  •                   IN THE COURT OF APPEALS OF NORTH CAROLINA
    2022-NCCOA-494
    No. COA21-359
    Filed 19 July 2022
    Wake County, No. 20 CVS 13930
    SCHOOLDEV EAST, LLC, Petitioner,
    v.
    TOWN OF WAKE FOREST, Respondent.
    Appeal by plaintiff from order entered 14 April 2021 by Judge Vinston M.
    Rozier, Jr. in Wake County Superior Court.      Heard in the Court of Appeals 26
    January 2022.
    Smith, Anderson, Blount, Dorsett, Mitchell & Jernigan, L.L.P., by Tobias R.
    Coleman, J. Mitchell Armbruster, and Patrick D. Wilson, and Stam Law Firm
    P.L.L.C., by Paul Stam and R. Daniel Gibson, for Petitioner-Appellant.
    Wyrick Robbins Yates & Ponton LLP by Samuel A. Slater for Respondent-
    Appellee.
    CARPENTER, Judge.
    ¶1         Appeal by Schooldev East, LLC (“Petitioner”) from the Wake County Superior
    Court’s order (the “Order”) entered 14 April 2021, which affirmed the Town of Wake
    Forest’s (the “Town”) 20 November 2020 orders denying Plaintiff’s applications for
    major site plan and major subdivision approval to build a charter school. On appeal,
    Petitioner argues the Town’s “sidewalk requirements violate N.C. Gen. Stat. § 160A-
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    307.1[.]” Alternatively, Petitioner contends it met the applicable local requirements,
    and therefore, the superior court erred in denying its applications. After careful
    review, we conclude Petitioner failed to present competent, material, and substantial
    evidence to establish a prima facie case for entitlement of the permits because the
    evidence did not satisfactorily show Petitioner met the Town’s ordinances requiring
    pedestrian connectivity to surrounding residential areas and accessibility by
    schoolchildren to the school. Accordingly, we affirm the Order.
    I.   Factual & Procedural Background
    ¶2         This case arises out of Petitioner’s applications for major site plan and major
    subdivision plan approval to build a kindergarten through twelfth-grade charter
    school, to be named Wake Preparatory Academy (“Wake Prep”). Petitioner contracted
    with Jane Harris Pate (“Pate”) to purchase approximately 35 acres (the “Property”)
    of Pate’s undeveloped, 68.29-acre tract of real property located on Harris Road, on
    which Petitioner planned to build Wake Prep. At all relevant times, the Property was
    located in the Town’s rural holding zoning district (“RD District”) and within the
    Town’s planning jurisdiction.
    ¶3         On 4 November 2019, Petitioner filed a major subdivision plan permit
    application (the “Subdivision Plan Application”) to subdivide Pate’s property into
    three parcels, and a major site plan permit application (the “Site Plan Application”)
    (together, the “Applications”) seeking approval to construct Wake Prep on the middle
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    parcel, or the Property.
    ¶4          On 3 September 2020, Petitioner presented evidence in support of its
    applications to the Town’s Planning Board and Board of Commissioners (the “Board”)
    in a quasi-judicial joint public hearing pursuant to the Wake Forest Unified
    Development Ordinance (the “UDO”). According to Sections 15.8.2 and 15.9.2 of the
    UDO,
    The Board of Commissioners shall approve, deny or
    approve with conditions the Site Master Plan [and the
    Subdivision Master Plan]. No Site Master Plan [or
    Subdivision Master Plan] approval shall be granted unless
    it complies with the following findings of fact:
    (1) The plan is consistent with the adopted plans and
    policies of the town;
    (2) The plan complies with all             applicable
    requirements of this ordinance;
    (3) There     exists    adequate        infrastructure
    (transportation and utilities) to support the plan
    as proposed; and
    (4) The plan will not be detrimental to the use or
    development of adjacent properties or other
    neighborhood uses.
    ¶5          During its 20 October 2020 meeting, the Board unanimously denied both of
    Petitioner’s applications based on its determination that Petitioner failed to offer
    sufficient evidence to satisfy the findings of fact as required by UDO Sections 15.8.2
    and 15.9.2. On 17 November 2020, the Board entered its written decisions denying
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    the Applications. The denial was based on a determination that the evidence did not
    satisfy certain policies of the Town’s Community Plan and a Town zoning ordinance.
    The relevant Community Plan policies provide:
    Policy S-1:     ADVANCED PLANNING FOR THE
    LOCATION OF NEW PUBLIC SCHOOLS serving Wake
    Forest should be a joint effort between the Wake County
    School Board and the Town. School locations should serve
    to reinforce desirable growth patterns rather than
    promoting sprawl. New elementary school locations should
    be    viewed   as    a    CORNERSTONE        OF     THE
    NEIGHBORHOODS they are intended to serve.
    ....
    Policy S-3: School campuses shall be designed to allow
    safe, PEDESTRIAN ACCESS FROM ADJACENT
    NEIGHBORHOODS. Transportation facilities within 1.5
    miles of all public schools shall be a priority for
    construction of sidewalks, bike paths and pedestrian trails.
    ....
    Policy S-5:       THE CO-LOCATION AND JOINT
    DEVELOPMENT of school facilities in conjunction with
    other community facilities and services shall be
    encouraged. This policy shall be especially applicable to
    schools co-located with park and recreation facilities.
    ¶6         With respect to the Site Plan Application, the Board found Petitioner
    submitted insufficient evidence regarding findings of fact 1, 2, and 4. Specifically,
    the Board found there was insufficient evidence to support: finding of fact 1 because
    the evidence submitted failed to meet policies S-1 and S-3 of the Town’s Community
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    Plan; finding of fact 2 because the Site Plan Application failed to comply with a
    portion of UDO Section 3.7.5(B)(2), which requires “[c]onnectivity (vehicular and
    pedestrian) to surrounding residential areas”; and finding of fact 4 because the
    evidence submitted failed to meet policies S-1, S-3, and S-5 of the Town’s Community
    Plan.
    ¶7           For the Subdivision Plan Application, the Board found that Petitioner
    submitted insufficient evidence regarding finding of fact 2 because the Subdivision
    Plan Application failed to comply with UDO Section 3.7.5(A), which states schools in
    the RD District are:
    [t]o encourage walking and bicycle accessibility by
    schoolchildren to schools, [by] requir[ing] the applicant to
    demonstrate how such accessibility can be achieved, given
    the low density nature of this district. Accommodation
    may include the construction of additional off-premise
    sidewalks, multi-use trails/paths or greenways to connect
    to existing networks.
    ¶8           On 11 December 2020, Petitioner filed a petition for writ of certiorari pursuant
    to N.C. Gen. Stat. § 160A-393, recodified as N.C. Gen. Stat. § 160D-1402, in the Wake
    County Superior Court. Petitioner argued in its petition: (1) N.C. Gen. Stat. § 160A-
    307.1 prohibits the Town from denying the Applications for failing to meet the Town’s
    policies requiring school connectivity to adjoining neighborhoods; (2) the Town cannot
    deny the Subdivision Plan Application because it found the Subdivision Plan
    Application complied with all provisions of the applicable subdivision ordinances; and
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    (3) Petitioner presented sufficient evidence to establish it is entitled to the permits,
    and there was no competent evidence in the record to support denial.
    ¶9         On 14 December 2020, the Clerk of Superior Court for Wake County issued a
    writ of certiorari. On 24 February 2021, the Honorable Vinston M. Rozier, Jr., judge
    presiding, heard arguments from the parties. On 14 April 2021, Judge Rozier entered
    an Order in which he denied Petitioner’s request to reverse the Board’s decision and
    affirmed the Board’s decision. Judge Rozier made the following pertinent conclusions
    of law:
    (21)    As to the interpretation of N.C. Gen. Stat. § 160A-
    307.1, the Court proceeds de novo. The Board of
    Commissioners properly analyzed the scope of a
    novel North Carolina Statute and determined that it
    did not preempt Town plans and ordinances
    requiring Schooldev to demonstrate pedestrian and
    bicycle connectivity.
    (22)    Having established that N.C. Gen. Stat. § 160A-
    307.1 does not prohibit towns from regulating
    pedestrian and bicycle connectivity in relation to
    proposed new schools, the Court next reviews the
    whole record to determine if the applicant submitted
    sufficient evidence to establish a prima facie case for
    entitlement to the requested permits by satisfying
    the Town’s plans and ordinances requiring
    pedestrian and bicycle connectivity.
    (23)    A review of the whole record shows that Schooldev
    presented sufficient, competent evidence that its
    Site Plan Application will not be detrimental to the
    use and development of adjacent properties, as
    required in Finding 4 of Section 15.8.2 of the UDO.
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    (24)    A review of the whole record then shows that
    Schooldev’s Site Plan Permit Application does not
    satisfy the Town’s plan and ordinances requiring
    pedestrian and bicycle connectivity.
    (25)    As a result, the Board of Commissioners properly
    denied both the Site Plan Application and the
    Subdivision Application.
    ¶ 10         On 20 April 2021, Petitioner filed notice of appeal to this Court.
    II.      Jurisdiction
    ¶ 11         This Court has jurisdiction to address Petitioner’s appeal from the Wake
    County Superior Court’s Order entered upon review of a quasi-judicial decision by a
    municipality pursuant to N.C. Gen. Stat. § 7A-27(b)(1) (2021).
    III.   Issues
    ¶ 12         The issues before this Court are whether: (1) Petitioner’s appeal is moot
    considering Wake Prep has amended its charter application and will no longer
    operate the school in which Petitioner proposes to develop; (2) N.C. Gen. Stat. § 160A-
    307.1 prohibits the Town from using local pedestrian and bicyclist connectivity and
    accessibility requirements to deny Petitioner’s development permits for a charter
    school; (3) the superior court erred in applying the whole record standard of review
    in determining whether Petitioner established a prima facie case for entitlement to
    the permits at issue; and (4) the superior court erred in holding Petitioner did not
    present sufficient evidence to establish a prima facie case for entitlement to its
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    requested development permits for a charter school.
    IV.    The Town’s Motion to Dismiss Appeal as Moot
    ¶ 13         As an initial matter, we consider the Town’s motion to dismiss filed on 23
    September 2021 pursuant to Rule 37 of the North Carolina Rules of Appellate
    Procedure. See N.C. R. App. P. 37(e)(2) (“After the record on appeal has been filed,
    an appellant . . . may move the appellate court in which the appeal is pending, prior
    to the filing of an opinion, for dismissal of the appeal.”). The Town contends the case
    is moot because “Schooldev . . . renounced its legal right to operate a charter school
    in [Wake Forest]” after filing its notice of appeal. Petitioner argues this Court should
    deny the Town’s motion to dismiss because Petitioner can establish standing in this
    case, and the case is not moot because “a court can still grant [it] effectual relief.”
    Petitioner also clarifies in its response to the Town’s motion to dismiss that it only
    develops schools. After developing the schools, Petitioner then seeks a separate
    entity to operate the school after the entity leases or buys the property that Petitioner
    has developed for school use.
    ¶ 14         Our Supreme Court has held:
    [w]henever, during the course of litigation it develops that
    the relief sought has been granted or that the questions
    originally in controversy between the parties are no longer
    at issue, the case should be dismissed, for courts will not
    entertain or proceed with a cause merely to determine
    abstract propositions of law.
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    In re Peoples, 
    296 N.C. 109
    , 147, 
    250 S.E.2d 890
    , 912 (1978), cert. denied, 
    442 U.S. 929
    , 
    99 S. Ct. 2859
    , 
    61 L. Ed. 2d 297
     (1979). “A case is ‘moot’ when a determination
    is sought on a matter which, when rendered, cannot have any practical effect on the
    existing controversy.” Chavez v. McFadden, 
    374 N.C. 458
    , 467, 
    843 S.E.2d 139
    , 146
    (2020) (citations omitted).
    ¶ 15         In the instant case, Petitioner sought site plan and subdivision permits from
    the Town. The record does not tend to show Petitioner applied for the establishment
    of the charter school pursuant to Chapter 115C of the North Carolina General
    Statutes; rather, Petitioner applied only for development permits under the Town’s
    UDO. Based on the evidence before us, it was a separate entity—Wake Preparatory
    Academy—that sought the charter applications, which would allow it to “operate the
    school.” See N.C. Gen. Stat. § 115C-218.5(a)(2) (2021). Thus, the Town’s contention
    that Petitioner “renounced its legal right to operate a charter school in the Town,”
    which rendered the case moot is without merit. (Emphasis added).
    ¶ 16         Furthermore, the Town provides no support to its argument that Petitioner
    was required to have an approved charter application from the State Board of
    Education before the Town could approve Petitioner’s requested development
    permits. Our review of the UDO reveals there is no ordinance requiring Petitioner to
    show it obtained the charter before it can proceed with zoning permits. In fact, the
    UDO provides only general zoning requirements for all elementary and secondary
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    schools. The issue of whether Petitioner satisfied the Town’s four findings entitling
    it to the permits, is a separate legal question from whether the operator of the
    proposed school obtained final approval of its charter under Chapter 115C of the
    North Carolina General Statutes. Therefore, we cannot conclude, as the Town urges
    us to, that “the questions originally in controversy” between Petitioner and the Town
    are moot. See In re Peoples, 
    296 N.C. at 147
    , 
    250 S.E.2d at 912
    . Petitioner seeks our
    review of the superior court’s determination of its development permits. Our decision
    on the existing controversy would have a “practical effect” on Petitioner’s ability to
    obtain the required development permits; therefore, we hold Petitioner’s appeal is not
    moot and consider the merits of the case. See Chavez, 374 N.C. at 467, 843 S.E.2d at
    146.
    V.   Standard of Review
    ¶ 17          Before a case arising from an application for site plan or subdivision approval
    comes to this Court, “the proceeding in question has been subject to several levels of
    examination and review.” PHG Asheville, LLC v. City of Asheville, 
    374 N.C. 133
    , 148–
    49, 
    839 S.E.2d 755
    , 765 (2020). The stage at which the application sits determines
    the standard of review to be utilized by the reviewing body. See id. at 149, 839 S.E.2d
    at 765–66.
    ¶ 18          Initially, the application for a permit comes before a local governmental board,
    and the board “must determine whether an applicant has produced competent,
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    material, and substantial evidence tending to establish the existence of the facts and
    conditions which the ordinance requires for the issuance of [the requested permit].”
    Id. at 149, 839 S.E.2d at 766 (citation, emphasis, and internal quotation marks
    omitted). If the applicant satisfies the initial burden of production, the applicant is
    “prima facie . . . entitled to the issuance of the requested permit.” Id. at 149, 839
    S.E.2d at 766 (internal quotation marks omitted). Where the applicant is entitled to
    the approval of its application, “any decision to deny the application should be based
    upon findings contra which are supported by competent, material, and substantial
    evidence appearing in the record . . . .” Id. at 149, 839 S.E.2d at 766 (emphasis added
    and internal quotation marks omitted).
    ¶ 19         Should an applicant appeal the board’s decision to the superior court by filing
    a petition for writ of certiorari under N.C. Gen. Stat. § 160D-1402, the superior court’s
    task of reviewing the application upon issuing a writ includes:
    ensur[ing] that the rights of petitioners have not been
    prejudiced because the decision-making body’s findings,
    inferences, conclusions, or decisions were:
    (a)   In violation of constitutional provisions, including
    those protecting procedural due process rights.
    (b)   In excess of the statutory authority conferred upon
    the local government, including preemption, or the
    authority conferred upon the decision-making board by
    ordinance.
    (c)    Inconsistent with applicable procedures specified by
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    statute or ordinance.
    (d)    Affected by other error of law.
    (e)   Unsupported by competent, material,                 and
    substantial evidence in view of the entire record.
    (f)    Arbitrary or capricious.
    N.C. Gen. Stat. § 160D-1402(j)(1)(a)-(f) (2021).
    ¶ 20          “The proper standard for the superior court’s judicial review depends upon the
    particular issues presented on appeal.” Mann Media, Inc. v. Randolph Cnty. Plan.
    Bd., 
    356 N.C. 1
    , 13, 
    565 S.E.2d 9
    , 17 (2002) (citations and internal quotation marks
    omitted). In the event the “petitioner contends the board’s decision was based on an
    error of law, ‘de novo’ review is proper.” 
    Id. at 13
    , 
    565 S.E.2d at 17
     (citations omitted
    and emphasis added). “Under de novo review[,] a reviewing court considers the case
    anew and may freely substitute its own interpretation of an ordinance for a board[’s]
    conclusions of law.” Morris Commc’ns Corp. v. City of Bessemer, 
    365 N.C. 152
    , 156,
    
    712 S.E.2d 868
    , 871 (2011) (emphasis added).              “Whether the record contains
    competent, material, and substantial evidence is a conclusion of law, reviewable de
    novo.” N.C. Gen. Stat. § 160D-1402(j)(2) (2021); see also PHG Asheville, 374 N.C. at
    150–51, 839 S.E.2d at 766–67 (citation omitted). Our Court has defined “material
    evidence” as “[e]vidence having some logical connection with the consequential facts
    or the issues.” Am. Towers, Inc. v. Town of Morrisville, 
    222 N.C. App. 638
    , 642, 731
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    S.E.2d 698, 702 (2012) (citation omitted), disc. rev. denied, 
    366 N.C. 603
    , 
    743 S.E.2d 189
    . “Substantial evidence” means “such relevant evidence as a reasonable mind
    might accept as adequate to support a conclusion.” Id. at 642, 731 S.E.2d at 702
    (citation omitted).
    ¶ 21            “In the event that the petitioner contends that the local governmental body’s
    decision was either (1) arbitrary or capricious or (2) not supported by competent,
    material, or substantial evidence, the superior court is required to conduct a whole
    record review.” PHG Asheville, LLC, 374 N.C. at 150–51, 839 S.E.2d at 766–67.
    Under the whole record test, “the reviewing court must examine all competent
    evidence (the ‘whole record’) in order to determine whether the agency decision is
    supported by substantial evidence.” Mann Media, Inc., 356 N.C. at 14, 
    565 S.E.2d at 17
     (citations and internal quotation marks omitted). In applying “the whole record
    test, [a] finding must stand unless it is arbitrary [or] capricious.” 
    Id. at 16
    , 
    565 S.E.2d at 19
    .
    ¶ 22            When this Court reviews an order of the superior court relating to an agency
    decision, we examine the order for errors of law in a twofold process: “(1) determining
    whether the trial court exercised the appropriate scope of review and, if appropriate,
    (2) deciding whether the court did so properly.” 
    Id. at 14
    , 
    565 S.E.2d at 18
    .
    ¶ 23            In this case, it is clear the superior court correctly exercised the de novo
    standard of review in conducting its statutory interpretation of N.C. Gen. Stat. §
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    160A-307.1 because the court’s Order states it proceeded de novo on the issue. See
    id. at 14, 
    565 S.E.2d at 18
    . For the reasons set forth below, we conclude the trial
    court properly applied de novo review in reaching its decision that N.C. Gen. Stat. §
    160A-307.1 does not prohibit municipalities from regulating pedestrian and bicycle
    connectivity. See id. at 14, 
    565 S.E.2d at 18
    .
    ¶ 24             Petitioner contends “[t]he Superior Court erred when it applied whole record
    review” to the issue of whether the burden of production is met. We agree. The trial
    court should have “applied de novo review to determine the initial legal issue of
    whether Petitioner had presented competent, material, and substantial evidence.”
    See PHG Asheville, LLC v. City of Asheville, 
    262 N.C. App. 231
    , 241, 
    822 S.E.2d 79
    ,
    86 (2018), aff’d, 
    374 N.C. 133
    , 
    839 S.E.2d 755
     (2020).        Instead, the trial court
    erroneously exercised the whole record test in determining the preliminary legal
    question concerning the sufficiency of Petitioner’s evidence.        For the reasons
    discussed below, we nevertheless conclude the trial court correctly affirmed the
    Board’s decisions because Petitioner failed to meet its burden of production to show
    it is entitled to the requested permits; thus, we find no prejudicial error. See Cannon
    v. Zoning Bd. of Adjustment, 
    65 N.C. App. 44
    , 47, 
    308 S.E.2d 735
    , 737 (1983)
    (concluding the petitioner’s challenged findings were “a recitation of largely
    uncontroverted evidence” and therefore the board’s decision was not prejudicial
    error).
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    VI.    Analysis
    A. The Town’s Local Ordinances “Requiring Sidewalks”
    ¶ 25         In its first argument, Petitioner contends N.C. Gen. Stat. § 160A-307.1
    prohibits “municipalities from requiring or otherwise conditioning approval of school
    construction on meeting local street improvement requirements,” including sidewalk
    improvement requirements. The Town asserts the plain text of the statute indicates
    the legislature’s intent to limit a municipality’s “ability to require ‘street
    improvements’ for schools to only those that are required for safe ingress and egress
    ‘to the municipal street system’ and that are physically connected to the school’s
    driveway”; thus, the legislature did not contemplate sidewalks falling within the
    meaning of a “street improvement.”
    ¶ 26         After careful review, we agree with the Town’s interpretation of N.C. Gen. Stat.
    § 160A-307.1, and we reject Petitioner’s contention that sidewalks are included
    within the meaning of “street improvements” for purposes of interpreting N.C. Gen.
    Stat. § 160A-307.1.
    ¶ 27         We review de novo the issue of whether N.C. Gen. Stat. § 160A-307.1 was
    properly interpreted. See Mann Media, Inc., 356 N.C. at 13, 
    565 S.E.2d at 17
    ; see also
    Quality Built Homes, Inc. v. Town of Carthage, 
    369 N.C. 15
    , 18, 
    789 S.E.2d 454
    , 457
    (2016) (“We review matters of statutory interpretation de novo . . . .”).
    ¶ 28         N.C. Gen. Stat. § 160A-307.1 provides in pertinent part:
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    A city may only require street improvements related to
    schools that are required for safe ingress and egress to the
    municipal street system and that are physically connected
    to a driveway on the school site.            The required
    improvements shall not exceed those required pursuant to
    [N.C. Gen. Stat. §] 136-18(29).
    N.C. Gen. Stat. § 160A-307.1 (2021).
    ¶ 29         Petitioner argues the broad definition of “improvements” found under 
    N.C. Gen. Stat. § 136-18
    (29a) is controlling as to the definition of “street improvements”
    under N.C. Gen. Stat. § 160A-307.1. Petitioner reasons N.C. Gen. Stat. § 160A-307.1
    references “[t]he required improvements” in citing to 
    N.C. Gen. Stat. § 136-18
    (29).
    The Town maintains Petitioner’s reading of the statute would lead to “absurd results”
    and “conflict[s] with the plain language of the statute.”
    ¶ 30         “In the interpretation of statutes, the legislative will is the all-important or
    controlling factor.”   In re Hardy, 
    294 N.C. 90
    , 95, 
    240 S.E.2d 367
    , 371 (1978).
    “Statutory interpretation properly begins with an examination of the plain words of
    the statute.” Jeffries v. Cnty. of Harnett, 
    259 N.C. App. 473
    , 488, 
    817 S.E.2d 36
    , 47
    (2018) (citation omitted), disc. rev. denied, 
    372 N.C. 297
    , 
    826 S.E.2d 710
     (2019). When
    language is “clear and unambiguous within the context of the statute,” the courts
    must give the words their “plain and ordinary meanings.” Brown v. Flowe, 
    349 N.C. 520
    , 522, 
    507 S.E.2d 894
    , 896 (1998). “[U]ndefined words in a statute ‘must be given
    their common and ordinary meaning’” when interpreting the plain language. State
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    v. Rieger, 
    267 N.C. App. 647
    , 649, 
    833 S.E.2d 699
    , 701 (2019) (quoting In re Clayton-
    Marcus Co., Inc., 
    286 N.C. 215
    , 219, 
    210 S.E.2d 199
    , 202 (1974)). However, “[w]ords
    and phrases of a statute may not be interpreted out of context, but individual
    expressions must be construed as a part of the composite whole and must be accorded
    only that meaning which other modifying provisions and the clear intent and purpose
    of the act will permit.” In re Hardy, 
    294 N.C. at
    95–96, 
    240 S.E.2d at
    371–72 (internal
    quotations omitted). Under the interpretative canon of noscitur a sociis, “[w]hen a
    word used in a statute is ambiguous or vague, its meaning may be made clear and
    specific by considering the company in which it is found[,] and the meaning of the
    terms which are associated with it.” Winston v. Beeson, 
    135 N.C. 271
    , 280, 
    47 S.E. 457
    , 460 (1904); see State v. Emery, 
    224 N.C. 581
    , 583, 
    31 S.E.2d 858
    , 860 (1944)
    (“Noscitur a sociis is a rule of construction applicable to all written instruments.”).
    ¶ 31          “[S]treet improvements” is not defined in Chapter 160A; thus, we look to the
    ordinary meaning of the words that comprise the term. See Rieger, 267 N.C. App. at
    649, 833 S.E.2d at 701. According to Merriam-Webster, a “street” is defined as “a
    thoroughfare especially in a city, town, or village that is wider than an alley or lane
    that usually includes sidewalks.” Street, Merriam-Webster, https://www.merriam-
    webster.com/dictionary/street (last visited June 9, 2022) (emphasis added).           An
    “improvement” means “the act or process of improving.” Improvement, Merriam-
    Webster, https://www.merriam-webster.com/dictionary/improvement (last visited
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    June 9, 2022). “Improve” means “to make (something better).” Improve, Merriam-
    Webster, https://www.merriam-webster.com/dictionary/improve (last visited June 9,
    2022).
    ¶ 32            Applying the ordinary meaning of the word “street” to the statute at issue, the
    statute     would   prohibit   municipalities    from      mandating   improvements   of
    thoroughfares—and        potentially    improvements        of   sidewalks—unless   such
    improvement is “required for safe ingress and egress to the municipal street system
    and [is] physically connected to a driveway on the school site.” See N.C. Gen. Stat. §
    160A-307.1.      We next determine if the language of the statute is “clear and
    unambiguous” as to whether sidewalks should be included within the ordinary
    meaning of “street improvements” based on the “context of the statute.” See Brown,
    349 N.C. at 522, 507 S.E.2d at 896; In re Hardy, 
    294 N.C. at
    95–96, 
    240 S.E.2d at 371
    .
    ¶ 33            According to Black’s Law Dictionary, “ingress” is “[t]he act of entering,” and
    “egress” is “[t]he act of going out or leaving.” Ingress, Black’s Law Dictionary (10th
    ed. 2014); egress, Black’s Law Dictionary (10th ed. 2014). In applying the principle
    of noscitur a sociis, we cannot conclude the legislature intended sidewalks to be
    required for safely entering into, and leaving from, the municipal street system, nor
    did it intend for cities to require only sidewalks which are “physically connected to a
    driveway on the school site.” See N.C. Gen. Stat. § 160A-307.1.
    ¶ 34            Finally, we consider the other statutory sections of Chapter 160A dealing with
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    sidewalks, streets, and/or improvements. “[W]e must be guided by the ‘fundamental
    rule of statutory construction that statutes in pari materia, and all parts thereof,
    should be construed together and compared with each other.’” Martin v. N.C. Dep’t
    Health & Hum. Servs., 
    194 N.C. App. 716
    , 719, 
    670 S.E.2d 629
    , 632 (2009) (emphasis
    added) (quoting Redevelopment Comm’n v. Sec. Nat’l Bank, 
    252 N.C. 595
    , 610, 
    114 S.E.2d 688
    , 698 (1960)). We have stated “[w]hen a legislative body includes particular
    language in one section of a statute but omits it in another section of the same Act, it
    is generally presumed that [the legislative body] acts intentionally and purposely in
    the disparate inclusion or exclusion.” N.C. Dep’t of Revenue v. Hudson, 
    196 N.C. App. 765
    , 768, 
    675 S.E.2d 709
    , 711 (2009) (internal quotation marks omitted) (quoting
    Rodriquez v. United States, 
    480 U.S. 522
    , 525, 
    107 S. Ct. 1391
    , 
    94 L. Ed. 2d 533
    , 537
    (1987).
    ¶ 35         Petitioner contends the definition of “improvements” found in 
    N.C. Gen. Stat. § 136-18
    (29a) should “control [in this case] because it comes from a statute that limits
    the types of roadway improvements that can be imposed on schools by government.”
    
    N.C. Gen. Stat. § 136-18
    (29a) provides: “[t]he term ‘improvements,’ as used in this
    subdivision, refers to all facilities within the right-of-way required to be installed to
    satisfy the road cross-section requirements depicted upon the approved plans,”
    including, inter alia, roadway construction, ditches and shoulders, and sidewalks.
    
    N.C. Gen. Stat. § 136-18
    (29a) (2021).       The use of the phrase “as used in this
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    subdivision,” indicates the legislature’s intent to restrict this definition of general
    “improvements” to this particular subsection.             Additionally, 
    N.C. Gen. Stat. § 136.18
    (29), the statute cited in N.C. Gen. Stat. § 160A-307.1, is referring only to
    driveway connections—not sidewalks. Thus, we are not persuaded by Petitioner’s
    argument that we should apply the definition of “improvements” found in 
    N.C. Gen. Stat. § 136-18
    (29a) to interpret “street improvements” under N.C. Gen. Stat. § 160A-
    307.1.
    ¶ 36            Additionally, our review of North Carolina statutes reveals not only has the
    General Assembly specifically referred to “sidewalks” when it intended to pass laws
    affecting sidewalks, see e.g., N.C. Gen. Stat. § 160A-296 (2021); N.C. Gen. Stat. §
    160A-189 (2021); N.C. Gen. Stat. 160A-300 (2021), but it has also specifically referred
    to “sidewalk improvements” when it intended to pass laws affecting sidewalk
    improvements. See N.C. Gen. Stat. § 160A-217 (2021).
    ¶ 37            In passing N.C. Gen. Stat. § 160A-217, the legislature distinguished between
    “street improvements” and “sidewalk improvements” in the context of levying special
    assessments for such improvements by using the disjunctive term “or” in separating
    the phrases “street improvements” and “sidewalk improvements.”              See Miller v.
    Lillich, 
    167 N.C. App. 643
    , 646, 
    606 S.E.2d 181
    , 183 (2004) (The legislature’s use of
    the word “or” to separate sub-parts of the statute at issue indicated the sub-parts
    “should be read disjunctively, each being an alternative to the other.”). The General
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    Assembly’s   specific   use   of   the   terms     “street   improvements,”   “sidewalk
    improvements,” and “improvements” in certain sections of Chapter 160A indicates its
    intent to have the categories separate and distinct from one another. Accordingly,
    we conclude the term “street improvements” referred to in N.C. Gen. Stat. § 160A-
    307.1 does not include sidewalk improvements. Therefore, we hold the superior court
    correctly concluded “N.C. Gen. Stat. § 160A-307.1 does not prohibit towns from
    regulating pedestrian and bicycle connectivity in relation to proposed new schools.”
    ¶ 38         We briefly discuss the separate concurring and dissenting opinion, which
    concludes N.C. Gen. Stat. § 160A-307.1 preempts the Town’s ordinances requiring
    sidewalks. The separate opinion correctly considers the plain meaning of the terms
    “street” and “improvement,” then erroneously offers cases that neither interpret the
    statute at issue nor consider the legislative intent of the statute. Rather, the cases
    are offered as support for the proposition that streets include sidewalks. Although
    these cases may appear to support the desired conclusion, their consideration in this
    context is contrary to the rules regarding statutory interpretation that have been
    developed by the Courts in this State. See Blowing Rock v. Gregorie, 
    243 N.C. 364
    ,
    371, 
    90 S.E.2d 898
    , 904 (1956) (“Statutes in pari materia are to be construed together,
    and it is a general rule that the courts must harmonize such statutes, if possible, and
    give effect to each, that is, all applicable laws on the same subject matter should be
    construed together so as to produce a harmonious body of legislation, if possible.”);
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    Wal-Mart Stores East v. Hinton, 
    197 N.C. App. 30
    , 41–42, 
    676 S.E.2d 634
    , 644 (2009).
    B. Sufficiency of Evidence to Establish Prima Facie Case for Entitlement
    of Permits
    ¶ 39         As previously stated, the proper standard of review for the initial legal issue of
    whether Petitioner had presented competent, material, and substantial evidence is
    de novo. See PHG Asheville, LLC, 262 N.C. App. at 241, 822 S.E.2d at 86.
    ¶ 40         There is no dispute Petitioner’s Applications complied with finding of fact 3 of
    UDO Sections 15.8.2 and 15.9.2. Moreover, the superior court concluded Petitioner’s
    Applications complied with finding of fact 4, and the Town does not contest this
    conclusion. Thus, only the superior court’s rulings as to findings of fact 1 and 2 are
    relevant to Petitioner’s appeal of the Applications. We consider the sufficiency of
    evidence for each factual finding in turn.
    1. Finding of Fact 1: Conformity with the Town’s Plans and Policies
    ¶ 41         Finding of fact 1 requires the requested permits are “consistent with the
    adopted plans and policies of the [T]own.” Here, denial of Petitioner’s Applications
    was based in part on Petitioner’s non-compliance with policies S-1 and S-3 of the
    Town’s policies for community-oriented schools.
    a. Community Plan, Policy S-1
    ¶ 42         As stated above, policy S-1 provides:
    ADVANCED PLANNING FOR THE LOCATION OF NEW
    PUBLIC SCHOOLS serving Wake Forest should be a joint
    effort between the Wake County School Board and the
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    Town. School locations should serve to reinforce desirable
    growth patterns rather than promoting sprawl. New
    elementary school locations should be viewed as a
    cornerstone of the neighborhoods they are intended to
    serve.
    ¶ 43          Petitioner argues “N.C. Gen. Stat. § 115C-218.35 prevents the Town from using
    vague and general policies on school development to prevent the construction of a
    charter school in a specific location.” The Town asserts N.C. Gen. Stat. § 115C-218.35
    did not prohibit the Town from denying permit applications related to charter schools.
    Additionally, the Town explains in its brief that it did not deny the Applications based
    on Wake Prep’s location, and it accepted the permit applications for the location.
    Rather, the Town admits that it denied the Applications because Petitioner failed “to
    include adequate sidewalks to satisfy the [T]own’s policies and ordinances in
    contravention of UDO §§ 15.8.2 and 15.9.2 . . . .”
    ¶ 44          The pertinent part of N.C. Gen. Stat. § 115C-218.35 upon which Petitioner
    relies provides: “[a] charter school’s specific location shall not be prescribed or limited
    by a local board or other authority except a zoning authority.” N.C. Gen. Stat. § 115C-
    218.35(a) (2021). Because the Board is acting as a zoning authority in this case,
    Petitioner’s argument that this statute prevents the Town from considering
    Community Plan policies and corresponding regulations is without merit. We next
    consider whether Petitioner offered sufficient evidence that it complied with the
    Town’s plans and policies.
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    ¶ 45         “A comprehensive plan is a policy statement to be implemented by zoning
    regulations, and it is the latter that have the force of law. It is generally deemed to
    be advisory, rather than controlling, and it may be changed at any time.” Piney Mt.
    Neighborhood Assoc. v. Town of Chapel Hill, 
    63 N.C. App. 244
    , 251, 
    304 S.E.2d 251
    ,
    255 (1983) (citations and internal quotation marks omitted).               A board of
    commissioners “must also proceed under standards, rules, and regulations, uniformly
    applicable to all who apply for permits.” Application of Ellis, 
    277 N.C. 419
    , 425, 
    178 S.E.2d 77
    , 81 (1970) (“[C]ommissioners cannot deny applicants a permit in their
    unguided discretion or, stated differently, refuse it solely because, in their view, [it]
    would ‘adversely affect the public interest.’”). “The inclusion of a use in a zoning
    district, even where a . . . permit is required, establishes a prima facie case that the
    use conforms with the comprehensive plan.” Am. Towers, Inc. v. Town of Morrisville,
    
    222 N.C. App. 639
    , 643, 
    731 S.E.2d 698
    , 703 (2012) (citing Woodhouse v. Bd. of
    Comm’rs, 
    299 N.C. 211
    , 216, 
    261 S.E.2d 882
    , 886 (1980)).
    ¶ 46         Here, policy S-1 is a policy statement applicable to the planning of a new school
    location. See Piney Mt. Neighborhood Ass’n, 63 N.C. App. at 251, 
    304 S.E.2d at 255
    .
    The Town does not argue that policy S-1 was implemented by a zoning regulation,
    nor does the Town contest that it accepted Petitioner’s permit applications for the
    Property to be the site location for Wake Prep. Therefore, policy S-1 is solely advisory,
    is irrelevant to Petitioner’s Applications, and was not a proper basis for the Board to
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    deny the Site Plan Application. See 
    id. at 251
    , 
    304 S.E.2d at 255
    . Furthermore, an
    elementary and secondary school is a permitted use within the RD District of the
    Property with additional supplemental standards; therefore, such an educational use
    “establishes a prima facie case that the use conforms with the comprehensive plan.”
    See Am. Towers, Inc., 222 N.C. App. at 643, 731 S.E.2d at 703.
    b. Community Plan, Policy S-3
    ¶ 47          Policy S-3 provides: “[s]chool campuses shall be designed to allow safe,
    pedestrian access from adjacent neighborhoods. Transportation facilities within 1.5
    miles of all public schools shall be a priority for construction of sidewalks, bike paths
    and pedestrian trails.”
    ¶ 48          Similar to policy S-1, policy S-3 is a policy of the Town’s comprehensive plan to
    be implemented by a zoning regulation and can be changed at any time. See Piney
    Mt. Neighborhood Ass’n, 63 N.C. App. at 251, 
    304 S.E.2d at 255
    . Standing by itself,
    S-3 is only advisory and does not have the force of law. See 
    id. at 251
    , 
    304 S.E.2d at 255
    .   However, UDO Section 3.7.5 is an ordinance by which policy S-3 was
    implemented. Thus, as discussed in detail below, Petitioner’s failure to satisfy UDO
    Section 3.7.5 was a proper basis on which the Town denied Petitioner’s applications.
    2. Finding of Fact 2: Compliance with Applicable Ordinances
    ¶ 49          Finding of fact 2 requires the Applications to “compl[y] with all applicable
    requirements of this ordinance.”
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    ¶ 50         In the instant case, the Town denied Petitioner’s Subdivision Plan Application
    because it did not comply with requirements set forth in UDO Section 3.7.5(A), which
    requires an applicant for a school to demonstrate how its plan will achieve “walking
    and bicycle accessibility by schoolchildren to schools” through off-premise sidewalks,
    multi-use trails or paths, or greenways connecting to existing networks. Similarly,
    the Town denied Petitioner’s Site Plan Application on the ground that Petitioner did
    not show it met the requirements of UDO Section 3.7.5(B), which requires all schools
    within the Town’s planning jurisdiction to have vehicular and pedestrian connectivity
    to surrounding residential areas.
    ¶ 51         Relying on Lanvale Properties, LLC v. County of Cabarrus, 
    366 N.C. 142
    , 
    731 S.E.2d 800
     (2012), Petitioner contends the Town erred in denying its Subdivision Plan
    Application on the ground that it failed to comply with UDO Section 3.7.5 because it
    is a zoning ordinance, and it is inapplicable to its subdivision request. We disagree
    and note Petitioner makes no argument as to why UDO Section 3.7.5 is inapplicable
    to its Site Plan Application.
    ¶ 52         In Lanvale Properties, LLC, our Court explained the difference between zoning
    ordinances and subdivision ordinances:
    [A]s a general matter, subdivision ordinances are designed
    to regulate the creation of new lots or separate parcels of
    land. Unlike zoning, which controls the use of land and
    remains important before, during and after development,
    subdivision regulation generally refers to controls
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    implemented during the development process. To this end,
    subdivision ordinances have several purposes, including,
    among other things, facilitat[ing] record keeping regarding
    land ownership; establishing standards on the size and
    shape of new lots and the layout of public facilities (such as
    street location, intersection design, and the like); and
    requir[ing] the provision of essential infrastructure (such
    as roads, utilities, recreational lands, and open space) and
    the details of how [that infrastructure] is to be laid out and
    constructed. Therefore, county subdivision ordinances
    control the development of specific parcels of land while
    general zoning ordinances regulate land use activities over
    multiple properties located within a distinct area of the
    county’s territorial jurisdiction.
    Lanvale Props., LLC, 366 N.C. at 158–59, 731 S.E.2d at 812 (citations and internal
    quotation marks omitted).
    ¶ 53         In this case, UDO Section 3.7.5 is intended to regulate the development of land
    to be used for educational uses and requires the provision of “off-premise sidewalks,
    multi-use trails or paths, or greenways” to allow for accessibility by students to the
    schools and for vehicular and pedestrian connectivity to surrounding residential
    areas. See id. at 158, 731 S.E.2d at 812. Since the ordinance concerns a component
    of “essential infrastructure” for an elementary and secondary school within the
    Town’s planning jurisdiction, we conclude UDO Section 3.7.5 is a subdivision
    ordinance, and the superior court properly considered the ordinance in denying
    Petitioner’s Subdivision Plan Application. See id. at 158, 731 S.E.2d at 812.
    ¶ 54         As discussed in detail in Section A, the Town’s UDO Section 3.7.5 was not
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    preempted by N.C. Gen. Stat. § 160A-307.1, and Petitioner has failed to show that it
    was not required to comply with UDO Section 3.7.5 to satisfy conditions for approval
    of the Applications.
    ¶ 55         The separate concurring and dissenting opinion states “[t]he Town’s staff
    reviewed Petitioner’s submittals and submitted a written report. The Town’s written
    report noted no deficiencies or further improvements needed.” We note the staff
    report recommended the Board determine if Petitioner met the required findings of
    fact, including determining whether the plan complies with all applicable
    requirements of the UDO, including UDO Section 3.7.5. We further note the ultimate
    decision as to whether Petitioner presented “competent, material, and substantial
    evidence” and met the UDO requirements remained with the Board.
    ¶ 56         Our review of the record shows Petitioner brought forth evidence
    demonstrating it would dedicate a twenty-five-foot right of way line along the
    frontage of the property and provide a ten-foot-wide multi-use path one foot behind
    the right of way line.    Petitioner also offered testimony tending to show “the
    [proposed] sidewalk . . . would align with the entrance into Joyner Park and the trails
    within Joyner Park.” Since Petitioner demonstrates that it would provide pedestrian
    connectivity to only one residential neighborhood through Joyner Park located to the
    south of the proposed school, we hold the superior court did not err in affirming the
    Board’s decision to deny the Applications.
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    Opinion of the Court
    VII.     Conclusion
    ¶ 57            We deny the Town’s motion to dismiss Petitioner’s appeal because the case is
    not moot. We hold the Town’s local ordinances requiring pedestrian connectivity and
    accessibility for schoolchildren to a school is not preempted by N.C. Gen. Stat. § 160A-
    307.1.    Although the superior court erred in applying the whole record test in
    considering whether Petitioner presented competent, material, and substantial
    evidence, we find no prejudicial error. Our de novo review of the record reveals
    Petitioner failed to meet its burden of production to show it met Section 3.7.5 of the
    Town’s UDO to establish a prima facie case for entitlement of the permits.
    Accordingly, we affirm the decision of the superior court.
    AFFIRMED.
    Judge ARROWOOD concurs.
    Judge TYSON concurs in part and dissents in part by separate opinion.
    No. COA21-359 – Schooldev East, LLC v. Town of Wake Forest
    TYSON, Judge, concurring in part and dissenting in part.
    ¶ 58         I concur with the majority’s opinion holding the Town’s motion to dismiss as
    moot be denied. I also agree with the majority’s conclusions the superior court erred
    and applied the incorrect “whole record” standard of review. I further concur with
    “[the Town’s Board] cannot deny applicants a permit in their unguided discretion or,
    stated differently, refuse it solely because, in their view, [it] would ‘adversely affect
    the public interest.’” “The inclusion of a [permitted] use in a zoning district, even
    where a special use permit is required, establishes a prima facie case the use
    conforms with the comprehensive plan.” Am. Towers, Inc. v. Town of Morrisville, 
    222 N.C. App. 638
    , 643, 
    731 S.E.2d 698
    , 703 (2012) (citing Woodhouse v. Bd. of Comm’rs,
    
    299 N.C. 211
    , 216, 
    261 S.E.2d 882
    , 886 (1980)). As such, Petitioner’s subdivision
    application should be approved.       The Town found Petitioner complied with all
    provisions of the applicable subdivision ordinances and future improvements to a
    parcel are subject to site plan review, and are not reviewed under the subdivision
    ordinance.
    ¶ 59         However, the majority incorrectly concludes the superior court’s erroneous
    whole record review was harmless; the Town’s UDO can pre-empt a limiting state
    statute, N.C. Gen. Stat. § 160A-307.1 (2021); and, Petitioner’s evidence failed to
    establish a prima facie case of entitlement to the special use permit. I respectfully
    dissent.
    I.   Issues
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    ¶ 60         Petitioner petitioned for a writ of certiorari pursuant to N.C. Gen. Stat. § 160A-
    393, recodified as N.C. Gen. Stat. § 160D-1402 (2021).            Petitioner argued in its
    petition: (1) N.C. Gen. Stat. § 160A-307.1 prohibits the Town from denying the
    Applications for failing to meet the Town’s policies requiring school connectivity to
    adjoining neighborhoods; (2) the Town cannot deny the Subdivision Plan Application
    because it found the Subdivision Plan Application complied with all provisions of the
    applicable subdivision ordinances; and, (3) Petitioner presented sufficient evidence to
    establish it is entitled to the permits, and there was no competent evidence contra in
    the record to support denial.
    II.    Standards of Review
    ¶ 61         “Whether the record contains competent, material, and substantial evidence is
    a conclusion of law, reviewable de novo.”           N.C. Gen. Stat. § 160D-1402(j)(2).
    Petitioner argues no disputed facts exist in this case and the only question is whether
    it “produced competent, material, and substantial evidence tending to establish the
    existence of the facts and conditions which the ordinance requires for the issuance of
    a special use permit[.]” Humble Oil & Ref. Co. v. Bd. of Aldermen, 
    284 N.C. 458
    , 468,
    
    202 S.E.2d 129
    , 136 (1974).
    ¶ 62         We all agree the Petitioner correctly argues: “[t]he Superior Court erred when
    it applied whole record review,” to the issue of whether Petitioner’s burden of
    production was met, a deferential review to the Town. Our Supreme “Court has
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    clearly held, the extent to which an applicant has presented competent, material, and
    substantial evidence tending to satisfy the standards set out in the applicable
    ordinance” for a quasi-judicial permit “is a question directed toward the sufficiency of
    the evidence presented by the applicant and involves the making of a legal, rather
    than a factual, determination.” PHG Asheville, LLC v. City of Asheville, 
    374 N.C. 133
    , 152, 
    839 S.E.2d 755
    , 767 (2020).
    ¶ 63         We all also agree the trial court should have “applied de novo review to
    determine the initial legal issue of whether Petitioner had presented competent,
    material, and substantial evidence.” PHG Asheville, LLC v. City of Asheville, 
    262 N.C. App. 231
    , 241, 
    822 S.E.2d 79
    , 86 (2018), aff’d, 
    374 N.C. 133
    , 
    839 S.E.2d 755
    (2020). Instead, the trial court erroneously applied the deferential “whole record” test
    to determine the legal question concerning the sufficiency of Petitioner’s evidence.
    See 
    id.
    ¶ 64         Also, the issue of whether N.C. Gen. Stat. § 160A-307.1 was properly
    interpreted and applied is reviewed de novo. See Mann Media, Inc. v. Randolph Cty.
    Planning Bd., 
    356 N.C. 1
    , 13, 
    565 S.E.2d 9
    , 17 (2002); see also Quality Built Homes,
    Inc. v. Town of Carthage, 
    369 N.C. 15
    , 18, 
    789 S.E.2d 454
    , 457 (2016) (“We review
    matters of statutory interpretation de novo”) (citation omitted).
    ¶ 65         “The fundamental right to [own and use] property is as old as our state.” Kirby
    v. N.C. Dep’t of Transp., 
    368 N.C. 847
    , 852, 
    786 S.E.2d 919
    , 923 (2016) (citations
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    omitted). “Public policy has long favored the free and unrestricted use and enjoyment
    of land.    Id. at 853, 786 S.E.2d at 924 (citations and internal quotation marks
    omitted).
    ¶ 66         “The general rule is that a zoning ordinance, being in derogation of common
    law property rights, should be construed in favor of the free use of property.” Dobo v.
    Zoning Bd. of Adjustment of Wilmington, 
    149 N.C. App. 701
    , 712, 
    562 S.E.2d 108
    , 115
    (2002) (Tyson, J., dissenting), rev’d per curiam for reasons stated in the dissenting
    opinion, 
    356 N.C. 656
    , 
    576 S.E.2d 324
     (2003); See Yancey v. Heafner, 
    268 N.C. 263
    ,
    266, 
    150 S.E.2d 440
    , 443 (1966); City of Sanford v. Dandy Signs, Inc., 
    62 N.C. App. 568
    , 569, 
    303 S.E.2d 228
    , 230 (1983); Innovative 55, LLC v. Robeson Cty., 
    253 N.C. App. 714
    , 720, 
    801 S.E.2d 671
    , 676 (2017).
    Zoning regulations are in derogation of common law
    rights and they cannot be construed to include or
    exclude by implication that which is not clearly
    their express terms. It has been held that well-founded
    doubts as to the meaning of obscure provisions of a Zoning
    Ordinance should be resolved in favor of the free use of
    property.
    ¶ 67         Land v. Village of Wesley Chapel, 
    206 N.C. App. 123
    , 131, 
    697 S.E.2d 458
    , 463
    (2010) (emphasis original)(citations omitted). The Town’s restrictive ordinances are
    to be construed narrowly and their applicability is limited and pre-empted by a state
    statute, which addresses and controls the very issue of the interior sidewalk
    improvements. N.C. Gen. Stat. § 160A-307.1.
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    III.   Sufficiency of Evidence to Establish a Prima Facie Case
    ¶ 68         The Petitioner’s burden of production at a use permit hearing is well
    established: “[W]hether the applicant for a conditional use permit made out the
    necessary prima facie case does not involve determining whether the applicant met
    a burden of persuasion, as compared to a burden of production, and is subject to de
    novo, rather than whole record, review during the judicial review process.” PHG
    Asheville, LLC, 374 N.C. at 153 n5, 839 S.E.2d at 768 n5. Under de novo review, the
    question is whether Petitioner “produced competent, material, and substantial
    evidence tending to establish the existence of the facts and conditions which the
    ordinance requires for the issuance of a [use] permit.” Id. at 149, 839 S.E.2d at 766
    (citation omitted).
    ¶ 69         “In the event that the applicant satisfies this initial burden of production, then
    ‘prima facie he is entitled to’ the issuance of the requested permit.” Id. (internal
    citation omitted).    The Supreme Court has analogized the applicant’s burden of
    production in these cases “to the making of the showing necessary to overcome a
    directed verdict motion during a jury trial.” Id at 152, 839 S.E.2d at 767. In cases
    where facts are not in dispute, “the City simply lack[s] the legal authority to deny,” if
    an applicant produces “competent, material, and substantial evidence” on each of the
    relevant standards for approval. Id. at 158, 839 S.E.2d at 771; Id. at 145, 839 S.E.2d
    at 763.
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    ¶ 70         Petitioner correctly argues the Town cannot deny the Subdivision Plan
    Application because the evidence supports and the Town found: (1) the Subdivision
    Plan Application complied with all provisions of the applicable subdivision
    ordinances; (2) it presented sufficient evidence to establish it is entitled to the
    permits; and, (3) no competent evidence contra in the record supports denial.
    ¶ 71         Also, no party disputes Petitioner’s Applications complied with finding of fact
    3 of UDO §§ 15.8.2 and 15.9.2.        As noted above, the superior court concluded
    Petitioner’s Applications also complied with finding of fact 4. The Town does not
    contest this conclusion on appeal. Thus, only factors 1 and 2 are at issue.
    ¶ 72         The Town, the superior court, and the majority’s opinion incorrectly weighs the
    evidence Petitioner produced in determining whether competent, material, and
    substantial evidence was submitted.        The RD Zoning District applicable to the
    Property unambiguously states an elementary and secondary school is a permitted
    use, with additional supplemental standards.           This permitted educational use
    “establishes a prima facie case that the use conforms with the comprehensive plan.”
    See Am. Towers, Inc., 222 N.C. App. at 643, 731 S.E.2d at 703 (citation omitted).
    ¶ 73         The majority’s opinion correctly concludes S-1 is a non-binding policy
    statement not applicable or controlling to Petitioner’s applications. See Piney Mt.
    Neighborhood Ass’n v. Town of Chapel Hill, 
    63 N.C. App. 244
    , 251, 
    304 S.E.2d 251
    ,
    255 (1983). The majority’s opinion also correctly notes the Town does not argue on
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    appeal that policy S-1 was implemented by a zoning regulation, nor does the Town
    contest it accepted Petitioner’s permit applications for the Property as a permitted
    use to be the site location for an educational facility, Wake Prep, and not as a re-
    zoning application. S-1 is solely advisory, irrelevant to Petitioner’s Applications, and
    was an improper basis for the Board to deny the Site Plan Application. See 
    id.
     We
    all agree this basis neither supports the Board’s denial of Petitioner’s applications
    nor the superior court’s affirmance thereof.
    ¶ 74         Petitioner contends the Town erred in denying its Subdivision Plan Application
    on the ground it failed to comply with UDO Section 3.7.5 because it is a zoning
    ordinance, and it is inapplicable to its subdivision request. The majority’s opinion
    improperly conflates the separate and distinct functions of subdivision and zoning
    ordinances.
    ¶ 75         Our Supreme Court in Lanvale Properties, LLC, sets out the differences
    between and in interpreting zoning ordinances and subdivision ordinances:
    [A]s a general matter, subdivision ordinances are
    designed to regulate the creation of new lots or
    separate parcels of land.       Unlike zoning, which
    controls the use of land and remains important before,
    during and after development, subdivision regulation
    generally refers to controls implemented during the
    development process.      To this end, subdivision
    ordinances have several purposes, including among
    other things, facilitat[ing] record keeping regarding
    land ownership; establishing standards on the size
    and shape of new lots and the layout of public
    facilities (such as street location, intersection
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    design, and the like); and requir[ing] the provision
    of essential infrastructure (such as roads, utilities,
    recreational lands, and open space) and the details
    of how [that infrastructure] is to be laid out and
    constructed.        Therefore,   county    subdivision
    ordinances control the development of specific
    parcels of land while general zoning ordinances
    regulate land use activities over multiple properties
    located within a distinct area of the county’s territorial
    jurisdiction.
    Lanvale Props., LLC v. Cnty. Of Cabarrus, 
    366 N.C. 142
    , 158-59, 
    731 S.E.2d 800
    , 812
    (2012) (citations and internal quotation marks omitted) (emphasis supplied).
    ¶ 76         In this case, the plain language of the Town’s UDO contains the word
    “development” in addition to prescribing policy goals for “adequate infrastructure
    (transportation and utilities)” and “development of adjacent properties or other
    neighborhood uses.” The intended regulation of the “development” of land to be used
    for educational uses requires the provision of “off-premise sidewalks, multi-use trails
    or paths, or greenways” to allow for accessibility by students to the schools and for
    vehicular and pedestrian connectivity to surrounding residential areas.” Id. at 158,
    731 S.E.2d at 812.      Since the ordinance concerns a component of “essential
    infrastructure” relating to “transportation and utilities” for an elementary and
    secondary school within the Town’s planning jurisdiction, the Town and the superior
    court erred in denying Petitioner’s Applications. See id.
    ¶ 77         Under this standard, Petitioner clearly produced competent, material, and
    substantial evidence sufficient of a prima facie showing of entitlement to the
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    respective permits. Petitioner’s evidence proffers to build a ten-foot-wide multi-use
    path along the front of the property, inside the public right of way. The Town’s staff
    reviewed Petitioner’s submittals and submitted a written report. The Town’s written
    report noted no deficiencies or further improvements needed.                  No competent
    testimony nor evidence contra was offered to challenge Petitioner’s evidence or this
    report. While none of the Town’s commissioners stated UDO 3.7.5 was relevant to
    the overall decision, Petitioner still offered competent, material, and substantial
    evidence to meet those requirements by showing this multi-use path would be for
    pedestrians and cyclists to use as a public sidewalk and path to a neighborhood
    located at the property’s southern point.
    ¶ 78         The Commissioners violated their oath to be an impartial decision maker in a
    quasi-judicial proceeding.   The decision must be based solely on the evidence
    presented. The Board ignored the evidence and merely substituted their subjective
    and unqualified hunches and notions to place an unlawful burden of persuasion upon
    Petitioner. This they cannot lawfully do. A “necessary prima facie case does not
    involve determining whether the applicant met a burden of persuasion, as compared
    to a burden of production, and is subject to de novo, rather than whole record, review
    during the judicial review process.” PHG Asheville, LLC, 374 N.C. at 153 n5, 839
    S.E.2d at 768 n5.
    ¶ 79         In addition to the Town staff’s testimony and report, Petitioner’s permit
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    requests met Town ordinances at the quasi-judicial hearing. Nine witnesses, three
    of which qualified and were received as experts, testified for Petitioner at the Town’s
    public hearing. No one from the Town or any opponents presented any evidence of
    noncompliance with any of the Town’s ordinances or policies. This evidence clearly
    satisfied Petitioner’s burden of production at a quasi-judicial hearing to be issued the
    special use permit.
    ¶ 80          Regarding Petitioner’s permit applications and the additional internal
    sidewalks, the Town’s Mayor stated, “it’s not just that we can’t require it, it’s that we
    cannot deny it because [of a lack of sidewalks].” The Town’s attorney affirmed this
    statement. Petitioner provided competent evidence to show their application met all
    requirements for approval.
    ¶ 81          The Town had accepted and affirmed Petitioner’s findings in its own set of
    hearings on the issue.        The Town offers no lawful basis to deny, and its
    Commissioners were sworn to be impartial and to base their decision solely on the
    record evidence, rather than their personal preferences or unsupported allegations.
    Id. “[C]ommissioners cannot deny applicants a permit in their unguided discretion
    or, stated differently, refuse it solely because, in their view, [it] would ‘adversely affect
    the public interest.’” In re Application of Ellis, 
    277 N.C. 419
    , 425, 
    178 S.E.2d 77
    , 81
    (1970).
    ¶ 82          Petitioner argues “N.C. Gen. Stat. § 115C-218.35 prevents the Town from using
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    vague and general policies on school development to prevent the construction of a
    [public] charter school in a specific location.”           The Town admits it denied the
    Applications solely because Petitioner failed “to include adequate sidewalks to satisfy
    the [T]own[’]s policies and ordinances in contravention of UDO §§ 15.8.2 and 15.9.2[.]”
    ¶ 83          The Town’s quasi-judicial hearing “must also proceed under standards, rules,
    and regulations, uniformly applicable to all who apply for permits.” Id. The Town’s
    decision must be based solely upon the evidence presented at the hearing, by an
    impartial decision maker, and any decision maker’s bias, personal and subjective
    policy preferences are immaterial, are not evidence contra, and cannot support denial.
    Id. (“[C]ommissioners cannot deny applicants a permit in their unguided discretion
    or, . . . , refuse it solely because, . . . , [it] would ‘adversely affect the public interest.’”).
    ¶ 84          “The inclusion of a [permitted] use in a zoning district, even where a . . . permit
    is required, establishes a prima facie case that the use conforms with the
    comprehensive plan.” Am. Towers, Inc., 222 N.C. App. at 643, 731 S.E.2d at 703
    (citing Woodhouse v. Bd. of Comm’rs, 
    299 N.C. 211
    , 216, 
    261 S.E.2d 882
    , 886 (1980)).
    This prior legislative finding is binding upon the Town and is not subject to review
    by the city, town, or the superior court during a quasi-judicial special use permit
    hearing or review. 
    Id.
    ¶ 85          Here, an elementary and secondary school is a permitted use within the RD
    District of the Property with supplemental permit standards. Such educational uses
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    as a permitted use in the RD District “establishes a prima facie case that the use
    conforms with the comprehensive plan” to satisfy that factor. 
    Id.
    ¶ 86         Again, we all agree policy S-1 is only a policy statement applicable to the
    planning of a new school location. See Piney Mt. Neighborhood Ass’n, 63 N.C. App.
    at 251, 
    304 S.E.2d at 255
    . The Town does not argue policy S-1 was implemented by
    a zoning regulation, nor does the Town contest that it accepted Petitioner’s permit
    applications for the Property as currently zoned, to be the new school site location for
    Wake Prep. Petitioner’s Applications do not seek a rezoning of the Property.
    ¶ 87         Policy S-1 is solely advisory and is irrelevant to Petitioner’s Applications and
    the Town’s and superior court’s reliance thereon is not a lawful basis to deny the Site
    Plan Application. See id.; see C.C. & J. Enter., Inc. v. City of Asheville, 
    132 N.C. App. 550
    , 553, 
    512 S.E.2d 766
    , 769, disc. review improvidently allowed, 
    351 N.C. 97
    , 
    521 S.E.2d 117
     (1999) (speculative assertions or mere expression of opinion about the
    possible effects of granting a permit are insufficient to support the findings of a quasi-
    judicial body); Jackson v. Guilford Cnty. Bd. of Adjustment, 
    275 N.C. 155
    , 164-65, 
    166 S.E.2d 78
    , 84-85 (1969) (the legislature may only confer upon a subordinate agency
    the authority or discretion to execute a law if adequate guiding standards are laid
    down).
    1. Community Plan, Policy S-3
    ¶ 88         Policy S-3 provides: “[s]chool campuses shall be designed to allow safe,
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    pedestrian access from adjacent neighborhoods. Transportation facilities within 1.5
    miles of all public schools shall be a priority for construction of sidewalks, bike paths
    and pedestrian trails.”
    ¶ 89         Similar to our analysis and conclusions of policy S-1, policy S-3 is also a policy
    of the Town’s comprehensive plan, is not an ordinance, and can be changed at any
    time. See Piney Mt. Neighborhood Ass’n, 63 N.C. App. at 251, 
    304 S.E.2d at 255
    .
    Standing by itself, policy S-3 is only advisory and has no force of law. See 
    id.
    ¶ 90         Petitioner’s site plan in evidence demonstrates it would dedicate a twenty-five-
    foot right of way line along the frontage of the property and provide a ten-foot-wide
    multi-use path one foot behind the right of way line.                 Petitioner also offered
    unchallenged expert testimony tending to show “the [proposed] sidewalk . . . would
    align with the entrance into Joyner Park and the trails within Joyner Park.” The
    Town’s local ordinances requiring pedestrian connectivity and accessibility for
    schoolchildren to a school is clearly pre-empted by N.C. Gen. Stat. § 160A-307.1.
    ¶ 91         We all agree the superior court erred in applying the whole record test in
    considering whether Petitioner presented competent, material, and substantial
    evidence.    No competent, material, and substantial evidence contra rebuts
    Petitioner’s prima facie showing. Upon de novo review Petitioner clearly met its
    burden of production to show its compliance with § 3.7.5 of the Town’s UDO to
    establish a prima facie case for entitlement of the permits.
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    ¶ 92           Upon de novo review of the order, as is required by statute and well-established
    Supreme Court precedents, the superior court erred when it applied whole record
    review and affirmed the Board’s decision. The decision was prejudicial and not
    harmless. Petitioner clearly produced competent, material, and substantial evidence
    to make a prima facie showing of entitlement to the respective permits. The Town’s
    and the superior court’s reliance on this non-ordinance to deny Petitioner’s permit
    was unlawful and is properly reversed.
    IV.   N.C. Gen. Stat. § 160A-307.1 Pre-emption
    ¶ 93           “Notwithstanding any provision of this Chapter to the contrary, a city may not
    condition the approval of any zoning, rezoning, or permit request on the waiver or
    reduction of any provision of this section.” N.C. Gen. Stat. § 160A-307.1 (emphasis
    supplied). Petitioner contends N.C. Gen. Stat. § 160A-307.1 prohibits “municipalities
    from requiring or otherwise conditioning approval of school construction on meeting
    local   street   improvement     requirements,”       including    sidewalk     improvement
    requirements. The language of the statute is clear, and no party asserts it contains
    any ambiguity. Id.
    ¶ 94           The analysis of whether Petitioner met the requirements of the Town’s UDO
    is subject to and must be reviewed under N.C. Gen. Stat. § 160A-307.1, which pre-
    empts and controls this issue. The Town is statutorily barred from withholding or
    conditioning the issuance of permits based upon “an out-and-out plan of extortion” or
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    other interior site improvements. Nollan v. California Coastal Comm., 
    483 U.S. 825
    ,
    837, 
    97 L. Ed. 2d 677
    , 689 (1987).
    ¶ 95            N.C. Gen. Stat. § 160A-307.1 provides in pertinent part:
    A city may only require street improvements related to
    schools that are required for safe ingress and egress to the
    municipal street system and that are physically connected
    to a driveway on the school site.            The required
    improvements shall not exceed those required pursuant to
    [N.C. Gen. Stat. §] 136-18(29).
    N.C. Gen. Stat. § 160A-307.1 (emphasis supplied).
    ¶ 96            Petitioner correctly asserts the plain text of the statute indicates the
    legislature’s intent to pre-empt and limit a municipality’s “ability to require ‘street
    improvements’ for schools to only those which are required for safe ingress and egress
    ‘to the municipal street system’ and are physically connected to the school’s
    driveway.”
    A. Definitions
    ¶ 97            Petitioner asserts the inclusion of the broad definition of “improvements” found
    under 
    N.C. Gen. Stat. § 136-18
    (29a) controls the definition of “street improvements”
    under N.C. Gen. Stat. § 160A-307.1. Petitioner reasons N.C. Gen. Stat. § 160A-307.1
    specifically references “[t]he required improvements” in citing “improvements shall
    not exceed those required” in 
    N.C. Gen. Stat. § 136-18
    (29). N.C. Gen. Stat. § 160A-
    307.1.
    ¶ 98            
    N.C. Gen. Stat. § 136-18
    (29a) provides: “[t]he term ‘improvements,’ as used in
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    this subdivision, refers to all facilities within the right-of-way required to be installed
    to satisfy the road cross-section requirements depicted upon the approved plans,”
    including, inter alia, roadway construction, ditches and shoulders, and sidewalks.
    
    N.C. Gen. Stat. § 136-18
    (29a) (2021) (emphasis supplied).
    ¶ 99          Petitioner contends the definition of “improvements” used in 
    N.C. Gen. Stat. § 136-18
    (29a) “controls [in this case] because it comes from a statute that limits the
    types of roadway improvements that can be imposed on schools by government.”
    ¶ 100         The use of the phrase “as used in this subdivision,” clearly indicates the
    legislature’s intent to restrict this definition of general “improvements” to this
    subsection. Additionally, 
    N.C. Gen. Stat. § 136-18
    (29), the statute cited in N.C. Gen.
    Stat. § 160A-307.1, is referring only to driveway connections—not sidewalks.
    ¶ 101         The statute also contains the express limitation a city “may only require street
    improvements . . . [which] are required for safe ingress and egress to the municipal
    street system and that are physically connected to a driveway on the school site.”
    N.C. Gen. Stat. § 160A-307.1 (2021) (emphasis supplied). By its own terms, the
    statute limits internal on-site improvements such as sidewalks, bike paths, trails,
    etc. to link a school campus to surrounding neighborhood.
    ¶ 102         The Town cannot require more as a condition of development approval unless
    they are “required for safe ingress and egress to the municipal street system and that
    are physically connected to a driveway on the school site.” Id. This limiting language
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    of the statute could not be plainer.
    ¶ 103         While “street improvements” are not defined in Chapter 160A, the ordinary
    meaning of the words are used that comprise the term. See State v. Rieger, 
    267 N.C. App. 647
    , 649, 
    833 S.E.2d 699
    , 701 (2019). According to The American Heritage
    College Dictionary, a “street” is defined as “a public way or thoroughfare in a city or
    town, usu[ally] with a sidewalk or sidewalks.” Street, The American Heritage College
    Dictionary (3d ed. 1993) (emphasis supplied). An “improvement” is defined as “the
    act or process of improving.” Improvement, The American Heritage College Dictionary
    (3d ed. 1993). “Improve” means “to . . . make better.” Improve, The American
    Heritage College Dictionary (3d ed. 1993).
    B. Application
    ¶ 104         Applying the ordinary meaning of the word “street” to the statute at issue, “[a]
    city may only require street improvements” of thoroughfares—and potentially
    improvements of sidewalks solely as “required for safe ingress and egress to the
    municipal street system and [is] physically connected to a driveway on the school
    site.” N.C. Gen. Stat. § 160A-307.1. Presuming N.C. Gen. Stat. § 160A-307.1 was
    ambiguous and requires statutory interpretation, the inclusion of the word “street”
    in the statute includes sidewalks.
    ¶ 105         For more than a century, our appellate courts have held the “street” includes
    sidewalks. See Willis v. New Bern, 
    191 N.C. 507
    , 510, 
    132 S.E. 286
    , 287 (1926) (“[A]
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    street includes the roadway . . . and sidewalks.”); see also Hester v. Durham Traction
    Co., 
    138 N.C. 288
    , 291, 
    50 S.E. 711
    , 713 (1905) (“The rights, powers, and liability of
    the municipality extend equally to the sidewalk as to the roadway, for both are parts
    of the street.”); see also State v. Mabe, 
    85 N.C. App. 500
    , 503, 
    355 S.E.2d 186
    , 188
    (1987)(citation omitted) (“By way of analogy, courts have universally held that a
    ‘street’ includes not only the roadway and travelled portions but also the sidewalks.”).
    C. Contradiction with Town Ordinances
    ¶ 106          The Town’s and the superior court’s position not only contradicts § 160A-307.1,
    it contradicts its own ordinance enforcement, which treats sidewalks as “street
    improvements.”
    ¶ 107         To prevent municipalities from attempting to evade the restrictions of § 160A-
    307.1 by narrowly defining what constitutes “street improvements” in their
    jurisdictions, the legislature provided such “improvements” include “all facilities
    within the right-of-way required to be installed to satisfy the road cross-section
    requirements” of the local government. 
    N.C. Gen. Stat. § 136-18
    (29a).
    ¶ 108         In this case, “sidewalks” are included by name in the facilities the Town’s
    ordinances require to be installed in the street improvements right-of-way. The
    inclusion of sidewalks within the required “street improvements” is expressly
    illustrated in the Town’s staff report on Petitioner’s Applications and its opinion of
    Petitioner’s compliance therewith.
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    ¶ 109         The Town’s ordinances state sidewalks are “required street improvements.”
    UDO § 6.6.2(E). The Town’s arguments and the majority opinion’s conclusion that
    the UDO requires more and can exceed and violate the express limitations in the
    statute are wholly without merit. N.C. Gen. Stat. § 160A-307.1 bars the Town from
    extorting and conditioning approval of Petitioner’s special use permit and a
    subdivision application on such further internal site improvements. The Town’s
    arguments are without merit.
    V.     Conclusion
    ¶ 110         We all agree the Town’s motion to dismiss Petitioner’s appeal is properly
    denied because the issues presented on appeal are not moot. We also agree the
    superior court erred in applying the whole record test in considering whether
    Petitioner produced competent, material, and substantial evidence. Plan policies are
    not ordinances, do not have the force of law, and are not competent evidence contra
    to defeat a prima facie case to support denial of a use permit. There is no dispute
    Petitioner satisfied two of the required findings and the Town does not argue
    otherwise. I fully concur with the majority’s opinion on these conclusions.
    ¶ 111         When properly reviewed narrowly and construed in favor of the free use of
    private property, I disagree a de novo review of the record reveals Petitioner failed to
    meet its burden of production to show compliance with § 3.7.5 of the Town’s UDO and
    N.C. Gen. Stat. § 160A-307.1. As the Mayor and Town attorney agreed and advised
    SCHOOLDEV EAST, LLC V. TOWN OF WAKE FOREST
    2022-NCCOA-494
    TYSON, J., concurring in part and dissenting in part
    the other Commissioners, Petitioner clearly met its burden of production at the quasi-
    judicial hearing before impartial decision makers and, with no evidence in the record
    contra, established a prima facie case for entitlement to the permits.
    ¶ 112           I also disagree with the majority’s notion N.C. Gen. Stat. § 160A-307.1 does not
    pre-empt the Town’s non-ordinance policy statements from requiring further internal
    pedestrian improvements beyond those specified in the statute.
    ¶ 113           Under de novo review, the order is affected by prejudicial errors, is properly
    vacated in its entirety, and remanded to the superior court with instructions to order
    the Town to issue Petitioner’s permits. I concur in part and respectfully dissent in
    part.