C. Carulli & B. Carulli, h&w v. N. Versailles Twp. Sanitary Auth. v. Port Vue Plumbing, Inc. ( 2022 )


Menu:
  •                IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    Carmen Carulli and Barbara Carulli,       :
    husband and wife                          :
    :    No. 1246 C.D. 2020
    v.                        :
    :    Argued: October 18, 2021
    North Versailles Township Sanitary        :
    Authority                                 :
    :
    v.                        :
    :
    Port Vue Plumbing, Inc.,                  :
    Appellant                :
    BEFORE:      HONORABLE PATRICIA A. McCULLOUGH, Judge
    HONORABLE MICHAEL H. WOJCIK, Judge
    HONORABLE CHRISTINE FIZZANO CANNON, Judge
    OPINION NOT REPORTED
    MEMORANDUM OPINION
    BY JUDGE McCULLOUGH                                    FILED: October 4, 2022
    This matter returns to this Court following our remand to the Court of
    Common Pleas of Allegheny County (trial court) in Carulli v. North Versailles
    Township Sanitary Authority, 
    216 A.3d 564
     (Pa. Cmwlth. 2019) (en banc) (Carulli I).
    Port Vue Plumbing, Inc. (Port Vue) appeals the trial court’s entry of judgment on
    October 28, 2020, awarding damages in the amount of $39,033.69 to the North
    Versailles Township (Township) Sanitary Authority (Authority), following a non-jury
    trial on the Authority’s breach of contract claim against Port Vue. Following resolution
    of the matters disposed of in Carulli I, Port Vue challenges the trial court’s application
    of the doctrine of fraudulent concealment to toll the applicable statute of limitations, as
    well as the amount of the damages awarded. Upon review, we affirm.
    Background
    As outlined in Carulli I:
    In December 2002, the Authority contracted with Port Vue
    to replace terra cotta sewer pipes along Bevan Road in North
    Versailles Township. Port Vue agreed to replace the pipes
    using the “pipe bursting” method, which bursts the existing
    pipe while simultaneously pulling through a new pipe. The
    portion of sewer line to be replaced stretched from manhole
    755 to manhole 767. Port Vue also contracted to excavate
    the new line to reconnect all residential sewer laterals to the
    new line. In July 2003, Port Vue notified the Authority that
    it had completed work on the project and requested final
    payment, which was approved by the Authority's engineer.
    In accordance with the contract, the Authority paid Port Vue
    for completion of the project.
    In March 2012, the Authority was notified that the basement
    of a house along Bevan Road belonging to Carmen and
    Barbara Carulli (together, Carullis) had flooded with raw
    sewage. The Authority also discovered that manhole 767
    was surcharged2 to within several feet of its top. The
    Authority inspected the sewage lines with a camera and
    discovered that 112.71 lineal feet of piping between manhole
    766 and manhole 767 had not been replaced in accordance
    with the contract. The Authority requested that Port Vue
    replace the sewer line between manhole 766 and manhole
    767. When Port Vue refused, the Authority retained another
    contractor, State Pipe Services, to replace the old sewer line.
    2
    A “[s]ewer surcharge refers to the overloading
    of the sewer beyond its design capacity due to
    inflow and infiltration of water. A surcharging
    sewer often results in sewer overflow at
    manholes and customers’ over flow relief
    gully[.]”    Sewer Surcharge, The Local
    Government Municipal and Knowledge Base,
    2
    http://www.lgam.info/sewer-surcharge               (last
    visited August 12, 2019).
    In September 2012, the Carullis filed a complaint for
    damages against the Authority. In response, on or about
    November 20, 2012, the Authority filed a complaint to join
    Port Vue as an additional defendant arising from Port Vue’s
    alleged failure to fulfill its obligations under the contract.
    The Carullis settled their claims, and the Authority and Port
    Vue proceeded to a non-jury trial.
    Carulli I, 216 A.3d at 568 (record citations omitted).1
    After trial, the trial court awarded the Authority $39,033.69 in damages
    resulting from Port Vue’s failure to complete its obligations under the contract.
    Although the trial court recognized that Port Vue breached the contract in 2003 and
    that contract claims are governed by a four-year statute of limitations under 42 Pa.C.S.
    §5525(a)(1), the trial court applied the discovery rule2 to conclude that, because the
    Authority did not learn of Port Vue’s breach until March of 2012, the statute of
    limitations was tolled and the Authority’s action against Port Vue was timely. This
    conclusion was the focus of Port Vue’s appeal in Carulli I.
    In Carulli I, this Court vacated the trial court’s order. With regard to the
    statute of limitations, this Court first determined that the doctrine of nullum tempus
    occurit regi (“time does not run against the king”) did not excuse the Authority from
    the applicable limitations period. Carulli I, 216 A.3d at 574-77. As for the discovery
    1
    This Court’s opinion in Carulli I additionally provided a detailed summary of the testimony
    offered at trial. See Carulli I, 216 A.3d at 568-72. The evidence that the trial court relied upon to
    support the legal conclusions at issue is highlighted infra.
    2
    The “discovery rule” is a judicially created mechanism to toll a statute of limitations arising
    from “the inability of the injured, despite the exercise of due diligence, to know of the injury or its
    cause.” Pocono International Raceway, Inc. v. Pocono Produce, Inc., 
    468 A.2d 468
    , 471 (Pa. 1983)
    (emphasis omitted).
    3
    rule, this Court analyzed the jurisprudence of both Pennsylvania and other states, and
    emphasized that the Pennsylvania Supreme Court had yet to endorse the application of
    the discovery rule to claims for the breach of a written contract. Carulli I, 216 A.3d at
    578-84. Absent such precedent, this Court declined to endorse the use of the discovery
    rule in this context. However, we noted that the Authority also had asserted that the
    applicable statute of limitations was tolled due to Port Vue’s fraudulent concealment
    of its breach—a theory that the trial court, relying instead upon the discovery rule, had
    not addressed. Id. at 585-86. Because this determination implicated the trial court’s
    function as the fact-finder, we remanded to the trial court “to issue a new decision
    determining whether Port Vue is estopped from asserting the statute of limitations as a
    defense to the Authority’s claim under the doctrine of fraudulent concealment.” Id. at
    586.3
    Following that remand, the trial court found that the testimony offered at
    trial supported the conclusion that Port Vue was estopped from asserting the statute of
    limitations under the doctrine of fraudulent concealment. The trial court highlighted
    the testimony of four witnesses: Donald Glenn, the owner of Glenn Engineering and
    Associates Ltd. (Glenn Engineering), who designed the project for the Authority;
    Joseph Dursa, a representative of Glenn Engineering who was on site conducting
    inspections of the project; Jack Gaffney, a representative of the Authority; and Richard
    Perkoski, the owner and president of Port Vue. In relevant part, the trial court
    emphasized:
    3
    The present author dissented in Carulli I, opining that the trial court’s existing factual
    findings were sufficient to apply the doctrine of fraudulent concealment, that the Court should
    therefore have refrained from deciding the broader question of whether the discovery rule can apply
    to breach of contract claims, and that, in any event, existing precedent supported the application of
    the discovery rule in the contract context. Carulli I, 216 A.3d at 586-89 (McCullough, J., dissenting).
    4
    It is undisputed [Port Vue] was paid for 100% of the contract
    in the summer of 2003. [Notes of Testimony, 11/21/2016
    (N.T.) at 24; Reproduced Record (R.R.) at 104a.] This
    payment was made after [Port Vue] sent an invoice to
    Glenn Engineering showing the project was 100%
    completed, which included the bursting of the entire line.
    [N.T. at 25, 148-49, 171-72; R.R. at 105a, 228a-29a, 251a-
    52a.] The final payment application was sent to Glenn
    Engineering because it was the engineer’s responsibility to
    make certain the contractor performed the work in
    accordance with the bid documents and was paid
    accordingly. [N.T. at 65; R.R. at 145a.] Donald Glenn
    approved the final payment to [Port Vue] based upon the
    final application for payment submitted by [Port Vue] and
    oral representations from Mr. Perkoski that the line
    bursting had been completed. [N.T. at 25-26, 58, 60; R.R.
    at 105a-06a, 138a, 140a.] Mr. Glenn and Mr. Perkoski had a
    good relationship and Mr. Glenn had no reason to doubt
    whether the application was falsified or not completed.
    [N.T. at 60; R.R. at 140a.] According to Mr. Glenn, Mr.
    Perkoski never informed him that the new line was 112.71
    feet short of manhole CR 767. [N.T. at 60; R.R. at 140a.]
    Mr. Dursa was on vacation when [Port Vue] supposedly
    completed the pipe bursting project. [N.T. at 25; R.R. at
    105a.] Mr. Dursa recalled the air compressor broke on the
    machine used by [Port Vue] to perform the pipe bursting
    work the day he left for vacation and by the time he returned
    the machine was gone and [Port Vue] was no longer on site.
    [N.T. at 112-14, 121-23, 156; R.R. at 192a-94a, 201a-03a,
    236a.] Mr. Dursa assumed the work had been completed
    while he was away and he had no further communication
    with [Port Vue] after that time. [N.T. at 121-23; R.R. at
    201a-03a.] There would have been no way for an inspector
    to visibly inspect the length of the sleeve that had been
    placed in the ground between manholes CR 764 and CR
    767 because the pipe was [18 to 20 feet] deep and there
    was no excavation in that area. [N.T. at 26; R.R. at 106a.]
    The excavation occurs primarily at the beginning of the job
    when the contractor has to make a hole to insert the liner.
    [N.T. at 26; R.R. at 106a.] At the time of completion of the
    project, the Authority did not have the physical
    equipment to do an in-camera inspection of that portion
    5
    of the line that was not completed. [N.T. at 59, 201; R.R.
    at 139a, 281a.] Mr. Gaffney testified he also believed the
    pipe bursting project was done in its entirety at 100%. [N.T.
    at 201; R.R. at 281a.]
    Mr. Perkoski admits the work was not completed in
    accordance with the bid documents, but he claims there was
    a verbal agreement with Mr. Glenn, Mr. Dursa[,] and Mr.
    Gaffney regarding substituting other work in lieu of
    completing the 112.71 feet of pipe in question. [N.T. at 148-
    49, 151, 155-56, 165; R.R. at 228a-29a; 231a, 235a-36a,
    245a.] There is no change order to confirm the substitution
    of work or other evidence of any verbal agreement and Mr.
    Dursa, Mr. Glenn[,] and Mr. Gaffney all deny having any
    such agreement or discussion with Mr. Perkoski or anyone
    else from [Port Vue]. [N.T. at 33, 110-11; R.R. at 113a,
    190a-91a.] Mr. Perkoski acknowledged the payment
    applications submitted by his company represent [that]
    100% of the pipe bursting had been completed, even
    though 112.71 feet of piping had not been completed.
    [N.T. at 171-72, 176; R.R. at 251a-52a, 256a.] Mr. Perkoski
    knew the Authority did not have additional funds approved
    to pay him for extras or for other work performed on the
    project. [N.T. at 176, 190; R.R. at 256a, 270a.] This [c]ourt
    noted Mr. Perkoski was generally evasive when answering
    questions about the alleged verbal agreement and why the
    payment applications were submitted with incorrect
    information. [N.T. at 175-77; R.R. at 255a-57a.]
    Trial Court Opinion at 3-54 (emphasis added).
    The trial court found it significant that Port Vue continuously and falsely
    represented to the Authority that it had completed all of the work required under the
    contract. Id. at 6. The Authority relied upon Port Vue’s representations, the trial court
    emphasized, because the Authority did not then possess the needed technology for
    video inspection of the work, and such video inspection was not a standard practice at
    4
    Because the trial court’s opinion is unpaginated, we have supplied page numbers for ease of
    reference.
    6
    the time. Id. Because the uncompleted work was underground, there was nothing
    apparent on the surface to indicate that Port Vue had failed to perform its obligations.
    Id. Port Vue was qualified for this sort of work and had successfully performed work
    for the Authority on prior occasions, so the trial court found that it was reasonable for
    the Authority to rely on Port Vue’s representations. Id. In light of Port Vue’s false
    representations, the trial court concluded that Port Vue’s conduct amounted to
    fraudulent concealment of its breach of the contract, which served to estop Port Vue
    from asserting the statute of limitations against the Authority. More specifically,
    “[a]fter reviewing the facts of record, [the trial court] conclude[d] the doctrine of
    fraudulent concealment applies to toll the statute of limitations until March of
    2012 when the Authority became aware that [Port Vue] failed to complete the
    work as required by the contract.” Id. at 5. Accordingly, the trial court opined that
    the Authority’s claim—which was filed in September 2012—was timely, and
    recommended that the November 22, 2016 verdict be upheld.
    Arguments
    Port Vue again appeals the trial court’s entry of judgment to this Court.5
    Primarily, Port Vue argues that the trial court erred in applying the doctrine of
    fraudulent concealment, such that the Authority’s claim remains barred by the statute
    of limitations. Port Vue contends that the Authority had the opportunity to inspect the
    work that Port Vue was performing at the time, and thereby should have discovered
    that Port Vue failed to perform the necessary work. (Port Vue’s Br. at 9-10.) Indeed,
    5
    “When reviewing a non-jury verdict, our standard of review is limited to determining
    whether [substantial] evidence supports the trial court’s findings of fact and whether the trial court
    committed an error of law.” Carulli I, 216 A.3d at 572 n.4 (quoting East Coast Paving & Sealcoating,
    Inc. v. North Allegheny School District, 
    111 A.3d 220
    , 225 n.8 (Pa. Cmwlth. 2015)). “This Court
    must treat the trial court’s findings of fact the same as this Court would treat a jury’s findings of fact.”
    
    Id.
     “This Court views the evidence in the light most favorable to the party that prevailed before the
    trial court.” 
    Id.
    7
    Port Vue suggests that such inspection was a contractual obligation of the Authority
    and its engineer, Glenn Engineering. 
    Id.
     at 9 (citing Bid, Div. VI, Contract Provisions,
    art. 1, § 1.06(.2); R.R. at 363a). Port Vue stresses Mr. Glenn’s testimony suggesting
    that one could determine that the pipes at issue were not replaced by climbing down a
    ladder in a manhole and shining a flashlight into the sewer, which, Port Vue suggests,
    the Authority should have done after Port Vue purported to complete its work. Id. at
    10 (citing N.T. at 28, 56; R.R. at 108a, 136a). For precedential support, Port Vue cites
    Fine v. Checcio, 
    870 A.2d 850
     (Pa. 2005), for the proposition that the same standard
    of “reasonable diligence” that is applied under the discovery rule also applies under the
    doctrine of fraudulent concealment. (Port Vue’s Br. at 11.) Because Port Vue contends
    that the Authority was not reasonably diligent in inspecting Port Vue’s work, the trial
    court erred in applying the doctrine of fraudulent concealment to toll the statute of
    limitations.
    Separately, Port Vue argues that the trial court’s damage award of
    $39,033.69 exceeded the amount of damages allowed by law. Port Vue cites Trosky v.
    Civil Service Commission, City of Pittsburgh, 
    652 A.2d 813
    , 817 (Pa. 1995), for the
    proposition that damages for a breach of contract are intended to protect either a party’s
    “expectation interest,” its “reliance interest,” or its “restitution interest.” (Port Vue’s
    Br. at 13.) Expectation interest is protected by returning the injured party to “as good
    a position as he would have been had the contract been performed, that is, had there
    been no breach.” Trosky, 652 A.2d at 817 (quoting Restatement (Second) of Contracts,
    Section 344, Comment a (American Law Institute 1981)).               Reliance interest is
    protected by returning the injured party to “the position in which he would have been
    had the contract not been made.” Id. Restitution interest is protected by requiring the
    8
    breaching party “to disgorge the benefit he has received by returning it to the party who
    conferred it.” Id.
    Port Vue contends that, applying these theories of recovery to the instant
    case, the trial court should have awarded no more than $14,351.00 in damages to the
    Authority. It reasons that, had the contract been performed, another 112 feet of pipe
    would have been burst and replaced. (Port Vue’s Br. at 13.) Port Vue asserts that the
    cost of the work at the time was $127.00 per foot. Id. Thus, Port Vue argues that the
    value of the unfinished work was $14,351.00.6 This figure, Port Vue suggests,
    represents the Authority’s expectation interest, as well as the restitution damages—
    funds paid for work not performed. (Id. at 13-14.) Therefore, Port Vue asserts, any
    damages awarded to the Authority above that amount were excessive as a matter of
    law.
    The Authority, by contrast, argues that the trial court was correct to deem
    Port Vue estopped from asserting the statute of limitations due to its fraudulent
    concealment of its breach. Citing Deemer v. Weaver, 
    187 A. 215
    , 216 (Pa. 1936), the
    Authority argues that, although mere silence on the part of the party to be estopped is
    not sufficient to invoke the doctrine, where the party takes affirmative actions to
    mislead, divert, or prevent discovery of the injury, the statute of limitations is tolled.
    (Authority’s Br. at 9.) The doctrine applies where the defending party hides from the
    injured party any facts that would put the latter on notice of the injury or its cause. 
    Id.
    (citing Deemer, 187 A. at 216). It is not the intention of the defending party that
    6
    It is not wholly clear how Port Vue has arrived at this figure, inasmuch as 112 multiplied by
    $127.00 is $14,224.00. The more precise measurement of the uncompleted length of pipe—112.71
    feet—multiplied by $127.00 is $14,314.17. Nonetheless, in broad strokes, it is apparent that Port Vue
    suggests that the appropriate measure of damages is the amount that it charged for the work that it did
    not complete.
    9
    matters, the Authority stresses, but rather the effect upon the injured party that gives
    rise to an estoppel. Id. (citing Nesbitt v. Erie Coach Co., 
    204 A.2d 473
    , 477 (Pa. 1964)).
    Here, the line bursting and pipe replacement project took place primarily
    underground, and any defects were not visible to the naked eye. Id. at 11. The
    Authority stresses that, as the trial court found, it lacked the capability at the time to
    inspect the underground work using cameras. Id. Although Port Vue places great
    emphasis upon the fact that physical inspection was possible, the Authority notes that
    such inspections are difficult and dangerous. Id. Per Mr. Gaffney’s testimony,
    Occupational Safety and Health Administration (OSHA) standards require multiple
    people to be present on site when climbing down into a manhole due to the safety
    issues. Id. (citing N.T. at 199; R.R. at 279a). Accordingly, the Authority asserts that
    it was required to rely upon Port Vue’s representation that it completed all of the work
    under the contract. Mr. Glenn explained that, because of his previous working
    relationship with Port Vue, he had no reason to doubt the veracity of Port Vue’s
    representation about its work. Id. at 13 (citing N.T. at 60; R.R. at 140a). In light of the
    testimony that it highlights, the Authority maintains that, by submitting a falsified
    invoice certifying that it completed 100% of the work, Port Vue fraudulently concealed
    the fact that it did not in fact complete the project as required by the contract. Id. at 16.
    Thus, because the Authority had no reason to believe that Port Vue had not completed
    the work until the line collapsed in March of 2012, the Authority argues that the statute
    of limitations was tolled until that date, and that its claim against Port Vue was thus
    timely.
    As for damages, the Authority argues that its expectation interest—the
    money expended to put the Authority in as good a place as if Port Vue had not breached
    the contract—includes the costs that the Authority incurred to complete the work that
    10
    Port Vue failed to perform. When the Authority became aware of Port Vue’s breach
    in March of 2012, it notified Port Vue and gave it the opportunity to return to complete
    the work, but Port Vue refused. The Authority then contracted with State Pipe Services
    to finish Port Vue’s work, incurring costs of $64,515.26. Id. at 19. The Authority
    further asserts that it expended an additional $25,080.28 for use of equipment and labor
    to remedy the backup of the sewer line into nearby residences, which the Authority
    argues was a natural result of Port Vue’s breach. Id. at 19-20. The Authority notes
    that it proved these amounts to the trial court with verified business documents showing
    the amounts that it paid to have the project completed and to repair the damage. Id. at
    20 (citing R.R. at 512a-29a). Thus, the Authority suggests that the correct amount of
    damages was $89,595.54, well in excess of both the $14,351.00 asserted by Port Vue
    and the $39,033.69 that the trial court awarded.
    Discussion
    I.    Fraudulent Concealment
    As our Supreme Court has explained:
    In addition to the discovery rule, the doctrine of fraudulent
    concealment serves to toll the running of the statute of
    limitations. The doctrine is based on a theory of estoppel,
    and provides that the defendant may not invoke the statute of
    limitations, if through fraud or concealment, he causes the
    plaintiff to relax his vigilance or deviate from his right of
    inquiry into the facts. Deemer, 187 A. at 215. The doctrine
    does not require fraud in the strictest sense encompassing an
    intent to deceive, but rather, fraud in the broadest sense,
    which includes an unintentional deception. Id. The plaintiff
    has the burden of proving fraudulent concealment by clear,
    precise, and convincing evidence. Molineux v. Reed, [
    532 A.2d 792
    , 794 (Pa. 1987)]. While it is for the court to
    determine whether an estoppel results from established facts,
    it is for the jury to say whether the remarks that are alleged
    to constitute the fraud or concealment were made. Nesbitt,
    204 A.2d at 476.
    11
    ****
    We are of the view [] that the standard of reasonable
    diligence, which is applied to the running of the statute of
    limitations when tolled under the discovery rule, also should
    apply when tolling takes place under the doctrine of
    fraudulent concealment. This is, we believe, the standard that
    will serve one of the overarching tenets in this area of our
    jurisprudence—the responsibility of a party who seeks to
    assert a cause of action against another to be reasonably
    diligent in informing himself of the facts upon which his
    recovery may be based. Pocono International, 468 A.2d at
    471. Moreover, because the doctrine captures even
    unintentional conduct on a defendant’s part and the standard
    of reasonable diligence requires from a party only that
    knowledge which is reasonably attained under the
    circumstances, we do not believe that deviation from that
    standard to a higher threshold of knowledge is warranted.
    Thus, we conclude that a statute of limitations that is tolled
    by virtue of fraudulent concealment begins to run when the
    injured party knows or reasonably should know of his injury
    and its cause.
    Fine, 870 A.2d at 860-61.
    We find no error in the trial court’s reliance upon the doctrine of
    fraudulent concealment to deem Port Vue estopped from invoking the statute of
    limitations against the Authority.    As noted above, the trial court supported its
    reasoning with a substantial amount of testimony from Mr. Glenn, Mr. Dursa, Mr.
    Gaffney, and Mr. Perkoski. In sum, this testimony established, and the trial court
    found, that Port Vue falsely represented to the Authority that it had completed 100%
    of the contracted work; that inspection of Port Vue’s failure was difficult given the
    technology available to the Authority at the time; and that the Authority had no reason
    to suspect that Port Vue’s representations were not truthful given the parties’ previous
    professional relationship. Having weighed and considered the circumstances of this
    case, and based on its credibility determinations, the trial court determined that the
    12
    Authority first knew, or had reason to know, that the sewage lines Port Vue installed
    were faulty in March 2012, when the Authority was notified that the basement of a
    residence had been flooded with raw sewage. See Trial Court Opinion at 3-5.
    Broadly speaking, Port Vue contends that its conduct “should not serve as
    the basis of fraudulent concealment.” (Port Vue’s Br. at 11.) However, as the trial
    court found, Port Vue engaged in two affirmative misrepresentations; first, when
    Port Vue sent an invoice to Glenn Engineering showing the project was 100%
    completed, and second, when Mr. Perkoski made oral misrepresentations to Mr.
    Glenn that the line bursting had been completed. Given the trial court’s findings in
    this regard, the trial court correctly determined that Port Vue’s affirmative
    misrepresentations caused the Authority “to relax [its] vigilance or deviate from [its]
    right of inquiry into the facts,” and that Port Vue’s conduct, as a matter of law, invokes
    application of the doctrine of fraudulent concealment. Fine, 870 A.2d at 860; see also
    Nesbitt, 204 A.2d at 477 (fraudulent concealment doctrine applied where “the agents
    of the defendant misled the plaintiff into believing” that a set of circumstances existed
    and “lulled her into a sense of false security”). Even if Port Vue’s misrepresentation
    was not an intentional act of dishonesty, the doctrine does not necessitate proof of an
    “intent to deceive,” but can apply equally to “unintentional deception.” Fine, 870 A.2d
    at 860. Whether intentional or unintentional, such deception was present here, and the
    Authority reasonably relied upon it. cf. Toy v. Metropolitan Life Insurance Co., 
    928 A.2d 186
    , 207 (Pa. 2007) (stating that “the recipient of an allegedly fraudulent
    misrepresentation is under no duty to investigate its falsity in order to justifiably
    rely”); see also Amodeo v. Ryan Homes, Inc., 
    595 A.2d 1232
    , 1236-37 (Pa. Super.
    1991) (concluding that principles of estoppel prevent a party from raising a statute
    of limitations defense where the party agrees to perform a repair, represents to
    13
    the other party that the repair was performed, and the other party relied upon
    the representation). And, in light of the trial court’s findings of fact, this remains true
    regardless of any general oversight authority the contract may have granted Glenn
    Engineering. Cf. Via Net v. TIG Insurance Co., 
    211 S.W.3d 310
    , 313 (Tex. 2006)
    (“Due diligence may include asking a contract partner for information needed to verify
    contractual performance. If a contracting party responds to such a request with false
    information, accrual may be delayed for fraudulent concealment.”). As found by the
    trial court, false information, or fraudulent concealment, was exactly what occcurred
    here. In submitting its invoice to the township engineer and representing therein that
    it had completed 100% of the work, Port Vue misrepresented its completion of the
    work and the township reasonably relied thereon thus tolling the statute of limitations.
    Tellingly, the Dissent agrees that the doctrine of fraudulent concealment applies in this
    case, and only disputes the timing, efforts, and due diligence of the Authority, which,
    as explained below, are factual issues for the trial court to resolve.
    On this note, the Dissent’s position mirrors, in large part, Port Vue’s
    arguments.    Port Vue contends that “the Authority and/or its Engineer had an
    affirmative duty to determine whether the work was completed [and] failed to exercise
    reasonable diligence.” (Port Vue’s Br. at 12.) Somewhat similarly, Port Vue asserts
    that the Authority had an opportunity, or indeed, a contractual obligation, to inspect
    Port Vue’s work and to learn of its breach at an earlier date.
    In Fine, the Supreme Court ultimately determined that “the standard of
    reasonable diligence, which is applied to the running of the statute of limitations when
    tolled under the discovery rule, also should apply when tolling takes place under the
    doctrine of fraudulent concealment.” Id. at 861. Reasonable diligence determines
    when an injured party should learn of his injury. Thus, the Fine Court held that “a
    14
    statute of limitations that is tolled by virtue of fraudulent concealment begins to run
    when the injured party knows or reasonably should know of his injury and its cause.”
    Id. Importantly, under this standard, “the point at which the complaining party should
    reasonably be aware that he has suffered an injury is a factual issue best determined by
    the collective judgment, wisdom and experience of jurors,” i.e., the fact-finder, here,
    the trial court. Crouse v. Cyclops Industries, 
    745 A.2d 606
    , 611 (Pa. 2000) (internal
    citation and quotation marks omitted). “Thus, once the running of the statute of
    limitations is properly tolled, only where the facts are so clear that reasonable minds
    cannot differ may the commencement of the limitations period be determined as a
    matter of law.” 
    Id.
     (emphasis in original).
    To be sure, the reasonable diligence inquiry is highly fact specific. “In
    order to determine when the statute should begin to run, the finder of fact focuses on
    whether the plaintiff was reasonably diligent in discovering his injury. Reasonable
    diligence is precisely that—a reasonable effort to discover the cause of an injury under
    the facts and circumstances present in the case.” 
    Id.
     Although the exercise of
    reasonable diligence can result in the discovery of pertinent facts, “there must be some
    reason to awaken inquiry and direct diligence in the channel in which it would be
    successful,” for “[t]his is what is meant by reasonable diligence.” 
    Id.
     (emphasis
    added). “In other words, a party is not under an absolute duty to discover the cause
    of his injury. Instead, he must exercise only the level of diligence that a reasonable
    man would employ under the facts and circumstances presented in a particular
    case.” 
    Id. at 611-12
     (emphasis added).
    That said, it is not surprising that the courts of this Commonwealth have
    routinely reversed orders granting summary judgment based on the statute of
    limitations because, oftentimes, the fact-finder will have to weigh and resolve conflicts
    15
    in the evidence due to the presence of genuine issues of material fact with respect to
    the reasonable diligence standard. See 1 Pennsylvania Civil Practice §6.17 n.37
    (collecting and discussing various cases). As an example, in Fine, our Supreme
    Court noted that, in reviewing a ruling on a motion for summary judgment, “the
    Superior Court [had] usurped the province of the jury, finding facts regarding [the
    doctor’s] conduct that remain disputed,” and especially stated that “application of the
    doctrine of fraudulent concealment to toll the statute of limitations [was] an open
    question to be resolved at trial.” 870 A.2d at 863 & n.6 (emphasis added). In other
    words, it was within the province of the fact-finder, the trial court, and not this Court
    to find facts. Nonetheless, Port Vue argues the opposite of this because it essentially
    requests this Court to reconstrue the facts of this case and find that the Authority,
    exclusive of other contrary contractual provisions and representations that were made
    that the work was 100% completed, was contractually required to inspect the final
    portion of the work.
    Specifically, Port Vue does not dispute the finding of fraudulent
    concealment but contends that the Authority had an opportunity to inspect Port Vue’s
    work and to learn of its breach at an earlier date. Unveiled from its mask, this assertion
    of error is effectively a claim that the verdict is against the weight of the evidence,
    which is virtually incognizable on appeal. See Commonwealth v. Champney, 
    832 A.2d 403
    , 408 (Pa. 2003) (“The weight of the evidence is exclusively for the finder of fact
    who is free to believe all, part, or none of the evidence and to determine the credibility
    of the witnesses. An appellate court cannot substitute its judgment for that of the finder
    of fact.”) (internal citations omitted). Nonetheless, the Dissent credits Port Vue’s
    argument fully.
    16
    Here, as the trial court emphasized and found, the camera technology that
    the Authority ultimately used to discover the breach was not available to it in 2003.
    Although there was some testimony suggesting that the Authority could have
    discovered the issue by having someone climb down into the nearest manhole and
    physically inspect the sewer line at issue, there was testimony indicating that this was
    difficult and dangerous. Moreover, as the trial court found, it would have been
    impossible for Glenn Engineering to visibly inspect the final and unfinished
    portion of the project, because there was no excavation in that area, and the
    Authority did not have the physical equipment to do an in-camera inspection.
    Ultimately, as the fact-finder, the trial court was entitled to accept as credible the
    facts favorable to the Authority, consider and weigh them against any and all
    countervailing facts, and determine that the Authority exercised reasonable
    diligence under the circumstances. See Fine.
    While our standard of review requires this Court to view the evidence in
    light most favorable to the Authority as verdict winner, Carulli I, 216 A.3d at 572, the
    Dissent actually views it in the light most favorable to Port Vue. Despite its disclaimer
    to the contrary, the Dissent reweighs the evidence, substitutes its judgment for the fact-
    finder, and engages in fact-finding. In so doing, the Dissent determines that the
    Authority should have done that which the trial court, as the actual fact-finder, found
    it was excused from doing in the first place because Port Vue committed fraudulent
    concealment in misrepresenting that it completed the project when, in fact, it did not.
    See Carulli v. North Versailles Township Sanitary Authority (Pa. Cmwlth., No. 1246
    C.D. 2020, filed October 4, 2022), slip op. at 13 (dissenting opinion) (“I merely observe
    that, under the facts of this case, as in any case involving the discovery rule or doctrine
    of fraudulent concealment, and possible tolling of the statute of limitations, the trial
    17
    court was required to consider when the Authority should have discovered the
    fraudulent concealment.”); id. (“This Court does not find facts, but simply concludes
    that the trial court improperly failed to consider facts that are relevant to when, in the
    exercise of due diligence, the Authority should have known of the fraud.”); id. at 14
    (“The trial court failed to consider that the Township released funds without requiring
    completion of the scope of work, including the provision of the as-built drawings; that
    the negotiated terms of the public contract contained a plethora of opportunities to
    inspect the work, both during the progress of the work and upon completion, including
    requiring Port Vue to excavate and uncover the work if necessary; and that the
    Authority’s engineer admitted that the work could also have been viewed by going
    down the manhole and using a flashlight.”).
    The above assertions ignore that the trial court did “consider facts that are
    relevant to” when the Authority should have discovered the fraudulent concealment by
    noting it was not possible for the Authority to climb down the hole, it did not have the
    camera equipment necessary to do so, and Port Vue represented it had completed 100%
    of the work. Moreover, such analysis, in essence, considers only isolated contractual
    terms and makes conclusions based on those alone, while disreading the contract when
    read a whole, flouting a fundamental tenet of contractual interpretation.
    See Commonwealth ex rel. Kane v. UPMC, 
    129 A.3d 441
    , 463-64 (Pa. 2015) (stating
    that “the entire contract should be read as a whole . . . to give effect to its true purpose
    . . . and all of its provisions”). Contrary to the position of Port Vue and the Dissent,
    the trial court properly considered all the circumstances of this case when issuing its
    credibility and weight determinations and factual findings. The trial court was well
    aware of the circumstances of the case and based on such, it determined that there was
    fraudulent concealment which prevented the Authority from knowing of the defect.
    18
    Further, neither party raised any issue concerning the contractual provisions at
    the trial court level.
    In sum, the Dissent agrees with the finding of fraudulent concealment, but
    would engage in further fact finding contrary to the trial court. To us, it is simply
    incorrect for the Dissent to say that “[t]he trial court failed to consider that the
    Township released funds without requiring completion of the scope of work.” Carulli,
    slip op. at 14 (dissenting opinion). There are several reasons why it was incorrect to
    do so.   First, the Dissent’s statement, in and of itself, contradicts the Dissent’s
    acknowledgement that fraudulent concealment occurred here. It also ignores the trial
    court’s findings that Port Vue submitted an invoice representing the work was 100%
    completed and made similar oral representations to Mr. Glenn. Moreover, the Dissent
    would find that the Authority could (and should) have gone down into the manhole, in
    total disregard of the trial court’s finding that this would be an unreasonable and
    dangerous endeavor, and that the Authority did not have the necessary equipment to do
    so. In making such assertions, the Dissent is clearly engaged in fact-finding contrary
    to that of the trial court. Just because the Dissent disagrees with the trial court’s
    findings, this is no basis for us to disturb or otherwise usurp the trial court’s role as the
    fact-finder.
    Port Vue and the Dissent also maintain that the Authority had an absolute
    and unconditional contractual obligation to discover the breach at an earlier date. These
    contentions are also unavailing, as a thorough examination of the entire contract clearly
    demonstrates otherwise.
    With regard to the purported contractual obligation of the Authority to
    inspect Port Vue’s work, Port Vue cites section 01.06.2 of the Contract Provisions,
    which provides:
    19
    Engineer To Determine Date of Completion – The Engineer
    will conduct reviews to determine the dates of substantial
    completion and final completion, will receive and forward to
    the Owner for the Owner’s review written warranties and
    related documents required by the contract and assembled by
    the Contractor, and will issue a final certificate for payment
    upon compliance with the requirement hereinafter set forth.
    Bid, Div. VI, Contract Provisions, art. 1, §1.06(.2); R.R. at 363a.7
    The language to which Port Vue apparently refers is the duty of Glenn
    Engineering to “conduct reviews to determine the dates of substantial completion and
    final completion” of the work. However, nowhere in this contractual language is it
    stated that the Authority was obligated to send someone to climb down every single
    manhole encompassed within the project and to inspect every foot of pipe required to
    be replaced, merely to verify that Port Vue was truthful in representing that it had
    completed the contracted work.
    Signficantly, Port Vue’s first express obligation under the contract makes
    clear that Glenn Engineering’s review function did not in any way relieve Port Vue of
    its duty to perform the work that it contracted to complete:
    All work shall be done in strict accordance with the Contract
    Documents. Observations, construction reviews, tests,
    recommendations, or approvals by the Engineer or persons
    other than the Contractor shall in no way relieve the
    Contractor of obligations to complete all work in
    accordance with the Contract Documents
    Bid, Div. VI, Contract Provisions, art. 3, §3.01(.1); R.R. at 365a (emphasis added).
    7
    The “Engineer” referred to in the contract is Glenn Engineering, and the “Owner” is the
    Authority. Bid, Div. V, Scope of Work, Part 1.00, §1.05(01); R.R. at 346a (“All references to the
    Owner shall mean the ‘North Versailles Township Sanitary Authority’. The Engineer shall be defined
    as the firm of Glenn Engineering and Associates, Ltd.”).
    20
    Nonetheless, the Dissent faults the Authority for not requesting “final
    drawings” under the contract and determines that this was “the point in which the
    Authority, in the exercise of reasonable diligence, should have known that Port Vue
    fraudulently concealed that the project had not been completed to contract
    specifications.” Carulli, slip op. at 4-5 (dissenting opinion). Moreover, this provision
    actually requires Port Vue to provide the “final drawing” to the Authority, and by no
    means does it place a contractual duty upon the Authority to inspect and/or approve the
    workmanship of Port Vue. See Bid, Div. IV, Contract Provisions, art. 4, §4.04(.01);
    R.R. at 352a (“The Contractor shall be responsible for supplying a clean and legible
    set of final drawings clearly showing the final position of all equipment or materials
    used in construction of the project. This set of drawings must be turned over to the
    Engineer and approved by the Owner before the final payment is released on the
    project. This drawing must be on the same data set as the existing drawing and a
    CAD.dwg file of the manholes supplied.”). N.T. at 156, R.R. at 219a. Regardless,
    even if the Authority, upon inspection of the documents, may have been able to
    discover that the work was not completed, it is just as likely that Port Vue would have
    misrepresented on the drawings that the work was completed, which would put the
    Authority in the same position in which it finds itself today—the recipient of
    fraudulent misrepresentations.
    Similarly, the Dissent refers to a section of the contract that vests Glenn
    Engineering with the right to conduct reviews of the project during its construction and
    upon completion to “find that the statute of limitations began to run anew upon the
    Authority’s . . . failure to conduct the inspections.” Carulli, slip op. at 14-15
    (dissenting opinion). See Bid, Div. IV, Contract Provisions, art. 1, §1.02(.5); R.R. at
    361a (“All materials and each part or detail of the work shall be subject at all times to
    21
    observation by the Engineer and the Owner, and the Contractor will be held strictly to
    the intent of the Contract Documents in regard to quality of materials, workmanship,
    and diligent execution of the contract.”).
    First, we note the Authority was conducting inspections until the very last
    one, when Glenn Engineering was informed by an agent of Port Vue that the work had
    been completed. (Trial Court opinion at 5-6.) Second, and perhaps more importantly,
    as the trial court found, it would have been impossible for Glenn Engineering to
    visibly inspect the final and unfinished portion of the project, because there was
    no excavation in that area, and the Authority did not have the physical equipment
    to do an in-camera inspection.
    In any event, the Dissent parses this provision from the remainder of the
    contract and, in so doing, overlooks the various sections in the contract that state that
    a review or inspection of the project by the Authority or its Engineer does not
    resolve Port Vue from its obligations to complete the contract and, further, does
    not relinquish the Authority of its right to maintain suit against Port Vue:
    3.04 Supervision and Construction Procedures
    .1 . . . . Any visits to the site by the Engineer or the Owner,
    or their representatives, or the daily presence of the Resident
    Project Representative shall not be construed as
    superintendence or supervision of the project. It is also
    expressly understood that all superintendence or supervision
    is provided by and is the sole responsibility of [Port Vue].
    .4 [Port Vue] shall not be relieved from obligations to
    perform the work in accordance with the Contract
    Documents either by the activities or duties of the
    Engineer in administration of the contract, or by review,
    tests, or approvals required or performed by persons
    other than [Port Vue].
    22
    Bid, Div. IV, Contract Provisions, art. 3, §3.04(.1), (.4); R.R.
    at 368a.
    3.17 Contractor Responsible Until Work Completed
    ....
    .2 . . . Neither the final certificate of payment nor any
    provision in the Contract Documents, nor partial or
    entire occupancy of the premises by the Owner, shall
    constitute an acceptance of work not done in accordance
    with the Contract Documents or relieve [Port Vue] of
    liability in respect to any express warranties or
    responsibility for faulty materials or workmanship. . . .
    Bid, Div. IV, Contract Provisions, art. 3, §3.17(.2); R.R. at
    377a.
    6.05 Rights and Remdies
    ....
    .2 No action or failure to act by the Owner, Engineer, or
    [Port Vue] shall constitute a waiver of any right or duty
    afforded any of them under the contract, nor shall any
    such action or failure to act constitute an approval of or
    acquiescence in any breach thereunder, except as may be
    specifically agreed in writing.
    Bid, Div. IV, Contract Provisions, art. 6, §6.05(.2); R.R. at
    380a.
    6.07 No Waiver of Rights
    .1 Neither the inspection by the Owner or Engineer, nor
    any order, measurement, or certificate by the Engineer,
    nor any order by the Owner for the payment of money,
    nor any payment for or acceptance of the whole or any
    part of the work by the Owner or Engineer or its
    employees, shall operate as a waiver of any provision of
    this contract, or of any power herein reserved to the
    Owner, or any right to damages herein provided nor shall
    23
    any waiver of any breach of this contract be held to be a
    waiver of any other or subsequent breach. . . .
    Bid, Div. IV, Contract Provisions, art. 6, §6.07(.1); R.R. at
    381a.
    In short, and contrary to the advocacy of the Dissent, there is no provision
    in the contract or the law that could serve as a basis to determine that the Authority had
    failed to exercise due diligence. Indeed, the above-noted provisions of the contract
    clearly indicate it was Port Vue’s duty to properly supervise and completely perform
    its contractual obligations, and the Authority did not waive any rights in this regard.
    Instead, all the credited evidence of record substantiates the trial court’s findings that
    Port Vue affirmatively misled the Authority into believing that the work was
    completed, thereby lulling the Authority into a false sense of security and a reasonable
    belief that it need not verify that Port Vue completed the contract. Simply put, the
    Authority did not incur an absolute and unconditional contractual legal obligation to
    inspect the work performed by Port Vue. In any event, to the extent that such a duty
    could be ascertained, it was merely one factor for the trial court to consider along with
    a variety of other factors to determine whether the Authority acted reasonably and
    exercised reasonable diligence under the circumstances. As noted above, Port Vue sent
    an invoice to Glenn Engineering showing the project was 100% completed, which
    included the bursting of the entire line; Mr. Glenn approved the final payment to Port
    Vue based upon the final application for payment submitted by Port Vue and oral
    representations from Mr. Perkoski that the line bursting had been completed; Mr.
    Glenn had no reason to doubt whether the application was falsified or not completed;
    there would have been no way for an inspector to visibly inspect the length of the sleeve
    that had been placed in the ground between manholes CR 764 and CR 767 because the
    pipe was 18 to 20 feet deep and there was no excavation in that area; and the Authority
    24
    did not have the physical equipment to do an in-camera inspection of that portion of
    the line that was not completed. On the current record, we discern no error in the trial
    court’s performance of its fact-finding function.8
    That said, we caution that our conclusion on this matter does not
    necessarily mean that the doctrine of fraudulent concealment becomes applicable in
    every situation in which one party to a contract falsely represents to the other that the
    contracted work is complete. In many situations, it may be obvious that work has not
    been performed as stated, or a rudimentary inspection may reveal the inaccuracy of
    such a representation. The instant case does not present such a circumstance. As the
    trial court found, the evidence in this matter established that the uncompleted work was
    located 18 to 20 feet underground and there was no excavation that would enable the
    Authority’s personnel to inspect it. (N.T. at 26; R.R. at 106a.)                      Moreover, the
    Authority’s witnesses testified that, at the time, they did not possess the camera
    equipment that would have allowed them to remotely inspect the subterranean portion
    of the line that Port Vue failed to complete. (N.T. at 59, 201-02; R.R. at 139a, 281a-
    82a.) Indeed, it is precisely because the discovery of Port Vue’s breach would have
    8
    Respectfully, in an apparent attempt to impugn the trial court’s factual findings, the Dissent
    also creates a heightened due diligence standard for governmental entities that enter public contracts
    to place a legal duty on the Authority to affirmatively discover the fact that Port Vue did not complete
    the project, even though, as the Dissent concedes, Port Vue engaged in fraudulent concealment when
    it misrepresented to the Authority that it had indeed completed all the work required under the
    contract. See Caruli, slip op. at 13 n.8 (dissenting opinion) (“I cannot agree with the Majority that
    the Authority had no duty to its taxpayers to inspect the work before it handed out taxpayer funds
    under a public contract.”); id. at 14 (“In examining when the Authority in the exercise of reasonable
    diligence should have known the injury caused by Port Vue’s insufficient work, the trial court erred
    in failing to recognize the Authority’s failure to comply with its own obligations to taxpayers.”).
    Not only is this theory entirely novel and unfounded in the law, it is incongruous for the
    Dissent to wave a banner in the name of taxpayer money, when it would be the taxpayers who would
    ultimately have to pick up the tab for Port Vue’s fraudulent concealment and breach of contract.
    Moreover, nothing in Fine compelled the trial court to apply a test that exceeded the standard of
    reasonable diligence.
    25
    been difficult if not impossible to discover that the Authority reasonably relied upon
    Port Vue’s representations. The trial court’s findings on this matter were supported by
    the evidence and establish a circumstance to which the application of the doctrine of
    fraudulent concealment is amply justified. Therefore, we conclude that the trial court
    did not err in applying the doctrine of fraudulent concealment to the facts that it found.
    II.    Damages
    Port Vue’s challenge to the amount of the damages awarded is likewise
    unpersuasive. Port Vue suggests that the absolute limit of the damages available to the
    Authority was the amount that Port Vue charged the Authority for the work that it failed
    to perform. This is incorrect as a matter of basic contract law.
    Port Vue is correct that contract damages are traditionally awarded to
    protect an injured party’s expectation interest, reliance interest, or restitution interest.
    Trosky, 652 A.2d at 817. However, the Authority’s expectation interest was not merely
    the amount that it paid Port Vue for the uncompleted work, as Port Vue suggests. The
    Authority’s expectation interest was the amount needed to put the Authority in “as good
    a position as [it] would have been had the contract been performed, that is, had there
    been no breach.” Id. Had there been no breach, the Authority would have incurred no
    additional costs beyond what it paid Port Vue for the work. Instead, due to Port Vue’s
    breach and its refusal to remedy it, the Authority was required to find another party to
    complete the work that Port Vue did not.
    It is long-settled law that “[w]here the subject of a contract relates to
    building or construction, the measure of damages is the reasonable cost to the owner
    of completing the contract . . . .” John Conti Co. v. Donovan, 
    57 A.2d 872
    , 875 (Pa.
    1948). “Pennsylvania courts . . . have generally allowed damages for incomplete or
    defective performance of a building contract to be measured by the cost of completing
    26
    the work or correcting the defects by another contractor.” Douglass v. Licciardi
    Construction Co., Inc., 
    562 A.2d 913
    , 915-16 (Pa. Super. 1989). In suggesting that the
    Authority was entitled only to a return of the funds that it paid it for the uncompleted
    work, Port Vue wholly neglects this measure of damages. Accordingly, Port Vue fails
    to demonstrate that the trial court’s damage award was excessive.9
    In light of all of the above, the order of the trial court is affirmed.
    ________________________________
    PATRICIA A. McCULLOUGH, Judge
    9
    We recognize that the Authority refers to costs that it incurred as a result of Port Vue’s breach
    in excess of the $39,033.69 that the trial court awarded it. However, the Authority does not presently
    seek a greater damage award than it received, and instead argues only for affirmance of the trial
    court’s order. Thus, at this juncture, we can merely state that Port Vue has not established that the
    damage award was excessive.
    27
    IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    Carmen Carulli and Barbara Carulli,     :
    husband and wife                        :
    :
    v.                       :
    :     No. 1246 C.D. 2020
    North Versailles Township Sanitary      :
    Authority                               :
    :
    v.                       :
    :
    Port Vue Plumbing, Inc.,                :
    Appellant              :
    ORDER
    AND NOW, this 4th day of October, 2022, the October 28, 2020 entry
    of judgment by the Court of Common Pleas of Allegheny County is AFFIRMED.
    ________________________________
    PATRICIA A. McCULLOUGH, Judge
    IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    Carmen Carulli and Barbara Carulli,       :
    husband and wife,                         :
    :
    v.                           :
    :
    North Versailles Township                 :
    Sanitary Authority                        :
    :
    v.                           :
    :
    Port Vue Plumbing, Inc.,                  :   No. 1246 C.D. 2020
    Appellant                :   Argued: October 18, 2021
    BEFORE:      HONORABLE PATRICIA A. McCULLOUGH, Judge
    HONORABLE MICHAEL H. WOJCIK, Judge
    HONORABLE CHRISTINE FIZZANO CANNON, Judge
    OPINION NOT REPORTED
    DISSENTING OPINION
    BY JUDGE FIZZANO CANNON                       FILED: October 4, 2022
    Respectfully, I dissent. Our Supreme Court held in Fine v. Checcio that
    “a statute of limitations that is tolled by virtue of fraudulent concealment begins to
    run when the injured party knows or reasonably should know of his injury and its
    cause.” 
    870 A.2d 850
    , 861 (Pa. 2005). While I agree with the Majority that the
    doctrine of fraudulent concealment applies to the instant matter, the North Versailles
    Township Sanitary Authority (Authority) had an obligation to protect the public,
    whose funds were utilized to pay for the project, by exercising reasonable diligence
    in accordance with the terms of the public contract. The Court of Common Pleas of
    Allegheny County (trial court) abused its discretion1 by failing to consider the terms
    of the contract that was formulated for the benefit and protection of the public
    through a public bidding process. Accordingly, although I would affirm the trial
    court’s conclusion that the doctrine of fraudulent concealment is applicable to toll
    the statute of limitations, I cannot agree with the Majority’s extension of the statute
    of limitations, in complete disregard of the precedent of Fine, because, as a result,
    the Majority condones the disbursement of public funds in the face of a lack of any
    diligence, much less reasonable diligence, on the part of the Authority. Therefore, I
    would reverse the trial court’s determination that the statute of limitations had not
    expired when this matter was filed. The statute of limitations did not first begin to
    run upon the flooding of residences with raw sewage in March of 2012, as the trial
    court determined, but rather, began to run when the Authority, in the exercise of
    reasonable diligence, should have known the work was not completed as required
    and that the contractor had fraudulently concealed its failure to fulfill the scope of
    work.
    In Fine, our Supreme Court explained:
    [R]easonable diligence is not an absolute standard, but is
    what is expected from a party who has been given reason
    to inform himself of the facts upon which his right to
    1
    “Our standard of review of a non-jury trial is to determine whether the findings of the
    trial court are supported by [substantial] evidence, and whether an error of law was committed.”
    Slack v. Slack, 
    256 A.3d 472
    , 477 (Pa. Cmwlth. 2021) (quoting City of Philadelphia v. Galdo, 
    181 A.3d 1289
    , 1291 n.2 (Pa. Cmwlth. 2018), aff’d, 
    217 A.3d 811
     (Pa. 2019), and Swift v. Dep’t of
    Transp., 
    937 A.2d 1162
    , 1167 n.5 (Pa. Cmwlth. 2007)) (quotation marks omitted).
    As the plaintiff in its joinder complaint against Port Vue Plumbing, Inc. (Port Vue), the
    North Versailles Sanitary Authority (Authority) had the burden of proving fraudulent concealment
    by clear, precise, and convincing evidence. See Fine v. Checcio, 
    870 A.2d 850
    , 860 (Pa. 2005)
    (citing Molineux v. Reed, 
    532 A.2d 792
    , 794 (Pa. 1987)). Whether estoppel arising from fraudulent
    concealment applies under a set of established facts is a question of law. Fine, 870 A.2d at 860.
    CFC - 2
    recovery is premised. As we have stated: “There are
    [very] few facts which diligence cannot discover, but there
    must be some reason to awaken inquiry and direct
    diligence in the channel in which it would be successful.
    This is what is meant by reasonable diligence.” Crouse v.
    Cyclops Indus[.], . . . 
    745 A.2d 606
    , 611 ([Pa.] 2000)
    (quoting Deemer v. Weaver, . . . 
    187 A. 215
    , 217 ([Pa.]
    1936) (citation omitted)). Put another way, “the question
    in any given case is not, what did the plaintiff know of the
    injury done him? But, what might he have known, by the
    use of the means of information within his reach, with the
    vigilance the law requires of him?” Scranton Gas &
    Water Co. v. Lackawanna Iron & Coal Co., . . . 
    31 A. 484
    ,
    485 . . . ([Pa.] 1895). While reasonable diligence is an
    objective test, “it is sufficiently flexible . . . to take into
    account the differences between persons and their capacity
    to meet certain situations and the circumstances
    confronting them at the time in question.” Crouse, 745
    A.2d at 611 (quotation omitted). Under this test, a party’s
    actions are evaluated to determine whether he exhibited
    “those qualities of attention, knowledge, intelligence and
    judgment which society requires of its members for the
    protection of their own interest and the interest of others.”
    Id.
    ....
    . . . [T]he standard of reasonable diligence, which is
    applied to the running of the statute of limitations when
    tolled under the discovery rule, also should apply when
    tolling takes place under the doctrine of fraudulent
    concealment. This is, we believe, the standard that will
    serve one of the overarching tenets in this area of our
    jurisprudence -- the responsibility of a party who seeks to
    assert a cause of action against another to be reasonably
    diligent in informing himself of the facts upon which his
    recovery may be based. Pocono [Int’l Raceway, Inc. v.
    Pocono Produce, Inc., 
    468 A.2d 468
    , 471 (Pa. 1983)].
    Moreover, because the doctrine captures even
    unintentional conduct on a defendant’s part and the
    standard of reasonable diligence requires from a party only
    that knowledge which is reasonably attained under the
    circumstances, we do not believe that deviation from that
    CFC - 3
    standard to a higher threshold of knowledge is warranted.
    Thus, we conclude that a statute of limitations that is tolled
    by virtue of fraudulent concealment begins to run when
    the injured party knows or reasonably should know of his
    injury and its cause.
    Fine, 870 A.2d at 858 & 861 (additional quotation marks omitted).
    Whether and when the statute of limitations began to run after the
    application of the fraudulent concealment doctrine is the exact question that must be
    addressed in resolving this matter. As observed above, and as will be discussed
    further below, a determination of the Authority’s contractual obligation is a question
    of law. Moreover, although the trial court was the finder of fact responsible for
    determining the weight of the evidence, the record contains a number of critical facts
    the trial court failed to consider. I review them here, not to opine on their weight,
    but simply to highlight the inadequacy of the trial court’s analysis.
    First, the “Scope of Work” for this public project required that Port Vue
    Plumbing, Inc. (Port Vue) provide “As-Built” Drawings to the Authority clearly
    showing where the pipe bursting ended. The bid specifications provided, in pertinent
    part, as follows:
    “Record” or “As-Built” Drawings
    The Contractor shall be responsible for supplying a clean
    and legible set of final drawings clearly showing the final
    position of all equipment or materials used in construction
    of the project. This set of drawings must be turned over to
    the Engineer and approved by the Owner before the final
    payment is released on the project. This drawing must be
    on the same data set as the existing drawing and a
    CAD.dwg file of the manholes supplied.
    Bid, Div. V, Scope of Work, Part 4.00, § 4.04(.01); Reproduced Record (R.R.) at
    352a. Thus, the Scope of Work could not be deemed completed, allowing for the
    disbursement of final payment under the contract, until these drawings were
    CFC - 4
    provided by Port Vue to the Authority. Id. Despite this, the Authority’s engineer
    never required or collected as-built drawings from Port Vue for the Authority’s pre-
    payment review. See Notes of Testimony, Nov. 21, 2016 (N.T.) at 32-33; R.R. at
    112a-13a. The Authority’s engineer, Donald Glenn (Glenn), testified that under the
    contract, Port Vue was to furnish these as-built drawings. N.T. at 32; R.R. at 95a.
    He stated he did not personally request that Port Vue submit as-built drawings after
    the contract was completed but that the request “would have come from one of my
    other people at the office.” Id. Glenn testified that, to his knowledge, Port Vue did
    not supply Glenn Engineering or the Authority with as-built drawings. N.T. at 32-
    33; R.R. at 95a-96a. The trial court erred by failing to identify the lack of as-built
    drawings as a failure by Port Vue to complete the scope of work for the project,
    precluding its entitlement to final payment. The trial court also erred by failing to
    identify the failure to provide as-built drawings as the point at which the Authority,
    in the exercise of reasonable diligence, should have known that Port Vue
    fraudulently concealed that the project had not been completed to contract
    specifications.
    Based upon Port Vue’s conduct, one might suppose that such
    drawings, if produced, may well have included further fraudulent concealment of
    the deficiency of the contractor’s work. Nonetheless, it may have forced the
    contractor to memorialize any alleged excuse it had for failing to complete the scope
    of work that was included in the bid, despite the absence of any change orders. The
    Authority’s failure to exercise its right to obtain these contractually required as-built
    drawings represents a failure to exercise reasonable diligence on behalf of taxpayers
    that could have revealed the shortcomings of the work.
    CFC - 5
    Additionally, I note that, unlike a party to a private contract, the
    Authority did not have a right to waive terms included in the bid specifications after
    acceptance of those terms. As our Supreme Court has observed, “[t]he obvious
    intent of a public competitive bidding requirement is to secure public contracts for
    the use of the government or a governmental body at the lowest cost to the
    taxpayers.” Willman v. Children’s Hosp. of Pittsburgh, 
    479 A.2d 452
    , 456 (Pa.
    1984). Further,
    [b]idding requirements are for the purpose of inviting
    competition, to guard against favoritism, improvidence,
    extravagance, fraud and corruption in the awarding of
    municipal contracts, and to secure the best work or
    supplies at the lowest price practicable, and are enacted for
    the benefit of property holders and taxpayers, and not for
    the benefit or enrichment of bidders, and should be so
    construed and administered as to accomplish such purpose
    fairly and reasonably with sole reference to the public
    interest.
    Yohe v. City of Lower Burrell, 
    208 A.2d 847
    , 850 (Pa. 1965) (internal quotation
    marks omitted) (quoting 10 McQuillan, Municipal Corporations § 29.19, at 266-67
    (3d ed. 1950)). “The statutory mandate of competitive bidding is grounded in sound
    public policy.” Hanisco v. Twp. of Warminster, 
    41 A.3d 116
    , 123 (Pa. Cmwlth.
    2012) (quoting Philips Bros. Elec. Contractors, Inc. v. Pa. Tpk. Comm’n, 
    960 A.2d 941
    , 945 (Pa. Cmwlth. 2008)).
    [I]t is the taxpaying citizen who provides the necessary
    funds and whose interest must be protected. Moreover,
    even if the purpose of an award is to benefit the public
    . . . , private negotiations between the party awarding the
    contract and a successful bidder through which the terms
    and conditions of the competitive bids are modified or
    changed, are not in keeping with the purpose of
    competitive bidding.
    CFC - 6
    
    Id.
     (internal quotation marks, brackets, and citation omitted). Notwithstanding that
    the Authority was not provided as-built drawings pursuant to the terms of the
    contract, the exercise of reasonable diligence required it to ensure that the project
    was completed before releasing final payment of public funds to Port Vue.
    The Authority did not have the power either to waive Port Vue’s
    obligation to supply as-built drawings of the completed project or to excuse its own
    obligations to the taxpaying public to inspect the project’s completion prior to
    issuing final payment. On the contrary, the Authority, through its engineer, had an
    obligation to conduct a final review to ensure actual completion of the project prior
    to verifying project completion for the purpose of subcontractor payment. See Bid,
    Div. VI, Contract Provisions, art. 1, § 1.06(.2); R.R. at 363a. No party disputes that
    this required inspection did not occur. Glenn expressly acknowledged the inspection
    requirement, but testified that, notwithstanding this obligation, he certified the
    completion of Port Vue’s work without inspecting it. See N.T. at 53; R.R. at 133a.2
    In fact, the trial court specifically stated: “The final payment application was sent to
    Glenn Engineering because it was the engineer’s responsibility to make certain the
    contractor performed the work in accordance with the bid documents and was paid
    accordingly.” R.R at 72a.
    Regarding this contractual obligation, the Majority states that
    [n]owhere in this contractual language is it stated that the
    Authority was obligated to send someone to climb down
    every single manhole encompassed within the project and
    to inspect every foot of pipe required to be replaced,
    merely to verify that Port Vue was truthful in representing
    that it had completed the work contracted for.
    2
    Glenn acknowledged that neither he nor anyone from his office conducted any type of
    inspection before certifying completion of the job. N.T. at 53; R.R. at 133a.
    CFC - 7
    Carulli v. N. Versailles Twp. Sanitary Auth. (Pa. Cmwlth., No. 1246 C.D. 2020, filed
    Oct. 4, 2022), slip op. (Maj. Op.) at 21. This observation misses the point. The
    Authority owed a duty to the public to exercise its rights under the contract, and the
    contract specifically called for inspections by the Authority’s engineer as the work
    progressed. That means that the Authority had a duty to taxpayers to exercise its
    right to inspect when the excavation was open, manhole to manhole, as the work was
    performed.    In fact, the contract itself underscored the importance of such
    inspections by giving the Authority the power to inspect the work even if the
    contractor had already finished the work and filled in the ground covering the pipes:
    The Engineer shall be furnished with every reasonable
    facility for ascertaining that the work is in accordance with
    the requirements and intentions of this contract; even to
    the extent of uncovering or taking down portions of
    finished work. Should this be deemed necessary and . . .
    should the work exposed or examined prove
    unsatisfactory, the uncovering, taking down and replacing
    in a satisfactory manner shall be at the expense of the
    Contractor.
    Bid, Div. VI, Contract Provisions, art. 1, § 1.02(.1)(c); R.R. at 361a (emphasis
    added).
    The parties here had options concerning the materials to be used and
    the inspection procedures to be followed, and they specified their agreed-upon
    choices in the contract. See Bid, Div. IX, Engineering Specifications; R.R. at 408a-
    85a. The contract provided that the engineer would be the Authority’s representative
    during construction until final payment was due. Bid, Div. VI, Contract Provisions,
    art. 1, § 1.01(.2); R.R. at 353a. The contract further provided that the engineer would
    visit the site at appropriate intervals to become familiar with the progress and
    quality of work. Id. § 1.01(.4); R.R. at 353a. The contract required Port Vue to have
    CFC - 8
    copies of the contract documents and an additional set of plans at the work site for
    use by the engineer and the Authority and further required observation of the work
    at all times by the engineer and the Authority. Id. § 1.01(.4-.5); R.R. at 353a; see
    also Bid, Div. VI, Contract Provisions, art. 3, § 3.11(.1); R.R. at 366a. Importantly,
    the Authority had the right under the contract to inspect the project as it was
    proceeding, including uncovering and examining completed portions of the work.
    See Bid, Div. VI, Contract Provisions, art. 1, § 1.02(.1)(c); R.R. at 361a. The trial
    court erred by failing to address the impact of all of the rights of inspection that the
    Authority had under the contract, as well as its failure to exercise those rights in the
    interest of taxpayers. These factors must be considered in determining whether the
    Authority exercised reasonable diligence.
    The Majority disposes of Port Vue’s argument that the Authority had a
    contractual obligation to inspect and, thus, discover its breach of contract earlier, by
    pointing to the trial court’s findings that (1) camera technology needed to inspect the
    pipe work was not readily available to the Authority in 2003, and (2) sending
    someone down manholes to physically inspect the sewer line was difficult and
    dangerous. See Maj. Op. at 17. However, Glenn conceded during his testimony that
    the work could have been physically inspected at any time without the aid of any
    type of camera, although he qualified the concession by stating that “[i]t would take
    a lot of effort to do that,” explaining that “[y]ou would have to climb down, get a
    flashlight, [and] shine it[.]”3 N.T. at 56; R.R. at 136a. The trial court never addressed
    Glenn’s admission that a visual inspection that included climbing into the manholes
    3
    While Glenn testified that, in the absence of camera equipment, one cannot physically
    inspect the entirety of the pipe sleeve placed between manholes because the pipe is 18-20 feet deep
    and there is no excavation the length of the pipe, he conceded that one could see the excavation at
    the beginning of the project and the sleeve at the end. N.T. at 25-26; R.R. at 105a-06a.
    CFC - 9
    and shining flashlights up the pipes to confirm the liner was in place was certainly
    within the Authority’s power and ability. See N.T. at 56; R.R. at 136a. Instead, the
    trial court simply reasoned that there would have been no way for an inspector to
    visibly inspect the length of the sleeve that had been placed in the ground between
    manholes CR 764 and CR 767 because the pipe was 18-20 feet deep and there was
    no excavation in that area. R.R. at 73a. However, as Glenn’s admission established,
    the length of the line did not have to be seen from above through an excavation, but
    could be seen from within the manhole with a flashlight. That such physical
    inspection was possible is further confirmed by the fact that, after the pipe collapse
    that occasioned this action, the Authority ascertained the line collapse through both
    physical observation and the use of a camera. See N.T. at 28-29; R.R. at 108a-09a.
    The post-collapse “physical inspection” of the sewage line involved an individual
    physically climbing down a ladder into the manhole and then shining a flashlight up
    the sewer line to observe the collapsed terra cotta piping – the very process that could
    have been used to inspect the sewer line for completion. See N.T. at 28; R.R. at
    108a. Thus, physical inspection of the pipeline to determine whether the piping
    sleeve had been inserted and attached to the manholes as contracted, even if perhaps
    inconvenient, was certainly possible. The trial court erred in failing to consider this
    express admission by the Authority.
    Unlike the Majority, I do not view conducting a visual inspection of a
    pipeline by descending into a manhole as “difficult and dangerous.” Maj. Op. at 17.
    On the contrary, where the contract empowered the Authority to confirm project
    completion prior to final payment, assuming camera equipment to aid in such an
    inspection was not yet readily available, and even appreciating that inspection of
    every foot of sewer pipe between manholes where surface digging had not occurred
    CFC - 10
    would have presented practical logistical difficulties, I would hold that the Authority
    was obligated to the public, at a minimum, to conduct a visual inspection to confirm
    whether the sewer pipe sleeve had been extended to the manholes as contracted,
    which the Authority’s own witness acknowledged would have been readily
    determinable by descending into manholes and shining flashlights into the sewer
    pipes. See N.T. at 56; R.R. at 136a. To hold otherwise would render the inspection
    requirements meaningless.
    Further, to the extent that Occupational Safety and Health
    Administration (OSHA) standards would have required multiple persons to be
    present for an inspection that involved an individual physically descending into a
    manhole,4 there was no evidence that such a requirement rendered a visual inspection
    so difficult or dangerous as to excuse the Authority of its contractual obligation to
    inspect. Presumably, a sewer authority is accustomed to sending individuals into
    manholes to inspect lines, and following OSHA standards would have ensured the
    safety of such an inspection. Further, and notably, the Authority knew at the time
    that it entered into the contract what capabilities it had for inspection and,
    presumably, did not obligate itself to inspections it could not conduct.
    In addition, and significantly, even accepting, arguendo, the Majority’s
    conclusion that the use of camera equipment and the descent of personnel into
    manholes for inspection were not feasible, the Authority still had the means,
    pursuant to the contract, to inspect the work as it progressed to verify the completion
    of the work. Further, as explained above, the Authority also had the power to compel
    the contractor to uncover finished portions of the work to facilitate inspection. See
    Bid, Div. VI, Contract Provisions, art. 1, § 1.02(.1)(c); R.R. at 361a.
    4
    See N.T. at 199-200; R.R. at 279a-80a.
    CFC - 11
    Moreover, Port Vue’s false representation regarding the completion of
    the work did not obviate the Authority’s responsibility to conduct the pre-final
    payment inspection.          While I appreciate that, based on the parties’ previous
    professional relationship, the Authority did not suspect that Port Vue’s
    representations were not truthful,5 the Authority still was obligated to protect
    taxpayers by inspecting the final work product and confirming the proper completion
    thereof, not simply taking the contractor’s word that the work had been completed.
    If, in fact, “conducting a video inspection of a newly installed sewer line was not a
    standard practice at the time[,]” the Authority still had an obligation to the public to
    inspect using methods that were available and within the Authority’s power. Trial
    Court’s Opinion on Remand at 6; R.R. at 73.2a. As Glenn admitted,6 a visual
    inspection that included climbing into the manholes and shining flashlights along
    the pipes or having the work uncovered to confirm the liner was in place was
    certainly within the Authority’s power and ability. See N.T. at 56; R.R. at 136a. In
    fact, as explained above, such a visual inspection was actually employed in 2012 to
    inspect the sewer pipe post-collapse. See N.T. at 28; R.R. at 108a. It is undisputed
    that the Authority failed to employ this readily available inspection method, which
    would have confirmed, at a minimum, whether the pipe sleeve was connected to the
    5
    See Maj. Op. at 12.
    6
    “The statements of a third person may be considered the admissions of a party if they are
    bound to that party because of agency, joint or common interest, or having vouched for their
    credibility and impliedly asserted that fact by calling the third person as a witness.” Durkin v.
    Equine Clinics, Inc., 
    546 A.2d 665
    , 670 (Pa. Super. 1988) (citing Zank v. W. Penn Power Co., 
    82 A.2d 554
    , 555 (Pa. Super. 1951)). A trial court abuses its discretion when it ignores a party’s
    admission. Rizzo v. Haines, 
    555 A.2d 58
    , 69 (Pa. 1989) (citing Silco Vending Co. v. Quinn, 
    461 A.2d 1324
    , 1327 (Pa. Super. 1983)).
    CFC - 12
    manholes, so as to fulfill the Authority’s obligation to inspect and confirm the
    completion of the contracted work before releasing payment therefor.
    As the Fine Court observed, there are few facts that cannot be
    discovered through reasonable diligence. 870 A.2d at 858 (first quoting Crouse, 745
    A.2d at 611; and then quoting Deemer, 187 A. at 217). The requisite degree of
    diligence varies with the circumstances, depending on the information within the
    plaintiff’s reach and the degree of vigilance the law requires of him. Fine, 870 A.2d
    at 858 (first quoting Scranton Gas, 31 A. at 485; and then citing Crouse, 745 A.2d
    at 611). Here, as explained above, the trial court’s decision, contrary to our Supreme
    Court’s analysis in Fine, failed to include consideration of the information that was
    within the Authority’s reach, i.e., its contractual authority to inspect the work, even
    by compelling the contractor to uncover the work if necessary. Also contrary to the
    requirements of Fine, the trial court failed to consider the degree of vigilance
    required of the Authority under the circumstances, where public money was being
    expended on the project and the specific contract at issue was formulated to provide
    the Authority with inspection rights that would have protected the taxpayers from
    the very kind of fraud that occurred.
    Contrary to the Majority’s mischaracterization, this opinion would not
    impose on government entities a heightened diligence requirement, nor would it
    create a new, universal legal duty of inspection.7 Rather, this opinion seeks to apply
    a reasonable diligence standard that already exists in our legal precedent, as defined
    by our Supreme Court in Fine. I merely observe that, under the facts of this case, as
    in any case involving the discovery rule or doctrine of fraudulent concealment, and
    7
    Nonetheless, I cannot agree with the Majority that the Authority had no duty to its
    taxpayers to inspect the work before it handed out taxpayer funds under a public contract.
    CFC - 13
    possible tolling of the statute of limitations, the trial court was required to consider
    when the Authority should have discovered the fraudulent concealment. Requiring
    such an analysis does not mean that the Authority lacked recourse for Port Vue’s
    fraudulent concealment. It merely requires that the claim against Port Vue had to be
    brought within the statute of limitations, which started to run when it should have
    known in the exercise of reasonable diligence that the work was not completed as
    required despite Port Vue’s attempt to conceal that fact. This Court does not find
    facts, but simply concludes that the trial court improperly failed to consider facts
    that are relevant to when, in the exercise of reasonable diligence, the Authority
    should have known of the fraud. The trial court here abused its discretion when it
    failed to properly analyze that issue. The trial court failed to consider that North
    Versailles Township released funds without requiring completion of the scope of
    work, including the provision of the as-built drawings; that the negotiated terms of
    the public contract contained a plethora of opportunities to inspect the work, both
    during the progress of the work and upon completion, including requiring Port Vue
    to excavate and uncover the work if necessary; and that the Authority’s engineer
    admitted that the work could also have been viewed by going down the manhole and
    using a flashlight.
    In summary, while Port Vue’s conduct was reprehensible and justified
    the invocation of the doctrine of fraudulent concealment, that conduct in no way
    prevented the Authority from exercising its own contractual rights and fulfilling its
    obligations to the public to inspect Port Vue’s work or to obtain as-built drawings as
    part of the scope of the work. Complying with these obligations would have revealed
    the deficiencies of Port Vue’s work, i.e., that the terra cotta piping had not been
    replaced with sleeving as contracted to at least one manhole covered by the bid
    CFC - 14
    specifications. In examining when the Authority in the exercise of reasonable
    diligence should have known the injury caused by Port Vue’s insufficient work, the
    trial court erred in failing to recognize the Authority’s failure to comply with its own
    obligations to taxpayers. Therefore, while I agree that the four-year statute of
    limitations was initially tolled in this matter by Port Vue’s fraudulent concealment
    of its deficient work product, I would find that the statute of limitations began to run
    anew upon the Authority’s failure to require the as-built drawings that may have
    revealed the deficiencies in Port Vue’s work, or upon its failure to conduct the
    inspections that certainly would have exposed those deficiencies.8
    Accordingly, I respectfully dissent.
    ________________________________
    CHRISTINE FIZZANO CANNON, Judge
    8
    Because this failure to inspect could have occurred at any time prior to final payment, I
    would set the date the statute of limitations began to run as the date of the Authority’s final payment
    to Port Vue.
    CFC - 15
    

Document Info

Docket Number: 1246 C.D. 2020

Judges: McCullough, J. ~ Dissenting Opinion by Fizzano Cannon, J.

Filed Date: 10/4/2022

Precedential Status: Precedential

Modified Date: 10/4/2022