Solcius, LLC and GoodLeap, LLC (Formerly Known as LOANPAL) v. Salvador Meraz ( 2023 )


Menu:
  •                                    COURT OF APPEALS
    EIGHTH DISTRICT OF TEXAS
    EL PASO, TEXAS
    §
    SOLCIUS, LLC and GOODLEAP, LLC                                   No. 08-22-00146-CV
    (formerly known as LOANPAL),                     §
    Appeal from the
    Appellants,        §
    168th Judicial District Court
    v.                                               §
    of El Paso County, Texas
    SALVADOR MERAZ,                                  §
    (TC# 2021DCV3036)
    Appellee.          §
    MEMORANDUM OPINION
    This is an appeal from an order denying Appellants’ motion to compel arbitration. Because
    the record contains conclusive evidence that Appellee electronically signed contracts with
    Appellants that contained arbitration provisions, we reverse the trial court’s order and remand to
    the trial court with directions to enter an order granting the motion to compel arbitration and
    staying Appellee’s lawsuit pending arbitration.
    I. FACTUAL AND PROCEDURAL BACKGROUND
    Appellee Salvador Meraz (Meraz) acknowledges that he entered into an oral agreement
    with Appellant Solcius, LLC (Solcius) to install solar panels on two of his properties and that he
    further applied for and received financing for the installation with Appellant Goodleap, LLC
    (Goodleap), formerly known as LoanPal. Meraz further acknowledges that Solcius installed the
    panels on his residence but claims that they were not performing as Solcius had represented they
    would. Meraz also claims Solcius never completed the installation on his second property and that
    his roof was damaged during the installation.
    The record reflects that the installation occurred in the summer of 2019 1 Approximately
    two years later, in August of 2021, Meraz filed his lawsuit, naming both Solcius and Goodleap as
    defendants (collectively, the Solar Defendants). Meraz sued for breach of contract and fraud in the
    inducement, alleging that Solcius had intentionally misrepresented the amount of energy savings
    he would receive from the solar panels.
    The Solar Defendants responded by filing a joint answer denying the allegations then filing
    a joint “Motion to Dismiss and Compel Arbitration” contending Meraz had electronically signed
    contracts that contained arbitration provisions indicating Meraz’s agreement to arbitrate any
    dispute arising out of the subject matter of the contracts. Meraz then amended his petition to add
    a claim for “unauthorized entering into contract,” contending that he did not sign either contract.
    He also responded to the motion to compel arbitration claiming he did not sign the contracts and
    therefore never agreed to the arbitration provisions. In support of his response, Meraz attached his
    own affidavit acknowledging that he had entered into an oral agreement with Solcius to install the
    solar panels but claiming that the installation was completed before he received any written
    contract to sign, despite his requests to review the proposed terms of the contract. Meraz, however,
    acknowledged receipt of his allegedly signed electronic contract copies on an unspecified date
    after the installation occurred but again claimed he never signed them, implying that the Solar
    Defendants signed them on his behalf.
    1
    The record contains several statements indicating that the installation occurred in 2020, rather than 2019. However,
    Solcius clarified in an unrebutted affidavit that the installation was completed in August of 2019, and Goodleap also
    presented unrebutted evidence that its loan agreement with Meraz arose in March of 2019.
    2
    In reply, the Solar Defendants alleged that they had evidence conclusively establishing that
    Meraz had electronically signed the contracts. Solcius submitted a sworn declaration from its
    employee, Michael Molen, explaining the procedures, which we review in more detail below, that
    Solcius uses to obtain electronic signatures on installation agreements. Molen explained that
    Solcius uses a company called DocuSign to obtain signatures, and he averred that Meraz had in
    fact signed an electronic agreement to install the solar panels on his properties (the Installation
    Agreement) prior to the installation using the DocuSign system. Molen attached a copy of the
    Installation Agreement in Spanish, which he contended Meraz had electronically signed, and also
    attached a version in English. 2 The Installation Agreement contained a provision in bold lettering
    stating that Meraz was agreeing to arbitrate any dispute arising out of the subject matter of the
    agreement, with Meraz’s initials below it. Molen further attested that the attached Installation
    Agreement was a true and correct copy of the contract that Meraz had electronically signed and
    initialled.
    Similarly, Goodleap provided a sworn declaration from its chief financial officer, Matt
    Dawson, who explained the procedures, which we will review in more detail below, that Goodleap
    uses to obtain electronic signatures on loan agreements. Dawson explained that after a customer
    has applied for and received approval for a loan, Goodleap sends a loan agreement to the customer
    to sign electronically, also using DocuSign. Dawson stated that Meraz had applied for and received
    financing with Goodleap for the solar installation and had thereafter electronically signed a loan
    agreement, setting forth the financing terms (the Loan Agreement). Dawson attached a copy of the
    Loan Agreement in Spanish, which he contended Meraz had electronically signed, and also
    2
    The translation was by an attorney/member of the American Translators Association, who provided a certificate
    attesting that he was competent to translate the agreement.
    3
    attached a version in English. 3 The Loan Agreement contained a provision in bold lettering stating
    that Meraz was agreeing to arbitrate any dispute arising out of the subject matter of the agreement,
    with Meraz’s initials below it. Dawson further averred that the attached Loan Agreement was a
    true and correct copy of the agreement that Meraz had electronically signed. Dawson also supplied
    a certificate of completion from DocuSign, which we discuss below.
    The trial court denied the Solar Defendants’ motion to dismiss and to compel arbitration
    without explanation. The Solar Defendants filed a joint motion to reconsider, and Solcius attached
    what it described as newly discovered evidence consisting of a certificate of completion from
    DocuSign relating to Meraz signing the Installation Agreement. Meraz opposed the motion,
    contending that neither defendant had presented sufficient evidence to support a finding that he
    had signed the contracts. The motion for reconsideration was overruled by operation of law, and
    the Solar Defendants filed this interlocutory appeal.
    II. ISSUES ON APPEAL
    In their joint brief, the Solar Defendants contend that the trial court erred in denying their
    motion to compel arbitration, arguing that they conclusively established that Meraz electronically
    signed contracts with them containing valid and enforceable arbitration agreements, and that all of
    Meraz’s claims fell within the scope of those agreements. In response, Meraz contends that the
    trial court had sufficient evidence to deny the motion based on his affidavit in which he averred
    that he did not sign the parties’ electronic contracts. Meraz also raises two procedural issues that
    he contends support the order denying the motion to compel arbitration: (1) the motion itself was
    not timely filed, and (2) the records the defendants attached to their motion were not properly
    authenticated and therefore could not be considered in determining whether he agreed to
    3
    The translated Loan Agreement was certified by the same translator Solcius had used.
    4
    arbitration. Finally, Meraz argues that we should not consider the evidence the Solar Defendants
    attached to their motion for reconsideration because nothing in the Rules of Civil Procedure
    provide for filing a motion for reconsideration; instead, he contends that the Solar Defendants
    should have filed a motion for new trial. 4
    III. MERAZ’S PROCEDURAL CHALLENGES ARE WITHOUT MERIT
    A. The motion to compel arbitration was not untimely
    We first consider whether the motion to dismiss and to compel arbitration was timely filed.
    In the trial court, as well as on appeal, Meraz seeks to characterize the motion as being a Rule 91a
    motion to dismiss, which must be filed within 60 days after service of the plaintiff’s first filing.
    See TEX. R. CIV. P. 91a.3(a). Rule 91a, however, by its express terms only governs motions “to
    dismiss a cause of action on the grounds that it has no basis in law or fact.” TEX. R. CIV. P. 91a.1.
    And, as the Solar Defendants point out, their motion primarily sought to compel arbitration based
    on the parties’ contracts and secondarily sought to dismiss Meraz’s lawsuit on the basis that
    arbitration was the proper forum in which to resolve his claims, as opposed to dismiss the suit on
    Rule 91a grounds. 5
    4
    This argument is without merit. While a motion to reconsider is not expressly provided for in the Rules, a trial court
    retains plenary jurisdiction to reconsider its interlocutory rulings until a final judgment or order is entered and the
    decree becomes final. Fernandez v. State, 
    621 S.W.3d 818
    , 826 (Tex. App.—El Paso 2021, pet. ref’d) (citing Fruehauf
    Corp. v. Carrillo, 
    848 S.W.2d 83
    , 84 (Tex. 1993) (per curiam) (a trial court has plenary power over its judgment until
    it becomes final); White v. Baptist St. Anthony’s Hosp., 
    188 S.W.3d 373
    , 374–75 (Tex. App.—Amarillo 2006, pet.
    denied) (recognizing that a trial court has plenary jurisdiction to reconsider its interlocutory rulings and retains that
    ability until a final judgment or order is entered in the cause and a decree becomes final); see also In re Panchakarla,
    
    602 S.W.3d 536
    , 539–40 (Tex. 2020) (per curiam) (recognizing that a trial court retains continuing control over
    interlocutory orders and may set them aside any time before a final judgment is rendered). Moreover, a motion for
    new trial is only applicable when the trial court has issued a final judgment, which it did not do here. See, e.g., Finley
    v. J.C. Pace Ltd., 
    4 S.W.3d 319
    , 320 (Tex. App.—Houston [1st Dist.] 1999, no pet.) (“A motion for new trial must,
    by its very nature, seek to set aside an existing judgment and request relitigation of the issues.”); see also TEX. R. CIV.
    P. 320 (“New trials may be granted and judgment set aside for good cause . . .”)
    5
    In the trial court, the Solar Defendants argued that the trial court should dismiss Meraz’s lawsuit upon granting their
    motion to compel arbitration, rather than simply staying the proceedings, as all of Meraz’s claims were subject to
    binding arbitration. However, as discussed in more detail below, we conclude that the proper procedure to follow
    when granting a motion to compel arbitration is to stay the proceedings. That the Solar Defendants requested dismissal
    5
    There is no provision in the Rules of Civil Procedure requiring a party to file a motion to
    compel arbitration within a specific timeframe. Instead, a party is only barred from filing a motion
    to compel arbitration if it has “substantially invok[ed] the judicial process to the other party’s
    detriment” before seeking to invoke an arbitration clause, given the inherent unfairness of allowing
    a party to switch between “litigation and arbitration.” See In re Citigroup Global Mkts., Inc., 
    258 S.W.3d 623
    , 625 (Tex. 2008) (orig. proceeding) (per curiam) (recognizing that a party waives an
    arbitration clause by substantially invoking the judicial process to the other party’s detriment)
    (quoting Perry Homes v. Cull, 
    258 S.W.3d 580
    , 589–90 (Tex. 2008)). Here, Meraz does not claim
    that the Solar Defendants invoked the judicial process to his detriment prior to filing their motion
    to compel arbitration, and the record does not reflect that they did so or that they switched between
    litigation and arbitration before filing their motion. Accordingly, we reject Meraz’s argument that
    the motion to compel arbitration was not timely filed. See Lucchese, Inc. v. Solano, 
    388 S.W.3d 343
    , 351–52 (Tex. App.—El Paso 2012, no pet.) (defendant was not barred from filing its motion
    to compel arbitration where there was no showing that it substantially invoked the judicial process
    or that it switched between litigation and arbitration to its own advantage).
    B. Meraz waived his authentication challenges
    We next consider Meraz’s argument that the records submitted in support of the motion to
    compel arbitration were not properly authenticated and were therefore inadmissible. In particular,
    Meraz contends that the Solar Defendants failed to accompany their records with either a business
    records affidavit to establish their authenticity, as provided for in Rule 902(10) of the Texas Rules
    rather than a stay does not change their intent to compel arbitration rather than seek a dismissal on the merits. See In
    re H&R Block Fin. Advisors, Inc., 
    262 S.W.3d 896
    , 902–03 (Tex. App.—Houston [14th Dist.] 2008, no pet.) (finding
    that trial court abused its discretion in failing to order arbitration despite that the defendant requested dismissal of the
    plaintiff’s lawsuit rather than a stay of the proceedings pending arbitration).
    6
    of Evidence, or a notarized certificate of acknowledgement, as provided for in Rule 902(8). 6 And
    in turn, Meraz contends that the sworn but unnotarized declarations that the Solar Defendants
    provided—in which their employees attested to the true and correct nature of the records—were
    insufficient to authenticate the records.
    As the Solar Defendants point out, Meraz did not raise any authentication challenges to the
    records, or any other challenge to the admissibility of the records for that matter, in the trial court.
    Challenges to the admissibility of evidence based on a failure to authenticate is considered a formal
    defect that is waived unless a party makes a timely objection to the evidence on that basis in the
    trial court and obtains a ruling on the objection. See Howe v. Howe, 
    551 S.W.3d 236
    , 252 (Tex.
    App.—El Paso 2018, no pet.) (citing Seymour v. Gillespie, 
    608 S.W.2d 897
    , 898 (Tex. 1980)
    (authentication is one of the evidence-predicate objections that must be specifically raised);
    Morales v. Rice, 
    388 S.W.3d 376
    , 381 (Tex. App.—El Paso 2012, no pet.) (appellant waived
    authentication error where it was not raised in the trial court; see generally TEX. R. APP. P. 33.1
    (prerequisite to presenting a complaint for appellate review, complaint must be made to the trial
    court by a timely request, objection, or motion, and ruled on either expressly or implicitly (or ruling
    refused)). Because Meraz failed to make an authentication objection in the trial court, he has failed
    to preserve this issue for our review. 7 See Howe, 
    551 S.W.3d at 252
     (where party made no
    objection at trial based on authentication, his authentication argument was waived on appeal).
    6
    Rule 908(10) provides that a document is self-authenticating if it is accompanied by an affidavit from an individual
    with knowledge of how the records are kept and who can attest that the records were kept in the regular course of
    business. TEX. R. EVID. 902(10). Rule 902(8) provides that a document is self-authenticating if it is accompanied by
    a “certificate of acknowledgment that is lawfully executed by a notary public or another officer who is authorized to
    take acknowledgments.” TEX. R. EVID. 902(8).
    7
    The Solar Defendants also contend that even if we were to overlook Meraz’s failure to preserve this issue for our
    review, we should find that their employees’ sworn declarations attesting to the accuracy of the records they attached
    were sufficient to authenticate the records. We need not reach this issue.
    7
    IV. THE TRIAL COURT ERRED IN DENYING ARBITRATION
    Having rejected Meraz’s procedural challenges, we turn to the merits of the Solar
    Defendants’ argument that the trial court erred in denying their motion to compel arbitration.
    A. Standard of review
    Arbitration is a contractual proceeding by which the parties, in order to obtain a speedy
    and inexpensive final disposition of disputed matters, consent to submit the controversy to
    arbitrators for resolution. See In re Phelps Dodge Magnet Wire Co., 
    225 S.W.3d 599
    , 605
    (Tex. App.—El Paso 2005, orig. proceeding [mand. denied]) (citing Jack B. Anglin Co., Inc. v.
    Tipps, 
    842 S.W.2d 266
    , 268 (Tex. 1992)). The party seeking to compel arbitration must prove that
    a valid and enforceable arbitration agreement exists, which includes proving that the other party
    consented to the agreement. See Aerotek, Inc. v. Boyd, 
    624 S.W.3d 199
    , 204 (Tex. 2021). The
    question of whether an arbitration agreement is valid and enforceable is a question of law subject
    to de novo review. See Baby Dolls Topless Saloons, Inc. v. Sotero, 
    642 S.W.3d 583
    , 586 (Tex.
    2022) (per curiam) (“If one party resists arbitration, the trial court must determine whether a valid
    agreement to arbitrate exists, which is a question of law subject to de novo review.”).
    While a party seeking to avoid arbitration can challenge the validity of the contract as a
    whole or the validity of the arbitration provision specifically, it may also challenge whether an
    agreement exists at all. 
    Id.
     at 586 (citing RSL Funding, LLC v. Newsome, 
    569 S.W.3d 116
    , 124
    (Tex. 2018). And here, Meraz contends that no agreement to arbitrate exists, as he never signed
    the electronic contracts with either of the Solar Defendants and therefore never agreed to arbitrate
    any disputes.
    B. Applicable Law: The Texas Uniform Electronic Transactions Act
    In large part, the answer to whether Meraz consented to the arbitration agreements depends
    on whether his electronic signature on the contracts can be considered genuine. As the Texas
    8
    Supreme Court has recognized, when a party signs a paper document, direct evidence can prove
    the genuineness of his signature, such as through a witness with the expertise to compare the
    signature against a genuine specimen. Aerotek, Inc., 624 S.W.3d at 204. However, an electronic
    signature requires “nothing more than clicking a box online and recording the information in an
    electronic database,” and therefore traditional methods of establishing whether a party’s signature
    is genuine are of no utility. Id. at 205. To address issues relating to the increasing use of electronic
    contracts, the Texas Legislature enacted the Texas Uniform Electronic Transactions Act (the Act).
    Id. at 200, 205 (citing TEX. BUS. & COM. CODE ANN. ch. 322). In determining whether an electronic
    signature can be attributed to an individual, the Act’s focus is on the efficacy of the security
    procedures inherent in the electronic transaction itself. TEX. BUS. & COM. CODE ANN. § 322.009(a)
    (providing that “[a]n electronic record or electronic signature is attributable to a person [by]
    showing . . . the efficacy of any security procedure applied to determine the person to which the
    electronic record or electronic signature was attributable”). Thus, once the parties have agreed to
    conduct business by electronic means, the party seeking to hold another responsible for signing an
    electronic contract must come forward with evidence to establish the efficacy of the security
    procedures utilized in the transaction. Aerotek, Inc., 624 S.W.3d at 204. The Act defines a security
    procedure as any
    procedure employed for the purpose of verifying that an electronic signature,
    record, or performance is that of a specific person or for detecting changes or errors
    in the information in an electronic record [which includes] a procedure that requires
    the use of algorithms or other codes, identifying words or numbers, encryption, or
    callback or other acknowledgment procedures.
    TEX. BUS. & COM. CODE ANN. § 322.002(13). And it is the efficacy of the security procedures used
    in an electronic transaction that “provides the link between the electronic record stored on a
    computer or in a database and the person to whom the record is attributed.” Aerotek, Inc., 624
    S.W.3d at 205–06.
    9
    The party opposing the enforcement of an electronic agreement may come forward with
    evidence that the security procedures utilized in the transaction “lack[ed] integrity or
    effectiveness,” and that therefore, the party’s signature on the contract cannot reliably be attributed
    to him. Id. at 210; see also Knox Waste Serv., LLC v. Sherman, No. 11-19-00407-CV, 
    2021 WL 4470876
    , at *9 (recognizing same). However, a party seeking to avoid the agreement cannot do so
    by submitting an affidavit merely denying that he signed the agreement, as such affidavits are
    nothing more than mere arguments to avoid an agreement and are insufficient to cast doubt on an
    otherwise reliable agreement. Aerotek, 624 S.W.3d at 206–209 (when faced with evidence
    conclusively demonstrating the reliability of the authentication procedures for electronic
    signatures, “[m]ere denials do not suffice” to create a genuine issue of material fact regarding the
    genuine nature of the signature); see also Knox Waste Serv., LLC, 
    2021 WL 4470876
    , at *9
    (recognizing same); CHG Hosp. Bellaire, LLC v. Johnson, 
    644 S.W.3d 188
    , 189 (Tex. 2022)
    (holding that a party to an electronic agreement did not create a fact issue regarding whether she
    consented to arbitrate a dispute simply by submitting an affidavit stating that she did not recall
    “electronically acknowledging the arbitration agreement at issue”).
    Although an appellate court must typically defer to a trial court’s express or implied finding
    that a party did not sign an agreement, the finding must be supported by evidence. Aerotek, 624
    S.W.3d at 204. When a party has presented evidence conclusively establishing the efficacy of the
    security procedures utilized to obtain the other parties’ signature on an electronic contract and the
    opposing party has failed to come forward with any evidence of fraud or lack of reliability with
    respect to those procedures, a court has no choice but to enforce the contract. See id. at 200, 205-
    07, 209-10 (citing TEX. BUS. & COM. CODE ANN. §§ 322.001–.009); see also Knox Waste Serv.,
    
    2021 WL 4470876
    , at *7, *9 (enforcing an arbitration agreement where appellants provided
    metadata conclusively demonstrating the genuine nature of the appellee’s signature on the
    10
    agreement). To hold otherwise would contravene the Texas Legislature’s policy in favor enforcing
    electronic transactions. Aerotek, 624 S.W.3d at 209–10; see also TEX. BUS. & COM. CODE ANN. §
    322.006 (providing that the Act must be “construed and applied: (1) to facilitate electronic
    transactions consistent with other applicable law; (2) to be consistent with reasonable practices
    concerning electronic transactions and with the continued expansion of those practices . . .”).
    With these principles in mind, we turn to the question of whether the Solar Defendants
    conclusively established the genuine nature of Meraz’s signature and initials on the electronic
    contracts in accordance with the Act.
    C. We may infer that Meraz agreed to conduct business by electronic means
    As a preliminary matter, we first consider Meraz’s argument that the Act does not apply to
    his contracts with the Solar Defendants. As set forth above, the Act only applies to transactions
    between parties who have agreed to conduct business by electronic means. See TEX. BUS. & COM.
    CODE ANN. § 322.005. And Meraz contends that nothing in the record suggests he agreed to
    conduct business by electronic means and that the Act therefore does not apply in determining
    whether he signed the Solar Defendants’ contracts. We disagree.
    The Act provides that the question of whether a party agreed to “conduct a transaction by
    electronic means is determined from the context and surrounding circumstances, including the
    parties’ conduct.” Id. § 322.005. Significantly, the Act does not require proof that the parties
    entered into an independent agreement to conduct business electronically or require express proof
    of such an agreement; instead, a party’s consent to enter into an electronic transaction may be
    inferred from a variety of factors surrounding the transaction itself. See Parks v. Seybold, No. 05-
    13-00694-CV, 
    2015 WL 4481768
    , at *5 (Tex. App.—Dallas July 23, 2015, no pet.) (mem. op.)
    (upholding trial court’s finding that the parties’ discussions, interactions, and behavior
    demonstrated that they agreed to transact business electronically) (citing TEX. BUS. & COM. CODE
    11
    ANN. § 322.005(d)); Cunningham v. Zurich Am. Ins. Co., 
    352 S.W.3d 519
    , 529 (Tex. App.—
    Fort Worth 2011, pet. denied) (“As with determining whether a signature was the act of a person,
    in determining whether the parties agreed to conduct a transaction by electronic means, we
    consider the context and surrounding circumstances, including the parties’ conduct.”); see also
    TEX. BUS. & COM. CODE ANN. § 322.002(1) (providing that an agreement can be found not only
    in the language of a contract itself, but may be “inferred from other circumstances . . . ”). Moreover,
    the Act provides that a person’s consent to enter into an electronic contract can be inferred not
    only from the circumstances in existence at the time of a contract’s creation or execution but from
    a party’s subsequent adoption of the contract. TEX. BUS. & COM. CODE ANN. § 322.009(b).
    Here, although Meraz repeatedly stated in his affidavit that he did not sign the electronic
    contracts at issue, he never denied that he agreed to conduct business with the Solar Defendants
    electronically. In addition, although he averred in his affidavit that he repeatedly sought to review
    the Solcius contract prior to installation, he never stated that he sought to review paper copies of
    the contract or that he otherwise asked to conduct the transaction using paper contracts. More
    importantly, Meraz acknowledged in his affidavit that he received copies of the signed electronic
    versions of the parties’ contracts by email, and there is nothing in the record to suggest that he
    notified either Solcius or Goodleap that he objected to conducting business electronically at that
    time. Thus, from Meraz’s actions, we can infer that he agreed to conduct business by electronic
    means.
    D. The Solar Defendants’ evidence establishing the efficacy of their security measures
    This brings us to the dispositive issue of whether the Solar Defendants provided sufficient
    evidence to support a finding that the electronic transaction security procedures were sufficient to
    conclusively establish the genuine nature of Meraz’s signature. We conclude that they did.
    In Aerotek, the Texas Supreme Court explained that
    12
    security procedures may include requiring personal identifying information—such
    as a social security number or an address—to register for an account; assigning a
    unique identifier to a user and then tying that identifier to the user’s actions;
    maintaining a single, secure system for tracking user activities that prevents
    unauthorized access to electronic records; business rules that require users to
    complete all steps in a program before moving on or completing it; and timestamps
    showing when users completed certain actions.
    Aerotek, 624 S.W.3d at 205–06. The court noted, however, that these examples were merely
    “illustrative and not exclusive” under the Act. Id. at 206. Here, both Solcius and Goodleap
    provided evidence of the security procedures they regularly used when entering into electronic
    agreements with their customers as well as the specific procedures they used to obtain Meraz’s
    signature on the contracts at issue, which contained many of the same security features listed in
    the Aerotek opinion. We review each agreement separately.
    1. The Loan Agreement
    In his sworn declaration, Goodleap’s CFO Matt Dawson explained that Goodleap has a
    standard practice of sending its customers who have previously applied for and received approval
    for a loan an email with key information pertaining to the terms of the loan. Goodleap sends this
    correspondence to the email address the customers previously provided. He explained that if the
    customer is satisfied with the terms, the customer may then “click a link within the subject email
    to proceed to the signing of the Loan Agreement.” Thereafter, Goodleap will transmit the Loan
    Agreement to the customer’s email address to review and sign electronically using DocuSign’s
    technology platform. According to Dawson, “[d]ocuments transmitted via DocuSign can only be
    opened by an individual with access to the customer provided e-mail address.” Dawson further
    explained that once the Loan Agreement is signed, a copy is transmitted to the customer-provided
    email address, and once again, can only be accessed there by the customer. And in the final step
    in the process, he explained that Goodleap receives a DocuSign certificate for the transaction,
    13
    which “records the date and time of the execution of the Loan Agreement document by the
    customer, among other key information.”
    Dawson averred that after Meraz applied for and received approval for his loan to install
    his solar panels, Goodleap followed its standard practice by sending Meraz the Loan Agreement
    to his previously provided email address through DocuSign. In addition to providing copies of the
    electronic agreement with Meraz’s signature on it, Dawson provided a certificate of completion
    from DocuSign dated March 13, 2019, containing record tracking and time stamps indicating that
    the Loan Agreement was sent to Meraz’s email address at 11:22:22 a.m. that same day; that Meraz
    viewed the agreement at 11:29:21 a.m.; and that he signed the agreement at 11:35:08 a.m., using
    a previously adopted electronic signature style. The certificate provided an IP address that
    corresponded to the mobile phone that had been used to sign the agreement. And finally, the
    certificate contained an envelope summary of events indicating that the signed document was
    encrypted and that security checks were performed with respect to the delivery, signing, and
    completion of the document.
    2. The Installation Agreement
    In his affidavit, Solcius’s employee, Michael Molen, provided a similar explanation of how
    Solcius conducts its electronic transactions. In particular, he explained that when a customer
    expresses interest in purchasing a home solar system, Solcius “transmits its Installation Agreement
    to the customer provided e-mail address via DocuSign for their review and signature.” And Molen
    explained that documents “transmitted via DocuSign can only be executed by an individual with
    access to the customer provided e-mail address.” He further explained that after a customer
    executes the Installation Agreement, DocuSign transmits the executed copies of the agreement to
    the customer at his previously provided email address. According to Molen, Solcius followed this
    standard procedure in obtaining Meraz’s signature and initials on the Installation Agreement by
    14
    sending the agreement to Meraz’s previously provided email address (the same one that Meraz
    provided to Goodleap). He further noted that Meraz had confirmed his email address on several
    occasions, including during a recorded welcome call that Solcius conducted after Meraz orally
    agreed to the installation.
    Moreover, in support of its Motion for Reconsideration, Solcius provided a certificate of
    completion generated by DocuSign with respect to the Installation Agreement. The document
    contains record tracking and time stamps showing that a Solcius representative received and
    viewed the contract on March 13, 2019, at 12:24:13 p.m. and signed it at 12:25:53 p.m. that same
    day. According to the certificate, the document was then sent to Meraz for signature at his
    previously provided email address that same day at 12:26:00 p.m., was viewed by Meraz at
    12:26:52, and was signed by him at 12:28:41 p.m., using a previously adopted signature style. The
    certificate also contained the IP address of the mobile phone that was used to sign the agreement,
    which was the same IP address listed in the Goodleap certificate of completion. The DocuSign
    certificate indicates that the signed contract was then sent to a Solcius representative that same day
    at 12:28:49 p.m. And finally, the certificate contained an envelope summary of events indicating
    that the document was encrypted and that security checks were performed with respect to the
    delivery, signing, and completion of the document.
    3. Meraz failed to rebut the efficacy of the security measures
    In the trial court, Meraz made no attempt to challenge the efficacy of the above-described
    security measures used by Solcius and Goodleap, and, in particular, he made no attempt to
    demonstrate that the DocuSign certificates of completion were fraudulent or that they did not
    accurately or reliably reflect the true nature of the parties’ transactions. Moreover, Meraz did not
    contend that the email address listed on the certificates (the same email to which the contracts were
    sent) was not his email address, and he further failed to present any evidence to suggest that the
    15
    listed IP address for the mobile phone used to complete the electronic transactions was not
    associated with his device. 8 And, as set forth above, Meraz admitted that he subsequently received
    copies of the electronically signed contracts via email on an undisclosed date, yet he provided no
    evidence to suggest that he objected to the validity of either contract upon receipt, and it appears
    that he instead only claimed that he did not sign the contracts after the Solar Defendants sought to
    enforce the arbitration provisions. 9
    Further, rather than challenge the reliability of the electronic contracts, Meraz simply
    alleged that he did not sign the electronic contracts or enter his initials under the arbitration
    provision in the contracts. An affidavit of this nature is insufficient to rebut otherwise conclusive
    proof that an electronic signature was obtained through reliable procedures and is tantamount to
    no evidence at all under these circumstances. See Aerotek, 624 S.W.3d at 210; see also Knox Waste
    Serv., LLC, 
    2021 WL 4470876
    , at *9. We therefore conclude that Meraz’s affidavit did not create
    a fact issue regarding whether the signature on the Solar Defendants’ contracts was genuine, and
    in turn, did not raise a fact question regarding the validity or enforceability of the arbitration
    provisions in the contracts.
    4. The typographical error in the translated version of the Solcius agreement
    In the trial court, Meraz also sought to cast doubt on the Solcius arbitration agreement by
    pointing out that the first English-translated version of the Installation Agreement Solcius provided
    8
    The Act provides that unless otherwise agreed between the sender and the recipient, an electronic record is sent when
    it “is addressed properly or otherwise directed properly to an information processing system that the recipient has
    designated or uses for the purpose of receiving electronic records[.]” TEX. BUS. & COM. CODE ANN. § 322.015(a)(1).
    It similarly provides that an electronic record is received when “it enters an information processing system that the
    recipient has designated or uses for the purpose of receiving electronic records[.]” Id. § 322.015(b)(1).
    9
    We note that the Act gives an individual the opportunity to correct any errors in an electronic document, but provides
    that the individual must promptly notify the other party that it did not intend to be bound by the agreement upon
    discovering error and must do so before it has accepted the benefits of the agreement. TEX. BUS. & COM. CODE ANN.
    § 322.010(c). Here, although Meraz admits he received a copy of the electronic records from both Solcius and
    Goodleap, there is nothing in the record to suggest that he promptly sought to notify either entity that he did not intend
    to be bound by the agreements.
    16
    to the trial court contained two discrepancies. In this first version, which was translated in February
    2022, the translator put the following information on the signature line on the final page: “Salvador
    Meraz /s/ Hector Garcia” and the initials HG on the line below the arbitration provision. Meraz
    contends that this discrepancy created a fact question regarding whether he signed the agreement.
    We disagree for at least two reasons.
    First, the original version of the agreements in Spanish did not contain any similar use of
    the name Hector Garcia or the initials HG. Instead, the version in Spanish is electronically signed
    “Salvador Meraz” in the style that Meraz adopted, and the arbitration provision contains the initials
    “SM,” making it clear that this was nothing more than the translator’s typographical error. Second,
    after the discrepancy was discovered, Solcius alerted the trial court that “[t]he previously provided
    translation[] . . . included certain typographical errors (namely, references to HG and Hector
    Garcia, as well as an incorrect start date for the contract), that did not appear in the original
    documents.” Solcius further provided the trial court with a corrected version of the agreement in
    English for the court’s review, along with a translation certificate stating that the translation was
    made in May 2022. Meraz made no attempt to challenge the accuracy of the second translation
    and did not provide his own translated version of the agreement. Accordingly, we find that Meraz’s
    challenge to the reliability of the Installation Agreement on this basis is without merit.
    We conclude that Solcius and Goodleap both presented sufficient unrebutted evidence that
    conclusively established the genuine nature of Meraz’s signatures on the contracts. And because
    Meraz has brought no other challenges to the validity or enforceability of the arbitration provisions
    contained in those contracts, we conclude that the trial court erred in denying the Solar Defendants’
    motion to compel arbitration.
    17
    E. The trial court should stay rather than dismiss the lawsuit pending arbitration
    Although we agree with the Solar Defendants that the trial court was required to compel
    arbitration, we disagree that the court was required to dismiss Meraz’s lawsuit upon ordering the
    parties to arbitration. The Texas Civil Practices and Remedies Code provides that a court shall stay
    a proceeding that involves an issue subject to arbitration if an order for arbitration or an application
    for that order is made under this subchapter. TEX. CIV. PRAC. & REM. CODE ANN. § 171.025(a);
    see also TEX. CIV. PRAC. & REM. CODE ANN. § 171.021(c) (“An order compelling arbitration must
    include a stay of any proceeding subject to Section 171.025.”); see also In re J.D. Edwards World
    Solutions Co., 
    87 S.W.3d 546
    , 549 (Tex. 2002) (orig. proceeding) (per curiam) (where valid
    arbitration agreement exists for which there is no valid defense, a “trial court has no discretion—
    it must compel arbitration and stay its own proceedings”). And as the Texas Supreme Court has
    recognized, a “stay is generally the only appropriate order for a state court with jurisdiction of all
    issues.” In re Gulf Expl., LLC, 
    289 S.W.3d 836
    , 841 (Tex. 2009) (orig. proceeding). The Texas
    Arbitration Act provides that “[a]n order compelling arbitration must include a stay” of the
    underlying litigation. 
    Id.
     (citing TEX. CIV. PRAC. & REM. CODE § 171.021(c) (emphasis added).
    This is because “[d]uring arbitration, a court order may be needed to replace an arbitrator, compel
    attendance of witnesses, or direct arbitrators to proceed promptly; [and] after arbitration, a court
    order is needed to confirm, modify, or vacate the arbitration award.” Id. (footnotes omitted).
    Consequently, dismissal is typically inappropriate because the trial court cannot dispose of all
    claims and all parties until arbitration is completed. Id. Here, we find no reason to deviate from the
    general practice of issuing a stay of Meraz’s lawsuit pending arbitration.
    18
    V. CONCLUSION
    We reverse the trial court’s order denying the motion to compel arbitration and remand to
    the trial court with directions to order the parties to arbitration and to stay Meraz’s lawsuit pending
    the outcome of the arbitration.
    LISA J. SOTO, Justice
    February 27, 2023
    Before Rodriguez, C.J., Soto, J., Marion, C.J. (Ret.)
    Marion, C.J. (Ret.) (sitting by assignment)
    19