EQT Production v. Teska, R. ( 2016 )


Menu:
  • J-A32023-15
    NON-PRECEDENTIAL DECISION - SEE SUPERIOR COURT I.O.P. 65.37
    EQT PRODUCTION COMPANY AND                     IN THE SUPERIOR COURT OF
    EQUITRANS, L.P.                                      PENNSYLVANIA
    Appellee
    v.
    RONALD K. TESKA AND GIULIA
    MANNARINO
    Appellants                  No. 16 WDA 2015
    Appeal from the Order December 3, 2014
    In the Court of Common Pleas of Greene County
    Civil Division at No(s): 217 of 2013
    BEFORE: SHOGAN, J., OTT, J., and STABILE, J.
    MEMORANDUM BY OTT, J.:                             FILED MARCH 17, 2016
    Ronald K. Teska and Giulia Mannarino (“Landowners”) appeal, pro se,
    from the order entered on December 3, 2014, which granted a motion for
    summary judgment filed by Appellees, EQT Corporation, EQT Production
    Company, Equitable Gas Company, and Equitrans (collectively, “EQT”), and
    issued a permanent injunction, enjoining and restraining Landowners from
    interfering with EQT’s right of entry upon their property and plugging
    operation.   On appeal, Landowners argue the court erred in granting the
    motion for summary judgment and the permanent injunction. Based on the
    following, we affirm.
    A previous panel of this Court summarized most of the relevant facts
    and procedural history of this case in the following manner:
    J-A32023-15
    This case arises out of a dispute over a gas well located on
    property currently owned by [Landowners]. On April 28, 1913,
    Florence and G.E. Houston (the Houstons) and Carnegie Natural
    Gas Company (Carnegie) entered into a lease. The lease, in
    relevant part, provided that Carnegie had the right to mine for
    gas, lay pipelines, and build tanks on the Houstons’ land. In
    exchange, Carnegie agreed to provide the Houstons free gas
    from any well drilled on the property as well as royalties.
    Subsequently, Carnegie drilled a shallow well and provided free
    gas to the Houstons. In 1992, the property, including the
    mineral and gas rights, was purchased by [Landowners]; and, in
    1999, Carnegie assigned its rights under the lease to EQT
    Production Company.       A gathering line owned by Equitrans
    actually provided the free gas to [Landowners’] home.1
    1
    The relationship between [the EQT entities] was
    explained during testimony from EQT Production Company
    employee Mary Drummond in the hearing on the
    preliminary injunction on August 20, 2012.             EQT
    Production Company is a gas production company and
    produces gas from wells. Equitable Gas Company is a
    separately operated entity that acts as a billing agent for
    free gas customers. Equitrans is a separate company that
    owns a “gathering line.” N.T., 8/20/2012, at 54-57. The
    complaint asserted no separate claims against Equitrans.
    In February 2011, [Landowners] noticed that a valve on the well
    that fed the gathering line was in a closed position. Records
    they obtained from the Pennsylvania Department of
    Conservation and Natural Resources indicated that the well had
    last produced gas for use in 2007. On February 28, 2011,
    [Landowners] sent a certified letter to EQT Production Company
    to inform them that the gas well had been abandoned, and they
    returned a semi-annual royalty check. They also inquired about
    the status of the lease. On October 13, 2011, EQT Production
    Company filed a Release and Surrender of Oil and Gas Lease in
    the Greene County Recorder of Deeds. On October 27, 2011,
    EQT Production Company sent [Landowners] a certified letter
    notifying [Landowners] that their free gas would be terminated
    on November 7, 2011. That termination date was extended until
    March 31, 2012. Equitable Gas Company sought for
    [Landowners] to sign a Temporary Limited Service Agreement
    (TLSA) and fill out an application in order to arrange gas service
    for [Landowners]. Because [Landowners] disagreed with the
    -2-
    J-A32023-15
    manner in which Equitable Gas Company was treating them,
    they filed a complaint with the Public Utility Commission (PUC).2
    2
    In October 2012, [Landowners] and Equitable Gas
    Company “agreed to a negotiated Settlement Stipulation
    prior to the scheduled PUC hearing resulting in
    [Landowners] officially [becoming] paying Equitable Gas
    Company customers and gas service was restored.”
    [Landowners’] Brief at 16. Thus, there are no issues to
    address regarding the [Landowners’] gas service.
    Meanwhile, in March 2012, representatives of EQT Production
    Company and [Landowners] met to discuss the transfer of the
    gas well, as tests had indicated that the well was not depleted.
    EQT Corporation notified [Landowners] that EQT Production
    Company required them to complete certain steps to facilitate
    transfer of ownership of the well; otherwise, EQT Production
    Company would be legally required to plug the well.
    [Landowners] disagreed with the need to complete those steps.
    Because the discussions about the free gas and the transfer of
    the well were not progressing, on July 26, 2012, EQT Production
    Company sent a letter to [Landowners] advising them they
    would be terminating their free gas service on August 13, 2012,
    as well as moving forward with plugging the well.
    On August 6, 2012, [Landowners] filed pro se a complaint for
    declaratory judgment against [EQT]. In that complaint,
    [Landowners] sought a declaration that they were the “owners of
    all rights of every kind” with respect to the gas well, as well as
    an order for EQT Production Company to transfer the “Operator’s
    Permit” to them. Complaint, 8/6/2012, at 15-16. [Landowners]
    also sought an injunction to prohibit [EQT] from discontinuing
    their gas service. 
    Id. at 16.
    On August 10, 2012, [Landowners] filed a “Motion for
    Emergency Injunctive Relief and Petition for Motion for
    Preliminary Injunction Hearing.” On the same day, [EQT] filed
    preliminary objections to [Landowners’] motion for injunctive
    relief, as well as a motion for continuance of the preliminary
    injunction hearing. On August 10, 2012, the trial court granted
    [EQT’s] request for a continuance of the preliminary injunction
    hearing and scheduled it for August 20, 2012. The order also
    provided that EQT Production Company “shall not begin plugging
    operation before that date.” Order, 8/10/2012.
    -3-
    J-A32023-15
    On August 17, 2012, [EQT] filed preliminary objections in the
    nature of a demurrer to [Landowners’] complaint for declaratory
    judgment. Specifically, [EQT] asserted, inter alia, that even if
    the well had been abandoned, [Landowners] still had no right to
    the fixtures associated with the well because Appellants do not
    meet the definition of “owner” as prescribed by Pennsylvania
    Department      of    Environmental      Protection regulations.
    Preliminary Objections to Complaint, 8/17/2012, at ¶¶ 16-27.
    Moreover, [EQT] argued that as the owners of the well, they
    were legally obligated to plug it. 
    Id. at ¶¶
    32-39.
    On August 20, 2012, the trial court held a hearing on the
    preliminary injunction. On August 21, 2012, the trial court
    entered an order overruling [EQT’s] preliminary objections to the
    motion for injunctive relief, and dissolving the no-plug order of
    August 10, 2012.
    On November 1, 2012, the trial court sustained [EQT’s]
    preliminary objections in the nature of a demurrer and dismissed
    [Landowners’] complaint for declaratory judgment. Specifically,
    the trial court concluded that [EQT] had the right to remove their
    fixtures from [Landowners’] property and that [EQT] had no duty
    to transfer ownership of the well to [Landowners]. See Trial
    Court Opinion, 11/1/2012, at 2-3.
    Teska v. EQT Corp., 
    82 A.3d 463
    [1983 WDA 2012] (Pa. Super. 2013)
    (unpublished memorandum at 1-5), appeal denied, 
    85 A.3d 484
    (Pa. 2014)
    (“Teska I”).1
    On June 18, 2013, a panel of this Court affirmed the trial court’s order,
    which sustained preliminary objections and dismissed Landowners’ complaint
    ____________________________________________
    1
    The remainder of facts and procedural history of this case have been
    gleaned from the certified record and the parties’ briefs, since no updated
    trial court opinion was filed. Rather, on January 8, 2014, the court entered
    an order, resting on previously filed record and decision. See Order,
    1/8/2014.
    -4-
    J-A32023-15
    for declaratory judgment.          Pertinent to this appeal, the panel made the
    following conclusions: (1) EQT, via its predecessor Carnegie Gas Company,
    was the owner of the well; (2) it had the right to remove its own fixtures
    from the land; and (3) it could have assigned or sold its ownership of the
    well to Landowners but was under no obligation to do so. 
    Id. at 6-9.
    The
    Pennsylvania Supreme Court denied Landowners’ petition for allowance of
    appeal on February 19, 2014.2
    While Landowners’ appeal was pending, EQT attempted to commence
    plugging    operations     but    Landowners     prohibited   EQT   personnel   from
    accessing the property.          As a result, EQT filed a complaint in equity and
    motion for preliminary injunction against Landowners on March 27, 2013,
    seeking equitable relief in the form of an injunction that would allow them to
    access the property for purposes of plugging the well. A hearing was held
    on April 26, 2013 and May 17, 2013. On May 20, 2013, the court entered
    ____________________________________________
    2
    Landowners also filed a separate appeal from a separate order, which was
    entered on October 22, 2013, raising the following issues: (1) the trial court
    erred or abused its discretion in making the determination that “continued
    payment of flat rate royalty by lessees on a nonproductive well, whose lease
    was held by production and where lessors were not informed that production
    had ceased, was not a representation but merely a ‘contractual obligation’”;
    and (2) the trial court erred or abused its discretion in making the
    determination that “continued payment of flat rate royalty by lessees on a
    nonproductive well, whose lease was held by production and where lessors
    were not informed that production had ceased, established a tenancy at will
    without the knowledge and mutual consent of lessors.” Teska v. EQT
    Corp., 
    106 A.3d 177
    [1983 WDA 2012] (Pa. Super. 2014) (unpublished
    memorandum at 4-5) (“Teska II”). A panel of this Court affirmed the trial
    court’s decision.
    -5-
    J-A32023-15
    an order denying the preliminary injunction, due, in part, to the fact that
    Landowners’ appeal in the related matter was pending.3
    On October 14, 2014, after Landowners’ appeal was decided, EQT filed
    a motion for summary judgment, arguing: (1) EQT’s clear right to relief is
    demonstrated by the fact that it is the statutory owner of the well and is
    legally obligated to plug the well; (2) equitable relief is necessary because
    monetary damages alone would not prevent Landowners from interfering
    with its statutory requirement to plug the well and its harm cannot be
    monetarily assessed; and (3) EQT would face a significantly greater injury
    from the denial of a permanent injunction because, without it, EQT would
    face regulatory fines, significant financial liability, and responsibility for
    environmental, health, and safety issues related to the well’s current
    condition. See EQT’s Motion for Summary Judgment, 10/14/2014, at 6-12.
    On November 20, 2014, Landowners filed an opposition to EQT’s
    motion for summary judgment, alleging: (1) EQT, as statutory “owner,” did
    not come to court with clean hands because they intentionally overlooked
    their legal obligation to plug the well for many years and their present
    interest in plugging it was retaliatory; (2) EQT is not entitled to equitable
    relief because there was an adequate administrative remedy available, there
    was no actual harm to EQT, and because plugging the well is no longer
    ____________________________________________
    3
    During this time, the presiding judge retired, and President Judge
    Toothman was appointed to handle the matter.
    -6-
    J-A32023-15
    statutorily required; and (3) Landowners face far greater injury if the
    injunction is granted than if it is not granted because plugging the well will
    be environmentally hazardous and all of EQT’s future liability could be easily
    transferred.     See Landowners’ Opposition to EQT’s Motion for Summary
    Judgment, 11/20/2014, at 8-16.
    On December 3, 2014, the trial court granted the motion for summary
    judgment and issued a permanent injunction, enjoining and restraining
    Landowners from denying or interfering with EQT’s right of entry upon the
    property and its plugging operations. This pro se appeal followed.4
    In Landowners’ first issue, they contend the court erred in granting
    EQT’s motion for summary judgment and in making the determination that
    no genuine issue of material fact regarding the plugging of the gas well still
    exists. See Landowners’ Brief at 13. They state that ownership of the well
    is not the only material fact at issue in this case, and assert there are two
    other equally important issues: (1) the environmental issues arising out of
    the plugging of the well; and (2) the irreparable harm Landowners could
    suffer. 
    Id. Landowners allege
    the plugging of well would result in negative
    environmental consequences, including the contamination or diminution of
    their domestic household water supply. 
    Id. at 14.
    As proof, they point to
    ____________________________________________
    4
    The court did not order Landowners to file a concise statement of errors
    complained of on appeal under Pa.R.A.P. 1925(b).             Nevertheless,
    Landowners filed a concise statement on January 29, 2015.
    -7-
    J-A32023-15
    the fact that a spring on their property was lost due to the plugging of a gas
    well on an adjacent property.           
    Id. Additionally, Landowners
    assert that
    “[a]lthough this case involves the same gas well and parties as the prior
    cases, the issue still under dispute is not identical to the issues resolved
    previously as it does not revolve around ‘ownership’ of or rights to the gas
    well   but   rather    the   consequences/necessity       of   its   plugging.”   
    Id. Landowners claim
    they deserve “the opportunity to conduct discovery to get
    more information about EQT’s decision and their motives behind it.” Id.5
    ____________________________________________
    5
    Landowners also imply that because the current presiding judge took over
    the case after the declaratory judgment proceedings were decided, he was
    “unfamiliar with the case” since he “did not sit throughout the past
    proceedings and was not involved in the earlier rulings or a close
    examination of all of the issues.” Landowners’ Brief at 15. This allegation is
    self-defeating because as stated above, Landowners claim the issue that is
    still in dispute “is not identical to the issues resolved previously as it does
    not revolved around ‘ownership’ of or rights to the gas well[.]”            
    Id. Therefore, it
    would be of no consequence if the presiding judge was not the
    same individual as ownership is not at issue. Moreover, other than bald
    allegations, Landowners do not present any evidence that the presiding
    judge was not well-prepared or acquainted with the pertinent facts and law.
    Moreover, Landowners contend (1) they were barraged with court
    filings by EQT, which they claim bordered on frivolous, (2) they “have
    erroneously been waiting for some direction from the court regarding the
    start of [d]iscovery,” and (3) “they certainly cannot be expected to be as
    familiar with the court process.” 
    Id. at 16-17.
    We point to the following:
    Although this Court is willing to liberally construe materials filed
    by a pro se litigant, pro se status confers no special benefit upon
    the appellant. To the contrary, any person choosing to represent
    himself in a legal proceeding must, to a reasonable extent,
    assume that his lack of expertise and legal training will be his
    undoing.
    (Footnote Continued Next Page)
    -8-
    J-A32023-15
    We observe our well-settled standard of review as follows:
    Our scope of review of an order granting summary judgment is
    plenary. [W]e apply the same standard as the trial court,
    reviewing all the evidence of record to determine whether there
    exists a genuine issue of material fact. We view the record in
    the light most favorable to the non-moving party, and all doubts
    as to the existence of a genuine issue of material fact must be
    resolved against the moving party. Only where there is no
    genuine issue as to any material fact and it is clear that the
    moving party is entitled to a judgment as a matter of law will
    summary judgment be entered.
    Motions for summary judgment necessarily and directly implicate
    the plaintiff’s proof of the elements of his cause of action. ...
    Thus, a record that supports summary judgment will either (1)
    show the material facts are undisputed or (2) contain insufficient
    evidence of facts to make out a prima facie cause of action or
    defense and, therefore, there is no issue to be submitted to the
    [fact-finder]. Upon appellate review, we are not bound by the
    trial court’s conclusions of law, but may reach our own
    conclusions. The appellate Court may disturb the trial court’s
    order only upon an error of law or an abuse of discretion.
    Pa. Servs. Corp. v. Tex. E. Transmission, LP, 
    98 A.3d 624
    , 629 (Pa.
    Super. 2014), quoting DeArmitt v. New York Life Ins. Co., 
    3 A.3d 578
    ,
    585-86 (Pa. Super. 2013) (citations and quotation marks omitted).
    Furthermore, Pennsylvania Rule of Civil Procedure 1035.2 provides the
    standard for granting a motion for summary judgment, as follows:
    After the relevant pleadings are closed, but within such time as
    not to unreasonably delay trial, any party may move for
    summary judgment in whole or in part as a matter of law
    _______________________
    (Footnote Continued)
    In re Ullman, 
    995 A.2d 1207
    , 1211-1212 (Pa. Super. 2010).
    -9-
    J-A32023-15
    (1) whenever there is no genuine issue of any material fact as to
    a necessary element of the cause of action or defense which
    could be established by additional discovery or expert report, or
    (2) if, after the completion of discovery relevant to the motion,
    including the production of expert reports, an adverse party who
    will bear the burden of proof at trial has failed to produce
    evidence of facts essential to the cause of action or defense
    which in a jury trial would require the issues to be submitted to a
    jury.
    Pa.R.C.P. 1035.2.
    Additionally, Rule 1035.3 of the Pennsylvania Rules of Civil Procedure
    states in pertinent part:
    Rule 1035.3. Response. Judgment for Failure to Respond
    (a) Except as provided in subdivision (e), the adverse party may
    not rest upon the mere allegations or denials of the pleadings
    but must file a response within thirty days after service of the
    motion identifying
    (1) one or more issues of fact arising from evidence in the record
    controverting the evidence cited in support of the motion or from
    a challenge to the credibility of one or more witnesses testifying
    in support of the motion, or
    (2) evidence in the record establishing the facts essential to the
    cause of action or defense which the motion cites as not having
    been produced.
    Pa.R.C.P. 1035.3(a)(1)-(2).
    Turning to the present matter, with respect to EQT’s motion for
    summary judgment, the issue was whether EQT was entitled to a permanent
    injunction based on its property interest in the well. As will be discussed in
    more detail with our analysis of the second issue, we briefly note the
    following:
    - 10 -
    J-A32023-15
    To be entitled to a permanent injunction, a party must
    establish a clear right to relief, and must have no adequate
    remedy at law, i.e., damages will not compensate for the
    injury.   Unlike a preliminary injunction, a permanent
    injunction does not require proof of immediate irreparable
    harm.
    Liberty Place Retail Assocs., L.P. v. Israelite Sch. of
    Universal Practical Knowledge, 
    2014 Pa. Super. 233
    , 
    102 A.3d 501
    , 505-06 (Pa. Super. 2014) (internal citations omitted).
    PA Energy Vision, LLC v. South Avis Realty, Inc., 
    120 A.3d 1008
    , 1013
    (Pa. Super. 2015).
    Landowners acknowledge that EQT is the owner of the well, which also
    was affirmed by the courts in prior decisions. See Landowners’ Brief at 13,
    17; Teska 
    I, supra
    .         Nevertheless, they state there are two outstanding
    genuine issues of material fact: (1) the environmental issues arising out of
    the plugging of the well; and (2) the irreparable harm they could suffer. 
    Id. However, in
    their brief, Landowners only discuss the alleged negative
    environmental consequences.           
    Id. at 14.
    6   As stated above, in support of
    their claim regarding environmental harm, they merely point to the fact that
    a spring on their property was lost due to the plugging of a gas well on an
    adjacent property.
    ____________________________________________
    6
    The fact that Landowners did not make any arguments regarding
    irreparable harm is of no consequence since “a permanent injunction does
    not require proof of immediate irreparable harm.” PA Energy Vision, 
    LLC, 120 A.3d at 1013
    .
    - 11 -
    J-A32023-15
    A review of the record reveals that other than meager allegations
    made in the pleadings, the only evidence regarding the environmental harm
    is Landowners’ Exhibit C, which was introduced at the hearing on the motion
    for summary judgment.     Exhibit C is a May 23, 2012, letter from Brian J.
    Lohr, a geologic specialist of the District Mining Office, to Christopher
    Rabbitt, of Consol Pennsylvania Coal Company, LLC, concerning the approval
    of a water supply replacement plan. At the hearing, the following exchange
    took place regarding the exhibit and the spring:
    [LANDOWNERS]: The relevance, if I may explain, is the
    fact that this is a claim for the spring that disappeared due to
    the well that was plugged so close to it on our property. The
    spring was on our property. The well that was plugged on the
    neighbor’s property, DeSimone, caused the spring to practically
    disappear. We talked to Consol [Energy] about it, and they filed
    paperwork with [the Pennsylvania Department of Environmental
    Protection (“DEP”)] to try to find a resolution to this
    consequence.
    THE COURT: Well, okay. But listen. Remember what
    we’re here for. And I think what you’re telling me is that on the
    neighboring property there was a well plugging operation. And
    that that well plugging operation interfered with the spring that
    you relied on for your water supply?
    [LANDOWNERS]: The spring was not to our house; the
    spring was actually watering our Blueberry plants.
    THE COURT: Okay. You had an interest in it?
    [LANDOWNERS]: Yes.
    THE COURT: And the spring was on your property?
    [LANDOWNERS]: Yes.
    - 12 -
    J-A32023-15
    THE COURT: Okay. And if somebody interfered with
    something you had by its activities, then you might have some
    cause of action against that entity. That isn’t this entity, and
    that’s not this well. And the purpose of this is to show what?
    That it might interfere with something else?
    [LANDOWNERS]:        Yes.   The fact that our domestic
    household water supply well is much closer to the well that they
    want to plug than our spring was to this well that was plugged.
    THE COURT: Okay.
    [LANDOWNERS]: That there is the potential for some kind
    of damage to our household water supply. And that is also
    verified by the fact that the state requires that water samples be
    taken before wells are altered.
    THE COURT: They told me they asked you for a water
    sample, and you refused.
    [LANDOWNERS]: We refused because of the case that is
    still pending.
    …
    [LANDOWNERS]:        But, Your Honor, if you allow the
    plugging to go on, it’s like putting a man in the electric chair
    before his DNA hearing occurs to prove he’s innocent.
    THE COURT: [Landowners], nobody is going to get hurt.
    [LANDOWNERS]: Oh, Your Honor, I disagree.
    THE COURT: You might be inconvenienced and you might
    suffer monetary loss. Nobody is going to get hurt.
    [EQT’S COUNSEL]: If I may, Your Honor. I think the
    Court hit the nail on the head with this line of questioning, that I
    think it’s not relevant or germane to the issue before the Court,
    and I think I’m going to object to this line of questioning so that
    we can move on with the testimony that’s relevant to the case
    before the Court.
    - 13 -
    J-A32023-15
    THE COURT: Well, let me ask you this: Are you prepared
    to offer expert testimony that plugging this well will interfere
    with your domestic water supply?
    [LANDOWNERS]: No. But there is no one that can offer
    testimony that it won’t, I don’t believe.
    …
    [LANDOWNERS]: I think our point is that we don’t believe
    their right to relief is clear, because we still have a legal
    controversy about who actually has the rights to this well. And
    they want to plug it, and we want to use it. It’s the same issue
    as the case that’s pending.
    And there’s the possibility of contamination or diminishing
    of water supplies. That’s why our neighbors’ water supplies
    have to be tested and why our water supply does.
    …
    THE COURT: Well, if what you are attempting to show, is
    that because an interruption of water supply occurred when a
    well was plugged on a neighbor’s property, that makes it more
    likely than not that this plugging operation will interfere with
    your water supply, then I’m going to agree with [EQT’S counsel]
    that’s irrelevant to this proceeding.
    N.T., 4/26/2013-5/17/2013, at 72-79.
    Based on Landowners’ paucity of evidence presented at the hearing,
    we find their allegation amounts to a bald, speculative assertion that there
    would be negative environmental consequences to the plugging of the well.
    As pointed out by the trial court, Landowners have not presented any expert
    opinions or reports that plugging would have any relevant, negative results.
    They merely have presented evidence that the plugging of a well on
    another person’s property affected the spring that supplies water to
    - 14 -
    J-A32023-15
    Landowners’ blueberry plants. Contrary to Rule 1035.3, Landowners did not
    meet their burden of presenting evidence that established facts essential to
    their defense to EQT’s right to access the well on their property.
    Moreover, to the extent that Landowners request more time to conduct
    discovery to determine EQT’s motives, we are guided by the following:
    We … recognize that “the party seeking discovery is under an
    obligation to seek discovery in a timely fashion.” Reeves v.
    Middletown      Athletic    Ass'n,    
    866 A.2d 1115
    ,   1124
    (Pa.Super.2004); see Fort Cherry School Dist. v. Gedman,
    
    894 A.2d 135
    , 140 (Pa.Super.2006) (reasoning “[t]he
    Pennsylvania Rules of Civil Procedure do not give [parties] an
    unlimited amount of time to conduct discovery”). However, this
    Court has unequivocally stated that the purpose of Rule 1035.2
    “is to eliminate cases prior to trial where a party cannot make
    out a claim or defense after relevant discovery has been
    completed; the intent is not to eliminate meritorious claims
    prematurely before relevant discovery has been completed.”
    Burger v. Owens Illinois, Inc., 
    966 A.2d 611
    , 618
    (Pa.Super.2009), quoting Gerrow, supra at 781–782.
    Moreover, “[t]he adverse party must be given adequate time to
    develop the case and the motion [for summary judgment] will be
    premature if filed before the adverse party has completed
    discovery relevant to the motion.” 
    Id. Anthony Biddle
    Contractors, Inc. v. Preet Allied Am. St., LP, 
    28 A.3d 916
    , 928-929 (Pa. Super. 2011) (footnote omitted).
    Here, Landowners have had ample opportunity to request discovery
    since the matter initially began in August of 2012. Moreover, we find that
    evidence of EQT’s alleged “motives” is irrelevant to the question of whether
    the plugging of the well will have a negative environmental impact, and does
    not, therefore, raise a genuine issue of material fact. Additionally, from our
    review of the record and the briefs, it appears that this is the first time that
    - 15 -
    J-A32023-15
    Landowners are making a discovery request. See Pa. R.A.P. 302 (“Issues
    not raised in the lower court are waived and cannot be raised for the first
    time on appeal.”).     While Landowners claim they are not familiar with the
    judicial process, we reiterate they have
    chosen to proceed pro se and [they] cannot expect our court [or
    the trial court] to act as [their] attorney. See Commonwealth
    v. Sanford, 299 Pa.Super. 64, 
    445 A.2d 149
    , 150 (1982) (“We
    decline to become appellant’s counsel. When issues are not
    properly raised and developed in briefs, when the briefs are
    wholly inadequate to present specific issues for review, a court
    will not consider the merits thereof.”)
    First Union Mortgage Corp. v. Frempong, 
    744 A.2d 327
    , 337-38 (Pa.
    Super. 1999).         Accordingly, we conclude Landowner’s first argument
    warrants no relief.
    In Landowners’ second issue, they contend the court erred in issuing
    the permanent injunction for various reasons: (1) the evidence submitted
    by EQT does not satisfy all three of the elements required for a permanent
    injunction, (2) administrative remedies have not been exhausted; and (3)
    EQT has not come before the court with “clean hands.” Landowners’ Brief at
    17.
    With respect to the elements of a permanent injunction, Landowners
    state that while EQT’s right to the well may be clear, it “has not submitted
    adequate evidence that [it] would suffer any injury or harm that could not
    be monetarily compensated if the gas well is not plugged” and it “also failed
    to provide evidence that greater injury would result if the Permanent
    - 16 -
    J-A32023-15
    Injunction [was not] granted.” 
    Id. at 18.
    Landowners’ argument focuses on
    EQT’s claim that it would face the harm of fines from the regulatory agency,
    the DEP, for being in violation of the plugging requirement.       Landowners
    allege EQT abandoned the well in 2007, and state they have been in contact
    with DEP employees regarding the “abandonment” and plugging of the well
    and “EQT has not been fined to date and it is very unlikely [it] ever will be.”
    
    Id. at 19.
    Additionally, Landowners obscurely claim,
    [A] more than reasonable amount of time has passed since the
    plugging was statutorily required.        EQT did not have any
    concerns about [its] liability or possible environmental hazards
    due to the well not being plugged, as required, for the many
    years [it was] in violation of this statute. Now [it is] playing the
    role of a prudent, concerned operator and alleging an urgent
    necessity to avoid injury and harm because the well is required
    to be plugged.      In fact, circumstances have changed.           A
    [Department of Transportation (“DOT”)] certified plumber has
    run a gas line from the gas well and it is now producing gas for
    domestic household use.         Because the well is no longer
    statutorily abandoned (i.e. not producing in the prior 12
    months), the plugging is now no longer statutorily required.
    
    Id. (reproduced record
    citations omitted).
    Lastly, with respect to their “unclean hands” argument, Landowners
    point to the following:      (1) EQT “intentionally ignored the plugging
    requirement as this operation would have alerted [them] to the fact that
    their lease, which was held by production with no provisions to extend it
    without production, was no longer valid” and is evidenced by the fact that
    - 17 -
    J-A32023-15
    EQT continued the lease by payment of the semi-annual royalty;7 (2) EQT
    refused “to negotiate terms of the well transfer;”8 and (3) EQT does not
    qualify for injunction because “there is an administrative remedy provided by
    the Oil and Gas Act” contained in 58 Pa.C.S. § 3251.9, 10
    As 
    noted supra
    ,
    [t]o be entitled to a permanent injunction, a party must
    establish a clear right to relief, and must have no adequate
    remedy at law, i.e., damages will not compensate for the injury.
    J.C. Ehrlich Co. v. Martin, 
    2009 Pa. Super. 127
    , 
    979 A.2d 862
    ,
    864 (Pa. Super. 2009) (quoting Pestco, Inc. v. Associated
    Prods., 
    2005 Pa. Super. 276
    , 
    880 A.2d 700
    , 710 (Pa. Super.
    2005)).
    …
    The grant or denial of a permanent injunction is a question of
    law. Buffalo Township v. Jones, 
    571 Pa. 637
    , 
    813 A.2d 659
    ,
    664 & n.4 (Pa. 2002).         Regarding the trial court’s legal
    determination, our standard of review is de novo, and our scope
    of review is plenary. Id.; J.C. 
    Ehrlich, 979 A.2d at 864
    . As in
    all equity matters, however, we must accept the trial court’s
    factual findings and give them the weight of a jury verdict where
    they are supported by competent evidence. RESPA of Pa., Inc.
    v. Skillman, 
    2001 Pa. Super. 30
    , 
    768 A.2d 335
    , 339 (Pa. Super.
    ____________________________________________
    7
    Landowners’ Brief at 20.
    8
    
    Id. at 21.
    9
    
    Id. Landowners cite
    “52 Section 601.501” in their brief, which does not
    produce any statutory provision. 
    Id. They also
    reference page nine in their
    answer to EQT’s complaint, which does cite Section 3251. Therefore, we will
    use that citation in our analysis.
    10
    Landowners also complain for the first time that the terms of the
    permanent injunction “are unreasonable and are physically impossible for
    anyone to comply.” 
    Id. at 22.
    Because they did not raise this claim with
    the trial court, it is waived on appeal. See Pa.R.A.P. 302.
    - 18 -
    J-A32023-15
    2001), abrogated on other grounds by Buffalo 
    Township, 813 A.2d at 664
    n.4.
    Liberty Place Retail Assocs., L.P. v. Israelite Sch. of Universal
    Practical Knowledge, 
    102 A.3d 501
    , 505-506 (Pa. Super. 2014).
    Initially, we note that contrary to Landowners’ unrelenting insinuation
    that EQT had abandoned its interest in the well prior to filing its October 12,
    2011, release and surrender of oil and gas lease documentation, the trial
    court found EQT was still the owner of the well and its fixtures, which was
    affirmed by this Court and the Pennsylvania Supreme Court. See Teska 
    I, supra
    .    As such, EQT’s ownership established a clear right to relief.   See
    Buffalo 
    Twp., supra
    (upheld finding that railroad did not abandon right-of-
    way property, the property did not revert to landowners merely because of
    nonuse, and therefore, the trial court properly enjoined the landowners from
    interfering with property interest).11 Moreover, EQT established that as the
    ____________________________________________
    11
    We also note in Buffalo Twp., the Supreme Court opined on
    abandonment in terms of an easement interest as follows:
    In evaluating whether the user abandoned the property, the
    court must consider whether there was an intention to abandon
    the property interest, together with external acts by which such
    intention is carried into effect.    In order to establish the
    abandonment of a right-of-way, the evidence must show that
    the easement holder intended to give up its right to use the
    easement permanently. Such conduct must consist of some
    affirmative act on his part which renders use of the easement
    impossible, or of some physical obstruction of it by him in a
    manner that is inconsistent with its further enjoyment. Mere
    nonuse by the railroad does not amount to abandonment.
    (Footnote Continued Next Page)
    - 19 -
    J-A32023-15
    owner and operator of the well, it was legally required to plug the well in
    conformity with DEP regulations. See 58 Pa.C.S. § 3203 (defining “owner”
    and “operator”); see also 25 Pa. Code § 78.91 (“Upon abandoning a well,
    the owner or operator shall plug the well under §§ 78.92 -- 78.98 or an
    approved alternate method under section 211 of the act (58 P.S. § 601.211)
    to stop the vertical flow of fluids or gas within the well bore[.]”); 58 Pa.C.S.
    § 3220 (“Upon abandoning a well, the owner or operator shall plug it in the
    manner prescribed by regulation of the department to stop vertical flow of
    fluids or gas within the well bore, unless the department has granted
    inactive status for the well or it has been approved by the department as an
    orphan well.”).
    Likewise, EQT also demonstrated that an injunction was necessary
    because the harm that was occurring, Landowners’ interference with its
    property interest, could not be monetarily assessed. As EQT notes, it faces
    fines because it “would be noncompliant with state and local environmental
    laws, and unable to exercise [its] legal rights in accessing and controlling
    [its] property.”   EQT’s Brief at 24.            See 58 Pa.C.S. § 3255(a) (“A person
    _______________________
    (Footnote Continued)
    Buffalo 
    Twp., 813 A.2d at 664-665
    (internal citations and quotation marks
    omitted).
    Turning to the present matter, other than allegations of nonuse,
    Landowners have not put forth any other argument to establish that EQT
    effectively abandoned its property interest in the well.
    - 20 -
    J-A32023-15
    violating a provision of this chapter commits a summary offense and, upon
    conviction, shall be sentenced to pay a fine of not more than $ 1,000 or to
    imprisonment of not more than 90 days, or both. Each day during which the
    violation continues is a separate and distinct offense.”); 58 Pa.C.S. § 3256
    (“In addition to other remedies available at law or in equity for a violation of
    this chapter, a regulation of the department, a departmental order or a
    permit condition, the department, after a hearing, may assess a civil penalty
    regardless of whether the violation was willful. The penalty shall not exceed
    $ 25,000 plus $ 1,000 for each day during which the violation continues or,
    in the case of a violation arising from the construction, alteration or
    operation of an unconventional well, $ 75,000 plus $ 5,000 for each day
    during which the violation continues.”).
    To the extent Landowners claim EQT has not been fined and will not be
    fined in the future, their argument amounts to nothing more than
    speculation as they rely on bald assertions alleged in their pleadings12 and
    did not present any other evidence to support their contention. Moreover,
    with regard to Landowners’ challenge that plugging is now no longer
    statutorily required because Landowners procured a plumber to run a gas
    line from the gas well and it is now producing gas for domestic household
    ____________________________________________
    12
    See Landowners’ Answer to EQT’s Complaint in Civil Action and Claims
    for Injunctive and Other Equitable Relief and New Matter, 6/18/2013, at 7;
    Landowners’ Opposition to EQT’s Motion for Summary Judgment,
    11/20/2014, at 13.
    - 21 -
    J-A32023-15
    use, we find this issue without merit for several reasons. First, it appears
    that in addition to prohibiting EQT access to the well, Landowners are further
    harming EQT’s legally-recognized property interest in the well by adapting it
    without EQT’s consent.        Second, as EQT points out,13 Landowners do not
    point    to   any   statutory    provision,    which   permits   their   unauthorized
    modification.
    Lastly, with respect to Landowner’s “unclean hands” argument, we are
    guided by the following: The Pennsylvania Supreme Court has explained the
    doctrine of unclean hands as “a self-imposed ordinance that closes the doors
    of a court of equity to one tainted with inequitableness or bad faith relative
    to the matter in which he seeks relief, however improper may have been the
    behavior of the defendant.” Jacobs v. Halloran, 
    710 A.2d 1098
    , 1103 (Pa.
    1999), citing Shapiro v. Shapiro, 
    204 A.2d 266
    , 268 (1964).
    In Lucey v. W.C.A.B. (Vy-Cal Plastics PMA Group), 
    732 A.2d 1201
    (Pa. 1999), the Supreme Court further discussed what constitutes unclean
    hands as follows:
    The doctrine of unclean hands is derived from the
    unwillingness of a court to give relief to a suitor who has
    conducted himself so as to offend the moral sensibilities of the
    judge, and the doctrine has nothing to do with the rights and
    liabilities of the parties. In re Estate of Pedrick, 
    505 Pa. 530
    ,
    544, 
    482 A.2d 215
    , 222 (1984). This maxim is far more than a
    mere banality. It is a self-imposed ordinance that closes the
    doors of a court of equity to one tainted with iniquity or bad faith
    ____________________________________________
    13
    EQT’s Brief at 24.
    - 22 -
    J-A32023-15
    relative to the matter in which he seeks relief. This doctrine is
    rooted in the historical concept of a court of equity as a vehicle
    for affirmatively enforcing the requirement of conscience and
    good faith. Thus, while equity does not demand that its suitors
    shall have led blameless lives as to other matters, it does require
    that they shall have acted fairly and without fraud or deceit as to
    the controversy in issue. See 
    Id. (citing Shapiro
    v. Shapiro,
    
    415 Pa. 503
    , 506-507, 
    204 A.2d 266
    , 268 (1964) (quoting
    Precision Instrument Mfg. Co. v. Automotive Maintenance
    Mach. Co., 
    324 U.S. 806
    , 814-815, 
    65 S. Ct. 993
    , 997-998, 
    89 L. Ed. 1381
    (1945))).
    
    Lucey, 732 A.2d at 1204-1205
    .
    The application of the doctrine to deny relief is within the
    discretion of the [trial court], and in exercising [its] discretion
    the [trial court] is free not to apply the doctrine if a
    consideration of the entire record convinces [it] that an
    inequitable result will be reached by applying it.
    In re Bosley, 
    26 A.3d 1104
    , 1114 (Pa. Super. 2011), quoting Stauffer v.
    Stauffer, 
    351 A.2d 236
    , 245 (Pa. 1976).        “The bar of unclean hands is
    applicable in Pennsylvania only where the wrongdoing of the plaintiff directly
    affects the equitable relationship subsisting between the parties and is
    directly connected with the matter in controversy.”    
    Id., 351 A.2d
    at 244.
    See also Equibank v. Adle, Inc., 
    595 A.2d 1284
    , 1287 (Pa. Super. 1991)
    (“The doctrine does not bar relief to a party merely because his conduct in
    general has been shown not to be blameless.”).
    Here, Landowners’ claim that EQT was allegedly deceitful by ignoring
    the plugging requirement and continuing to pay them royalties is disproved
    by the fact that in the earlier declaratory judgment action, the trial court
    concluded, and a panel of this Court agreed, that the continued payments by
    - 23 -
    J-A32023-15
    EQT of the flat rate royalty on the nonproductive gas well were not evidence
    of a fraudulent misrepresentation because the lease was still in effect at the
    time EQT proferred the lease payments. See Teska I
    I, supra
    .
    Furthermore, their argument that EQT acted with unclean hands by
    purportedly refusing to negotiate terms of the well transfer is contradicted
    by the fact that in Teska I, the panel determined EQT could have assigned
    or sold its ownership of the well to Landowners, but was under no
    obligation to do so. See Teska 
    I, supra
    . Other than a bald assertion that
    EQT included additional provisions designed to maintain involvement in the
    future operation of the well, Landowners also do not present any factual
    evidence that EQT acted fraudulently or deceitfully with respect to the
    negotiations. See 
    Lucey, supra
    .
    Lastly, Landowners argue EQT does not qualify for injunctive relief
    because there is an administrative remedy provided by Section 3251 of the
    Oil and Gas Act.14 This contention, however, is similarly unavailing. As EQT
    ____________________________________________
    14
    Section 3251 provides, in pertinent part:
    The department or any person having a direct interest in a
    matter subject to this chapter may, at any time, request that a
    conference be held to discuss and attempt to resolve by mutual
    agreement a matter arising under this chapter. Unless otherwise
    provided, conferences shall be held within 90 days after a
    request is received by the department, and notice shall be given
    by the department to all interested parties. A representative of
    the department shall attend the conference and the department
    may make recommendations. An agreement reached at a
    (Footnote Continued Next Page)
    - 24 -
    J-A32023-15
    points out,15 Chapter 32 of Oil and Gas Act deals with oil and gas resource
    development and does not concern disputes involving well ownership. See
    58 Pa.C.S. § 3202 (declaration of purpose of chapter). Moreover, as 
    stated supra
    , EQT was under no legal obligation to assign its property interest to
    Landowners and therefore, a conference remedy under Section 3251 was not
    applicable to the present matter. While EQT may have not been amenable
    in negotiations, Landowners have not demonstrated any wrongdoing on
    EQT’s part directly affected the equitable relationship between the parties
    and was directly connected with the matter at hand. 
    Stauffer, 351 A.2d at 244
    . Therefore, Landowners’ second argument also fails.
    Accordingly, we conclude the trial court did not err in granting EQT’s
    motion for summary judgment and issuing a permanent injunction against
    Landowners.
    Order affirmed.
    _______________________
    (Footnote Continued)
    conference shall be consistent with this chapter and, if approved
    by the department, it shall be reduced to writing and shall be
    effective, unless reviewed and rejected by the department within
    ten days after the conference. The record of an agreement
    approved by the department shall be kept on file by the
    department and copies shall be furnished to the parties. The
    scheduling of a conference shall have no effect on the
    department's authority to issue orders to compel compliance
    with this chapter.
    58 Pa.C.S. § 3251(a).
    15
    See EQT’s Brief at 30-31.
    - 25 -
    J-A32023-15
    Judgment Entered.
    Joseph D. Seletyn, Esq.
    Prothonotary
    Date: 3/17/2016