  • J-A04014-17
    NON-PRECEDENTIAL DECISION - SEE SUPERIOR COURT I.O.P. 65.37
    GLEN WILLOW PROPERTIES, LLC,                     IN THE SUPERIOR COURT OF
    PENNSYLVANIA
    v.
    INDUSTRIAL ORCHARDS LAND
    ASSOCIATES, LP AND MAHMOOD
    CHOUDHURY D/B/A INDUSTRIAL
    ORCHARDS ASSOCIATES, LP,
    ----------------------------------------------
    ORCHARDS INDUSTRIAL LAND
    ASSOCIATES, LP,
    v.
    GLEN WILLOW PROPERTIES, LLC,
    ----------------------------------------------
    ORCHARDS INDUSTRIAL LAND
    ASSOCIATES, LP,
    v.
    JP MORGAN CHASE BANK, N.A.,
    v.
    GLEN WILLOW PROPERTIES, LLC,
    APPEAL OF: JP MORGAN CHASE BANK,
    N.A.,
    Appellant                No. 1334 EDA 2016
    Appeal from the Judgment Entered April 19, 2016
    In the Court of Common Pleas of Bucks County
    Civil Division at No(s): 07-05467-26-5
    GLEN WILLOW PROPERTIES, LLC,                     IN THE SUPERIOR COURT OF
    PENNSYLVANIA
    v.
    J-A04014-17
    INDUSTRIAL ORCHARDS LAND
    ASSOCIATES, LP AND MAHMOOD
    CHOUDHURY D/B/A INDUSTRIAL
    ORCHARDS LAND ASSOCIATES, LP,
    ----------------------------------------------
    INDUSTRIAL ORCHARDS LAND
    ASSOCIATES, LP,
    v.
    GLEN WILLOW PROPERTIES, LLC,
    ----------------------------------------------
    INDUSTRIAL ORCHARDS LAND
    ASSOCIATES, LP,
    v.
    JP MORGAN CHASE BANK, N.A.,
    v.
    GLEN WILLOW PROPERTIES, LLC,
    APPEAL OF: GLEN WILLOW PROPERTIES,
    LLC,
    Appellant                No. 1500 EDA 2016
    Appeal from the Judgment Entered April 19, 2016
    In the Court of Common Pleas of Bucks County
    Civil Division at No(s): 07-05467-26-5
    BEFORE: SHOGAN, SOLANO, and PLATT,* JJ.
    MEMORANDUM BY SHOGAN, J.:                            FILED APRIL 24, 2017
    ____________________________________________
    *
    Retired Senior Judge assigned to the Superior Court.
    -2-
    J-A04014-17
    In these consolidated appeals, Glen Willow Properties, LLC (“Glen
    Willow”) appeals from the entry of judgment in favor of Industrial Orchards
    Land Associates, LP (“Orchards”) and JP Morgan Chase Bank (“JPMC”), and
    JPMC appeals from the entry of judgment in favor of Orchards.                 Upon
    review, we affirm in part and reverse in part.
    The trial court thoroughly set forth the factual background of this case
    in its Pa.R.A.P. 1925(a) opinion. Trial Court Opinion, 7/19/16, at 1–5. In
    summary, Orchards and Glen Willow executed a land sale agreement
    (“Contract”) on February 8, 2006, whereby Orchards would sell Bucks
    County Tax Map Parcel 22-057-004 (“Property”) to Glen Willow for
    $5,000,000; Glen Willow      intended   to    develop    the   Property for    the
    construction of 100 townhouses. The parties executed an escrow agreement
    the next day, and Glen Willow paid its initial, non-refundable deposit of
    $150,000 (“Escrow Deposit”).
    In the Fall of 2006, the parties negotiated an amendment to ¶ 34(C) of
    the Contract that addressed the period in which Glen Willow was required to
    obtain   development    approvals   from     various    government    authorities
    (“Approvals Period”). The proposed amendment would give Glen Willow an
    option to extend the Approvals Period by twelve months upon a written
    request and payment of $200,000 to Orchards (“Option”). The amendment
    would also excuse Glen Willow from providing the $1,000,000 letter of credit
    (“letter of credit”) to Orchards required under ¶ 34(B) of the Contract.
    -3-
    J-A04014-17
    Pursuant to the parties’ oral negotiations, Orchards’ general partner,
    Mahmood Choudhury (“Choudhury”), drafted and sent a document that
    reflected the terms of the proposed amendment to James Luke (“Luke”), an
    officer of Glen Willow. After some delay, Luke returned a document, signed
    and dated December 7, 2006 (“Amendment”).           Assured by his real estate
    agent, Sandy Farry, that the Amendment was the same document
    Choudhury had drafted, Choudhury signed the Amendment without first
    reviewing it.
    Several weeks later, on or around January 30, 2007, Choudhury
    learned from Glen Willow’s real estate agent, Sharon Otto, that the
    Amendment did not include the twelve-month extension language.                In
    response, Choudhury contacted Glen Willow by email on January 31 and
    February 2, 2007, declaring the Amendment null and void and notifying Glen
    Willow that it was in breach of the Contract for failing to deliver the letter of
    credit.   In a responsive letter from counsel dated February 2, 2007, Glen
    Willow refused to modify the Amendment and to submit the letter of credit.
    On April 6, 2007, Choudhury sent an email to Glen Willow terminating the
    Contract.
    Despite Choudhury’s emails, and in anticipation of the Contract’s
    June 8, 2007 settlement date, Glen Willow attempted to exercise the Option
    by sending a written request for an extension and a cashier’s check for
    $200,000 to Orchards on June 4, 2007. The cashier’s check was issued by
    -4-
    J-A04014-17
    JPMC.     Believing that Glen Willow’s check was a business check, not a
    cashier’s check as required under the Contract, Choudhury instructed his
    wife to write VOID on the cashier’s check; Choudhury subsequently
    misplaced the check.
    In April of 2008, Glen Willow directed JMPC to stop payment on the
    unpaid cashier’s check; JPMC complied on April 21, 2008.        Thirty-three
    months after voiding the cashier’s check, Choudhury requested payment on
    the cashier’s check from JPMC in March of 2010.        JPMC refused, having
    already returned the funds to Glen Willow’s account.
    Three lawsuits arose from the Contract dispute and unpaid cashier’s
    check.     First, on July 9, 2007, Glen Willow sued Orchards for specific
    performance and indexed a lis pendens against the Property; Orchards
    counterclaimed, seeking a declaratory judgment that the Contract was
    terminated and requesting liquidated damages. Second, Orchards sued Glen
    Willow, requesting reformation of the Amendment, a declaration that Glen
    Willow breached the Contract, and damages.        In response, Glen Willow
    struck the lis pendens on February 9, 2011, abandoned its claim for specific
    performance, terminated the Contract as amended due to Orchards’ alleged
    breach, and requested damages. Third, Orchards sued JPMC for payment on
    the cashier’s check, and JPMC joined Glen Willow seeking indemnification.
    The three lawsuits were consolidated for trial.
    -5-
    J-A04014-17
    Following a nonjury trial, the trial court entered verdicts for Orchards
    in all three cases and in favor of JPMC on its indemnification claim against
    Glen Willow. The trial court awarded Orchards the $150,000 Escrow Deposit
    and $533,333.33 for the lis pendens encumbrance to be paid by Glen Willow
    and the $200,000 to be paid by JPMC.            The trial court granted JPMC’s
    request for indemnification on the $200,000, and awarded it attorneys’ fees,
    and costs to be paid by Glen Willow. Glen Willow and JPMC filed post-trial
    motions, which the trial court denied. These appeals followed. The parties
    and the trial court complied with Pa.R.A.P. 1925.
    We address Glen Willow’s appeal first, wherein it presents the
    following questions for our consideration:
    1. Whether the trial court, being guided by its determinations of
    [Glen Willow’s] “delays and deception” that were either
    predicated upon errors of law and/or were not supported by
    competent evidence of record, erred in rendering its verdict in
    favor of Orchards and against [Glen Willow].
    2. Whether even if, in the alternative, this Court were to uphold
    the trial court’s findings of liability in favor of Orchards, it
    must nevertheless find that the damages awarded against
    [Glen Willow] were erroneous as a matter of law.
    3. Whether the trial court erred as a matter of law in ordering
    [Glen Willow] to indemnify JPMC.
    Glen Willow’s Brief at 3 (full capitalization omitted).
    We apply the following standard of review to a nonjury trial verdict:
    Our appellate role in cases arising from nonjury trial
    verdicts is to determine whether the findings of the trial court
    are supported by competent evidence and whether the trial court
    committed error in any application of the law. The findings of
    -6-
    J-A04014-17
    fact of the trial judge must be given the same weight and effect
    on appeal as the verdict of a jury. We consider the evidence in a
    light most favorable to the verdict winner. We will reverse the
    trial court only if its findings of fact are not supported by
    competent evidence in the record or if its findings are premised
    on an error of law. However, where the issue . . . concerns a
    question of law, our scope of review is plenary. The trial court’s
    conclusions of law on appeal originating from a non-jury trial
    “are not binding on an appellate court because it is the appellate
    court’s duty to determine if the trial court correctly applied the
    law to the facts” of the case.
    Allegheny Energy Supply Co., LLC v. Wolf Run Min. Co., 
    53 A.3d 53
    ,
    60–61 (Pa. Super. 2012) (quoting Wyatt Inc. v. Citizens Bank of
    Pennsylvania, 
    976 A.2d 557
    , 564 (Pa. Super. 2009) (citations omitted)).
    The trial court entered the following summary of findings:
    We find that problems between Orchards and [Glen
    Willow] began to develop in the Fall of 2006 after [Glen Willow]
    received the Zoning Change called for in the Original Contract
    but failed to deliver the $1,000,000.00 letter of credit required of
    it. In an attempt to resolve the dispute, Mr. Choudhury, the
    General Partner in charge of Orchard[s] arranged a meeting with
    Mr. Luke, one of the then members of [Glen Willow] at the office
    of [Glen Willow’s] zoning attorney, Mr. Marte, who also
    participated in the meeting.        The meeting resulted in an
    agreement to resolve the dispute by providing [Glen Willow] with
    an option to extend the time of settlement for one year from the
    existing June 8, 2007 deadline by paying Orchard[s] an
    additional $200,000.00 at the time the optional extension was
    exercised. The agreement also relieved [Glen Willow from] its
    pre-existing obligation to post the $1,000,000.00 letter of credit.
    Immediately after the meeting in Mr. Marte’s office,
    Mr. Choudhury correctly reduced the agreed upon terms to
    writing (Exhibit O-2) and submitted it to [Glen Willow] through
    the offices of Coldwell Banker, where the real estate agents
    representing both [Glen Willow] (Sharon Otto) and Orchard[s]
    (Sandra Farry) were located.
    -7-
    J-A04014-17
    When the written agreement was not returned promptly[,]
    follow-up inquiries were initialed [sic] by Mr. Choudhury and
    ultimately he was told by Ms. Farry that the Amendment to
    Agreement of Sale had been signed by [Glen Willow] and
    delivered to her office. At her request, Mr. Choudhury came to
    her office and signed the Amendment without the close
    examination that would have revealed that it had been altered
    by [Glen Willow] to change the extension from a one year period
    to an indefinite period.
    The delay by [Glen Willow] in executing the agreed upon
    amendment increased the level of concern that Orchard[s]
    rightfully had over the sincerity of [Glen Willow’s] intentions in
    the transaction.    That concern was greatly magnified when
    Orchard[s] learned the [Glen Willow] had fraudulently changed
    the terms of the amendment as indicated above.
    From the testimony of Mr. Luke on behalf of [Glen Willow]
    and considering the lack of testimony of Steven Plofker, the lead
    member of [Glen Willow], it is apparent that one of three
    scenarios explain[s] the delay in returning the signed
    amendment and the fraudulent altering of it. They include that
    Mr. Luke did it with the full authorization of and/or at the
    direction of Mr. Plofker, that Mr. Plofker did it or had it done and
    instructed Mr. Luke to refrain from letting anyone know it had
    been done or that Mr. Plofker did it or had it done and failed to
    inform even Mr. Luke that it had been done. In the latter of
    those scenarios it is possible that Mr. Luke did not discover the
    change or that he did discover it but chose not to reveal it to
    Orchard[s]. For purposes of the outcome of this case[,] which
    scenario took place is not important. All had the intended end
    result of getting Orchard[s] to sign a written document with the
    belief that it complied with the agreed upon terms when it did
    not.
    The fact that the written amendment did not contain the
    agreed upon terms is not disputed in this case by [Glen Willow].
    However, despite being caught in their deception and
    acknowledging the “mistake”, [Glen Willow] refused to correct
    the amendment. Orchard[s] had made it clear to [Glen Willow]
    that the “mistake” needed to be corrected or [Glen Willow]
    would not be entitled to the benefit of not having to post the
    $1,000,000.00 letter of credit as called for in the Original
    [Contract].
    -8-
    J-A04014-17
    Because of [Glen Willow’s] aforesaid delays and deception,
    Orchard[s] was now rightfully extremely concerned about [Glen
    Willow’s] intentions and trustworthiness. Therefore, when [Glen
    Willow] requested Orchard[s] to allow [Glen Willow] to apply for
    a PennDot Highway Occupancy Permit with a recordable waiver
    signed by Orchard[s] at a time when the Permit was not even
    needed, Orchard[s] rightfully suggested that either the permit
    application be delayed or that instead the permit be applied for
    in Orchard[s’] name with the understanding that it would be
    transferred to [Glen Willow] when and if the transaction went to
    settlement. [Glen Willow’s] contention that Orchard[s’]
    reluctance to submit the permit application as originally
    requested by [Glen Willow] somehow was a violation of
    Orchard[s’] contractual obligations and/or caused any concerns
    on [Glen Willow’s] part is simply not credible.
    Even though [Glen Willow] obtained preliminary land
    development plan approval in March of 2007 and could have
    immediately taken steps to submit the application for final
    approval, [Glen Willow] instead chose to do nothing further until
    its June attempt to exercise the option to extend the settlement
    deadline by one year.
    Summary of Findings and Verdict, 9/18/15, at 2–4 (emphasis in original).
    Glen Willow challenges the trial court’s conclusion that Glen Willow was
    liable to Orchards for breach of the Contract.    Glen Willow’s Brief at 28.
    According to Glen Willow, the trial court’s finding that Glen Willow engaged
    in fraud regarding the Approvals Period was not supported by the record
    because there was no testimony or documents establishing that Glen Willow
    “made any misrepresentations as to what Choudhury was signing or made
    any inducements in this regard.” 
    Id. at 32.
    Glen Willow also disputes the
    trial court’s finding that Orchards “justifiably relied upon any alleged fraud
    on the part of Glen Willow” because Choudhury “admittedly failed to read
    the Amendment before signing it.” 
    Id. at 35.
    Glen Willow concludes that
    -9-
    J-A04014-17
    the trial court “could not have enforced any contract between the parties
    and      could   not    have    determined      if   either   had   performed/not
    performed . . . due to the uncorrected mutual mistake” regarding the
    Option. 
    Id. at 37.
    Initially, we address the fraud underpinnings of this case.      “Under
    Pennsylvania law, a cause of action framed as a tort but reliant upon
    contractual obligations will be analyzed to determine whether the cause of
    action properly lies in tort or contract.”       Autochoice Unlimited, Inc. v.
    Avangard Auto Fin., Inc., 
    9 A.3d 1207
    , 1212 (Pa. Super. 2010).                “In
    general, courts are cautious about permitting tort recovery based on
    contractual breaches. In keeping with this principle, this Court has
    recognized the ‘gist of the action’ doctrine, which operates to preclude a
    plaintiff from re-casting ordinary breach of contract claims into tort claims.”
    Hart v. Arnold, 
    884 A.2d 316
    , 339 (Pa. Super. 2005). The doctrine bars
    tort claims:
    (1) arising solely from a contract between the parties; (2) where
    the duties allegedly breached were created and grounded in the
    contract itself; (3) where the liability stems from a contract; or
    (4) where the tort claim essentially duplicates a breach of
    contract claim or the success of which is wholly dependent on
    the terms of a contract.
    
    Id. at 340
    (quoting eToll, Inc. v. Elias/Savion Adver., 
    811 A.2d 10
    , 19
    (Pa. Super. 2002)). “The question of whether the gist of the action doctrine
    applies is an issue of law subject to plenary review.” eToll, 
    Inc., 811 A.2d at 15
    .
    - 10 -
    J-A04014-17
    In the case sub judice, Orchards alleged fraud in connection with the
    Contract as amended in its new matter to Glen Willow’s complaint for
    specific performance, stating, “[Glen Willow] obtained [Orchards’] signature
    on [the Amendment] by fraudulent means.”            Answer, New Matter, and
    Counterclaim, 8/29/07, at ¶ 30. However, in its own complaint against Glen
    Willow, Orchards raised claims of breach of contract and unjust enrichment,
    but not fraud. Complaint, 5/4/10, at ¶¶ 19–29.
    Our thorough review of the record indicates that the subject matter of
    the underlying litigation was the Contract as amended.          It is clear to this
    Court that the rights Orchards seeks to vindicate specifically arise from its
    contractual relationship to Glen Willow and not from a general societal policy
    embodied by the law of torts. We conclude, therefore, that Orchards’ claim
    is properly viewed as an action on the Contract as amended and that its
    allegations of fraud are barred by the gist-of-the-action doctrine. Thus, we
    further conclude that the trial court erred in its application of the law to the
    facts by making fraud-based conclusions in this contract action.          Accord
    Allegheny Energy 
    Supply, 53 A.3d at 60
    –61 (instructing that conclusions
    of law on appeal from a nonjury trial “are not binding on an appellate court
    because it is the appellate court’s duty to determine if the trial court
    correctly applied the law to the facts” of the case).
    Reviewing this controversy from the proper legal perspective, the
    following principles govern our interpretation of a contract:
    - 11 -
    J-A04014-17
    Because contract interpretation is a question of law, this Court is
    not bound by the trial court’s interpretation. Our standard of
    review over questions of law is de novo and to the extent
    necessary, the scope of our review is plenary as the appellate
    court may review the entire record in making its decision. With
    respect to factual conclusions, we may reverse the trial court
    only if its findings of fact are predicated on an error of law or are
    unsupported by competent evidence in the record.
    Step Plan Servs., Inc. v. Koresko, 
    12 A.3d 401
    , 408 (Pa. Super. 2010)
    (internal quotation marks, citations, and modifications omitted).
    We must view the evidence of record in a light most favorable to
    Orchards, the verdict winner.       In doing so, we conclude the following
    findings of fact by the trial court are supported by competent evidence of
    record: Glen Willow received the Zoning Change called for in the Contract,
    but it failed to deliver the letter of credit required of it.       The parties
    negotiated an amendment, giving Glen Willow the Option and waiving the
    letter-of-credit obligation.   Although the Amendment did not include the
    twelve-month-extension language, both parties signed it. The provision at
    issue reads as follows:
    Notwithstanding the terms of the Contract, the Approval Period,
    as defined in Paragraph 34(c) of the Contract will be extended
    automatically on the written request of the Buyer, provided it is
    accompanied with a payment in the amount of $200,000.00,
    payable in certified funds or by wire transfer, on or before June
    8, 2007. No new extensions will be granted. Paragraph 35(5) is
    hereby being superseded by this Amendment. This extension
    will be valid only if payment of $200,000, as stated hereinabove
    is received and acknowledged by the Seller.
    Amendment, 12/4/06, at ¶ 2.        Pursuant to the Amendment, Glen Willow
    attempted to exercise the Option by sending a written request for an
    - 12 -
    J-A04014-17
    extension and a $200,000 cashier’s check to Orchards on June 4, 2007.
    Orchards received the check but voided it.             Orchards subsequently
    demanded the letter of credit and gave Glen Willow additional time in which
    to deliver it. When Glen Willow did not provide the letter of credit, Orchards
    terminated the Contract.    Glen Willow requested a stop payment on the
    cashier’s check, which JPMC executed.        Despite nullifying the Amendment,
    denying Glen Willow an extension of the Approvals Period, and terminating
    the Contract, Orchards requested payment on the cashier’s check from
    JPMC, which JPMC refused.
    These facts give rise to the following conclusions of law: Glen Willow’s
    initial failure to deliver the letter of credit constituted a breach of the
    Contract.   Orchards did not acknowledge the $200,000 cashier’s check as
    payment for an extension under the Amendment, as evidenced by
    Choudhury having the cashier’s check marked “void” and his subsequent
    notices to Glen Willow. Pursuant to ¶ 2 of the Amendment, therefore, Glen
    Willow did not obtain an extension of the Approvals Period and remained in
    breach of the Contract. Despite Orchards’ renewed demand for the letter of
    credit, Glen Willow failed to deliver the letter of credit within the sixty-day
    - 13 -
    J-A04014-17
    cure period under ¶ 16 of the Contract1 and the additional time afforded by
    Orchards through Choudhury’s emails. Based on the foregoing, we discern
    no error in the trial court’s ultimate conclusion that Glen Willow breached the
    Contract by failing to deliver the letter of credit.
    Glen Willow’s second issue raises an alternative argument that, even if
    the trial court’s conclusion that Glen Willow breached the Contract was
    correct, its award of damages was “erroneous as a matter of law.”         Glen
    Willow’s Brief at 38. Glen Willow argues that Orchards’ sole remedy under ¶
    17 of the Contract was liquidated damages, i.e., the Escrow Deposit. 
    Id. at 39.
    Therefore, Glen Willow contends, the trial court erred in reforming the
    Amendment, extending the Approvals Period to September 18, 2015, “more
    than eight years after the expiration of the originally intended one-year
    extension of the Approvals Period,” and awarding $533,333.33—which was
    the uncontested value of the Approvals Period extended and pro-rated for
    the actual length of time the Property was subject to Glen Willow’s lis
    ____________________________________________
    1
    This provision reads as follows:
    16. Correcting Defects. There shall be no event of default or
    right to terminate this Contract unless sixty (60) days prior
    written notice is given to the other party in which to cure or
    correct such defect or case for termination and can be
    terminated by either party with written notice if the written
    notice does not take place within the 60-day period.
    Contract for Buy/Sale of Real Estate, 2/8/06, at ¶ 16.
    - 14 -
    J-A04014-17
    pendens. 
    Id. at 36,
    39 (emphasis in original).2 We agree with Glen Willow
    that the trial court’s award of additional damages to Orchards was
    erroneous.
    In a breach of contract action, damages are awarded to
    compensate the injured party for loss suffered due to the
    breach. The purpose of damages is to put the plaintiff in the
    position he or she would have been in but for the breach.
    Empire Properties, Inc. v. Equireal, Inc., 
    674 A.2d 297
    , 304–305 (Pa.
    Super. 1996) (internal citations omitted).
    Here, the Contract expressly provides for damages as follows:
    17. Termination of Contract. If this Contract is legally and
    rightfully terminated by the Buyer for reasons permitted
    hereunder, the Escrow Deposit and the Letter of Credit shall be
    refunded to the Buyer, without interest. If the Contract is
    terminated by the Seller because of Buyer’s default, the
    Escrow Deposit shall be retained by the Seller as
    liquidated damages.       In the event Seller defaults in its
    obligations hereunder, Buyer shall have the right to seek specific
    performance.
    Contact for Buy/Sale of Real Estate, 2/8/06, at ¶ 17 (emphasis in text
    supplied). Pursuant to ¶ 17, the trial court’s award of the Escrow Deposit to
    Orchards was proper.
    ____________________________________________
    2
    Orchards argues that this claim is waived because it does not appear in
    Glen Willow’s Pa.R.C.P. 1925(b) statement. Orchards’ Brief at 20. Our
    review of the record confirms that Glen Willow’s challenge to reformation of
    the Amendment was not expressly included in its Rule 1925(b) statement;
    however, we find that this claim is fairly subsumed in Glen Willow’s
    arguments related to the damages awarded to Orchards.
    - 15 -
    J-A04014-17
    The trial court based its award of additional damages to Orchards on
    Glen Willow’s alleged fraud and the lis pendens:
    The fraudulent Amendment that spurred this litigation was
    entered on or around December 4, 2006 with an effective date of
    June 8, 2007. The lis pendens was lifted on February 9, 2011.
    See Praecipe to Strike Lis Pendens p. 1. It is undisputed that
    prior to the Amendment’s execution, both parties had orally
    agreed that the cost of a one-year extension on the line of credit
    requirement was $200,000.        Therefore, we reasoned that
    Orchard[s] should recover $200,000 for every year from the
    effective date of the Amendment until the time the lis pendens
    was lifted. Orchard[s] was awarded $200,000 per year pro rated
    for the period from June 8, 2007 through February 9, 2011,
    which totaled $733,333.33.
    Damages we awarded to Orchard[s] from Glen Willow are
    the direct result of Glen Willow’s conduct in trying to fraudulently
    obtain an indefinite extension of the original Contract’s time
    limit. The original Contract required Glen Willow to post a one
    million dollar letter of credit once it received zoning approval.
    Having received such approval[,] Glen Willow engaged in a
    course of conduct to avoid that requirement by instead agreeing
    to pay $200,000.00 of [sic] a one-year extension. It then
    fraudulently got Orchard[s’] signature on an Amendment that
    gave it an unlimited extension. When caught in its fraud, Glen
    Willow began a course of conduct that attempted to paint
    Orchard[s] as the defaulting party. In determining how to
    calculate damages, we granted Orchard[s] the benefit of the
    bargain it and Glen Willow actually agreed to when the terms of
    the Amendment were negotiated. We could have found that the
    Amendment was null and void as Orchard[s] requested and
    awarded Orchard[s] the one million dollars they would have
    received had Glen Willow posted the letter of credit called for by
    the original Contract and then defaulted. We chose not to do so
    because we felt that considering the facts as we found them, the
    award we made was the most appropriate since it put the parties
    in the position they would have been had the terms actually
    agreed upon when the Amendment was negotiated were
    implemented.
    Trial Court Opinion, 7/19/16, at 17–18 (emphasis in original).
    - 16 -
    J-A04014-17
    Upon review, we conclude that the trial court’s award of damages in
    excess of the Escrow Deposit was erroneous for several reasons. First, upon
    Orchards’ termination of the Contract, it was entitled to retain only the
    Escrow Deposit as liquidated damages. Contact for Buy/Sale of Real Estate,
    2/8/06, at ¶ 17. Contrary to the trial court’s assertion, therefore, it could
    not have awarded Orchards one million dollars under the letter of credit.
    Second, Glen Willow did not successfully exercise the Option because
    Orchards     voided   the   cashier’s   check    and   nullified   the   Amendment.
    Stipulation of Agreed-Upon Facts, 9/11/15, at Exhibit B.             Therefore, Glen
    Willow did not owe—and Orchards was not entitled to—$200,000. Third, the
    trial court’s endorsement of Orchards’ fraud allegations as a basis for
    damages in this action for breach of contract violates the gist-of-the-action
    doctrine.
    Finally, the trial court’s reliance on the lis pendens as a basis for
    reforming the Amendment and awarding additional damages conflicts with
    our recent decision in In Re: Foremost Industries, Inc. v. GLD Foremost
    Holdings, LLC, ___ A.3d ___, 
    2017 Pa. Super. 37
    (Pa. Super. filed February
    16, 2017).    The appeal of Foremost Industries arose out of “the lower
    court’s denial of GLD’s emergency petition to strike the lis pendens on
    properties owned by Foremost Industries.” 
    Id. at *6.
    We explained the law
    of lis pendens as follows:
    Lis pendens is construed to be the jurisdiction, power, or control
    which courts acquire over property involved in a suit, pending
    - 17 -
    J-A04014-17
    the continuance of the action, and until final judgment. Lis
    pendens may be imposed when the property is subject to
    litigation and that any interest acquired by the third party will be
    subject to the result of the litigation.
    The doctrine of lis pendens is based in common law and
    equity jurisprudence, rather than in statute, and is wholly
    subject to equitable principles. The doctrine does not establish
    an actual lien on the affected property. Its purpose is merely to
    give notice to third persons that the real estate is subject to
    litigation and that any interest which they may acquire in the
    real estate will be subject to the result of the action.
    If title to the property is not subject to the result of the
    litigation, then there is no reason to provide notice to a third
    party about the litigation. To impose lis pendens in such a case
    would prove to be an arbitrary application of the doctrine and,
    equity can and should refuse to give it effect, and, under its
    power to remove a cloud on title can and should cancel a notice
    of lis pendens which might otherwise exist.
    Thus, a two-part analysis emerges from the common law
    that the courts should apply to determine whether exerting the
    court’s control over real property is appropriate. The first step is
    to ascertain whether title is at issue in the pending litigation.
    The second step is an equitable inquiry:
    The lower court must balance the equities to
    determine whether the application of the doctrine is
    harsh or arbitrary and whether the cancellation of
    the lis pendens would result in prejudice to the non-
    petitioning party.
    
    Id. at *6–7
    (internal quotation marks and citations omitted).
    Here, the underlying action does not involve a dispute over title to the
    Property, but rather a contract dispute. Technically, therefore, Glen Willow
    had “no reason to provide notice to a third party about the litigation.”
    Foremost Industries, 
    2017 Pa. Super. 37
    , at *6. The second step of the lis
    pendens analysis is informed by the record. Glen Willow sued Orchards for
    - 18 -
    J-A04014-17
    specific performance of the Contract and recorded a lis pendens. Orchards
    filed suit against Glen Willow for breaching the Contract.            Glen Willow
    cancelled the lis pendens on February 9, 2011, when it withdrew its action
    for specific performance.         Prior to Glen Willow’s cancellation of the lis
    pendens, Orchards did not move to strike it, nor has Orchards claimed the
    loss of any potential sale of the Property as a result of the lis pendens. The
    Contract limits Orchards’ damages for Glen Willow’s breach to the Escrow
    Deposit. Agreement for Buy/Sale of Real Property, 2/8/06, at ¶ 17. In light
    of this record, we discern no basis for the trial court’s equitable award of
    damages to Orchards based on the lis pendens.
    In sum, we conclude that the trial court’s award of the Escrow Deposit
    to Orchards was authorized under ¶ 17 of the Contract. Contrarily, the trial
    court erred in awarding $733,333.33 to Orchards by reforming the nullified
    Amendment and using the lis pendens to calculate damages.               Thus, we
    reverse the entry of judgment in favor of Orchards and against Glen Willow
    for $733,333.33 and the entry of judgment in favor of Orchards against
    JPMC for $200,000.3
    Glen Willow’s final issue challenges the trial court’s ruling that Glen
    Willow must indemnify JPMC.              Glen Willow’s Brief at 40.    On JPMC’s
    ____________________________________________
    3
    In light of this holding, JPMC is not liable to Orchards for the unpaid
    cashier’s check. Therefore, we need not address the challenges raised in
    JPMC’s appeal to the trial court’s rejection of JPMC’s defenses. JPMC’s Brief
    at 10–11.
    - 19 -
    J-A04014-17
    indemnification claim, the trial court awarded JPMC its defense costs of
    $161,084.99 through August 31, 2015, and the $200,000 payable to
    Orchards in the event JPMC paid that amount and was not immediately
    reimbursed by Glen Willow. Summary of Findings and Verdict, 9/18/15 at 5.
    Subsequently, the trial court awarded JPMC an additional $47,088.34 in
    post-August 31, 2015 attorneys’ fees and expenses. Order, 3/22/16.
    The trial court explained its two-part indemnification ruling as follows:
    We were further reasonable and logical when we granted
    JPMC’s request for indemnification and attorney fees against
    [Glen Willow]. At trial, we found JPMC’s argument regarding the
    indemnification claims convincing.          JPMC stated that
    indemnification is provided for both in its contract with [Glen
    Willow] and the UCC [Uniform Commercial Code].              In the
    agreement Plofker signed for [Glen Willow] when he opened
    [Glen Willow’s] account with JPMC, he agreed to indemnify the
    bank for any claims brought against it because of services
    provided to [Glen Willow] as a customer. N.T. 9/14/2015, p.
    187. The processing of the stop payment request was clearly a
    service provided to [Glen Willow] as a customer.           Further,
    § 3312 of the UCC provides protection to a bank if a cashier’s
    check has been outstanding for longer than ninety days. N.T.
    9/14/2015, p. 189. Finally, counsel for JPMC submitted detailed
    documentation regarding its costs incurred in litigating this case.
    N.T. 9/14/2015, p. 190. See Post-Trial Petition of JPMC for an
    Award Against [Glen Willow] of Additional Legal Fees &
    Expenses, 1/14/2016.       The undersigned did not abuse its
    discretion in awarding JPMC $208,173.33 in fees and
    expenses[.]
    Trial Court Opinion, 7/19/16, at 18.
    In response to the trial court’s indemnification decision on the cashier’s
    check, Glen Willow relies on the rule of contract interpretation that specific
    language controls general language, and it directs our attention to the Stop
    - 20 -
    J-A04014-17
    Payment Affidavit executed by Plofker.            Glen Willow’s Brief at 41 (citing
    Southwestern Energy Production Co. v. Forest Resources, LLC, 
    83 A.3d 177
    (Pa. Super. 2013)); Stipulation of Agreed-Upon Facts, 9/11/15, at
    Exhibit E. The Stop Payment Affidavit provision reads as follows:
    THAT if the check was issued not more than 90 days ago,
    in consideration of your issuing a duplicate of the said
    check/crediting     account  number     ______________,      the
    undersigned agrees to indemnify [JPMC] against any loss,
    damages, suits, counsel fees, expenses and liabilities which it
    may incur in connection with any claim which may be made with
    respect to the original check or duplicate check in connection
    with the honoring or declining to honor whether through
    inadvertence or otherwise either of the said checks, and further
    agrees to promptly surrender the original check to [JPMC] for
    cancellation if located.
    
    Id. at 2
    (emphasis in original). According to Glen Willow:
    JPMC would only be indemnified if the check on which a stop-
    payment was requested was issued less than 90 days from the
    request to stop payment. Here, the Bank Check was issued well
    beyond 90 days from the request to stop payment and, as such,
    there was no duty on the part of [Glen Willow] to indemnify
    JPMC with respect to it.
    Glen Willow’s Brief at 42 (emphasis in original).          Additionally, Glen Willow
    asserts “there is no provision in section 3312 of the Uniform Commercial
    Code, 13 Pa. C.S.A. § 3312 (“Lost, destroyed or stolen cashier’s check,
    teller’s   check   or   certified   check”),     that   even   mentions   the   word
    ‘indemnification’ or any variation or idea of it.” 
    Id. at 42.
    In contrast, JPMC argues that the specific provision in the Stop
    Payment Affidavit does not nullify, supersede, abrogate, or conflict with the
    general indemnification provision in the parties’ agreement. JPMC’s Brief at
    - 21 -
    J-A04014-17
    7–10 (citations omitted).    JPMC further argues, “The provision in the Stop
    Payment Affidavit does not apply because the check had been outstanding
    for more than 90 days.” 
    Id. at 10–13
    (citing 13 Pa.C.S. § 3312(b)(2)).
    Upon review of the parties’ arguments, the law, and the certified
    record, we reverse the trial court’s indemnification ruling in part and affirm
    in part.   As explained above, Orchards did not acknowledge the cashier’s
    check as payment under the Amendment, and it nullified the Amendment;
    therefore, there was no extension of the Approvals Period.       Consequently,
    Glen Willow was not required to pay $200,000; Orchards was not entitled to
    payment on the cashier’s check; JPMC was not liable to Orchards for
    nonpayment of the cashier’s check; and Glen Willow was not required to
    indemnify JPMC for the $200,000.       Based on the foregoing conclusions of
    law, we reverse the trial court’s order directing Glen Willow to indemnify
    JPMC.
    As for the second component of the trial court’s indemnification ruling,
    Glen Willow does not mount any challenge to the order requiring it to
    indemnify JPMC for attorneys’ fees and costs. Glen Willow’s Brief at 40–42.
    Nor could it as the record supports the trial court’s findings, and we discern
    no error of law in its conclusion. Specifically, the record confirms that, as a
    customer of JPMC, Glen Willow agreed to the General Terms for Accounts
    and Services (“General Terms”). Stipulation of Agreed-Upon Facts, 9/11/15,
    at Exhibit D. The General Terms contain an indemnification provision:
    - 22 -
    J-A04014-17
    I [Glen Willow] agree to indemnify and hold you [JPMC] and all
    Morgan Affiliates harmless from any claim, loss, liability, or
    expense, including, without limitation, collection costs,
    reproduction and search costs and the reasonable fees and
    disbursements of counsel and other advisers incurred by you
    or them (i) in rendering services hereunder; (ii) in connection
    with any breach of this Agreement by me; or (iii) in connection
    with claims, suits or proceedings brought against you by
    third parties as a result of your providing products and
    services to me, except any claim, loss, or liability that results
    from your gross negligence or willful misconduct.
    
    Id. at ¶
    17 (emphases supplied). Under the plain language of this provision,
    Glen Willow unambiguously agreed to indemnify JPMC for attorneys’ fees
    and costs incurred in connection with Orchards’ third-party suit against JPMC
    on the cashier’s check. Thus, we affirm the trial court’s entry of judgment in
    favor of JPMC and against Glen Willow for attorneys’ fees and costs.
    Judgment in favor of Orchards and against Glen Willow for $150,000
    affirmed; judgment in favor of Orchards and against Glen Willow for
    $533,333.33 reversed; judgment in favor of Orchards and against JPMC for
    $200,000 reversed; judgment in favor of JPMC and against Glen Willow for
    attorneys’ fees and costs affirmed; judgment in favor of JPMC and against
    Glen Willow for indemnification of $200,000 reversed.
    Judgment Entered.
    Joseph D. Seletyn, Esq.
    Prothonotary
    Date: 4/24/2017