City of Philadelphia v. S. Dvortsova ( 2021 )


Menu:
  •           IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    City of Philadelphia                        :
    :
    v.                             :   No. 1529 C.D. 2019
    :   Argued: November 9, 2020
    Svetlana Dvortsova,                         :
    Appellant                 :
    BEFORE:      HONORABLE MARY HANNAH LEAVITT, President Judge
    HONORABLE MICHAEL H. WOJCIK, Judge
    HONORABLE ELLEN CEISLER, Judge
    OPINION
    BY PRESIDENT JUDGE LEAVITT1                                     FILED: January 8, 2021
    Svetlana Dvortsova (Owner) appeals an order of the Court of Common
    Pleas of Philadelphia County (trial court) that imposed a statutory fine in the amount
    of $94,000 for violations of the Philadelphia Administrative Code (Code).2 Owner
    asserts that the trial court erred because she complied with the City of Philadelphia’s
    (City) stop work order. Alternatively, Owner asserts that the fine is excessive and
    unreasonable. Finally, Owner asserts that the trial court denied her procedural due
    process rights. Upon review, we reverse.
    Background
    On August 2, 2017, the City issued an initial notice of violation and
    order (Initial Notice and Order) after an inspection of Owner’s property (Property),
    which read in pertinent part:
    1
    This case was assigned to the opinion writer before January 4, 2021, when President Judge
    Leavitt served as President Judge.
    2
    THE PHILADELPHIA CODE, Title 4, Subcode A, added by Bill No. 960591-A of March 26, 1997,
    as amended.
    YOU ARE ORDERED TO CORRECT THE FOLLOWING
    VIOLATIONS PRIOR TO THE NEXT REINSPECTION
    DATE INCLUDED ON THIS NOTICE
    VIOLATIONS:
    The [Department of Licenses and Inspections (Department)] has
    issued a Stop Work Order for this premises. Erection,
    construction, alterations, installation, repairs, removal,
    demolition and other activities shall cease immediately and that
    the premises be vacated pending compliance because the
    erection, construction, alterations, installation, repairs,
    removal, demolition or other activity is being performed in or on
    this structure or premises, or any part thereof, without the
    required fire prevention permit. (See A-504.1)
    Location: Entire
    Sprinklers are needed for the continuation of work on the
    property[.]
    Reproduced Record at 15a (R.R.__) (emphasis added). Section A-504.1 of the Code
    authorizes the City to issue a stop work order and require that the premises be
    vacated. The Initial Notice and Order stated that fines in the range of $150 to $2,000
    could be imposed for each day the violation remained uncorrected.
    On January 26, 2018, following the reinspection of the Property, the
    City issued a final warning, which appears identical to the Initial Notice and Order
    issued on August 2, 2017. The City advised Owner that her “failure to correct the
    violations noted in this, and previous notices, requires the Department to pursue
    additional enforcement action against [her] as provided by law.” R.R. 18a.
    On July 25, 2018, the City initiated a suit in equity to require Owner’s
    compliance with the Code and impose fines. The trial court issued a rule to show
    cause why the City’s requested relief should not be granted and set a hearing date
    2
    for September 25, 2018. The hearing was continued to December 4, 2018, because
    the City had not personally served the complaint on Owner.
    On December 4, 2018, the parties appeared before the trial court and
    signed an agreement by which Owner agreed that by March 12, 2019, the next
    scheduled hearing, she would: (1) request the Department to “roll back” the building
    permit, which had then expired, or apply for a new building permit; (2) apply for “a
    sprinkler permit”; (3) arrange for an inspection of the Property; and (4) make “all
    reasonable efforts to comply” with requirements for the Property. Order to Comply
    by Agreement, 12/4/2018, at 2; R.R. 52a. The agreement stated that Owner’s failure
    to complete these actions in a timely fashion could result in the imposition of a daily
    fine in the amount of $150; nevertheless, Owner “reserve[d] the right to argue
    against imposition of any fines.” Id.
    On March 12, 2019, the parties signed another agreement before the
    trial court, in which Owner agreed that by June 4, 2019, the next scheduled hearing,
    she would: (1) obtain suppression, electrical, plumbing, and all other permits
    required to install a fire suppression or sprinkler system at the Property; (2) upon
    issuance of the permits, begin installation and “work in a workmanlike fashion to
    complete installation of the suppression system”; (3) schedule and pass all required
    inspections under the permits; and (4) take all reasonable steps to ensure that the
    Department “has marked the [C]ode violations as ‘complied.’” Order to Comply,
    3/12/2019, at 2; R.R. 55a. The agreement provided that Owner’s failure to complete
    these actions in a timely manner might result in the imposition of a daily fine in the
    amount of $150, and the trial court would determine, at the June 4, 2019, hearing,
    the sanctions to be imposed against Owner “for non-compliance with any of the
    terms of the Orders entered in this matter[.]” Id. at 2-3; R.R. 55a-56a. Likewise, the
    3
    agreement provided that Owner “reserves the right to argue against the imposition
    of any and all statutory fine amounts by [the trial court].” Id. at 2; R.R. 55a.
    At the June 4, 2019, hearing, the City presented evidence and testimony
    from its building inspector Saleem Muhammad. He described the Property as a
    three-story masonry building with the third story as “an addition.”          Notes of
    Testimony (N.T.), 6/4/2019, at 16; R.R. 134a. To allow for the third-story addition,
    the City issued a building permit in March 2015. Owner’s building plan showed that
    a sprinkler system would be installed at the premises.
    Muhammad explained that the City inspected the Property in July 2017,
    and at that time discovered that Owner had neither obtained a permit for a fire
    suppression system nor installed one. For this reason, the City issued the Initial
    Notice and Order on August 2, 2017. Muhammad testified that he did not do the
    inspection. He visited the Property but was unable to enter because it was sealed.
    Muhammad testified that by the December 4, 2018, hearing, the
    building permit had expired. Accordingly, the City “rolled back” the permit at
    Owner’s request in April 2019. The City issued Owner a “rough-in” permit “to put
    the piping in” for the fire suppression system. N.T. 25; R.R. 143a. However, work
    had not begun on the rough-in permit. Muhammad testified that the Property had
    been “sealed” and, thus, no work had been done there since August 2, 2017, when
    the Initial Notice and Order was issued. N.T. 42; R.R. 160a.
    Owner testified that she purchased the Property for investment, and it
    has been vacant since her purchase. In May 2017, three months before the Initial
    Notice and Order was issued, Owner learned that the City had revoked the building
    permit without notice while the construction was ongoing. Without the permit,
    Owner testified that she could not install a sprinkler system. She contacted the City
    4
    but was unable to get an answer. Owner acknowledged that she did not appeal the
    Initial Notice and Order; nevertheless, all construction work has stopped in
    accordance with the City’s stop work order. The City issued the rough-in permit for
    installation of the sprinklers after rolling back the building permit in April 2019.
    Trial Court Decision
    After the hearing, the trial court entered an order that imposed a fine
    against Owner in the amount of $94,000 for “violations of Title 4 of The Philadelphia
    Code of General Ordinances” as cited in the Initial Notice and Order. Trial Court
    Order, 6/4/2019, at 1. The trial court did not specify the Code provision that Owner
    violated; it determined, nevertheless, that the violations constituted “Class I
    violations” under the Code that have not been remedied, and the Property has posed
    “a threat to the health, safety, and welfare of the neighboring properties, first
    responders, and the general public.” Id. at 1-2. The $94,000 fine represented the
    $150 daily fine for the violations at the premises for 633 days. The trial court also
    ordered Owner to perform the following by August 4, 2019:
    a. Immediately schedule the required initial inspection and
    begin work to install fire suppression system under permit
    960522;
    b. Work continuously and in a workmanlike manner in
    accordance with the terms of permit [] 960522 to bring the
    subject premises into compliance with the [] Code;
    c. Timely schedule and pass all intermediate and final
    inspections required under permit [] 960522;
    d. Obtain and immediately begin work under any and all
    additional building, plumbing, electrical permits required to
    install a working fire suppression system to correct the [C]ode
    violations at the subject premises; and
    5
    e. Take all reasonable steps to ensure that the Department has
    marked the [C]ode violations as “complied.”
    Trial Court Order, 6/4/2019, at 1-2. The trial court further imposed a conditional
    fine in the amount of $150 per day if Owner failed to comply with the terms of the
    final order by August 4, 2019.
    Owner appealed. The trial court ordered Owner to file a Concise
    Statement of Errors Complained of on Appeal pursuant to PA. R.A.P. 1925(b). In
    her 1925(b) Statement, Owner argued, inter alia, that the trial court denied her due
    process. Owner was not able to access the court docketing system, which had been
    down for several weeks before the hearing. Nor was Owner able to introduce
    testimony from her contractor because he was unavailable on the date of the hearing.
    The trial court refused to postpone the hearing. Owner further argued that the trial
    court erred in imposing the fine because all construction work stopped in accordance
    with the Initial Notice and Order, and the Property has never been occupied. The
    City presented no evidence of a dangerous condition on the Property. As such,
    Owner argued that the fine was excessive.
    The trial court issued an opinion pursuant to PA. R.A.P. 1925(a), stating
    that Owner was properly fined because she did not bring the Property into
    compliance with the Code. The agreements of December 4, 2018, and March 12,
    2019, required Owner to obtain all permits required, complete all work necessary,
    and schedule and pass all inspections relating to the fire suppression system.
    However, Owner did not complete these actions by the time of the June 4, 2019,
    hearing. The trial court explained that the Code authorizes a fine of not less than
    $150 per day and not more than $300 per day for each offense, and the Property
    lacked a fire suppression system for over 600 days. Finally, the trial court rejected
    Owner’s due process claim.
    6
    Appeal
    On appeal,3 Owner raises three issues for our review, which we reorder
    and summarize as follows. Owner first argues that the record does not support the
    trial court’s conclusion that she violated the Initial Notice and Order. To the
    contrary, Owner argues that she complied with that Order and immediately stopped
    work on the Property. Second, Owner argues that the fine of $94,000 is excessive.
    Finally, Owner argues that the trial court denied her due process of law.
    Owner argues, first, that the trial court erred in imposing any fine
    because she complied with the Initial Notice and Order, which directed that all
    construction on the Property “cease immediately” and the premises “be vacated”
    until a fire prevention permit was issued. R.R. 15a. The Initial Notice and Order
    recited that sprinklers “are needed for the continuation of work on the [P]roperty,”
    but it did not cite a code provision for this statement. The only Code provision cited
    was the one authorizing a stop work order, i.e., Section A-504.1 of the Code. Id.
    (emphasis added). The City did not present any evidence that Owner did work on
    the Property after receiving the Initial Notice and Order. Rather, she terminated
    construction and the Property has been vacant since she purchased it. Because
    Owner complied with the Initial Notice and Order, there was no basis for a fine.
    The City counters that Owner admitted her violations of the Code by
    signing the agreements before the trial court on December 4, 2018, and March 12,
    3
    Owner initially appealed to the Superior Court, which transferred the case to this Court. When
    reviewing a trial court’s decision on whether there has been a violation of an ordinance, “our
    review is limited to determining whether the trial court abused its discretion or committed an error
    of law.” Commonwealth v. Holtzapfel, 
    895 A.2d 1284
    , 1286 n.1 (Pa. Cmwlth. 2006). Further,
    “[w]hether a fine is excessive under our Constitution is a question of law, therefore our standard
    of review is de novo and our scope of review is plenary.” Commonwealth v. Eisenberg, 
    98 A.3d 1268
    , 1279 (Pa. 2014).
    7
    2019. The City maintains that Owner has waived the argument that she complied
    with the Initial Notice and Order because she did not appeal the Order to the City’s
    Board of License and Inspection Review. The City argues that the record supports
    the trial court’s holding that, as of the June 4, 2019, hearing, Owner had failed “to
    obtain a full suppression system permit and to actually install the system.” City
    Brief at 16.
    The burden of proof in an action for a civil penalty rests upon the
    moving party. Commonwealth v. Whiteford, 
    884 A.2d 364
    , 366-67 (Pa. Cmwlth.
    2005) (where an ordinance did not provide for imprisonment in lieu of payment of a
    fine, the violations charged were civil in nature, and “normal civil burden” applies).
    The plaintiff must prove that the defendant violated the ordinance under which the
    penalty was imposed. The trial court, sitting as fact-finder, is free to believe all, part
    or none of the evidence, to make all credibility determinations, and to resolve all
    conflicts in the evidence. This Court cannot reweigh the evidence to reach a contrary
    factual conclusion. Holtzapfel, 
    895 A.2d at
    1289 n.2.
    Here, the City filed a civil complaint seeking an injunction and
    imposition of statutory fines based upon its allegation that Owner did not correct the
    violations set forth in the Initial Notice and Order. Complaint, ¶11; R.R. 9a. The
    Initial Notice and Order described the “violations” as “the erection, construction,
    alterations, installation, repairs, removal, demolition or other activity [] being
    performed in or on this structure or premises, or any part thereof, without the
    required fire prevention permit. (See A-504.1)…. Sprinklers are needed for the
    continuation of work on the property.” R.R. 15a (emphasis added).
    8
    Section A-504.1 of the Code, as cited in the Initial Notice and Order,
    authorizes the City to issue a stop work order. Section A-504.1 states in pertinent
    part as follows:
    The Department and, to the extent permitted under the
    [Pennsylvania] Construction Code Act[4] and Uniform
    Construction Code,[5] any Philadelphia Fire Department
    Battalion Chief is authorized to issue Stop Work Orders directing
    that erection, construction, alterations, installation, repairs,
    removal, demolition and other activities cease immediately and
    that the premises be vacated pending compliance with such
    orders whenever:
    1. Any structure or part thereof, including any adjoining or
    abutting structures, is found to be in a dangerous or unsafe
    condition due to inadequate maintenance, deterioration, damage
    by natural causes, fire, or faulty construction that it is likely to
    cause imminent injury to persons or property.
    2. Any erection, construction, alterations, installation, repairs,
    removal, demolition or other activity is being performed in or on
    any structure or premises, or part thereof, contrary to accepted
    construction practices or in a dangerous or unsafe manner which
    imperils life, safety or property, constitutes a fire or health
    hazard, or will interfere with a required inspection.
    3. Any erection, construction, alterations, installation, repairs,
    removal, demolition or other activity is being performed in or on
    any structure or premises, or any part thereof, without required
    permits.
    ***
    CODE §A-504.1.
    4
    Act of November 10, 1999, P.L. 491, as amended, 35 P.S. §§7210.101-7210.1103.
    5
    
    34 Pa. Code §§401.1-405.42
    .
    9
    The Initial Notice and Order directed that construction on the Property
    “shall cease immediately and that the premises be vacated pending compliance[.]”
    R.R. 15a. Owner did not appeal but, rather, stopped construction as the Initial Notice
    and Order directed. Muhammad, the City’s inspector, confirmed this fact, testifying
    that the Property has been “sealed” since August 2, 2017. N.T. 42; R.R. 160a. The
    Property is vacant.
    In its PA. R.A.P. 1925(a) opinion, the trial court explained that it
    imposed the fine due to Owner’s failure to comply with the terms of its December
    4, 2018, and March 12, 2019, orders. The December 4, 2018, order required Owner
    to apply for a sprinkler permit before March 12, 2019. The March 12, 2019, order
    went further and required Owner to “begin installation and work in a workmanlike
    fashion to complete installation of the suppression system.” Order to Comply,
    3/12/2019, at 2; R.R. 55a. However, the Initial Notice and Order described the
    violations as “construction … being performed in or on this structure or premises,
    or any part thereof, without the required fire prevention permit…. Sprinklers are
    needed for the continuation of work on the [P]roperty.” R.R. 15a (emphasis added).
    There is no dispute that construction has not been done since August 2, 2017.
    Further, the Initial Notice and Order did not require immediate installation of the
    sprinklers. Notably, the trial court’s final order made no mention of Owner’s failure
    to comply with the orders of December 4, 2018, and March 12, 2019. The trial court
    based the $94,000 fine on “violations of Title 4 of The Philadelphia Code of General
    Ordinances” as cited in the Initial Notice and Order. Trial Court Order, 6/4/2019, at
    1.
    For the foregoing reasons, we conclude that the trial court exceeded the
    bounds of the Initial Notice and Order by imposing a fine for Owner’s failure to
    10
    install the sprinklers when construction has not occurred on the Property since the
    issuance of the Initial Notice and Order.6
    Conclusion
    The trial court erred in imposing the $94,000 fine against Owner
    because the City’s Initial Notice and Order did not require immediate installation of
    the sprinklers. It is undisputed that construction work stopped at the premises upon
    the issuance of the Initial Notice and Order, and the Property has been vacant since
    it was purchased by Owner. The trial court’s December 4, 2018, and March 12,
    2019, orders exceeded the bounds of the Initial Notice and Order in finding that
    Owner violated the Code by failing to immediately install the sprinklers. Regardless,
    the trial court’s final order made no mention of the December 4, 2018, and March
    12, 2019, orders in imposing the $94,000 fine. We thus reverse the trial court’s June
    4, 2019, order.
    _____________________________________
    MARY HANNAH LEAVITT, President Judge
    Judge Ceisler dissents.
    6
    Because we conclude that the trial court erred in imposing the fine, we need not address whether
    the fine imposed is excessive. We also need not address Owner’s argument that the trial court
    violated her right to due process by refusing to continue her case so that she could access the trial
    court’s docket information and depose her contractor. We note that Owner would not prevail on
    this argument because she already had a copy of the complaint and answer, and three months’
    notice of the June 4, 2019, hearing, which provided ample time to interview witnesses.
    11
    IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    City of Philadelphia                    :
    :
    v.                          :   No. 1529 C.D. 2019
    :
    Svetlana Dvortsova,                     :
    Appellant             :
    ORDER
    AND NOW, this 8th day of January, 2021, the June 4, 2019, Order of the Court
    of Common Pleas of Philadelphia County, in the above-captioned matter, is
    REVERSED.
    _____________________________________
    MARY HANNAH LEAVITT, President Judge
    