    services and materials.
    During November and December 2017, a jury trial was conducted on
    the remaining causes of action of Plaintiffs’ complaint and Defendants’
    amended cross-complaint. During trial, Plaintiffs moved for a judgment of
    nonsuit on Defendants’ first and third cross-claims. The court granted
    Plaintiffs’ motion and thereafter instructed the jury that Patrick had
    performed architectural services without a California architect’s license. The
    jury returned a special verdict, answering 42 questions on the remaining
    4
    causes of action alleged in Plaintiffs’ complaint and Defendants’ amended
    cross-complaint. In particular, the jury found that M&C had breached its
    construction contract with Plaintiffs and overcharged Plaintiffs by $325,000.
    The jury also found that there were no construction defects and rejected
    Plaintiffs’ causes of action against Defendants for negligence, intentional
    misrepresentation, and breach of fiduciary duty. In a bifurcated bench trial,
    the court subsequently found that Patrick was an alter ego of M&C and
    therefore, personally liable for the judgment amount. Plaintiffs subsequently
    elected the remedy of reimbursement under their section 7031(b) cause of
    action in lieu of the damages awarded by the jury for their cause of action for
    breach of the construction contract.
    On February 28, 2018, the trial court entered judgment for Plaintiffs
    and against M&C and Patrick in the amount of $2,732,627.87 on Plaintiffs’
    section 7031(b) cause of action, reflecting the total amount paid by Plaintiffs
    to M&C. The court subsequently awarded Plaintiffs attorney fees in the
    amount of $155,008.50 and costs in the amount of $52,689.13. The court also
    granted Plaintiffs’ motion to add M&A as a judgment debtor. The court
    denied Plaintiffs’ request for an award of prejudgment interest pursuant to
    section 3287(a). On January 25, 2019, the court entered a second amended
    judgment against M&C, Patrick, and M&A for a total amount of
    $2,940,325.50. That judgment did not award Defendants any relief on their
    amended cross-complaint.
    Defendants filed notices of appeal challenging the February 28, 2018
    judgment, the August 3, 2018 order awarding Plaintiffs attorney fees, and
    the January 25, 2019 second amended judgment. Plaintiffs filed a notice of
    cross-appeal challenging the November 9, 2018 order denying their motion
    for prejudgment interest.
    5
    DISCUSSION
    DEFENDANTS’ APPEAL
    I
    Order Granting Plaintiffs’ Motion for Summary Adjudication
    of Their Section 7031(b) Cause of Action
    Defendants contend that the trial court erred by granting Plaintiffs’
    motion for summary adjudication against M&C on Plaintiffs’ second cause of
    action for reimbursement under section 7031(b) for amounts they paid to
    M&C for construction services and materials. In particular, Defendants
    argue that a motion for summary adjudication is unavailable under Code of
    Civil Procedure section 437c, subdivision (f)(1) (§ 437c(f)(1)) unless the motion
    disposes of the cause of action against all defendants and not just a single
    defendant. They also contend that the court erred by finding that there were
    no triable issues of material fact as to Plaintiffs’ second cause of action and
    the second and fourth causes of action of Defendants’ amended cross-
    complaint and that Plaintiffs were entitled to summary adjudication on those
    causes of action.
    A
    Section 7031 generally. The Contractors State License Law (CSLL)
    (§ 7000 et seq.) “is a comprehensive legislative scheme governing the
    construction business in California. [It] provides that contractors performing
    construction work must be licensed unless exempt. [Citations.] ‘The
    licensing requirements provide minimal assurance that all persons offering
    such services in California have the requisite skill and character, understand
    applicable local laws and codes, and know the rudiments of administering a
    contracting business. [Citations.]’ [Citation.] The [CSLL is] designed to
    6
    protect the public from incompetent or dishonest providers of building and
    construction services. [Citation.]” (White v. Cridlebaugh (2009) 
    178 Cal.App.4th 506
    , 517 (White).)
    The CSLL’s “statutory scheme encourages licensure by subjecting
    unlicensed contractors to criminal penalties and civil remedies. [Citation.]
    The civil remedies ‘affect the unlicensed contractor’s right to receive or retain
    compensation for unlicensed work.’ [Citation.] The hiring party is entitled to
    enforce these remedies through a defensive ‘shield’ or an affirmative ‘sword.’
    [Citation.]” (Alatriste v. Cesar’s Exterior Designs, Inc. (2010) 
    183 Cal.App.4th 656
    , 664 (Alatriste).) “The shield, contained in section 7031(a), was enacted
    more than 70 years ago, and provides that a party has a complete defense to
    claims for compensation made by a contractor who performed work without a
    license, unless the contractor meets the requirements of the statutory
    substantial compliance doctrine. [Citation.]”3 (Alatriste, at pp. 664-665,
    fn. omitted.) Section 7031, subdivision (a) (§ 7031(a)), the “shield” provision,
    currently provides:
    “[N]o person engaged in the business or acting in the
    capacity of a contractor, may bring or maintain any action,
    or recover in law or equity in any action, in any court of
    this state for the collection of compensation for the
    performance of any act or contract where a license is
    required by this chapter without alleging that [he or she]
    was a duly licensed contractor at all times during the
    3     Section 7031, subdivision (e), “the substantial compliance exception,
    provides relief only in very narrow specified circumstances . . . .” (Alatriste,
    supra, 183 Cal.App.4th at p. 665.) Because Defendants do not assert on
    appeal that the substantial compliance exception applies in this case, we do
    not discuss its provisions or its potential application to the performance of
    contracting acts by M&C.
    7
    performance of that act or contract regardless of the merits
    of the cause of action brought by the person . . . .”
    “The California Supreme Court has long given a broad, literal
    interpretation to section 7031(a)’s shield provision. [Citation.] The court has
    held that section 7031(a) applies even when the person for whom the work
    was performed knew the contractor was unlicensed. [Citation.]” (Alatriste,
    supra, 183 Cal.App.4th at p. 665.) In MW Erectors, Inc. v. Niederhauser
    Ornamental & Metal Works Co., Inc. (2005) 
    36 Cal.4th 412
     (MW Erectors),
    the court stated: “[S]ection 7031(a) bars a person from suing to recover
    compensation for any work he or she did under an agreement for services
    requiring a contractor’s license unless proper licensure was in place at all
    times during such contractual performance.” (Id. at p. 419.) Because the
    Legislature has determined that the importance of deterring unlicensed
    persons from engaging in the contracting business outweighs any harshness
    between the parties, the bar of section 7031(a) applies regardless of the
    equities. (Id. at p. 423.) “In denying recovery to unlicensed contractors
    courts have rationalized the harsh impact on some competent, but
    unlicensed, persons by deferring to the legislative determination that
    deterrence outweighs the cumulative effect of the penalty suffered by the
    contractor and the unjust enrichment obtained by the property owner.”
    (Executive Landscape Corp. v. San Vicente Country Villas IV Assn. (1983) 
    145 Cal.App.3d 496
    , 498.)
    “In 2001, the Legislature amended section 7031 to add a sword remedy
    to the hiring party’s litigation arsenal. That sword remedy, contained in
    section 7031(b), currently reads: ‘Except as provided in subdivision (e), a
    person who utilizes the services of an unlicensed contractor may bring an
    action in any court of competent jurisdiction in this state to recover all
    8
    compensation paid to the unlicensed contractor for performance of any act or
    contract.’ ” (Alatriste, supra, 183 Cal.App.4th at p. 666, italics added.) In
    White, the court concluded that the Legislature intended that section 7031(a)
    and section 7031(b) be interpreted in a consistent manner so that the same
    remedy applies regardless of whether the unlicensed contractor is the
    plaintiff or defendant. (White, supra, 178 Cal.App.4th at pp. 519-520; see
    also Alatriste, at p. 666.) “In short, those who have not paid [the unlicensed
    contractor] are protected from being sued for payment and those who have
    paid may recover all compensation delivered.” (White, at p. 520.) Further,
    “section 7031(b) applies to allow full reimbursement even if the contractor
    obtained a license after he or she began performing the work.” (MW Erectors,
    supra, 36 Cal.4th at p. 429, fn. 8; Alatriste, at p. 671.) “[S]ection 7031(b)
    provides a reimbursement right for all amounts paid to an unlicensed
    contractor if the contractor was unlicensed at any time during the
    performance . . . .” (Alatriste, at p. 669, italics added.) Because “the
    Legislature intended that section 7031(b) be a mirror image of section
    7031(a), . . . section 7031(b) does not permit an offset for work performed
    after a license is obtained . . . .” (Alatriste, at p. 672.) “[T]he authorization of
    recovery of ‘all compensation paid to the unlicensed contractor for
    performance of any act or contract’ means that unlicensed contractors are
    required to return all compensation received without reductions or offsets for
    the value of material or services provided.” (White, at pp. 520-521.) In
    addition, “under section 7031(b), a party is entitled to reimbursement for
    amounts paid to an unlicensed contractor even if the party knew the
    contractor was unlicensed.” (Alatriste, at p. 668.) From an equitable
    viewpoint, the reimbursement remedy provided by section 7031(b) could
    therefore, under some circumstances, be considered draconian.
    9
    B
    Summary adjudication generally. “Motions for summary adjudication
    are procedurally identical to motions for summary judgment [citation], and
    our review of rulings on those motions is de novo [citation].” (Dunn v. County
    of Santa Barbara (2006) 
    135 Cal.App.4th 1281
    , 1290 (Dunn).) Under section
    437c(f)(1), “[s]ummary adjudication is warranted only if the motion
    completely disposes of a cause of action, an affirmative defense, a claim for
    damages, or an issue of duty.” (Dunn, at p. 1290.)
    “The purpose of the law of summary judgment [or summary
    adjudication] is to provide courts with a mechanism to cut through the
    parties’ pleadings in order to determine whether, despite their allegations,
    trial is in fact necessary to resolve their dispute.” (Aguilar v. Atlantic
    Richfield Co. (2001) 
    25 Cal.4th 826
    , 843 (Aguilar).) Aguilar clarified the
    standards that apply to motions for summary judgment and summary
    adjudication. (Id. at pp. 843-857.) Generally, if all of the papers submitted
    by the parties show that there is no triable issue of material fact and that the
    “ ‘moving party is entitled to a judgment [or summary adjudication] as a
    matter of law,’ [citation]” the court must grant the motion for summary
    judgment or summary adjudication. (Id. at p. 843.) Aguilar stated:
    “If a party moving for summary judgment [or summary
    adjudication] in any action . . . would prevail at trial
    without submission of any issue of material fact to a trier of
    fact for determination, then he should prevail on summary
    judgment [or summary adjudication]. In such a case, . . .
    the ‘court should grant’ the motion ‘and avoid a . . . trial’
    rendered ‘useless’ by nonsuit or directed verdict or similar
    device.” (Aguilar, 
    supra,
     25 Cal.4th at p. 855.)
    10
    On appeal, the appellant has the burden to show that the trial court
    erred in granting a motion for summary judgment or summary adjudication.
    (Bains v. Moores (2009) 
    172 Cal.App.4th 445
    , 455.) It is therefore appellant’s
    burden to affirmatively demonstrate error by showing that there are triable
    issues of material fact that preclude summary judgment or summary
    adjudication. (Ibid.) “On appeal after a motion for summary judgment [or
    summary adjudication] has been granted, we review the record de novo,
    considering all the evidence set forth in the moving and opposition papers
    except that to which objections have been made and sustained.” (Guz v.
    Bechtel National, Inc. (2000) 
    24 Cal.4th 317
    , 334; see Saelzler v. Advanced
    Group 400 (2001) 
    25 Cal.4th 763
    , 767.) “On appeal, we exercise ‘an
    independent assessment of the correctness of the trial court’s ruling, applying
    the same legal standard as the trial court in determining whether there are
    any genuine issues of material fact or whether the moving party is entitled to
    judgment [or summary adjudication] as a matter of law.’ [Citation.] ‘The
    appellate court must examine only papers before the trial court when it
    considered the motion, and not documents filed later. [Citation.] Moreover,
    we construe the moving party’s affidavits strictly, construe the opponent’s
    affidavits liberally, and resolve doubts about the propriety of granting the
    motion in favor of the party opposing it.’ ” (Seo v. All-Makes Overhead Doors
    (2002) 
    97 Cal.App.4th 1193
    , 1201-1202.) Although we generally review de
    novo, or independently, a trial court’s ruling on a motion for summary
    judgment or summary adjudication, we apply the abuse of discretion
    standard in reviewing the trial court’s rulings on a party’s evidentiary
    objections. (Powell v. Kleinman (2007) 
    151 Cal.App.4th 112
    , 122; Carnes v.
    Superior Court (2005) 
    126 Cal.App.4th 688
    , 694.)
    11
    C
    Procedural background. The second cause of action of Plaintiffs’
    complaint alleged that in March 2014 Patrick represented to Plaintiffs that
    Defendants were general contractors duly licensed in California. It alleged
    that in April 2014 Plaintiffs entered into an oral contract with Defendants for
    construction of Plaintiffs’ new single-family residence on their La Jolla
    property. It further alleged that because Defendants were not duly licensed
    contractors in California when they performed contractor services from
    March 2014 and thereafter, under section 7031 Defendants must disgorge all
    sums Plaintiffs paid them, “which amount is at least $2,732,627.87, plus
    interest.”
    Defendants’ amended cross-complaint alleged causes of action against
    Plaintiffs for breach of oral construction contract (second cause of action) and
    quantum meruit based on the construction contract (fourth cause of action).
    Their second cause of action alleged that on or about April 30, 2014, M&C
    and Plaintiffs entered into an oral contract for M&C to provide general
    contracting services in the construction of Plaintiffs’ new residence “on a cost
    plus contract basis” (i.e., costs of construction plus 15 percent). It further
    alleged that Plaintiffs breached the oral contract by failing to pay M&C for
    the construction services rendered and materials supplied, causing M&C
    damages of at least $764,000. Defendants’ fourth cause of action alleged that
    the reasonable value of the materials and services provided by M&C to
    Plaintiffs for which Plaintiffs had not paid was at least $764,000 and that it
    would be inequitable to unjustly enrich Plaintiffs with materials and services
    in that amount.
    12
    Plaintiffs filed a motion for summary adjudication of their second cause
    of action against M&C and the second and fourth causes of action alleged
    against them in Defendants’ amended cross-complaint. Plaintiffs argued that
    there were no triable issues of material fact as to their allegation that M&C
    did not hold a valid contractor’s license at all times during its performance of
    their oral construction contract and therefore, M&C was liable under section
    7031(b) for disgorgement of all compensation that Plaintiffs had paid to it.
    Plaintiffs likewise argued that there were no triable issues of material fact as
    to their allegation that M&C did not hold a valid contractor’s license at all
    times during its performance of their oral construction contract and
    therefore, pursuant to section 7031(a), M&C could not maintain an action to
    recover compensation for its acts. In support of their motion for summary
    adjudication, Plaintiffs submitted a memorandum of points and authorities;
    declarations of Kivel, Lund, and their counsel Christopher A. Elliott; exhibits
    to those declarations; a separate statement of undisputed material facts; and
    a request for judicial notice.
    In their separate statement of undisputed material facts, Plaintiffs
    asserted that it was undisputed that in March 2014 M&C requested bids for
    demolition of the existing home on Plaintiffs’ property and for construction of
    their new home.4 They asserted that demolition of the existing home began
    4     Plaintiffs also asserted that it was undisputed that on March 24, 2014,
    Patrick applied for a combination building permit for their new home. They
    also asserted that on April 3, 2014, M&C hired someone to excavate the gas
    line on Plaintiffs’ property. In support of those assertions, Plaintiffs
    submitted an email dated April 1, 2014, from Patrick to Lund, in which he
    stated that he had met with SDG&E and had “organized for someone to be at
    the house tomorrow to unearth the gas line at the sidewalk and the meter.”
    He stated that SDG&E would then return to the site to cut the gas line and
    stop the gas service at the sidewalk and remove the meter.
    13
    in April 2014. Plaintiffs asserted that on May 2, 2014, M&C sent them a
    “construction invoice” dated April 30, 2014, in the amount of $50,000, which
    they paid by a check dated May 8, 2014. They asserted that on May 9, 2014,
    a permit was issued in Patrick’s name for demolition of the existing home.
    Importantly, Plaintiffs asserted that it was undisputed that M&C was not
    actively licensed as a contractor in California until May 22, 2014. Although
    Patrick obtained a California contractor’s license in 2008, he placed his
    license on inactive status in 2012 and reactivated and reassigned it to M&C
    on May 22, 2014.
    In support of their separate statement, Plaintiffs submitted exhibits,
    including an email dated March 30, 2014, from Patrick to Lund, updating her
    on deconstruction of the existing home and stating that he had received a
    reply from Israel at RRR Green Demolition (RRR) offering to reduce his price
    by $2,000, and that he had also asked Dirt Cheap Demolition to confirm that
    its bid included the perimeter walls in its pricing. Patrick stated: “It is likely
    we will sub-contract with RRR Green Demolition (Israel)” and that he had
    asked to meet Israel on the site the following Tuesday to review the work.
    Plaintiffs also submitted an email dated April 1, 2014, from Patrick to Lund
    in which Patrick stated that he had “received a revised bid from Dirt Cheap
    Demo (increased by $5K) and a revised bid from Israel (reduced by $3K). The
    two bids are now within $4K with Israel’s work linking directly to the ReCon
    company. So I plan to subcontract Israel to move this forward.” (Italics
    added.) Patrick also stated that he had “asked each of the subcontracting
    firms to provide time lines in respect to each item of work.”5
    5     Plaintiffs also submitted an email dated April 13, 2014, from Patrick to
    Lund, stating that “[w]e have been organizing all the trades as we move into
    this new phase.” Patrick also updated Lund on the status of the building
    14
    Plaintiffs also submitted an email dated May 2, 2014, from Patrick to
    Plaintiffs, attaching three invoices. Patrick explained that the third invoice
    was “an on-account payment to cover the first subcontractors, deconstruction,
    shoring, and site set-up.” Plaintiffs submitted a copy of “Invoice No. 441F”
    from M&C to Plaintiffs, dated April 30, 2014, which was titled “Construction
    Invoice.” That construction invoice was in the amount of $50,000, which was
    “[n]ow [d]ue,” and stated:
    “On Account Payment of $50,000 for site-set [sic] up costs
    related to [the property].
    “Temporary Construction Fence
    “Temporary Toilet
    “Shoring (Subcontract)
    “Deconstruction (Subcontract)”
    Plaintiffs also submitted a copy of a check dated May 8, 2014, in the amount
    of $50,000 from Kivel to M&C, which showed that it had been paid by Kivel’s
    bank on May 15, 2014.
    Plaintiffs submitted a copy of the demolition permit issued on May 9,
    2014, by City to Patrick, as the permit holder, for demolition of the existing
    home and garage.6 Plaintiffs also submitted Elliott’s declaration, which
    permit application that he had filed with the City of San Diego (City),
    explaining that the City was “running behind schedule” and that he had
    “worked through the weekend to answer all of the major issues.” Patrick also
    stated that he had received a bid from a local solar firm and would review it
    and forward it to Plaintiffs.
    6     Plaintiffs also submitted a copy of a City document, showing its
    approval on May 27, 2014, of the combination building permit to Patrick, as
    the permit holder, for construction of the new residence, and indicating that
    the application for the permit had been filed on March 24, 2014.
    15
    attached as exhibits documents produced by Defendants pursuant to
    Plaintiffs’ requests for production served in their action against Defendants.
    Those exhibits included copies of bids from demolition subcontractors. On
    March 20, 2014, J.T.H, Inc. submitted separate bids for demolition of the
    existing house and garage and for the breaking and removal of all concrete.
    On March 20, 2014, RRR submitted separate bids for deconstruction of the
    existing house and garage and for removal of the hardscape (e.g., driveway,
    foundations, sidewalks, and retaining walls). On March 26, 2014, RRR
    submitted an additional bid for removal of the hardscape.7 All of the
    foregoing subcontractor bids were submitted to Patrick. Elliott also attached
    a certification of records, dated April 14, 2017, from the custodian of records
    for the California Contractors State License Board, stating that Patrick was
    issued a Class B general building contractor’s license on October 22, 2008,
    which was renewed as inactive on November 1, 2012, and became active and
    was reassigned to M&C on May 22, 2014.
    In its opposition to Plaintiffs’ motion for summary adjudication, M&C
    submitted a memorandum of points and authorities, arguing that there were
    triable issues of material fact that precluded summary adjudication. In
    particular, M&C argued that there were disputed facts regarding whether it
    had performed contracting services prior to the issuance of its contractor’s
    license on May 22, 2014. In support of its opposition, M&C submitted a
    request for judicial notice of the application for a demolition permit signed by
    7     Other documents produced by Defendants included bids dated March
    26, 2014, and April 8, 2014, from a window and door installer (R.H. Fitch
    Incorporated) and a bid dated March 29, 2014, from an excavating company
    (Mike Lloyd Excavating, Inc.).
    16
    Patrick on May 7, 2014, identifying M&C as the permit holder and RRR as
    the demolition subcontractor.
    M&C also submitted a separate statement responding to Plaintiffs’
    separate statement of undisputed material facts. In particular, M&C
    disputed that the existing home was to be demolished, asserting that it was
    instead to be deconstructed for salvage of many of its reusable materials, and
    asserted that Plaintiffs had instructed M&C to begin investigating
    deconstruction vendors in March 2014.8 M&C disputed that deconstruction
    of the existing home began in April 2014, asserting instead that
    deconstruction by RRR began after the demolition permit was issued on May
    7, 2014. M&C agreed with Plaintiffs’ assertion that Plaintiffs had paid M&C
    $2,732,627.87 for materials supplied and services rendered in construction of
    their new home. M&C asserted that it did not begin working as a contractor
    prior to receipt of its license on May 22, 2014. However, M&C did not dispute
    that Patrick’s contractor’s license was placed on inactive status in 2008 and
    reactivated and reassigned to M&C on May 22, 2014. M&C also did not
    dispute that it was not a licensed architect when it performed services for
    Plaintiffs.
    In its separate statement, M&C also asserted its own undisputed
    material facts, including that on March 20, 2014, RRR submitted a
    deconstruction proposal and that in April 2014 Plaintiffs decided that they
    wanted to use RRR to deconstruct the existing home. M&C also asserted
    8      M&C also disputed that it applied for a combination building permit on
    March 24, 2014, asserting instead that it did not apply for such permit until
    May 27, 2014. M&C also clarified that it did not hire anyone to excavate the
    gas line, asserting instead that Patrick had met with SDG&E to locate the
    gas line.
    17
    that by April 2014, Plaintiffs had indicated that they wanted M&C to serve
    as their general contractor and Patrick informed them that he would do so,
    but that he would have to reactivate his contractor’s license and transfer it to
    M&C before performing any general contracting services.
    Also in support of its opposition, M&C submitted Patrick’s declaration,
    which stated that the $50,000 construction invoice transmitted to Plaintiffs
    on May 2, 2014, was an “on-account payment [sic] for future construction site
    set up costs.” His declaration also stated that on May 7, 2014, M&C
    submitted an application for a demolition permit identifying M&C as the
    permit holder and RRR as the contractor, and that on May 9, 2014, RRR
    “commenced deconstruction of the existing structure.” Also in support of its
    opposition, M&C submitted declarations from Paul Benton, a licensed
    architect, and William M. Lyons, a licensed contractor.
    In reply to M&C’s opposition, Plaintiffs submitted a supplemental
    request for judicial notice and Elliott’s supplemental declaration. In
    particular, Elliott’s declaration stated that on August 1 and 2, 2017, his
    colleague Hayward Kaiser took Patrick’s deposition in this case. A copy of
    excerpts from the deposition transcript were attached to the declaration.
    Kaiser asked Patrick at his deposition: “Did you charge a markup on the
    expenses and costs you paid in connection with the deconstruction of the old
    house?” Patrick asked Kaiser to repeat the question. Kaiser restated his
    question: “Did you charge a 15 percent markup on the costs [M&C] incurred
    on the deconstruction of the old house?” Patrick answered: “Yes.” Kaiser
    then asked: “Do you think that was appropriate?” Patrick answered: “I do.”
    Kaiser asked: “Why?” Patrick answered: “Because I procured, managed,
    and paid for the deconstruction of the old house.” (Italics added.)
    18
    Plaintiffs’ supplemental request for judicial notice asked that the court
    take judicial notice of a certified copy of City’s record of permit-related
    appointments for their property through May 28, 2014. That record reflected
    that a demolition permit was issued on May 9, 2014.9
    On August 30, 2017, the trial court granted Plaintiffs’ motion for
    summary adjudication and, in so doing, granted the parties’ requests for
    judicial notice. The court stated:
    “[Patrick] is the president and sole shareholder of M&C.
    [Citation.] [Patrick] had a contractor’s license that went
    inactive in 2012. [Citation.] On April 30, 2014, [P]laintiffs
    and M&C entered into an oral contract to provide general
    contracting services in connection with the home.
    [Citations.] On May 22, 2014, [Patrick] reactivated the
    license and reassigned it to M&C. [Citation.]
    “Under section 7031(a), . . . [t]he question . . . is whether
    there is any triable issue of material fact as to whether
    M&C was licensed at all times during contractual
    performance. There is not.
    “On April 30, 2014 . . . , M&C sent [P]laintiffs a
    construction invoice for $50,000 for ‘site set-up costs’
    including a temporary construction fence, shoring and
    deconstruction. [Citation.] Engaging in ‘administrative
    duties’ such as ‘soliciting and accepting payment,’ are ‘in
    the capacity of’ a contractor[] and require a license.
    [Citation.] In other words, there was contractual
    performance -- not just execution -- before M&C was
    licensed.
    9     That record also reflected that on March 18, 2014, a building permit
    application was submitted for a new single-family dwelling unit and on
    March 24, 2014, seven sets of drawings were submitted in support of that
    application. It further reflected that on May 27, 2014, the building permit for
    the new single-family dwelling unit was issued.
    19
    “ . . . A ‘contractor’ includes ‘any person, who undertakes to
    or offers to undertake to or purports to have the capacity to
    undertake or submits a bid’ to construct, alter or repair any
    building. [Citation.] Thus, a valid license was required
    when [P]laintiffs were billed for construction work. The
    fact that the construction invoice also notes that some of
    the work will be subcontracted out is immaterial. ‘The
    California courts have also long held that those who enter
    into construction contracts must be licensed, even when
    they themselves do not do the actual work under the
    contract.’ [Citation.]
    “M&C began soliciting bids for deconstruction of the
    existing house in March 2014. [Citation.] On May 7, 2014,
    [Patrick] submitted an application for a demolition permit
    listing [RRR] as the contractor. [Citation.] Deconstruction
    began on May 9, 2014. [Citation.] Contractors must be
    licensed when they hire subcontractors. [Citation.]
    [Patrick] testified that M&C was entitled to be
    compensated for deconstruction because he ‘procured,
    managed, and paid for the deconstruction.’ [Citation.]
    M&C acted as a contractor by soliciting bids for
    deconstruction, hiring [RRR] and applying for a demolition
    permit. The fact that [RRR] did the actual deconstruction
    work does not exempt M&C from licensing requirements.
    “ . . . Thus there is no triable issue of fact that M&C acted
    as a contractor during a portion of the relevant time
    without having a license. . . .
    “Because M&C is not entitled to recover for the outstanding
    construction costs allegedly owed, it follows that [P]laintiffs
    are entitled to recover their construction costs.
    Accordingly, the motion for summary adjudication is
    granted.”
    After trial, Plaintiffs elected the section 7031(b) remedy of
    reimbursement under their second cause of action in lieu of the damages
    awarded by the jury for their cause of action for breach of the construction
    20
    contract. The court subsequently entered the second amended judgment for
    Plaintiffs and against M&C, Patrick, and M&A in the amount of
    $2,732,627.87 on Plaintiffs’ section 7031(b) cause of action.
    D
    Interpretation of section 437c(f)(1). In asserting that the trial court
    erred by granting Plaintiffs’ motion for summary adjudication against M&C
    on Plaintiffs’ second cause of action for reimbursement under section 7031(b),
    which was alleged against all Defendants, Defendants initially argue that a
    motion for summary adjudication is unavailable under section 437c(f)(1)
    unless the motion disposes of the cause of action against all defendants and
    not just a single defendant. Defendants rely on the language of section
    437c(f)(1), which provides:
    “A party may move for summary adjudication as to one or
    more causes of action within an action, one or more
    affirmative defenses, one or more claims for damages, or
    one or more issues of duty, if the party contends that the
    cause of action has no merit, that there is no affirmative
    defense to the cause of action, that there is no merit to an
    affirmative defense to any cause of action, that there is no
    merit to a claim for damages, as specified in Section 3294 of
    the Civil Code, or that one or more defendants either owed
    or did not owe a duty to the plaintiff or plaintiffs. A motion
    for summary adjudication shall be granted only if it
    completely disposes of a cause of action, an affirmative
    defense, a claim for damages, or an issue of duty.” (Italics
    added.)
    Defendants misconstrue the plain language of section 437c(f)(1) in arguing
    that a motion for summary adjudication must completely dispose of a cause of
    action against all defendants and not just as to a single defendant. To the
    contrary, there is no language in section 437c(f)(1) that requires that
    21
    summary adjudication completely dispose of a cause of action against all
    defendants.
    In interpreting a statute, “our fundamental objective is to ascertain the
    legislative intent.” (Alatriste, supra, 183 Cal.App.4th at p. 663.) We initially
    focus on the words of the statute because statutory language is generally the
    most reliable indicator of legislative intent. (Ibid.) The words of the statute
    should be given their ordinary and usual meaning and should be construed in
    their statutory context. (Ibid.; MW Erectors, 
    supra,
     36 Cal.4th at p. 426.) If
    the statutory language is unambiguous, we presume that the Legislature
    intended what it stated and the plain meaning of the statute governs. (MW
    Erectors, at p. 426.) On appeal, we independently review the legal question of
    the proper interpretation of a statute. (Alatriste, at p. 664.)
    “Prior to the 1990 amendment to the summary adjudication statute,
    parties could seek summary adjudication on any issues raised in a case. The
    1990 amendment limited summary adjudication motions to a cause of action,
    an affirmative defense, a claim for punitive damages, or an issue of duty.
    [Citation.] . . . The clear purpose of the amendment was to ‘ “stop the practice
    of adjudication of facts or adjudication of issues that do not completely
    dispose of a cause of action or a defense.” ’ [Citation.]”10 (Paramount
    10     In 1990, section 437c(f) was amended to provide in pertinent part that
    “any party may move for summary adjudication as to [a] cause or causes of
    action . . . .” (Lilienthal & Fowler v. Superior Court (1993) 
    12 Cal.App.4th 1848
    , 1851-1852 (Lilienthal).) In 1993, section 437c(f) was amended and
    renumbered as section 437c(f)(1), reading substantially as it reads today.
    (Stats.1993, ch. 276, § 1; see Hood v. Superior Court (1995) 
    33 Cal.App.4th 319
    , 323 [“ ‘A party may move for summary adjudication as to one or more
    causes of action . . . . A motion for summary adjudication shall be granted
    only if it completely disposes of a cause of action . . . .’ ”].)
    22
    Petroleum Corp. v. Superior Court (2014) 
    227 Cal.App.4th 226
    , 241-242
    (Paramount).)
    By its express language, section 437c(f)(1) allows “[a] party” to file a
    motion for summary adjudication, clearly indicating that a single plaintiff or
    defendant may file such a motion. Thus, in any action in which there are
    multiple plaintiffs or defendants, one plaintiff or one defendant may file a
    motion for summary adjudication. There is nothing in the language of section
    437c(f)(1) that precludes a plaintiff or defendant from filing a motion for
    summary adjudication of a cause of action as to only one of multiple
    defendants or one of multiple plaintiffs. Further, section 437c(f)(1) provides
    that a party may file a motion for summary adjudication as to a cause of
    action if the party asserts, inter alia, “that one or more defendants either
    owed or did not owe a duty to the plaintiff or plaintiffs.” (Italics added.) That
    language plainly indicates that summary adjudication may be granted in
    favor of, or against, “one or more defendants” if there is no triable issue as to
    whether one or more defendants owed a duty to the plaintiff or plaintiffs.
    (§ 437c(f)(1).) Based on the plain language of section 437c(f)(1), we conclude
    that the Legislature intended that summary adjudication of a cause of action
    may be granted against only one of multiple defendants named in that cause
    of action if there are no triable issues of material fact on that cause of action
    as to that defendant and the plaintiffs are entitled to judgment on that cause
    of action. (Cf. Paramount, supra, 227 Cal.App.4th at p. 243 [plaintiff can
    obtain summary adjudication of cause of action if plaintiff establishes each
    element of cause of action entitling plaintiff to judgment on that cause of
    action].)
    Contrary to Defendants’ assertion, there is nothing in the language of
    section 437c(f)(1) that requires all plaintiffs or all defendants to be either the
    23
    moving parties or opposing parties on a motion for summary adjudication of a
    cause of action. If Defendants’ position were correct, we would expect that
    they could cite, or that our research would reveal, a published case so holding
    during the almost 30-year period since the current language of section
    437c(f)(1) was enacted.11 However, our research shows that courts have
    affirmed summary judgments and summary adjudications against one of
    multiple defendants or in favor of one of multiple plaintiffs. (See, e.g., Lyons
    v. Security Pacific Nat. Bank (1995) 
    40 Cal.App.4th 1001
    , 1006, 1023
    [affirmed summary judgment in favor of one of two defendants]; Orange
    County Water Dist. v. Sabic Innovative Plastics US, LLC (2017) 
    14 Cal.App.5th 343
    , 417, fn. 38 [affirmed summary adjudication in favor of one
    of multiple defendants]; Archdale v. American Internat. Specialty Lines Ins.
    Co. (2007) 
    154 Cal.App.4th 449
    , 473 [affirmed summary judgment in favor of
    one of multiple plaintiffs].)
    Further, Code of Civil Procedure section 579 provides: “In an action
    against several defendants, the court may, in its discretion, render judgment
    against one or more of them, leaving the action to proceed against the others,
    11    Although Defendants cite Lilienthal, supra, 
    12 Cal.App.4th 1848
    , as
    their primary case in support of their position, that case is inapposite to this
    case and did not address the question whether a motion for summary
    adjudication may be granted against one of multiple defendants or one of
    multiple plaintiffs. Rather, Lilienthal concluded that because a cause of
    action alleged in the complaint in that case combined two separate and
    distinct claims (i.e., primary rights or theories of liability), the trial court
    erred by refusing to rule on the plaintiffs’ motion for summary adjudication of
    one of the two claims that were, in effect, two separate causes of action. (Id.
    at pp. 1850, 1854.) Because Lilienthal is inapposite to the issue in this case,
    it does not persuade us to reach a contrary conclusion regarding our
    interpretation of section 437c(f)(1).
    24
    whenever a several judgment is proper.” Although that statute does not
    expressly apply to a summary adjudication against one or more of several
    defendants, one can infer from its provisions that in enacting section
    437c(f)(1), the Legislature did not intend to preclude a summary adjudication
    against one of multiple defendants. Accordingly, Defendants have not carried
    their burden on appeal to show that Plaintiffs could not properly file, and the
    trial court could not properly grant, a motion for summary adjudication of the
    complaint’s second cause of action as to M&C only, and not as to all
    Defendants.
    E
    No triable issues of material fact. Defendants alternatively contend
    that the trial court erred by granting Plaintiffs’ motion for summary
    adjudication because there exist triable issues of material fact as to the
    second cause of action of Plaintiffs’ complaint and as to the second and fourth
    causes of action of Defendants’ amended cross-complaint. In particular,
    Defendants argue that there are triable issues on the factual question of
    whether M&C performed contracting services prior to May 22, 2014, the date
    on which it became licensed as a contractor in California.
    Section 7026 defines a “contractor” as “any person who undertakes to or
    offers to undertake to, or purports to have the capacity to undertake to, or
    submits a bid to, or does himself or herself or by or through others, construct,
    alter, repair, add to, subtract from, improve, move, wreck or demolish any
    building . . . or other structure, . . . or to do any part thereof . . . .” (Italics
    added.) As discussed above, section 7031(a) provides: “[N]o person engaged
    in the business or acting in the capacity of a contractor, may bring or
    maintain any action, or recover in law or equity in any action, in any court of
    25
    this state for the collection of compensation for the performance of any act or
    contract where a license is required by this chapter without alleging that [he
    or she was] a duly licensed contractor at all times during the performance of
    that act or contract . . . .” Section 7031(b) provides: “[A] person who utilizes
    the services of an unlicensed contractor may bring an action in any court of
    competent jurisdiction in this state to recover all compensation paid to the
    unlicensed contractor for performance of any act or contract.”
    Section 7031(b) allows a plaintiff to recover “full reimbursement even if
    the contractor obtained a license after he or she began performing the work.”
    (MW Erectors, supra, 36 Cal.4th at p. 429, fn. 8; Alatriste, supra, 183
    Cal.App.4th at p. 671.) Importantly, “section 7031(b) provides a
    reimbursement right for all amounts paid to an unlicensed contractor if the
    contractor was unlicensed at any time during the performance . . . .”
    (Alatriste, at p. 669, italics added; see also Judicial Council of California v.
    Jacob Facilities, Inc. (2015) 
    239 Cal.App.4th 882
    , 896 (Judicial Council) [“[I]f
    a contractor is unlicensed for any period of time while delivering construction
    services, the contractor forfeits all compensation for the work, not merely
    compensation for the period when the contractor was unlicensed.”].) Section
    7031(b) does not permit an offset for work performed after a license is
    obtained. (Alatriste, at p. 672.) Unlicensed contractors are required to return
    all compensation received without reductions or offsets for the value of
    material or services provided. (White, supra, 178 Cal.App.4th at pp. 520-
    521.) Therefore, if M&C performed any act requiring a contractor’s license
    prior to May 22, 2014, it is subject to the shield provisions of section 7031(a)
    and the sword provisions of section 7031(b).
    Based on our review of the record, we conclude that there is undisputed
    evidence showing that M&C performed one or more acts that required a
    26
    contractor’s license prior to May 22, 2014, when M&C obtained a California
    contractor’s license. In particular, before May 22, 2014, M&C performed
    contracting acts related to demolition or deconstruction of the existing home
    on Plaintiffs’ property. In March 2014, M&C requested and received bids
    from subcontractors for the demolition or deconstruction of the existing home,
    garage and hardscape. In support of their motion for summary adjudication,
    Plaintiffs submitted Elliott’s declaration, which attached copies of bids from
    demolition subcontractors. On March 20, 2014, J.T.H, Inc. submitted
    separate bids for demolition of the existing house and garage and for the
    breaking and removal of all concrete. On March 20, 2014, RRR submitted
    separate bids for deconstruction of the existing house and garage and for
    removal of the hardscape (e.g., driveway, foundations, sidewalks, and
    retaining walls). On March 26, 2014, RRR submitted an additional bid for
    removal of the hardscape. Defendants do not dispute the authenticity of
    those bids.
    Plaintiffs also submitted a copy of an email dated March 30, 2014, from
    Patrick to Plaintiffs updating her on deconstruction of the existing home and
    stating that he had received a reply from RRR offering to reduce its price by
    $2,000 and that he had also asked Dirt Cheap Demolition to confirm that its
    bid included the perimeter walls in its pricing. Patrick stated: “It is likely
    we will sub-contract with [RRR]” and that he had asked to meet with Israel of
    RRR on the site the following Tuesday to review the work. Defendants do not
    dispute the authenticity of that email or its substance showing that in March
    2014 Patrick, on behalf of M&C, solicited bids from subcontractors for the
    demolition or deconstruction of the existing home and garage. Plaintiffs also
    submitted a copy of an email dated April 1, 2014, from Patrick to Lund in
    which he stated that he had “received a revised bid from Dirt Cheap Demo
    27
    (increased by $5K) and a revised bid from [RRR] (reduced by $3K). The two
    bids are now within $4K with [RRR]’s work linking directly to the ReCon
    company. So I plan to subcontract Israel [of RRR] to move this forward.”
    (Italics added.) Defendants do not dispute the authenticity of that email or
    its substance showing that on or before April 1, 2014, Patrick, on behalf of
    M&C, solicited bids from subcontractors for the demolition or deconstruction
    of the existing home and garage and, in addition, intended to subcontract
    with RRR for that demolition or deconstruction work.
    In support of its opposition to Plaintiffs’ motion, M&C submitted a
    request for judicial notice (which the trial court subsequently granted) of the
    application for a demolition permit signed by Patrick on May 7, 2014,
    identifying M&C as the permit holder and RRR as the demolition
    subcontractor. Plaintiffs submitted a copy of the demolition permit issued on
    May 9, 2014, by City to Patrick, as the permit holder, for demolition of the
    existing home and garage. M&C also submitted Patrick’s declaration, stating
    that on May 9, 2014, RRR “commenced deconstruction of the existing
    structure.” Importantly, Plaintiffs also submitted Elliott’s supplemental
    declaration that attached an excerpt from Patrick’s deposition in which
    Patrick stated: “I procured, managed, and paid for the deconstruction of the
    old house.” (Italics added.)
    Based on the above undisputed evidence, it is clear that during the
    period from March 20, 2014, through May 9, 2014, M&C solicited bids from
    subcontractors, received bids from subcontractors, hired a subcontractor, and
    used a subcontractor to perform the acts of demolition or deconstruction of
    the existing home and garage, and that all of those acts by M&C occurred
    before May 22, 2014, when M&C received a contractor’s license. Contrary to
    Defendants’ assertion, the fact that RRR was listed on the demolition permit
    28
    as the licensed contractor for performance of the demolition work does not
    prove that M&C was not acting as a contractor when it solicited bids from
    and hired RRR as the subcontractor to perform that demolition work. Section
    7026 includes in its definition of a “contractor” any person “who undertakes
    to . . . or does himself or herself or by or through others, construct, alter,
    repair, add to, subtract from, improve, move, wreck or demolish any
    building . . . or other structure . . . or to do any part thereof . . . .” (Italics
    added.) Therefore, when a person or entity such as M&C hires a
    subcontractor, such as RRR, to perform the act of demolition or
    deconstruction of (i.e., “subtract from”) any building, that person or entity is
    acting as a contractor and must be licensed as a contractor to perform that
    act. (§§ 7026, 7031(a).) In Vallejo Development Co. v. Beck Development Co.
    (1994) 
    24 Cal.App.4th 929
    , at page 941, the court stated: “[B]oth the person
    who provides construction services himself and one who does so ‘through
    others’ qualifies as a ‘contractor’ [under section 7026]. The California courts
    have also long held that those who enter into construction contracts must be
    licensed, even when they themselves do not do the actual work under the
    contract.” (Italics added.) Accordingly, there is no triable issue of material
    fact as to the question whether M&C performed contracting services by
    soliciting bids from subcontractors, and hiring and using a subcontractor, to
    perform demolition or deconstruction work on Plaintiffs’ property prior to
    May 22, 2014, when M&C obtained its contractor’s license.
    In addition, there is undisputed evidence that prior to May 22, 2014,
    M&C performed contracting acts by submitting a construction invoice to
    Plaintiffs and accepting payment on that invoice. In support of their motion,
    Plaintiffs submitted an email dated May 2, 2014, from Patrick to Plaintiffs,
    attaching an invoice for “an on-account payment to cover the first
    29
    subcontractors, deconstruction, shoring, and site set-up.” Plaintiffs
    submitted a copy of “Invoice No. 441F” from M&C to Plaintiffs, dated April
    30, 2014, and titled “Construction Invoice.” That construction invoice stated
    that the amount of $50,000 was “[n]ow [d]ue” and was for site set-up costs,
    including a temporary construction fence, a temporary toilet, a shoring
    subcontract, and a deconstruction subcontract. Plaintiffs also submitted a
    copy of their check dated May 8, 2014, in the amount of $50,000 to M&C,
    which showed that it was paid by Plaintiffs’ bank on May 15, 2014.
    In support of its opposition to Plaintiffs’ motion, M&C submitted
    Patrick’s declaration, which stated that the $50,000 construction invoice
    transmitted to Plaintiffs on May 2, 2014, was an “on-account payment [sic]
    for future construction site set up costs.” However, the construction invoice
    does not limit those site set-up costs to only those costs incurred on or after
    May 22, 2014, when M&C obtained its contractor’s license. Because
    Defendants do not dispute that demolition or deconstruction of the existing
    house and garage began on May 9, 2014, the only reasonable inference is that
    at least some portion of the demolition costs reflected on the April 30, 2014
    construction invoice was incurred by M&C before May 22, 2014.12 The
    evidence is therefore undisputed that on May 2, 2014, M&C sent an invoice to
    Plaintiffs for construction costs and Plaintiffs’ $50,000 check in payment of
    that invoice cleared Plaintiffs’ bank account on May 15, 2014. By carrying
    out such administrative duties as “soliciting and accepting payment” prior to
    12    Similarly, it could be inferred that the initial set-up costs for a
    temporary construction fence and a temporary toilet were also incurred by
    M&C on or before May 9, 2014, when that demolition or deconstruction
    began, which was before May 22, 2014, when M&C obtained its contractor’s
    license.
    30
    May 22, 2014, M&C engaged in the business of a contractor within the
    meaning of section 7026 before it obtained a contractor’s license. (Cf.
    Judicial Council, supra, 239 Cal.App.4th at p. 905.) Accordingly, there is no
    triable issue of material fact as to the issue of whether M&C performed
    contracting services by submitting a construction invoice to Plaintiffs and
    accepting payment on that invoice prior to May 22, 2014, when it obtained its
    contractor’s license.
    Contrary to Defendants’ assertion, the fact that some of M&C’s services
    could alternatively be described as “design” services does not negate the fact
    that M&C performed acts requiring a contractor’s license prior to May 22,
    2014. In Banis Restaurant Design, Inc. v. Serrano (2005) 
    134 Cal.App.4th 1035
     (Banis), the court addressed a construction contract entered into by an
    unlicensed contractor, which included compensation for certain design
    services to be provided by the unlicensed contractor, such as “drawings for
    electrical and plumbing plans [and] drawing plans for a reflected ceiling.”
    (Id. at pp. 1040-1042, 1044.) The court concluded that those services
    constituted acts of a contractor under section 7026 and therefore, that section
    7031(a) barred the unlicensed contractor’s action for compensation. (Banis,
    at pp. 1042-1043; see also WSS Industrial Construction, Inc. v. Great West
    Contractors, Inc. (2008) 
    162 Cal.App.4th 581
    , 592 [applying Banis to
    unlicensed contractor’s preparation of shop drawings].)
    Based on the undisputed evidence that M&C performed acts requiring
    a contractor’s license prior to May 22, 2014, when it obtained its contractor’s
    license, the trial court correctly concluded that under section 7031(a) and
    section 7031(b) there were no triable issues of material fact regarding the
    second cause of action of Plaintiffs’ complaint and the second and fourth
    causes of action of Defendants’ amended cross-complaint, and that Plaintiffs
    31
    were therefore entitled to summary adjudication on those causes of action.
    (§ 437c(f)(1); Aguilar, 
    supra,
     25 Cal.4th at pp. 843, 855; Dunn, supra, 135
    Cal.App.4th at p. 1290.) None of the evidence cited by Defendants, including
    the conclusory declarations of their two experts that M&C’s acts did not
    constitute acts requiring a contractor’s license, persuades us to reach a
    contrary conclusion. In particular, to the extent that M&C provided
    Plaintiffs with cost estimates and an estimated construction timetable before
    proceeding with their construction project, the undisputed evidence discussed
    above shows that M&C’s acts prior to May 22, 2014 were not restricted solely
    to providing such purported cost and timetable estimate services.13
    II
    Nonsuit on Defendants’ Architectural Services Cross-Claims
    Defendants contend that the trial court erred by granting Plaintiffs’
    motion for a judgment of nonsuit on Defendants’ cross-claims for
    compensation for architectural services provided by M&C and Patrick and by
    instructing the jury that Patrick was not a licensed architect when he
    performed services for Plaintiffs that required an architect’s license. In
    particular, Defendants argue that Patrick’s services in designing an all-
    concrete accessory building were exempt from California’s architectural
    licensing requirements.
    13     Because we dispose of this issue based on our application of section
    7031(a) and section 7031(b) to the undisputed evidence of M&C’s contracting
    acts performed prior to May 22, 2014, as discussed above, we need not, and
    do not, address Plaintiffs’ alternative contention that those statutes also
    entitled them to summary adjudication because M&C’s contractor’s license
    was automatically suspended under section 7125.2 for failure to carry
    worker’s compensation insurance for its employees.
    32
    A
    The first and third causes of action of Defendants’ amended cross-
    complaint alleged cross-claims for breach of an oral design contract and
    quantum meruit for design services. At trial, Patrick testified that the house
    and garage for which he designed plans were timber-framed (i.e., wood-
    framed), but the two-story annex or accessory building that he designed was
    made of “poured-in-place concrete.” On conclusion of the evidentiary portion
    of the jury trial, Plaintiffs moved for a judgment of nonsuit on Defendants’
    first and third cross-claims. The court granted the motion, finding that the
    exemptions provided in section 5537 do not apply to exempt the services
    provided by Patrick to Plaintiffs in designing the concrete accessory building
    from California’s architectural licensing requirements. The court also
    instructed the jury:
    “The Court has found that in performing design services for
    Plaintiffs’ home, Patrick McInerney was performing
    architectural services for which a license was required and
    that Mr. McInerney did not have such a license.”
    After the jury returned its special verdict, the court, in a bifurcated trial,
    denied Plaintiffs’ first cause of action for restitution of architecture fees paid
    to Defendants.
    B
    An architect must be licensed by the State of California to perform
    architectural services in California. (§ 5500 et seq.; Hughes v. Board of
    Architectural Examiners (1998) 
    17 Cal.4th 763
    , 772-773.) An unlicensed
    person cannot recover consideration under a contract for, or the reasonable
    value of, any architectural services rendered. (§ 143, subd. (a); Force v. Hart
    (1930) 
    209 Cal. 600
    , 605.) Section 5537 provides an exception from licensing
    33
    requirements for architectural services performed relating to certain
    woodframe structures, stating:
    “(a) This chapter does not prohibit any person from
    preparing plans, drawings, or specifications for any of the
    following:
    “(1) Single-family dwellings of woodframe construction not
    more than two stories and basement in height.
    “(2) Multiple dwellings containing no more than four
    dwelling units of woodframe construction not more than
    two stories and basement in height. . . .
    “(3) Garages or other structures appurtenant to buildings
    described under subdivision (a), of woodframe construction
    not more than two stories and basement in height.
    “(4) Agricultural and ranch buildings of woodframe
    construction . . . .
    “(b) If any portion of any structure exempted by this section
    deviates from substantial compliance with conventional
    framing requirements for woodframe construction found in
    the most recent edition of Title 24 of the California Code of
    Regulations or tables of limitation for woodframe
    construction, as defined by the applicable building code
    duly adopted by the local jurisdiction or the state, the
    building official having jurisdiction shall require the
    preparation of plans, drawings, specifications, or
    calculations for that portion by, or under the responsible
    control of, a licensed architect or registered engineer. The
    documents for that portion shall bear the stamp and
    signature of the licensee who is responsible for their
    preparation. . . .” (Italics added.)
    C
    Defendants assert that the trial court erred by granting Plaintiffs’
    motion for a judgment of nonsuit on the first and third causes of action of
    34
    Defendants’ amended cross-complaint because the exception in section 5537
    applied to allow Patrick and M&C, each of which was unlicensed as an
    architect in California, to design the construction plans for Plaintiffs’
    property, including a wood-framed single family residence and a two-story
    all-concrete accessory building, which were then certified by a licensed
    structural engineer. In particular, Defendants argue that section 5537,
    subdivision (b) applies to their design of the all-concrete accessory building.
    As discussed above, in interpreting the meaning of a statute, we
    initially focus on the words of the statute because statutory language is
    generally the most reliable indicator of legislative intent. (Alatriste, supra,
    183 Cal.App.4th at p. 663.) The words of the statute should be given their
    ordinary and usual meaning and should be construed in their statutory
    context. (Ibid.; MW Erectors, 
    supra,
     36 Cal.4th at p. 426.) If the statutory
    language is unambiguous, we presume that the Legislature intended what it
    stated and the plain meaning of the statute governs. (MW Erectors, at
    p. 426.) On appeal, we independently review the legal question of the proper
    interpretation of a statute. (Alatriste, at p. 664.)
    Based on our independent review of the plain language of section 5537,
    we conclude that statute does not provide any exemption from California’s
    architectural services licensing requirements for the design of an all-concrete
    accessory building. Section 5537, subdivision (a) provides exemptions from
    California’s architectural services license requirements for the preparation of
    plans for four specified types of wood-frame structures. There are two types
    of wood-framed structures designed by Patrick for Plaintiffs that presumably
    are covered by section 5537, subdivision (a)’s exemptions: (1) the single
    family residence (§ 5537, subd. (a)(1) [“[s]ingle-family dwellings of woodframe
    construction”]); and (2) the wood-framed garage (§ 5537, subd. (a)(3)
    35
    [“[g]arages or other structures appurtenant to buildings described under
    subdivision (a), of woodframe construction”]). However, the plain language of
    section 5537, subdivision (a) does not set forth any exemption for an all-
    concrete building.
    Further, the plain language of section 5537, subdivision (b) does not
    apply in this case to provide any exemption from California’s architectural
    services licensing requirements for Patrick’s design of Plaintiffs’ all-concrete
    accessory building. Section 5537, subdivision (b) applies only to the four
    specified structures exempted under section 5537, subdivision (a).
    Importantly, section 5537, subdivision (b) begins with the prefatory phrase:
    “If any portion of any structure exempted by this section [i.e., section 5537,
    subdivision (a)] deviates from substantial compliance with conventional
    framing requirements for woodframe construction . . . .” (Italics added.) By
    its plain language, section 5537, subdivision (b) applies only if there is any
    portion of a structure of woodframe construction exempted in section 5537,
    subdivision (a) that does not substantially comply with requirements for
    woodframe construction. Accordingly, section 5537, subdivision (b)’s
    provisions apply only if the structure in question is made in part of
    woodframe construction and in part of non-woodframe construction (e.g.,
    concrete). Section 5537, subdivision (b) is thus plainly inapplicable to an all-
    concrete structure, such as the two-story all-concrete accessory building
    designed by Patrick in this case. Because Patrick and M&C were not
    licensed as architects in California and section 5537 did not apply to exempt
    their design of Plaintiffs’ all-concrete accessory building from licensing
    requirements, we conclude that the trial court correctly granted Plaintiffs’
    motion for a judgment of nonsuit on the first and third causes of action of
    36
    Defendants’ amended cross-complaint.14 Further, based on the reasoning
    above, we conclude that the court properly instructed the jury that Patrick
    performed architectural services for which a license was required and that he
    did not have such a license. Defendants do not cite any case or other
    authority persuading us to reach a contrary conclusion.15
    III
    Patrick’s Alter Ego Liability
    Defendants contend that the trial court erred by finding that Patrick is
    liable for the judgment amount as an alter ego of M&C. In particular,
    Defendants argue that there is insufficient evidence to support the court’s
    14    Although the parties have not raised the issue on appeal, we presume
    that under section 143, subdivision (a), an unlicensed architect, like an
    unlicensed contractor under section 7031(b), generally cannot obtain
    compensation for services performed if any part of a project requires a
    license. (Cf. Banis, supra, 134 Cal.App.4th at pp. 1046-1047 [because work
    performed by unlicensed contractor that required license was part of
    integrated whole, § 7031(a) precluded recovery by unlicensed contractor for
    both part of work that required license and part of work that did not require
    license]; WSS Industrial Construction, Inc., supra, 162 Cal.App.4th at
    pp. 591-592 [same].)
    15    Assuming, for purposes of argument, that the trial court erred by
    granting Plaintiffs’ nonsuit motion and by instructing the jury as described
    above, we nevertheless would conclude that Defendants have not carried
    their burden on appeal to affirmatively show that those errors were
    prejudicial under the standard of review set forth in People v. Watson (1956)
    
    46 Cal.2d 818
    , 836 (i.e., that it is reasonably probable Defendants would have
    obtained a more favorable result if the errors had not occurred). (Pool v. City
    of Oakland (1986) 
    42 Cal.3d 1051
    , 1069; Cassim v. Allstate Ins. Co. (2004) 
    33 Cal.4th 780
    , 800; Citizens for Open Government v. City of Lodi (2012) 
    205 Cal.App.4th 296
    , 308-310.)
    37
    finding that if the acts of M&C were treated as those of the corporation alone,
    an inequitable result would follow.
    A
    The alter ego doctrine is an equitable doctrine, which one court
    described as follows: “A corporate identity may be disregarded--the ‘corporate
    veil’ pierced--where an abuse of the corporate privilege justifies holding the
    equitable ownership of a corporation liable for the actions of the corporation.
    [Citation.] Under the alter ego doctrine, then, when the corporate form is
    used to perpetuate a fraud, circumvent a statute, or accomplish some other
    wrongful or inequitable purpose, the courts will ignore the corporate entity
    and deem the corporation’s acts to be those of the persons or organizations
    actually controlling the corporation, in most instances the equitable owners.
    [Citations.]” (Sonora Diamond Corp. v. Superior Court (2000) 
    83 Cal.App.4th 523
    , 538 (Sonora Diamond Corp.).)
    “In California, two conditions must be met before the alter ego doctrine
    will be invoked. First, there must be such a unity of interest and ownership
    between the corporation and its equitable owner that the separate
    personalities of the corporation and the shareholder do not in reality exist.
    Second, there must be an inequitable result if the acts in question are treated
    as those of the corporation alone. [Citations.]” (Sonora Diamond Corp.,
    supra, 83 Cal.App.4th at p. 538.) “Whether a party is liable under an alter-
    ego theory is normally a question of fact. [Citations.] ‘The conditions under
    which the corporate entity may be disregarded, or the corporation be
    regarded as the alter ego of the stockholders, necessarily vary according to
    the circumstances in each case inasmuch as the doctrine is essentially an
    equitable one and for that reason is particularly within the province of the
    38
    trial court.’ [Citation.]” (Zoran Corp. v. Chen (2010) 
    185 Cal.App.4th 799
    ,
    811 (Zoran).)
    “The first requirement for disregarding the corporate entity under the
    alter ego doctrine--whether there is sufficient unity of interest and ownership
    that the separate personalities of the individual and the corporation no
    longer exist--encompasses a series of factors. Among the many factors to be
    considered in applying the doctrine are one individual’s ownership of all stock
    in a corporation; use of the same office or business location; commingling of
    funds and other assets of the individual and the corporation; an individual
    holding out that he is personally liable for the debts of the corporation;
    identical directors and officers; failure to maintain minutes or adequate
    corporate records; disregard of corporate [or legal] formalities; absence of
    corporate assets and inadequate capitalization; and the use of the corporation
    as a mere shell, instrumentality or conduit for the business of an individual.
    [Citation.] This list of factors is not exhaustive, and these enumerated
    factors may be considered with others under the particular circumstances of
    each case. ‘ “No single factor is determinative, and instead a court must
    examine all the circumstances to determine whether to apply the doctrine.” ’
    [Citation.]” (Misik v. D’Arco (2011) 
    197 Cal.App.4th 1065
    , 1073 (Misik).)
    “The second requirement for application of the alter ego doctrine is a
    finding that the facts are such that adherence to the fiction of the separate
    existence of the corporation would sanction a fraud or promote injustice.
    [Citation.] The test for this requirement is that if the acts are treated as
    those of the corporation alone, it will produce an unjust or inequitable result.
    [Citation.]” (Misik, supra, 197 Cal.App.4th at p. 1073, italics added.)
    “Application of the alter ego doctrine does not depend upon pleading or proof
    of fraud.” (Engineering Service Corp. v. Longridge Inv. Co. (1957) 153
    
    39 Cal.App.2d 404
    , 415 (Engineering Service Corp.).) “It is enough if the
    recognition of the two entities as separate would result in an injustice.”
    (Gordon v. Aztec Brewing Co. (1949) 
    33 Cal.2d 514
    , 523 (Gordon); see also
    Automotriz del Golfo de California S.A. de C.V. v. Resnick (1957) 
    47 Cal.2d 792
    , 796 (Automotriz).)
    On appeal, we apply the substantial evidence standard in reviewing a
    trial court’s finding that the alter ego doctrine applies. (Wolf Metals Inc. v.
    Rand Pacific Sales, Inc. (2016) 
    4 Cal.App.5th 698
    , 703 (Wolf Metals Inc.); Las
    Palmas Associates v. Las Palmas Center Associates (1991) 
    235 Cal.App.3d 1220
    , 1248; Alexander v. Abbey of the Chimes (1980) 
    104 Cal.App.3d 39
    , 46-
    47.) In applying the substantial evidence standard of review, we review the
    whole record in the light most favorable to the judgment to determine
    whether it discloses substantial evidence—that is, evidence that is
    reasonable, credible, and of solid value—to support the finding of fact.
    (People v. Rodriguez (1999) 
    20 Cal.4th 1
    , 11.) We do not reweigh the
    evidence, resolve conflicts in the evidence, or reevaluate the credibility of
    witnesses. (People v. Cochran (2002) 
    103 Cal.App.4th 8
    , 13.) The substantial
    evidence standard of review involves two steps. “First, one must resolve all
    explicit conflicts in the evidence in favor of the respondent and presume in
    favor of the judgment all reasonable inferences. [Citation.] Second, one must
    determine whether the evidence thus marshaled is substantial. While it is
    commonly stated that our ‘power’ begins and ends with a determination that
    there is substantial evidence [citation], this does not mean we must blindly
    seize any evidence in support of the respondent in order to affirm the
    judgment. . . . [Citation.] ‘[I]f the word “substantial” [is to mean] anything at
    all, it clearly implies that such evidence must be of ponderable legal
    significance. Obviously the word cannot be deemed synonymous with “any”
    40
    evidence. It must be reasonable . . . , credible, and of solid value . . . .’
    [Citation.] The ultimate determination is whether a reasonable trier of fact
    could have found for the respondent based on the whole record.” (Kuhn v.
    Department of General Services (1994) 
    22 Cal.App.4th 1627
    , 1632-1633, fns.
    omitted.)
    B
    Before trial, Plaintiffs filed a trial brief, arguing that all Defendants
    were alter egos of each other and should therefore be found liable on the
    causes of action alleged against them. The parties agreed that the issue of
    alter ego liability would be tried by the court at a bifurcated hearing after the
    jury trial. After the jury returned its special verdict against M&C, the court
    heard Plaintiffs’ request to add Patrick, M&A, and McInerney Architects as
    judgment debtors, as alter egos of M&C. The court granted the request as to
    Patrick and denied it as to M&A and McInerney Architects. The court stated:
    “The Court finds [Patrick] is in fact an alter ego of [M&C].
    The Court notes it is not making that finding just because,
    as [Patrick] testified, he was the sole officer, director,
    shareholder and employee of [M&C]. [Patrick] also notes
    that [M&C] and [Patrick] shared a home office computer
    and CPA.
    “It notes that moneys [sic] appear to have been diverted
    from [M&C] for [Patrick’s] individual use. Moneys [sic]
    were not kept separate. Corporate formalities were not
    honored. There was no evidence of adequate capitalization.
    “Furthermore -- and this was not argued by the parties, but
    the Court considered the fact that [Patrick] testified that he
    kept separate calendars and diaries for the separate
    entities and work. No such diaries and calendars were ever
    produced. As a result, I am construing that evidence
    against the defendant.
    41
    “On the question of bad faith, the Court notes that all of the
    acts of [M&C], in particular, the act of acting as an
    architect, were taken individually by [Patrick]. The court
    finds that this is sufficient in this case to support alter ego.
    It rises to the level that it would be inequitable to allow the
    corporate formalities to prevent individual liability against
    [Patrick]. The Court finds further the responsible
    corporate officer doctrine supports this result.”
    The court imposed alter ego liability on Patrick on all causes of action and
    included him as a judgment debtor in the initial judgment and the second
    amended judgment.
    C
    Defendants contend that there is insufficient evidence to support the
    trial court’s finding that Patrick was an alter ego of M&C and that he should
    therefore be held liable for the full amount of the judgment awarded against
    M&C. Based on our review of the record, we conclude that there is
    substantial evidence to support the court’s finding that both requirements for
    alter ego liability were satisfied.
    On the first requirement, we conclude that there is substantial
    evidence that there was “such a unity of interest and ownership between the
    corporation and its equitable owner that the separate personalities of the
    corporation and the shareholder do not in reality exist.” (Sonora Diamond
    Corp., supra, 83 Cal.App.4th at p. 538.) As Patrick testified, and other
    evidence admitted at trial showed, Patrick was the sole shareholder, sole
    director, sole officer, and sole employee of M&C. M&C’s business office was
    located at Patrick’s home. Patrick and M&C shared the same accountant.
    Importantly, the evidence showed that Patrick commingled M&C’s funds
    with his personal funds and used M&C’s funds to pay his personal expenses.
    42
    Plaintiffs presented the testimony of Jennifer Ziegler, a forensic accountant,
    who stated that about $500,000 in credit card charges were paid from M&C’s
    bank subaccount for Plaintiffs’ project for expenses that were not for
    Plaintiffs’ project. Also, Patrick testified that he used M&C’s funds (i.e.,
    M&C’s bank subaccount for the Plaintiffs’ project) to pay his personal
    expenses (e.g., personal vacation expenses, car insurance payments, taxes,
    retirement deposits, housekeeper payments, home mortgage payments,
    etc.).16 Based on the above evidence showing that Patrick paid his personal
    expenses with M&C’s funds and other evidence showing that he
    interchangeably used his own name (e.g., “Patrick McInerney, architect”) on
    emails and other documents in conducting M&C’s construction business, the
    court could reasonably infer that Patrick used M&C as a mere conduit for his
    construction business.
    Further, the trial court could reasonably infer from the evidence that
    M&C did not maintain adequate capitalization for the nature and scope of its
    business and potential liabilities. In imposing alter ego liability on Patrick,
    the court found that there was no evidence of adequate capitalization for
    M&C. Although Patrick testified that he left certain funds (i.e., up to
    $113,000) that he had purportedly “earned” in M&C’s subaccount to
    capitalize that account in order to pay the potential costs of Plaintiffs’ project,
    the court could nevertheless reasonably infer that such fluctuating bank
    account funds did not prove that M&C had adequate capitalization for its
    construction business. Defendants do not cite to any M&C balance sheets or
    16    Although Patrick claimed that he maintained a diary that apparently
    tracked M&C’s funds that were used for his personal expenses, he did not
    present any such diary as evidence at trial to support that claim.
    43
    other evidence in the record showing the amounts of M&C’s capitalization, if
    any, from 2014 through December 2017 (when the court made its alter ego
    finding). The court could therefore reasonably infer that M&C had little, if
    any, capitalization by December 2017.17 Notably, as discussed in more detail
    below, Patrick suspended M&C’s business operations and, in effect,
    abandoned M&C in late 2017, when he began using M&A instead of M&C for
    his construction business. Even assuming that M&C had capitalization of up
    to $113,000 from 2014 through December 2017, the court could reasonably
    infer that this amount of capitalization was inadequate when considering the
    nature and scope of M&C’s construction business, its potential liabilities, and
    the $2,732,627.87 amount awarded against M&C on Plaintiffs’ section
    7031(b) cause of action in this case. (Cf. Automotriz, supra, 47 Cal.2d at
    p. 798 [court “could have inferred that $5,000 was an insufficient capital
    investment in view of the volume of business conducted” by the corporation];
    Claremont Press Pub. Co. v. Barksdale (1960) 
    187 Cal.App.2d 813
    , 815, 817
    [$500 in capitalization was irresponsible degree of undercapitalization when
    corporation owed $7,000 to creditor and collapsed the following year].)
    The factors that the trial court could consider in making its alter ego
    finding included: Patrick’s ownership of all stock in M&C; his capacity as
    M&C’s sole director, officer, and employee; his use of the same office as
    M&C’s office; the commingling of his funds with M&C’s funds (e.g., by paying
    his personal expenses with M&C’s funds and charging M&C’s expenditures
    17    To the extent that Defendants argue that Patrick capitalized M&C by
    carrying commercial general liability insurance for M&C, they do not cite,
    and we are unaware of, any authority holding that liability insurance can
    constitute part of a corporation’s capitalization or otherwise substitute for the
    lack of adequate capitalization.
    44
    on his personal credit cards); the absence of adequate capitalization of M&C;
    disregard of corporate formalities; and Patrick’s use of M&C as a mere
    conduit for his construction business. (Misik, supra, 197 Cal.App.4th at
    p. 1073.) Based on our review of the record, there is substantial evidence to
    support the court’s finding that the above factors showed that there was such
    a unity of interest and ownership between M&C and Patrick that the
    separate personalities of M&C and Patrick did not in reality exist. (Sonora
    Diamond Corp., supra, 83 Cal.App.4th at p. 538.) There is thus substantial
    evidence from which the trial court could have found that the first
    requirement for Patrick’s alter ego liability was satisfied. To the extent that
    Defendants cite evidence and inferences therefrom that would have
    supported a contrary finding by the court, they misconstrue and/or misapply
    the substantial evidence standard of review.
    On the second requirement, we conclude that there is substantial
    evidence to support the trial court’s finding that there would be an
    inequitable result if M&C’s acts in this case were treated as those of the
    corporation alone. (Sonora Diamond Corp., supra, 83 Cal.App.4th at p. 538.)
    As discussed above, under that second requirement, alter ego liability may be
    imposed if treating the acts as those of the corporation alone would produce
    an unjust or inequitable result. (Misik, supra, 197 Cal.App.4th at p. 1073.)
    “Application of the alter ego doctrine does not depend upon pleading or proof
    of fraud.” (Engineering Service Corp., supra, 153 Cal.App.2d at p. 415.) “It is
    enough if the recognition of the two entities as separate would result in an
    injustice.” (Gordon, supra, 33 Cal.2d at p. 523.) The California Supreme
    Court has recognized that a corporation’s inadequate capitalization may be
    sufficient to find that there would be an inequitable result if the corporate
    veil were not pierced and alter ego liability imposed, stating:
    45
    “ ‘If a corporation is organized and carries on business
    without substantial capital in such a way that the
    corporation is likely to have no sufficient assets available to
    meet its debts, it is inequitable that that shareholders
    should set up such a flimsy organization to escape personal
    liability. The attempt to do corporate business without
    providing any sufficient basis of financial responsibility to
    creditors is an abuse of the separate entity and will be
    ineffectual to exempt the shareholders from corporate
    debts. It is coming to be recognized as the policy of the law
    that shareholders should in good faith put at the risk of the
    business unincumbered [sic] capital reasonably adequate
    for its prospective liabilities. If the capital is illusory or
    trifling compared with the business to be done and the
    risks of loss, this is a ground for denying the separate
    entity privilege.’ ” (Automotriz, supra, 47 Cal.2d at p. 797,
    quoting from Ballantine on Corporations (rev. ed. 1946), at
    pp. 302-303, italics added.)
    The trial court found that there was no evidence that M&C was
    adequately capitalized for the nature and scope of its construction business
    and potential and actual liabilities, and, as discussed above, the record
    includes evidence showing that Patrick disregarded corporate formalities and
    that he used M&C, his wholly owned corporation, as a mere conduit to carry
    out his personal construction business. Based our review of the record, we
    conclude that there is substantial evidence to support the court’s finding that
    it would be inequitable to treat M&C’s acts in this case as those of M&C
    alone and thereby limit Plaintiffs’ ability to enforce their judgment to only
    the amount of assets that the inoperative corporation held at the time of the
    judgment. There is thus substantial evidence to support the trial court’s
    finding that the second requirement for Patrick’s alter ego liability was
    satisfied (Sonora Diamond Corp., supra, 83 Cal.App.4th at p. 538), and that
    Patrick, as the alter ego of M&C, should be held jointly liable with M&C for
    46
    the amount of the judgment in Plaintiffs’ favor.18 To the extent that
    Defendants cite evidence and inferences therefrom that would have
    supported a contrary finding by the court, they again misconstrue and/or
    misapply the substantial evidence standard of review.
    Contrary to Defendants’ assertion, there is nothing in the jury’s special
    verdict that precluded the trial court from finding, in a bifurcated bench trial,
    that Patrick was an alter ego of M&C and imposing on him joint liability for
    the amount of the judgment. As the trial court noted, the jury did not find
    Patrick liable on Plaintiffs’ causes of action for breach of contract, negligence,
    breach of fiduciary duty, and fraud. However, in making those findings, the
    jury did not address the question of whether Patrick should be held liable
    together with M&C as its alter ego. In particular, the jury was not asked to
    make findings on the two requirements for alter ego liability: (1) whether
    there was such a unity of interest and ownership between M&C and Patrick
    that the separate personalities of the corporation and the shareholder do not
    in reality exist; and (2) whether there would be an inequitable result if the
    acts in question were treated as those of M&C alone. (Sonora Diamond
    Corp., supra, 83 Cal.App.4th at p. 538.) Further, because alter ego liability is
    an equitable issue, that determination must be made by the trial court and
    not a jury. In this case, that determination was, in fact, made by the trial
    court per the parties’ stipulation to a bifurcated trial on that issue. (Dow
    18     Because we conclude that there is substantial evidence to support the
    trial court’s alter ego finding, we need not, and do not, address Plaintiffs’
    alternative argument that the trial court also properly found Patrick jointly
    liable with M&C under the responsible officer doctrine. (See, e.g., People v.
    Roscoe (2008) 
    169 Cal.App.4th 829
    , 832, 839 [discussing elements for
    imposing liability on corporate officer under responsible officer doctrine].)
    47
    Jones Co. v. Avenel (1984) 
    151 Cal.App.3d 144
    , 147-148; Stark v. Coker (1942)
    
    20 Cal.2d 839
    , 846 (Stark); Zoran, supra, 185 Cal.App.4th at p. 811
    [determination of alter ego liability is equitable issue within province of trial
    court].) Accordingly, Defendants have not carried their burden on appeal to
    show that the jury’s special verdict precluded the trial court from finding that
    Patrick was an alter ego of M&C and imposing on Patrick liability for the
    judgment amount based thereon.
    Also, contrary to Defendants’ assertion, neither fraud nor bad faith is
    required for a finding of alter ego liability. “Application of the alter ego
    doctrine does not depend upon pleading or proof of fraud.” (Engineering
    Service Corp., supra, 153 Cal.App.2d at p. 415.) “It is enough if the
    recognition of the two entities as separate would result in an injustice.”
    (Gordon, supra, 33 Cal.2d at p. 523.) It is correct, as Defendants note, that in
    1932, the California Supreme Court stated that to impose alter ego liability,
    it must be shown, among other things, that “the observance of the fiction of
    [the] separate existence would, under the circumstances, sanction a fraud or
    promote injustice. Bad faith in one form or another must be shown before the
    court may disregard the fiction of separate corporate existence.” (Hollywood
    Cleaning & Pressing Co. v. Hollywood Laundry Service (1932) 
    217 Cal. 124
    ,
    129 (Hollywood).) However, in the almost 90-year period since that case, the
    California Supreme Court has not repeated or reaffirmed its statement in
    Hollywood that bad faith is required for alter ego liability and has instead
    consistently adopted and applied the less stringent requirement of an
    inequitable result, as discussed above. (See, e.g., Mesler v. Bragg Mgt. Co.
    (1985) 
    39 Cal.3d 290
    , 300-301; Automotriz, supra, 47 Cal.2d at p. 796 [second
    requirement described as “if the acts are treated as those of the corporation
    alone, an inequitable result will follow”]; Gordon, at p. 523 [“It is not
    48
    necessary that the plaintiff prove actual fraud. It is enough if the recognition
    of the two entities as separate would result in an injustice.”]; Stark, supra, 20
    Cal.2d at p. 846 [same]; Watson v. Commonwealth Ins. Co. (1936) 
    8 Cal.2d 61
    ,
    68 [second requirement described as “adherence to the fiction of separate
    existence would, under the circumstances, promote fraud or injustice . . . .
    [I]t is sufficient that it appear that recognition of the acts as those of a
    corporation only will produce inequitable results.”].) It therefore appears
    that just four years after Hollywood was decided (i.e., in 1936 in Watson v.
    Commonwealth Ins. Co., at p. 68) the California Supreme Court abandoned
    any requirement of a finding of fraud or bad faith in order to impose alter ego
    liability and has consistently held since that time that the second
    requirement is satisfied when a court finds that if the acts are treated as
    those of the corporation alone, an inequitable result will follow. As we
    concluded above, there is substantial evidence to support the trial court’s
    finding in this case that the second requirement for Patrick’s alter ego
    liability was satisfied.19
    19    Further, if the second requirement for alter ego liability were
    interpreted more broadly than current case law provides so as to include
    consideration of the equities of section 7031(b) reimbursement liability, it is
    possible that the trial court could have reached a contrary finding and/or we
    might have concluded that this requirement was not satisfied. As
    Defendants suggest, there appears on its face to be an inequity in allowing
    Plaintiffs to retain the fruits of M&C’s labor and materials (i.e., the
    apparently defect free La Jolla residence valued at $2.7 million) while also
    awarding Plaintiffs a judgment for reimbursement of all amounts they paid
    to M&C for construction of that residence. The result in this case is
    unquestionably harsh. However, given the statutory language of, and
    current case law pertaining to, section 7031(b) as discussed above, we are
    constrained from considering those underlying equities in determining
    whether there is substantial evidence to support the trial court’s finding that
    the second requirement for alter ego liability is satisfied. To absolve Patrick
    49
    Further, contrary to Defendants’ assertion, the trial court did not err by
    denying their request for a written statement of decision on its finding of
    alter ego liability. As Defendants concede, the trial court conducted its
    bifurcated trial on the alter ego issue on December 20, 2017, and in an oral
    ruling the court explained its reasons for finding that Patrick was liable for
    the judgment as M&C’s alter ego. Because that trial took less than one day,
    Defendants were not entitled to a written statement of decision under Code of
    Civil Procedure section 632.20 Contrary to Defendants’ assertion, the fact
    that the trial court may have relied, in part, on evidence that was admitted
    during the jury trial on the other issues in ruling on the alter ego issue, did
    not convert the alter ego bifurcated trial into a three-week trial, which would
    have required, upon request, a written statement of decision. Defendants do
    not cite, nor are we aware of, any case so holding. Because Defendants have
    not carried their burden on appeal to affirmatively show that they were
    of alter ego liability based on a perceived inequitable result would be contrary
    to, and in fact would negate, the remedy that the Legislature intended by
    enacting section 7031(b).
    20     Code of Civil Procedure section 632 provides: “In superior courts, upon
    the trial of a question of fact by the court, written findings of fact and
    conclusions of law shall not be required. The court shall issue a statement of
    decision explaining the factual and legal basis for its decision as to each of
    the principal controverted issues at trial upon the request of any party
    appearing at the trial. The request must be made within 10 days after the
    court announces a tentative decision unless the trial is concluded within one
    calendar day or in less than eight hours over more than one day in which
    event the request must be made prior to the submission of the matter for
    decision. . . . [¶] The statement of decision shall be in writing, unless the
    parties appearing at trial agree otherwise; however, when the trial is
    concluded within one calendar day or in less than 8 hours over more than one
    day, the statement of decision may be made orally on the record in the
    presence of the parties.” (Italics added.)
    50
    entitled to a statement of decision, we conclude that the court did not err by
    denying Defendants’ request for a written statement of decision on its alter
    ego finding. In any event, Defendants have not carried their burden on
    appeal to affirmatively show that the court’s purported error was prejudicial
    to them (i.e., that there was a miscarriage of justice or that they would have
    obtained a more favorable result if the court had issued a written statement
    of decision). (F.P. v. Monier (2017) 
    3 Cal.5th 1099
    , 1108.)
    IV
    Addition of M&A as a Judgment Debtor
    Defendants contend that the trial court erred by granting Plaintiffs’
    request to add M&A as a judgment debtor as a successor corporation to M&C
    and amending the judgment accordingly.
    A
    After the initial judgment was entered in January 2018, Plaintiffs filed
    a motion to add M&A as a judgment debtor, arguing that M&A was a
    successor corporation to M&C. Plaintiffs argued that after the trial in this
    case, Patrick allowed M&C to be suspended as a California corporation,
    ceased conducting his construction business through M&C, and instead
    began using M&A to conduct his construction business. They argued that, as
    M&C’s successor corporation, M&A should be added as a judgment debtor
    together with M&C and Patrick. Plaintiffs submitted evidence showing that
    at about the time of the January 2018 judgment, Patrick switched his
    business from M&C to M&A and began operating his construction business
    through M&A. Defendants opposed the motion, arguing that it would be
    inappropriate in the circumstances of this case to find that M&A was an alter
    51
    ego of M&C. However, Defendants did not dispute Plaintiffs’ assertion that
    M&A was a successor corporation to M&C.
    At the hearing on Plaintiffs’ motion, citing McClellan v. Northridge
    Park Townhome Owners Assn., Inc. (2001) 
    89 Cal.App.4th 746
     (McClellan),
    the trial court granted the motion to add M&A as a judgment debtor on the
    ground that M&A was a successor corporation to M&C. In its minute order,
    the court stated:
    “Corporations ‘cannot escape liability by a mere change of
    name or a shift of assets when and where it is shown that
    the new corporation is, in reality, but a continuation of the
    old,’ especially when the rights of creditors are involved.
    [Citations.] As noted, the Court previously found that
    M&C was [Patrick’s] alter ego. M&C has not done any
    work since it completed its last project in 2017. [Citation.]
    M&C then became ‘dormant’ and [Patrick] began working
    for M&A. [Citation.] [Patrick] is the sole owner and
    employee of M&A. [Citation.] M&A was not doing any
    business as of August 2017. [Citation.] At his debtor’s
    exam, [Patrick] said he switched companies because M&A
    primarily deals with design. [Citation.] However, during
    his deposition [Patrick] said he created M&A to service his
    foreign clients and M&C for local clients. [Citation.]
    [Patrick] also conceded that M&C also did design work.
    [Citation.] M&A’s 2017 Statement of Information says the
    company is in the ‘construction’ business. [Citation.]
    [Patrick] said he receives a salary from M&A but was
    unable to recall how the salary is determined. [Citation.]
    In 2018, M&A paid for some of the McInerney family’s
    personal expenses such as a personal trainer and
    housekeeper. [Citation.] [Patrick] similarly used M&C to
    pay personal expenses. Based on the foregoing, [P]laintiffs
    have proven that M&A is merely a continuation of M&C. It
    appears that [Patrick] has sought to frustrate [P]laintiffs’
    ability to collect on the judgment by essentially changing
    the name of his business while carrying on the same
    business as before. Under these circumstances, it is
    52
    appropriate to hold M&A liable as a judgment debtor.
    Accordingly, the motion to add M&A as a judgment debtor
    is granted.”
    On January 25, 2019, the trial court entered a second amended
    judgment adding M&A as a judgment debtor together with M&C and Patrick
    for a total judgment amount of $2,940,325.50, which included an award of
    Plaintiffs’ attorney fees and costs.
    B
    Under Code of Civil Procedure section 187, the “trial court has
    jurisdiction to modify a judgment to add additional judgment debtors.”
    (McClellan, supra, 89 Cal.App.4th at p. 752.) As an alternative to alter ego
    liability, modification of a judgment to add a judgment debtor may also be
    proper under the successor corporation theory. (Wolf Metals Inc., supra, 4
    Cal.App.5th at p. 704.) “According to that theory, when a corporation sells or
    transfers all of its assets to another corporation constituting its ‘ “mere
    continuation,” ’ the latter is also liable for the former’s debts and liabilities.
    [Citations.]” (Id. at pp. 704-705.) “ ‘California decisions holding that a
    corporation acquiring the assets of another corporation is the latter’s mere
    continuation and therefore liable for its debts have imposed such liability
    only upon a showing of one or both of the following factual elements: (1) no
    adequate consideration was given for the predecessor corporation’s assets and
    made available for meeting the claims of its unsecured creditors; (2) one or
    more persons were officers, directors, or stockholders of both corporations.
    [Citations.]’ ” (McClellan, at p. 754, fn. 4, quoting Ray v. Alad Corp. (1977) 
    19 Cal.3d 22
    , 29.) Alternatively stated, “ ‘corporations cannot escape liability by
    a mere change of name or a shift of assets when and where it is shown that
    the new corporation is, in reality, but a continuation of the old. Especially is
    53
    this well settled when actual fraud or the rights of creditors are involved,
    under which circumstances the courts uniformly hold the new corporation
    liable for the debts of the former corporation.’ ” (Cleveland v. Johnson (2012)
    
    209 Cal.App.4th 1315
    , 1327 (Cleveland), quoting Blank v. Olcovich Shoe
    Corp. (1937) 
    20 Cal.App.2d 456
    , 461 (Blank).)
    The application of the successor corporation theory is an equitable issue
    to be decided based on the unique facts of a case. (Cleveland, supra, 209
    Cal.App.4th at p. 1330.) Accordingly, on appeal, we apply the substantial
    evidence standard in reviewing a trial court’s determination to apply the
    successor corporation theory to add a successor corporation as a judgment
    debtor. (Wolf Metals Inc., supra, 4 Cal.App.5th at p. 703; McClellan, supra,
    89 Cal.App.4th at pp. 751-752.)
    C
    Based on our review of the record, we conclude that there is substantial
    evidence to support the trial court’s finding that M&A is a successor
    corporation to M&C and therefore, should be added as a judgment debtor.
    The evidence showed that Patrick was the sole shareholder, sole director, sole
    officer, and sole employee of both M&C and M&A. Patrick incorporated M&C
    in 2011 and M&A in July 2014. M&C’s statement of information for 2016
    stated that it was in the business of construction, while its statement of
    information for 2017 stated that it was in the business of architecture.
    M&A’s statements of information for 2016 and 2017 stated that it was in the
    business of construction. Patrick testified that he did not know why he had
    two corporations that engaged in construction in California. Patrick testified
    that M&C and M&A share the same office, the same computers, and the
    same accountant. He testified that he maintained a diary in which he
    54
    recorded his time worked for each of M&C and M&A, but was unable to find
    that diary.
    At his judgment debtor’s examination in July 2018, Patrick testified
    that he did not recall receiving any compensation from M&A prior to January
    2, 2018. After Patrick ceased working for M&C in late 2017, M&C became
    dormant. He could not recall working on any projects for M&A prior to 2018.
    Patrick testified that M&C was initially a design company and became a
    design and construction company because of Plaintiffs’ project, while M&A
    focused only on design. He testified that he received a salary from M&A, but
    could not recall how that salary was determined. Patrick’s attorney
    instructed him not to answer questions regarding M&A, such as balances in
    its bank accounts, its gross revenues, and the projects it worked on.
    The above evidence supports findings by the trial court that one person
    (i.e., Patrick) was the shareholder, director, and officer of both M&C and
    M&A, thereby satisfying one of the two factors, and thus the minimum
    required, for application of the successor corporation doctrine to add M&A as
    a judgment debtor. (McClellan, supra, 89 Cal.App.4th at p. 754, fn. 4; Ray v.
    Alad Corp., supra, 19 Cal.3d at p. 29.) In addition, based on the evidence
    showing that Patrick ceased working for and, in effect, abandoned M&C and
    then immediately began to conduct his business through M&A, the court
    could reasonably infer that Patrick transferred his construction and design
    business from M&C to M&A in late 2017 or early 2018 and that there was no
    evidence showing that M&A paid M&C any consideration for the transfer of
    M&C’s business and other assets (e.g., business goodwill). Based on this
    evidence, the court could reasonably infer that no adequate consideration was
    given by M&A for M&C’s assets, which could have been made available for
    meeting the claims of unsecured creditors (e.g., Plaintiffs), thereby satisfying
    55
    the other (and non-essential) factor for application of the successor
    corporation doctrine. (McClellan, at p. 754, fn. 4; Ray v. Alad Corp., at p. 29.)
    Even in the absence of an actual transfer of assets from M&C to M&A, the
    court could reasonably infer that Patrick switched his design and
    construction business from M&C to M&A to hinder Plaintiffs’ recovery of the
    judgment against M&C (cf. McClellan, at pp. 750, 755-756), and thus, that
    “in reality” M&A was a mere continuation of the business of M&C.
    (Cleveland, supra, 209 Cal.App.4th at p. 1327; Blank, supra, 20 Cal.App.2d at
    p. 461.) We therefore conclude that there is substantial evidence to support
    the court’s finding that the successor corporation doctrine applied and that
    M&A should be added as a judgment debtor. (Wolf Metals Inc., supra, 4
    Cal.App.5th at p. 703; McClellan, at pp. 751-752.) To the extent that
    Defendants cite evidence or inferences therefrom that would have supported
    a contrary finding by the trial court, they again misconstrue and/or misapply
    the substantial evidence standard of review. (Wolf Metals Inc., at p. 703;
    McClellan, at pp. 751-752.) Accordingly, Defendants have not carried their
    burden on appeal to affirmatively show that the trial court erred by granting
    Plaintiffs’ motion to add M&A as a judgment debtor and entering the second
    amended judgment adding M&A as a judgment debtor.21
    21     In particular, we are not persuaded by Defendants’ conclusory
    assertion that application of the successor corporation doctrine in this case
    would violate the constitutional prohibition against involuntary servitude.
    (U.S. Const., 13th Amend., § 1 [“Neither slavery nor involuntary
    servitude . . . shall exist within the United States . . . .”].) Defendants do not
    cite, and we are not aware of, any case holding that the 13th Amendment
    applies to preclude the application of the successor corporation doctrine to
    cases involving two corporations with the same sole shareholder and sole
    employee.
    56
    V
    Award of Attorney Fees under Section 1029.8
    Defendants contend that the trial court erred by awarding Plaintiffs
    attorney fees under section 1029.8 in the amount of $155,008.50 for
    prevailing on Plaintiffs’ section 7031(b) cause of action.
    A
    Originally enacted in 1985, section 1029.8 currently provides:
    “(a) Any unlicensed person who causes injury or damage to
    another person as a result of providing goods or performing
    services for which a license is required under . . . Division 3
    (commencing with Section 5000) . . . of the Business and
    Professions Code . . . shall be liable to the injured person
    for treble the amount of damages assessed in a civil action
    in any court having proper jurisdiction. The court may, in
    its discretion, award all costs and attorney’s fees to the
    injured person if that person prevails in the action.
    [¶] . . . [¶]
    “(d) For the purposes of this section, the term ‘unlicensed
    person’ shall not apply to any of the following: [¶] (1) Any
    person, partnership, corporation, or other entity providing
    goods or services under the good faith belief that they are
    properly licensed and acting within the proper scope of that
    licensure. . . .” (Stats. 1985, ch. 895, § 1; amended by Stats.
    2004, ch. 575, § 1.)
    As discussed above, in interpreting a statute, “our fundamental
    objective is to ascertain the legislative intent.” (Alatriste, supra, 183
    Cal.App.4th at p. 663.) We initially focus on the words of the statute because
    statutory language is generally the most reliable indicator of legislative
    intent. (Ibid.) The words of the statute should be given their ordinary and
    usual meaning and should be construed in their statutory context. (Ibid.;
    57
    MW Erectors, supra, 36 Cal.4th at p. 426.) If the statutory language is
    unambiguous, we presume the Legislature intended what it stated and the
    plain meaning of the statute governs. (MW Erectors, at p. 426.) On appeal,
    we independently review the legal question of the proper interpretation of a
    statute. (Alatriste, at p. 664; Kirby v. Immoos Fire Protection, Inc. (2012) 
    53 Cal.4th 1244
    , 1250 [independent, or de novo, review of questions of statutory
    construction].) Accordingly, we review, de novo, the trial court’s
    interpretation of section 1029.8 in this case. (Rony v. Costa (2012) 
    210 Cal.App.4th 746
    , 756 [de novo review of interpretation of § 1029.8].)
    B
    As noted above, Plaintiffs elected the remedy of reimbursement under
    their section 7031(b) cause of action in lieu of the damages awarded by the
    jury for their cause of action for breach of the construction contract. After the
    trial court entered its initial judgment in favor of Plaintiffs, Plaintiffs filed a
    motion for an award of attorney fees requesting that the court award fees
    pursuant to section 1029.8. Defendants opposed the motion, arguing that
    section 1029.8 was inapplicable to Plaintiffs’ award of reimbursement
    pursuant to section 7031(b) because Plaintiffs were not an “injured” party
    under that statute. In reply, Plaintiffs argued that section 1029.8 could
    apply to their section 7031(b) reimbursement award because they were
    “injured” by M&C’s actions.
    On August 3, 2018, the trial court issued an order granting Plaintiffs’
    motion for attorney fees under section 1029.8, stating:
    “Defendants argue that [P]laintiffs do not qualify as an
    ‘injured party’ because [P]laintiffs elected the remedy of
    disgorgement under . . . section 7031 which does not
    require a showing of injury or damage. Defendants’
    58
    argument fails to acknowledge that section 1029.8
    specifically incorporates Division 3 of the Business and
    Professions Code, which includes . . . section 7031. Thus,
    section 1029.8 contemplates that fees may be awarded in
    cases where an unlicensed contractor is required to forfeit
    their compensation. Moreover, section 1029.8 does not
    ‘affect or limit any other remedy, including, but not limited
    to, a claim for exemplary damages.’ [Citation.] Thus, the
    fact that [P]laintiffs elected a statutory remedy does not
    preclude them from seeking fees.”
    Accordingly, the court awarded Plaintiffs attorney fees in the amount of
    $155,008.50 that they incurred in prevailing on their motion for summary
    adjudication of their section 7031(b) cause of action.
    C
    In challenging the attorney fee award, Defendants assert that the trial
    court erred in interpreting section 1029.8 in a manner that would allow an
    award of attorney fees to a party that prevails on a cause of action for section
    7031(b) reimbursement. Defendants argue that the plain language of section
    1029.8 requires that an unlicensed person “cause[] injury or damage” to
    another person (i.e., the “injured person”) as a result of providing goods or
    performing services for which a license is required and provides that the
    court may award attorney fees “to the injured person”. (§ 1029.8.) Because
    Plaintiffs elected the section 7031(b) remedy of reimbursement, which is not
    based on injury or damage, Defendants argue that Plaintiffs are not injured
    persons within the meaning of section 1029.8 and the court therefore erred by
    awarding Plaintiffs attorney fees.
    As Defendants note, a section 7031(b) reimbursement award is, in
    effect, a statutory penalty imposed on an unlicensed contractor based on
    public policy and not on the equities of a particular case or any injury
    59
    suffered by a customer of an unlicensed contractor. (MW Erectors, supra, 36
    Cal.4th at pp. 418, 423, 425; Hydrotech Systems, Ltd. v. Oasis Waterpark
    (1991) 
    52 Cal.3d 988
    , 995, 997 (Hydrotech).) The California Supreme Court
    stated that the CSLL “imposes strict and harsh penalties for a contractor’s
    failure to maintain proper licensure.” (MW Erectors, at p. 418, italics added.)
    Those penalties apply “regardless of the merits of” an action. (Ibid.) In
    enacting section 7031(a), the Legislature intended “to impose a stiff all-or-
    nothing penalty for unlicensed work.” (Id. at p. 426.) We infer that the
    Legislature had the same intent in enacting section 7031(b) in 2001. “By
    adding this [section 7031(b)] remedy, the Legislature sought to further
    section 7031(a)’s policy of deterring violations of licensing requirements by
    ‘allow[ing] persons who utilize unlicensed contractors to recover
    compensation paid to the contractor for performing unlicensed work.
    [Citation.]’ [Citation.]” (Alatriste, supra, 183 Cal.App.4th at p. 666.) “[T]he
    Legislature intended that courts interpret section[s] 7031(a) and [7031](b) in
    a consistent manner, resulting in the same remedy regardless of whether the
    unlicensed contractor is the plaintiff or defendant.” (Ibid.) Alternatively
    stated, “the Legislature enacted section 7031(b) to ensure the same penalties
    apply for an unlicensed contractor regardless whether the contractor was the
    plaintiff or the defendant.” (Id. at p. 667, italics added.) Accordingly, to
    establish a section 7031(b) reimbursement cause of action, a plaintiff need
    not prove that the unlicensed contractor/defendant caused the plaintiff an
    injury by reason of negligent or deficient services, defective materials, or
    other injurious acts, but need simply show that the unlicensed
    contractor/defendant was paid for services or materials for which a
    contractor’s license was required. (Miller v. Municipal Court of Los Angeles
    (1943) 
    22 Cal.2d 818
    , 837 [“The test generally underlying most of the cases
    60
    . . . is that a ‘penalty’ includes any law compelling a defendant to pay a
    plaintiff other than what is necessary to compensate him for a legal damage
    done him by the former.”].) Therefore, a section 7031(b) reimbursement
    cause of action can be successful even where, as in this case, the unlicensed
    contractor’s services and materials met prevailing construction standards
    and, as a result, the plaintiff did not suffer any actual injury or damage from
    those services and materials. (Cf. Siry Investment, L.P. v. Farkhondehpour
    (2020) 
    45 Cal.App.5th 1098
    , 1141 [no attorney fee award allowed under
    § 1029.8 because plaintiff did not allege contractor’s unlicensed status caused
    its injury].)
    Independently construing the language of section 1029.8, we conclude
    that its plain language allows an award of attorney fees only when an
    unlicensed person “causes injury or damage” to another person (i.e., the
    “injured person”) as a result of providing goods or performing services for
    which a license is required. (§ 1029.8.) Next, independently construing the
    language of section 7031(b), we conclude that its plain language requires, as
    a statutory penalty, reimbursement of all compensation paid to an unlicensed
    contractor for all services performed and all materials provided for which a
    contractor’s license is required. (§ 7031(b); see also MW Erectors, 
    supra,
     36
    Cal.4th at pp. 418, 423, 425; Hydrotech, 
    supra,
     52 Cal.3d at pp. 995, 997;
    Alatriste, supra, 183 Cal.App.4th at p. 667.) A section 7031(b)
    reimbursement award is a statutory penalty that applies regardless of
    whether the plaintiff has suffered any legal injury or damage as a result of
    services or goods provided by an unlicensed contractor within the meaning of
    section 1029.8.
    The trial court’s order granting Plaintiffs’ motion for summary
    adjudication on their second cause of action under section 7031(b) made no
    61
    finding regarding any legal injury or damage suffered by Plaintiffs caused by
    M&C’s unlicensed status. Rather, the amount of the section 7031(b)
    reimbursement award was based solely on the total amount of compensation
    paid by Plaintiffs to M&C. The judgment awarding Plaintiffs reimbursement
    for the amounts paid to M&C was therefore a statutory penalty under section
    7031(b) that was imposed without any nexus or connection to any legal injury
    or damage suffered by Plaintiffs. (MW Erectors, supra, 36 Cal.4th at pp. 418,
    423, 425; Hydrotech, 
    supra,
     52 Cal.3d at pp. 995, 997; Alatriste, supra, 183
    Cal.App.4th at p. 667.) Because the jury did not find that Plaintiffs suffered
    any legal injury or damage caused by M&C’s unlicensed status, section
    1029.8’s plain language does not apply to allow an award of attorney fees.
    Accordingly, we conclude that the trial court erred by awarding Plaintiffs
    attorney fees of $155,008.50 pursuant to section 1029.8.22
    Plaintiffs assert, and the trial court found, that section 1029.8 applied
    to a section 7031(b) reimbursement award because section 1029.8,
    subdivision (a) lists Division 3 of the Business and Professions Code, which
    includes section 7031(b) and other contractor licensing provisions (i.e., § 7000
    et seq.), within the types of licenses covered by section 1029.8. Initially, we
    agree that it is a prerequisite to a section 1029.8 attorney fee award that the
    defendant be an unlicensed contractor. Specifically, section 1029.8(a) lists
    those types of licenses for which an attorney fee award may be imposed
    against an unlicensed person for provision of services that require a license.
    22    Because we dispose of this issue based on section 1029.8’s plain
    language, we need not, and do not, address Defendants’ alternative assertion
    that no section 1029.8 attorney fee award was appropriate because M&C
    acted “under a good faith belief” that it was properly licensed within the
    meaning of section 1029.8, subdivision (d).
    62
    However, contrary to Plaintiffs’ and the trial court’s apparent understanding,
    that unlicensed status is insufficient, by itself, to support an attorney fee
    award under section 1029.8; there must also be a finding that the unlicensed
    person caused a legal injury or damage to the plaintiff as a result of providing
    goods or performing services for which a license is required. (§ 1029.8, subd.
    (a).) Because, as discussed above, Plaintiffs’ section 7031(b) reimbursement
    award was not based on any legal injury or damage that they suffered,
    Plaintiffs are not entitled to an award of their attorney fees under section
    1029.8.
    PLAINTIFFS’ CROSS-APPEAL
    VI
    Section 3287(a) Prejudgment Interest
    In their cross-appeal, Plaintiffs contend that the trial court erred by
    denying their request for prejudgment interest under section 3287(a).
    Plaintiffs assert that because they timely and sufficiently requested an award
    of prejudgment interest under section 3287(a), they are entitled to an award
    of prejudgment interest under that statute as a matter of law.
    A
    Section 3287(a) provides:
    “A person who is entitled to recover damages certain, or
    capable of being made certain by calculation, and the right
    to recover which is vested in the person upon a particular
    day, is entitled also to recover interest thereon from that
    day . . . .”
    One purpose of section 3287(a) prejudgment interest is to provide
    compensation to the plaintiff for the loss of use of the award during the
    63
    prejudgment period. (Lakin v. Watkins Associated Industries (1993) 
    6 Cal.4th 644
    , 663.) Under section 3287(a), “the court has no discretion, but must
    award prejudgment interest upon request . . . .” (North Oakland Medical
    Clinic v. Rogers (1998) 
    65 Cal.App.4th 824
    , 828 (North Oakland).)
    “[T]here is no authority mandating any particular procedure for
    securing an award of prejudgment interest.” (North Oakland, supra, 65
    Cal.App.4th at p. 829.) “[N]o statute or rule of court establishes a procedure
    for requesting an award of prejudgment interest, or a time limit therefor, in
    the superior court.” (Id. at pp. 829-830.) Nevertheless, a party must make a
    reasonably timely request for prejudgment interest. “[P]rejudgment interest
    is not a cost, but an element of damages,” and therefore “prejudgment
    interest should be awarded in the judgment on the basis of a specific request
    therefor made before entry of judgment.” (Id. at p. 830.) “A general prayer in
    the complaint is adequate to support an award of prejudgment interest.” (Id.
    at p. 829.) Regarding the timeliness of a request, “at the latest, a request for
    prejudgment interest under section 3287 may be sought as part of a motion
    for new trial pursuant to Code of Civil Procedure section 657 . . . .” (North
    Oakland, at p. 830.) In the absence of a statute or a rule of court setting
    forth procedural requirements for a request for prejudgment interest, the
    court in North Oakland concluded that “requests for prejudgment interest
    under section 3287 by a successful plaintiff must be made by way of motion
    prior to entry of judgment, or the request must be made in the form of a
    motion for new trial no later than the time allowed for filing such a motion.
    (Code Civ. Proc., § 659.)” (North Oakland, at p. 831.)
    However, at least one other court has held, instead, that a formal
    motion is not a prerequisite for an award of section 3287 prejudgment
    interest. In Watson Bowman Acme Corp. v. RGW Construction, Inc. (2016) 2
    
    64 Cal.App.5th 279
     (Watson), the court stated: “[T]he fact that Watson’s request
    [for prejudgment interest] was not labeled as [a] motion for new trial or as a
    motion for modification under Code of Civil Procedure section 657 does not
    render its format defective. [Citations.]”23 (Watson, at p. 299.) Rather, a
    request for prejudgment interest is sufficient if it “provides the relevant
    information to the opposing party and the court and gives the adverse party a
    reasonable opportunity to oppose the request on its merits. [Citations.]”
    (Ibid.) In the circumstances of Watson, the court concluded that “Watson’s
    request clearly identified (1) the relief requested (i.e., the addition of
    prejudgment interest to the amount of the judgment) and (2) the grounds
    upon which the request was based--specifically, [section 3287(a)] and its
    contention that the damages were a liquidated sum. Furthermore, Watson
    provided RGW a sufficient opportunity to oppose the request, as is evident
    from the written opposition filed by RGW with the court. Consequently, we
    conclude Watson’s request provided RGW with the [sic] sufficient notice and a
    reasonable opportunity for opposition, thus satisfying the purpose and
    requirements of Code of Civil Procedure section 659, subdivision (a).”
    (Watson, at p. 299, italics added.) Accordingly, the court concluded that “the
    format of Watson’s request for prejudgment interest was not defective.” (Id.
    at p. 300.)
    23    Watson further clarified that “[a] request for prejudgment interest is
    not a request for a new trial . . . , but a request to modify the decision to
    include an award of prejudgment interest.” (Watson, supra, 2 Cal.App.5th at
    p. 298, fn. 14.)
    65
    B
    In their complaint, Plaintiffs alleged that they had made 10 payments
    to Defendants, which totaled $2,732,627.87, and they specified the amounts
    of each of those 10 payments. In their second cause of action for section
    7031(b) reimbursement (or disgorgement), Plaintiffs sought reimbursement
    of all amounts paid to Defendants, “which amount is at least $2,732,627.87,
    plus interest.” (Italics added.) In their prayer for relief, Plaintiffs included
    the following request: “7. For prejudgment interest according to law.”
    (Italics added.)
    On January 22, 2018 (after the jury had returned its special verdict),
    Plaintiffs served Defendants with their proposed judgment, which included a
    provision stating: “On the Second Cause of Action for Disgorgement of
    Contractor’s Fees, the sum of $2,732,627.87, plus prejudgment interest at the
    rate of 10% per annum to the date hereof in the amount of $___________.” In
    submitting that proposed judgment, Christopher Elliott, Plaintiffs’ counsel,
    stated in an accompanying letter:
    “For the Court’s ease in calculating prejudgment interest,
    prejudgment interest from the dates of the payments to be
    disgorged to the date of this filing [i.e., January 22, 2018]
    totals $795,297.20 at 10% per annum, and increases by
    $748.66 per day thereafter until entry of judgment
    ($2,732,627.87 times 10% divided by 365). A chart
    summarizing the accumulated interest through the date of
    this filing is attached (hereto as Exhibit B).”
    Exhibit B, as referenced above and attached to Plaintiffs’ submission of their
    proposed judgment, set forth a table or chart that listed the date and amount
    of each of the 10 payments made by Plaintiffs to M&C, as follows:
    66
    “Check Date                  Amount
    “05/08/14             $      50,000.00
    “08/25/14                    346,901.62
    “11/25/14                    633,127.47
    “02/26/15                    430,000.00
    “02/26/15                    250,000.00
    “03/12/15                    180,000.00
    “07/25/15                    741,418.00
    “10/21/15                    2,799.19
    “10/21/15                    19,627.29
    “10/21/15                    78,754.30
    $      2,732,627.87”24
    On February 1, 2018, Defendants filed their objection to Plaintiffs’
    proposed judgment, arguing that “the judgment should not provide for any
    award of prejudgment interest to Plaintiffs.”
    On February 8, 2018, Plaintiffs filed their response to Defendants’
    objections to their proposed judgment, arguing: “Plaintiffs are entitled to an
    award of interest pursuant to . . . section 3287.” (Italics added.) Plaintiffs
    quoted section 3287(a) and argued: “That test is obviously met here. Here,
    prejudgment interest on Plaintiffs’ section 7031 claim is required because the
    amounts ordered disgorged were ‘certain, or capable of being made certain by
    calculation.’ They are simply the amounts paid for construction by Plaintiffs
    to [M&C]. Those amounts are certain. . . . The amount of prejudgment
    interest to be awarded is easily calculated. . . . Defendants have not
    challenged [Plaintiffs’ calculation attached to their proposed judgment].”
    24    Exhibit B also listed the check number and invoice number for each of
    those 10 payments.
    67
    Plaintiffs further argued that the court, and not the jury, must determine
    their entitlement to prejudgment interest under section 3287.
    On February 28, 2018, the trial court entered a judgment for Plaintiffs,
    which included the above provision in their proposed judgment stating: “On
    the Second Cause of Action for Disgorgement of Contractor’s Fees, the sum of
    $2,732,627.87, plus prejudgment interest at the rate of 10% per annum to the
    date hereof in the amount of $___________.” The judgment did not set forth
    the amount of prejudgment interest in the blank provided, nor did it
    expressly provide that an award of prejudgment interest, or the amount
    thereof, was yet to be determined.25
    On March 16, 2018, Plaintiffs filed a document titled: “PLAINTIFFS’
    REQUEST TO ADD AMOUNT OF PREJUDGMENT INTEREST TO
    JUDGMENT.” Plaintiffs’ request for prejudgment interest asked the trial
    court to add to its February 28, 2018 judgment prejudgment interest in the
    amount of $822,998.51 through the date of that judgment. Noting that the
    amount of prejudgment interest had been left blank in the February 28, 2018
    judgment, Plaintiffs calculated the correct amount of total prejudgment
    interest (i.e., $822,998.51) and attached an exhibit setting forth the dates and
    amounts of the 10 payments made by Plaintiffs to M&C and the amount of
    prejudgment interest that should be awarded with respect to each such
    payment.
    25    In contrast, the judgment entered on February 28, 2018, included the
    handwritten acronym “TBD” in three subsequent blanks relating to Plaintiffs’
    recovery of costs, their recovery of attorney fees, and the total amount of the
    judgment award. We presume that “TBD” is an acronym used by the court to
    indicate that those three other issues remained “to be determined.”
    68
    On April 23, 2018, Defendants filed their objection to Plaintiffs’ request
    for prejudgment interest and proposed nunc pro tunc amended judgment that
    would set forth the amount of prejudgment interest awarded (i.e.,
    $822,998.87).26 Citing North Oakland, Defendants argued that the time for
    Plaintiffs to file a motion for an award of prejudgment interest had expired.
    They argued that in requesting an award of prejudgment interest, Plaintiffs
    did not request a hearing date or briefing schedule and therefore, Defendants
    “have never received due process” as required by North Oakland. Defendants
    also argued that section 3287(a) prejudgment interest cannot be awarded on
    a section 7031(b) disgorgement judgment because Plaintiffs did not suffer any
    actual monetary loss.
    On April 25, 2018, Plaintiffs filed their response to Defendants’
    objection to their request for prejudgment interest. Plaintiffs argued that
    their request was timely and that it satisfied the requirements set forth in
    North Oakland and Watson. Specifically, Plaintiffs argued that they had
    timely requested an award of section 3287(a) prejudgment interest both
    before the judgment was entered and soon thereafter, and that Defendants
    had an opportunity to respond to Plaintiffs’ requests for prejudgment interest
    and had, in fact, filed their written opposition to those requests. Plaintiffs
    also argued that an award of section 3287(a) prejudgment interest is
    appropriate on the amount of a section 3071(b) judgment because the
    amounts of the payments to be reimbursed pursuant to that judgment were
    certain or capable of being made certain by calculation within the meaning of
    section 3287(a).
    26    Defendants represented that on April 13, 2018, they had been served
    with Plaintiffs’ proposed nunc pro tunc amended judgment.
    69
    The record on appeal does not contain any order by the trial court
    either expressly approving or denying Plaintiffs’ request to add prejudgment
    interest to its judgment, until the court’s November 9, 2018 order discussed
    below. At a March 2, 2018 hearing on Defendants’ motion for reconsideration
    of the court’s denial of their request for a statement of decision, Plaintiffs’
    counsel inquired why the court had not included the amount of prejudgment
    interest in its February 28, 2018 judgment. The court stated that its
    judgment included several blanks that would have to be determined at a later
    date. At the initial June 8, 2018 hearing on Defendants’ motion to tax costs,
    in addressing a Code of Civil Procedure section 998 issue, the court stated
    that it would not sign Plaintiffs’ proposed nunc pro tunc amended judgment
    that sought prejudgment interest, based on its apparent belief that it had
    already ruled on that issue. At the continued August 3, 2018 hearing on
    Defendants’ motion to tax costs, the court maintained that it had already
    ruled on Plaintiffs’ request for prejudgment interest and had not awarded
    them prejudgment interest. Plaintiffs argued that the court had yet to rule
    on their request for prejudgment interest. The court disagreed and stated
    that to the extent Plaintiffs were asking the court to reconsider the
    prejudgment interest issue, it denied that renewed request as having been
    made without proper notice thereof.
    On September 27, 2018, Plaintiffs filed a notice of motion and motion
    for an order granting their request for an award of prejudgment interest. On
    October 29, Defendants filed their opposition to Plaintiffs’ motion. On
    November 2, Plaintiffs filed their reply to Defendants’ opposition. At a
    hearing on November 9, the trial court denied Plaintiffs’ motion to add
    prejudgment interest. The court stated in part:
    70
    “Judgment was entered on February 28, 2018. [Citation.]
    Although the judgment included a blank line where an
    award of prejudgment interest could have been inserted, no
    amount was entered because prejudgment interest had not
    been requested by motion.
    “Plaintiffs’ motion for prejudgment interest was filed
    September 27, 2018. [Citation.] The motion was filed
    beyond the time to bring a motion for new trial. . . . [¶]
    [P]laintiffs never before filed a motion under section 3287.
    The submission of a proposed judgment is not sufficient.
    Indeed, the first indication that [P]laintiffs were seeking
    interest under section 3287 was in response to
    [D]efendants’ objection to the proposed judgment.
    [Citations.]
    “ . . . In contrast to Watson, the motion now before the
    Court was not made within the time for a new trial motion.
    Thus, it does not substantially comply with the statute
    governing new trial motions.”
    Accordingly, the court denied Plaintiffs’ motion.
    On January 25, 2019, the court entered a second amended judgment
    against M&C, Patrick, and M&A for a total amount of $2,940,325.50, which
    included the attorney fee award and costs and did not include an award of
    prejudgment interest.
    C
    At the outset, we address Plaintiffs’ assertion that their cross-appeal of
    the November 9, 2018 order is timely. Defendants argue that because
    Plaintiffs’ notice of cross-appeal was not timely filed, this court lacks
    jurisdiction to consider Plaintiffs’ challenge to the November 9, 2018 order.
    As we explain below, we agree with Plaintiffs that their cross-appeal of the
    November 9, 2018 order is timely.
    71
    On November 9, 2018, the trial court issued its order denying Plaintiffs’
    motion to add prejudgment interest to the judgment. On December 30, 2018,
    Plaintiffs filed a notice of cross-appeal challenging the court’s November 9,
    2018 order, but the notice misidentified the case number and apparently was
    electronically filed in the San Diego County Superior Court’s register of
    actions under a different case. Responding to this court’s letter of inquiry,
    Plaintiffs submitted a letter on January 28, 2019, informing us that on
    December 30, 2018, they had filed a notice of cross-appeal challenging the
    November 9, 2018 order in the instant case, but that their notice of cross-
    appeal had been mistakenly filed in a different case (i.e., Case No. 37-2018-
    00049647-CU-MC-CTL). On January 25, 2019, the court entered its second
    amended judgment, which crossed-out language included in the February 28,
    2018 judgment relating to its award on the second cause of action that read:
    “plus prejudgment interest at the rate of 10% per annum to the date hereof in
    the amount of $___________.” On February 5, 2019, Plaintiffs served on all
    parties a notice of entry of the January 25, 2019 second amended judgment.
    On February 13, 2019, Defendants filed their notice of appeal challenging the
    January 25, 2019 second amended judgment. On March 6, 2019, Plaintiffs
    filed a second notice of cross-appeal, again challenging the November 9, 2018
    order. This notice of cross-appeal correctly identified the instant case
    number.
    Code of Civil Procedure section 904.1, subdivision (a)(2) provides that a
    party may appeal “an order made after a judgment made appealable by
    paragraph (1).” Because the February 28, 2018 judgment was appealable
    pursuant to Code of Civil Procedure section 904.1, subdivision (a)(1), the
    November 9, 2018 order, which was issued after that judgment, is appealable
    pursuant to Code of Civil Procedure section 904.1, subdivision (a)(2).
    72
    The timeliness of an appeal is generally determined by California Rules
    of Court, rule 8.104(a).27 That rule provides:
    “(1) Unless a statute or rules 8.108, 8.702, or 8.712 provide
    otherwise, a notice of appeal must be filed on or before the
    earliest of:
    “(A) 60 days after the superior court clerk serves on the
    party filing the notice of appeal a document entitled ‘Notice
    of Entry’ of judgment or a filed-endorsed copy of the
    judgment, showing the date either was served;
    “(B) 60 days after the party filing the notice of appeal
    serves or is served by a party with a document entitled
    ‘Notice of Entry’ of judgment or a filed-endorsed copy of the
    judgment, accompanied by proof of service; or
    “(C) 180 days after entry of judgment.”28 (Cal. Rules of
    Court, rule 8.104(a).)
    Rule 8.104(b) provides: “Except as provided in rule 8.66, no court may extend
    the time to file a notice of appeal. If a notice of appeal is filed late, the
    reviewing court must dismiss the appeal.”
    Defendants argue, in a conclusory manner, that Plaintiffs’ notice of
    cross-appeal was untimely because it was not filed within 60 days of the
    November 9, 2018 order. However, in so arguing, Defendants do not cite to
    any document in our records or the record on appeal (or, for that matter, in
    the register of actions maintained by the San Diego County Superior Court)
    showing that a notice of entry of that order, or a filed-endorsed copy of that
    27    All references to rules are to the California Rules of Court.
    28   Rule 8.108(g) provides for 20-day extensions for the time to file a cross-
    appeal in certain circumstances, which we need not address in this case.
    73
    order, was served by either the San Diego County Superior Court clerk or a
    party. Such service would have triggered a shortened 60-day appeal period
    pursuant to rule 8.104(a)(1)(A) or (B) in lieu of the default 180-day appeal
    period pursuant to rule 8.104(a)(1)(C). Although the November 9, 2018 order
    expressly directed Plaintiffs “to serve notice on all parties within 2 court days
    of this ruling,” there is nothing in our records or the record on appeal (nor
    apparently in the San Diego County Superior Court’s register of actions)
    showing that Plaintiffs served notice of the order on all parties.29 Because
    Defendants do not cite to, and we are not aware of, any document showing
    that either the superior court clerk or a party served a notice of entry, or a
    filed-endorsed copy, of the November 9, 2018 order, the default 180-day
    appeal period pursuant to rule 8.104(a)(1)(C) applies to Plaintiffs’ cross-
    appeal of that order. Therefore, regardless of whether Plaintiffs’ notice of
    cross-appeal filed on December 30, 2018 or their second notice of cross-appeal
    filed on March 6, 2019 is the operative notice of appeal, Plaintiffs timely filed
    a notice of cross-appeal within the 180-day appeal period that began to run
    on November 9, 2018. Defendants do not cite to any document or authority
    persuading us to reach a contrary conclusion.
    Even assuming that a 60-day appeal period applied pursuant to rule
    8.104(a)(1)(A) or (B), we would nevertheless conclude that Plaintiffs timely
    29    The November 9, 2018 order addressed both Plaintiffs’ request for
    prejudgment interest and their motion to add M&A as a judgment debtor.
    We presume that the trial court’s direction to Plaintiffs to serve all parties “of
    this ruling” was not limited to just its ruling on Plaintiffs’ motion to add
    M&A as a judgment debtor.
    74
    filed a notice of cross-appeal within that period.30 The notice of cross-appeal
    filed by Plaintiffs on December 30, 2018 expressly appealed from orders
    “entered on 11/09/2018 and 11/30/2018.” The only order filed by the court on
    November 9, 2018 that was adverse to Plaintiffs was its order denying their
    request for prejudgment interest. Rule 8.100(a)(2) provides: “The notice of
    appeal must be liberally construed. The notice is sufficient if it identifies the
    particular judgment or order being appealed.” When it is reasonably clear
    what an appellant is trying to appeal from and the respondent would suffer
    no prejudice, an appellate court should treat a notice of appeal as being from
    that underlying judgment or order. (Walker v. Los Angeles County
    Metropolitan Transportation Authority (2005) 
    35 Cal.4th 15
    , 18; see also Luz
    v. Lopes (1960) 
    55 Cal.2d 54
    , 59-60.) Even though Plaintiffs’ December 30,
    2018 notice of cross-appeal misidentified the superior court case number for
    this case, it clearly identified the order being appealed (i.e., November 9,
    2018 order) and thereby gave Defendants notice of what order they were
    appealing. Accordingly, when Defendants were served with a notice of that
    cross-appeal, they were not prejudiced by the (presumably clerical) error in
    identifying the case number for Plaintiffs’ cross-appeal of the November 9,
    2018 order. (Cf. D’Avola v. Anderson (1996) 
    47 Cal.App.4th 358
    , 362 [“The
    30     On August 5, 2019, Plaintiffs filed the civil case information statement
    for their second notice of cross-appeal challenging the November 9, 2018
    order. Plaintiffs state therein that a notice of entry of that order was served
    on February 5, 2019, by either the superior court clerk or a party. However,
    our review of the San Diego County Superior Court’s register of actions shows
    that the notice of entry served by Plaintiffs on February 5, 2019, was a copy
    of the January 25, 2019 second amended judgment and not the November 9,
    2018 order. We therefore remain unpersuaded that a notice of entry of the
    November 9, 2018 order was served, which service would have triggered a
    shortened 60-day appeal period pursuant to rule 8.104(a)(1)(A) or (B).
    75
    fact that the wrong superior court case number was affixed to the notice of
    appeal does not change the result” because the California Rules of Court do
    not require any case number to be affixed to a notice of appeal to be effective];
    Aguilar v. Gostischef (2013) 
    220 Cal.App.4th 475
    , 479 [applying D’Avola’s
    reasoning to allow appeal where notice of appeal was filed in a different
    case].) Accordingly, construing Plaintiffs’ December 30, 2018 notice of cross-
    appeal liberally, we conclude that Plaintiffs timely cross-appealed the
    November 9, 2018 order. (Rule 8.100(a)(2); D’Avola, at p. 362; Aguilar v.
    Gostischef, at p. 479.)
    D
    Addressing the merits of Plaintiffs’ contention, we agree with Plaintiffs
    that the trial court erred by denying their request for an award of section
    3287(a) prejudgment interest on the ground that their request was not
    timely. As discussed above, while the trial court based its ruling at least in
    part on the fact that Plaintiffs had not filed a timely noticed motion for
    prejudgment interest, there is no statute or rule of court that establishes a
    procedure, or time limit, for requesting an award of section 3287(a)
    prejudgment interest. (Watson, supra, 2 Cal.App.5th at p. 297; Steiny & Co.,
    Inc. v. California Electric Supply Co. (2000) 
    79 Cal.App.4th 285
    , 294; North
    Oakland, supra, 65 Cal.App.4th at pp. 829-830.) Rather, a request for section
    3287(a) prejudgment interest requires only that the party opposing the
    request be provided sufficient notice of the request and a reasonable
    opportunity to oppose the request. (Watson, at p. 299.) Further, that request
    must be timely made either before entry of judgment or, at the latest, within
    the time period for new trial motions under Code of Civil Procedure section
    659. (North Oakland, at p. 831; Watson, at p. 298.)
    76
    Based on our review of the record on appeal, we conclude that Plaintiffs
    provided Defendants with both sufficient notice of their request for an award
    of section 3287(a) prejudgment interest and a reasonable opportunity to
    oppose their request. From the beginning of this action in 2016, Plaintiffs
    alleged that they were entitled to an award of interest on their section
    7031(b) cause of action. Plaintiffs’ complaint alleged that they had made 10
    payments to Defendants, which totaled $2,732,627.87, and their second cause
    of action sought section 7031(b) reimbursement of all amounts paid to
    Defendants, “which amount is at least $2,732,627.87, plus interest.” (Italics
    added.) Further, Plaintiffs’ prayer for relief requested: “prejudgment interest
    according to law.” (Italics added.)
    On January 22, 2018, Plaintiffs served Defendants with their proposed
    judgment, which included a provision for an award of prejudgment interest as
    follows: “On the Second Cause of Action for Disgorgement of Contractor’s
    Fees, the sum of $2,732,627.87, plus prejudgment interest at the rate of 10%
    per annum to the date hereof in the amount of $___________.” (Italics added.)
    Together with their proposed judgment, Plaintiffs’ counsel submitted a table
    setting forth the date and amount of each of the 10 payments made by
    Plaintiffs to M&C and provided the calculations for prejudgment interest
    through January 22, 2018 (i.e., $795,297.20) and the daily accrual amount
    (i.e., $748.66) until entry of the judgment.
    Having received notice of Plaintiffs’ request for an award of
    prejudgment interest in Plaintiffs’ complaint and in their proposed judgment,
    Defendants had an opportunity to oppose, and did in fact oppose, Plaintiffs’
    request. Specifically, on February 1, 2018, Defendants opposed Plaintiffs’
    request for prejudgment interest by filing their objection to Plaintiffs’
    77
    proposed judgment, arguing that “the judgment should not provide for any
    award of prejudgment interest to Plaintiffs.” (Italics added.)
    On February 8, 2018, Plaintiffs responded to Defendants’ opposition to
    their request for prejudgment interest and objections to their proposed
    judgment, arguing: “Plaintiffs are entitled to an award of interest pursuant
    to . . . section 3287” on their section 7031(b) claim. (Italics added.)
    Based on the above pleadings, we conclude that Plaintiffs provided
    Defendants sufficient notice of their request for an award of section 3287(a)
    prejudgment interest and that Defendants had a reasonable opportunity to
    oppose that request, which is confirmed by Defendants’ filing an opposition to
    that request. Further, Plaintiffs’ request for section 3287(a) prejudgment
    interest was timely because it was made before entry of judgment on
    February 28, 2018. (North Oakland, supra, 65 Cal.App.4th at p. 831; Watson,
    supra, 2 Cal.App.5th at pp. 298-299.)
    Even if we were to presume that Plaintiffs’ prejudgment request for an
    award of section 3287(a) prejudgment interest was not sufficient to give
    Defendants notice of that request, we would nevertheless conclude that
    Plaintiffs’ subsequent additional request after entry of the judgment provided
    Defendants sufficient notice of that request and a reasonable opportunity to
    oppose it. On February 28, 2018, the court entered a judgment for Plaintiffs,
    including a provision stating: “On the Second Cause of Action for
    Disgorgement of Contractor’s Fees, the sum of $2,732,627.87, plus
    prejudgment interest at the rate of 10% per annum to the date hereof in the
    amount of $___________.” On March 16, 2018, presumably because the
    judgment did not set forth the amount of prejudgment interest in the blank
    provided therefor, Plaintiffs filed a request for the court to add to its
    78
    February 28, 2018 judgment prejudgment interest in the amount of
    $822,998.51 through the date of that judgment.
    We conclude that Plaintiffs’ March 16, 2018 request for prejudgment
    interest was timely made, provided Defendants with sufficient notice of that
    request, and allowed Defendants a reasonable opportunity to oppose it.
    Plaintiffs’ request was timely because it was filed within the time period for
    filing a motion for new trial. As with a motion for new trial, a request for
    prejudgment interest must be filed “[w]ithin 15 days of the date of mailing
    notice of entry of judgment by the clerk of the court . . . or service upon
    [Plaintiffs] by any party of written notice of entry of judgment, or within 180
    days after the entry of judgment, whichever is earliest.” (Code Civ. Proc.,
    § 659, subd. (a)(2); North Oakland, supra, 65 Cal.App.4th at pp. 830-831;
    Watson, supra, 2 Cal.App.5th at pp. 298-299.) Our review of the record on
    appeal did not locate, and Defendants do not cite to, any notice of entry of the
    February 28, 2018 judgment that was served by either the superior court
    clerk or a party.31 Therefore, the applicable period for a timely motion for
    new trial, and thus for a timely request for section 3287(a) prejudgment
    31     Further, the superior court’s register of actions does not appear to
    contain a notice of entry of that judgment served by either its court clerk or a
    party. Although Plaintiffs state in their cross-appellants’ opening brief that
    they served a notice of entry of judgment on March 16, 2018, they provide no
    citation to the record in support of that statement and our review of the
    record on appeal does not reflect any such notice of entry. Nevertheless, even
    if Plaintiffs had served a notice of entry on March 16, 2018, their request for
    an award of section 3287(a) prejudgment interest was filed on March 16,
    2018, and was therefore timely filed within the 15-day period for filing new
    trial motions (i.e., on or before March 31, 2018). (Code Civ. Proc., § 659, subd.
    (a)(2).)
    79
    interest, is within 180 days after the entry of the judgment on February 28,
    2018. (Code Civ. Proc., § 659, subd. (a)(2); North Oakland, at pp. 830-831;
    Watson, at pp. 298-299.) Because Plaintiffs’ March 16, 2018 request for an
    award of section 3287(a) prejudgment interest was filed 16 days after the
    judgment was entered on February 28, 2018, their request was timely.
    Further, Plaintiffs’ March 16, 2018 request was sufficient because it
    provided Defendants and the trial court with the relevant information that
    Plaintiffs were requesting an award of section 3287(a) prejudgment interest.
    (Watson, supra, 2 Cal.App.5th at p. 299.) In particular, Plaintiffs’ request,
    like the request in Watson, clearly identified the relief requested (i.e., the
    addition of prejudgment interest to the judgment amount) and the grounds
    on which that request was based (i.e., § 3287(a) and Plaintiffs’ assertion that
    their § 7031(b) award was liquidated). (Cf. Watson, at p. 299.) Also,
    Plaintiffs’ request, like the request in Watson, provided Defendants with a
    reasonable opportunity to oppose the request, as is evident from Defendants’
    written opposition filed with the court on April 23, 2018. We therefore
    conclude that Plaintiffs’ request gave Defendants sufficient notice of their
    request for an award of section 3287(a) prejudgment interest and that
    Defendants had a reasonable opportunity to oppose that request, which is
    confirmed by Defendants’ actual opposition to that request, filed on April 23,
    2018. Accordingly, we conclude that the trial court erred in determining that
    Plaintiffs’ additional request for an award of section 3287(a) prejudgment
    interest filed on March 16, 2018 was untimely and/or insufficient to provide
    Defendants with notice of Plaintiffs’ request and a reasonable opportunity to
    oppose the request. As noted, contrary to the trial court’s apparent belief and
    Defendants’ argument, unlike a motion for new trial, no formal motion is
    required to request an award of section 3287(a) prejudgment interest.
    80
    (Watson, supra, 2 Cal.App.5th at p. 299.) To the extent that there is
    language in North Oakland that would support a contrary position, we
    disagree with it and decline to adopt it and instead conclude that the
    reasoning in Watson is more persuasive.32
    E
    Plaintiffs also contend that they are entitled to an award of
    prejudgment interest under section 3287(a) as matter of law because their
    section 7031(b) reimbursement award was certain or capable of being made
    certain by calculation. Plaintiffs’ complaint alleged that they had made 10
    payments to Defendants, which totaled $2,732,627.87, and their second cause
    of action sought section 7031(b) reimbursement of all amounts paid to
    Defendants. Their complaint specifically alleged the date and amount of each
    of those 10 payments. In support of Plaintiffs’ motion for summary
    adjudication of their second cause of action against M&C, they submitted a
    separate statement of undisputed material facts, which asserted that
    32     North Oakland stated that “requests for prejudgment interest under
    section 3287 by a successful plaintiff must be made by way of motion prior to
    entry of judgment, or the request must be made in the form of a motion for
    new trial no later than the time allowed for filing such a motion. (Code Civ.
    Proc., § 659.)” (North Oakland, supra, 65 Cal.App.4th at p. 831.) Watson
    subsequently declined to require a formal motion for a request for
    prejudgment interest, instead stating: “[T]he fact that Watson’s request [for
    prejudgment interest] was not labeled as [a] motion for new trial or as a
    motion for modification under Code of Civil Procedure section 657 does not
    render its format defective. [Citations.]” (Watson, supra, 2 Cal.App.5th at
    p. 299.) As Watson noted, “[n]o statutes specify the timing or mechanism for
    seeking prejudgment interest” and “no rule of court specifies when
    prejudgment interest must be sought.” (Id. at p. 297.)
    81
    Plaintiffs had paid M&C $2,732,627.87 for the construction of their home. In
    support of their opposition to the motion, Defendants submitted their
    separate statement that, in effect, admitted that Plaintiffs had paid
    Defendants that amount, stating: “Plaintiffs disbursed to M&C
    $2,732,627.87 for the materials supplied and services rendered during the
    construction of [Plaintiffs’ home].” As discussed above, the trial court
    subsequently granted Plaintiffs’ motion for summary adjudication, finding
    that Plaintiffs were entitled to section 7031(b) reimbursement from M&C in
    the amount of $2,732,627.87. The court thereafter entered the judgment
    awarding Plaintiffs $2,732,627.87 on their section 7031(b) reimbursement
    cause of action.
    Based on the record, Plaintiffs’ section 3287(a) reimbursement damages
    (i.e., $2,732,627.87) were clearly “certain, or capable of being made certain by
    calculation,” within the meaning of section 3287(a). Specifically, Defendants
    knew, or should have known, the date and amount of each of Plaintiffs’ 10
    payments to M&C. An award of section 3287(a) prejudgment interest to
    Plaintiffs is therefore mandatory and not within the discretion of the trial
    court. (North Oakland, supra, 65 Cal.App.4th at p. 828 [under § 3287(a), “the
    court has no discretion, but must award prejudgment interest upon
    request.”]; Watson, supra, 2 Cal.App.5th at p. 293 [same].)
    F
    Contrary to Defendants’ argument, an award of section 3287(a)
    prejudgment interest is mandated on a section 7031(b) reimbursement award
    if the amount of reimbursement was certain or capable of being made certain
    by calculation. (§ 3287(a).) The purpose of section 3287(a) prejudgment
    interest is to “compensate[] the plaintiff for the loss of the use of property or
    82
    money during the period before the judgment is entered.” (Watson, supra, 2
    Cal.App.5th at p. 293.) Alternatively stated, “[f]rom a plaintiff’s perspective,
    prejudgment interest compensates [the plaintiff] for the loss of use of the
    money during the period between the assertion of the claim and the rendition
    of judgment.” (Ibid.) Section 3287(a) prejudgment interest is intended to
    compensate a plaintiff “for loss of use of the award during the prejudgment
    period.” (Lakin v. Watkins Associated Industries, 
    supra,
     6 Cal.4th at p. 663,
    italics added.) Contrary to Defendants’ assertion, section 3287(a)
    prejudgment interest is not limited to contractual or compensatory damages
    and their citation to North Oakland, supra, 65 Cal.App.4th at page 826, does
    not set forth any such limitation. Rather, as Plaintiffs note, section 3287(a)
    applies to causes of action arising in tort, contract, or otherwise, provided
    that the damages awarded were readily ascertainable. (Wisper Corp. v.
    California Commerce Bank (1996) 
    49 Cal.App.4th 948
    , 958 [§ 3287’s
    “application to actions other than contract actions, such as tort actions, is
    well established”]; Marine Terminals Corp. v. Paceco, Inc. (1983) 
    145 Cal.App.3d 991
    , 995 [§ 3287(a) “allows recovery of prejudgment interest in
    causes of action other than contract. The crucial factor is . . . whether the
    damages were readily ascertainable”].) “When Civil Code section 3287 was
    ‘adopted in 1872, the key distinguishing factor was not . . . whether the cause
    of action arose in tort or contract, but rather whether the damages were
    readily ascertainable.’ [Citation.]” (Wisper Corp., at p. 958, quoting Levy-
    Zentner Co. v. Southern Pac. Transportation Co. (1977) 
    74 Cal.App.3d 762
    ,
    795.) Section 3287(a) “has been applied consistently to allow the recovery of
    prejudgment interest in causes of action other than those in contract.” (Levy-
    Zentner Co., at p. 796.) There is nothing in the language of section 3287(a)
    that limits its provisions for prejudgment interest to only contract causes of
    83
    action. Further, there is nothing in its language that precludes an award of
    prejudgment interest on section 7031(b) reimbursement awards.
    Section 3287(a) generally provides that prejudgment interest must be
    awarded to “[a] person who is entitled to recover damages certain, or capable
    of being made certain by calculation . . . .” Section 7031(b) provides that a
    person who uses an unlicensed contractor “may bring an action . . . to recover
    all compensation paid to the unlicensed contractor . . . .” By providing for the
    recovery of all compensation paid, section 7031(b), in effect, allows a plaintiff
    to recover, as damages, all compensation paid to the unlicensed contractor.
    Therefore, the damages sought by a plaintiff under section 7031(b) consist of
    all compensation paid to an unlicensed contractor, which are sought to be
    recovered in a section 7031(b) reimbursement action.
    To the extent that section 3287(a) prejudgment interest is arguably
    limited to cases in which compensatory damages are sought in a contract,
    tort, or other cause of action, a section 7031(b) reimbursement cause of action
    has been viewed as “fundamentally contractual in nature since it is based on
    an unlicensed contractor’s agreement with the beneficiary to provide services,
    and the beneficiary’s agreement to pay for same.” (Goldstein v. Barak
    Construction (2008) 
    164 Cal.App.4th 845
    , 854.) Because a section 7031(b)
    plaintiff seeks compensatory damages in the form of reimbursement for all
    compensation paid to an unlicensed contractor pursuant to an express
    written or oral contract or an implied construction agreement, that plaintiff is
    entitled to an award of prejudgment interest under the express provisions of
    section 3287(a) if the plaintiff shows that those compensatory damages were
    certain or capable of being made certain by calculation. Contrary to
    Defendants’ apparent assertion, we discern no inconsistency in viewing a
    section 7031(b) award as compensatory damages while also viewing such an
    84
    award as a statutory penalty, as discussed in part V above. (See, e.g., MW
    Erectors, 
    supra,
     36 Cal.4th at pp. 418, 423, 425; Hydrotech, 
    supra,
     52 Cal.3d
    at pp. 995, 997; Alatriste, supra, 183 Cal.App.4th at pp. 666-667.) Rather, we
    conclude that a section 7031(b) reimbursement award is properly, and
    consistently, viewed as both an award of compensatory damages based on the
    amount of compensation paid to an unlicensed contractor and a statutory
    penalty imposed against an unlicensed contractor based on section 7031(b)’s
    public policy purpose of deterring violations of contractor licensing laws.
    (MW Erectors, at pp. 418, 423, 425; Hydrotech, at pp. 995, 997; Alatriste, at
    pp. 666-667.) Defendants do not cite any case in support of their assertion or
    otherwise persuade us to reach a contrary conclusion. Further, contrary to
    Defendants’ assertion, an award of section 3287(a) prejudgment interest on a
    section 7031(b) reimbursement award would not constitute “punitive
    damages,” but instead, is compensation for the loss of the use of that money
    paid to an unlicensed contractor from the time of payment through the date
    of the judgment.
    G
    The legislative intent underlying section 7031(b) also supports a
    plaintiff’s entitlement to prejudgment interest under section 3287(a). As
    discussed above, the Legislature intended that section 7031(a) and section
    7031(b) be interpreted in a consistent manner so that the same remedy
    applies regardless of whether the unlicensed contractor is the plaintiff or
    defendant. (White, supra, 178 Cal.App.4th at pp. 519-520; see also Alatriste,
    supra, 183 Cal.App.4th at p. 666.) The Legislature therefore intended that a
    section 7031(b) plaintiff be placed in as good a position as a section 7031(a)
    defendant. A section 7031(a) defendant uses that statute as a shield,
    preventing an unlicensed contractor from obtaining compensation for services
    85
    performed or materials provided that require a contractor’s license. As a
    result, a section 7031(a) defendant naturally will not suffer any loss of the
    use of money from the time those services were performed or materials
    provided through the date of the judgment and therefore, would have no need
    for an award of section 3287(a) prejudgment interest. (Cf. Watson, supra, 2
    Cal.App.5th at p. 293.)
    In contrast, a section 7031(b) plaintiff necessarily will have suffered a
    loss of the use of money from the time the plaintiff paid an unlicensed
    contractor for services or materials through the date of the judgment.
    Regardless of the length of that time period (e.g., months or years), there is a
    “time-value” to that money during the period that the unlicensed contractor
    retains that money and the plaintiff has lost use of that money. In order to
    place a section 7031(b) plaintiff in the same position as a section 7031(a)
    defendant, as the Legislature intended, a section 7031(b) plaintiff should be
    compensated for the loss of the use of the money paid to an unlicensed
    contractor by an award of prejudgment interest on the amount of a section
    7031(b) reimbursement award.
    Accordingly, an award of section 3287(a) prejudgment interest on a
    section 7031(b) reimbursement award carries out the legislative intent
    underlying section 7031(b). To deny a section 7031(b) plaintiff prejudgment
    interest would have the practical effect of treating section 7031(a) defendants
    and section 7031(b) plaintiffs disparately and would, in effect, deprive section
    7031(b) plaintiffs of the same remedy that section 7031(a) defendants have.
    (White, supra, 178 Cal.App.4th at pp. 519-520; Alatriste, supra, 183
    Cal.App.4th at p. 666.) Further, if the Legislature had intended to disallow a
    section 3287(a) prejudgment interest award for section 7031(b) plaintiffs, we
    presume that it would have expressly so provided. “The Legislature is
    86
    presumed to be aware of existing laws . . . when it enacts legislation.”
    (Alatriste, at p. 670.) Because the Legislature did not do so, we conclude that
    it intended section 7031(b) plaintiffs to recover section 3287(a) prejudgment
    interest on section 7031(b) reimbursement awards. (Cf. Alatriste, at p. 670.)
    DISPOSITION
    The order dated August 3, 2018, granting in part Plaintiffs’ motion for
    attorney fees under section 1029.8, and the order dated November 9, 2018,
    denying Plaintiffs’ request for prejudgment interest under section 3287(a),
    are reversed. In all other respects, the judgment and orders are affirmed.
    The matter is remanded with directions that the superior court issue a new
    order denying Plaintiffs’ motion for an award of section 1029.8 attorney fees
    and granting their request for an award of section 3287(a) prejudgment
    interest and enter a new judgment consistent with this opinion.
    AARON, J.
    WE CONCUR:
    HUFFMAN, Acting P. J.
    GUERRERO, J.
    87