PPL Electric Utilities Corp. v. PUC ( 2020 )


Menu:
  •                   IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    PPL Electric Utilities Corporation,                :
    Petitioner                     :
    :    No. 624 C.D. 2019
    v.                                 :
    :    Argued: May 13, 2020
    Public Utility Commission,                         :
    Respondent                       :
    BEFORE:         HONORABLE MARY HANNAH LEAVITT, President Judge
    HONORABLE RENÉE COHN JUBELIRER, Judge
    HONORABLE P. KEVIN BROBSON, Judge
    HONORABLE PATRICIA A. McCULLOUGH, Judge
    HONORABLE ANNE E. COVEY, Judge
    HONORABLE ELLEN CEISLER, Judge
    HONORABLE J. ANDREW CROMPTON, Judge
    OPINION NOT REPORTED
    MEMORANDUM OPINION
    BY JUDGE McCULLOUGH                                                   FILED: October 27, 2020
    PPL Electric Utilities Corporation (Utility) petitions for review from the
    April 25, 2019 order of the Pennsylvania Public Utility Commission (Commission)
    denying its application for approval of internal corporate restructuring pursuant to
    section 1102(a)(3) of the Public Utility Code (Code), 66 Pa.C.S. §1102(a)(3),1 and the
    1
    This section states, in notable part, as follows:
    Upon the application of any public utility and the approval of such
    application by the [C]ommission, evidenced by its certificate of
    public convenience first had and obtained, and upon compliance with
    existing laws, it shall be lawful . . . [f]or any public utility . . . to
    acquire from, or to transfer to, any person or corporation, including a
    (Footnote continued on next page…)
    Commission’s Statement of Policy located at 
    52 Pa. Code §69.901
    .                          The issues
    presented are whether the proposed restructuring is one that would require a
    certificate of public convenience (CPC) and, if so, what legal standard the
    Commission should have utilized to determine whether to grant such a certificate.
    See section 1103(a) of the Code, 66 Pa.C.S. §1103(a) (stating that the Commission
    shall grant a CPC “only if the [C]ommission shall find or determine that the granting
    of such certificate is necessary or proper for the service, accommodation,
    convenience, or safety of the public”).2
    (continued…)
    municipal corporation, by any method or device whatsoever,
    including the sale or transfer of stock and including a consolidation,
    merger, sale or lease, the title to, or the possession or use of, any
    tangible or intangible property used or useful in the public service.
    66 Pa.C.S. §1102(a)(3).
    2
    In its relevant respects, section 1103(a) provides that
    [a] certificate of public convenience shall be granted by order of the
    commission, only if the [C]ommission shall find or determine that the
    granting of such certificate is necessary or proper for the service,
    accommodation, convenience, or safety of the public. The
    commission, in granting such certificate, may impose such conditions
    as it may deem to be just and reasonable. In every case, the
    commission shall make a finding or determination in writing, stating
    whether or not its approval is granted. Any holder of a certificate of
    public convenience, exercising the authority conferred by such
    certificate, shall be deemed to have waived any and all objections to
    the terms and conditions of such certificate.
    66 Pa.C.S. §1103(a)(3).
    2
    Background
    The germane facts and procedural history of this case are as follows. On
    October 16, 2017, Utility filed its application and on November 21, 2017, the Office
    of Small Business Advocate (OSBA) filed a notice of intervention and protest,
    opposing the application. Thereafter, Utility and the OSBA filed a joint stipulation
    for the admission of evidence and submitted uncontested testimony and documents to
    the Administrative Law Judges (ALJs), from which we glean the following pertinent
    facts.
    In terms of corporate structure, PPL Corporation stands at the top of the
    pyramid and is the bona fide parent corporation and a pure holding company that
    owns, among other things, a controlling share of stock of certain subsidiaries engaged
    in the electric utility business. Utility is a direct subsidiary of PPL Corporation and is
    a “public utility” as defined in section 102 of the Code, 66 Pa.C.S. §102, providing
    electric service to approximately 1.4 million customers in eastern and central
    Pennsylvania. PPL Corporation owns all of the shares of stock of Utility, and Utility
    owns all of its operational assets.      The proposed restructuring would vertically
    interject two new Delaware holding companies, PPL Subsidiary Holdings, LLC
    (Newco 1) and PPL Energy Holdings, LLC (Newco 2), between PPL Corporation and
    Utility, thereby rendering Utility an indirect and down-the-stream subsidiary of PPL
    Corporation. Meanwhile, Newco 1 would become a wholly-owned direct subsidiary
    of PPL Corporation, while Newco 2 would become a wholly-owned direct subsidiary
    of Newco 1. PPL Corporation would then contribute all of the interests that it owns
    in Utility to Newco 1, and Newco 1, in turn, would contribute all of the shares of
    Utility’s stock that it received from PPL Corporation to Newco 2. The net result
    would be that, through these transactions, PPL Corporation would ultimately transfer
    3
    all of the shares of stock in Utility to Newco 2. As such, Newco 2 would become the
    new or immediate “parent” of Utility and Utility would become a direct subsidiary of
    Newco 2. (Commission’s decision at 3-6; ALJs’ decision at 1-5.)
    With respect to the effect that the proposed restructuring would have on
    PPL Corporation, Utility, and the public in general, PPL Corporation averred that the
    general and overall purpose of the restructuring would allow PPL Corporation to
    control its tax liabilities in a more prudent manner. For instance, by consolidating the
    tax basis of the relevant subsidiaries within Newco 1 and Newco 2, PPL Corporation
    alleged that it would be able to manage the movement of cash within its corporate
    framework with increased efficiency, while, at the same time, mitigate the negative
    tax impact on capital gains. PPL Corporation also stated that the restructuring would
    permit it to operate its regulated businesses more effectively because intracompany
    financing, including the management of Utility’s capital structure and associated
    regulatory requirements, would be conducted and facilitated by and through Newco 1
    and Newco 2, rather than PPL Corporation itself. In addition, PPL Corporation
    asserted that the proposed restructuring would promote the public interest because it
    would create an enhanced and viable method for it to distribute cash received from
    Utility for purposes of funding capital expenditures and projects, and the
    establishment of Newco 1 and Newco 2 would provide a flexible corporate structure
    through which PPL Corporation could engage in business acquisitions, including the
    combination or consolidation of existing non-regulated corporate entities.         PPL
    Corporation further averred that, under the proposed reorganization, it would be able
    to raise equity capital at more favorable rates, which would improve Utility’s
    financial condition and reduce the need for Utility to raise additional external debt.
    According to PPL Corporation, the restructuring would have no adverse effect on the
    4
    finances, management, or operations of Utility, and Utility would maintain a separate
    investment rating from credit rating agencies. (Commission’s decision at 6-7; ALJs’
    decision at 18-19.)
    In a decision dated August 23, 2018, the ALJs recommended that
    Utility’s application be denied in its entirety. The ALJs noted that PPL Corporation
    owns all of Utility’s shares of stock and that, pursuant to the proposed restructuring,
    PPL Corporation would transfer these shares to Newco 1 and then, via a subsequent
    transfer, to Newco 2. The ALJs reasoned that Utility’s application, in essence, sought
    approval to vest a new corporate entity with a controlling interest in a public utility
    and, therefore, PPL Corporation was required to meet the standards to obtain a CPC.
    The ALJs further concluded that Utility and PPL Corporation failed to establish that
    the proposed restructuring would result in an affirmative and substantial benefit to the
    public or that it would be a necessary or proper way to further the service,
    accommodation, convenience, or safety of the public. (ALJs’ decision at 14-17, 20-
    21.)
    On October 11, 2018, Utility filed exceptions, contending that the ALJs
    erred in concluding that it was required to obtain a CPC because the proposed internal
    restructuring would amount to a technical change in control, as opposed to a change
    in ultimate ownership, and would have no negative effect on its management or
    operations. In the alternative, Utility asserted that, even if a CPC was necessary, the
    ALJs erred in applying a “substantial affirmative public benefit” standard given the
    internal nature of the proposed restructuring.
    5
    On April 25, 2019, the Commission entered an opinion and order
    dismissing the exceptions filed by Utility and denying its application for corporate
    restructuring. Subsequently, Utility filed a petition for review in this Court.3, 4
    Discussion
    First, Utility argues that it did not need to obtain Commission approval
    and a CPC under section 1102(a)(3) of the Code because the proposed restructuring
    would not change the entity that would have ultimate control over the Utility, i.e.,
    PPL Corporation, would not affect the management or operations of Utility, and
    would not result in the transfer of title or possession of Utility’s property or
    operational assets.5
    Relevantly, section 1102(a)(3) of Code mandates that a corporate entity
    obtain a CPC when the entity seeks “to acquire from, or to transfer to, any person or
    corporation, including a municipal corporation, by any method or device
    whatsoever, including the sale or transfer of stock . . . the title to, or the possession
    or use of, any tangible or intangible property used or useful in the public service.”
    66 Pa.C.S. §1102(a)(3) (emphasis added). A “corporation” is defined in the Code as
    “[a]ll bodies corporate, joint-stock companies, or associations, domestic or foreign,
    their lessees, assignees, trustees, receivers, or other successors in interest, having any
    3
    Our scope of review of the Commission’s order is limited to determining whether
    constitutional rights were violated, whether an error of law was committed, or whether the findings,
    determinations, or order are supported by substantial evidence. Regency Transportation Group,
    Ltd. v. Pennsylvania Public Utility Commission, 
    44 A.3d 107
    , 110 n.3 (Pa. Cmwlth. 2012).
    4
    The OSBA has filed an appellate brief as an intervenor in support of the Commission.
    5
    On the latter point, the Energy Association of Pennsylvania filed an amicus curiae brief in
    support of Utility and PPL Corporation.
    6
    of the powers or privileges of corporations not possessed by individuals or
    partnerships.” 66 Pa.C.S. §102.
    In the Statement of Policy, the Commission noted the “ambiguous
    language” of section 1102(a)(3) and how it had created “considerable uncertainty . . .
    regarding what type of transaction requires Commission approval,” particularly with
    respect to “stock transfers which may equate to the transfer of utility property.” 
    52 Pa. Code §69.901
    (a)(1). The Commission thus deemed it “necessary,” with regard to
    stock transfers, “to further define and establish clear standards regarding what
    transfer of voting interest constitutes a change in de facto control and thereby
    constitutes the transfer or acquisition of utility property within the intendment of
    [section] 1102(a)(3).” 
    52 Pa. Code §69.901
    (a)(2).
    In clarifying the vernacular in section 1102(a)(3), the Commission
    reiterated its holding in Joint Application of Paging Network of Pittsburgh, Inc. (Pa.
    P.U.C., No. A-330013, F.5000, filed October 22, 1993), that approval and a CPC
    were necessary when there was “a transaction resulting in a change of the de facto
    controlling interest in a utility or its parent, regardless of the tier in the corporate
    organization” because this type of transaction “constitutes a change of control of the
    utility.”   
    52 Pa. Code §69.901
    (a)(2). Drawing on this administrative adjudication,
    and others, the Commission determined in the Statement of Policy that approval and a
    CPC are needed when there is “[a] transaction or series of transactions resulting in a
    new controlling interest,” namely “when the transaction or transactions result in a
    different entity becoming the beneficial holder of the largest voting interest in the
    utility or parent, regardless of the tier.” 
    52 Pa. Code §69.901
    (b)(1). By definition, “a
    controlling interest is an interest, held by a person or a group acting in concert, which
    enables the beneficial holders to control at least 20% of the voting interest in the
    7
    utility or its parent, regardless of the remoteness of the transaction.” 
    52 Pa. Code §69.901
    (b)(2).
    Here, the proposed restructuring sought to effectuate internal corporate
    transactions that would ultimately transfer all of the shares of Utility’s stock from
    PPL Corporation to Newco 2. As a matter of black letter corporate law, a subsidiary
    (Utility) is a “corporation” in its own right, and it is an entity that is separate and
    distinct from its proffered immediate parent (Newco 2), thereby constituting an
    entirely “different entity” altogether.    
    52 Pa. Code §69.901
    (b)(1).        See, e.g.,
    Commonwealth v. Gulf Oil Corporation, 
    60 A.2d 46
    , 48 (Pa. 1948) (“Appellant
    [parent corporation] and its subsidiary are distinct corporations notwithstanding that
    the former owns all of the latter’s stock.”); Appeal of Callery, 
    116 A. 222
    , 224 (Pa.
    1922) (“A corporation does not lose its corporate identity when its stock is all owned
    by another corporation.”); Simon v. Commonwealth, 
    422 A.2d 1229
    , 1230-31 (Pa.
    Cmwlth. 1980) (noting that a parent corporation and a subsidiary are “separate legal
    entities,” “separate and distinct corporations,” each with their own “separate
    corporate identity”) (internal citation omitted). Pursuant to the plain language of
    section 1102(a)(3) and the Statement of Policy, Newco 2 would obtain a controlling
    interest in Utility, and “the transaction [would] result in a different entity becoming
    the beneficial holder of the largest voting interest in [Utility].” 
    52 Pa. Code §69.901
    (b)(1). Indeed, in this case, Newco 2 would receive all of the voting interest
    and stock in Utility, and, therefore, a CPC was mandatory in order to receive
    Commission approval for the proffered reorganization. This is so regardless of the
    fact that PPL Corporation, by way of its internal hierarchy, is associated with Newco
    2—as Newco 2 is a wholly-owned subsidiary of Newco 1, and Newco 1 is a wholly-
    owned subsidiary of PPL Corporation—because it is Newco 2, and not PPL
    8
    Corporation, that would own all the stock of Utility. As the Statement of Policy
    elucidates, the fact that a new entity has obtained a controlling interest in stock is the
    paramount and dipositive factor in the inquiry, and considerations such as the
    “remoteness” or “tier” of the transactions are immaterial. 
    52 Pa. Code §69.901
    (b)(1),
    (2).
    While this may be simple enough, PPL Corporation nonetheless argues
    that Utility would maintain its own internal managerial and operational facets. But
    this contention overlooks one basic fact and reality. That is, by owning all of the
    shares of Utility, and possessing a “controlling interest in [Utility],” Newco 2—the
    would be immediate parent company—would acquire the direct and/or indirect
    authority “to manage, direct, or oversee” and ultimately “govern the management and
    policies of [Utility].” Black’s Law Dictionary 378, 885 (9th ed. 2009). See Appeal of
    Callery, 116 A. at 224 (“Holding company, as its sole stockholder, controls
    subsidiary [and] through its officers . . . it imposes its will on subsidiary.”); Craig v.
    Lake Asbestos of Quebec, Ltd., 
    843 F.2d 145
    , 150 (3d Cir. 1988) (“It is assumed to be
    the norm that a parent will have not only . . . the potential to exercise control [over
    the subsidiary], but to exercise it to a substantial degree.”) (internal citation and
    quotation marks omitted, brackets in original); Action Manufacturing Co. v. Simon
    Wrecking Co., 
    375 F.Supp. 2d 411
    , 423 (E.D. Pa. 2005) (stating that the “officers of
    any corporation that owns the stock . . . necessarily exercise a considerable degree of
    control over the subsidiary corporation”). Consequently, Newco 2 would be vested
    with the authority to alter Utility’s managerial and operational directions, irrespective
    of the fact that Newco 2 would be a wholly-owned subsidiary of Newco 1 and an
    indirect subsidiary, up through the corporate chain, of PPL Corporation.
    9
    PPL Corporation also takes issue with the language of section 1102(a)(3)
    of the Code and posits that a new corporate entity must receive the assets and
    property of a public utility in order for the requirements of approval and a CPC to
    apply. In PPL Corporation’s view, the proposed transaction would not result in the
    transfer of any of Utility’s assets and property and Newco 2 would not obtain
    ownership over or possession of such assets or property.
    However, the language of section 1102(a)(3) was not written so
    narrowly and restrictively. Instead, the phraseology of the statute is very broad and
    encompasses instances where there is the simple “transfer of stock.” 66 Pa.C.S.
    §1102(a)(3). Generally, a stock transfer, in its common parlance and understanding,
    is not tantamount to a transfer of assets. See In re Goetz’s Estate, 
    85 A. 65
    , 66 (Pa.
    1912) (“The estate, as a holder of all the stock, would not be the owner of the
    corporation, but only of the shares of its capital stock, which constitute a species of
    property entirely distinct from the corporate property.”); 
    id.
     (“We have been referred
    to no authority, and we know of none, that asserts the doctrine that the purchaser of
    all the shares of the capital stock of a corporation thereby becomes the owner of its
    property.”). Stated otherwise, a stock transfer stands in stark contrast to a contractual
    exchange where the operational assets of one entity are transferred or otherwise
    conveyed to another entity for monetary consideration. See Schmidt v. Boardman
    Co., 
    958 A.2d 498
    , 504 (Pa. Super. 2008), aff’d, 
    11 A.3d 924
     (Pa. 2011) (discussing
    situations where “one company sells or transfers all of its assets to another
    company”).    A simple stock transfer is also remarkably different from classical
    fundamental changes in corporate structure that yield an acquisition of assets, such as
    that which occurs in the case of a merger or consolidation. See Seven Springs Farm,
    Inc. v. Croker, 
    748 A.2d 740
    , 744 n.4 (Pa. Super. 2000) (en banc), aff’d, 
    801 A.2d 10
    1212 (Pa. 2002) (“A merger occurs when a seller corporation, including all of its
    assets and liabilities, is absorbed into a purchasing corporation and the seller loses its
    identity as a separate entity.”) (internal citation omitted); 
    id. at 774
     (“The merger of
    two or more corporations is neither a sale nor a liquidation of corporate property, but
    a consolidation of properties, powers, and facilities of the constituent companies,
    forming a new corporate entity.”) (internal citation omitted); Cortland Specialty Co.
    v. Commissioner of Internal Revenue, 
    60 F.2d 937
    , 939 (2d Cir. 1932) (“A
    consolidation involves a dissolution of the companies consolidating and a transfer of
    corporate assets and franchises to a new company.”).
    Notably, section 1102(a)(3) covers transfers “by any method or device
    whatsoever, including the sale or transfer of stock and including a consolidation,
    merger, [or] sale . . . .” 66 Pa.C.S. §1102(a)(3). Because the term “including” is a
    word of enlargement, and not one of limitation, see Readinger v. Workers’
    Compensation Appeal Board (Epler Masonry), 
    855 A.2d 952
    , 955 (Pa. Cmwlth.
    2004), we must presume that our General Assembly intended a sale of stock to be
    distinct from, and in addition to, a merger, consolidation, or a sale of assets. In this
    vein, the Statement of Policy is entirely consonant with the statute by deeming the
    transfer of a controlling interest of stock as essentially constituting a transfer of utility
    property requiring Commission approval under section 1102(a)(3) of the Code.
    Further, the Commission’s current adjudication and its Statement of Policy, which
    was adopted and became effective in 1994 and was predicated upon previous
    adjudications, expound upon the ambiguity surrounding what “stock transfers,” in
    particular, should fall within the ambit of section 1102(a)(3). Consequently, and
    contrary to the arguments of Utility, the Commission’s interpretation and application
    of the phrase “transfer of stock” is entitled to administrative deference. See Snyder
    11
    Brothers, Inc. v. Pennsylvania Public Utility Commission, 
    198 A.3d 1056
    , 1069,
    1077-78 (Pa. 2018) (concluding that the Commission’s interpretation of an
    ambiguity, in accordance with rulemaking orders, was entitled to administrative
    deference even though “the administrative orders were not enacted according to
    formal rulemaking procedures” and were “mere ‘non-legislative rules,’ or agency
    ‘pronouncements,’” because the Commission had “faithfully adhered to its
    construction” in the rulemaking orders for years prior to the litigation that ensued in
    that case); see also Pennsylvania Human Relations Commission v. Norristown Area
    School District, 
    374 A.2d 671
    , 679 (Pa. 1977) (stating that an administrative agency
    can formulate “policy that will have the force of law,” among other ways, “through
    adjudications which constitute binding precedents”).
    Moreover, as crafted by our General Assembly, section 1102(a)(3)
    embodies those instances where there is a “transfer of stock” that effectively assigns
    the “use of[] any . . . intangible property used . . . in the public service.” 66 Pa.C.S.
    §1102(a)(3). In its corporate form, and considered in isolation and in and of itself,
    Utility is undoubtedly “intangible property” and is the means by which the “public
    service” of providing electricity is accomplished or “used.”           See Trustees of
    Dartmouth College v. Woodward, 
    17 U.S. 518
    , 636 (1819) (“A corporation is an
    artificial being, invisible, intangible, and existing only in contemplation of law.”). As
    explained above, Newco 2, as a result of acquiring a controlling interest in Utility,
    would attain the authority to exercise control over the management and operations of
    Utility. Hence, at the very least, the proffered restructuring would have the effect of
    bestowing upon Newco 2 the authority to “use” Utility in the sense that Utility would
    become a direct subsidiary of Newco 2, subject to Newco 2’s control in terms of
    policy, management, and operations as they pertain to providing electric service to
    12
    the public. See State Farm Mutual Automobile Insurance Co. v. Cavoto, 
    34 A.3d 123
    , 133 (Pa. Super. 2011) (quoting an authoritative dictionary and defining the term
    “use,” in part, as “the privilege or benefit of using something,” “a method or manner
    of employing or applying something,” or “the ability or power to use something”).
    Quite simply, Newco 2 could exercise significant influence over Utility in its conduct
    of providing services as a utility and, thus, shape and “use” Utility to a substantial
    degree with respect to the functional aspects that are associated with the assimilation
    and distribution of electrical energy.
    On this note, based on the terms of the proposal, PPL Corporation, via a
    transfer through Newco 1, would relinquish not only all of its ownership interest in
    Utility, but also its right to exercise direct control over Utility, to Newco 2.6 Because
    PPL Corporation seeks to divest itself of any and every direct legal interest that it has
    in Utility, it is difficult to understand how the Concurring and Dissenting Opinion
    (CDO) repeatedly pronounces that PPL Corporation “would [] retain sole ultimate
    ownership of Utility” and “ultimate title to Utility and its assets.” PPL Electric
    Utilities Corp. v. Public Utility Commission (Pa. Cmwlth., 624 C.D. 2019, filed
    October 27, 2020) (Ceisler, J., concurring and dissenting) (CDO), slip op. at 2, 8. To
    be sure, the CDO attempts to support this proposition with a blanket statement that
    6
    The only connection PPL Corporation would have to Utility is that PPL Corporation would
    wholly own Newco 1, Newco 1 would wholly own Newco 2, and Newco 2 would wholly own
    Utility. By owning all of the shares of Utility’s voting stock, Newco 2 has direct control of Utility
    and the authority to “use” and dictate Utility in any manner that it deems fit, including its
    operational strategies and objectives. Although PPL Corporation could potentially exert indirect
    influence on (or rather render advice to) Newco 2, because PPL Corporation wholly owns Newco 1,
    and Newco 1 wholly owns Newco 2, PPL Corporation cannot legally compel Newco 2 or Utility to
    abide by those directives. In other words, the board of directors of PPL Corporation cannot get
    together and vote to change Utility’s operational policy because PPL Corporation does not possess
    any of Utility’s stock and, hence, lacks the voting power necessary to effectuate such a change.
    13
    relegates “the stock transfers to Newco 1 and 2” to “merely paper transactions.” 
    Id.
    Unfortunately, as explained above, the law governing stock transfers of a controlling
    interest in a corporation does not share this view, see Appeal of Callery, 116 A. at
    224; Craig, 
    843 F.2d at 150
    ; Action Manufacturing Co., 
    375 F.Supp. 2d at 423
    , and
    neither do the courts, which have interpreted statutory provisions substantially similar
    to section 1102(a)(3) and the Statement of Policy. For example, in Title Insurance
    and Trust Co. v. County of Riverside, 
    767 P.2d 1148
     (Cal. 1989), the Supreme of
    California interpreted a statute, which, akin to section 1102(a)(3) and the Statement of
    Policy, stated, in pertinent part, that “[w]hen a corporation . . . obtains control through
    direct or indirect ownership or control of more than 50[%] of the voting stock of any
    corporation . . . the purchase or transfer of that stock . . . shall be a change of
    ownership of the real property owned by the corporation . . . in which the controlling
    interest is obtained.” 
    Cal. Rev. & Tax Code §64
    (c) (1995) (section 64(c)). In
    discussing this provision, the California court persuasively explained,
    [t]he section provides, in essence, that if one corporation
    either directly or indirectly obtains control over another by
    the transfer or purchase of stock, a change of ownership
    occurs as to the real property owned by the corporation over
    which it has obtained direct or indirect control . . . . The
    fundamental requirement for a change in ownership under
    the section is the obtaining of control of the corporation that
    owns the property subject to reassessment, whether that
    control is obtained directly or indirectly. The purchase of
    stock is the means by which the control [is] secured.
    Title Insurance and Trust Co., 
    767 P.2d at 1152
     (bold emphasis added); see 
    id. at 1156
     (“As we emphasize repeatedly above, the touchstone of a change of ownership
    under section 64(c) is control of the corporation that owns the property subject to
    reassessment; it is not the right to occupy the property or to take possession of it.”).
    14
    Likewise, in section 1102(a)(3), our General Assembly determined that a “transfer of
    stock” could result in “the possession or use of [a utility’s] tangible or intangible
    property,” 66 Pa.C.S. §1102(a)(3), and the Statement of Policy declares that when “a
    different entity becom[es] the beneficial holder of the largest voting interest in the
    utility,” 
    52 Pa. Code §69.901
    (b)(1), the transaction “constitutes the transfer or
    acquisition of utility property within the intendment of [section 1102(a)(3)].” 
    52 Pa. Code §69.901
    (a)(2).
    Otherwise, the CDO, in an apparent form of fact-finding, appears to
    credit, at face value, PPL Corporation’s assertion that it would retain ultimate control
    over and ownership of Utility because PPL Corporation “is not seeking to deny
    responsibility for Utility’s obligations” and would be estopped “from asserting in the
    future that [it] lacks such ownership, control, and responsibility.” (CDO, slip op. at
    12.) However, the Commission, as the actual fact-finder in these proceedings, see
    Kviatkovsky v. Pennsylvania Public Utility Commission, 
    618 A.2d 1209
    , 1211 (Pa.
    Cmwlth. 1992), did not find PPL Corporation’s representation credible, seemingly
    because it lacks any basis in law or fact. To the extent that the CDO and Utility rely
    on the theory of piercing the corporate veil to establish that PPL Corporation would
    have ultimate ownership and control of Utility, such reliance is severely misplaced.
    Traditionally, the doctrine of piercing the corporate veil has been used to allow a
    court to “ignore the corporate boundaries between parent and subsidiary if fraud or
    inequity is shown,” Applied Biosystems, Inc. v. Cruachem, Ltd., 
    772 F.Supp. 1458
    ,
    1463 (D. Del. 1991), and, if so, “the parent corporation will be held liable for the
    obligations of its subsidiary.” Japan Petroleum Co. (Nigeria) Ltd. v. Ashland Oil,
    Inc., 
    456 F.Supp. 831
    , 839 (D. Del. 1978). To pierce the corporate veil, a plaintiff
    must show that the defendant corporation is “involved in an elaborate shell game or
    15
    [is] otherwise abusing the corporate form to effect a fraud,” for example, when the
    parent corporation exercises such “exclusive domination and control . . . to the point
    that [the subsidiary] no longer ha[s] legal or independent significance of [its] own.”
    Outokumpu Engineering Enterprises, Inc. v. Kvaerner EnviroPower, Inc., 
    685 A.2d 724
    , 729 & n.2 (Del. Super. Ct. 1996). In short, while the equitable doctrine of
    piercing the corporate veil is a way to impose liability on a parent for a subsidiary’s
    conduct, it has never been a means through which a corporation can create distinct
    corporate entities like subsidiaries to control wholly-owned subsidiaries, and then
    disregard that corporate form and structure in order to exercise the very right of
    ownership and control that it has transferred to those subsidiaries and wholly-owned
    subsidiaries. Therefore, we believe that the CDO offers an unpersuasive expression
    of rationale to support its position.
    For these reasons, we conclude that the Commission did not err in
    determining that Utility’s proposed restructuring would require approval and a CPC
    for purposes of section 1102(a)(3) of the Code.
    Next, Utility asserts that, assuming arguendo, it was required to receive
    a CPC, it was not required to establish that its internal reorganization would confer a
    substantial, affirmative benefit to the public.    In this regard, Utility posits that
    application of such a standard “would produce an absurd and unreasonable result as it
    would create a standard of review of internal reorganizations that, for all practical
    purposes, would be impossible to meet.” (Br. for Utility at 26.) Emphasizing the
    plain language of section 1103(a) of the Code, the Utility contends that the phrase,
    “necessary or proper,” is disjunctive in nature and that a showing that the proffered
    reorganization would be proper for serving the public with electricity would suffice.
    16
    To recapitulate, section 1103(a) provides that a CPC “shall be granted
    by order of the [C]ommission, only if the [C]ommission shall find or determine
    that the granting of such certificate is necessary or proper for the service,
    accommodation, convenience, or safety of the public.”             66 Pa.C.S. §1103(a)
    (emphasis added).
    In its adjudication, the Commission applied an “affirmative public
    benefit” standard and, for support, relied predominately upon two decisions from our
    Supreme Court. (Commission’s decision at 41.) See City of York v. Pennsylvania
    Public Utility Commission, 
    295 A.2d 825
    , 828 (Pa. 1972) (stating that section 1103(a)
    “makes it clear that a [CPC] approving a merger is not to be granted unless the
    Commission is able to find affirmatively that [a] public benefit will result from the
    merger”; the statute “requires that the proponents of a merger demonstrate that the
    merger will affirmatively promote the service, accommodation, convenience, or
    safety of the public in some substantial way”) (internal quotation marks omitted);
    accord Popowsky v. Pennsylvania Public Utility Commission, 
    937 A.2d 1040
    , 1057
    (Pa. 2007) (“[A]s indicated in City of York, the appropriate legal framework requires
    a reviewing court to determine whether substantial evidence supports the
    Commission’s finding that a merger will affirmatively promote the service,
    accommodation, convenience, or safety of the public in some substantial way.”). In
    point of fact, the Commission determined that, “as an administrative agency, [it was]
    bound by judicial interpretation of the Code,” (Commission’s decision at 40 n.10),
    indicated that it had no choice or discretion in the matter, and stated that, pursuant to
    City of York and Popowsky, it was obligated to decide whether Utility’s proposed
    restructuring would confer an “affirmative public benefit.” (Commission’s decision
    at 40-41.)
    17
    However, as this Court has noted, both City of York and Popowsky
    “provided [] guidance for reviewing merger applications.” Lloyd v. Pennsylvania
    Public Utility Commission, 
    17 A.3d 425
    , 430 (Pa. Cmwlth. 2011) (emphasis added).
    This observation is extremely critical because, in the unique and specific context
    when there is a proffered merger between two utility companies at the parent level or
    otherwise, there are overarching and serious concerns about the potential for attaining
    monopolistic power, which could have an adverse effect on consumer rates.
    By way of background, “[i]n Pennsylvania, the regulation of electric
    service distribution has traditionally afforded utility companies natural monopolies”
    City of Pittsburgh v. West Penn Power Co., 
    147 F.3d 256
    , 259 (3d Cir. 1998), or, in
    other words, “a regulated quasi-monopoly.”          City of Pittsburgh v. Pennsylvania
    Public Utility Commission, 
    128 A.2d 372
    , 386 (Pa. Super. 1956). In 1996, our
    General Assembly passed the Electricity Generation Customer Choice and
    Competition Act (Competition Act),7 which became effective in 1997. In terms of
    electric distribution, this legislation “effectuated . . . the de-regulation of the electric
    market,” PECO Energy Company v. Commonwealth, 
    919 A.2d 188
    , 189 (Pa. 2007),
    and “was passed to encourage a more competitive marketplace for electricity sales.”
    Spectrum Arena Limited Partnership v. Commonwealth, 
    983 A.2d 641
    , 645 (Pa.
    2009). Stated otherwise, the Competition Act was based on the underlying view that
    “[c]ompetitive market forces are more effective than economic regulation in
    controlling the cost of generating electricity,” George v. Pennsylvania Public Utility
    Commission, 
    735 A.2d 1282
    , 1284, 1288 (Pa. Cmwlth. 1999), and “was enacted to
    encourage a competitive wholesale electric market and to provide cost savings to
    7
    66 Pa.C.S. §§2801-2812.
    18
    consumers.” American Electric Power Service Corporation v. Commonwealth, 
    160 A.3d 950
    , 955 (Pa. Cmwlth. 2017).
    In West Penn Power Co., the City of Pittsburgh commenced suit against
    two electrical utility companies that were planning to merge, asserting claims under
    section 1 of the Sherman Antitrust Act (Sherman Act)8 and section 7 of the Clayton
    Act.9 Addressing the nature of these claims in light of the Commission’s regulatory
    oversight of public utilities, the United States Court of Appeals for the Third Circuit
    stated:
    The present case arises in a factual context which is
    substantially different from that of most antitrust cases. The
    [City of Pittsburgh] has alleged anticompetitive behavior in
    an industry which is highly regulated: those [that] wish to
    compete to provide their services must obtain a [CPC] from
    the [the Commission] to do so. As the First Circuit has
    explained, “[f]ull price regulation dramatically alters the
    calculus of antitrust harms and benefits.” Town of Concord,
    Massachusetts v. Boston Edison Co., 
    915 F.2d 17
    , 25 (1st
    Cir. 1990) (holding that alleged price squeeze did not
    violate [the] Sherman Act because utility’s rates were
    regulated). Similarly, here, the regulation which frames the
    issue is the statutory requirement that a utility obtain
    permission from the [Commission], in the form of a [CPC],
    in order to provide electric service to a particular
    geographic region.
    The [United States] Supreme Court has made clear that
    regulated industries—even those that historically have been
    treated as natural monopolies—are not exempt from the
    antitrust laws. See Otter Tail Power Co. v. United States,
    
    410 U.S. 366
     (1973). However, in this case, the
    comprehensive regulatory framework significantly restricts
    8
    
    15 U.S.C. §1
    .
    9
    
    15 U.S.C. §18
    .
    19
    the nature of the competition which is permitted. While it is
    true that the regulatory landscape of the electric power
    industry is in the process of changing, even the Competition
    Act does not anticipate a completely “free market” for
    electric services. Rather, the changes will result in a form
    of regulated competition.
    West Penn Power Co., 
    147 F.3d at 263-64
    .
    That said, in City of York, which was decided prior to the Competition
    Act, our Supreme Court instructed “that the Commission should consider, at least in a
    general fashion, the effect that a proposed merger is likely to have on future rates to
    consumers” because “the probable general effect of the merger upon rates is certainly
    a relevant criter[ion] of whether the merger will benefit the public.” 295 A.2d at 829.
    Approximately 35 years after City of York was decided, our Supreme Court
    reaffirmed and clarified that decision in Popowsky. In doing so, the Court noted “that
    City of York does not hold that a merger benefits the public only if the [proponent]
    can demonstrate that the merger savings will lower prices to consumers” and added
    that “competitive impact is a substantial component of a rational net public benefits
    evaluation in the merger context.” 937 A.2d at 1056 (emphasis in original).
    Then, in Lloyd, this Court discussed and synthesized City of York and
    Popowsky.    We explained that when conducting an “affirmative public benefit”
    inquiry,
    the Supreme Court instructed the [Commission] in all cases
    of merger, (1) to evaluate the competitive effects of the
    merger; and, (2) if the effects of the merger are anti-
    competitive, then the [Commission] must consider whether
    those anti-competitive effects outweigh or “negate” the
    affirmative public benefits it has identified.     If the
    [Commission] concludes that the anti-competitive effects
    outweigh the affirmative public benefits, then the
    [Commission] should not issue a [CPC].
    Lloyd, 
    17 A.3d at 432
     (internal citation omitted) (emphasis in original).
    20
    In enacting section 1103(a) of the Code, our General Assembly
    “provided no definition of specifically what the criteria were to be in determining the
    propriety of granting a [CPC].” Elite Industries, Inc. v. Pennsylvania Public Utility
    Commission, 
    832 A.2d 428
    , 432 (Pa. 2003). In light of the inherent nature of
    mergers, “transactions [which] are so highly regulated,” Popowsky, 937 A.2d at 1057,
    considered in the background of federal antitrust laws and later the Competition Act,
    we can readily discern that mergers and consolidations are deserving of special
    attention in terms of their impact on the public. And, given the Commission’s
    regulatory role and oversight with respect to a merger’s effect on competition in the
    marketplace, it makes complete sense that our Supreme Court would engraft an
    “affirmative public benefit” standard into the statute and develop an analytical
    framework that focuses on competitive effects, while taking into account the rate
    prices that will inure to consumers. This is especially true considering that when
    dealing with utilities in the merger scenario, if the thrust of a proffered merger, on
    balance, would result in anticompetitive behavior, then public utilities could resort to
    the monopolistic and/or monopsonistic practices of the antiquated past, potentially
    resulting in unreasonable increases in consumer prices and harm to the public in
    general.
    However, in the circumstances before us, the concerns and dangers
    associated with anticompetitive behavior are not present, or at least not present to a
    degree that is reasonably comparable to those that could occur in the situation of a
    merger. In its proposed internal restructuring, Utility is not seeking to gain a larger
    share of market power by combining two separate public utilities.           Rather, the
    proffered reorganization would merely divest PPL Corporation of any and all
    interests, including a controlling share of stock, that it has in Utility and would
    21
    transfer these interests to Newco 1 and Newco 2 as holding companies. Perhaps
    significantly, holding companies have traditionally been created for internal structural
    advantages, namely in order to receive shelter from legal liability, obtain tax benefits,
    and facilitate strategic corporate finance objectives. See Douglas G. Smith, Piercing
    the Corporate Veil in Regulated Industries, 2008 B.Y.U. L. REV. 1165, 1170-71
    (2008) (noting that “limited liability is the rule not the exception” for holding
    companies, parents, and subsidiaries and explaining that “[c]ourts will pierce the
    corporate veil only in exceptional circumstances” because “disregarding the corporate
    form and imposing liability on affiliated corporate entities is an extreme remedy,
    sparingly used”); 1189 (“[H]olding companies can provide subsidiaries with a level
    of financial flexibility, including capital infusions, access to capital markets, and in
    some cases, additional cash flow sources from other operations.”); 1190 (“[H]olding
    companies can be advantageous from a tax perspective; by combining losses and
    gains from different subsidiaries, all companies may benefit through reduction in tax
    liabilities.”). In its application, Utility averred benefits that arguably duplicate or
    mimic those above and have asserted that the proposed internal reorganization would
    not have a detrimental effect on the public, but instead, could be advantageous to the
    public due to the possibility that Utility would be more fiscally sound and secure.
    In view of the schematics of Utility’s proposed internal restructuring, it
    would be very difficult, if not impossible, for Utility to establish an affirmative and
    substantial benefit to the public as that concept has been employed by our Supreme
    Court when there has been a proposed merger between two or more public utilities.
    Distilled to its essence, the test to decide whether there is an affirmative public
    benefit necessitates the Commission to “evaluate[] the impact of [a] merger on
    competition” and to ultimately determine if “the merger would have a positive impact
    22
    on competition,” Lloyd, 
    17 A.3d at 434
    , or lower prices to consumers. See City of
    York, 295 A.2d at 829. Quite simply, this mode of analysis does not fit the facts of
    this case and has no place in the calculus for determining whether Utility has met the
    statutory requirements for a CPC.
    Our Supreme Court has cautioned that its decisions must be read against
    their specific facts because “decisional law generally develops incrementally, within
    the confines of the circumstances of cases as they come before the Court.” Scampone
    v. Highland Park Care Center, LLC, 
    57 A.3d 582
    , 604 (Pa. 2012). We follow that
    lead here and conclude that the “substantial” and “affirmative public benefit” test
    developed in City of York and Popowsky is circumscribed to utilities’ applications for
    a merger, consolidation, or the like, specifically where two separate public utilities
    propose to combine. This analysis, however, is ill suited and unworkable for internal
    reorganizations such as the one in this case, where a parent creates subsidiaries that
    are set up as holding companies and only one public utility is moved downward in the
    parental vertical chain. In this situation, a less demanding evidentiary burden is
    warranted—one that does not mandate an appraisal of the effects on competition in
    the marketplace, yet is consistent with the plain language of the statute, and pays due
    consideration to the public. Therefore, the Court concludes that, contrary to the
    Commission’s understanding, the Commission was not bound to apply the test
    enunciated in City of York and Popowsky, and we reverse the Commission on this
    point.
    In Elite Industries, Inc., our Supreme Court reviewed section 1103(a) of
    the Code and concluded that this Court erred in determining that an applicant for a
    CPC to operate a limousine service had to prove “public necessity” or “public need.”
    832 A.2d at 430-31. The Supreme Court found that we erroneously “focused only on
    23
    the word ‘necessary’ rather than on the phrase ‘necessary or proper.’” Id. at 431.
    “However,” said the Supreme Court, “the conjunction ‘or’ must be given its
    ordinarily disjunctive meaning unless such a construction would lead to an absurd
    result.”    Id.   Heeding this advice, we believe the Commission can conduct a
    disjunctive analysis in this case and that, for purposes of section 1103(a), Utility need
    only establish—and the Commission need only find—that granting a CPC would be
    “proper for the service . . . of the public.” 66 Pa.C.S. §1103(a). As a general guide,
    the customary dictionary definition of “proper” is being “adapted or appropriate to
    the purpose or circumstances; fit; suitable.” Vodvarka v Grasmeyer, 
    675 N.W.2d 847
    , 853 (Mich. Ct. App. 2003) (quoting Random House College Dictionary 1061
    (rev. ed. 1979)). Nonetheless, we leave it to the sound discretion of the Commission
    to formulate the specific criteria or factors to be used in assessing whether Utility’s
    proposed internal restructuring is “proper” for servicing the public with electricity
    and deserving of a CPC. See Elite Industries, Inc., 832 A.2d at 432. Accordingly, we
    remand to the Commission to undertake this inquiry and determine whether Utility is
    entitled to a CPC pursuant to the above-mentioned standard.10
    10
    Ostensibly, the CDO wants to import a revised version of the “affirmative public benefit
    standard” that our Supreme Court has developed in the context of merger acquisitions to this case.
    According to the CDO, “Utility met its burden of showing a substantial affirmative public benefit
    by establishing the financial advantages” that would inure to PPL. Corporation, specifically, “a
    stronger company, ease of access to money markets, improved administrative efficiencies, and tax
    benefits.” (CDO, slip op. at 13, 15.) Respectfully, we believe that there is no “public” in the
    CDO’s “affirmative public benefit” analysis—only the strengthening of a corporate entity and the
    potential pavement of its way toward monopolistic power in its most archaic and oppressive form.
    24
    For all of the foregoing reasons and grounds, we affirm in part and
    reverse and remand in part.
    ________________________________
    PATRICIA A. McCULLOUGH, Judge
    Judge Fizzano Cannon did not participate in this decision.
    25
    IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    PPL Electric Utilities Corporation,         :
    Petitioner              :
    :    No. 624 C.D. 2019
    v.                              :
    :
    Public Utility Commission,                  :
    Respondent                :
    ORDER
    AND NOW, this 27th day of October, 2020, the April 25, 2019 order
    of the Pennsylvania Public Utility Commission (Commission) is affirmed in part
    and reversed in part. The matter is remanded to the Commission for further
    proceedings consistent with this opinion.
    Jurisdiction relinquished.
    ________________________________
    PATRICIA A. McCULLOUGH, Judge
    IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    PPL Electric Utilities Corporation,    :
    Petitioner         :
    :
    v.                               : No. 624 C.D. 2019
    : ARGUED: May 13, 2020
    Public Utility Commission,             :
    Respondent           :
    BEFORE:      HONORABLE MARY HANNAH LEAVITT, President Judge
    HONORABLE RENÉE COHN JUBELIRER, Judge
    HONORABLE P. KEVIN BROBSON, Judge
    HONORABLE PATRICIA A. McCULLOUGH, Judge
    HONORABLE ANNE E. COVEY, Judge
    HONORABLE ELLEN CEISLER, Judge
    HONORABLE J. ANDREW CROMPTON, Judge
    OPINION NOT REPORTED
    DISSENTING/CONCURRING OPINION
    BY JUDGE CEISLER                                      FILED: October 27, 2020
    Respectfully, I concur in part and dissent in part.
    I disagree with the majority’s conclusion that a certificate of public
    convenience from the Pennsylvania Public Utility Commission (PUC) was required
    for an internal corporate restructuring in which the parent corporation, PPL
    Corporation (Parent), would retain ultimate ownership of a wholly owned
    subsidiary, PPL Electric Utilities Corporation (Utility).
    Even if a certificate of public convenience was required, I believe the PUC
    erred as a matter of law by determining that the evidence demonstrated no substantial
    affirmative public benefit from Parent’s proposed internal restructuring. Therefore,
    I agree with the majority’s reasoning insofar as it reverses the PUC’s finding of no
    affirmative public benefit. However, I do not believe a remand is needed to allow
    the PUC to reconsider its decision under a different legal standard.
    I. Background
    Parent currently owns all shares of Utility directly. Utility applied to the PUC
    for approval of Parent’s proposal to insert two new wholly owned subsidiary holding
    companies, PPL Subsidiary Holdings, LLC (Newco 1) and PPL Energy Holdings,
    LLC (Newco 2), between Parent and Utility in the corporate structure, as part of a
    larger internal restructuring. The ownership of Utility is illustrated as follows:
    Current:      Parent —> Utility
    Proposed: Parent —> Newco 1 —> Newco 2 —> Utility
    See Reproduced Record (R.R.) at 106a-07a (illustrating complete present and
    proposed corporate structures). Under the restructuring proposal, each entity in the
    chain of ownership would wholly own the entity below. Thus, Parent would still
    retain sole ultimate ownership of Utility through its ownership of Newco 1 and
    Newco 2.
    Parent proposed the restructuring in order to manage intercompany cash flows
    more effectively, operate more efficiently, and manage its tax liabilities more
    prudently, thereby improving its financial profile. The proposed restructuring would
    not alter the management or operations of Utility. Parent also would retain ultimate
    control over all of its subsidiaries, including Utility.
    Two administrative law judges (ALJs) issued a decision recommending that
    the PUC deny Utility’s application for approval of Parent’s proposed restructuring.
    The ALJs concluded that although the restructuring might benefit the shareholders
    EC - 2
    and would not harm the public, it would not provide a substantial affirmative public
    benefit to Utility’s customers. See R.R. at 98a.
    Utility filed exceptions to the ALJs’ decision. In a 3-2 decision with two
    dissenting statements, the PUC denied Utility’s exceptions. R.R. at 149a-50a. The
    PUC majority concluded that Parent’s proposed internal restructuring required a
    certificate of public convenience pursuant to Section 1102(a)(3) of the Public Utility
    Code, 66 Pa.C.S. § 1102(a)(3) (Section 1102(a)(3)), because the proposed new
    structure would constitute a de facto change of control of Utility, as set forth in the
    PUC’s Policy Statement at 
    52 Pa. Code § 69.901
     (Policy Statement). R.R. at 139a-
    42a; see also Policy Statement Regarding Interpretation of 66 Pa.C.S. § 1102 (a)(3)
    (Pa. P.U.C., No. M-930490, filed September 13, 1994), 1994 Pa. PUC LEXIS 56.
    The PUC majority denied Utility’s application, agreeing with the ALJs that Utility
    failed to demonstrate the proposed restructuring would produce a substantial
    affirmative public benefit to its customers. R.R. at 148a.
    Two Commissioners voted against denying the restructuring proposal.
    Commissioner John F. Coleman, Jr. opined that Utility met its burden of
    demonstrating that the restructuring would provide a substantial affirmative public
    benefit. Noting that Parent “is the ultimate source of equity capital” for Utility,
    Commissioner Coleman found that improved cash flow and more efficient financial
    management would result in “reduced capital needs and an improved ability to raise
    capital at more favorable rates, thereby benefitting [Utility’s] customers.” R.R. at
    157a. Citing the PUC’s own decision in Application of Duquesne Light Co. for a
    Certificate of Public Convenience Under Section 1102(a)(3) (Pa. P.U.C., Nos. A-
    110150 & A-311233, filed April 24, 2007), Commissioner Coleman concluded that
    EC - 3
    “[m]ore efficient access to capital has been previously recognized by the [PUC] as
    an example of an affirmative public benefit.” R.R. at 158a.
    Commissioner Norman J. Kennard also dissented. Commissioner Kennard
    observed that the restructuring would involve “no change in the ultimate control of
    [Utility] or any of the other entities involved,” that Parent would remain the 100%
    owner of all subsidiaries, and that there would be no change in Utility’s management.
    R.R. at 152a. Noting the PUC’s own conclusion that Section 1102(a)(3) was
    intended to address transfers of control, Commissioner Kennard opined, “I don’t
    think that we should have it both ways. Having declared Section 1102(a)(3) to be a
    change of control statute via the Policy Statement, the [PUC] should not now rule
    that a change of control is not required for the [PUC] to have jurisdiction over a
    transaction under Section 1102(a)(3).” R.R. at 153a. Therefore, he concluded no
    certificate of public convenience was needed for the restructuring.
    Alternatively, Commissioner Kennard suggested that even if a certificate of
    public convenience was required, Utility sustained its burden of demonstrating a
    substantial affirmative public benefit through increased cash flow flexibility and
    better management of tax liabilities. Like Commissioner Coleman, Commissioner
    Kennard pointed to the PUC’s prior determination that “the ability of a parent
    company of a utility to raise capital on reasonable terms and attract investors is an
    example of a substantial public benefit under Section 1102(a)(3) and the City of
    York[1] standard.” R.R. at 154a.
    Even one of the three Commissioners who voted to deny Utility’s application
    did so reluctantly. Vice Chairman David W. Sweet found the outcome of the PUC’s
    majority decision “troubling” and voted “regretfully” to deny Utility’s application,
    1
    City of York v. Pa. Pub. Util. Comm’n, 
    295 A.2d 825
     (Pa. 1972). Our Supreme Court’s
    decision in City of York is discussed in Section III, C, below.
    EC - 4
    commenting that he had “difficulty believing the General Assembly intended this
    interpretation of Section 1102[(a)(3)] . . . .” R.R. at 156a.
    II. Issues
    Utility raises several related arguments in its petition for review:
    1.      The PUC erred as a matter of law by concluding that a certificate of
    public convenience was required for the proposed restructuring.
    2.      The PUC erred as a matter of law by concluding that its Policy
    Statement required the restructuring proposal to meet the requirements of Section
    1102(a)(3).
    3.      Even assuming a certificate of public convenience was required, the
    PUC erred as a matter of law and abused its discretion in applying the “substantial
    affirmative public benefit” standard to the restructuring proposal.
    III. Discussion
    A. Certificate of Public Convenience Requirement
    1. Section 1102(a)(3)’s Provisions
    Section 1102(a)(3) specifies when a certificate of public convenience must be
    obtained from the PUC. Section 1102(a)(3) provides, in pertinent part:
    (a) General rule.--Upon the application of any public utility and
    the approval of such application by the [PUC], evidenced by its
    certificate of public convenience first had and obtained, and upon
    compliance with existing laws, it shall be lawful:
    * * *
    (3) For any public utility or an affiliated interest of
    a public utility. . . to acquire from, or to transfer to, any
    person or corporation, including a municipal corporation,
    EC - 5
    by any method or device whatsoever, including the sale or
    transfer of stock and including a consolidation, merger,
    sale or lease, the title to, or the possession or use of, any
    tangible or intangible property used or useful in the
    public service.
    66 Pa.C.S. § 1102(a)(3) (emphasis added).
    2. The Policy Statement’s Provisions
    In the Policy Statement, the PUC concluded that Section 1102(a)(3) is
    ambiguous, resulting in confusion “regarding what type of transaction requires
    [PUC] approval.” 
    52 Pa. Code § 69.901
    (a)(1). The PUC then “determined that the
    transfer of stock or other voting interest of a utility’s parent is jurisdictional [i.e., it
    requires a certificate of public convenience approved by the PUC] regardless of the
    remoteness of the transaction if the effect of the transaction is to change the control
    of a utility.” 
    52 Pa. Code § 69.901
    (a)(2) (emphasis added). Further, “a transaction
    resulting in a change of the de facto controlling interest in a utility or its parent,
    regardless of the tier in the corporate organization, constitutes a change of control
    of the utility and is jurisdictional under [Section 1102(a)(3)].” 
    Id.
     (emphasis added).
    3. Utility’s Position
    Utility observes that the PUC’s interpretation of a statute is not entitled to
    deference from courts unless the statute is ambiguous. See Scanlon v. Dep’t of Pub.
    Welfare, 
    739 A.2d 635
    , 636 (Pa. Cmwlth. 1999). Utility asserts that, contrary to the
    PUC’s conclusory averment in the Policy Statement, Section 1102(a)(3) is not
    ambiguous. Utility argues Section 1102(a)(3) facially does not require a certificate
    of public convenience here, because the proposed restructuring would not transfer
    any title, possession or use of property useful in the public service (i.e., any interest
    EC - 6
    in Utility); rather, Parent would continue to hold the ultimate ownership and control
    of Utility.
    Utility also contends that even if Section 1102(a)(3) is ambiguous, the
    legislature did not intend to require a certificate of public convenience for an internal
    restructuring that does not alter the ultimate ownership or control of a utility. Utility
    argues Parent is entitled to autonomy in its internal structuring. The legislature did
    not intend to, nor could it, assert control over purely internal organizational
    transactions.
    4. PUC’s Position
    The PUC contends Section 1102(a)(3) is reasonably susceptible to more than
    one interpretation, and accordingly, it is ambiguous. Therefore, the PUC insists the
    Policy Statement, as the PUC’s interpretation of Section 1102(a)(3), is entitled to
    deference.
    The PUC also disputes Utility’s contention that no change of control would
    occur through the proposed restructuring. The PUC argues that as a matter of law,
    the proposed new subsidiaries, Newco 1 and Newco 2, are separate legal entities.
    Therefore, the proposed restructuring would result in a change of ownership and
    control, despite Parent’s retention of ultimate ownership of all its subsidiaries. The
    majority essentially adopts this argument.
    5. Analysis
    a. Ambiguity
    As Utility points out, whether Section 1102(a)(3) is ambiguous is a question
    of first impression for Pennsylvania courts; only the PUC has so far made such a
    EC - 7
    determination. Contrary to the PUC’s position, in my view, Section 1102(a)(3) is
    unambiguous as it applies to this case. Section 1102(a)(3) provides that a certificate
    of public convenience is required for a transfer of “the title to, or the possession or
    use of, any tangible or intangible property used or useful in the public service.”
    
    Id.
     (emphasis added). That language is clear. Because the statute is not ambiguous,
    the PUC’s interpretation of it is not entitled to deference from this Court. See
    Scanlon, 
    739 A.2d at 636
    .
    Moreover, even according deference to the PUC, its reading of Section
    1102(a)(3) is incorrect. Parent proposes to retain ultimate title to Utility and its
    assets, while Utility would retain possession and use of the property over which it
    exercises control in its normal operations. By contrast, neither Newco 1 nor Newco
    2 would gain either ultimate title to Utility or possession and use of its assets.
    The PUC’s distinction between ultimate control and de facto control also
    seems inapt here. It is evident from the record that the stock transfers to Newco 1
    and 2 as part of the planned restructuring are merely paper transactions and that
    Newco 1 and 2 will be merely holding companies formed to facilitate financial and
    tax transactions. Parent will retain de facto control as well as ultimate ownership.
    In my view, Parent’s proposed internal restructuring would not transfer title,
    possession, or use of any property of Utility that is “used or useful in the public
    service.” Section 1102(a)(3), 66 Pa. C.S. § 1102(a)(3). Accordingly, I respectfully
    disagree with the majority’s conclusion that a certificate of public convenience is
    required for Parent’s proposed internal restructuring.
    b. PUC’s Judicial Estoppel Argument
    The PUC also argues that Parent and Utility are foreclosed by the principle of
    judicial estoppel from denying the requirement of a certificate of public
    EC - 8
    convenience. According to the PUC, Utility’s very application for a certificate of
    public convenience constituted a representation that one was required. Although the
    majority’s analysis made it unnecessary to address this argument, I do so here for
    completeness. In my opinion, the PUC’s judicial estoppel argument is without merit.
    Judicial estoppel applies to prevent a party that has successfully asserted a
    position in one legal proceeding from later asserting the opposite position in a
    subsequent proceeding. Trowbridge v. Scranton Artificial Limb Co., 
    747 A.2d 862
    (Pa. 2000). The purpose of the doctrine of judicial estoppel is to prevent litigants
    from “‘play[ing] fast and loose’ with the courts by switching legal positions to suit
    their own ends.” 
    Id. at 865
     (quoting Ligon v. Middletown Area Sch. Dist., 
    584 A.2d 376
    , 380 (Pa. Cmwlth. 1990)); see also 
    id.
     (quoting Gross v. City of Pittsburgh, 
    686 A.2d 864
    , 867 (Pa. Cmwlth. 1997) (“the purpose of this doctrine is to uphold the
    integrity of the courts by ‘preventing parties from abusing the judicial process by
    changing positions as the moment requires’”)).
    For judicial estoppel to apply, the estopped party’s asserted positions on the
    pertinent issue must be completely inconsistent,2 and the party must have prevailed
    on that issue in the prior proceeding. See Trowbridge. Here, Utility did not assert
    in its application that a certificate of public convenience was required; in fact, it
    2
    For example, in Trowbridge, the plaintiff, who suffered from muscular dystrophy, was
    fired from her job. She sought and obtained social security disability benefits on the basis that she
    was totally disabled. She then sued her former employer under the Pennsylvania Human Relations
    Act, Act of October 27, 1955, P.L. 744, as amended, 43 P.S. §§ 951-963, alleging she was
    improperly fired on the basis of a non-job-related disability, because she was capable of
    performing her job with a reasonable accommodation. Our Supreme Court rejected the former
    employer’s assertion of judicial estoppel. The Court reasoned that the criteria for assessing
    eligibility for social security disability did not include consideration of possible job
    accommodations. Therefore, it was not necessarily inconsistent for the plaintiff to sue her former
    employer, alleging she could have performed her job with a reasonable accommodation, while also
    receiving social security benefits based on total disability.
    EC - 9
    asserted that it was not required. Utility merely requested any approval that might
    be necessary for Parent’s restructuring. See Petitioner’s Reply Br. at 15-16 and
    record cites therein. Moreover, Utility was unsuccessful in asserting before the PUC
    that no certificate of public convenience was required for the restructuring. Id.
    Therefore, neither element of judicial estoppel was met.
    Indeed, it would have been reckless for Parent to proceed with its restructuring
    without informing the PUC and seeking review. Such a course of action would have
    exposed both Parent and Utility to potentially damaging consequences if the PUC
    decided – as in fact it did – that its approval was required for the restructuring to
    move forward. By seeking the necessary approval, if any, before implementing the
    restructuring, Parent and Utility were simply acting prudently; they were not
    conceding that such approval was definitely required.
    For all of the reasons discussed above, I conclude that no change of ownership
    or control of Utility would result from Parent’s proposed internal restructuring.
    Accordingly, the PUC erred in concluding that a certificate of public convenience
    was required for Parent’s proposed restructuring. I respectfully dissent from the
    majority’s conclusion on this issue.
    B. PUC Policy Statement and Internal Restructuring
    Notably, the PUC has not previously applied Section1102(a)(3) to require a
    certificate of public convenience for a purely internal restructuring; this is an issue
    of first impression.   As Utility aptly points out, the PUC’s Policy Statement
    emphasizes the element of “de facto” control as key in determining whether a
    certificate of public convenience is required. Utility’s argument that de facto control
    of Utility would not change under the proposed restructuring is well taken. Newco
    1 and 2, as their corporate names suggest, would be holding companies, passing
    EC - 10
    through ultimate ownership and control of Utility to Parent. Indeed, the majority
    correctly acknowledges that a mere transfer of stock does not convey any corporate
    assets.   Moreover, the day-to-day management of Utility itself would remain
    unchanged.
    The PUC points out that Newco 1 and 2, which are limited liability
    corporations (LLCs), are separate corporations. The PUC reasons that corporate
    separation must be maintained, notwithstanding Parent’s sole ultimate ownership of
    all its subsidiaries. Therefore, according to the PUC, insertion of holding companies
    in the chain of ownership between Parent and Utility constitutes a change in Utility’s
    ownership for purposes of requiring a certificate of public convenience.          The
    majority again agrees with the PUC. Respectfully, I believe the majority errs by
    failing to consider in its analysis the applicable law governing business corporations
    generally.
    Utility essentially seeks to pierce the corporate veil to acknowledge Parent’s
    ultimate ownership and control of Utility. Newco 1 and 2 are LLCs registered in
    Delaware.    Therefore, Delaware law governs piercing of the corporate veil.
    Commonwealth v. Golden Gate Nat’l Senior Care LLC, 
    194 A.3d 1010
     (Pa. 2018).
    Delaware law generally recognizes the legal separation of corporate entities,
    but a court will disregard the corporate form where equitable considerations require
    it in the interests of justice. Mabon, Nugent & Co. v. Texas Am. Energy Corp. (Del.
    Ch., No. 8578, filed January 27, 1988), 
    1988 Del. Ch. LEXIS 11
    . Under Delaware
    law, a party seeking to pierce the corporate veil must plead and prove detailed facts
    in support. Albert v. Alex. Brown Mgmt. Servs. (Del. Ch., Nos. 762-N, 763-N, filed
    August 26, 2005), 
    2005 Del. Ch. LEXIS 133
    .
    EC - 11
    For example, in Mabon, the plaintiffs alleged that the defendant had led them
    to believe it was assuming the liabilities of its subsidiary as part of a corporate
    consolidation and reorganization. The complaint also alleged that both parent and
    subsidiary operated through joint management, obtained their financing through a
    joint credit agreement, and jointly engaged in borrowings and intercorporate
    transfers of assets. Further, the parent listed the subsidiary’s debts as part of the
    parent’s obligations in federal securities filings and submissions to credit rating
    services. The Delaware court found the plaintiffs pleaded sufficient facts to support
    their request to pierce the corporate veil. Moreover, the complaint averred sufficient
    facts to support the plaintiffs’ assertion that the defendant was estopped from
    denying responsibility for its subsidiary’s obligations.
    Significantly, here, Parent is not seeking to deny responsibility for Utility’s
    obligations. On the contrary, Parent insists that its proposed insertion of two wholly
    owned subsidiary LLC holding companies between itself and Utility in the corporate
    hierarchy is purely an internal restructuring tool that will improve efficiency and
    financial performance without altering Parent’s ultimate ownership and control of
    Utility. That assertion does not appear to be disputed.
    In this circumstance, the analysis of Mabon offers support for Parent’s
    position on two bases. First, Utility pleaded and proved before the PUC sufficient
    facts to support Parent’s retention of ultimate ownership and control of, and
    responsibility for, the obligations of Utility. Second, if Utility prevails in this appeal,
    the positions taken before the PUC and this Court on that issue will estop both Parent
    and Utility from asserting in the future that Parent lacks such ownership, control,
    and responsibility.3
    3
    See the discussion of judicial estoppel above.
    EC - 12
    In my opinion, based on this analysis, the PUC erred in refusing to pierce the
    corporate veil as Parent and Utility themselves requested. The PUC offers no reason
    why Parent may not avail itself of corporate separation for financial purposes while
    still retaining ultimate ownership and control of Utility for purposes of compliance
    with the PUC’s governing statute and regulations. Therefore, I respectfully dissent
    from the majority’s refusal to pierce the corporate veil here.
    C. “Substantial Affirmative Public Benefit” Standard
    In City of York v. Pennsylvania Public Utility Commission, 
    295 A.2d 825
     (Pa.
    1972), our Supreme Court affirmed the decisions of the PUC and this Court
    approving a merger of three telephone companies.4 Our Supreme Court disapproved
    its prior decisions applying a standard that merely required no harm to the public;
    instead, the Court explained that the terms of Section 1102(a)(3) required
    demonstration of a substantial affirmative public benefit. 
    Id. at 828
    .
    However, our Supreme Court in City of York pointed with approval to the
    PUC’s determination that the anticipated public benefits included formation of a
    stronger company, ease of obtaining capital in money markets, and lower
    administrative costs. 
    Id. at 828-29
    . Although the PUC did not expressly find the
    merger would provide an affirmative public benefit, our Supreme Court concluded
    the PUC’s determination that financial benefits would result from the merger
    constituted such a finding. 
    Id. at 829
    . As the Court observed, “the [PUC’s] explicit
    finding that the merger would result in ‘considerable’ economies can only be taken
    as an indication of the [PUC’s] belief that the merger would in fact have a beneficial
    effect upon rates.” 
    Id.
     Further, the Court pointed to the PUC’s determination that
    4
    All three companies were owned by the same holding company, and the same person
    served as president of all three companies. Notably, however, the City of York opinion does not
    suggest the proposed merger was a mere internal restructuring as asserted by Utility here.
    EC - 13
    because of the economies that would result from the merger, the utility’s subscribers
    would be beneficiaries of the merger. 
    Id. at 830
    . See also McCloskey v. Pa. Pub.
    Util. Comm’n, 
    195 A.3d 1055
     (Pa. Cmwlth. 2018) (evidence forecasting better
    management practices, economies of scale, increased operational efficiencies, and
    lack of adverse effects on customer service constituted substantial evidence of
    affirmative public benefit, in support of merger transaction).
    Here, the record demonstrates the same kinds of financial benefits recognized
    in City of York, including a stronger company, ease of access to money markets,
    improved administrative efficiencies, and tax benefits. Moreover, the majority
    expressly acknowledges the financial benefits of internal restructuring through the
    expedient of holding companies, citing internal structural advantages, shelter against
    legal liability, tax benefits, furthering strategic corporate financial objectives,
    financial flexibility, capital infusions and capital market access for subsidiaries, and
    additional cash flow. See Majority op. at 18.
    The PUC does not contend otherwise. The PUC simply argues that such
    benefits do not demonstrate that Parent’s proposed restructuring would provide a
    substantial affirmative benefit to the public or to Utility’s customers. That argument
    is contrary to our Supreme Court’s opinion, and the PUC’s own reasoning, in City
    of York.
    I agree with the majority’s conclusion that previous applications of the
    substantial affirmative benefit test in the context of proposed mergers, which have
    anticompetitive overtones not present here, are inapt in analyzing purely internal
    restructuring. The majority reasons that a certificate of public convenience should
    be granted on a determination that the proposal at issue would be necessary or proper
    to serve the public need. Majority op. at 20. Thus, the majority holds that the PUC
    EC - 14
    could issue a certificate of public convenience based on a determination that it would
    be proper for the service of the public. 
    Id.
     (citing Section 1103(a) of the Public
    Utility Code, 66 Pa. C.S. § 1103(a)). I do not disagree with this as a statement of
    law. However, I do not believe the Court needs to reach that issue here, because, as
    discussed above, financial advantages to the parent and subsidiary constitute
    substantial affirmative public benefits justifying issuance of a certificate of public
    convenience. The PUC erred in concluding otherwise.
    Importantly, Utility did not have to prove with precision what specific
    financial benefits would arise from the proposed restructuring. As this Court
    explained in McCloskey, it is not necessary to offer specific evidence on how a
    transaction will offer substantial affirmative public benefits. Evidence that is general
    in nature may support a finding of a public benefit sufficient to justify a
    determination that the requested transaction is in the public interest. McCloskey, 195
    A.3d at 1065 (citing Popowsky v. Pa. Pub. Util. Comm’n, 
    937 A.2d 1040
     (Pa. 2007)).
    Therefore, even if a certificate of public convenience was required, Utility met
    its burden of showing a substantial affirmative public benefit by establishing the
    financial advantages of Parent’s proposed restructuring. The PUC committed legal
    error by concluding otherwise.
    IV. Conclusion
    For the reasons discussed above, I would reverse the PUC’s decision and find
    that no certificate of public convenience was required for Parent’s proposed internal
    restructuring. I would further find that even if a certificate of public convenience
    was required, the PUC erred as a matter of law by determining that the anticipated
    financial advantages demonstrated no substantial affirmative public benefit from
    EC - 15
    Parent’s proposed internal restructuring. Therefore, respectfully, I also disagree
    with the majority’s conclusion that a remand is necessary for the PUC to issue a new
    decision applying a different legal standard to determine whether to grant a
    certificate of public convenience.
    __________________________________
    ELLEN CEISLER, Judge
    President Judge Leavitt and Judge Crompton join in this dissenting/concurring
    opinion.
    EC - 16
    

Document Info

Docket Number: 624 C.D. 2019

Judges: McCullough, J. ~ Dissenting/Concurring Opinion by Ceisler, J.

Filed Date: 10/27/2020

Precedential Status: Precedential

Modified Date: 10/27/2020

Authorities (18)

Town of Concord, Massachusetts v. Boston Edison Company , 915 F.2d 17 ( 1990 )

Cortland Specialty Co. v. Commissioner of Internal Rev. , 60 F.2d 937 ( 1932 )

Title Ins. & Trust Co. v. County of Riverside , 48 Cal. 3d 84 ( 1989 )

City of Pittsburgh v. West Penn Power Comp., D/B/A ... , 147 F.3d 256 ( 1998 )

clarence-craig-and-duveen-a-craig-v-lake-asbestos-of-quebec-ltd-v , 843 F.2d 145 ( 1988 )

Applied Biosystems, Inc. v. Cruachem, Ltd. , 772 F. Supp. 1458 ( 1991 )

Regency Transportation Group, Ltd. v. Pennsylvania Public ... , 44 A.3d 107 ( 2012 )

Llyod v. Pennsylvania Public Utility Commission , 17 A.3d 425 ( 2011 )

Outokumpu Engineering Enterprises, Inc. v. Kvaerner ... , 685 A.2d 724 ( 1996 )

George v. Pennsylvania Public Utility Commission , 735 A.2d 1282 ( 1999 )

Scanlon v. Department of Public Welfare , 739 A.2d 635 ( 1999 )

Readinger v. Workers' Compensation Appeal Board , 855 A.2d 952 ( 2004 )

Ligon v. Middletown Area School District , 136 Pa. Commw. 566 ( 1990 )

Japan Petroleum Co.(Nigeria) Ltd. v. Ashland Oil , 456 F. Supp. 831 ( 1978 )

Seven Springs Farm, Inc. v. Croker , 748 A.2d 740 ( 2000 )

State Farm Mutual Automobile Insurance v. Cavoto , 34 A.3d 123 ( 2011 )