Queen City Pastry, LLC v. Bakery Technology Enterprises, LLC ( 2018 )


Menu:
  •                                                                                        08/14/2018
    IN THE COURT OF APPEALS OF TENNESSEE
    AT NASHVILLE
    August 29, 2017 Session
    QUEEN CITY PASTRY, LLC v. BAKERY TECHNOLOGY
    ENTERPRISES, LLC
    Appeal from the Circuit Court for Maury County
    No. 15651 Stella L. Hargrove, Judge
    ___________________________________
    No. M2017-00112-COA-R3-CV
    ___________________________________
    The purchaser of automated cake-line equipment filed this action against the seller
    alleging breach of contract, breach of express and implied warranties, negligent
    misrepresentation, and violation of the Tennessee Consumer Protection Act. On the
    seller’s motion, the trial court dismissed the complaint as untimely. Because we
    conclude that the complaint was filed after the applicable limitations periods, either as
    agreed to by the parties or set by statute, we affirm.
    Tenn. R. App. P. 3 Appeal as of Right; Judgment of the Circuit Court Affirmed
    W. NEAL MCBRAYER, J., delivered the opinion of the court, in which FRANK G.
    CLEMENT, JR., P.J., M.S., and ANDY D. BENNETT, J., joined.
    Colin B. Calhoun and M. Ben Moore II, Nashville, Tennessee, for the appellant, Queen
    City Pastry, LLC.
    Dalton M. Mounger, Charles M. Molder, and Kori Bledsoe Jones, Columbia, Tennessee,
    for the appellee, Bakery Technology Enterprises, LLC.
    OPINION
    I.
    Queen City Pastry, LLC makes, sells, and distributes a line of specialty cakes and
    related bakery products. In 2010, Queen City decided to automate its cake-baking
    process. To that end, the company contacted Bakery Technology Enterprises, LLC about
    purchasing equipment for an automated cake line.            Representatives of Bakery
    Technology later visited Queen City’s facility to view its operations and to discuss its
    needs.
    On March 25, 2011, Bakery Technology sent Queen City a proposal that included
    prices and specifications for equipment for an automated cake line. The proposal gave
    Queen City the option of either a used or a new oven and the option of adding an auto-
    depan system as part of the line. Significantly, the proposal was also subject to eight
    pages of terms and conditions, discussed further below.
    Queen City accepted the proposal, choosing an automated line with a used oven
    and adding the auto-depan system. And a representative of Queen City signed the
    proposal. On May 20, 2012, Bakery Technology delivered the used oven and other
    related equipment for which Queen City paid in excess of $550,000.
    According to Queen City, after delivery, it discovered that the oven was designed
    primarily for baking cookies or crackers, not specialty cakes, and that the other
    equipment it purchased from Bakery Technology was inappropriate. But Queen City did
    not reject the goods or notify Bakery Technology that the delivered goods were defective.
    Instead, the company requested additional information,1 which Queen City claimed
    Bakery Technology never provided.
    On July 30, 2014, Queen City filed suit against Bakery Technology in North
    Carolina, but after the case was removed to federal court, the United States District Court
    for the Western District of North Carolina dismissed the case for improper venue. One
    year after the dismissal, Queen City refiled in the Circuit Court for Maury County,
    Tennessee. The complaint alleged breach of contract, negligent misrepresentation,
    breach of express and implied warranties, and violation of the Tennessee Consumer
    Protection Act. See Tenn. Code Ann. §§ 47-18-101 to -131 (2013 & Supp. 2017).
    Under Tennessee Rule of Civil Procedure 12.02(6), Bakery Technology moved to
    dismiss the case for failure to state a claim upon which relief could be granted. The trial
    court determined that Queen City’s claims for relief were based in contract and that the
    parties’ contract gave the buyer fifteen months to file a lawsuit against the seller.
    Because Queen City’s original complaint was filed after the time allowed, the court
    granted the motion to dismiss.
    1
    Queen City requested additional information about “electrical wiring, gas piping and connection
    details along with automated line coordination for interrelated equipment and functions so that Queen
    City could determine if said oven and related equipment could or would meet its special needs.”
    2
    II.
    A Rule 12.02(6) motion “challenges only the legal sufficiency of the complaint,
    not the strength of the plaintiff’s proof or evidence.” Webb v. Nashville Area Habitat for
    Humanity, Inc., 
    346 S.W.3d 422
    , 426 (Tenn. 2011). Thus, “[t]he resolution of a 12.02(6)
    motion to dismiss is determined by an examination of the pleadings alone.” 
    Id. Consideration may
    also be given to exhibits attached to the complaint. Ivy v. Tenn. Dep’t
    of Corr., No. M2001-01219-COA-R3-CV, 
    2003 WL 22383613
    , at *3 (Tenn. Ct. App.
    Oct. 20, 2003); see West v. Schofield, 
    468 S.W.3d 482
    , 488-89 (Tenn. 2015) (applying
    standard of review for motion to dismiss when trial court considered the amended
    complaint and the attached exhibits).
    We “construe the complaint liberally, presuming all factual allegations to be true
    and giving the plaintiff the benefit of all reasonable inferences.” Trau-Med of Am., Inc. v.
    Allstate Ins. Co., 
    71 S.W.3d 691
    , 696 (Tenn. 2002). The complaint should not be
    dismissed unless it appears that the plaintiff can prove no set of facts in support of his or
    her claim that would warrant relief. Doe v. Sundquist, 
    2 S.W.3d 919
    , 922 (Tenn. 1999)
    (citing Riggs v. Burson, 
    941 S.W.2d 44
    , 47 (Tenn. 1997)). Making such a determination
    presents a question of law. Our review of a trial court’s determinations on issues of law
    is de novo, with no presumption of correctness. 
    Id. (citing Stein
    v. Davidson Hotel Co.,
    
    945 S.W.2d 714
    , 716 (Tenn. 1997)).
    A.
    The trial court’s resolution of the motion to dismiss rested on the parties’
    agreement. As noted above, Bakery Technology’s proposal was subject to terms and
    conditions, which limited both its liability and Queen City’s remedies. In pertinent part,
    the terms and conditions provided as follows:
    VI. Claims and Remedies
    1. . . . Shipments shall conclusively be deemed accepted by BUYER unless
    written notice of rejection is received by SELLER within three (3) business
    days after arrival of goods at their shipping destination, which notice the
    parties agree is reasonable. Once the goods have been accepted, Buyer’s
    sole and exclusive remedy with respect to such goods, including the right to
    revoke acceptance, shall be limited to claims under Seller’s Warranty, if
    any, as set forth herein.
    ....
    6. Any lawsuit against SELLER must be brought within three (3) months
    following the expiration of the Warranty period or be forever barred.
    ....
    3
    VIII. Warranty
    1. Warranty is 12 months on parts and labor based on normal wear and
    tear. . . .
    ....
    5. Within the stated warranty period, SELLER, at its sole option, will
    repair or replace any goods or parts thereof which prove defective under
    conditions of normal use and service at no charge to BUYER. . . .
    6. Where applicable, the capacity of the equipment to be furnished is set
    forth in the Equipment Specifications section of Seller’s proposal. If the
    equipment is unable to achieve the specified capacity, despite a duplication
    of the conditions stated in the proposal, SELLER will, at its sole option,
    either replace or modify the equipment to achieve the specified
    capacity. . . .
    7. Any claims under this Warranty shall be promptly made by BUYER in
    writing and BUYER shall provide to SELLER details of any defects,
    deficiencies or problems with the goods sold to BUYER. . . .
    ....
    13. EXCEPT AS PROVIDED IN SECTION XI, THE FOREGOING
    WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES AND
    REPRESENTATIONS, EXPRESSED OR IMPLIED[.]                           SELLER
    DISCLAIMS ANY AND ALL OTHER WARRANTIES, EXPRESS OR
    IMPLIED, INCLUDING BUT NOT LIMITED TO THE IMPLIED
    WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A
    PARTICULAR PURPOSE.
    ....
    XI. Limitation of Liability
    ....
    2. Upon acceptance of the goods, as provided in Section VI, paragraph 1,
    Seller’s liability is expressly limited to its obligations under Seller’s
    Warranty contained in Sections VIII and IX.[2]
    Tennessee law favors “allowing competent parties to strike their own bargains.”
    Ellis v. Pauline S. Sprouse Residuary Tr., 
    280 S.W.3d 806
    , 814 (Tenn. 2009); see also
    Tenn. Code Ann. § 47-1-302 cmt. 1 (Supp. 2017) (emphasizing the role of freedom of
    contract in commercial transactions). Courts are not concerned with the wisdom or folly
    of voluntary agreements. Chapman Drug Co. v. Chapman, 
    341 S.W.2d 392
    , 398 (Tenn.
    1960). Our “role is to enforce an unambiguous contract as it is written unless the contract
    is being challenged based on fraud or mistake.” Boyd v. Comdata Network, Inc., 
    88 S.W.3d 203
    , 223 (Tenn. Ct. App. 2002).
    2
    Section IX of the terms and conditions concerned patent and trademark claims that are
    inapplicable here.
    4
    B.
    Both parties agree that this transaction is governed by Article 2 of the Uniform
    Commercial Code as adopted in Tennessee. See Tenn. Code Ann. §§ 47-2-101 to -725.
    (2001 & Supp. 2017). Queen City alleged that the oven and related equipment did not
    conform to the contract. When a seller tenders nonconforming goods, Article 2 allows
    the buyer to accept or reject those goods in whole or in part. 
    Id. § 47-2-601
    (2001). If
    the buyer chooses to accept the goods, rejection is no longer an option, but other
    remedies are available under Article 2 unless limited by the parties’ agreement. 
    Id. §§ 47-2-607(2),
    -719(1) (2001).
    Bakery Technology delivered the oven and related equipment on May 20, 2012.
    Under the parties’ agreement, Queen City had three days after delivery to notify Bakery
    Technology that it was rejecting the goods. See 
    id. § 47-2-602
    cmt. 1 (2001) (“Contract
    provisions limiting the time for rejection . . . are effective if the time set gives the buyer a
    reasonable time for discovery of defects.”). But Queen City did not reject the goods or
    notify Bakery Technology that the goods were nonconforming. Queen City also paid for
    the delivered goods. Under both Article 2 and the terms of the contract, Queen City
    accepted the goods. See 
    id. § 47-2-606
    (2001).
    As provided by the parties’ agreement, once Queen City accepted the goods, its
    “sole and exclusive remedy with respect to such goods, including the right to revoke
    acceptance, [was] limited to claims under Seller’s Warranty, if any, as set forth [in the
    terms and conditions].” See 
    id. § 47-2-719(1)
    (allowing parties to limit available
    remedies by agreement). The agreed upon terms and conditions included an express
    warranty to repair or replace defective goods for a period of twelve months from
    acceptance. After accepting the nonconforming goods, Queen City’s only avenue of
    redress was to make a warranty claim.
    The parties’ agreement further provided that “[a]ny lawsuit against [Bakery
    Technology] must be brought within three (3) months following the expiration of the
    Warranty period.” Thus, Queen City was required to file a lawsuit within fifteen months
    after acceptance of the delivered goods. See Certain Underwriter’s at Lloyd’s of London
    v. Transcarriers Inc., 
    107 S.W.3d 496
    , 499 (Tenn. Ct. App. 2002) (“[A] contractual
    limitations period begins to run upon accrual of the cause of action.”); Tenn. Code Ann.
    § 47-2-725(2) (2001) (specifying when a cause of action accrues under Article 2); Goot v.
    Metro. Gov’t of Nashville & Davidson Cty., No. M2003-02013-COA-R3-CV, 
    2005 WL 3031638
    , at *12 (Tenn. Ct. App. Nov. 9, 2005) (noting that the “discovery rule cannot
    supercede a contractually agreed upon limitations period as along as the agreed upon
    period affords a reasonable time within which to file suit”). It is undisputed that Queen
    City’s original complaint was filed after expiration of the fifteen-month period.
    5
    Contractual provisions limiting the time allowed for filing suit are enforceable in
    Tennessee. See, e.g., Guthrie v. Conn. Indem. Ass’n, 
    49 S.W. 829
    , 830 (Tenn. 1899); MR
    Hotels, LLC v. LLW Architects, Inc., No. M2015-00840-COA-R9-CV, 
    2016 WL 4070050
    , at *5 (Tenn. Ct. App. July 28, 2016); Town of Crossville Hous. Auth. v.
    Murphy, 
    465 S.W.3d 574
    , 581 (Tenn. Ct. App. 2014); Desgro v. Pack, No. E2012-00918-
    COA-R3-CV, 
    2013 WL 84899
    , at *4 (Tenn. Ct. App. Jan. 8, 2013); Skaan v. Fed.
    Express Corp., No. W2011-01807-COA-R3-CV, 
    2012 WL 6212891
    , at *9 (Tenn. Ct.
    App. Dec. 13, 2012); State v. Evans, 
    334 S.W.2d 337
    , 342 (Tenn. Ct. App. 1959). Unless
    prohibited by statute, contracting parties may agree to shorten the statutory limitation
    period as long as the chosen time period is reasonable. 
    Evans, 334 S.W.2d at 342
    .
    Queen City does not cite to any statute prohibiting this limitation found in the
    terms and conditions, and we have not found one. Article 2 permits buyers and sellers to
    “reduce the period of limitation to not less than one (1) year.” Tenn. Code Ann. § 47-2-
    725(1). And, although Queen City does not make the claim that fifteen months is an
    unreasonable time, given that Article 2 allows a one-year limitation period, we conclude
    that fifteen months is reasonable.
    Instead, Queen City argues that the limitation period is unenforceable because the
    contract may be rescinded for failure of consideration.3 We disagree. Failure of
    3
    Rescission is a common law remedy available as an alternative to a breach of contract claim.
    See Isaacs v. Bokor, 
    566 S.W.2d 532
    , 537 (Tenn. 1978). But Article 2 preempts common law remedies
    that are inconsistent with its provisions or its purposes and policies. The official comments explain that
    the Uniform Commercial Code is the primary source of commercial law rules in areas
    that it governs, and its rules represent choices made by its drafters and the enacting
    legislatures about the appropriate policies to be furthered in the transactions it covers.
    Therefore, while principles of common law and equity may supplement provisions of the
    Uniform Commercial Code, they may not be used to supplant its provisions, or the
    purposes and policies those provisions reflect, unless a specific provision of the Uniform
    Commercial Code provides otherwise. In the absence of such a provision, the Uniform
    Commercial Code preempts principles of common law and equity that are inconsistent
    with either its provisions or its purposes and policies.
    Tenn. Code Ann. § 47-1-103 cmt. 2 (Supp. 2017). “[T]he prevailing view now is that when the UCC
    provides a comprehensive remedy for the parties to a transaction, common-law and other non-Code
    claims and remedies should be barred.” C-Wood Lumber Co. v. Wayne Cty. Bank, 
    233 S.W.3d 263
    , 281
    (Tenn. Ct. App. 2007) (concluding that Articles 3 and 4 provide a nearly comprehensive scheme
    “governing the endorsement, negotiation, collection, and payment of checks” displacing the common law
    actions at issue); see Haverlah v. Memphis Aviation, Inc., 
    674 S.W.2d 297
    , 302 (Tenn. Ct. App. 1984)
    (concluding that buyers’ claim for rescission based on seller’s misrepresentation of the quality of the
    aircraft sold was controlled by provisions of Article 2). Here, allowing rescission based on a claim that
    the seller failed to provide equipment suitable for Queen City’s special needs when the seller had
    disclaimed the implied warranties of merchantability and fitness for a particular purpose may be
    inconsistent with the purposes and policies of Article 2.
    6
    consideration means that the promised performance failed. See 3 RICHARD A. LORD,
    WILLISTON ON CONTRACTS § 7:11 (4th ed.), Westlaw (database updated May 2018).
    Construing the complaint liberally, presuming all factual allegations to be true, and
    giving Queen City the benefit of all reasonable inferences, a breach of contract has been
    alleged. A claimed breach does not preclude enforcement of a valid contractual
    limitation period. Cf. Harris v. Provident Life & Accident Ins. Co., No. E2007-00157-
    COA-R3-CV, 
    2008 WL 1901110
    , at *10 (Tenn. Ct. App. Apr. 30, 2008) (“If [a claimed
    breach prevented enforcement of a contractual limitations period], then no limitations
    period in any contract would have any practical effect, since the limitations period is not
    relevant unless and until someone claims a breach.”). We conclude that the contractual
    limitation period is enforceable. See 
    Evans, 334 S.W.2d at 342
    .
    C.
    Our conclusion that the contractual limitation period is enforceable does not end
    our inquiry. We must determine whether the limitation period applied to all of Queen
    City’s claims. The contractual limitation period barred Queen City’s claims for breach of
    contract and warranty. See Order of United Commercial Travelers of Am. v. Wolfe, 
    331 U.S. 586
    , 608 (1947) (“[I]t is well established that, in the absence of a controlling statute
    to the contrary, a provision in a contract may validly limit, between the parties, the time
    for bringing an action on such contract to a period less than that prescribed in the general
    statute of limitations, provided that the shorter period itself shall be a reasonable
    period.”).    But Queen City’s complaint also included claims for negligent
    misrepresentation and violation of the Tennessee Consumer Protection Act (“TCPA”).4
    See Tenn. Code Ann. § 47-18-104(b)(5), (b)(7) (Supp. 2017).
    To determine whether the negligent misrepresentation and the TCPA claims were
    also subject to the contractual limitation period, we look to the language used in the
    contract. Contract interpretation is a question of law, which we review de novo with no
    presumption of correctness. West v. Shelby Cty. Healthcare Corp., 
    459 S.W.3d 33
    , 42
    (Tenn. 2014). The “cardinal rule of contract interpretation is to ascertain and give effect
    to the intent of the parties” as expressed in the plain language of the contract. Allstate
    Ins. Co. v. Watson, 
    195 S.W.3d 609
    , 611 (Tenn. 2006). “The literal meaning of the
    contract language controls if the language is clear and unambiguous.” Dick Broad. Co. of
    Tenn. v. Oak Ridge FM, Inc., 
    395 S.W.3d 653
    , 659 (Tenn. 2013).
    The words used in the terms and conditions — “[a]ny lawsuit against SELLER”
    — are broad and unrestricted. But the provision appeared under the section entitled
    4
    In its complaint, Queen City also alleged unjust enrichment, but recovery was only requested if
    the parties’ agreement was rescinded. See Whitehaven Cmty. Baptist Church v. Holloway, 
    973 S.W.2d 592
    , 596 (Tenn. 1998) (noting that an unjust enrichment theory is viable only if “there is no contract
    between the parties or a contract has become unenforceable or invalid”).
    7
    “Claims and Remedies.” Viewing the terms and conditions as a whole, the limitation
    period extended to any lawsuit against the seller in which the buyer asserted claims and
    remedies arising out of the sale of goods. But see Langley v. MP Spring Lake, LLC, 
    813 S.E.2d 441
    , 443-44 (Ga. Ct. App.), reh’g denied, (May 15, 2018) (concluding that lease
    provision requiring “any legal action” against landlord to be filed within one year applied
    to action for personal injuries sustained by tenant on leased premises).
    We conclude that the limitation period applied to Queen City’s negligent
    misrepresentation claim. Queen City alleged that Bakery Technology negligently
    represented that the oven and related equipment could produce specialty cakes and that it
    detrimentally relied on that misrepresentation when it paid for the delivered goods.
    Although labeled as a tort, the true object of this claim is breach of warranty. See Mid-S.
    Milling Co. v. Loret Farms, Inc., 
    521 S.W.2d 586
    , 588-89 (Tenn. 1975) (concluding that
    the gravamen of the plaintiffs’ negligence claim was breach of warranty under the UCC);
    Oak Ridge Precision Indus., Inc. v. First Tenn. Bank Nat’l Ass’n, 
    835 S.W.2d 25
    , 30
    (Tenn. Ct. App. 1992) (concluding that the trial court properly dismissed the plaintiff’s
    negligence claim because the alleged negligent acts involved contract performance);
    Perryman v. Peterbilt of Knoxville, Inc., 
    708 S.W.2d 403
    , 404, 406 (Tenn. Ct. App. 1985)
    (concluding that allegations that buyer relied to his detriment on seller’s representations
    concerning the quality and fitness of a vehicle should be treated as breach of warranty not
    tort).
    And although a TCPA claim is distinct from a claim under the UCC, Morris v.
    Mack’s Used Cars, 
    824 S.W.2d 538
    , 539 (Tenn. 1992), the TCPA claim was also
    properly dismissed as untimely. Queen City alleged Bakery Technology violated the
    TCPA by misrepresenting the quality or characteristics of the used oven and related
    equipment. A TCPA claim must be brought within one year from “discovery of the
    unlawful act or practice.” Tenn. Code Ann. § 47-18-110 (2013). And Queen City
    alleged that it discovered that the oven “was designed primarily for baking cookies and/or
    crackers, not specialty cakes” after delivery on May 20, 2012. Thus, any claim for
    violation of the TCPA should have been filed within one year of that discovery. Queen
    City did not file an action against Bakery Technology until July 30, 2014, over a year too
    late. See Heatherly v. Merrimack Mut. Fire Ins. Co., 
    43 S.W.3d 911
    , 917-18 (Tenn. Ct.
    App. 2000) (affirming dismissal of the plaintiffs’ negligence and TCPA claims on statute
    of limitations grounds).
    III.
    The limitation period agreed to by Queen City and Bakery Technology was
    enforceable and applied to all claims arising out of the parties’ contract. Because it filed
    suit more than fifteen months after acceptance of the delivered goods, Queen City’s
    claims for breach of contract, breach of warranty, and negligent misrepresentation were
    untimely. And because suit was filed more than one year after discovery of the alleged
    8
    unlawful act or practice, Queen City’s TCPA claim was also untimely under that statute.
    Thus, we affirm the dismissal of the complaint.
    _________________________________
    W. NEAL MCBRAYER, JUDGE