    AUI CONSTRUCTION GROUP, LLC,                   ) Appeal from the Circuit Court
    ) of Lee County.
    Plaintiff-Appellant,                  )
    )
    v.                                             ) No. 14-CH-38
    )
    LOUIS J. VAESSEN, in His Capacity as           )
    Trustee of the Louis J. Vaessen Trust Dated    )
    6/24/2003 ½ Interest; CAROL A. VAESSEN, )
    in Her Capacity as Trustee of the Carol A.     )
    Vaessen Trust Dated 6/24/2003 ½ Interest;      )
    GSG 7, LLC; CLIPPER WINDPOWER, LLC; )
    POSTENSA WIND STRUCTURES US, LLC; )
    ROCK RIVER READY MIX, INC.;                    )
    ILLINOIS TRUCK AND EQUIPMENT                   )
    COMPANY, INC.; CUMMINGS                        )
    ELECTRICAL, INC.; KR WIND, INC.,               )
    d/b/a Mammoet Wind, Inc.; UNKNOWN              )
    OWNERS; and NONRECORD CLAIMANTS, )
    )
    Defendants                            )
    )
    (Louis J. Vaessen, in His Capacity as Trustee )
    of the Louis J. Vaessen Trust Dated 6/24/2003 )
    ½ Interest; Carol A. Vaessen, in Her Capacity )
    as Trustee of the Carol A. Vaessen Trust Dated )
    6/24/2003 ½ Interest; GSG 7, LLC; Clipper      )
    Windpower, LLC; Postensa Wind Structures, )
    US, LLC; Rock River Ready Mix, Inc.;           )
    Illinois Truck and Equipment Company, Inc.; )
    Cummings Electrical, Inc.; Unknown Owners; ) Honorable
    and Nonrecord Claimants, Defendants-           ) Daniel A. Fish,
    Appellees).                                    ) Judge, Presiding.
    ______________________________________________________________________________
    
    2016 IL App (2d) 160009
    PRESIDING JUSTICE SCHOSTOK delivered the judgment of the court, with opinion.
    Justices McLaren and Jorgensen concurred in the judgment and opinion.
    OPINION
    ¶1     The instant controversy arises from a wind energy system that was developed by GSG 7
    and built on the property of Louis and Carol Vaessen. After the tower was completed, one of the
    subcontractors that worked on the tower, AUI Construction Group, LLC (AUI), filed a complaint
    to foreclose a mechanic’s lien against the Vaessens’ property and sought to recover over $3
    million. The Vaessens filed a motion to dismiss the complaint, and Clipper Windpower, LLC
    (Clipper), a general contractor on the project, filed a motion for summary judgment. Both
    motions asserted that the wind energy system remained GSG 7’s personal property and was a
    nonlienable trade fixture rather than an improvement to the property. The circuit court of Lee
    County agreed and granted the Vaessens’ motion to dismiss and Clipper’s motion for summary
    judgment. AUI appeals from that order. For the reasons that follow, we affirm.
    ¶2                                     BACKGROUND
    ¶3     On June 29, 2007, Louis and Carol Vaessen entered into a windpark easement agreement
    with GSG 7, a developer of wind energy. Among other things, the easement provided GSG 7 the
    exclusive right “to erect, install, construct, replace, maintain, repair and operate wind energy
    conversion systems on the Property as Developer determined in its sole discretion.”         The
    agreement provided that the Vaessens would receive annual payments of $7500 upon erection of
    a wind turbine.
    ¶4     Following its agreement with the Vaessens, GSG 7 entered into an agreement with
    Clipper to supply the wind turbine and the tower to support that wind turbine.          Clipper
    manufactured wind turbines but not the towers to support those turbines. Therefore, Clipper
    -2-
    
    2016 IL App (2d) 160009
    entered into a fixed-price contract with Postensa Wind Structures US, LLC (Postensa), for the
    construction of a prototype tower designed to support the wind turbine.
    ¶5      Postensa, in turn, entered into a cost-plus agreement with AUI for the construction of the
    foundation and tower. The Postensa-AUI agreement is dated November 3, 2011, but it was not
    executed until January 16, 2012, by AUI and until February 1, 2012, by Postensa. The recital to
    the agreement stated that Postensa had entered into an agreement with Clipper to design and
    build the foundation and tower for a wind-powered electrical generator facility that was owned
    by GSG 7. The Postensa-AUI agreement provided that the estimated total construction costs for
    AUI’s scope of work would be $1,664,791.
    ¶6      A memorandum of the windpark easement agreement between the Vaessens and GSG 7
    was recorded on December 22, 2011.
    ¶7      After AUI completed its work in March or May of 2012, it claimed that the total amount
    due from Postensa was $5,904,272.69. After giving Postensa credit for various payments, AUI
    asserted that there remained an outstanding balance of $3,188,634.44. AUI filed an arbitration
    demand against Postensa for the approximately $3 million that it claimed it was still owed.
    ¶8      On June 25, 2013, the arbitrator entered a partial award. On August 20, 2013, Postensa
    filed for bankruptcy. On December 4, 2013, the arbitrator entered a final award in favor of AUI
    for $3,527,043 (including $655,839 in AUI’s attorney fees and costs).
    ¶9      On April 17, 2014, AUI filed a complaint to foreclose a mechanic’s lien against the
    Vaessens. AUI asserted that, because the materials, fixtures, services, and labor it furnished
    constituted a valuable and permanent improvement to the property, the Vaessens benefitted in an
    amount equivalent to the arbitration award. AUI further requested that the Vaessens’ property be
    sold at public auction to satisfy its lien.
    -3-
    
    2016 IL App (2d) 160009
    ¶ 10   On June 23, 2014, the Vaessens filed a motion pursuant to section 2-619 of the Code of
    Civil Procedure (Code) (735 ILCS 5/2-619 (West 2014)) to dismiss AUI’s complaint. On
    October 17, 2014, Clipper filed a motion for summary judgment. Both motions asserted that the
    wind energy system remained GSG 7’s personal property and was a nonlienable trade fixture
    rather than an improvement to the property.
    ¶ 11   On April 15, 2015, the trial court granted the Vaessens’ motion to dismiss and Clipper’s
    motion for summary judgment. The trial court explained that mechanic’s lien laws are based on
    the theory that an owner is benefitted by improvements that become part of his premises. As
    such, the owner should pay for this accruing benefit when the owner induced or encouraged the
    erection of the improvement. Relying on Crane Erectors & Riggers, Inc. v. La Salle National
    Bank, 
    125 Ill. App. 3d 658
    , 662 (1984), the trial court found that there were three factors to be
    considered in determining whether equipment has become a fixture to the realty and thus
    lienable. Specifically, those factors were (1) the nature of the equipment’s attachment to the
    realty, (2) the equipment’s adaptation to and necessity for the purposes to which the premises are
    devoted, and (3) whether it was intended that the equipment should be considered part of the real
    estate. After considering these factors, the trial court determined that GSG 7 retained ownership
    of the wind energy system according to the unambiguous terms of the easement and that AUI
    had notice of the terms of the easement through the recorded memorandum. The trial court
    expounded:
    “If AUI’s mechanic’s lien were allowed to attach to the real estate and GSG [7] chose to
    terminate the easement and removed all of its property brought onto the premises as
    allowed by the easement agreement,[1] the lien would remain upon the real estate after
    1
    As will be discussed in more detail, infra ¶ 20, the Vaessen-GSG 7 agreement provided
    -4-
    
    2016 IL App (2d) 160009
    removal of the benefit upon which the lien was based. Therefore, to allow AUI’s filing
    of a mechanic’s lien to attach to the real estate where removal of the fixture is allowed
    would produce an absurd result not intended by the lien act.”
    ¶ 12   On May 14, 2015, AUI filed a motion to reconsider. On December 11, 2015, the trial
    court denied that motion. AUI thereafter filed a timely notice of appeal.
    ¶ 13                                        ANALYSIS
    ¶ 14   On appeal, AUI argues that the trial court erred in granting the Vaessens’ section 2-619
    motion to dismiss their complaint and Clipper’s motion for summary judgment. AUI insists that
    a question of fact remains as to whether the tower was a lienable land improvement as opposed
    to a nonlienable trade fixture. AUI further argues that the trial court erred in its consideration of
    factors that determine whether a structure is lienable.
    ¶ 15   The purpose of a section 2-619 motion to dismiss is to dispose of issues of law and easily
    proved issues of fact at the outset of litigation. Van Meter v. Darien Park District, 
    207 Ill. 2d 359
    , 367 (2003). A section 2-619 motion admits as true all well-pleaded facts, along with all
    reasonable inferences that can be gleaned from those facts.          Porter v. Decatur Memorial
    Hospital, 
    227 Ill. 2d 343
    , 352 (2008). “[W]hen ruling on a section 2-619 motion to dismiss, a
    court must interpret all pleadings and supporting documents in the light most favorable to the
    nonmoving party.” 
    Id.
     On appeal from a ruling on a section 2-619 motion, the reviewing court
    must consider whether the existence of a genuine issue of material fact should have precluded
    the dismissal or, absent such an issue of fact, whether dismissal is proper as a matter of law.
    Thurman v. Champaign Park District, 
    2011 IL App (4th) 101024
    , ¶ 18.
    that, upon termination of the easement agreement, GSG 7 was obligated to remove the wind
    energy system from the Vaessens’ property.
    -5-
    
    2016 IL App (2d) 160009
    ¶ 16   The purpose of a motion for summary judgment is to determine whether a genuine issue
    of triable fact exists (People ex rel. Barsanti v. Scarpelli, 
    371 Ill. App. 3d 226
    , 231 (2007)), and
    such a motion should be granted only when “the pleadings, depositions, and admissions on file,
    together with the affidavits, if any, show that there is no genuine issue as to any material fact and
    that the moving party is entitled to judgment as a matter of law” (735 ILCS 5/2-1005(c) (West
    2014)). An order granting summary judgment should be reversed if the evidence shows that a
    genuine issue of material fact exists or if the judgment is incorrect as a matter of law. Clausen v.
    Carroll, 
    291 Ill. App. 3d 530
    , 536 (1997). We review de novo the trial court’s grant of a motion
    for summary judgment. Coole v. Central Area Recycling, 
    384 Ill. App. 3d 390
    , 395 (2008).
    ¶ 17   The purpose of the Mechanics Lien Act (Act) (770 ILCS 60/0.01 et seq. (West 2014)) is
    to protect those who, in good faith, furnish material or labor for the improvement of real
    property. Mostardi-Platt Associates, Inc. v. Czerniejewski, 
    399 Ill. App. 3d 1205
    , 1209 (2010).
    The Act permits a lien upon property where a benefit has been received by the owner and where
    the value or condition of the property has been increased or improved by the furnishing of the
    labor or materials.     
    Id.
       The Act is a comprehensive statute that outlines the rights,
    responsibilities, and remedies of parties to construction contracts, including owners, contractors,
    subcontractors, and third parties. Cordeck Sales, Inc. v. Construction Systems, Inc., 
    382 Ill. App. 3d 334
    , 353 (2008). The burden of proving that each requirement of the Act has been satisfied is
    on the party seeking to enforce the lien. Czerniejewski, 399 Ill. App. 3d at 1209. Because the
    right to a mechanic’s lien is statutory, a plaintiff must strictly comply with the Act. Cordeck,
    382 Ill. App. 3d at 353. However, once a plaintiff has complied with the procedural requisites,
    the Act is liberally construed in order to accomplish its remedial purpose. Weydert Homes, Inc.
    v. Kammes, 
    395 Ill. App. 3d 512
    , 516 (2009).
    -6-
    
    2016 IL App (2d) 160009
    ¶ 18   The central question in this case is whether AUI’s work constituted improvement to real
    property, which is lienable (Czerniejewski, 399 Ill. App. 3d at 1209), as opposed to improvement
    to a trade fixture, which is not (B. Kreisman & Co. v. First Arlington National Bank of Arlington
    Heights, 
    91 Ill. App. 3d 847
    , 852 (1980)). The factors to be considered in determining whether
    equipment added to property constitutes a land improvement and is thus lienable are: (1) the
    nature of its attachment to the realty, (2) its adaptation to and necessity for the purposes to which
    the premises are devoted, and (3) whether it was intended that the item in question should be
    considered part of the realty. Crane Erectors, 125 Ill. App. 3d at 662. Intent is the preeminent
    factor, the other considerations being primarily evidences of intent. Id. The fact that an item can
    be removed without material injury to the realty does not of itself destroy its lienability. Id.
    Further, that an item can be removed does not conclusively establish that it is a trade fixture
    where it is clear that there is an intent to permanently improve the property by its installation.
    See Dual Temp Installations, Inc. v. Chicago Title & Trust Co., 
    41 Ill. App. 3d 415
    , 417-18
    (1976). “Parties may, however, contract to evidence an intention that the title to chattels which
    become annexed to realty does not pass and that they retain their character as trade fixtures until
    paid for; this agreement is binding upon the parties to the agreement where no rights of third
    parties are unfairly affected.” Crane Erectors, 125 Ill. App. 3d at 662 (citing Jones v. Jos.
    Greenspon’s Son Pipe Corp., 
    381 Ill. 615
    , 619-20 (1943)).
    ¶ 19   The first two factors suggest that the tower is lienable. As the trial court aptly stated:
    “The nature of the attachment of the [wind energy system (WES)] to the premises
    is considerable. The WES consists of a tower over 500 feet tall, [and a] turbine system
    attached to a foundation reaching nearly 12 feet below ground with power lines and
    roads. This form of attachment clearly suggests permanent attachment to the premises.
    -7-
    
    2016 IL App (2d) 160009
    Secondly, the equipment is specific and necessary for the production of wind energy to
    which at least a portion of the premises [is] devoted.”
    ¶ 20   As to the third factor, this factor strongly weighs in favor of finding that the parties
    intended that the tower was a trade fixture that would remain the property of GSG 7 and not
    become a land improvement. The easement agreement provides that all property installed by
    GSG 7 would remain the property of GSG 7 and would be removable by GSG 7 upon three
    months’ notice to the Vaessens. The agreement further provides that GSG 7 could terminate the
    agreement upon three months’ notice and that GSG 7 would dismantle and remove all
    improvement fixtures and property owned by GSG 7.                As such, the agreement clearly
    demonstrates that the Vaessens and GSG 7 did not intend the tower to be a permanent land
    improvement. As the intent of the parties is the most important factor in determining whether an
    item is a removable trade fixture or a permanent improvement, the easement agreement
    establishes that the tower was a trade fixture. See 
    id.
    ¶ 21   AUI insists that the easement should not be binding against it, because it performed $1.7
    million in work before the windpark easement was recorded. AUI points out that in Crane
    Erectors the court determined that agreements would be binding only “where no rights of third
    parties are unfairly affected.” 
    Id.
     As its rights would be “unfairly affected” if we found that the
    easement affected its ability to file a lien on the Vaessens’ property, AUI argues, we should find
    that it did not have timely notice of that easement
    ¶ 22   In making this argument, AUI would have us overlook its own contract with Postensa.
    That agreement provides in relevant part:
    “[Postensa] has entered an agreement with Clipper Windpower LLC (‘Turbine Supplier’)
    to design and build the foundation and tower (‘Design-Builder’s Work’) for a wind-
    -8-
    
    2016 IL App (2d) 160009
    powered electrical generation facility known as the Eve project consisting of one (1) 2.5
    MW wind turbine generator located in Sulette County, Illinois, USA (the ‘Project’) and
    owned by GSG 7, LLC (‘Owner’).” (Emphasis added.)
    The Postensa-AUI contract states that the owner of the project upon which AUI would be
    working was GSG 7.        In this important regard, the Postensa-AUI agreement mirrors the
    Vaessens-GSG 7 agreement in providing that the owner of the project was GSG 7, not the
    Vaessens.
    ¶ 23   Further, the Postensa-AUI agreement, dated November 3, 2011, predated the recording of
    the easement on December 22, 2011. There is no indication in the record that AUI performed
    any work on the project prior to November 3, 2011. Nor is there any reason to draw such an
    inference. As AUI had knowledge through its contract with Postensa that the work it would be
    performing would ultimately benefit GSG 7, it is not unfair to find that the agreement between
    the Vaessens and GSG 7—which provided the exact same thing—was binding on them as well.
    AUI points out that the trial court did not rely on AUI’s contract with Postensa in determining
    that AUI had notice of the easement agreement. However, it is well settled that we may affirm
    on any basis appearing in the record. See Burkhart v. Wolf Motors of Naperville, 
    2016 IL App (2d) 151053
    , ¶ 23. 2
    2
    The American Subcontractors Association (ASA) has filed an amicus curiae brief in
    support of AUI’s position. ASA argues that the trial court’s decision is contrary to both the Act
    and public policy because AUI should not have been required to do a title search to determine
    the relationship between the Vaessens and GSG 7. We need not determine whether AUI should
    have conducted such a title search, because, as explained above, in light of AUI’s own contract
    with Postensa, AUI should have known that the Vaessens were not the owners of the project.
    -9-
    
    2016 IL App (2d) 160009
    ¶ 24   AUI further insists that there are other factors that the trial court should have considered
    as to the lienability of the tower, beyond those enumerated by Crane Erectors. Those additional
    factors include: (1) whether the item provides any benefit or enhancement to the property; (2)
    whether the item is removable without material damage to the realty; (3) whether it is impractical
    to remove the item; (4) whether the item was used to convert the premises from one use to
    another; and (5) the agreement and relationship between the parties. AUI contends that, as no
    single factor is dispositive (Crane Erectors, 125 Ill. App. 3d at 662-64), the trial court should
    have found, considering all of the factors together, that the tower was in fact a lienable structure.
    The defendants respond that AUI is trying to “cherry-pick” from other cases and add factors that
    the trial court is simply not required to consider.
    ¶ 25   We believe that all of the additional factors that AUI argues the trial court should have
    considered are consistent with the ones enumerated in Crane Erectors, which the trial court did
    consider. All of the additional factors that AUI points to pertain to what the parties intended
    when they entered their contract. Again, as Crane Erectors stated, the parties’ intent in forming
    their contract is the preeminent factor. Id. at 662.
    ¶ 26   Moreover, the consideration of these factors would not change our view. As to whether
    the tower provided a benefit to the Vaessens, we note that the Vaessens did not receive anything
    other than rent from GSG 7, which is not a benefit for purposes of the Act. See L.J. Keefe Co. v.
    Chicago & Northwestern Transportation Co., 
    287 Ill. App. 3d 119
    , 122 (1997). In L.J. Keefe,
    the owner of the land underlying railway tracks granted a license to Commonwealth Edison
    Company to install power lines on its land. The plaintiff was retained to perform tunneling work
    to allow the installation of steel casing and pipe grouting for Commonwealth Edison Company
    and attempted to enforce a lien against the owner of the land. The court held that no lien is
    - 10 -
    
    2016 IL App (2d) 160009
    enforceable against the owner of the land when a subcontractor constructs or installs apparatus
    for a contractor’s sole benefit and the work does not improve the land or benefit the landowner.
    
    Id.
     The court held that there was no contract to improve the land. 
    Id.
     Rather, Commonwealth
    Edison Company had been granted a license to construct an apparatus for its own benefit, not for
    the benefit of the landowner. 
    Id.
     The subcontractor’s work was performed solely for the benefit
    of Commonwealth Edison Company and did not benefit the land or the landowner in any way.
    
    Id.
        The court specifically found that the rent that the landowner had received from
    Commonwealth Edison Company was “too attenuated to fall within the purview of the Act.” 
    Id.
    ¶ 27    We note that there is case law suggesting that whether construction provides a benefit to
    the property is the “central inquiry” in mechanic’s lien cases. See First Bank of Roscoe v.
    Rinaldi, 
    262 Ill. App. 3d 179
    , 183 (1994). However, there is also case law that indicates that no
    single factor is dispositive in determining whether an item is a lienable improvement. See Crane
    Erectors, 125 Ill. App. 3d at 662-64. Regardless, we find that this factor weighs in favor of
    finding that the tower was not lienable.
    ¶ 28    Relying on Crane Erectors, AUI next argues that, because the removal of the tower
    would be impractical and cause damage to the property, these considerations weigh in favor of
    finding that the tower was a permanent improvement. Relying on Jones, 
    381 Ill. at 619-22
    , and
    E.R. Darlington Lumber Co. v. Burton, 
    156 Ill. App. 82
    , 86-87 (1910), Clipper responds that
    those considerations will not outweigh the parties’ intent in building an item unless it is in fact
    impossible to remove the item.
    ¶ 29    In Crane Erectors, the plaintiff installed an overhead crane in the defendant’s warehouse.
    After the plaintiff failed to receive payment for its work, the plaintiff sought to enforce its
    mechanic’s lien claim against the defendant. The defendant argued that the crane was leased by
    - 11 -
    
    2016 IL App (2d) 160009
    its warehouse tenant, which prevented a lien claim against the defendant. The reviewing court
    considered numerous factors in determining that the crane had become a permanent fixture in the
    warehouse and that therefore a lien against the defendant was proper. Those factors included
    that (1) because the crane was very large, running the length of the warehouse, it would be
    impractical (but not impossible) to remove it; (2) the defendant, and not its tenant, had made
    payments to the plaintiff for the work done; and (3) the crane remained in the building after a
    transfer of ownership. Crane Erectors, 125 Ill. App. 3d at 660-64.
    ¶ 30   In Jones, the supreme court considered whether 1382 feet of well casing embedded and
    cemented into the ground for oil and gas extraction was a trade fixture. Evidence was presented
    that a bomb would have to be used to remove the casing. The appellate court determined that the
    casing constituted a permanent land improvement, but the supreme court reversed, explaining:
    “The Appellate Court clearly erred in holding that the appellant had no right to
    enter upon the leasehold premises and repossess the casing because the same had become
    embedded and cemented in the oil well. To so hold was, in effect, to transfer the title to
    the casing from the vendor to the vendee, through the act of the latter, in plain violation
    of the terms of the contract. ***
    ***
    Since it appears that the landlord and [the lessee] agreed that the casing could be
    removed, we hold that the oil casing placed in the ground under such circumstances is a
    trade fixture as between the landlord and [the lessee].” Jones, 
    381 Ill. at 619, 621-22
    .
    ¶ 31   In Darlington, a landowner entered into an agreement to lease 160 acres of her land to be
    used as an amusement park. The agreement provided that the lease would be for five years and
    that all of the buildings or fixtures erected thereon would be removed at the end of the lease.
    - 12 -
    
    2016 IL App (2d) 160009
    After the buildings were erected and a dam put in to form a lake, the lessee defaulted in the
    payment of rent. Thereafter, the Darlington Lumber Company, which had furnished material for
    the structures, sought to enforce a mechanic’s lien against the landowner on the basis that the
    improvements to the land were permanent. The reviewing court determined that a lien could not
    be enforced against those improvements that could be removed. However, as to the dam, the
    reviewing court stated:
    “It is obvious that such improvement could not be removed from the premises except at
    considerable expense, and without rendering the material used practically worthless, and
    totally destroying the lake.      The privilege granted to remove such materials at the
    termination of the lease was therefore of no practical value or advantage to the lessee, and
    may be regarded as nugatory, and the improvement being incapable of removal
    necessarily inured to the owners of the fee of the premises. The [landowner] having
    authorized the erection of improvements which [she] must be held to have known to be of
    that character and which of necessity would remain upon the premises at the expiration of
    the lease, and thus inure to the benefit of the then owner of the fee, cannot be permitted to
    invoke the removal clause in the lease to escape liability for the cost of the same.”
    Darlington, 156 Ill. App. at 86-87.
    ¶ 32   From Jones and Darlington, 3 we can extrapolate that an improvement that the parties
    consider to be temporary will be found to be temporary unless that improvement really cannot be
    removed. To hold otherwise would essentially transfer ownership rights in the property when
    3
    As Darlington is an appellate court decision prior to 1935, it is not precedential. Bryson
    v. News America Publications, Inc., 
    174 Ill. 2d 77
    , 95 (1996). However, we may still consider it
    as persuasive authority.
    - 13 -
    
    2016 IL App (2d) 160009
    the parties themselves did not intend to transfer such rights. See Jones, 
    381 Ill. at 619
    . We note
    that this was part of the trial court’s rationale in denying AUI’s lien claim against the Vaessens.
    ¶ 33   Here, it is clear that the tower can be removed. AUI’s president, Mario Carbone, testified
    that bombs would have to be used to remove the tower. We observe that this was the same
    method that would have been used to remove the well casing in Jones. Further, Carbone testified
    that it would cost over $600,000 to remove that tower. 4 Although expensive to remove, the
    tower was clearly not “incapable of removal.” See Darlington, 156 Ill. App. at 87.
    ¶ 34   Moreover, we find AUI’s reliance on Crane Erectors to be misplaced. Although that
    court indicated that one of the reasons it found that an overhead crane was a permanent fixture
    was that it would be impractical to remove it, the court also found pertinent two additional
    reasons not present here—that the landlord, rather than the tenant, had made payments to the
    contractor and that the crane remained in the building even after the ownership of the building
    had changed. It is apparent that the court’s determination that the crane was a permanent
    improvement was based on the totality of those circumstances.
    ¶ 35   AUI additionally points out that the Vaessens-GSG 7 agreement provides that the tower
    will have a foundation installed 12 feet deep into the ground. However, upon termination of the
    4
    The Vaessens argue that “Carbone’s opinions in his affidavit are unsupported expert
    opinions that cannot be considered at the summary judgment phase, because they would not be
    admissible at trial.” Specifically, the Vaessens argue that “Carbone is not qualified to give
    expert testimony regarding removal of the [tower] from the Subject Premises, methods of
    removal, cost of removal, and whether the Subject Premises would be damaged by removal.”
    We need not address this argument, because, even if we were to find that all of his testimony was
    admissible, it would not change the result.
    - 14 -
    
    2016 IL App (2d) 160009
    easement, the agreement provides that only the top four feet of the foundation will be removed.
    AUI suggests that, as the foundation will not be completely removed, the improvement to the
    property is indeed permanent.
    ¶ 36   We note that AUI points to nothing in the record that suggests that leaving concrete
    buried 4 to 12 feet below the Vaessens’ farmland will affect their use of the property. Rather, the
    record supports an inference that after the tower is removed the Vaessens will be able to resume
    farming on the land that was occupied by the tower. As such, this fact is consistent with the
    conclusion that the tower was not intended to be a permanent land improvement.
    ¶ 37   In sum, although it is clear that it will be expensive to remove the tower from the
    Vaessens’ property, it is also evident that it is not impossible to do so.          As such, this
    consideration does not outweigh the fact, reflected in the Vaessens-GSG 7 agreement, that the
    tower was intended to be temporary.
    ¶ 38   As to the next factor that AUI argues the trial court should have considered—whether the
    item was used to convert the premises from one use to another—we find that this is equivalent to
    a factor that the trial court did consider—the item’s adaptation to and necessity for the purposes
    to which the premises are devoted. The trial court found that, because a portion of the premises
    was converted from farmland to harnessing wind energy, this factor weighed in favor of finding
    that the tower was lienable.
    ¶ 39   The fifth additional factor—the Vaessens-GSG 7 agreement—as we have already
    discussed extensively, weighs heavily in favor of finding that the tower was not a lienable
    structure. Thus, even considering these additional factors, it is readily apparent that Vaessens
    and GSG 7 did not intend the tower to be a permanent improvement.
    - 15 -
    
    2016 IL App (2d) 160009
    ¶ 40   AUI further contends, however, that beyond the factors listed above, there are other
    factors—specific to this case—that warrant a finding that the tower was a lienable object.
    Specifically, AUI argues that (1) the Vaessens-GSG 7 agreement expressly contemplated
    lienable work; (2) Illinois law treats wind energy devices as taxable real property; and (3) AUI’s
    construction agreement with Postensa contemplated lienable work. We do not believe that any
    of those considerations warrants a different result.
    ¶ 41   AUI points to paragraph 5.3 of the Vaessens-GSG 7 agreement, which requires GSG 7 to
    “keep Owner’s interest in the Property free and clear of all liens and claims of liens for labor and
    services performed on, and materials, supplies and equipment furnished to the Property in
    connection with Developer’s use of the Property.” AUI also asserts that the Vaessens-GSG 7
    agreement provides for the construction of “improvements,” “facilities,” and “real property.”
    AUI contends that these provisions demonstrate that the Vaessens and GSG 7 contemplated that
    the construction of the tower would constitute lienable work. We disagree. The plain language
    of these provisions indicates the exact opposite: that the Vaessens contemplated that there would
    be no liens placed on their property based on GSG 7’s development of a wind energy system.
    ¶ 42   As to the tax consequences of the wind energy system, AUI argues that Illinois’s tax
    treatment of wind energy devices weighs heavily in favor of finding that the tower is an
    improvement on real estate and not a trade fixture. AUI asserts that, under the Property Tax
    Code (35 ILCS 200/1-1 et seq. (West 2014)), the property tax valuation of a wind energy device
    is based on the “real property cost basis” of “the land and real property improvements of a wind
    energy device,” valued at $360,000 per megawatt of nameplate capacity, minus an allowance for
    physical depreciation, and with adjustments for inflation. See 35 ILCS 200/10-600, 10-605
    (West 2014).
    - 16 -
    
    2016 IL App (2d) 160009
    ¶ 43   In response, Clipper argues that the Property Tax Code does not treat a wind energy
    device as a fixture to the owner’s land. Clipper asserts that, because Illinois does not have a
    general personal property tax, and because it does not want to permit multimillion-dollar turbines
    to escape all taxation, it imposes a real property tax on a wind energy device, but only after
    isolating the wind energy device from the land. See 35 ILCS 200/10-620 (West 2014). Pursuant
    to section 10-620 of the Property Tax Code, the owner of the wind energy device must have a
    land surveyor prepare a plat of the area of the device, and that plat is then issued its own parcel
    identification number so that the device may be separately taxed. Clipper argues that section 10-
    620’s approach to taxing wind turbines is entirely consistent with the Vaessens-GSG 7
    agreement, which requires GSG 7 to pay taxes associated with the wind development project that
    GSG 7 continues to own after the installation.
    ¶ 44   We agree with Clipper’s interpretation of section 10-620 of the Property Tax Code.
    There is nothing in that provision, or any other provision of the Property Tax Code, that suggests
    that a wind turbine that is installed on property is considered to be a permanent improvement to
    the land. Rather, the fact that the Illinois General Assembly added a specific section to the
    Property Tax Code to cover wind turbines suggests that it was concerned that those wind
    turbines would not otherwise be taxed, because they are not land improvements.
    ¶ 45   As to AUI’s argument that its construction agreement with Postensa contemplated
    lienable work, we note that AUI cites no authority as to why that fact should even have a bearing
    in this case. Absent any such authority or cogent analysis of why this fact is relevant, this fact
    does not require us to reach a different result. Ill. S. Ct. R. 341(h)(7) (eff. Feb. 6, 2013).
    ¶ 46   Finally, we note that an amici curiae brief has been filed in support of AUI’s position by
    the Associated General Contractors of America, Builders Association, Central Illinois Builders
    - 17 -
    
    2016 IL App (2d) 160009
    of AGC, Fox Valley Associated General Contractors, and Southern Illinois Builders Association
    (collectively referred to as AGC). AGC argues that the trial court’s ruling is contrary to both
    Illinois law and public policy that prohibit no-lien construction contracts and projects.
    Specifically, AGC contends that the Act prohibits construction contracts that require contractors
    or subcontractors to waive their lien rights “in anticipation of and in consideration for the
    awarding of a contract or subcontract.” 770 ILCS 60/1(d) (West 2014).
    ¶ 47   AGC’s argument is flawed because there is no contractual language here that requires
    contractors to waive their lien rights. 5 AGC implicitly recognizes this, as it instead asserts that
    the trial court’s ruling had the effect of resurrecting the no-lien contracts that the Illinois General
    Assembly prohibits. We disagree. The trial court’s decision was based on Illinois jurisprudence
    that trade fixtures are not subject to mechanic’s liens. AGC essentially asks that we disregard
    that law and find that even trade fixtures are subject to mechanic’s liens. This argument should
    be directed at the Illinois General Assembly, not this court.
    ¶ 48   AGC next argues that the trial court erred in finding that AUI could have filed a lien
    against GSG 7 pursuant to the Uniform Commercial Code (UCC). AGC contends that UCC
    security interests simply do not exist “in ordinary building materials incorporated into an
    improvement on land.” 810 ILCS 5/9-334(a) (West 2014). As AUI built the wind structure with
    concrete, rebar, electrical conduit, and other “ordinary building materials,” the UCC does not
    apply. AGC therefore argues that AUI should have been allowed to file a mechanic’s lien
    against the Vaessens’ fee simple interest in the land.
    5
    As discussed earlier, the Vaessens-GSG 7 agreement provided that GSG 7 was to
    ensure that no liens were placed on the Vaessens’ property. However, as that contract was
    between a landowner and a developer, it is not contrary to any of the provisions of the Act.
    - 18 -
    
    2016 IL App (2d) 160009
    ¶ 49   We do not disagree with AGC’s assertion that AUI does not have any basis to file a UCC
    lien against GSG 7.     However, that does not mean we should ignore the above-discussed
    precedent and find that AUI should be allowed to maintain a mechanic’s lien against the
    Vaessens instead.
    ¶ 50   AGC’s final argument is that the trial court failed to recognize AUI’s separate and
    distinct mechanic’s lien rights against GSG 7’s interest in the land. AGC argues that, under
    section 1(a) of the Act, a mechanic’s lien “extends to an estate in fee, for life, for years, or any
    other estate or any right of redemption or other interest which the owner may have in the lot or
    tract of land at the time of making such contract or may subsequently acquire.” 770 ILCS
    60/1(a) (West 2014). Under section 21(a), a subcontractor has a lien “on the same property as
    provided for the contractor.” 770 ILCS 60/21(a) (West 2014). AGC contends that it therefore
    follows that AUI’s mechanic’s lien extended to GSG 7’s interest in the land, as set forth in AUI’s
    lien claim and complaint to foreclose.
    ¶ 51   In making this argument, AGC argues that GSG 7’s interest in the land, “while cloaked
    as an easement, is in substance a long-term leasehold interest.” AGC primarily points to the fact
    that the agreement could last 50 years as the reason why the agreement should be treated as a
    lease rather than an easement. AGC seeks to reclassify the agreement as a lease because,
    although leases may be subject to mechanic’s liens (Hacken v. Isenberg, 
    288 Ill. 589
     (1919)),
    easements clearly are not. See Matanky Realty Group, Inc. v. Katris, 
    367 Ill. App. 3d 839
    (2006). In Matanky, the reviewing court explained:
    “An easement provides a right or privilege in the use of another’s property. [Citation.]
    An easement qualifies as appurtenant when the user of the right enjoys a dominant estate
    over the used land, which is considered the servient estate. [Citation.] The individual
    - 19 -
    
    2016 IL App (2d) 160009
    with the easement is entitled to the necessary use of the easement.              [Citation.]
    Accordingly, the easement provides use rights; however, it does not provide ownership
    rights or an ownership interest in the land. As a result, defendants cannot be considered
    owners of the [land at issue] or any portion thereof merely because they have rights under
    the easement.” Id. at 842.
    ¶ 52     Here, as explained earlier, the Vaessens-GSG 7 agreement provided that it could last as
    little as three months. This mitigates against a finding that the agreement was in reality a lease.
    Further, as the trial court noted, finding that AUI could place a lien on the Vaessens’ land even if
    GSG 7 were to remove the tower would be inequitable and contrary to the plain language of the
    Act. 6
    ¶ 53                                      CONCLUSION
    ¶ 54     For the reasons stated, we affirm the decision of the circuit court of Lee County.
    ¶ 55     Affirmed.
    6
    We note that both AUI and AGC argue that, although AUI seeks to place a lien on the
    Vaessens’ property, the Vaessens’ farm will not be subject to foreclosure, because GSG 7 agreed
    to indemnify the Vaessens. Therefore, GSG 7, not the Vaessens, will be ultimately liable to pay
    AUI. Although that might be true (assuming GSG 7 does not itself file for bankruptcy), there is
    nothing in the Act that permits a contractor to obtain a lien against a landowner simply because
    that landowner has an indemnity agreement with a developer. We decline AUI and AGC’s
    implicit invitation to expand the Act to allow a lien to be placed against a landowner in such a
    situation.     See Inter-Rail Systems, Inc. v. Ravi Corp., 
    387 Ill. App. 3d 510
    , 516 (2008)
    (mechanic’s liens should not be extended to cases not provided for by the language of the Act
    even though they might fall within its reason).
    - 20 -