Oceana v. Bureau of Ocean Energy Management , 37 F. Supp. 3d 147 ( 2014 )


Menu:
  •                             UNITED STATES DISTRICT COURT
    FOR THE DISTRICT OF COLUMBIA
    OCEANA, et al.                                     :
    :
    Plaintiffs,                                 :       Civil Action No.:      12-0981 (RC)
    :
    v.                                          :       Re Document No.:       60, 63, 68
    :
    BUREAU OF OCEAN ENERGY                             :
    MANAGEMENT, et al.,                                :
    :
    Defendants. 1                               :
    :
    AMERICAN PETROLEUM                                 :
    INSTITUTE, et al.,                                 :
    :
    Intervenor-Defendants                       :
    MEMORANDUM OPINION
    GRANTING FEDERAL-DEFENDANTS’ MOTION FOR SUMMARY JUDGMENT;
    GRANTING INTERVENOR-DEFENDANTS’ MOTION FOR SUMMARY JUDGMENT;
    DENYING PLAINTIFFS’ MOTION FOR SUMMARY JUDGMENT
    I. INTRODUCTION
    On April 20, 2010, the Deepwater Horizon, a deep-water exploratory oil rig, exploded,
    caught fire, and sank in the Gulf of Mexico, resulting in the largest oil spill in the United States
    in modern history. Less than two years later, the Bureau of Ocean Energy Management
    (“BOEM”), approved two lease sales in the area where the Deepwater Horizon spill occurred.
    The plaintiffs bring this action challenging BOEM’s approval of those lease sales under the
    National Environmental Policy Act, the Administrative Procedure Act, and the Endangered
    Species Act. The plaintiffs also bring suit against the National Marine Fisheries Service
    1
    The plaintiffs originally brought suit against, inter alia, Kenneth Salazar, in his
    official capacity as Secretary of the Interior. Pursuant to Federal Rule of Civil Procedure 25(d),
    Sally Jewell, his successor, is automatically replaced as defendant.
    (“NMFS”) for failing to issue a Biological Opinion in the wake of the oil spill in violation of the
    Administrative Procedure Act. All parties 2 moved for summary judgment. For the reasons that
    follow, the Court will grant all the defendants’ motions for summary judgment, and deny the
    plaintiffs’ motion for summary judgment.
    II. FACTUAL BACKGROUND
    A. Statutory Landscape
    1. Outer Continental Shelf Lands Act (“OCSLA”)
    The Outer Continental Shelf (“OCS”) “is an area of submerged lands, subsoil, and seabed
    that lies between the outer seaward reaches of a state’s jurisdiction and that of the United States.”
    Ctr. for Biological Diversity v. U.S. Dep’t of Interior, 
    563 F.3d 466
    , 472 (D.C. Cir. 2009). In
    1953, Congress enacted the Outer Continental Shelf Lands Act of 1953, 
    43 U.S.C. § 1331
    , et
    seq., “to authorize federal leasing of the OCS for oil and gas development.” Sec’y of the Interior
    v. California, 
    464 U.S. 312
    , 336 (1984). In 1978, the OCSLA was amended “to provide for the
    ‘expeditious and orderly development, subject to environmental safeguards,’ of resources on the
    OCS.” 
    Id.
     (quoting 
    43 U.S.C. § 1332
    (3)).
    The OCSLA provides a four-step process for the development of the OCS. See 
    id. at 337
    ; see also Ctr. for Biological Diversity, 
    563 F.3d at 473
    . The first stage of the development
    process requires the Department of the Interior (“Department”) to create a nationwide five-year
    leasing program. See 
    43 U.S.C. § 1344
    (a) (“The Secretary . . . shall prepare and periodically
    2
    The Court granted several motions to intervene in this case. See ECF Nos. 10, 26,
    38. The intervenor-defendants are: American Petroleum Institute, Independent Petroleum
    Association of America, International Association of Drilling Contractors, US Oil & Gas
    Association, Exxon Mobil Corporation, ConocoPhillips Company, Statoil Gulf of Mexico LLC,
    Apache Corporation, Apache Deepwater LLC, and National Ocean Industries Association. They
    will be referred to collectively as “intervenor-defendants.” In addition, on August 23, 2013, the
    Court denied a motion by federal defendants to transfer the case to the Southern District of
    Alabama. See ECF No. 64.
    2
    revise, and maintain an oil and gas leasing program . . . . The leasing program shall consist of a
    schedule of proposed lease sales . . . which he determines will best meet national energy needs
    for the five-year period following its approval or reapproval.”). The second stage allows the
    Secretary to solicit bids and issue leases for offshore leasing areas. See 
    43 U.S.C. § 1337
    . After
    a lease is approved, a lessee may conduct ancillary activities, which include geological and
    geophysical explorations and development, and surveys. See 
    30 C.F.R. § 550.207
    . The third
    stage is known as the exploration stage; during this stage, the Secretary reviews the lessee’s
    exploration plan (“EP”). See 
    43 U.S.C. § 1340
    . The final stage is known as development and
    production, and during this stage, the Secretary reviews the development and production plan of
    the lessee for the purposes of actually producing oil and gas from the leaseholds. See 
    43 U.S.C. § 1351
    . The phase at issue in this case is the second stage—the lease sale stage. 3
    2. National Environmental Policy Act (“NEPA”)
    NEPA was enacted in 1970 “to promote efforts which will prevent or eliminate damage
    to the environment and biosphere . . . .” 
    42 U.S.C. § 4321
    . The Act provides that federal
    agencies shall “include in every recommendation or report on . . . major Federal actions
    significantly affecting the quality of the human environment, a detailed statement by the
    responsible official on (i) the environmental impact of the proposed action; (ii) any adverse
    environmental effects which cannot be avoided should the proposal be implemented, [and] (iii)
    alternatives to the proposed action . . . .” 
    42 U.S.C. § 4332
    (2)(C). This is known as the
    Environmental Impact Statement (“EIS”). NEPA regulations explain that the “primary purpose
    3
    Importantly, the OCSLA provides that a challenge to activity in the third and
    fourth phases (exploration and development) can only be brought in a U.S. Court of Appeals.
    See 
    43 U.S.C. § 1349
    (c)(2) (“Any action of the Secretary to approve, require modification of, or
    disapprove any exploration plan or any development and production plan under this subchapter
    shall be subject to judicial review only in a United States court of appeals for a circuit in which
    an affected State is located.”).
    3
    of an environmental impact statement is to serve as an action-forcing device to insure that the
    policies and goals defined in the Act are infused into the ongoing programs and actions of the
    Federal Government.” 
    40 C.F.R. § 1502.1
    . The “heart of the environmental impact statement”
    is the analysis of alternatives. 
    40 C.F.R. § 1502.14
    . 
    40 C.F.R. § 1502.14
     provides that the
    agency shall, inter alia, “[r]igorously explore and objectively evaluate all reasonable
    alternatives,” “[d]evote substantial treatment to each alternative considered,” and “[i]nclude the
    alternative of no action” in its analysis. 
    40 C.F.R. §§ 1502.14
    (a), (b), (d).
    3. Endangered Species Act (“ESA”)
    Section 7(a) of the ESA requires federal agencies to “insure that any action authorized,
    funded, or carried out by such agency is not likely to jeopardize the continued existence of any
    endangered species . . . .” 
    16 U.S.C. § 1536
    (a)(2). In fulfilling this obligation, “each agency
    shall use the best scientific and commercial data available.” 
    Id.
     If a proposed agency action
    “may affect” a listed species, federal agencies are required to formally consult with either the
    National Marine Fisheries Service (“NMFS”) or the Fish and Wildlife Service (“FWS”),
    depending on whether the species is marine or terrestrial. see Pl.’s Mot. Summ. J. 5 n.3, ECF
    No. 60; see also 
    16 U.S.C. § 1536
    (a)(2); 
    50 C.F.R. § 402.01
    (b); 
    50 C.F.R. § 402.14
    (a).
    Following formal consultation, the NMFS (in this case) must issue a written statement known as
    a Biological Opinion, explaining how the proposed action will affect the species or its habitat.
    See Bennett v. Spear, 
    520 U.S. 154
    , 158 (1997) (citing 
    16 U.S.C. § 1536
    (b)(3)(A)).
    Section 7(d) of the ESA states that “[a]fter initiation of consultation,” the relevant agency
    “shall not make any irreversible or irretrievable commitment of resources with respect to the
    agency action which has the effect of foreclosing the formulation or implementation of any
    4
    reasonable and prudent alternative measures which would not violate subsection (a)(2) of this
    section.” 
    16 U.S.C. § 1536
    (d).
    B. Lease Sales in the Gulf of Mexico
    The Gulf of Mexico (“GOM”) is a unique and important part of the American landscape
    and economy. It “includes one of the most extensive estuary systems in the world,” “produces
    more than one-third of the nation’s domestic seafood supply,” and is home to many endangered
    species, such as the sperm whale, the West Indian manatee, several species of sea turtles, beach
    mice, the whooping crane, and the gulf sturgeon. See Am. Compl. ¶¶ 43‒45. At the same time,
    the OCS of the Gulf of Mexico is responsible for 20% of total U.S. crude oil production. See
    Intervenor-Def.’s Cross-Mot. Summ. J. 17, ECF No. 68.
    To understand the importance of the lease sales at issue here, it is helpful to wade into the
    Gulf of Mexico’s recent OCS lease sale history. In April 2007, BOEM 4 published a Multisale
    EIS, which covered eleven lease sales planned for in the Gulf of Mexico. See Am. Compl. ¶ 46,
    see also Outer Continental Shelf (OCS), Western and Central Gulf of Mexico (GOM), Oil and
    Gas Lease Sales for Years 2007‒2012, 
    72 Fed. Reg. 18,667
     (April 13, 2007). Three of these
    eleven Lease Sales, Lease Sales 206, 216, and 222, were located in the Central Planning Area
    (“CPA”) of the Gulf of Mexico—where the Deepwater Horizon spill took place. See Am.
    Compl. ¶ 46. Another one of the eleven leases was located in the Western Planning Area
    (“WPA”) of the Gulf of Mexico, Lease Sale 218. Am. Compl. ¶ 47. In September 2008, after
    Congress repealed a moratorium on drilling, BOEM issued a Supplemental EIS for seven lease
    sales that had been covered in the 2007 Multisale EIS, called the 2009‒2012 Supplemental EIS.
    Am. Compl. ¶ 57; see also AR2433‒2917.
    4
    BOEM was previously known as the Minerals Management Service, also within
    the Department of the Interior.
    5
    On April 20, 2010, a deep-water exploratory oil rig known as the Deepwater Horizon,
    caught fire and exploded, releasing almost five million barrels of oil into the Gulf over the course
    of many weeks and months. “The Deepwater Horizon blowout produced the largest accidental
    marine oil spill in U.S. history, an acute human and environmental tragedy.” See National
    Commission on the BP Deepwater Horizon Oil Spill & Offshore Drilling, Deepwater: The Gulf
    Oil Disaster and the Future of Offshore Drilling, Report to the President, at 173. 5
    As of the Deepwater Horizon 6 oil spill in 2010, there were two lease sales remaining in
    the Gulf under the 2007 Multisale EIS: Lease Sale 218 and Lease Sale 222 (which was combined
    with Lease Sale 216 in 2012). Am. Compl. ¶ 58. In light of the spill, on November 10, 2010,
    BOEM issued a notice of intent to prepare a Supplemental EIS (“SEIS”) for Lease Sale 216/222
    and Lease Sale 218. See Outer Continental Shelf (OCS), Western and Central Planning Areas,
    Gulf of Mexico (GOM) Oil and Gas Lease Sales for the 2007‒2012 5‒Year OCS Program, 
    75 Fed. Reg. 69,122
     (November 10, 2010). The purpose of undertaking the SEIS was “to consider
    new circumstances and information arising, among other things, from the Deepwater Horizon
    blowout and spill.” See 75 Fed. Reg. at 69,122. BOEM explained that the focus of the SEIS
    would be “on updating the baseline conditions and potential environmental effects of oil and
    natural gas leasing, exploration, development, and production in the WPA and CPA.” Id.
    On July 1, 2011, BOEM issued a Draft SEIS for Lease Sale 216/222. See 
    76 Fed. Reg. 38,676
     (July 1, 2011). Meanwhile, on December 14, 2011, BOEM held the first lease sale since
    the Deepwater Horizon explosion in the Gulf of Mexico—for Lease Sale 218. See Outer
    Continental Shelf (OCS), Western Planning Area (WPA) Gulf of Mexico Oil and Gas Lease Sale
    5
    available at http://www.gpo.gov/fdsys/pkg/GPO-OILCOMMISSION/pdf/GPO-
    OILCOMMISSION.pdf.
    6
    This event is hereinafter referred to either as the Deepwater Horizon spill or the
    “DWH” spill, for short, depending on who the speaker is.
    6
    218, 
    76 Fed. Reg. 70,473
    -01 (Nov. 14, 2011). On January 20, 2012, BOEM issued the final
    SEIS for Lease Sale 216/222 (“2012 SEIS”). See AR5438‒6673. This 2012 SEIS concluded
    that “[n]o substantial new information, with the exception of archeological resources, was found
    that would alter the impact conclusions as presented in the Multisale EIS and the 2009‒2012
    Supplemental EIS for a CPA lease sale.” AR5448. BOEM also explained that “[i]t is important
    to note that, barring another catastrophic oil spill, which is a low probability accidental event, the
    adverse impacts associated with the proposed CPA lease sale are small, even in light of the
    DWH event.” AR5624.
    Lease Sale 216 had been scheduled to take place in 2011 and Lease Sale 222 had been
    scheduled for 2012. See Federal-Def.’s Cross-Mot. Summ. J. 6, ECF No. 63. Following the
    Deepwater Horizon incident, BOEM decided to postpone proposed Lease Sale 216 and combine
    it with proposed Lease Sale 222. After the 2012 SEIS was published, BOEM held Lease Sale
    216/222 in June 2012. 
    Id.
    C. Endangered Species Act consultation
    In 2007, the NMFS completed a Biological Opinion (“BO”) for five Gulf of Mexico lease
    sales, including Lease Sale 218 and Lease Sale 216/222. See Pl.’s Mot. Summ. J. 9. In response
    to the Deepwater Horizon spill, on July 30, 2010, the BOEM reinitiated consultation with the
    FWS and the NMFS because BOEM explained that “the spill volumes and scenarios used in the
    analysis for the existing NMFS BO need to be readdressed given the ‘rare event’ of a spill
    exceeding 420,000 gallons as referenced in the current NMFS BO . . . .” AR7351. BOEM noted
    that as a result, the “affects to and the status of some listed species or designated critical habitats
    may have been altered as a result of the DWH incident and therefore require further
    consideration.” 
    Id.
    7
    To date, the consultation has not yet been completed. However, BOEM and NMFS have
    developed an interim consultation process until the new Biological Opinion is issued. “That
    process gives NMFS the opportunity to review and comment on certain-post lease activities
    (such as exploration plans).” See Federal-Def.’s Cross-Mot. Summ. J. 9; see also DOI 7496‒
    7501, 7557‒58, 7561 (all describing the interim consultation process). NMFS anticipates a
    March 2015 date of completion of the BO. See Bernhart Decl., ECF No. 75-1.
    III. ANALYSIS
    The plaintiffs, various environmental organizations, 7 brought suit against BOEM and
    NMFS alleging NEPA, ESA, and APA violations. They argue that (1) BOEM violated NEPA
    and was arbitrary and capricious in issuing its 2012 SEIS because it failed to take a “hard look”
    at the environmental impacts of Lease Sale 216/222 and failed to consider a no action
    alternative; (2) that BOEM violated the ESA by failing to insure against jeopardy to listed
    species in issuing Lease Sales 216/222 and 218; and (3) that NMFS violated the APA by
    unreasonably delaying the issuance of the Biological Opinion. The Court turns to the relevant
    legal standards and analyzes each argument in turn.
    A. APA Standard of Review
    Under the APA, a reviewing court may set aside agency action if it is “arbitrary,
    capricious, an abuse of discretion, or otherwise not in accordance with law.” 
    5 U.S.C. § 706
    (2).
    Agency action is considered “arbitrary and capricious if the agency has relied on factors which
    Congress has not intended it to consider, entirely failed to consider an important aspect of the
    problem, offered an explanation for its decision that runs counter to the evidence before the
    7
    The plaintiff organizations are Oceana, Defenders of Wildlife, Center for
    Biological Diversity, and National Resources Defense Council. Though the plaintiffs have
    included several exhibits demonstrating their members’ standing, the defendants do not
    challenge plaintiffs’ standing to bring this action.
    8
    agency, or is so implausible that it could not be ascribed to a difference in view or the product of
    agency expertise.” Motor Vehicle Ass’n v. State Farm Mutual Auto Ins., 
    463 U.S. 29
    , 43 (1983).
    “Although this inquiry into the facts is to be searching and careful, the ultimate standard of
    review is a narrow one. The court is not empowered to substitute its judgment for that of the
    agency.” Citizens to Preserve Overton Park Inc. v. Volpe, 
    401 U.S. 402
    , 416 (1971).
    Under NEPA, the court’s role is “simply to ensure that the agency has adequately
    considered and disclosed the environmental impact of its actions and that its decision is not
    arbitrary or capricious.” Baltimore Gas & Elec. v. NRDC, 
    462 U.S. 87
    , 97–98 (1983). “An
    environmental impact statement is reviewed to ensure that the agency took a hard look at the
    environmental consequences of its decision to go forward with the project.” Nat’l Comm. for the
    New River v. F.E.R.C., 
    373 F.3d 1323
    , 1327 (D.C. Cir. 2004) (citations omitted). “When an
    agency is evaluating scientific data within its technical expertise, an extreme degree of deference
    to the agency is warranted.” 
    Id.
     (internal quotation marks and citation omitted). Meanwhile,
    judicial review of agency action under the ESA is governed by the arbitrary and capricious
    standard. See Cabinet Mountains Wilderness v. Peterson, 
    685 F.2d 678
    , 685 (D.C. Cir. 1982)
    (“Since the ESA does not specify a standard of review, judicial review is governed by section
    706 of the Administrative Procedure Act.”); accord WildEarth Guardians v. Salazar, 
    670 F. Supp. 2d 1
    , 4 (D.D.C. 2009).
    B. NEPA Claims
    The plaintiffs argue that BOEM violated NEPA in three ways: (1) by failing to gather
    information essential to a reasoned choice among alternatives in violation of 
    40 C.F.R. § 1502.22
    ; (2) by failing to adequately consider new analyses of the risks of another large oil spill;
    9
    and (3) by failing to consider a true “no action” alternative. See Pl.’s Mot. Summ. J. 13. Each
    one of these arguments is addressed below.
    1. 
    40 C.F.R. § 1502.22
    The plaintiffs first argue that BOEM determined that certain information was essential to
    a reasoned choice among alternatives, and yet made no effort (1) to obtain the essential
    information or (2) demonstrate that the cost of obtaining it was exorbitant. See Pl.’s Mot. Summ.
    J. 15. As set forth above, under NEPA, when an agency prepares an EIS, it must “[r]igorously
    explore and objectively evaluate all reasonable alternatives . . . .” 
    40 C.F.R. § 1502.14
    (a). In
    undertaking such an analysis, “[w]hen an agency is evaluating reasonably foreseeable significant
    adverse effects on the human environment in an [EIS] and there is incomplete or unavailable
    information, the agency shall always make clear that such information is lacking.” 
    40 C.F.R. § 1502.22
    . If the missing information is “essential to a reasoned choice among alternatives and the
    overall costs of obtaining it are not exorbitant, the agency shall include the information in the
    [EIS].” 
    Id.
     § 1502.22(a). If, on the other hand, the missing information cannot be obtained
    “because the overall costs of obtaining it are exorbitant or the means to obtain it are not known,”
    the agency must include within the EIS: “(1) [a] statement that such information is incomplete or
    unavailable; (2) a statement of the relevance of the incomplete or unavailable information to
    evaluating reasonably foreseeable significant adverse impacts on the human environment; (3) a
    summary of existing credible scientific evidence which is relevant to evaluating the reasonably
    foreseeable significant adverse impacts on the human environment; and (4) the agency’s
    evaluation of such impacts based upon theoretical approaches or research methods generally
    accepted in the scientific community.” Id. § 1502.22(b).
    10
    The Council on Environmental Quality (“CEQ”) promulgates binding regulations on
    federal agencies to help them implement NEPA. See National Environmental Policy Act
    Regulations; Incomplete or Unavailable Information, 
    51 Fed. Reg. 15,618
    -01 (April 25, 1986).
    The CEQ explains that “[t]he term ‘incomplete information’ refers to information which the
    agency cannot obtain because the overall costs of doing so are exorbitant. The term ‘unavailable
    information’ refers to information which cannot be obtained because the means to obtain it are
    not known.” 51 Fed. Reg. at 15,621. The CEQ regulations further note that the term “overall
    costs” is intended to encompass “financial costs and other costs such as costs in terms of time
    (delay) and personnel.” Id. at 15,622. It also “intends that the agency interpret ‘overall costs’ in
    light of overall program needs.” Id. Finally, the CEQ guidelines provide that the phrase “‘the
    means to obtain it are not known’ is meant to include circumstances in which the unavailable
    information cannot be obtained because adequate scientific knowledge, expertise, techniques or
    equipment do not exist.” 51 Fed. Reg. at 15,622 (emphasis added). In addition, other NEPA
    regulations provide that “[i]n circumstances where the provisions of 
    40 C.F.R. § 1502.22
     apply,
    bureaus must consider all costs to obtain information. These costs include monetary costs as
    well as other non-monetized costs when appropriate, such as social costs, delays, opportunity
    costs, and non-fulfillment or non-timely fulfillment of statutory mandates.” 
    43 C.F.R. § 46.125
    .
    In Chapter 4 of the 2012 SEIS, BOEM explained that for thirteen resources, there is
    “incomplete or unavailable information that is relevant to reasonably foreseeable significant
    adverse impacts; however, it is not essential to a reasoned choice among alternatives.”
    AR5624. 8 For eleven other resources, however, BOEM concluded that “there is incomplete or
    8
    The plaintiffs do not challenge BOEM’s determination as to whether the
    unavailable information was “essential.” See Federal-Def.’s Cross-Mot. Summ. J. 10 n.2; Pl.’s
    Mot. Summ. J. 13‒17. As such, the Court defers to BOEM’s determination on this issue.
    11
    unavailable information that is relevant to reasonably foreseeable significant adverse impacts and
    may be essential to a reasoned choice among alternatives.” 
    Id.
     BOEM analyzed each of those
    eleven resources, which are Seagrass Communities, Live Bottoms, Topographic Features,
    Marine Mammals (the sperm whale and the West Indian manatee, specifically), Sea Turtles,
    Coastal and Marine Birds, Gulf Sturgeon, Fish Resources and Essential Fish Habitat,
    Commercial Fisheries, Environmental Justice, and Diamondback Terrapins. See AR5624‒25.
    Because the plaintiffs take issue with BOEM’s treatment of each of these eleven
    resources for which there was “incomplete or unavailable [yet essential] information,” the Court
    must examine what, exactly, BOEM did to determine whether it complied with the requirements
    of 
    40 C.F.R. § 1502.22
    (b). With respect to Seagrass Communities, BOEM concluded the
    following:
    [T]here remains uncertainty regarding the impacts of the DWH event on
    submerged vegetation . . . . BOEM cannot definitively determine that the
    incomplete or unavailable information being developed through the NRDA
    process would not be essential to a reasoned choice among alternatives.
    Nevertheless, the ongoing research on submerged vegetation after the DWH event
    is being conducted through the NRDA process. These research projects may be
    years from completion, and data and conclusions have not been released to the
    public. Regardless of the costs involved, it is not within BOEM’s ability to obtain
    this information from the NRDA process within the timeline of this Supplemental
    EIS. In light of this incomplete and unavailable information, BOEM subject-
    matter experts have used credible scientific information that is available and
    applied it using scientifically accepted methodology.
    AR5709‒10.
    BOEM made similar statements regarding the Live Bottom (Pinnacle Trend) habitat, see
    AR5721; Topographic Features, see AR5781; Marine Mammals, see AR5839; Sea Turtles, see
    AR5858‒59; Coastal and Marine Birds, see AR5879; Gulf Sturgeon, see AR5907; Fish
    Resources and Habitat, see AR5922; Commercial Fishing, see AR5938; Environmental Justice,
    see AR6010; and Diamondback Terrapins, see AR6060‒61.
    12
    BOEM explained the methodologies it relied on generally, and then explained the
    scientific studies it relied on specifically for each of the eleven resources. Generally, BOEM
    included the following section as to its methodology in Appendix B of the SEIS:
    Two general approaches are utilized to analyze a catastrophic event under NEPA.
    The first approach is a bounding analysis for each individual resource category
    (e.g., marine mammals, sea turtles, etc.). A bounding analysis involves selecting
    and evaluating a different set of factors and scenarios for each resource in the
    context of a worst-case analysis. The second approach involves the selection of a
    single set of key circumstances that, when combined, result in catastrophic
    consequences. The second approach is used for a site-specific analysis and,
    consequently, its possible application is more limited. Accordingly, this analysis
    combines the two approaches, relying on a generalized scenario while identifying
    site-specific severity factors for individual resources. This combined approach
    allows for the scientific investigation of a range of possible, although not
    necessarily probable, consequences of a catastrophic blowout and oil spill in the
    Gulf of Mexico.
    AR6562.
    On the more specific level, BOEM relied on various studies, both dated pre-and post-oil spill,
    and made evaluations of the environmental impacts to the particular resource in light of those
    studies. See, e.g., AR5707 (“The panhandle [of Florida] was exposed to oil and tarballs from the
    DWH event, but the majority of the seagrass beds in south Florida received little impact from the
    DWH event (USDOC, NOAA, 2010e). It is assumed these communities will be similar to how
    they were before the DWH event unless a significant delayed impact occurs.”); AR5711 (citing
    to, explaining, and apply various studies with respect to seagrass communities); AR5839‒40
    (stating that “BOEM subject-matter experts have used available scientifically credible evidence
    in this analysis and based upon accepted scientific methods and approaches” and, citing to and
    applying a Waring et al. (2009) study on sperm whales, to discuss the impacts of both the
    proposed action and the DWH spill on sperm whales); AR5858 (citing to studies post-Ixtoc I oil
    spill off the coast of Mexico to compare effects of spills on sea turtles in the Gulf of Mexico, and
    13
    citing to various other scientific studies both before and after the spill to discuss impacts to sea
    turtles of the proposed action); AR5874 (“peer-reviewed modeling of bird mortality was
    completed by Antonio et al. (2011) . . . . If physical oiling of individuals or local groups of birds
    occurs, some degree of both acute and chronic psychological stress associated with direct and
    secondary uptake of oil would be expected.”); AR5907 (“Based on the publicly available
    information found in the OSAT and OSAT-2 reports (OSAT, 2010; OSAT-2, 2011), it was noted
    that, after August 2010, the more toxic oil components were limited to an area . . . [and]
    sediment samples did not reach USEPA’s exceedances for aquatic life benchmarks.”); AR5922
    (“Based on existing research, adult fish have been observed to actively avoid contact with oil in
    the water column (Wannamaker and Rice, 2000). Nevertheless, information on effects of the
    DWH event on fisheries is unavailable or incomplete at this time . . . .”); AR5940 (“In a recent
    study of the concentrations of the bioavailable form of mercury in drill mud, Trefry et al. (2003)
    found concentrations did not vary significantly between near-platform and far-platform sites . . . .
    As such, any impact to commercial fisheries would likely be indistinguishable from exposure to
    background concentrations.”); AR6061‒62 (explaining effects of 1990 oil spill on population of
    diamondback terrapins and explaining that effects of DWH oil spill “may have potentially
    impacted the terrapin community” but noting that such effects cannot be quantified at this time).
    a. BOEM disclosed what was unavailable
    The plaintiffs first argue that BOEM failed to comply with 
    40 C.F.R. § 1502.22
     because
    it did not explain why the overall costs to obtaining the essential missing information were
    exorbitant. 
    40 C.F.R. § 1502.22
     first requires that “[w]hen an agency is evaluating reasonably
    foreseeable significant adverse effects on the human environment in an environmental impact
    statement and there is incomplete or unavailable information, the agency shall always make clear
    14
    that such information is lacking.” 
    40 C.F.R. § 1502.22
    (b) goes on to state that if the essential,
    missing, information “cannot be obtained because the overall costs of obtaining it are exorbitant
    or the means to obtain it are not known,” then the agency must include four particular statements
    in the EIS.
    BOEM stated that certain information that may be essential to a reasoned choice among
    alternatives was incomplete or unavailable. See supra, at 12. The plaintiffs argue that BOEM
    did not satisfy 
    40 C.F.R. § 1502.22
     because BOEM failed to demonstrate or explain why the
    overall cost to obtaining the essential information was exorbitant. See Pl.’s Mot. Summ. J. 15;
    Pl.’s Reply 3‒4. But 
    40 C.F.R. § 1502.22
     itself does not require such a demonstration—it only
    requires that “[i]f the information . . . cannot be obtained because the overall costs of obtaining it
    are exorbitant,” then the agency must disclose the four enumerated statements in §1502.22(b) in
    the EIS (emphasis added). §1502.22(b) does not impose a requirement that the agency explain
    why the “overall costs of obtaining [the missing, essential information] are exorbitant or the
    means to obtain it are not known”—just that it provide the four enumerated statements in the EIS
    if the costs to obtaining the information are exorbitant. See Oregon Envt’l Council v. Kunzman,
    
    817 F.2d 484
    , 495‒96 (9th Cir. 1987) (“The omission of an explicit exposition of the agency’s
    determination of exorbitance does not warrant deeming this EIS legally inadequate.”).
    And regardless of whether the regulation required such an explanation, BOEM
    nevertheless provided one. In the 2012 SEIS, BOEM repeatedly stated that the essential
    unavailable research may take years to complete, and that it was not within BOEM’s ability to
    obtain the information within the timeframe contemplated by the SEIS, thus stating that “the
    means to obtain [missing information] are not known.” 
    40 C.F.R. § 1502.22
    (b). BOEM also
    repeatedly stated that “[r]egardless of the costs of acquiring these data, given the realities of the
    15
    NRDA process, 9 these data will not be available within the timeframe contemplated for this
    NEPA analysis.” AR5941. See also AR5942 (explaining that, with respect to the impact on
    commercial fisheries, “impacts from the DWH event may be difficult or impossible to discern
    from other factors. Therefore, it is not possible for BOEM to obtain this information within the
    timeframe contemplated in this Supplemental EIS”); AR5623‒24 (“Credible scientific data
    regarding the potential short-term and long-term impacts on CPA resources is slowly becoming
    available but remains incomplete at this time, it could take many years before this information
    becomes available via the Natural Resources Damage Assessment (NRDA) process, BOEM’s
    Environmental Studies Program, and numerous studies by academia.”). BOEM also referenced
    the experience of the Exxon Valdez oil spill, and the fact that it took so many years to get viable
    scientific information after that disaster, as an example. See, e.g., AR5839 (“even 20 years after
    the Exxon Valdez spill, long-term impacts to marine mammal populations are still being
    investigated (Matkin et al., 2008). Therefore it is not possible for BOEM to obtain this
    9
    The Oil Pollution Act of 1990 created a process called the Natural Resource
    Damage Assessment (“NRDA”) to “assess natural resource damages” in the case of damage
    from oil spills. See 
    33 U.S.C. §§ 2702
    (a), 2706(c). The President designates certain federal
    agencies, states, and Indian tribes, as trustees to evaluate the impacts of oil spills on natural
    resources. See 
    id.
     § 2706(b). The NRDA for the Deepwater Horizon spill is currently underway,
    and BOEM was not designated a trustee for the Deepwater Horizon NRDA process. In an email
    from Joe Christopher, BOEM’s Regional Supervisor for the Gulf of Mexico leasing program, to
    Michael Bromwich, the Director of BOEM at the time, he explained that because BOEM is not a
    trustee of NRDA, they “did not have a seat on the NRDA committee” and thus “have had little
    success in accessing, either in the planning of studies, or in the sharing of data.” See AR3232.
    He requested that they be allowed to become a trustee to join the committee, to help develop a
    robust SEIS. Id. See also AR5855 (“Due to NMFS’s and FWS’s role in the [NRDA]
    investigation, BOEM does not have the ability to obtain its own data on stranded animals.”).
    The record therefore reflects that BOEM attempted to get involved in the NRDA process, but
    was denied access through no fault of its own. Moreover, even if BOEM could have become a
    trustee on the Board, “there is no indication that information would be available and usable by
    BOEM as part of the 2012 SEIS,” see Federal-Def.’s Cross-Mot. Summ. J. 12, as the relevant
    scientific data was, and still is being developed.
    16
    information within the timeline contemplated in this Supplemental EIS, 10 regardless of the cost
    or resources needed.”).
    BOEM thus explained that the reason the information could not be obtained was because
    of the ongoing research being conducted post-oil spill, and that regardless of cost, it was not
    within BOEM’s ability to obtain the information from the NRDA process. BOEM’s discussion
    of its inability to obtain the essential information because the data was not yet available from the
    NRDA, and might not be for years, therefore suffices for purposes of demonstrating that the
    “means to obtain[ing]” the information were not known. And BOEM’s discussion of the delay
    in timing of the information being available suffices for purposes of determining whether “the
    overall costs” were exorbitant (regardless of whether BOEM had to “demonstrate” exorbitance
    or not), per the CEQ guidelines. 11
    10
    The plaintiffs argue that it was arbitrary and capricious for BOEM to set its own
    SEIS-development timeline. However, agencies have discretion to set up their own timelines
    when undertaking an environmental impact statement. See 
    40 C.F.R. § 1501.8
     (“Federal
    agencies are encouraged to set time limits appropriate to individual actions.”). See also 
    id.
     §
    1501.8(b)(2)(i)-(vii) (allowing an agency to set up a time limit for all parts of the environmental
    impact statement analysis); Wyoming v. U.S. Dep’t of Agriculture, 
    661 F.3d 1209
    , 1239 (10th
    Cir. 2011) (“absent constitutional constraints or extremely compelling circumstances the
    administrative agencies should be free to fashion their own rules of procedure and methods of
    inquiry permitting them to discharge their multitudinous duties”) (internal citations and quotation
    marks omitted). BOEM spent thirteen months developing the 2012 SEIS, from November 2010
    when it issued its notice of intent to prepare an SEIS for Lease Sale 216/222 to January 2012
    when it issued the Final SEIS for Lease Sale 216/222. The Court defers to the agency’s timeline
    and does not find it arbitrary and capricious. While BOEM was assuredly intent on proceeding
    with the lease sales, it nevertheless took time to develop a Draft SEIS, prepare a new Oil Spill
    Risk Analysis, accept comments, respond to comments, and publish the Final SEIS.
    11
    The plaintiffs argue that BOEM’s exorbitance explanation is a post-hoc litigation
    position, and as such, is afforded no deference. See Pl.’s Reply 3‒4. The Court finds this
    argument unpersuasive, because, as set forth above, the 2012 SEIS itself did contain explanations
    for why the information was not available and why it was unobtainable regardless of costs. And
    any additional information it has provided in its motion papers is not new, but rather, clarifying.
    See Nat’l Oilseed Processors Ass’n v. Browner, 
    924 F. Supp. 1193
    , 1204 (D.D.C. 1996) (“[t]he
    rule against post-hoc rationalizations does not prevent a court from considering a more detailed
    explanation of an agency’s action in response to a legal challenge. As long as the agency does
    17
    The CEQ regulations further provide that “one of the costs that must be weighed by
    decisionmakers is the cost of uncertainty—i.e., the costs of proceeding without more and better
    information.” 51 Fed. Reg. at 15,624 (quoting Alaska v. Andrus, 
    580 F.2d 465
    , 473 (D.C. Cir.
    1978), vacated on other grounds by Western Oil & Gas Ass’n v. Alaska, 
    439 U.S. 922
     (1978)).
    To be sure, BOEM could have waited until all the essential post-oil spill data became available
    before it moved forward with the lease sales. But nothing in 
    40 C.F.R. § 1502.22
     requires the
    agency to halt action in the face of uncertain information—it just requires disclosure that such
    information is lacking, and commands the agency to provide as comprehensive an analysis it can
    with the information available to it. Courts have recognized that “NEPA does not require that
    complete information about the environmental impact of a project be obtained before a project is
    undertaken.” N. Slope Borough v. Andrus, 
    486 F. Supp. 326
    , 330 (D.D.C. 1979); see also Seattle
    Audubon Soc’y v. Lyons, 
    871 F. Supp. 1291
    , 1318 (W.D. Wash. 1994), aff’d, 
    80 F.3d 1401
     (9th
    Cir. 1996) (“It is not required . . . that action be deferred until all studies have been done that
    might be done.”). The administrative record shows that BOEM gathered as much information as
    it could and comported with the initial requirements of 
    40 C.F.R. § 1502.22
    .
    b. BOEM evaluated impacts based on theoretical approaches or research methods
    generally accepted in the scientific community
    The plaintiffs next argue that even if BOEM had satisfied the requirement to demonstrate
    that it could not obtain essential information due to exorbitant cost, see Pl.’s Reply 4, it still
    failed to comply with the final step 12 of 
    40 C.F.R. §1502.22
    (b), which required BOEM to
    not present a new basis for its action, it may supply a clearer or more detailed explanation.”)
    (citing Methodist Hosp. of Sacramento v. Shalala, 
    38 F.3d 1225
    , 1233 n.11 (D.C. Cir. 1994)).
    12
    It is not disputed by the parties that BOEM met the requirements of 
    40 C.F.R. § 1502.22
    (b)(1)‒(3). And the Court finds that those requirements are met here. First, BOEM
    explains that certain information is unavailable: “the impacts of DWH” on a particular species or
    resource. Second, BOEM states the relevance of that information: that it may be essential to a
    18
    “evaluat[e] . . . such impacts based upon theoretical approaches or research methods generally
    accepted in the scientific community.” 
    40 C.F.R. §1502.22
    (b)(4). Contrary to the plaintiffs’
    argument that the agency did not use the scientific methodologies to make a “true prediction of
    impacts based on” the methodologies it studied, see Pl.’s Reply 5 n.3, the Court finds that BOEM
    did evaluate impacts based on “theoretical approaches or research methods generally accepted in
    the scientific community.” For each of the eleven resources for which BOEM determined there
    was essential, unavailable information, BOEM analyzed the impacts to those species in light of
    the information it did have available to it.
    For instance, with respect to sea turtles, BOEM cited an OSAT 2010 study and then
    determined that “[i]t is likely that there were effects on individual sea turtles in the vicinity of the
    DWH event spill caused by spilled oil and/or response activities . . . . [but] [w]ithout any further
    data than what exist [sic] from NMFS and FWS (which have jurisdiction over sea turtles in water
    and on land, respectively), it is impossible to determine if the spill has led to population-level
    effects or if sea turtles are experiencing chronic effects or persistent adverse impacts from the
    spill at the population level.” AR5854. With respect to the gulf sturgeon, BOEM cited to an
    OSAT 2010 and 2011 study as well as an FWS study from 2010 that discussed the effects of the
    oil spill on the gulf sturgeon’s critical habitat. AR5912. BOEM then concluded that “critical
    habitat from Lake Borgne to the Florida/Alabama State line has at least been exposed to oil from
    the DWH event . . . . but did not exceed USEPA’s benchmarks for aquatic life in either
    sediments or water.” 
    Id.
     For birds, BOEM explained that it had no peer-reviewed studies of the
    impacts of oil spills on birds in the Gulf of Mexico, but in place of that, “investigations of spills
    determination of a reasoned choice among alternatives. Third, BOEM summarizes “existing
    credible scientific evidence which is relevant” in each of the eleven sections that it analyzes, as
    well as in Appendix B.
    19
    in other areas, mathematical modeling, and laboratory tests (e.g., toxicity tests and veterinarian
    studies of rehabilitation) are used for insight into DWH impacts on all life history stages of birds
    . . . . Although information from the DWH event would be useful, it is not expected to
    significantly change this existing body of science.” AR5885. BOEM thus applied the scientific
    information it had before it to discuss what impacts Lease Sale 216/222 would have on the
    effected resources.
    Moreover, BOEM included a Catastrophic Spill Event Analysis in Appendix B of the
    2012 SEIS. There, BOEM cited its general “Methodology,” quoted above (see AR6562), and
    proceeded to apply that methodology to the rest of Appendix B, which analyzed the effects of a
    Catastrophic Spill on every resource identified in the Gulf of Mexico. See AR6563‒6612.
    BOEM also included a 100-page bibliography in Appendix B, compliant with CEQ guidelines
    for “literature searches and peer review,” see 51 Fed. Reg. at 15,622, illustrating that BOEM’s
    subject matter experts relied upon consultation with outside sources, including scientists, to
    complete the 2012 SEIS. See AR6315‒6412. BOEM then spent over fifty pages evaluating the
    environmental impacts of a catastrophic spill based upon the various sources of credible
    scientific evidence it cited. See AR6563 (“[T]his analysis, based on credible, scientific evidence,
    identifies the most likely and most significant impacts from a high-volume blowout and oil spill
    that continued for an extended period of time.”). 
    40 C.F.R. § 1502.22
    (b)(4) requires that the
    agency “use[] available data to explore the potential impacts and articulate[] the basis for its
    decision.” Cabinet Res. Grp. v. U.S. Fish & Wildlife Serv., 
    465 F. Supp. 2d 1067
    , 1100 (D.
    Mont. 2006). BOEM did just that. As such, it complied with 
    40 C.F.R. § 1502.22
    , and did not
    violate NEPA on these grounds.
    20
    BOEM did repeatedly state in somewhat boilerplate fashion that “BOEM subject-matter
    experts have used available scientifically credible evidence in this analysis and based it upon
    accepted scientific methods and approaches.” See supra, at 12. The plaintiffs argue that “[i]t is
    insufficient for BOEM to simply state that it used such methodologies without record evidence,”
    see Pl.’s Reply 5. But Chapter 4 of the 2012 SEIS, along with Appendix B reference numerous
    studies and evaluate what information BOEM did have in light of the proposed impact of the
    lease sales going forward. Just because BOEM did not specifically re-cite and evaluate those
    studies in the sections where the above-quoted language comes from does not mean that it did
    not make the requisite evaluations at all. On the contrary, BOEM stated generally that it was
    relying on accepted scientific methods and approaches and then specifically applied relevant
    studies for each effected resource it examined throughout the 2012 SEIS.
    Finally, the plaintiffs argue that BOEM did not gather the essential information required
    by 
    40 C.F.R. § 1502.22
    . The vast administrative record and foregoing discussion undermines
    this contention. To be sure, BOEM lacked certain information, which it disclosed in the SEIS,
    because many of the effects of the oil spill on the environment are still unknown. However, in
    every place it reasonably could, BOEM updated its analyses in light of the information it did
    have available. BOEM took a hard look at the effects of the Deepwater Horizon oil spill and
    incorporated all the information it reasonably could in the 2012 SEIS. As such, it did not violate
    
    40 C.F.R. § 1502.22
    .
    2. BOEM considered new analyses about the risks of catastrophic oil spills
    The plaintiffs next argue that BOEM failed to adequately consider new information about
    the risks of future oil spills. Pl.’s Mot. Summ. J. 17. Specifically, the plaintiffs argue that
    BOEM (1) failed to incorporate critical information from its new spill risk analysis prior to the
    21
    completion of the SEIS, (2) significantly downplayed the Gulf spill in the analysis it did perform,
    and (3) failed to conduct new modeling in light of the spill and its new analysis. 
    Id. at 18
    .
    Before diving into the depths of the studies and tables, some background information is
    useful. NEPA regulations provide that agencies are allowed to “tier their environmental impact
    statements to eliminate repetitive discussions of the same issues and to focus on the actual issues
    ripe for decision at each level of environmental review.” See 
    40 C.F.R. § 1502.20
    . As BOEM
    explained, the 2012 SEIS “tiers from” the 2007 Multisale EIS and the 2009‒2012 Supplemental
    EIS. AR5445. The main oil spill study relied upon by BOEM in the 2007 Multisale EIS, the
    2009‒2012 Supplement, and the Draft SEIS was a study by Anderson and Labelle (2000).
    AR5556. The Anderson and Labelle study was updated by BOEM’s own draft report, entitled
    “Update of Oil Spill Occurrence Rates for Offshore Oil Spills” [hereinafter “Draft Report”]. See
    
    id.
     (“Anderson and Labelle (2000) have [sic] been updated by DOI’s draft report, Update of Oil
    Spill Occurrence Rates for Offshore Oil Spills (USDOI, BOEMRE, 2011a).”). BOEM also
    explained that in light of this update, “[p]latform and pipeline spill rates and likely spill sizes
    published in the Multisale EIS have thus become outdated. Readers should note that Tables 4-
    13, 4-14, 4-16, and 4-35 of the Multisale EIS and Table 3-6 of the 2009‒2012 Supplemental EIS
    use the 2000 spill rates and sizes rather than the 2011 spill rates and sizes.” 
    Id.
    The Draft Report incorporated new data based on the Deepwater Horizon spill (called the
    “Macondo” spill in the report) into BOEM’s figures for oil spill occurrences. See DOI REF
    48326‒48339. BOEM generally structures its analysis in terms of oil spill size. The relevant
    spill sizes for purposes of this case are the larger spill sizes: ≥ 1,000 bbl and ≥ 10,000 bbl (bbl
    standing for barrel). After updating its calculations to include oil spills up through 2010
    (including the Macondo spill), BOEM concluded, inter alia, that:
    22
    (1)        spill rates 13 for OCS Platforms were unchanged for spills ≥ 1,000 bbl at 0.32
    spills per bbl, but improved from 0.12 to 0.06 spills ≥ 10,000 bbl when
    examined over the entire record (1964–2010) and adjusted for a trend. DOI
    REF 48326.
    (2)        spill rates for OCS platforms doubled when comparing the most recent 15
    years [of] data (1996–2010 data) to the last 15 years [of] data in the previous
    analysis (Anderson & LaBelle 2000: 1985‒1999 data) from 0.13 to 0.25 spills
    per bbl for spills ≥ 1,000; and from 0.05 to 0.13 spills per bbl for spills ≥
    10,000 bbl. These rates are still relatively low and include a spill from
    Hurricane Rita (2005) and the Macondo spill in 2010.
    
    Id.
     14
    The 2012 SEIS references this Draft Report in the following places (that either the Court
    can find or that the parties cite to): AR5556, AR5575, AR5576, AR6471. 15
    13
    As BOEM explained, “[s]pill rates were calculated based on the assumption that
    spills occur in direct proportion to the volume of oil handled and are expressed as number of
    spills per billion barrels of oil handled.” AR5576. Moreover, in the Draft Report, BOEM
    defines “spill rate” as “[e]stimated occurrence rates for oil spills based on historic spill
    occurrences and associated volume of oil produced and transported.” See DOI REF 48328.
    14
    The Draft Report has since been finalized, is available on BOEM’s website, and
    BOEM is using it in the 2012‒2017 Five-Year Lease Program. The Final Report arrives at the
    same conclusions the Draft Report did. See http://www.boem.gov/uploadedFiles/BOEM/
    Oil_and_Gas_Energy_Program/Leasing/Five_Year_Program/2012-
    2017_Five_Year_Program/Update%20of%20Occurrence%20Rates%20for%
    20Offshore%20Oil%20Spills.pdf. The only substantive difference is that the Final Report more
    clearly explains how including the Macondo spill in the average drastically changes the statistics
    for a typical event. See 
    id.
     at 37‒39.
    15
    It is also provided in the administrative record to this case at DOI REF 48326‒
    48377.
    23
    a. BOEM incorporated new information
    The plaintiffs first argue that BOEM completed an updated risk analysis in light of the
    Deepwater Horizon spill—the Draft Report—and yet did not provide data from that new analysis
    in the 2012 SEIS. See Pl.’s Mot. Summ. J. 19. The plaintiffs’ argument focuses on Table 3-5,
    provided at AR6471. Table 3-5 is entitled “Mean Number and Sites of Spills Estimated to Occur
    in OCS Offshore Central Planning Area Waters from an Accident Related to Rig/Platform and
    Pipeline Activities Supporting a CPA Proposed Action Over a 40-Year Time Period.” See 
    id.
    The significance of the table is that it provides “[t]he risk of various sizes of oil spills occurring
    in the CPA.” See, e.g., AR5822.
    The plaintiffs take issue with Table 3-5’s exclusion of the ≥ 10,000 bbl category from the
    table’s body itself. In the 2007 Multisale EIS, the risk of various oil spills occurring in the CPA
    was provided in Table 4-35, and in the 2009‒2012 Supplement EIS performed, it was moved to
    Table 3-6. See AR5578. As BOEM explained in the 2012 SEIS, these figures use the 2000 spill
    rates rather than the updated 2011 spill rates. AR5556. In these prior iterations, the tables
    provided a category for oil spills ≥ 10,000 bbl. In addition, the SEIS for Lease Sale 218 as well
    as the Draft SEIS for Lease Sale 216/222 include a table that includes a ≥ 10,000 bbl category.
    Essentially, of all the EISs or SEISs performed in the Gulf of Mexico CPA and WPA for the
    2007‒2012 leasing period, the 2012 SEIS is the only one that excludes a ≥10,000 bbl category in
    the table body estimating mean number and sizes of oil spills. Instead, in the notes section
    directly under the table, BOEM states “[a] spill size group for ≥ 10,000 bbl was not included in
    the table, because the catastrophic Deepwater Horizon oil spill (4.9 million bbl) was the only
    spill this size range during 1996-2010, and thus meaningful statistics (such as median spill size)
    24
    could not be calculated.” AR6471. In the Draft Report, BOEM gave the following explanation
    for its treatment of the ≥ 10,000 bbl category:
    In the case of OCS Platform spills, spill size averages and medians were
    calculated through to 2009 rather than 2010. [sic] because the Macondo spill size
    overwhelms the rest of the record in any calculation using spill volume. The
    Macondo well spilled an estimated 4.9 million barrels in the Gulf of Mexico –
    about 8.5 times the roughly 750,000 bbl of petroleum previously spilled (spills ≥
    1 bbl) between 1964 and 2009 from OCS oil and gas activities. Unfortunately,
    the Macondo spill was a ‘worst case’ spill – a complete loss of well control due to
    multiple failures on a well with a very large reservoir under very high pressures
    that released uncontrolled for months. Few wells would be capable of this size
    release even under the worst of circumstances. It is appropriate to count the
    Macondo spill in the spill rates for spills of 1,000 and 10,000 bbl or greater.
    Means (averages) and medians are statistical measures that are frequently used to
    characterize a ‘typical’ event. In the interest of characterizing the size of a
    ‘typical’ or ‘representative’ OCS spill it would be best to exclude the Macondo
    spill volume in the calculation of mean (average) or median spill size.
    DOI REF 48339 (emphasis added).
    Thus, BOEM included the Macondo spill in Table 3-5 for spill rates statistics for spills ≥
    1,000 bbl, but excluded the Macondo spill from median spill size statistics for spills ≥ 1,000,
    explaining that using the 4.9 million barrel figure would overwhelm the record. And BOEM did
    not include separate statistics in the table for spills ≥ 10,000 bbl at all, because it determined that
    it could not meaningfully provide them, given that the Macondo spill was the only spill in that
    category for the relevant 15-year period.
    The plaintiffs’ concern with this category’s exclusion from the body of the table is
    understandable. Given that every prior version of the table includes the ≥ 10,000 bbl category,
    the Court is puzzled as to why BOEM decided in the 2012 SEIS—which was only undertaken to
    account for changes in light of the Deepwater Horizon spill (a spill ≥ 10,000 bbl)—to exclude
    that figure from the table body itself. While the Court likely would not have relegated that
    category to the “Notes” section of the table, and, for the sake of consistency, have kept the
    category in the table as it appeared in the Draft SEIS (with updated figures—regardless of
    25
    whether or not they were “meaningful”), see AR4861, the Court cannot say that BOEM excluded
    the category from consideration in the 2012 SEIS altogether, as the plaintiffs would have the
    Court find. Even if the body of Table 3-5 itself does not provide statistics for a ≥ 10,000 bbl
    category spill occurring, the 2012 SEIS still does. For instance, in Chapter 4 of the SEIS, BOEM
    states repeatedly that “[t]he risk of various sizes of oil spills occurring in the CPA is presented in
    Table 3-5. The possibility of a spill over 10,000 bbl in the OCS of the CPA is estimated to be
    <1-1 spill, over the 40-year cycle for the proposed action for the 5-Year Program.” AR5807,
    AR5622 (same); see also AR5822 (“The possibility of a spill > 10,000 bbl in the CPA is
    estimated to be up to one spill in the 40-year period for the proposed action.”), AR5831 (same). 16
    And even though the body of Table 3-5 itself does not include the ≥ 10,000 bbl category, the
    note directly under it does, stating that “[a] spill size group for ≥ 10,000 bbl was not included in
    this table, because the catastrophic Deepwater Horizon oil spill (4.9 million bbl) was the only
    16
    The plaintiffs are correct that there are some discrepancies between the Table and
    how it is cited to in the 2012 SEIS. For instance, at AR5622, BOEM states that “[t]he number of
    spills ≥ 1,000 bbl and ≥ 10,000 bbl estimated to occur as a result of the CPA proposed action is
    provided in Table 3-5. The mean number of spills estimated for the proposed action in the CPA
    is 1-3 spills (≥ 1,000 bbl) and <1-1 spill (≥ 10,000 bbl).” This “< 1-1” estimated mean number
    of spills figure for oil spills ≥ 10,000 bbl is not provided in Table 3-5, as the parties so zealously
    dispute. There also appears to be a typographical error at AR5576, where BOEM states that
    “[a]s shown on Table 3-5, the mean number of spills estimated for the CPA proposed action is
    <1-1 spill ≥ 1,000 bbl.” AR5576. The actual estimated number of spills for a CPA proposed
    action ≥ 1,000 bbl is 1-2 spills. The <1-1 figure is the figure from the ≥ 10,000 bbl category that
    is excluded in this rendition of the table, but was included in the Draft SEIS. Notwithstanding
    what appear to be typographical oversights on the part of BOEM when it went from Draft to
    Final version of the SEIS, the Court still finds that as a whole, BOEM “took a hard look at the
    environmental consequences of its decision to go forward with the project.” Nat’l Comm. for the
    New River v. F.E.R.C., 
    373 F.3d 1323
    , 1327 (D.C. Cir. 2004) (citations omitted). And moreover,
    the errors are harmless. See Nevada v. Dep’t of Energy, 
    457 F.3d 78
    , 90‒91 (D.C. Cir. 2006)
    (explaining that under the harmless error standard, the court would not “order the DOE to revise
    the FEIS” because doing so would be tantamount to “a meaningless gesture.”); accord Oregon
    Envt’l Council v. Kunzman, 
    817 F.2d 484
    , 492 (9th Cir. 1987) (“The reviewing court may not fly
    speck an EIS and hold it insufficient on the basis of inconsequential, technical deficiencies”
    (citation omitted)).
    26
    spill size in this size range during 1996-2010, and thus meaningful 17 statistics (such as median
    spill size) could not be calculated.” See AR6471. Thus, the relevant figures are not hidden from
    the public, but rather, they just appear in a different place. And the ≥ 1,000 bbl category’s spill
    rate accounts for the Macondo spill. See DOI REF 48339. Moreover, BOEM thoroughly
    considered the ≥ 10,000 bbl spill category in its Draft Report, which it cited to several times, and
    included in the administrative record. While the plaintiffs argue that the Draft Report was not
    disclosed, and the record reflects that BOEM may have been hesitant about sharing it—perhaps
    because it was in draft form, the Report was ultimately included in the administrative record, and
    was referred to in the 2012 SEIS. See AR5556, AR5575, AR5576, AR6471, DOI REF 48326‒
    48377; see also AR6141 (explaining that the Anderson and LaBelle (2000) study has been
    recently updated, even though it is still in draft form).
    Though BOEM did not necessarily create a table and conduct its analysis the way the
    Court might have, it still took a “hard look” at the ≥ 10,000 bbl category, and in turn the
    Deepwater Horizon spill in the 2012 SEIS generally. As such, BOEM was not arbitrary and
    capricious in excluding the ≥ 10,000 bbl category from the body of the table itself—a single
    table within an SEIS of over 1,100 pages in length. See Bowman Transp., Inc. v. Arkansas-Best
    Freight Sys., Inc., 
    419 U.S. 281
    , 285‒86 (1974) (“While we may not supply a reasoned basis for
    the agency’s action that the agency itself has not given, we will uphold a decision of less than
    ideal clarity if the agency’s path may reasonably be discerned.”) (internal quotation marks and
    citations omitted); Wilderness Soc’y v. Salazar, 
    603 F. Supp. 2d 52
    , 59 (D.D.C. 2009) (“The
    court’s role is to ensure that the agency takes a ‘hard look’ at the environmental consequences of
    17
    Presumably, by “meaningful” statistics, BOEM means that because there was
    only one spill ≥ 10,000 between 1996 and 2010 to occur, a median spill size could not be
    calculated for that category (because an average by definition, requires more than one figure).
    Thus, the Court defers to the agency in its determination of “meaningful” statistics.
    27
    an action, not to interject its own judgment as to the course of action to be taken.”) (quoting
    Hammond v. Norton, 
    370 F. Supp. 2d 226
    , 240 (D.D.C. 2005)); see also Miami-Dade Cnty. v.
    EPA, 
    529 F.3d 1049
    , 1065 (11th Cir. 2008) (“courts must be extremely deferential when an
    agency’s decision rests on the evaluation of complex scientific data within the agency’s technical
    expertise . . . . although a reviewing court may not rubber stamp an agency decision, it must look
    at the agency’s decision not as the chemist, biologist, or statistician that it is qualified neither by
    training nor experience to be, but as a reviewing court exercising . . . certain minimal standards
    of rationality”) (internal quotation marks and citations omitted). BOEM took a hard look at the
    Deepwater Horizon event in the 2012 SEIS and its exclusion of a ≥ 10,000 bbl category from
    Table 3-5 does not undermine that conclusion. 18 See Oregon Envt’l Council v. Kunzman, 
    817 F.2d 484
    , 492 (9th Cir. 1987) (“The reviewing court may not fly speck an EIS and hold it
    insufficient on the basis of inconsequential, technical deficiencies” (citation omitted)).
    b. BOEM considered impacts of deepwater drilling
    The plaintiffs next argue that BOEM ignored its duty to assess the risks of deepwater
    drilling. See Pl.’s Mot. Summ. J. 21. The administrative record shows that BOEM did consider
    the risks of deepwater drilling, throughout the 2012 SEIS. BOEM first noted that “[i]n response
    to increasing deepwater activities in the GOM, this Agency developed a comprehensive strategy
    to address NEPA compliance and environmental issues in the deepwater areas. A key
    component of that strategy was the completion of a Programmatic EA [environmental
    18
    The plaintiffs argue that the exclusion of the ≥ 10,000 bbl category represents a
    deviation from BOEM’s past practice of considering a ≥ 10,000 bbl category. See Pl.’s Reply 7‒
    8 (citing, e.g., FCC v. Fox Television Stations, Inc., 
    556 U.S. 502
    , 515 (2009)). However, this is
    not a situation where the agency has departed from a prior policy without explanation. First,
    BOEM did not depart from a prior policy entirely—it only changed one of the categories that it
    usually includes in its table on estimated oil spills (but still considered it, as set forth above).
    Second, even if doing so marked a departure from prior policy, BOEM explained why it did so.
    Therefore, the line of cases cited by plaintiffs is inapposite.
    28
    assessment] to evaluate the potential effects of the deepwater technologies and operations.”
    AR5488. BOEM also explained that it “prepared a series of technical papers that provide a
    summary description of the different types of structures that may be employed in the
    development and production of hydrocarbon resources in the deepwater areas of the GOM (Regg
    et al., 2000). The Programmatic EA and technical papers were used in the preparation of this
    Supplemental EIS.” 
    Id.
    The Draft Report, relied upon by BOEM in the 2012 SEIS, also discussed the move into
    deepwater drilling. BOEM stated that spill rates for OCS platform spills ≥ 1,000 bbl increased
    over time, “due to the Macondo spill.” DOI REF 48335. BOEM explained, “[t]hese rates are
    still relatively low . . . . Prior to these two spills, the last OCS Platform spill ≥ 1,000 bbl occurred
    in 1980, and the last OCS Platform spill ≥ 10,000 bbl occurred in 1970.” DOI REF 48326.
    BOEM acknowledged that “[i]t is worth noting that this most recent 15-year period spans the
    move of OCS oil production into deepwater ( > 1,000 ft water depth). In 1996, deepwater oil
    production in the Gulf of Mexico was just under 20% of the total oil production in the region. In
    2010, that percentage had increased to 81%.” DOI REF 48335. In addition, BOEM explained
    that it calculates spill rates “based on the assumption that spills occur in direct proportion to the
    volume of oil handled and are expressed as number of spills per billion barrels of oil handled.”
    AR5576. And in the Draft Report, BOEM found that after taking the Deepwater Horizon spill
    into account, “tests indicate the volume of oil handled between OCS platform spills still appears
    to be nonrandom,” thus showing that spills are correlated with the volume of production, not with
    the depth of production. See DOI REF 48334.
    BOEM thus explained that the increase in spill rates over the 15-year period was
    attributable almost exclusively to the Macondo spill, and not to any other trend in the data
    29
    suggesting that as offshore drilling goes into deeper water so too does the frequency of oil spills.
    See id.; see also AR6280 (“BOEM uses data on past OCS production and spills, along with
    estimates of future production, to evaluate the risk of future spills. Data on the numbers, types,
    sizes, and other information on past spills, including those that are relevant to ultra-deepwater
    wells, were reviewed to develop the spill scenario for analysis in this Supplemental EIS. Past
    spill data used in the model indicate that there is no trend of increased number of spills based on
    exploration in deeper water prior to Macondo.”) (emphasis added).
    In their comments to the draft SEIS, but not in their briefs, the plaintiffs indicated that
    high pressure and high temperature wells, which occur in deepwater in the Gulf of Mexico “are
    extremely dangerous and add exorbitant risk to drilling, completion, and workover operations.”
    AR7435. In the 2012 SEIS, BOEM addressed this deepwater concern, explaining that “[n]either
    high-temperature/high-pressure conditions nor water depth are used to calculate the risk of future
    spills because these are postlease operational issues that cannot be reasonably predicted at the
    lease stage without site-specific information. In the postlease stage, applicants submit site-
    specific data on conditions, and BOEM technical staff reviews this data to determine whether
    conditions on approval, based on well data are appropriate.” AR6280. As the intervenor-
    defendants persuasively argue, and as discussed infra, this is “consistent with the staged
    environmental review dictated by the structure of offshore leasing under the OCSLA.” See
    Intervenor’s Reply 15 n.3 (citing Ctr. for Biological Diversity, 
    563 F.3d at 483
    ). In light of the
    fact that there was no trend indicating the increased risk of oil spills in deepwater, and BOEM’s
    30
    consideration of the risks of deepwater spills in both the 2012 SEIS, and the Draft Report, it is
    evident that BOEM did take a hard look at the risks of deepwater spills. 19
    c. BOEM incorporated Deepwater Horizon into its spill modeling
    The plaintiffs also argue that “the Bureau failed to conduct a new OSRA run taking the
    Deepwater Horizon spill into account.” Pl.’s Mot. Summ. J. 22. OSRA is the Oil Spill Risk
    Analysis Model BOEM uses “to estimate the likely trajector[y] of hypothetical offshore spills ≥
    1,000 bbl. The trajectories, combined with estimated spill occurrence, are used to estimate the
    risk of future spills occurring and contacting environmental features.” AR5577. In the wake of
    the Deepwater Horizon disaster, BOEM conducted a “special OSRA run . . . in order to estimate
    the impacts of a possible future catastrophic or high-volume, long-duration oil spill.” AR6635.
    BOEM explained that “overall OSRA is designed for use as a risk-based assessment, [but] for
    this analysis, only the conditional probability, the probability of contact to the resource, was
    calculated. The probability of a catastrophic spill occurring was not calculated; thus the
    combination of the probability of a spill and the probability of contact to the resources from the
    hypothetical spill locations were not performed.” 
    Id.
     BOEM continued by noting that “[r]esults
    from this trajectory analysis provide input to the final product by estimating where spills might
    travel on the ocean’s surface and what land segments might be contacted if and when another
    catastrophic spill occurs, but it does not provide input on the probability of another catastrophic
    19
    Moreover, in addition to undertaking the 2012 SEIS, in the wake of the
    Deepwater Horizon event, BOEM implemented new safety requirements to insure that oil and
    gas operators have systems in place “that would be adequate to promptly respond to a blowout or
    other loss of well control.” AR5593‒94. While none of those agency actions are before the
    Court today, it is evident that BOEM took immediate action in the wake of the Deepwater
    Horizon event to make deepwater drilling safer. See Oil and Gas and Sulphur Operations on the
    Outer Continental Shelf—Increased Safety Measures for Energy Development on the Outer
    Continental Shelf, 
    77 Fed. Reg. 50,856
    , 50,858 (Aug, 22, 2010) (explaining that one of the
    purposes of the Final Rule is to “[e]stablish new requirements for specific well-control training
    to include deepwater operations”).
    31
    spill occurring.” 
    Id.
     (emphasis added). In the results section, BOEM notes that “[i]t should be
    reiterated that these are conditional probabilities; 20 the condition being that a spill is assumed to
    have occurred.” AR6638.
    The plaintiffs take issue with BOEM’s concession that “the probability of a catastrophic
    spill occurring was not calculated.” AR6636; see also Pl.’s Mot. Summ. J. 23. They cite to a
    2010 internal document that explained that “[d]ue to time constraints and catastrophic spills not
    being the focus of the supplemental EIS, OSRA will not be rerun for spills > 1,000 barrels.” 21
    AR3005. That same document stated “[d]ue to the remote possibility of a catastrophic spill
    occurring, ‘conditional’ results will be used. ‘Combined’ probabilities will not be useful.” 
    Id.
    BOEM and the intervenor-defendants argue that the OSRA “run was conducted in order to
    estimate the impacts of a possible future catastrophic or high-volume, long-duration oil spill,”
    20
    As explained by BOEM in the 2012 SEIS, there is a difference between combined
    probabilities and conditional probabilities. “The probability that an oil spill will contact a
    specific land segment within a given time of travel from a certain location or spill point is termed
    a conditional probability; the condition being that a spill is assumed to have occurred.” AR6636.
    Meanwhile, “the probability of a spill occurring as a result of a proposed action and contacting
    the environmental resource of concern” is often referred to as a “combined probability” because
    “they combine the risk of occurrence of a spill ≥ 1,000 bbl from OCS sources and the risk of
    such a spill contacting environmental resources.” AR2513.
    21
    While OSRA may not have been rerun for spills ≥ 1,000 barrels in the 2012 SEIS,
    BOEM’s predecessor, the Minerals Management Service (“MMS”) reran OSRA when it did its
    Supplemental EIS for the 2009‒2012 Lease Sales. AR2768. MMS concluded that “[f]or this
    SEIS, the OSRA model was rerun due to the revised geographic area and increased oil
    production estimates in comparison with those used for the Multisale EIS. Results from this
    OSRA run confirmed that the revised geographic area and increased oil production estimates did
    not substantially affect probabilities in comparison with those obtained from the previous OSRA
    run.” Id.; see also AR2514. And, as BOEM explained in the 2012 SEIS, “[a] new OSRA run
    based on just the last CPA proposed lease sale in this Supplemental EIS scenario would not be
    expected to substantially affect probabilities in comparison with those obtained from the
    previous OSRA run.” AR5577. BOEM thus provided two reasoned explanations for not
    rerunning OSRA in this 2012 SEIS: (1) time constraints, and (2) its belief that probabilities
    would likely not change, given that they had not for the last OSRA run performed in the 2009‒
    2012 Multisale SEIS.
    32
    and was “never intended to estimate the risk of future spills occurring.” Federal-Def.’s Cross-
    Mot. Summ. J. 22 (emphasis in original).
    The plaintiffs do not persuasively explain why BOEM had to calculate the probability of
    a catastrophic oil spill within the OSRA run. They argue that the failure to calculate the
    probability of a ≥ 10,000 bbl spill occurring in the OSRA run means that “the only information
    given to the public is that the spill rate for an oil spill over 1,000 bbls is 1.13 and the estimated
    spill size is 2,200 bbl, which is actually lower than the spill size stated in the Multisale EIS 2007.
    Compare AR5576 to 1872.” Pl.’s Mot. Summ. J. 23. But the public was provided with more
    information than just that regarding spill rates. As set forth above, though the four corners of
    Table 3-5 itself do not provide an estimated spill rate for spills ≥ 10,000 bbl, the notes
    underneath the table disclose to the public the size of the Deepwater Horizon spill (4.9 million
    bbls), and the table includes the Deepwater Horizon spill in the data for spill rates for spills ≥
    1,000 bbl. See DOI REF 48339. And in several places, the 2012 SEIS references the probability
    of a catastrophic oil spill occurring. See, e.g., AR5822 (“The possibility of a spill > 10,000 bbl
    in the CPA is estimated to be up to one spill in the 40-year period for the proposed action.”);
    AR5831 (same). Thus, the failure to calculate the probability of a catastrophic oil spill occurring
    within the OSRA run did not preclude BOEM from making meaningful disclosures about
    probabilities and updating its data in light of the Deepwater Horizon event in the 2012 SEIS.
    As to the smaller spill size identified in Table 3-5, BOEM explained that the 2,200 bbl
    figure was based on updated data from the Draft Report, which included information up through
    2010, whereas the previous version only included information from 1985‒1999, see AR5576,
    and that the smaller number in Table 3-5 was due to the fact that Table 3-5 only represents
    median spill size for that particular area of the CPA, whereas prior versions of the table represent
    33
    median spill size for the entire CPA and the WPA. See Federal-Def.’s Cross-Mot. Summ. J. 23.
    On technical calculations such as these, the Court must defer to the agency. 22 See Miami-Dade
    Cnty., 
    529 F.3d at 1065
     (“although a reviewing court may not rubber stamp an agency decision,
    it must look at the agency’s decision not as the chemist, biologist, or statistician that it is
    qualified neither by training nor experience to be, but as a reviewing court exercising . . . certain
    minimal standards of rationality”) (internal quotation marks and citations omitted).
    More importantly, however, BOEM took a “hard look” at the Deepwater Horizon spill
    because it still conducted a special OSRA run for the specific purpose of “estimat[ing] the
    impacts of a possible future catastrophic spill.” AR6636. BOEM assumed—a 100% probability
    in other words—that a catastrophic spill would occur and sought out to analyze the impacts of
    such a spill. BOEM’s approach was therefore not arbitrary and capricious—it took a hard look
    at the Deepwater Horizon event by running a catastrophic spill run in the first instance to
    determine what the impacts of another catastrophic spill occurring would be.
    The plaintiffs conclude their “hard look argument” by arguing that BOEM’s “oil spill risk
    analysis does not satisfy NEPA’s requirement for scientific integrity or informed
    decisionmaking” citing 
    40 C.F.R. § 1502.24
    . See Pl.’s Mot. Summ. J. 24. 
    40 C.F.R. § 1502.24
    requires that agencies “insure the professional integrity, including the scientific integrity, of the
    22
    Again, the Court notes that it likely would have done things differently here, by
    including the Macondo spill in the 2,220 bbl figure, regardless of whether it distorted the
    statistics. However, BOEM has provided a reasoned explanation for its exclusion, as set forth
    above, and under arbitrary and capricious review, the Court must defer to that determination.
    Bowman Transp., Inc. v. Arkansas-Best Freight Sys., Inc., 
    419 U.S. 281
    , 285‒86 (1974) (“While
    we may not supply a reasoned basis for the agency’s action that the agency itself has not given,
    we will uphold a decision of less than ideal clarity if the agency’s path may reasonably be
    discerned.”) (internal quotation marks and citations omitted); Wilderness Soc’y v. Salazar, 
    603 F. Supp. 2d 52
    , 59 (D.D.C. 2009) (“The court’s role is to ensure that the agency takes a ‘hard look’
    at the environmental consequences of an action, not to interject its own judgment as to the course
    of action to be taken.”) (quoting Hammond v. Norton, 
    370 F. Supp. 2d 226
    , 240 (D.D.C. 2005)).
    34
    discussion and analyses in environmental impact statements.” The D.C. Circuit has explained
    that this provision “does not require that an agency employ the best, most cutting-edge
    methodologies.” Theodore Roosevelt Conservation P’ship v. Salazar, 
    616 F.3d 497
    , 511 (D.C.
    Cir. 2010). In that case, BLM had relied on a methodology called the Scheffe method to
    measure air quality analyses in its EIS. 
    Id. at 510
    . In response to criticism that the method was
    outdated, BLM admitted that the method “used outdated measurements and assumptions” but
    explained that it was nevertheless an “overly conservative screening level modeling tool.” 
    Id.
    (internal quotation marks omitted). BLM also considered the fact that a newer method was being
    developed, but “given the many months required to conduct full analysis with the new data,”
    decided to press forward with the older method. 
    Id. at 511
     (internal quotation marks omitted).
    The court found that BLM was not arbitrary and capricious in relying on the older method
    because “[g]iven the Bureau’s conclusion that the Scheffe method was an acceptable and
    conservative method when the analysis was carried out, the Bureau reasonably decided to retain
    the old estimates rather than undertake a new air quality analysis.” Id.; see also Village of
    Bensenville v. FAA, 
    457 F.3d 52
    , 71 (D.C. Cir. 2006) (“The method that the FAA chose, creating
    its models with the best information available when it began its analysis and then checking the
    assumptions of those models as new information became available, was a reasonable means of
    balancing those competing considerations, particularly given the many months required to
    conduct full modeling with new data.”).
    Similarly here, BOEM admitted that “[p]latform and pipeline spill rates and likely spill
    sizes published in the Multisale EIS have thus become outdated” because the studies relied upon
    “have been updated by DOI’s draft report.” AR5556; see also AR6141. However, as set forth
    above, BOEM explained that “[f]uture OSRA runs will use this updated historical spill rate
    35
    information,” and noted, as set forth above, that “[a] special OSRA run was conducted in order
    to estimate the impacts of a possible future catastrophic spill.” AR6141. Though BOEM did not
    rerun OSRA to account for a new > 1,000 bbl spill, it did not have to employ the “best, most
    cutting-edge methodolog[y],” because it reasonably concluded that a “new OSRA run . . . would
    not be expected to substantially affect probabilities in comparison with those obtained from the
    previous OSRA run.” AR5577. And because BOEM conducted a special OSRA run assuming a
    catastrophic spill would occur, BOEM did take a hard look at the problem. BOEM reasonably
    relied upon information that was available to it at the time it made its decision, and “particularly
    given the many months required to conduct full analysis with the new data,” its decision to do so
    was not arbitrary and capricious. Theodore Roosevelt Conservation P’ship v. Salazar, 
    605 F. Supp. 2d 263
    , 273 (D.D.C. 2009), aff’d, 
    616 F.3d 497
     (D.C. Cir. 2010) (internal quotation marks
    omitted).
    3. BOEM considered an adequate no action alternative
    The plaintiffs next argue that BOEM violated NEPA by not considering a true no action
    alternative in the 2012 SEIS. As a threshold matter, the intervenor-defendants argue that the
    plaintiffs have waived this argument because they failed to raise it with BOEM at the
    administrative level. See Intervenor-Def.’s Cross-Mot. Summ. J. 42‒43. “As the Supreme Court
    has long admonished, ‘[p]ersons challenging an agency’s compliance with NEPA must structure
    their participation so that it . . . alerts the agency to the [parties’] position and contentions,’ in
    order to allow the agency to give the issue meaningful consideration.” Nevada v. Dep’t of
    Energy, 
    457 F.3d 78
    , 88 (D.C. Cir. 2006) (quoting Dep’t of Transp. v. Pub. Citizen, 
    541 U.S. 752
    , 764 (2004)). Though the intervenor-defendants argue that the plaintiffs did not raise the no
    action issue in their comments to the Draft SEIS, the Court disagrees. Specifically, in its
    36
    “overarching problems” section of its comments submission, the plaintiffs stated that “[t]he
    DSEIS does not analyze a reasonable range of alternatives. Additional alternatives that should
    be analyzed include . . . [d]elaying leasing until complete information regarding the damage
    caused by the Deepwater Horizon spill is available.” AR6240‒41. BOEM responded as follows
    in the SEIS: “The Center for Biological Diversity commented that BOEM should consider an
    alternative suspending leasing until complete information about the damage caused by the DWH
    spill is available. This is essentially the same as the No Action Alternative (Alternative D),
    where a lease sale would not be held at this time; thus, the Center’s requested course of action
    has been analyzed in this Supplemental EIS.” AR6277 (emphasis added). BOEM, therefore,
    equated one of the plaintiffs’ comments with the no action alternative, and was therefore on
    notice that the plaintiffs were not satisfied with its reasonable range of alternatives discussion,
    including the alternative of no action, i.e., delaying the lease sale. 23 As such, the Court
    concludes that plaintiffs have not waived this argument.
    Having found that the plaintiffs did not waive their no action alternative argument, the
    Court now turns to the discussion of that issue on the merits. The no action alternative
    requirement is found in 
    40 C.F.R. § 1502.14
    (d). That section provides that analysis of
    alternatives is “the heart of the environmental impact statement.” 
    40 C.F.R. § 1502.14
    . This
    section demands that the agency “[r]igorously explore and objectively evaluate all reasonable
    alternatives,” including “the alternative of no action.” 
    Id.
     §§ 1502.14(a), (d). CEQ put forth a
    memorandum explaining the concept of “no action” as “instances involving federal decisions on
    proposals for projects. ‘No action’ in such cases would mean the proposed activity would not
    23
    Moreover, in its comments to the Final SEIS, the plaintiffs included a large
    section where they questioned BOEM’s treatment of its “suspending leasing” comment, as well
    as the no action alternative generally. See AR6757‒59. Therefore, the intervenor-defendants
    cannot really say that the no action issue was never raised at the administrative level.
    37
    take place, and the resulting environmental effects from taking no action would be compared
    with the effects of permitting the proposed activity or an alternative activity to go forward.” See
    Forty Most Asked Questions Concerning CEQ’s National Environmental Policy Act
    Regulations, 
    46 Fed. Reg. 18,026
    -01, 18,027 (March 23, 1981). That guideline goes on to
    explain that “[w]here a choice of ‘no action’ by the agency would result in predictable actions by
    others, this consequence of the ‘no action’ alternative should be included in the analysis. For
    example, if denial of permission to build a railroad to a facility would lead to construction of a
    road and increased truck traffic, the EIS should analyze this consequence of the ‘no action’
    alternative.” 
    Id.
    In the 2012 SEIS, BOEM analyzed four alternatives: Alternative A (The Proposed Action
    of Lease Sale 216/222), Alternative B (The Proposed Action Excluding the Unleased Blocks
    Near Biologically Sensitive Topographic Features), Alternative C (The Proposed Action
    Excluding the Unleased Blocks within 15 Miles of the Baldwin County, Alabama, Coast), and
    Alternative D (No Action). See AR5446‒47. BOEM described the No Action Alternative as
    follows:
    Alternative D is the cancellation of the proposed CPA lease sale. The opportunity
    for development of the estimated 0.801-1.624 BBO and 3.332-6.560 TcF of gas
    that could have resulted from the proposed lease sale would be precluded or
    postponed. Any potential environmental impacts resulting from the proposed
    lease sale would not occur or would be postponed.
    AR5541. In the “Summary of Impacts” statement for Alternative D, BOEM explained that
    “[c]anceling the lease sale would eliminate the effects described for Alternative A. The
    incremental contribution of the proposed lease sale to cumulative effects would also be avoided,
    but effects from other activities, including other OCS lease sales, would remain.” 
    Id.
     The
    conclusion, however, went on to explain that “the resulting development of oil and gas would
    38
    most likely be postponed to a future sale; therefore, the overall level of OCS activity in the CPA
    would only be reduced to a small percentage, if any. Therefore, the cancellation of the proposed
    lease sale would not significantly change the environmental impacts of overall OCS activity.”
    
    Id.
     BOEM goes on to note that “[o]ther sources of energy may substitute for the lost production”
    of oil and gas and “[r]evenues collected by the Federal Government (and thus revenue
    disbursement to the States) would be adversely affected also.” 
    Id.
    Given the language and explanation in the 2012 SEIS of Alternative D, the Court finds
    that BOEM did consider a true no action alternative as mandated by NEPA, and that its analysis
    was reasonable. BOEM analyzed what the environmental impact would be if the proposed
    action, Lease Sale 216/222, was cancelled. That conclusion was that “[a]ny potential
    environmental impacts resulting from the proposed lease sale would not occur or would be
    postponed.” AR5541. However, BOEM further explained that the environmental impact of
    cancelling this particular lease “would not significantly change” because the Central Planning
    Area of the Gulf of Mexico is a hotbed for oil and gas leases generally. And, practically
    speaking, if this particular lease sale did not go forward, another lease sale in the same area
    eventually would (because BOEM is statutorily tasked with developing the OCS) 24 and that
    would likely end up having the same environmental impact as the action-alternative, Alternative
    A. NEPA requires that the agency use the “rule of reason,” which is exactly what BOEM did
    here. See Nevada, 457 F.3d at 93 (“We have recognized that a ‘rule of reason’ applies both to an
    24
    In fact, BOEM has already implemented another 5-year Leasing Program for
    2012‒2017 for the Central Planning Area of the Gulf of Mexico. See Notice of Availability of
    the Proposed Final Five Year Outer Continental Shelf (OCS) Oil and Gas Leasing Program, 
    77 Fed. Reg. 41,448
     (July 13, 2012); see also http://www.boem.gov/Five-Year-Program-2012-
    2017/. It is therefore very likely that even if this particular lease sale was cancelled, another
    lease sale in the same area would likely present the same environmental risks, albeit further into
    the future.
    39
    agency’s identification of the available alternatives and to its examination of their relative
    merits.”) (quoting Citizens Against Burlington, Inc. v. Busey, 
    938 F.2d 190
    , 196‒97 (D.C. Cir.
    1991)). BOEM simply recognized that even if it cancelled this lease sale, another lease sale in
    the same area would likely eventually go forward, and therefore cancelling the lease sale would
    not significantly change the impact to the environment.
    And moreover, the CEQ encourages agencies to include in the no action alternatives
    analysis situations “where a choice of ‘no action’ by the agency would result in predictable
    actions by others.” 
    46 Fed. Reg. 18,026
    , 18,027 (Mar. 23. 1981). Courts have upheld such
    analyses. See Young v. Gen. Serv. Admin., 
    99 F. Supp. 2d 59
    , 74 (D.D.C. 2000) (finding the
    GSA’s no action alternative analysis reasonable because “where, as here, a decision by the
    government not to consolidate its facilities on undeveloped land would result in significant
    private commercial and residential development on the vacant property, the consequences of that
    alternative development should be addressed”); see also Communities, Inc., v. Busey, 
    956 F.2d 619
    , 626 (6th Cir. 1992) (explaining that with or without the federal government taking its
    proposed action, local governments still planned on demolishing the local area, and the FAA’s
    inclusion of that reality in its no action alternative did not render it unreasonable).
    The plaintiffs analogize this case to Ctr. for Biological Diversity v. U.S. Dep’t of Interior,
    
    623 F.3d 633
     (9th Cir. 2010) and N. Carolina Wildlife Fed. v. N. Carolina Dep’t of Transp., 
    677 F.3d 596
     (4th Cir. 2012). In Center for Biological Diversity, the plaintiffs brought suit against
    the Department of the Interior challenging the Bureau of Land Management’s (“BLM”) approval
    of a land exchange in Arizona. 623 F.3d at 636. The EIS at issue had a “No Action Alternative”
    but it stated that “foreseeable uses of the selected lands are assumed to be the same for all
    alternatives.” Id. at 640 (internal quotation marks omitted). Because the EIS made such an
    40
    assumption, it contained “no comparative analysis of the environmental consequences of the land
    exchange and the no action alternative.” Id. The court found that BLM acted arbitrarily and
    capriciously in assuming that the environmental impacts on the land at issue would be the same
    regardless of who owned the lands—a private entity or the federal government—because in
    reality the manner and extent of the mining activity allowed differed depending on landowner,
    due in large part to different obligations imposed on those two entities by the Mining Law of
    1872. Id. at 642‒43. The court therefore held that BLM failed to take a hard look at the
    environmental consequences of the exchange in violation of NEPA by “failing to perform a
    comparative analysis of the likely environmental consequences of the proposed land exchange,
    on the one hand, and the no action alternative, on the other.” Id. at 650.
    Similarly, in North Carolina Wildlife Federation, plaintiffs challenged two agencies’
    decision to approve construction of a new twenty-mile toll road in North Carolina. 
    677 F.3d at 598
    . The agencies prepared an EIS that analyzed five different alternatives to building the road,
    including a “no build” (no action) scenario. 
    Id. at 602
    . The plaintiffs challenged the EIS on the
    grounds that the agencies “conflated the ‘no build’ and ‘build’ scenarios” because in their “no
    build” analysis, they included data that “assumed the existence of the” toll road. 
    Id.
     The court
    found that the agencies had acted arbitrarily and capriciously by evaluating the “no build” data
    under the assumption that the toll road construction would go forward. 
    Id.
     at 602‒603. The
    court held that by failing to disclose “the [no-build] data’s underlying assumptions” that the toll
    road would be built, “the Agencies failed to take the required hard look at environmental
    consequences,” and violated NEPA. 
    Id. at 605
     (citations omitted). The plaintiffs also cite
    Friends of Yosemite Valley v. Scarlett, for the proposition that “[a] no action alternative in an EIS
    is meaningless if it assumes the existence of the very plan being proposed.” 
    439 F. Supp. 2d 41
    1074, 1105 (E.D. Cal. 2006), aff’d sub nom. Friends of Yosemite Valley v. Kempthorne, 
    520 F.3d 1024
     (9th Cir. 2008).
    Because the cases plaintiffs cite are distinguishable, the Court is not persuaded that
    BOEM’s no action alternative analysis was unreasonable. In North Carolina, for instance, the
    no-build alternative was unreasonable because it incorporated data whose underlying statistical
    assumption was that the toll road would be built. The North Carolina court was troubled by the
    fact that the scientific methodology underlying the no-build data did not actually account for a no
    action alternative. And the agency there recognized as much, by admitting that its methodology
    did not actually account for a no-build scenario. Such an underlying flaw in methodology is not
    present here. Center for Biological Diversity is also distinct. In that case, BLM’s flaw was in
    assuming that regardless of the owner of certain land involved in a land exchange, the
    environmental impact on the land would remain the same, and therefore there was nothing to
    consider in the no action analysis. The BLM, however, was wrong in making this assumption
    because the Mining Law of 1872 imposed different statutory commands on the federal
    government as owner of the lands, versus private entities as owners of the land, and the impact to
    the environment, would have in fact been different.
    In this case, by contrast, the OCSLA mandates that the Secretary, who delegates authority
    to BOEM, implement lease sales of the OCS in 5-year increments. See 
    43 U.S.C. § 1344
    . As
    such, regardless of this particular lease sale going forward, in all likelihood, another one
    eventually will in the CPA of the Gulf of Mexico. The plaintiffs present no facts or argument
    undermining that assumption. BOEM here did not make an incorrect assumption, but rather
    acknowledged a practical reality of the OCSLA statutory scheme. And moreover, it did
    undertake a separate analysis in consideration of the no action alternative that was different from
    42
    its analysis for the other alternatives. Compare AR6068‒6069 (Alternative D analysis) with
    AR5514‒5539 (Alternative A analysis). 25 Thus, unlike the agencies in North Carolina and
    Center for Biological Diversity, BOEM did consider a true no action alternative in its analysis of
    alternatives, and that analysis was reasonable.
    *    *    *
    In sum, BOEM did not violate NEPA. It complied with 
    40 C.F.R. § 1502.22
    ,
    incorporated all the new data it had into the 2012 SEIS, considered the effects of deepwater
    drilling, ran a special OSRA model run to account for impacts of an assumed catastrophic oil
    spill, and considered a true no action alterative. Though the Court may have done things a little
    differently with respect to Table 3-5, BOEM still considered the ≥ 10,000 bbl category in its
    analysis, and therefore took a “hard look” at the effects of the Deepwater Horizon spill in the
    2012 SEIS.
    C. ESA Claims
    The plaintiffs also bring claims under the ESA. They argue that BOEM did not comply
    with the ESA’s requirement to insure against the jeopardy of endangered species by approving
    the lease sales without the benefit of a Biological Opinion assessing important new information.
    See Pl.’s Mot. Summ. J. 27. Plaintiffs argue (1) that BOEM had to complete consultation with
    25
    The quote taken out of context in Friends of Yosemite might give the Court pause
    about BOEM’s assumption of the “existence of the very plan being proposed.” 439 F. Supp. 2d
    at 1105. However, the quote read in context reveals that the cases are distinguishable. In that
    case, the National Park Service (“NPS”) relied on a prior management plan in its updated EIS
    that the Ninth Circuit had previously vacated. The court agreed with the plaintiff “that because
    the Ninth Circuit held the [previous plan] to be illegal, NPS cannot properly include elements
    from that plan in the no action alternative as the status quo.” Id. For that reason, the no action
    alternative was meaningless, because it assumed the existence of the very plan it was proposing
    that had already been struck down. In contrast, the no action alternative in this case does not rely
    on an invalid plan or assumption, but instead recognizes a practical reality of suspending the
    lease sales.
    43
    NMFS, not just re-initiate it; and (2) that BOEM did not consider the best available science by
    relying on NMFS’s 2007 Biological Opinion. The defendants counter that BOEM did not need
    to complete consultation because of section 7(d) of the ESA, which allows agencies to proceed
    with agency action so long as it does not constitute an irreversible or irretrievable commitment of
    resources. In addition, the defendants argue that BOEM complied with section 7(a) by relying
    on updated science, in addition to the 2007 Biological Opinion included in the 2007 Multisale
    EIS.
    1. BOEM did not need to complete consultation
    The first ESA issue is whether BOEM violated the ESA by failing to complete
    consultation with the NMFS before proceeding with Lease Sales 216/222 and 218. Section 7(a)
    of the ESA requires that “[e]ach federal agency shall, in consultation with and with the
    assistance of the Secretary, insure that any action authorized, funded, or carried out by such
    agency is not likely to jeopardize the continued existence of any endangered species or
    threatened species or result in the destruction or adverse modification of habitat of such species .
    . . .” 
    16 U.S.C. § 1536
    (a)(2) (emphasis added). Section 7(a)(2) “imposes two obligations upon
    federal agencies. The first is procedural and requires that agencies consult with the FWS [or
    NMFS] to determine the effects of their actions on endangered or threatened species and their
    critical habitat. The second is substantive and requires that agencies insure that their actions not
    jeopardize endangered or threatened species or their critical habitat.” Fla. Key Deer v. Paullson,
    
    522 F.3d 1133
    , 1138 (11th Cir. 2008). With respect to the procedural requirement, 
    50 C.F.R. § 402.14
    (a) provides that “[e]ach Federal agency shall review its actions at the earliest possible
    time to determine whether any action may affect listed species or critical habitat. If such a
    determination is made, formal consultation is required.”
    44
    In this case, BOEM and the NMFS engaged in a formal consultation during the 2007
    Multisale EIS phase that resulted in the 2007 Biological Opinion issued by the NMFS. See
    Federal-Def.’s Cross-Mot. Summ. J. 8. That BO concluded that the proposed action in the 2007
    Multisale “will not appreciably reduce the likelihood of survival and recovery of the listed
    species considered in this biological opinion.” AR7138. On July 30, 2010, in the wake of the
    Deepwater Horizon event, BOEM contacted the NMFS to reinitiate consultation. See Bernhart
    Decl. ¶ 4, ECF No. 63-1. Since then, the agencies have been working closely to issue a new BO.
    See 
    id.
     Thus, the procedural aspect of section 7(a)(2) has been met. The BO, however, has not
    yet been issued, and NMFS anticipates a March 2015 date of completion. See Bernhart Decl. ¶¶
    5‒6, ECF No. 75-1.
    While the plaintiffs argue that under the ESA, BOEM had to complete its consultation
    with the NMFS before it issued its Record of Decision for Lease Sales 216/222 and 218, 26
    neither the ESA nor the case law interpreting the ESA require completion of a BO before action
    26
    The plaintiffs cite three cases for the proposition that “[r]einitiation of
    consultation requires the Fish and Wildlife Service to issue a new Biological Opinion before a
    project may go forward.” Mt. Graham Red Squirrel v. Madigan, 
    954 F.2d 1441
    , 1451 (9th Cir.
    1992); Envt’l Prot. Info. Ctr. v. Simpson Timber Co., 
    255 F.3d 1073
    , 1076 (9th Cir. 2001)
    (“Reinitiation of consultation requires either the FWS or the NMFS to issue a new Biological
    Opinion before the agency action may continue.”); Greenpeace v. Nat’l Marine Fisheries Serv.,
    
    106 F. Supp. 2d 1066
    , 1072 (W.D. Wash. 2000) (“In the absence of a completed comprehensive
    biological opinion NMFS has not, and cannot, insure that continued fishing in designated critical
    habitat will not result in harm to endangered Stellar sea lions.”). The first two cases are not
    persuasive because those statements appear in dicta and the relevant quotes are dropped in the
    legal standard sections with no explanation or citation whatsoever. The Eleventh Circuit agreed
    in Defenders of Wildlife v. Bureau of Ocean Energy Mgmt., stating that “[w]e decline to give this
    statement any weight since ESA has no such requirement.” 
    684 F.3d 1242
    , 1252 n.4 (11th Cir.
    2012). In addition, Greenpeace is distinguishable because, in that case, the NMFS had issued a
    Biological Opinion that was invalidated by a prior court ruling. See 
    106 F. Supp. 2d at
    1069–70.
    As such, the NMFS was allowing commercial fishing to continue in the absence of any valid
    Biological Opinion being in place. That is not the case here, where the NMFS and BOEM
    continue to rely on the 2007 Biological Opinion that has neither been held invalid, nor is being
    challenged in the present action.
    45
    in all instances. Section 7(d) of the ESA allows agencies to take action during the reinitiated
    consultation, so long as that action does not constitute an “irreversible or irretrievable
    commitment of resources.” Section 7(d) provides that “after initiation of consultation required
    under subsection (a)(2) of this section, the Federal agency and the permit or license applicant
    shall not make any irreversible or irretrievable commitment of resources with respect to the
    agency action which has the effect of foreclosing the formulation or implementation of any
    reasonable and prudent alternative measures . . . .” 
    16 U.S.C. § 1536
    (d). As one court has
    helpfully explained, “under § 7(d), an agency is not forbidden from taking all action while
    consultation is underway, but is simply barred from irreversibly or irretrievably committing
    resources during that interval. The purpose of § 7(d) is to ensure that the status quo is
    maintained during consultation, so as to avoid a circumstance in which a large-scale commitment
    of resources is made during the consultation process, which resources cannot be diverted or
    redirected to other productive uses if the outcome of consultation is that the project would violate
    the ‘no jeopardy’ requirement of § 7(a).” Defenders of Wildlife v. Bureau of Ocean Energy
    Mgmt., 
    871 F. Supp. 2d 1312
    , 1326 (S.D. Ala. 2012), appeal dismissed, No. 12-13709 (11th Cir.
    July 24, 2012).
    All courts considering lease sales under the OCSLA have concluded that “lease sales do
    not constitute an ‘irreversible or irretrievable commitment of resources’ within the meaning of
    section 7(d).” Vill. of False Pass v. Watt, 
    565 F. Supp. 1123
    , 1163 (D. Alaska 1983), aff’d sub
    nom. Vill. of False Pass v. Clark, 
    733 F.2d 605
     (9th Cir. 1984); see also N. Slope Borough v.
    Andrus, 
    642 F.2d 589
    , 611 (D.C. Cir. 1980) (“Plainly, the preliminary activities permitted by this
    lease sale entail no ‘irreversible or irretrievable commitment of resources with respect to the
    Agency action which has the effect of foreclosing . . . alternative measures which avoid
    46
    jeopardizing the continued existence of any endangered or threatened species . . . .’”);
    Conservation Law Foundation of New England, Inc. v. Andrus, 
    623 F.2d 712
    , 714‒716 (1st Cir.
    1979) (rejecting appellants’ argument that the lease sale stage constituted an irreversible or
    irretrievable commitment of resources for purposes of a preliminary injunction); Defenders of
    Wildlife, 871 F. Supp. 2d at 1326 (“Nothing in BOEM’s mere approval of bids for Lease Sale
    213 could reasonably be viewed as constituting an irreversible or irretrievable commitment of
    resources under § 7(d).”) 27
    This conclusion is due primarily to the structure of the OCSLA, which provides for ESA
    review at each stage of the process. See Village of False Pass, 
    733 F.2d at 609
     (“it is clear that
    OCSLA prescribes three distinct stages for offshore oil and gas activities: leasing, exploration,
    27
    Center for Biological Diversity v. U.S. Dep’t of Interior, 
    563 F.3d 466
     (D.C. Cir.
    2009) and Wyoming Outdoor Council v. U.S. Forest Service, 
    165 F.3d 43
     (D.C. Cir. 1999) are
    not to the contrary. In Wyoming Outdoor Council, the D.C. Circuit held that “the point of
    irreversible and irretrievable commitment of resources and the concomitant obligation to fully
    comply with NEPA do not mature until leases are issued.” 
    165 F.3d at 49
    . Similarly, in Center
    for Biological Diversity, the D.C. Circuit, relying largely on Wyoming Outdoor, found that the
    lease sale stage was the “critical stage where an irreversible and irretrievable commitment of
    resources” occurs. 
    563 F.3d at 480
     (internal quotation marks omitted). But those decisions arose
    in the context of a ripeness analyses for purposes of NEPA review, not ESA review. The courts
    in those cases never interpreted the meaning of “irreversible and irretrievable commitment”
    under section 7(d) of the ESA. And moreover, the court’s analysis of the OCSLA in Center for
    Biological Diversity supports this Court’s finding that the lease sales at issue here do not
    constitute an irreversible and irretrievable commitment of resources. As that court explained,
    “[g]iven the multi-stage nature of leasing programs under OCSLA, we must consider any
    environmental effects of a leasing program on a stage-by-stage basis, and correspondingly
    evaluate ESA’s obligations with respect to each particular stage of the program.” 
    563 F.3d at 483
    . And at this stage of the lease sale process, nothing irreversible has been done. The
    Secretary and BOEM must still review any exploration and development plans to ensure that
    those plans comport with NEPA and the ESA before drilling can be done. See 
    43 U.S.C. §§ 1334
    (a)(1)‒(2) & 1351. And if at any point during interim consultation in this case the Secretary
    determines that activities that follow the lease sale (exploration and production) would result in
    jeopardy to a species, it could “deny or rescind any drilling plan or permit approval,” or “suspend
    all activities allowed under those plans.” AR7503. Thus, the lease sale itself does not constitute
    an irreversible commitment of resources here, because any jeopardizing activity that follows it, if
    at all, can be undone.
    47
    and development and production. ESA appears to apply equally to each stage of its own force
    and effect.”); accord Ctr. for Biological Diversity, 
    563 F.3d at 474
    ; Defenders of Wildlife, 871 F.
    Supp. 2d at 1328. And, as BOEM notes in its brief, the Department of Interior retains “strict
    control” over all operations conducted under leases, and the OCSLA expressly authorizes the
    Department to suspend any operation or activity conducted under the lease sales if there is a
    threat to any marine life or the surrounding environment. See 
    43 U.S.C. §§ 1334
    (a)(1)(B) &
    (2)(A)(i) (allowing the Secretary to suspend any operation or activity pursuant to any lease if
    “there is a threat of serious, irreparable, or immediate harm or damage to life (including fish and
    other aquatic life)” or to cancel a lease if “continued activity pursuant to such lease or permit
    would probably cause serious harm or damage to life (including fish and other aquatic life) . . .
    .”).
    The two courts most recently confronting this particular issue have found that BOEM did
    not have to complete consultation with the NMFS before it could continue its operations in the
    Gulf of Mexico post-Deepwater Horizon spill, precisely because of the structure of the OCSLA.
    See Defenders of Wildlife v. Bureau of Ocean Energy Mgmt., 
    684 F.3d 1242
    , 1253 (11th Cir.
    2012) (explaining that at the exploration plan stage, “the ESA does not require BOEM to delay
    approval of the Shell EP until results of reinitiated consultation are received.”); Defenders of
    Wildlife, 871 F. Supp. 2d at 1327 (explaining that at the lease sale stage, “this is not a case in
    which the § 7(d) prohibition on irreversible or irretrievable commitments of resources foreclosed
    BOEM from taking action with respect to Lease Sale 213 pending the conclusion of the
    reinitiated consultation with expert agencies.”). 28 Similarly here, the lease sales at issue do not
    28
    The plaintiffs note that BOEM, and not NMFS, made a unilateral section 7(d)
    determination in this case that the lease sales did not constitute an irreversible and irretrievable
    commitment of resources. See NMFS AR4527‒4531. They say that such a determination by
    48
    constitute an irreversible commitment of resources—they simply represent the “opportunity to
    try to obtain exploration and development rights in accordance with the procedures and under the
    standards in the [inter alia, OCSLA].” Mobil Oil Exploration & Producing Southeast, Inc. v.
    U.S., 
    530 U.S. 604
    , 620 (2000). Because the OCSLA provides for ESA review at two
    subsequent stages of the oil and gas production process, and allows the Secretary to suspend any
    and all activity in the OCS at any time if she determines that endangered species are at risk, the
    lease sale stage does not represent an irreversible or irretrievable commitment of resources. As
    such, BOEM was not required to complete consultation before it approved the lease sales at issue
    here. See N. Slope Borough, 
    642 F.2d at 609
     (“satisfaction of the ESA mandate that no
    endangered life be jeopardized must be measured in view of the full contingent of OCSLA
    checks and balances and all mitigating measures adopted in pursuance thereof”).
    2. BOEM complied with section 7(a)
    The plaintiffs further argue that, regardless of the implications of section 7(d), the re-
    initiation of consultation does not render BOEM necessarily compliant with section 7(a). To be
    sure, BOEM has an independent obligation to comply with section 7(a)(2) regardless of whether
    section 7(d) applies. See Defenders of Wildlife, 871 F. Supp. 2d at 1327 (“As the Federal
    Defendants properly recognize, avoiding irreversible or irretrievable commitment of resources
    under § 7(d) does not necessarily discharge their obligations as to the no jeopardy requirement of
    BOEM—the action, not the expert agency—deserves no deference because “these unilateral
    [7(d)] determinations are afforded no weight.” Sw. Ctr. for Biological Diversity v. U.S. Forest
    Svc., 
    2001 U.S. Dist. LEXIS 25027
    , at *122 (D. Ariz. March 30, 2001) (citing Pac. Rivers
    Council v. Thomas, 
    30 F.3d 1050
    , 1053–54 (9th Cir. 1994)). Those cases are inapposite because
    in those cases, there was no Biological Opinion at all available, and therefore the action agency’s
    7(d) determination, absent any expert agency section 7(d) determination was afforded no
    deference. Moreover, “neither the [ESA] nor any other court decision . . . even suggests that
    federal agencies must obtain the concurrence of the Wildlife Service [or Fisheries Service] prior
    to relying on Section 7(d).” Sw. Ctr. for Biological Diversity v. U.S. Forest Svc., 
    82 F. Supp. 2d 1070
    , 1079‒80 (D. Ariz. 2000).
    49
    § 7(a). . . . [t]he point is that BOEM’s actions with respect to Lease Sale 213 could still violate §
    7(a), notwithstanding their compliance with § 7(d).”); see also Florida Key Deer v. Brown, 
    386 F. Supp. 2d 1281
    , 1293–94 (S.D. Fla. 2005) (“Section 7(d) does not excuse federal agencies
    from meeting the requirements of Section 7(a)(2).”).
    However, BOEM has met the requirements of both 7(d) and 7(a)(2) in this case. Under
    section 7(a), BOEM must insure that its actions do not cause jeopardy to any endangered species.
    In the OCSLA lease sale context, courts across the board hold that lease sales are not jeopardy-
    inducing agency actions. See Defenders of Wildlife, 871 F. Supp. 2d at 1329‒30 (“The
    inescapable fact of the matter is that BOEM’s approval of a bid, and the issuance of a lease to an
    oil drilling/development/exploration company, is a narrowly circumscribed event, in terms of its
    repercussions for listed species and their habitat . . . . It does not authorize full scale exploration,
    development, or production.”); see also id. (“The purchase of an OCS lease, standing alone,
    entails no right to explore, develop, or produce oil and gas resources on the OCS.”) (quoting
    Sec’y of the Interior, 
    464 U.S. at 340
    ); Tribal Vill. of Akutan v. Hodel, 
    869 F.2d 1185
    , 1194‒95
    (9th Cir. 1988) (“We once again note that the risks to endangered species during the lease sale
    stage are virtually nonexistent. Only limited preliminary activities are permitted during this
    stage, such as geological, geophysical and other surveys ‘which do not result in any physical
    penetration of the seabed of greater than 500 feet and which do not result in any significant
    adverse impact on the natural resources of the [OCS].’”) (quoting Final Rule, Oil and Gas and
    Sulphur Operations in the Outer Continental Shelf, 
    53 Fed. Reg. 10596
    , 10704 (April 1, 1988))
    (emphasis added); Village of False Pass, 
    733 F.2d at 611
     (“The lease sale decision itself could
    not directly place gray or right whales in jeopardy.”). Similarly here, there is nothing about these
    particular lease sales that would jeopardize the endangered species located in the Gulf of
    50
    Mexico. It is at later stages of OCS development that jeopardy, if at all, is more likely to occur.
    Cf. Ctr. for Biological Diversity, 
    563 F.3d at 483
     (“The welfare of animals is, by design, only
    implicated at later stages of the [OCSLA] program, each of which requires ESA consultation and
    additional environmental review by Interior.”).
    Moreover, BOEM took efforts to insure that Lease Sale 216/222 itself would not
    jeopardize any listed species, while it awaited (awaits) NMFS’s Biological Opinion. First,
    BOEM included stipulations in Lease Sale 216/222 to provide for the protection of certain
    species. See AR1100‒11, AR1096 (map showing areas where stipulations made). For instance,
    with respect to live bottoms, lessees, “[p]rior to any drilling activities or the construction or
    placement of any structure for exploration or development on this lease . . . will submit to
    [BOEM-Regional Director (“RD”)] a live-bottom survey report.” AR1101. “If it is determined
    that the live bottoms might be adversely impacted by the proposed activity, the BOEM-RD will
    require the lessee to undertake any measure deemed economically, environmentally, and
    technically feasible to protect the pinnacle area. These measures may include, but are not limited
    to . . . relocation of operations, and monitoring to assess the impacts of the activity on the live
    bottoms.” 
    Id.
     And with respect to endangered species generally, BOEM included a list of six
    actions lessees must take to insure that its lease activities “prevent or minimize harm to the
    environment,” including “maintain[ing] a distance of 90 meters or greater from whales,” and
    “employ[ing] mitigation measures . . . for all seismic surveys.” AR1110. Such lease stipulations
    show that BOEM set out to minimize harm to the endangered species in the Gulf of Mexico, and
    therefore insure no-jeopardy.
    In North Slope, for instance, the D.C. Circuit found that certain lease stipulations
    “represent part of the Secretary’s attempt to protect wildlife from the outset . . . [and] are
    51
    intended to ensure, as much as possible, the continued prosperity of marine life in the area.” 
    642 F.2d at
    595‒96. That court found this to be an important factor is assessing whether the agency
    had comported with the ESA. 
    Id. at 610
     (“We hold that section 7(a)(2) was not violated as the
    Secretary incorporated in the ‘final notice of sale’ the suggested alternatives that NMFS
    indicated could ensure the freedom from jeopardy for the endangered whales. These savings
    alternatives, of course, constituted the bulk of the lease stipulations and the mitigating measures
    subsumed under ‘Information to Lessees.’”).
    Second, BOEM also developed new safety regulations for deepwater drilling, as set forth
    above, to insure that another blowout spill would not occur. See Oil and Gas and Sulphur
    Operations in the Outer Continental Shelf—Increased Safety Measures for Energy Development
    on the Outer Continental Shelf, 
    75 Fed. Reg. 63,346
     (Oct. 14, 2010) (Interim Final Rule with
    request for comments); Oil and Gas and Sulphur Operations in the Outer Continental Shelf—
    Increased Safety Measures for Energy Development on the Outer Continental Shelf, 
    77 Fed. Reg. 50,856
     (Aug. 22. 2012) (Final Rule).
    The plaintiffs in reply argue that BOEM did not insure that the ancillary activities 29
    allowed at the lease sale stage cause no jeopardy. See Pl.’s Reply 16. They argue that
    “[v]ulnerable species harmed by the spill may, in fact, be jeopardized by the preliminary
    activities” authorized at the lease sale stage. 
    Id. at 17
    . Though, as set forth above, courts have
    found that lease sales are not jeopardy-causing activities, no court has yet considered whether
    ancillary activities may jeopardize species made more vulnerable post-oil spill. For plaintiffs to
    29
    It is unclear such ancillary activities can even be challenged here, as the plaintiffs
    did not make claims about the ancillary activities in their First Amended Complaint, or
    arguments about them in their opening brief. See Am. Compl. ¶¶ 23, 63; Pl.’s Mot. Summ. J. 3,
    9‒10. Nevertheless, the Court still finds that the plaintiffs have not provided any evidence that
    such activities cause jeopardy, whereas BOEM has shown that it has taken steps to minimize
    harm to the endangered species from these activities, as set forth above.
    52
    be successful on this claim, however, they must put forth new evidence, showing that relying on
    the 2007 information on ancillary activities, see Federal-Def.’s Reply 17‒19, is arbitrary and
    capricious. See Pyramid Lake Paiute Tribe of Indians v. U.S. Dep’t of Navy, 
    898 F.2d 1410
    ,
    1415 (9th Cir. 1990) (“even when the FWS’s opinion is based on ‘admittedly weak’ information,
    another agency’s reliance on that opinion will satisfy its obligations under the Act if a
    challenging party can point to no ‘new’ information—i.e., information the Service did not taken
    into account—which challenges the opinion’s conclusions.”). Here, the plaintiffs failed to carry
    their burden because they did not proffer any new evidence that ancillary activities jeopardize
    species made more vulnerable post oil-spill. As such, this argument, to the extent it can even be
    raised, fails.
    Moreover, ancillary activities themselves undergo a multi-step review wherein a lessee
    must insure to the BOEM regional supervisor that its activities will not cause harm to the
    environment. 
    30 C.F.R. § 550.207
     provides that after a lease is approved, a lessee may conduct
    ancillary activities, which include geological and geophysical explorations and development, and
    surveys. Before a lessee can conduct any ancillary activities, however, it must notify the
    Regional Supervisor of BOEM in writing and, inter alia, “[d]escribe the potential adverse
    environmental effects of the proposed activity and any mitigation to eliminate or minimize these
    effects on the marine, coastal, and human environment.” 
    30 C.F.R. § 550.208
    (d)(4). The
    Regional Supervisor then reviews the notice “to ensure that [the] ancillary activity complies with
    the performance standards listed in 550.202(a), (b), (d), and (e).” 
    30 C.F.R. § 550.209
    . Under
    
    30 C.F.R. § 550.202
    (e), a lessee must demonstrate that its activities do “not cause undue or
    serious harm or damage to the human, marine, or coastal environment.” Thus, there are statutory
    53
    safeguards in place to insure that ancillary activities allowed at the lease sale stage do not cause
    harm to the environment.
    Moreover, with respect to ancillary activities, BOEM issued certain Notices to Lessees
    (“NTL”) to insure that protective measures are taken when engaging in ancillary activity. See
    Notice to Lessees and Operators of Federal Oil, Gas, and Sulphur Leases, Outer Continental
    Shelf, Gulf of Mexico OCS Region, NTL No. 2009-G34, December 1, 2009. 30 Such measures
    include seismic survey mitigation measures and protected species observer programs. See
    JOINT NTL No. 2012-G02, January 1, 2012. 31 Thus, BOEM has taken steps to insure that its
    actions do not cause harm to endangered species while it engages in interim consultation with
    NMFS on the updated Biological Opinion. It has therefore independently insured no-jeopardy
    and satisfied the requirements of section 7(a) of the ESA.
    3. BOEM considered the best available scientific data
    The plaintiffs next argue that BOEM’s reliance on the NMFS’s 2007 Biological
    Opinion 32 is arbitrary and capricious because BOEM knew or should have known that that
    Opinion was outdated, and it should have inquired into the status of the environmental baseline
    pursuant to 
    50 C.F.R. § 402.14
    (g)(2), which it failed to do. See Pl.’s Mot. Summ. J. 31‒32. The
    30
    available at http://www.boem.gov/Regulations/Notices-To-Lessees/2009/09-
    G34.aspx.
    31
    available at http://www.boem.gov/Regulations/Notices-To-Lessees/2012/2012-
    JOINT-G02-pdf.aspx.
    32
    The plaintiffs suggest that re-initiation of consultation somehow renders the 2007
    Biological Opinion invalid. However, plaintiffs do not challenge the validity of the 2007
    Biological Opinion in the instant action, and even if they did, other courts have found that re-
    initiation of consultation does not render a former Biological Opinion invalid. See Defenders of
    Wildlife, 684 F.3d at 1252 (“There is no precedent in our circuit to support Petitioners’ argument
    that BOEM’s choice to reinitiate consultation with NMFS and FWS automatically renders the
    former biological opinions invalid. The biological opinions of NMFS and FWS were
    reconfirmed in 2008 and 2009, and have not been withdrawn despite re-initiation of
    consultations.”).
    54
    defendants counter that the environmental baseline requirement applies to the NMFS / FWS, not
    the BOEM, and that it was not arbitrary and capricious to rely on the 2007 BO. See Intervenor-
    Def.’s Cross-Mot. Summ. J. 54.
    The defendants are right on their first point. 
    50 C.F.R. § 402.14
    (g) confers duties on the
    expert agency—NMFS or FWS—not on BOEM. See 
    50 C.F.R. § 402.12
    (g) (“Service
    responsibilities during formal consultation are as follows . . . .”). As such, its requirements are
    inappropriately cited by the plaintiffs. 33
    As to BOEM’s reliance on the 2007 Biological Opinion, the most recent court decision
    considering this issue found that it was not arbitrary and capricious for BOEM to rely on the
    2007 Biological Opinion, in addition to the new evidence it considered. See Defenders of
    Wildlife, 684 F.3d at 1253 (“Given the Bureau’s broad consideration of the Deepwater Horizon
    disaster and new safety measures, the Bureau did not act arbitrarily when it relied on the 2007
    consultation in conjunction with more recent studies”) (emphasis added); see also Defenders of
    Wildlife, 871 F. Supp. 2d at 1331‒32 (“As to the narrow lease-sale stage at issue herein, the
    likely effects on listed species and critical habitat appear no different after Deepwater Horizon
    than before.”) (emphasis added); Cf. N. Slope, 
    642 F.2d at
    610 n.131 (“It is quite clear that a
    favorable biological opinion may be issued even though the absence of complete data on a
    species makes it impossible to know with complete certainty the potential impact.”).
    Similarly here, in light of the fact that BOEM relied on the 2007 Biological Opinion,
    supplemented that with the new evidence before it, peppered throughout the 2012 SEIS, see, e.g.,
    Chapter 4 of the 2012 SEIS, and also took steps to implement new safety and mitigation
    33
    Even if the plaintiffs were correct that under 
    50 C.F.R. § 402.14
    , BOEM had a
    duty to update the environmental baseline, BOEM did do that in the 2012 SEIS by considering
    the Deepwater Horizon spill effects on each resource. See generally Chapter 4 of the 2012 SEIS.
    It also did so in its Biological Assessment, provided to NMFS in February 2013. See AR7900.
    55
    measures, the Court finds that BOEM comported with section 7(a) of the ESA. In addition, the
    plaintiffs 34 have failed to show that the lease sales themselves—and not what comes after
    them—causes jeopardy, based on the best scientific data available. As such, they have not met
    their burden of showing that, at the narrow lease-sale stage, BOEM was arbitrary and capricious
    in relying on the 2007 Biological Opinion, in conjunction with the new information it also
    considered.
    And while the plaintiffs argue that the 2007 BO lacks sufficiently specific information
    about the size and tract location of the lease sales, and production estimates for the lease sales,
    see Pl.’s Mot. 34‒35, all of this information is somewhat speculative at the lease sale stage,
    thereby negating the impact of any changes since 2007 on figures such as production estimates,
    tract sizes, etc. See Wilderness Soc’y, 
    603 F. Supp. 2d at 60
     (“limited information available at
    the leasing stage necessarily limits the scope of the environmental analysis”); Tribal Village of
    Akutan, 869 F.2d at 1192 (“[w]e are the least troubled by what may seem to be incomplete or
    speculative data at the lease sale stage.”). Moreover, any changes in that production-related
    34
    Though the plaintiffs argue that it is the defendants’ burden to prove that they
    insured no-jeopardy, see Pl.’s Mot. Summ. J. 37; Pl.’s Reply 18 n.14, the plaintiffs have brought
    this action challenging the agency’s action, and it is therefore their burden to show that the
    defendants violated the ESA. See, e.g., Defenders of Wildlife v. Bureau of Ocean Energy
    Management, 
    871 F. Supp. 2d 1312
    , 1330 (S.D. Ala. 2012) (“Recall that it is plaintiff’s burden
    to show not only that BOEM’s action in approving leases post-Deepwater Horizon were
    violative of the ESA, but that they were arbitrary, capricious, and an abuse of discretion within
    the meaning of the APA.”). As explained in Sierra Club v. U.S. Army Corps. of Engineers, the
    challenger “bears a heavy burden to prove that the [agency] was arbitrary and capricious in
    relying upon the FWS [no-jeopardy] determination of a matter firmly within that agency’s area
    of expertise.” 
    295 F.3d 1209
    , 1222‒23 (11th Cir. 2002). This is because the “ESA does not
    specify a standard of review,” and therefore “judicial review is governed by section 706 of the
    Administrative Procedure Act.” Cabinet Mountains Wilderness/Scotchman’s Peak Grizzly Bears
    v. Peterson, 
    685 F.2d 678
    , 685 (D.C. Cir. 1982); accord Nat’l Wildlife Fed. v. NMFS, 
    254 F. Supp. 2d 1196
    , 1204 (D. Or. 2003). Here, the plaintiffs bear the burden of proving that BOEM
    was arbitrary and capricious in relying upon NMFS’s no-jeopardy finding in its 2007 Biological
    Opinion. They have not met that burden.
    56
    information will not change the likely impacts of ancillary activities on listed species and critical
    habitat at the narrow lease-sale stage.
    In sum, BOEM did not violate the ESA because it relied on the best available science, it
    took action to insure no-jeopardy, and its actions were not tantamount to an irreversible and
    irretrievable commitment of resources, so it did not need to await completed consultation with
    NMFS before it proceeded with the lease sales.
    D. Biological Opinion Claim against the NMFS
    The plaintiffs’ final argument is that NMFS’s delay in producing its BO in the wake of
    the Deepwater Horizon spill is unreasonable, and asks this Court to compel NMFS to complete
    consultation by a date-certain. See Pl.’s Mot. Summ. J. 39, 44. This claim fails because NMFS
    has not unreasonably delayed production of the BO.
    As set forth above, the ESA provides for consultation between expert agencies (NMFS)
    and action agencies (BOEM) to insure that the action agency’s action is not likely to jeopardize
    endangered species. 
    16 U.S.C. § 1536
    (a)(2). Following formal consultation, the NMFS must
    issue a written statement known as a Biological Opinion, explaining how the proposed action
    will affect the species or its habitat. See Bennett v. Spear, 
    520 U.S. 154
    , 158 (1997) (citing 
    16 U.S.C. § 1536
    (b)(3)(A)). The Biological Opinion must include “(1) “[a] summary of the
    information on which the opinion is based; (2) a detailed discussion of the effects of the action
    on listed species or critical habitat; and (3) The Service’s opinion on whether the action is likely
    to jeopardize the continued existence of a listed species . . . .” 
    50 C.F.R. § 402.14
    (h).
    Meanwhile, to comply with its consultation obligations under section 7(a), the action agency
    “shall conduct a biological assessment for the purpose of identifying any endangered or
    threatened species which is likely to be affected by such action.” 
    16 U.S.C. § 1536
    (c). “The
    57
    Federal agency [BOEM] requesting formal consultation shall provide the Service [NMFS] with
    the best scientific and commercial data available or which can be obtained during the
    consultation for an adequate review of the effects that an action may have upon listed species or
    critical habitat.” 
    50 C.F.R. § 402.14
    (d).
    1. Background information on the consultation
    As set forth above, BOEM reinitiated consultation with NMFS in July 2010. Since then,
    the parties have been engaged in constant communication to set up timelines for achieving the
    goals of consultation and for producing a new Biological Opinion. See AR7496‒7501. They
    have set up an interim consultation process and timetables for achieving those goals. See
    Bernhart Decl., Ex., ECF No. 63-1. The agencies also expanded the scope of the initial
    consultation to include all leases currently pending, and all expected lease sales in the Gulf of
    Mexico up through 2022. 35 See Federal-Def.’s Cross-Mot. Summ. J. 8; AR7909. In February
    35
    The plaintiffs argue that, as a result of this consolidated process, ESA consultation
    occurs only at the lease sale stage in the Gulf of Mexico, creating a “shell game where
    meaningful ESA review to account for the nation’s largest environmental disaster is always
    either premature or occurred at an earlier stage.” See Pl.’s Reply 18‒19. However, this position
    is neither consistent with the facts of this case, nor with the multi-staged nature of the OCSLA.
    BOEM’s and NMFS’s ongoing consultation “will look at all stages of on-going and future oil
    and gas activities related to prior and proposed lease sales through 2022 in the Gulf of Mexico
    over the next 50 years.” Federal-Def.’s Reply 22 (emphasis added). And moreover, even if it
    did not, under the OCLSA, “the Secretary must comply with the ESA at every step of the oil
    development process.” Tribal Village of Akutan v. Hodel, 
    869 F.2d 1185
    , 1195 (9th Cir. 1988)
    (emphasis added); see also Village of False Pass v. Clark, 
    733 F.2d 605
    , 609 (9th Cir. 1984) (“it
    is clear that OCSLA prescribes three distinct stages for offshore oil and gas activities: leasing,
    exploration, and development and production. ESA appears to apply equally to each stage of its
    own force and effect.”). Thus, regardless of the scope of BOEM’s ESA consultation at the lease
    sale stage, BOEM still must comply with the ESA at the subsequent stages of the OCSLA
    process. Plaintiff’s argument on this point has been explicitly rejected by another court. See
    Defenders of Wildlife, 871 F. Supp. 2d at 1331 (“plaintiff’s insistence that BOEM will get a free
    ride from ESA review during the exploration, development and production stages unless those
    stages are scrutinized now appears both inaccurate and incompatible with the stage-by-stage
    environmental review process that courts have pegged as being Congress’s purpose in
    establishing the OCSLA framework”).
    58
    2013, BOEM provided the NMFS with an updated Biological Assessment, updating the
    environmental baseline post-Deepwater Horizon spill. See AR7900‒8139.
    Meanwhile, NMFS originally represented to the Court that the Biological Opinion would
    be completed by October 31, 2014. See Bernhart Decl. ¶ 4, ECF No. 75-1. NMFS later updated
    that date to November 18, 2014. Id. It has since represented to the Court that NMFS’s
    Biological Opinion will be completed by March 18, 2015, explaining that the “most critical
    outstanding issue for completing the Biological Opinion concerns the nature and extent of
    reduction in risk of oil well blowouts and catastrophic releases of oil into the environment
    resulting from regulatory measures and industry incentives implemented since the Deepwater
    Horizon incident.” See Bernhart Decl. ¶¶ 5‒6.
    2. Application of the TRAC factors
    The APA empowers a reviewing court to “compel agency action unlawfully withheld or
    unreasonably delayed.” 
    5 U.S.C. § 706
    (1). “Section 706 of the APA ‘leaves in the courts the
    discretion to decide whether agency delay is unreasonable.’” Cobell v. Norton, 
    240 F.3d 1081
    ,
    1096 (D.C. Cir. 2001) (quoting Forest Guardians v. Babbitt, 
    174 F.3d 1178
    , 1190 (10th Cir.
    1999)). In reviewing an unreasonable delay claim, the D.C. Circuit has stated that the inquiry
    has taken on a “hexagonal contour[]” because there are up to six factors a court can consider,
    though “the standard is hardly ironclad.” Telecomms. Research & Action Ctr. v. FCC (“TRAC”),
    
    750 F.2d 70
    , 80 (D.C. Cir. 1984). The TRAC court listed the following factors as useful
    guidance: First, “the time agencies take to make decisions must be governed by a ‘rule of
    reason.’” 
    Id.
     Second, “where Congress has provided a timetable or other indication of the speed
    with which it expects the agency to proceed in the enabling statute, that statutory scheme may
    supply content for this rule of reason.” 
    Id.
     Third, “delays that might be reasonable in the sphere
    59
    of economic regulation are less tolerable when human health and welfare are at stake.” 
    Id.
    Fourth, “the court should consider the effect of expediting delayed action on agency activities of
    a higher or competing priority.” 
    Id.
     Fifth, “the court should also take into account the nature
    and extent of the interests prejudiced by delay.” 
    Id.
     Finally, “the court need not find any
    impropriety lurking behind agency lassitude in order to hold that agency action is unreasonably
    delayed.” 
    Id.
     (internal quotation marks and citation omitted).
    At the outset, the parties disagree on the actual length of delay in this case. The plaintiffs
    argue that the Court should measure the delay from the time that consultation began, in July
    2010. See Pl.’s Reply 23. This would make NMFS’s delay in issuing its Biological Opinion
    nearly four years to date, and nearly five years to projected completion. Alternatively, the
    defendants argue that the Court should begin assessing the delay from the time BOEM issued its
    Biological Assessment and provided it to NMFS in February 2013, based on the argument that
    they could not have begun the Biological Opinion prior to the receipt of the assessment. See
    Federal-Def.’s Reply 24; Intervenor’s Cross-Mot. Summ. J. 61. By this calculation, NMFS’s
    delay would be approximately over one-year to date, and just over two years to projected
    completion.
    The Court need not reach the difficult issue of when the clock started running, because
    regardless of the length of delay, the Court finds that NMFS has acted reasonably throughout the
    consultation process. And moreover, because context means everything in assessing an alleged
    undue delay, there is no per se rule as to what amount of time constitutes undue delay. Compare
    Sierra Club v. Thomas, 
    828 F.2d 783
    , 799 (D.C. Cir. 1987) (“Given the complexity of the issues
    facing EPA and the highly controversial nature of the proposal, agency deliberation for less than
    three years—little more than one year since the close of the public comment period—can hardly
    60
    be considered unreasonable.”) (emphasis added); Biodiversity Legal Found. v. Norton, 
    285 F. Supp. 2d 1
    , 16 (D.D.C. 2003) (“Four years have passed since the issuance of the 1999 MSRP,
    which gave rise to FWS’s duty to revise the Cape Sable seaside sparrow’s critical habitat
    designation. With the bird’s extinction expected in less than two decades, delay will become less
    and less reasonable despite competing priorities. As of this time, however, the Court cannot say
    that FWS’s delay has gone beyond the rule of reason due to the Service’s ‘need to prioritize in
    the face of limited resources.’”) (citation omitted), with In re People’s Mojahedin Org. of Iran,
    
    680 F.3d 832
    , 838 (D.C. Cir. 2012) (finding two-year delay unreasonable); Muwekma Tribe v.
    Babbitt, 
    133 F. Supp. 2d 30
    , 37 (D.D.C. 2000) (finding four-year delay unreasonable but
    explaining that the court does not “intend by its ruling to suggest that four years is per se
    unreasonable in all cases”).
    In determining whether or not the agency delay is reasonable, the Court first assesses the
    statutory scheme set up by Congress. See, e.g., TRAC, 
    750 F.2d at 80
    . The relevant statutory
    provision here states as follows: “Consultation . . . shall be concluded within the 90-day period
    beginning on the date on which initiated or . . . within such other period of time as is mutually
    agreeable to the Secretary and the Federal agency.” 
    16 U.S.C. § 1536
    (b)(1)(A) (emphasis
    added). To the extent that this scheme informs the reasonableness inquiry, it demonstrates that
    the agency and the Secretary have a great deal of discretion in mutually setting their own
    timelines. The 90-day timeline is nothing more than a default setting, and there is no limitation
    in the statute on the length of the period of time that the Secretary and the agency can agree to
    extend the 90-day default period.
    Despite this, the plaintiffs argue that the defendants’ delay is unreasonable because it
    “flies in the face of the Fisheries Service’s own policy for completing consultations in 135 days.”
    61
    See Pl.’s Mot. Summ. J. 41. NMFS’s policy specifically states that “[t]he Services ensure the
    biological opinion . . . is prepared and delivered within 135 days of initiation of formal
    consultation . . . . If the Services need more time to analyze the data or prepare the final opinion,
    or if the action agency needs time to provide data or review a draft opinion, an extension may be
    requested by either party. Both the Services and the action agency must agree to the extension.
    Extensions should not be indefinite, and should specify a schedule for completing the
    consultation.” See Endangered Species Act Consultation Handbook: Procedures for Conducting
    Section 7 Consultation and Conferences, U.S. Fish & Wildlife Service and National Marine
    Fisheries Service, March 1998, at 4-7. 36 Plaintiffs mischaracterize NMFS’s policy, which is to
    complete consultations in 135 days unless either side requests an extension. The policy
    embodied by both the statute and the regulations is thus that the agencies should set deadlines,
    and formally extend those deadlines if they need more time. Here, the agencies were in constant
    communication regarding consultation and the timeline for producing the BO. See Federal-
    Def.’s Ex. 1, ECF No. 63-1 (timetable with proposed deadlines). The statutory scheme,
    therefore, cuts in favor of finding that NMFS’s delay was reasonable, because the scope and
    complexity of the task merits additional time agreed to by both agencies.
    The consequences of the agency’s delay, the next factor in the analysis, also cuts in favor
    of the government here. Delays are generally not tolerable “when human health and welfare are
    at stake.” TRAC, 
    750 F.2d at 80
    . The plaintiffs have alleged that the delay will threaten
    endangered species. See Pl.’s Reply 16. But, as set forth above, the lease sales are a narrow,
    circumscribed event in the OCSLA scheme that will have minimal impact on endangered
    species. See Defenders of Wildlife, 871 F. Supp. 2d at 1329‒30. And though NEPA covers
    36
    available at http://www.fws.gov/endangered/esa-
    library/pdf/esa_section7_handbook.pdf.
    62
    agency action that significantly impacts the quality of the human environment, it is unclear how
    any delay in NMFS’s BO here would harm the human environment. On the contrary, an order
    compelling the agency to issue its BO immediately might undermine the entire process, and
    arguably have even harsher consequences than any delay. As the defendants have articulated,
    critical new data is being analyzed and a premature decision could undermine the time already
    put in and “only threaten NMFS’s ability to conduct a thorough and searching analysis.”
    Federal-Def.’s Cross-Mot. Summ. J. 45.37
    The final three factors—other agency priorities, nature and extent of interests prejudiced,
    and any agency impropriety or lassitude (or lack thereof)—also cut in favor of NMFS. Here, the
    defendants have offered several relevant explanations for the delay: (1) the scientific and
    regulatory questions are “staggeringly complex,” and the BO examines effects 50 years into the
    future; (2) production of the BO requires coordination between BOEM, NMFS, and two other
    agencies—Bureau of Safety and Environmental Enforcement (“BSEE”), and EPA; and (3)
    37
    The plaintiffs counter that NMFS does not need to wait for better science to
    develop—it just needs the best science available, citing Sw. Ctr. for Biological Diversity v.
    Babbitt, 
    215 F.3d 58
    , 60 (D.C. Cir. 2000) (The “best available data” requirement makes it clear
    that the Secretary has no obligation to conduct independent studies . . . . Even if the available
    scientific and commercial data were quite inconclusive, he may—indeed must—still rely on it . .
    . .) (citation omitted)) and San Luis & Delta-Mendota Water Auth. v. Salazar, 
    760 F. Supp. 2d 855
    , 872 (E.D. Cal. 2010) (“FWS must utilize the best scientific . . . data available, not the best
    scientific data possible.”), aff’d in part, rev’d in part, by San Luis & Delta-Mendota Water Auth.
    v. Jewell, 
    2014 WL 975130
     (9th Cir. March 13, 2014) (internal quotation marks omitted). The
    plaintiffs cannot have it both ways—they repeatedly fault BOEM and NMFS for relying on
    “stale” science (which the Court finds they did not), and now, would have the Court rush those
    very agencies into producing a Biological Opinion based on uncertain, incomplete information.
    And moreover, plaintiffs’ reliance on those cases is misplaced. Southwestern Center for
    Biological Diversity arises in the context of an ESA listing decision, not in the context of
    developing a Biological Opinion. And there, the circuit court reversed the district court’s
    imposition of a requirement that the agency conduct a population count in order to develop the
    best available science, which was neither contemplated by the ESA or the agency itself. 
    215 F.3d at
    60‒61. Finally, San Luis & Delta-Mendota is no longer even persuasive authority, as the
    Ninth Circuit has since reversed that court’s judgment.
    63
    NMFS has limited resources—its Southeast Regional Office has a staff of 16 members, only two
    of whom are available to work on this particular BO. See Federal-Def.’s Cross-Mot. Summ. J.
    40‒41; see also Bernhart Decl. ¶¶ 4‒7. In light of the amount of information the agencies must
    process and analyze, the complexity of the issues, the coordination between several agencies, and
    the limited resources available to them, the Court finds that NMFS’s delay in producing the BO
    has been reasonable.
    The Court notes, however, that by the time NMFS produces its Biological Opinion in
    2015, the Deepwater Horizon oil spill will be five years behind it. The Court, though, does not
    question the holistic approach the agencies are taking in ambitiously assessing the environmental
    impact of oil and gas exploration and production on endangered and threatened species and their
    designated critical habitats throughout the Gulf of Mexico, rather than assessing each lease sale
    separately. This approach seems sensible, even preferable. But, of course, such an ambitious
    endeavor takes time. And the time expended to date seems to have been reasonably spent. The
    APA requires no more.
    IV. CONCLUSION
    For the foregoing reasons, the federal-defendants’ and intervenor-defendants’ motions for
    summary judgment are GRANTED, and the plaintiffs’ motion for summary judgment is
    DENIED. An order consistent with this Memorandum Opinion is separately and
    contemporaneously issued.
    Dated: March 31, 2014                                             RUDOLPH CONTRERAS
    United States District Judge
    64
    

Document Info

Docket Number: Civil Action No. 2012-0981

Citation Numbers: 37 F. Supp. 3d 147

Judges: Judge Rudolph Contreras

Filed Date: 3/31/2014

Precedential Status: Precedential

Modified Date: 8/31/2023

Authorities (55)

Village of False Pass v. Watt , 565 F. Supp. 1123 ( 1983 )

Southwest Center for Biological Diversity v. United States ... , 82 F. Supp. 2d 1070 ( 2000 )

Wyoming v. US Dept. of Agriculture , 661 F.3d 1209 ( 2011 )

Sierra Club v. U.S. Army Corps of Engineers , 295 F.3d 1209 ( 2002 )

forest-guardians-a-non-profit-new-mexico-corporation-and-defenders-of , 174 F.3d 1178 ( 1999 )

conservation-law-foundation-of-new-england-inc-v-cecil-d-andrus-etc , 623 F.2d 712 ( 1979 )

Nc Wildlife Federation v. Nc Dept. of Transp. , 677 F.3d 596 ( 2012 )

Village of False Pass, Cross-Appellees v. William C. Clark, ... , 733 F.2d 605 ( 1984 )

environmental-protection-information-center-a-non-profit-corporation-v , 255 F.3d 1073 ( 2001 )

Miami-Dade County v. United States Environmental Protection ... , 529 F.3d 1049 ( 2008 )

Friends of Yosemite Valley v. Kempthorne , 520 F.3d 1024 ( 2008 )

Pyramid Lake Paiute Tribe of Indians v. United States ... , 898 F.2d 1410 ( 1990 )

Florida Key Deer v. Paulison , 522 F.3d 1133 ( 2008 )

communities-inc-dulworth-rives-inc-prestonia-area-neighborhood , 956 F.2d 619 ( 1992 )

Natl Com New Riv Inc v. FERC , 373 F.3d 1323 ( 2004 )

Center for Biological Diversity v. US Dept. of Interior , 563 F.3d 466 ( 2009 )

seattle-audubon-society-washington-environmental-council-washington-native , 80 F.3d 1401 ( 1996 )

pacific-rivers-council-oregon-natural-resources-council-hells-canyon , 30 F.3d 1050 ( 1994 )

mt-graham-red-squirrel-tamiasciurus-hudsonicus-grahamensis-an , 954 F.2d 1441 ( 1992 )

oregon-environmental-council-citizens-for-the-safe-control-of-the-gypsy , 817 F.2d 484 ( 1987 )