    Krozel v. Court of Claims, 
    2017 IL App (1st) 162068
    Appellate Court       LAINIE KROZEL, Plaintiff-Appellant, v. THE COURT OF
    Caption               CLAIMS; THE STATE OF ILLINOIS; and CONNIE BEARD, in Her
    Official Capacity as Director of Revenue, Defendants-Appellees.
    District & No.        First District, First Division
    Docket No. 1-16-2068
    Filed                 April 24, 2017
    Rehearing denied      June 9, 2017
    Decision Under        Appeal from the Circuit Court of Cook County, No. 15-CH-13301; the
    Review                Hon. Rita M. Novak, Judge, presiding.
    Judgment              Affirmed.
    Counsel on            Nixon Peabody LLP, of Chicago (Floyd D. Perkins, of counsel), for
    Appeal                appellant.
    Lisa Madigan, Attorney General, of Chicago (David L. Franklin,
    Solicitor General, and Frank H. Bieszczat, Assistant Attorney
    General, of counsel), for appellees.
    Panel                 JUSTICE HARRIS delivered the judgment of the court, with opinion.
    Presiding Justice Connors and Justice Mikva concurred in the
    judgment and opinion.
    OPINION
    ¶1       Plaintiff, Lainie Krozel, appeals the order of the circuit court granting defendants’ motion
    to dismiss her complaint for writ of certiorari, which sought review of the Court of Claims’
    dismissal of her indemnity claim. On appeal, plaintiff contends her complaint should be
    reinstated because (1) the Court of Claims erroneously applied the two-year general statute of
    limitations contained in section 22(h) of the Court of Claims Act (705 ILCS 505/22(h) (West
    2014)) instead of the five-year statute of limitations in section 22(a) for claims arising out of a
    contract (705 ILCS 505/22(a) (West 2014)); and (2) her due process rights were violated where
    the Court of Claims did not consider her complaint on the merits. For the following reasons, we
    affirm.
    ¶2                                         JURISDICTION
    ¶3       The trial court dismissed plaintiff’s complaint on May 17, 2016. Plaintiff filed a motion to
    reconsider and vacate, which the trial court denied on June 23, 2016. Plaintiff filed her notice
    of appeal on July 21, 2016. Accordingly, this court has jurisdiction pursuant to Illinois
    Supreme Court Rule 301 (eff. Feb. 1, 1994) and Rule 303 (eff. May 30, 2008) governing
    appeals from final judgments entered below.
    ¶4                                         BACKGROUND
    ¶5       The following facts are relevant to this appeal. On December 12, 2008, the office of the
    Executive Inspector General (EIG) filed a complaint with the Illinois Executive Ethics
    Commission (EEC) alleging that plaintiff, the acting chief of staff for the Illinois Department
    of Revenue, violated the State Officials and Employees Ethics Act (5 ILCS 430/1-1 et seq.
    (West 2014)). Plaintiff sought legal representation from the Attorney General pursuant to
    section 2 of the State Employee Indemnification Act (Indemnification Act) (5 ILCS 350/2
    (West 2014)). The Attorney General, however, represented EIG in the matter and denied
    plaintiff’s request. Plaintiff therefore retained private counsel to represent her. Plaintiff
    continued to request representation by the Attorney General’s office, and she argued for
    dismissal of the charge against her. Motions were filed and discovery conducted in preparation
    for trial on June 29, 2010. However, on the eve of trial, the Attorney General’s office
    voluntarily dismissed the complaint against plaintiff. Plaintiff subsequently sought
    indemnification for her attorney fees under section 2(b) of the Indemnification Act (5 ILCS
    350/2(b) (West 2014)). In April 2011, the Illinois Department of Revenue notified plaintiff it
    would not indemnify her for her attorney fees and costs.
    ¶6       On March 5, 2014, plaintiff filed a claim with the Court of Claims to recover her costs and
    attorney fees under section 2(b). The State filed a motion to dismiss pursuant to section 2-619
    of the Code of Civil Procedure (Code) (735 ILCS 5/2-619 (West 2014)), arguing that section
    22(h) of the Court of Claims Act requires plaintiff to file her claim within two years after its
    accrual. The State alleged that plaintiff’s claim accrued “either when the EEC matter was
    voluntarily dismissed by the EIG on June 29, 2010, ending [her] need for legal representation,
    or at the very latest, when her subsequent request for attorneys’ fees was denied, in April
    2011.” The State argued that since plaintiff filed her claim on March 5, 2014, it is barred by the
    limitations period set forth in section 22(h) and “must be dismissed in its entirety.” The State
    -2-
    also argued that plaintiff’s claim should be dismissed under section 2-615 of the Code (735
    ILCS 5/2-615 (West 2014)) for failure to state a claim under the Indemnification Act.
    ¶7          Plaintiff filed a response to the State’s motion to dismiss, in which she argued that the
    proper limitations period for filing her claim is found in section 22(a) of the Court of Claims
    Act for claims “arising out of a contract.” 705 ILCS 505/22(a) (West 2014). Such claims “must
    be filed within 5 years after it first accrues” rather than the two years under section 22(h) for
    “[a]ll other claims.” 705 ILCS 505/22(a), (h) (West 2014). Plaintiff argued that section 22(a)
    applies because she “seeks reimbursement for her attorneys’ fees, costs, and expenses under
    the terms and conditions of her employment contract with the State, as those terms and
    conditions are set out in the Indemnification Act.” Plaintiff argued that the State “was required
    to pay reasonable court costs, litigation expenses, and attorneys’ fees pursuant to the
    Indemnification Act” where the Attorney General could not represent her due to a conflict of
    interest. In response, the State argued that the two-year limitations period applied because
    plaintiff was seeking payment pursuant to a statute (the Indemnification Act) rather than
    asserting a contract claim.
    ¶8          After the Court of Claims heard argument from both parties on the issue, it dismissed
    plaintiff’s claim in its entirety. The Court of Claims acknowledged that the appropriate statute
    of limitations for claims arising under the Indemnification Act is an issue of “first impression.”
    It noted that the Indemnification Act encompasses statutory duties “distinct from other theories
    of liability.” Therefore, it concluded that plaintiff’s “potential right to reimbursement pursuant
    to the Indemnification Act is independent from the underlying contract with the State of
    Illinois.” It applied the two-year limitations period because plaintiff’s right to recovery arose
    from a statute rather than a contract, and since plaintiff did not file her claim within two years
    of April 2011, when her reimbursement request was denied, her claim was untimely.
    ¶9          Plaintiff filed a petition for rehearing in which she again alleged that her claim arose out of
    a contract and therefore the five-year limitations period of section 22(a) applied. Plaintiff
    argued that her right to indemnification under the Indemnification Act arose from her
    employment and service; therefore, it was a matter arising out of contract. The State filed a
    response, and plaintiff replied, reiterating her argument that her claim is a contract claim. The
    Court of Claims denied the petition and upheld its previous order dismissing plaintiff’s
    complaint as untimely. In the order, the Court of Claims disagreed that “the Indemni[fication]
    Act must be construed as a contractual term of [plaintiff’s] employment with the State.” It
    found that “[t]he law is clear. Statutes are presumed not to create contractual rights unless there
    is clear and explicit intent to do so by the legislature. The Indemni[fication] Act does not
    demonstrate a clear and explicit intent by the legislature to create a vested contractual right.”
    The Court of Claims found “unconvincing” plaintiff’s argument that the word “agreement” in
    the latter part of section 2(a) of the Indemnification Act (5 ILCS 350/2(a) (West 2014)) shows
    legislative intent to create a contractual right. Rather, plaintiff’s argument “discounts the
    context in which the word ‘agreement’ is used and isolates it from the proper context,” and the
    mere use of the word “does not explicitly create a contract, covenant, or vested right that
    obligates the State, its agents, or the Attorney General to appear on behalf of the employee and
    defend the action.” It affirmed the dismissal of plaintiff’s claim as untimely.
    ¶ 10        Plaintiff filed a complaint for writ of certiorari, seeking review and reversal of the Court of
    Claims’ decision. In her complaint, plaintiff alleged that the Court of Claims failed to apply the
    five-year statute of limitations on her contract claim and, by failing to follow the law, the
    -3-
    decision “denied her both constitutional due process and equal protection.” Plaintiff also
    argued that she “had no opportunity to be heard in a meaningful manner based on the Court’s
    unlawful failure to follow the law.” Defendants moved to dismiss the complaint pursuant to
    section 2-619.1 of the Code (735 ILCS 5/2-619.1 (West 2014)), arguing that the trial court
    lacked jurisdiction to review the correctness of the Court of Claims’ determination and that
    plaintiff was not denied due process where she received a meaningful opportunity to be heard
    before the Court of Claims.
    ¶ 11        The trial court granted defendants’ motion to dismiss and found the following cases
    controlling: Klopfer v. Court of Claims, 
    286 Ill. App. 3d 499
    (1997), Reyes v. Court of Claims,
    
    299 Ill. App. 3d 1097
    (1998), and Hyde Park Medical Laboratory, Inc. v. Court of Claims, 
    259 Ill. App. 3d 889
    (1994). Plaintiff filed a motion to reconsider which the trial court denied.
    Plaintiff filed this timely appeal.
    ¶ 12                                            ANALYSIS
    ¶ 13       On appeal, plaintiff contends that the Court of Claims erroneously applied the two-year
    statute of limitations to dismiss her indemnification claim against defendants. She argues that
    the Court of Claims’ improper dismissal denied her the right to be heard on the merits of her
    claim and, since she alleged this violation of her due process rights, the trial court erred in
    dismissing her complaint for writ of certiorari. Defendants filed a combined motion to dismiss
    under section 2-619.1 of the Code (735 ILCS 5/2-619.1 (West 2014)). In reviewing a dismissal
    pursuant to both sections 2-615 and 2-619 of the Code (735 ILCS 5/2-615, 2-619 (West
    2014)), “we accept all well-pleaded facts in the complaint as true and draw all reasonable
    inferences from those facts in favor of the nonmoving party.” Dopkeen v. Whitaker, 399 Ill.
    App. 3d 682, 684 (2010). Dismissal under either section is proper where plaintiff alleges no set
    of facts that would entitle her to relief. 
    Id. We review
    dismissal pursuant to both sections
    de novo. Kopchar v. City of Chicago, 
    395 Ill. App. 3d 762
    , 766 (2009).
    ¶ 14       When the 1970 Illinois Constitution (Ill. Const. 1970, art. XIII, § 4) abolished the doctrine
    of sovereign immunity, “[e]xcept as the General Assembly may provide by law,” the
    legislature established the Court of Claims with exclusive jurisdiction to hear and determine
    “[a]ll claims against the State.” See 705 ILCS 505/8(a), (b) (West 2014). The function of the
    Court of Claims is not to adjudicate cases but rather “to receive and resolve claims against the
    state.” People v. Philip Morris, Inc., 
    198 Ill. 2d 87
    , 97 (2001). The Act does not provide a
    method of review of Court of Claims decisions. However, our supreme court has determined
    that a party may use certiorari as a means to address alleged deprivations of due process.
    Rossetti Contracting Co. v. Court of Claims, 
    109 Ill. 2d 72
    , 79 (1985). “The purpose of
    certiorari review is to have the entire record of the inferior tribunal brought before the court to
    determine, from the record alone, whether the tribunal proceeded according to applicable law.”
    Reichert v. Court of Claims, 
    203 Ill. 2d 257
    , 260 (2003). However, “certiorari may not be used
    to review the correctness of a decision by the Court of Claims based upon the merits of the case
    before it.” 
    Id. at 261.
    Instead, a reviewing court determines whether the requirements of due
    process were met through the provision of “an orderly proceeding in which a party receive[d]
    adequate notice and an opportunity to be heard.” 
    Id. “Due process
    is not abridged where a
    tribunal misconstrues the law or otherwise commits an error for which its judgment should be
    reversed.” 
    Id. -4- ¶
    15       In determining whether the Court of Claims proceeding violated plaintiff’s right to due
    process, we find Klopfer instructive. In Klopfer, the plaintiff filed a complaint in the Court of
    Claims on January 16, 1981, seeking payment for abortions he performed on public aid
    recipients from June 1978 to February 1979. 
    Klopfer, 286 Ill. App. 3d at 501
    . An evidentiary
    hearing was held, and the parties submitted briefs in support of their respective positions. The
    Court of Claims denied the plaintiff’s claim, finding, in part, that his claim was untimely as it
    was filed after the one-year limit provided for in the Act. 
    Id. The plaintiff
    filed a petition for
    rehearing in which he argued that the Illinois Department of Public Aid waived the statutory
    limitations period because it failed to raise the issue as an affirmative defense or by written
    motion, and that he had been denied a fair opportunity to address the issue. 
    Id. at 501-02.
    The
    Court of Claims denied the petition, holding that the limitations issue was sufficiently raised
    during the proceedings and that timeliness was a jurisdictional issue such that the Court of
    Claims could dismiss an untimely claim on its own motion. 
    Id. at 502.
    ¶ 16       The plaintiff filed a petition for a writ of certiorari in the circuit court against the Court of
    Claims, and the Court of Claims moved to dismiss the petition. The trial court granted the
    motion to dismiss. In determining whether dismissal was proper, the appellate court noted that
    “decisions of the Court of Claims are generally not subject to judicial review” except “where
    the Court of Claims acts in a manner that deprives a party of the constitutional right to due
    process.” 
    Id. The court
    thus considered only issues that addressed the due process given
    plaintiff before the Court of Claims, and “the propriety of the trial court having disposed of this
    action” under section 2-619. 
    Id. at 503.
    ¶ 17       Noting that the plaintiff must show he filed his claim within the one-year limitation period
    provided in the Act, the court found that “[n]othing in the record of the proceedings before the
    Court of Claims or in the factual allegations contained in plaintiff’s petition for a writ of
    certiorari even remotely suggests” the plaintiff was denied “an opportunity to introduce
    evidence in an effort to meet that burden.” 
    Id. at 506.
    It also found “no exception to the
    requirement that the jurisdictional time limitations in the Act must be met before the subject
    matter jurisdiction of the Court of Claims attaches.” 
    Id. at 507.
    Therefore, since the plaintiff
    did not file his claim within the one-year statute of limitations period and there was no
    deprivation of his due process rights by the Court of Claims, the trial court properly dismissed
    the plaintiff’s petition for writ of certiorari. 
    Id. at 508.
    See also 
    Reyes, 299 Ill. App. 3d at 1104-06
    (plaintiff was not deprived of his due process rights when the Court of Claims
    dismissed his claim as untimely, where it considered plaintiff’s objections to the motion to
    dismiss based on the timeliness issue, as well as plaintiff’s motion for rehearing and
    reconsideration, giving plaintiff “several opportunities to be heard”).
    ¶ 18       As in Klopfer and Reyes, the issue before this court is whether the dismissal of plaintiff’s
    indemnity claim as untimely denied her due process. To make this determination we consider,
    pursuant to Klopfer and Reyes, whether the Court of Claims provided plaintiff with an orderly
    proceeding where she received adequate notice and an opportunity to be heard. 
    Id. at 1104.
           After plaintiff filed her claim with the Court of Claims, the State moved to dismiss based on the
    statute of limitations and plaintiff filed a response arguing that the five-year limitation applied
    and her claim was timely. The parties also presented their arguments at a hearing before the
    Court of Claims. After the dismissal of her claim, plaintiff filed a petition for rehearing in
    which she again argued for the five-year limitation and that she was denied due process. The
    record shows that plaintiff had numerous opportunities to be heard on the timeliness issue.
    -5-
    Therefore, plaintiff was not denied due process, and the trial court did not err in dismissing her
    complaint for writ of certiorari. 
    Klopfer, 286 Ill. App. 3d at 508
    ; 
    Reyes, 299 Ill. App. 3d at 1104-05
    .
    ¶ 19        Plaintiff, however, argues that due process requires she have a chance to be heard on the
    merits of her claim before the Court of Claims. As support, she cites Rossetti. In Rossetti, a
    general contractor entered into a contract with the Illinois Department of Transportation and
    hired a subcontractor to work on various projects pursuant to the contract. 
    Rossetti, 109 Ill. 2d at 74
    . After a dispute, the general contractor filed a claim with the Court of Claims seeking
    money due under the contract, including payments owed to the subcontractor. The Department
    of Transportation raised an affirmative defense, arguing that the general contractor engaged in
    fraud against the State. 
    Id. at 74-75.
    The subcontractor sought to intervene in the action to
    argue that it had not engaged in fraud and should be paid. The Court of Claims, providing no
    reason, denied the subcontractor’s request to intervene and granted summary judgment in
    favor of the Department of Transportation. The general contractor’s claim was then dismissed
    in its entirety. 
    Id. at 75.
    ¶ 20        The subcontractor filed a complaint for writ of certiorari in the circuit court. Although the
    court acknowledged that a manifest injustice had been done to the subcontractor and that it
    should have a right to appear in a forum and present its claim for payment, the court
    determined it had no jurisdiction over the matter and dismissed the complaint. 
    Id. at 76.
    The
    subcontractor filed an appeal which this court dismissed. The supreme court allowed a petition
    for leave to appeal. 
    Id. at 76-77.
    ¶ 21        Recognizing that the Court of Claims Act provides no method of judicial review of Court
    of Claims’ decisions, the supreme court characterized the “primary issue” before it as whether
    filing a writ of certiorari was a proper method for the subcontractor to obtain judicial review.
    
    Id. at 77.
    Following its decision in People ex rel. Harrod v. Illinois Courts Comm’n, 
    69 Ill. 2d 445
    , 458 (1977), in which the supreme court determined that the Illinois Courts Commission
    was not a coequal court within the meaning of the constitution, it found that the Court of
    Claims also “is not a court within the meaning of the judicial article but instead is a fact-finding
    body.” 
    Rossetti, 109 Ill. 2d at 78
    . Reasoning that “it is the function and duty of [the supreme
    court] to act as the final arbiter of the Constitution,” the court concluded it had “both the
    authority and responsibility” to determine whether the Court of Claims unconstitutionally
    deprived the subcontractor of its right to due process. 
    Id. at 78.
    The supreme court found that
    the Court of Claims’ application of the Department of Transportation’s affirmative defense
    against the subcontractor, without allowing the subcontractor an opportunity to be heard, was a
    violation of due process reviewable on a writ of certiorari. 
    Id. It cautioned,
    however, that “[i]n
    deciding that certiorari was appropriate under the rare set of circumstances in the instant case,
    we do not now hold that certiorari would be available to review the correctness of any decision
    of the Court of Claims based on the merits of an appeal.” 
    Id. at 79-80.
    ¶ 22        Plaintiff contends that she, like the subcontractor in Rossetti, had no opportunity to be
    heard before the Court of Claims, and therefore she also was deprived of her due process
    rights. We disagree. First, Rossetti did not involve a statute of limitations issue as we have
    here. Before reaching the merits of plaintiff’s claim, the Court of Claims must have jurisdiction
    to hear her claim. There is “no exception to the requirement that the jurisdictional time
    limitations in the Act must be met before the subject matter jurisdiction of the Court of Claims
    attaches.” 
    Klopfer, 286 Ill. App. 3d at 507
    . Also, unlike the subcontractor in Rossetti, who
    -6-
    never had the opportunity to intervene or present any argument, plaintiff here had multiple
    opportunities to be heard on the limitations issue, which satisfies due process concerns under
    these circumstances. See 
    id. at 508;
    Reyes, 299 Ill. App. 3d at 1104-05
    .
    ¶ 23        We note that there is a distinction between Klopfer and Reyes, and the case before us,
    where the parties in those cases did not dispute the applicable limitations period while the
    parties here disagree on whether the two or five-year limitations period applies. Plaintiff
    argues that her claim stems from a contractual right created by section 2(a) of the
    Indemnification Act, making the five-year limitations period applicable to her. The Court of
    Claims, however, looked at the language of the Indemnification Act and determined that no
    contract right was created; thus, the five-year limitations did not apply to plaintiff. Although
    certiorari may not be used to review the correctness of a Court of Claims’ decision based on
    the merits, a court may review that decision for due process violations where the Court of
    Claims’ actions exceed its constitutional authority to so act. 
    Rossetti, 109 Ill. 2d at 78
    -80. Thus,
    in cases where the Court of Claims applies “its own independent judicial interpretation” and
    construction to statutory ambiguities, and its interpretation has no basis in law or citations to
    authority, the Court of Claims could be viewed as acting beyond its constitutional grant of
    authority. 
    Harrod, 69 Ill. 2d at 472
    ; 
    Rossetti, 109 Ill. 2d at 78
    .
    ¶ 24        Here, in determining that the five-year limitations period for claims arising from a contract
    did not apply, the Court of Claims relied on clear and settled law that statutes are presumed not
    to create contractual rights unless the legislature expresses a clear and explicit intent to do so.
    Its order after rehearing cited to Dopkeen v. Whitaker, 
    399 Ill. App. 3d 682
    , 685 (2010), for this
    proposition. We find that the Court of Claims did not exceed its constitutional authority in
    making its determination, and therefore, plaintiff was not deprived of her due process rights.
    
    Rossetti, 109 Ill. 2d at 78
    . This is the limit of our scope of review pursuant to Rossetti, and we
    decline to extend that scope to review the merits of the Court of Claims’ decision. See also
    Hyde 
    Park, 259 Ill. App. 3d at 896
    (court declined to extend its scope of review to reach the
    merits of the Court of Claims’ decision).
    ¶ 25        For the foregoing reasons, the judgment of the circuit court is affirmed.
    ¶ 26      Affirmed.