  •            IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    Metropolitan Edison Company                   :
    :
    v.                              :   No. 2188 C.D. 2014
    :   Argued: September 17, 2015
    City of Reading,                              :
    Appellant         :
    BEFORE: HONORABLE DAN PELLEGRINI, President Judge
    HONORABLE RENÉE COHN JUBELIRER, Judge
    HONORABLE P. KEVIN BROBSON, Judge
    OPINION BY JUDGE BROBSON                          FILED: October 15, 2015
    The City of Reading (Reading) appeals from an order of the Court of
    Common Pleas of Berks County (trial court), which held that Reading was not
    immune from liability in a suit initiated by Metropolitan Edison Company
    (Met-Ed). The trial court further held that Reading was negligent and awarded
    Met-Ed $53,000 in damages. We now reverse.
    On July 7, 2009, Reading began excavating a site located on the 200
    block of North 5th Street, Reading, Pennsylvania. (Reproduced Record (R.R.)
    at 416a.) The goal of the excavation was to uncover Reading’s sanitary sewer
    main in order to conduct a repair. (Id.) During the course of the excavation,
    Reading encountered an electrical duct bank1 owned by Met-Ed. (Id. at 417a.)
    Reading employees observed that the duct bank was in poor condition and was
    1
    An electrical duct bank is “a series of conduits or ducts” comprised of PVC or terra
    cotta piping, which encases underground electrical wire. (R.R. at 293a-94a.)
    unstable. (Id. at 296a-97a, 349a.) Specifically, part of the concrete encasing the
    duct bank had collapsed. (Id. at 332a.) Reading contacted Met-Ed’s Supervisor of
    Regional Operations, Kenneth Sweitzer, to notify Met-Ed of the condition of its
    duct bank. (Id. at 331a.) Mr. Sweitzer contacted Met-Ed’s contractor, Allen
    Homan, to inspect and repair the duct bank. (Id. at 332a.) Mr. Homan completed
    the repair of the duct bank on July 10, 2009. (Id. at 298a.) Reading resumed its
    excavation work, but, on July 15, 2009, Reading employees noticed that the duct
    bank was falling away from the wall. (Id. at 420a.) Mr. Homan returned to the site
    and found that the excavated hole was deeper and there was further erosion, but the
    repaired duct bank was still intact. (Id. at 298a-99a.) There was no shoring in
    place to prevent further erosion. (Id. at 299a.) Reading continued its excavation
    work, but, on July 20, 2009, the duct bank fully collapsed.           (Id. at 352a.)
    Mr. Homan conducted an extensive repair of the duct bank, which involved the
    removal of the collapsed portions of the duct bank and the installation of a new
    duct bank. (Id. at 302a.)
    Met-Ed filed a complaint with the trial court, alleging that Reading’s
    negligence caused the collapse of the duct bank. Reading filed a motion for
    summary judgment, asserting that it was immune from liability pursuant to
    Section 8541 of what is commonly referred to as the Political Subdivision Tort
    Claims Act (Act).2 The trial court denied Reading’s motion and conducted a bench
    trial. During the bench trial, Met-Ed presented the testimony of Mr. Homan.
    Mr. Homan testified that after completing the first repair of the duct bank, he
    informed the Sewer Department Supervisor, John Farrier, that Reading’s
    2
    42 Pa. C.S. § 8541.
    2
    excavation and repair needed to be completed as soon as possible, so that the hole
    could be backfilled. (Id. at 304a.) Mr. Farrier indicated that the work would be
    completed by the end of the week. (Id.) The excavated hole was not backfilled as
    of July 15, 2009, and Mr. Homan again warned Mr. Farrier that Reading’s work
    needed to be completed quickly. (Id. at 305a.) Mr. Homan indicated that if the
    hole was not promptly backfilled, “bad things” could happen. (Id.)
    On October 27, 2014, the trial court issued an amended verdict in
    favor of Met-Ed and adopted Met-Ed’s proposed findings of fact and conclusions
    of law.    The trial court issued an opinion on January 20, 2015, in which it
    concluded that Reading was not immune from liability. The trial court explained
    that Reading’s negligent conduct created a dangerous condition of the property.
    After Mr. Homan’s first repair of the duct bank, Reading was aware of the
    “unstable conditions of dirt and soil located underneath Met-Ed’s [duct] bank and
    the potential danger if the [duct] bank was not adequately supported.” (Trial Ct.
    Op. at 6.)      Reading had sufficient notice to install shoring and correct the
    dangerous conduct before the foreseeable duct bank collapse on July 20, 2009.
    Accordingly, Reading was not immune from liability. The trial court further held
    that Reading’s actions were negligent, and it awarded Met-Ed damages in the
    amount of $53,000. Reading appealed to this Court.
    The sole issue on appeal3 is whether Reading was immune from
    liability in the negligence suit initiated by Met-Ed. “Generally, local agencies are
    3
    “Our standard of review of a non-jury trial is to determine whether the findings of the
    trial court are supported by competent evidence, and whether an error of law was committed.”
    Swift v. Dep’t of Transp., 
    937 A.2d 1162
    , 1167 n.5 (Pa. Cmwlth. 2007), appeal denied, 
    950 A.2d 270
    (Pa. 2008).
    3
    immune from tort liability under Section 8541 of the . . . Act.” Gibellino v.
    Manchester Twp., 
    109 A.3d 336
    , 342 (Pa. Cmwlth. 2015). There are, however,
    exceptions to this immunity. See 42 Pa. C.S. § 8542. Section 8542(b)(5) of the
    Act, 42 Pa. C.S. § 8542(b)(5), provides:
    (b) Acts which may impose liability.--The following
    acts by a local agency or any of its employees may result
    in the imposition of liability on a local agency:
    (5)     Utility service facilities.--A dangerous
    condition of the facilities of steam, sewer, water,
    gas or electric systems owned by the local agency
    and located within rights-of-way, except that the
    claimant to recover must establish that the
    dangerous condition created a reasonably
    foreseeable risk of the kind of injury which was
    incurred and that the local agency had actual notice
    or could reasonably be charged with notice under
    the circumstances of the dangerous condition at a
    sufficient time prior to the event to have taken
    measures to protect against the dangerous
    condition.
    “Because of the clear intent to insulate government from exposure to tort liability,
    the exceptions to immunity are to be strictly construed.” Lockwood v. City of
    Pittsburgh, 
    751 A.2d 1136
    , 1139 (Pa. 2000). Under Section 8542(b)(5) of the Act,
    “liability depends first on the strictly legal determination that the injury was caused
    by a condition of the property itself, which has its origin or source in the property.”
    Miller v. Dep’t of Transp., 
    690 A.2d 818
    , 820-21 (Pa. Cmwlth. 1997). The term
    right-of-way, as it relates to the exception provided in Section 8542(b)(5) of the
    Act, “include[s] the strip of land on which the local agency construct[s] its utility
    service facilities.” 
    Id. at 820.
                 Reading cites Metropolitan Edison Company v. Reading Area Water
    Authority, 
    937 A.2d 1173
    (Pa. Cmwlth. 2007), in support of its contention that it is
    4
    immune from liability.4         In Metropolitan Edison Company, employees of the
    Reading Area Water Authority (water authority) struck and damaged a Met-Ed
    utility line during the course of an excavation. Met-Ed filed a suit against the
    water authority, alleging that the water authority failed to take reasonable steps to
    protect Met-Ed’s property pursuant to the Pennsylvania “One Call Act.”5 The
    water authority moved for summary judgment, asserting that it was immune from
    liability.     The trial court granted the water authority’s motion, and Met-Ed
    appealed to this Court. On appeal, Met-Ed argued that “the design, construction,
    installation and maintenance of [the water authority]’s water line, in close
    proximity to Met-Ed’s utility line, constitute[d] a dangerous condition of [the water
    authority]’s water distribution system.” Metro. Ed. 
    Co., 937 A.2d at 1175
    . This
    Court explained that to qualify for immunity under Section 8542(b)(5) of the Act,
    “the allegedly dangerous condition must have derived or originated from, or had its
    source as the local agency’s realty.” 
    Id. Met-Ed failed
    to allege that the dangerous
    condition originated with the water line. Instead, this Court reasoned that “the
    dangerous condition, as alleged, originated with the conduct of [the water
    authority]’s employees.” 
    Id. (emphasis added).
    The water authority, therefore,
    was immune from liability. Reading argues that the dangerous condition in the
    instant matter also originated with the conduct of its employees, and, thus, it is
    immune from liability. We agree.
    4
    Reading also argues that the “policy implications of a local agency being liable for its
    employees’ excavation activities require a reversal of the trial court’s ruling.” (Reading Br. at
    23.)
    5
    Act of December 10, 1974, P.L. 852, as amended, 73 P.S. §§ 176-86.
    5
    Here, the trial court noted that the dangerous condition was “the
    unstable condition[] of the dirt and soil located underneath Met-Ed’s [duct] bank.”
    (Trial Ct. Op. at 6.) The dangerous condition, however, did not originate from
    Reading’s facilities. Rather, the dangerous condition derived from the conduct of
    Reading’s employees during the excavation. Specifically, Reading’s employees
    removed the soil beneath the duct bank, did not use support or shoring to stabilize
    the duct bank, and did not promptly backfill the excavated hole. In this respect, the
    instant matter is analogous to Metropolitan Edison Company, wherein the conduct
    of the water authority’s employees created the dangerous condition.6                        The
    6
    Met-Ed argues that Metropolitan Edison Company is distinguishable from the instant
    matter, because the water authority’s employees in Metropolitan Edison Company directly
    caused the damage to Met-Ed’s utility line. Specifically, Met-Ed contends that although an
    agency may not be liable for damage it causes directly, an agency may, through its negligent
    conduct, create a dangerous condition of the property that later causes damage. Met-Ed cites
    DeTurk v. South Lebanon Township, 
    542 A.2d 213
    (Pa. Cmwlth. 1988), in support of this
    proposition. In DeTurk, South Lebanon Township and South Lebanon Township Authority
    (collectively, township) hired a contractor to assist in the construction of a water collection
    system. During the course of this construction, the contractor added a layer of asphalt to an
    adjacent alley, which raised the road surface by four inches. After the project was completed,
    the area experienced heavy rain, and the water ran off the road surface and into Glenn DeTurk’s
    (DeTurk) garage. In attempting to remove plywood sheets from his garage, DeTurk slipped and
    fell. DeTurk filed a complaint against the township for negligent construction of the water
    collection system, and the township filed a motion for summary judgment, asserting that it was
    immune from liability. The Court of Common Pleas of Lebanon County granted the township’s
    motion, explaining that there was insufficient evidence to show that the township had notice of a
    dangerous condition. DeTurk appealed to this Court, which reversed. We concluded that “the
    construction of the swale by the [t]ownship . . . place[d] them in the exception from immunity
    under Section 8542(b)(5) [of the Act].” 
    DeTurk, 542 A.2d at 215
    . Further, evidence that the
    water collection system was constructed to alleviate known problems concerning water run-off
    and evidence that the contractor damaged the swale during paving was sufficient to show that the
    township had constructive notice of the dangerous condition of the water collection system.
    The instant matter is distinguishable from DeTurk. In DeTurk, the dangerous condition
    derived from the road surface. As noted above, the dangerous condition here arose from
    (Footnote continued on next page…)
    6
    exception from immunity in Section 8542(b)(5) of the Act does not apply in this
    case, and Reading, therefore, is immune from liability.7
    Accordingly, we reverse the trial court’s order.
    P. KEVIN BROBSON, Judge
    (continued…)
    Reading’s excavation activities at the site—namely, removal of soil from beneath Met-Ed’s duct
    bank, failure to use proper shoring to stabilize the duct bank, and failure to promptly backfill the
    excavated hole.
    7
    Because we reverse the trial court’s order, we need not address Reading’s additional
    argument concerning the policy implications of affirming the trial court’s order.
    7
    IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    Metropolitan Edison Company           :
    :
    v.                        :   No. 2188 C.D. 2014
    :
    City of Reading,                      :
    Appellant     :
    ORDER
    AND NOW, this 15th day of October, 2015, the order of the Court of
    Common Pleas of Berks County is hereby REVERSED.
    P. KEVIN BROBSON, Judge
    

Document Info

Docket Number: 2188 C.D. 2014

Citation Numbers: 125 A.3d 499

Judges: Brobson, J.

Filed Date: 10/15/2015

Precedential Status: Precedential