  •                     IN THE COURT OF APPEALS OF IOWA
    No. 15-2154
    Filed October 12, 2016
    EVERETTE HAMNER, JENNIFER HAMNER,
    JUDY SKOGMAN, and SUSAN HIMES,
    Plaintiffs-Appellees,
    vs.
    CITY OF BETTENDORF, IOWA, an Iowa Municipal Corporation,
    Defendant-Appellant.
    ________________________________________________________________
    Appeal from the Iowa District Court for Scott County, J. Hobart Darbyshire,
    Judge.
    The City of Bettendorf appeals the district court’s entry of summary
    judgment for the plaintiffs. AFFIRMED.
    Kristine Stone, City Attorney, and Rex J. Ridenour, Assistant City
    Attorney, for appellant.
    Michael J. Meloy of Meloy Law Office, Bettendorf, for appellees.
    Heard by Danilson, C.J., Tabor, J., and Mahan, S.J.*
    *Senior judge assigned by order pursuant to Iowa Code section 602.9206 (2015).
    2
    MAHAN, Senior Judge.
    The City of Bettendorf appeals the district court’s determination that the
    scope of the City’s streambank-stabilization project exceeds the purposes under
    which the twenty-five-foot wide “utility and drainage easements” were granted
    and that those easements therefore must be condemned.
    We agree with the property owners that the original grantors of the
    easement did not contemplate the expansive use of the easement now sought by
    the City. Because “[p]rivate property shall not be taken for public use without just
    compensation being made, or secured to be made to the owner thereof” under
    article I, section 18 of the Iowa Constitution, we affirm the district court’s ruling
    that the City must compensate the landowners for the proposed project on the
    twenty-five-foot easement along Stafford Creek.
    I. Background Facts and Proceedings.
    The following facts are not in dispute. Everette Hamner, Jennifer Hamner,
    Judy Skogman, and Susan Himes (hereinafter referred to as “the landowners”)
    are all property owners where Stafford Creek runs along their south property line.
    The City of Bettendorf does not own property on either side of Stafford Creek.
    The properties at issue are part of the Rolling Meadows subdivision. The
    Dedication of the subdivision states, in part:
    A perpetual easement is hereby granted to any local public utility or
    municipal department, their successors and assigns, within the
    area shown on the Plat and marked “Easement” to install, lay,
    construct, renew, operate, maintain and remove conduits, cables,
    pipes, poles and wires, overhead and underground, with all
    necessary braces, guys, anchors and other equipment for the
    purpose of serving the subdivision and other property with
    telephone, electric and gas, sewer and water service, as a part of
    the respective utility systems. There is also granted (subject to the
    3
    prior rights of the public therein) the right to use the streets with
    aerial service wires to serve adjacent lots and street lights, the right
    to cut down and remove, or trim and keep trimmed, any trees or
    shrubs that interfere or threaten to interfere with any such public
    utility easement. No permanent buildings or trees shall be placed
    on said area as shown on the Plat and marked “Easement” but the
    same may be used for gardens, shrubs, landscaping and other
    purposes that do not then or later interfere with the aforesaid uses
    or rights herein granted. Nothing herein contained shall be
    construed to place upon any of the lots shown upon said Plat any
    easement or rights in the public of any kind other than the tract
    shown upon said Plat as subject to such easement and the rights
    herein granted are limited to those areas designated upon said Plat
    as “Easements.”
    Each landowner’s property is subject to the following easement granted in
    May 1968 by Rolling Meadows, Inc. to the City:
    [A]n easement for utility purposes and for sanitary sewer and storm
    sewer purposes and for drainage purposes over and across all of
    the easements as shown upon Rollins Meadows Addition to the
    City of Bettendorf, Iowa, . . . Rolling Meadows, Inc., as plattor of
    said Addition, does state that it is the intention of Rolling Meadows,
    Inc. as plattor that the easements as shown upon said plat of
    Rolling Meadows Addition to the City of Bettendorf, Iowa be used
    for storm sewer, sanitary sewer or drainage purposes as well as for
    utility purposes.
    We will refer to these two easements as the 1968 Easements.               The 1968
    Easements allow the City to enter upon a twenty-five-foot rear section of each of
    the landowner’s real property.
    The City adopted the Stafford Creek Stream Bank Improvement Project
    (the “Project”). The Project includes removing all trees and foliage within the
    twenty-five-foot easements on both sides of the creek; installing a retaining wall
    on the Tanglefoot Court side of the creek; adding a seventy-foot coconut wood
    log along the creek on the landowners’ property; installing chain link fences
    throughout the creek bed; installing on one property a twenty-five-ton “rip rap” (a
    4
    collection of rocks along and on the creek bed); reseeding the area with a variety
    of grasses and plants; and re-grading the slope of the back half of the
    landowners’ backyards, making that portion of the back yards about twice as
    steep as before the work.
    In January 2015, the City requested the appointment of a compensation
    commission to appraise damages for a 7.5-foot temporary construction easement
    north of the twenty-five-foot easement on the landowners’ properties.
    The landowners sought a temporary and permanent injunction, asserting
    the City’s eminent-domain proceeding was not for a public purpose and the 1968
    Easements “do[] not allow or authorize [the City] to change the water flow,
    direction, volume of water, change the grade and elevation of [the landowners’]
    real properties or to remove all existing mature trees and all vegetation on this
    twenty-five foot portion of real property subject to said Easement[s].”        The
    landowners   also   asserted   the   Project   was   a   taking,   which   required
    compensation.
    The City’s answer admitted its “condemnation proceeding [is] seeking only
    such temporary construction easement over [the landowners’] properties as it
    needs to complete the stabilization of the Stafford Creek Streambed.” It also
    admitted “it will be changing the topography within its present easement but
    affirmatively states that such is not compensable by reason of its existing
    easement rights.” The City is not offering any compensation for the removal of
    trees, change of land elevation, and the re-grading of twenty-five feet of the
    landowners’ real property.
    5
    The parties filed cross-motions for summary judgment. Submitted with the
    City’s motion was an affidavit from the public works director who avowed that
    creeks within the city “have meandered and new development has occurred
    upstream which has increased the amount of drainage in these creekways and
    has intensified the erosion to the creek banks.” He further stated:
    5. The Bettendorf City Council has determined that there is a
    public purpose in stabilizing specific creekways where adjacent
    homes and businesses are at risk today, or may be at risk in the
    near future. These creeks are used for stormwater drainage
    throughout the city, and it is in the public’s interest that they be
    maintained.
    6. Improvements to the section of Stafford Creek between
    Kingsway Drive and Tanglefoot Court have been on the City of
    Bettendorf’s Community Improvement Program (CIP) since FY
    2011/2012. The CIP is adopted annually, as part of the city’s
    budget, after public meetings and hearings are held.
    7. Planned improvements to this creekway include grading
    the banks to a suitable slope and stabilization of the soil through
    native plantings. This project will also include the installation of
    rock riffles that will dissipate the energy of the stream in high flow
    conditions to minimize future erosion.
    The City argued that because of the 1968 Easements the landowners were not
    entitled to the relief they requested.
    For their part, the landowners asserted the 1968 Easements allow the City
    only to “enter upon a twenty-five-foot rear section of each of plaintiffs’ real
    properties . . . for the purpose of the maintaining of the sanitary sewer, storm
    sewer, Stafford Creek drainage and utility pole purposes,” and the City’s Project
    constitutes a taking larger than the condemnation application allows.
    The district court entered judgment for the landowners, concluding:
    [T]he City of Bettendorf does not have the rights under its existing
    easements to do the proposed work on and along Stafford Creek
    on [the landowners’] properties. . . . [T]he Court finds that the work
    of the level proposed by the City exceeds the scope of rights
    6
    granted to the City in both easements from 1968. As such, the
    proposed work would constitute a taking under the Iowa
    Constitution, and just compensation must be paid. The City must
    initiate condemnation proceedings for the twenty-five-foot area on
    which the work is to be done and compensate [the landowners] for
    the devaluation of their property that the taking will cause.
    The City now appeals.
    II. Scope and Standard of Review.
    “Review of a case in equity resulting in summary judgment is for correction
    of errors at law.” Kucera v. Baldazo, 
    745 N.W.2d 481
    , 483 (Iowa 2008) (quoting
    Keokuk Junction Ry. Co. v. IES Indus., Inc., 
    618 N.W.2d 352
    , 355 (Iowa 2000)).
    Summary judgment is appropriate when there are no genuine issues of material
    fact and the movant is entitled to judgment as a matter of law. Iowa R. Civ. P.
    1.981(3). “Where the parties agree that all material facts are undisputed, and the
    case presents solely legal issues, summary judgment is the appropriate remedy.”
    
    Kucera, 745 N.W.2d at 483
    .
    III. Discussion.
    Both parties assert this case is governed by existing case law and the
    result in Stew-Mc Development, Inc. v. Fisher, 
    770 N.W.2d 839
    (Iowa 2009).
    And both parties claim their positions are necessitated by that case law. We
    conclude the landowners have the better position.
    “An easement is a liberty, privilege or advantage in land without profit,
    existing distinct from ownership.” Hawk v. Rice, 
    325 N.W.2d 97
    , 98 (Iowa 1982).
    An easement is a restriction on another person’s property rights, benefitting the
    dominant estate and burdening the servient estate. Gray v. Osborn, 
    739 N.W.2d 855
    , 861 (Iowa 2007).     Under Iowa law governing easements, the dominant
    7
    estate acquires no greater use than the parties intended when an easement was
    created. Schwob v. Green, 
    215 N.W.2d 240
    , 243 (Iowa 1974).
    “Once a valid easement has been created and the servient landowner
    justly compensated, the continued use of the easement must not place a greater
    burden on the servient estate than was contemplated at the time of formation.”
    Keokuk 
    Junction, 618 N.W.2d at 362
    . Moreover, if the easement was “granted
    for a particular purpose, what is reasonably necessary for that purpose is to be
    considered.”   Flynn v. Michigan–Wisconsin Pipeline Co., 
    161 N.W.2d 56
    , 65
    (Iowa 1968) (quoting 3 Herbert Tiffany, Real Property, § 805, at 332 (3d ed.
    1939)).
    As stated in Keokuk 
    Junction, 618 N.W.2d at 356
    :
    To determine the scope of the easement, this court compares the
    language of the easement with the proposed use.               Three
    considerations are: (1) the physical character of past use compared
    to the proposed use; (2) the purpose of the easement compared to
    the purpose of the proposed use; and (3) the additional burden
    imposed on the servient land by the proposed use.
    The district court considered these factors and determined “the work of the
    level proposed by the City exceeds the scope of rights granted to the City in the
    1968 Easement and Dedication.”       The City argues the district court erred in
    concluding the project exceeded the purposes of the 1968 Easements and the
    scope of the work contemplated constitutes a taking. It maintains the “utility and
    drainage easement” granted at the time of platting was “clearly given for the
    express purpose of constructing and maintaining the storm sewer/drainage
    utility.” The City concedes it did not formally adopt a storm water management
    plan until “some years” after the 1968 Easements were granted. Nonetheless, it
    8
    asserts the City “had an interest in preserving easements for the purpose of
    facilitating the overall drainage system.” Even accepting the City’s interest in an
    overall drainage system, that interest does not necessitate reading the 1968
    Easements so broadly so as to allow the major changes the project
    contemplates.
    (1) The physical character of past use compared to the proposed use. In
    order to accomplish the 2015 project, the City will remove all trees and foliage
    within the twenty-five-foot easement area on both sides of the creek. It will install
    a retaining wall on one side of the creek and a seventy-foot coconut wood log
    along the creek on the landowners’ property. The City will place a twenty-five-ton
    pile of rocks along either side and in the creek bed, reseed the area with a variety
    of grasses and plants, and will re-grade and change the elevation of the
    landowners’ back yards. Thus, the project substantially changes the physical
    character of the past use of the landowners’ properties. See Keokuk 
    Junction, 618 N.W.2d at 356
    .
    (2) The purpose of the easement compared to the purpose of the
    proposed use.     The purpose of the 1968 Easements was “for storm sewer,
    sanitary sewer or drainage purposes as well as for utility purposes.” The City
    argues statutory provisions give broad definition to “city utility,” see Iowa Code
    § 362.2(6) (2015), “public improvement” as including drainage channels, see 
    id. § 384.37(19),
    and drainage as public benefit, see 
    id. § 468.2(1).
    Even so, the
    easement must place no “greater burden on the servient estate than was
    contemplated at the time of formation.” Keokuk 
    Junction, 618 N.W.2d at 355
    .
    The district court looked to the language of the Dedication and determined:
    9
    While the proposed work does pertain to drainage in a
    general sense (the increased drainage along the whole of Stafford
    Creek caused the erosion problems in this area of the creek), and
    part of the proposed work involves installing new subsurface
    drainage tiles, the substance and particularly the scope of the work
    exceeds the purpose of mere maintenance or installation of sewage
    or drainage utilities. The purpose of the project is to reshape
    Stafford Creek and the surrounding creek bed to cure past erosion
    and prevent future erosion. This could potentially be argued as
    conforming with the “drainage purposes” and “water service”
    purposes, but the scope and magnitude of the proposed work
    suggests a greater purpose than mere “water service.”
    We agree.
    (3) The additional burden imposed on the servient land. The district court
    found the third factor noted in Keokuk Junction to be the “most significant and
    compelling.” The proposed project involves a complete removal of all current
    trees and foliage along Stafford Creek on the landowners’ properties, as well as
    substantial re-grading that will result in significantly steeper slope of the
    landowners’ back yards. The re-grading, walls, chain-link fencing, and rock will
    alter the character and aesthetic of the area.       The landowners presented
    estimates from a consultant of the loss of value of their properties ranging from
    $27,500 to $30,250. The district court found, “Even if the true devaluation of [the
    landowners’] land is half of that estimated by [the] consultant, the burden placed
    on [the landowners’] would still be substantial.”
    We find the district court’s ruling consistent with Stew-Mc Development,
    where the court concluded that the scope of a developer’s private easement over
    a lane on farm properties was not broad enough to allow the uncontemplated
    “comparatively dense residential development” 
    proposed. 770 N.W.2d at 847
    .
    We agree with the landowners that the original grantors of the easement did not
    10
    “contemplate the expansive use of the easement now sought” by the City. 
    Id. at 848.
    Because “[p]rivate property shall not be taken for public use without just
    compensation being made, or secured to be made to the owner thereof” under
    article I, section 18 of the Iowa Constitution, we affirm the district court’s ruling
    that the City must compensate the landowners for the proposed project on the
    twenty-five-foot easement along Stafford Creek.
    AFFIRMED.