Perry D. (Don) Wright and Lee A. Murphy v. the Modern Group, Ltd., the Modern Group Gp, Inc., Modern Epc, Inc., Will Crenshaw and Casey Crenshaw ( 2013 )


Menu:
  •                         NUMBER 13-12-00293-CV
    COURT OF APPEALS
    THIRTEENTH DISTRICT OF TEXAS
    CORPUS CHRISTI - EDINBURG
    PERRY D. (DON) WRIGHT
    AND LEE A. MURPHY,                                                  Appellants,
    v.
    THE MODERN GROUP, LTD.,
    THE MODERN GROUP GP, INC.,
    MODERN EPC, INC., WILL CRENSHAW
    AND CASEY CRENSHAW,                                                  Appellees.
    On appeal from the 136th District Court
    of Jefferson County, Texas.
    MEMORANDUM OPINION
    Before Justices Rodriguez, Benavides, and Longoria
    Memorandum Opinion by Justice Benavides
    By six issues, appellants Perry D. (Don) Wright and Lee Murphy appeal the trial
    court’s granting of summary judgment in favor of appellees The Modern Group, Ltd. et
    al.1 We affirm.
    I.      BACKGROUND2
    A.     The Underlying Lawsuit
    Appellants are former employees of Modern EPC, Inc. (“Modern EPC”), a
    wholly-owned subsidiary of The Modern Group, Ltd., and its general partner, The
    Modern Group GP, Inc.              Modern EPC was an engineering, procurement, and
    construction company in the oil and gas industry.             The Modern Group, Ltd. and The
    Modern Group GP, Inc. are owned by appellees Will and Casey Crenshaw.
    Following their termination of employment from Modern EPC, appellants sued
    appellees and alleged various causes of action, including:                  fraud, statutory fraud,
    breach of contract, promissory estoppel, negligent misrepresentation, negligence, and
    gross negligence.       Appellants sought damages for: past and future “benefit of the
    bargain” damages; $2,000,000 related to a purported contract discussed in more detail
    below; past and future lost wages and/or lost earning capacity; past and future lost
    employment compensation package benefits; mental anguish; reliance damages;
    attorney’s fees; and punitive/exemplary damages.
    B.     The Alleged Contracts
    1
    The full list of appellees is as follows: The Modern Group, Ltd., The Modern Group GP, Inc.,
    Modern EPC, Inc., Will Crenshaw, and Casey Crenshaw.
    2
    This case is before this Court on transfer from the Ninth Court of Appeals in Beaumont pursuant
    to a docket-equalization order issued by the Supreme Court of Texas. See TEX. GOV’T CODE ANN. §
    73.001 (West 2005).
    2
    The underlying lawsuit relates to three purported contracts made between
    appellants and appellees.
    1.     August 13, 2007—Five-Year Oral Employment Contract
    The first deals with an oral five-year employment agreement allegedly made on
    August 13, 2007. This oral employment agreement was struck between appellants and
    Will Crenshaw and deal exclusively with appellants’ employment in the Crenshaws’ new
    start-up company, Modern EPC. Appellants assert that prior to their employment with
    Modern EPC, both were “well regarded,” “well compensated,” “high-ranking employees”
    with a similar business, Chicago Bridge & Iron (CB&I). On August 13, 2007, Will met
    with appellants and solicited their employment to help start-up Modern EPC. Wright
    testified that during these negotiations, Will and appellants orally agreed to a minimum
    five-year employment commitment with Modern EPC. During his deposition, Wright
    described the agreement as “a handshake” and “a commitment.”
    During the negotiations on August 13, 2007, Wright testified that none of the
    parties discussed terms in which anyone could “leave” or be fired under the agreement.
    According to Wright, the parties “never discussed” how anyone could leave employment
    with Modern EPC because “[i]t wasn’t an option for either one of us to part ways with the
    other.” Wright summarized the negotiations that day as follows:
    What we talked about was pretty simple. It was that long-term commitment
    that we both had for each other and we all had for each other. The term
    “termination” never entered anybody's mind.
    Wright asserted that he and Murphy were not at-will employees, but a written definition of
    their employment status or terms of employment was not made.
    3
    Murphy testified to a similar account of the August 13, 2007 meeting.                 Murphy
    described the agreement as a “joint commitment.”                 According to Murphy, Will was
    committed to appellants for five years, and appellants were committed to Modern EPC
    for five years.      Murphy stated further in his deposition that he was led to believe,
    through representations by Will, that “[Will] would stand behind us in our efforts to get
    this company going for a period of five years.” Murphy defined these commitments as
    he and Wright “were willing to leave [their] jobs at CB&I, start this adventure and that it
    wasn’t for a short term.” Murphy further stated that Will, on behalf of Modern Group,
    “would give [Modern EPC] a fair opportunity to be successful.” Murphy acknowledged
    that nothing from the August 13, 2007 negotiations was reduced to writing.                 During his
    deposition, Murphy also acknowledged that he signed an employee manual on August
    27, 2007, which states that he was hired on as an at-will employee.                     Murphy later
    stated, however, that he did not understand his status to be that of an at-will employee
    because he “had a commitment from [Will].” Finally, appellants attached an exhibit to
    their live petition, which purports to be an agreed-upon bonus plan for calendar year
    2008, which stemmed from this oral agreement.3
    2.        The Phantom Equity Agreement
    The second alleged agreement is known as the Phantom Equity Agreement.
    Around late August 2007 or early September 2007, appellants approached Will to
    discuss what Murphy described in his deposition as a plan to own stock or become
    3
    According to the record, appellants’ individual bonuses exceeded $100,000 for that calendar
    year.
    4
    shareholders in Modern EPC “in order to attract and hire people that [appellants] wanted
    to seek out.” Murphy testified that at the time he and Wright brought up this idea, Will
    “was a little surprised that [appellants] were bringing it up at [that] time.” Murphy stated
    that he told Will that the reason for developing this stock/shareholder plan was to
    squelch fears that Modern EPC would be sold “unbeknownst to [Murphy] and without any
    of [Murphy’s] input into that decision matter.” Murphy described the stock/shareholder
    plan as “reinsurance.” Put more colloquially, appellants stated that they wanted “more
    skin in the game” to realize a profit if Modern EPC was ever sold to a willing buyer.
    Murphy testified that in another meeting, the Crenshaws told them that they
    thought appellants’ stock/shareholder plan was a “good idea” and agreed to give
    appellants each a five percent stake in Modern EPC. On September 21, 2007, Casey
    emailed appellants a written draft agreement of the plan prepared by a law firm, but
    neither appellants nor the Crenshaws agreed to the language.       Later, on December 19,
    2007, Casey emailed a copy of the “Phantom Equity and Change of Control Agreement,”
    in letter form, to appellants, which Casey described as an agreement which “handles the
    spirit of the deal.” The agreement stated the following on Modern Group letterhead:
    12/18/07
    [....]
    Reference:
    Modern EPC, Inc
    Phantom Equity and Change of Control Agreement
    Effective Date:      September 1, 2007
    5
    Phantom Equity:
    Description: 5% of the outstanding shares of Modern EPC (5%
    ownership)
    —Vesting Date: 5 years from the effective Date and
    must be employed by Modern EPC or The Modern
    Group, Ltd
    —At the time of vesting you will have the right to do
    one of the following options:
    o Convert Phantom Equity of Modern EPC to 5%
    of the outstanding shares of Modern EPC and
    be a minority shareholder with minority rights
    (5% ownership)
    o Sell the 5% phantom equity of Modern BPC for
    fair market value (FMV) back to The Modern
    Group. Ltd (Fair market value must be agreed
    to by both parties: if not agreed by both parties
    then FMV will be based on an enterprise value
    using the following method: 5 times EBITDA (or
    actual sales price of Modern EPC) less all
    liabilities (then apply the percentage ownership
    (FMV) multiplied by 5%))
    Change of Control (during the 5 year vesting period):
    Description: Qualifying Event: During the 5 year vesting period
    The Modern Group, Ltd sells a majority and controlling
    interest in Modern EPC, Inc. (this does not include a
    forced sell by our bank/financial institution)
    — Qualifying event Payment:           The greater of
    $1,000,000 (one million dollar [sic]) or the FMV (see
    definition above) of the 5%
    — Payment will be made 90 days after the qualifying
    event
    As with all employees of The Modern Group, Ltd and Modern EPC, Inc you
    are an “AT WILL” employee. This agreement is meant to be an incentive
    6
    to stay with Modern EPC for a minimum of 5 years and to provide a defined
    value if there is a Change of Control event during the first 5 year period.
    We are excited about this venture and the future of Modern EPC!
    This agreement is agreed to and authorized 12/19/2007 by:
    [signature]
    Casey Crenshaw
    On behalf of: The Modern Group, Ltd / Modern EPC, Inc.
    The record shows that Wright and Murphy replied separately to Casey’s email,
    and both appellants stated that they were in agreement with the document.
    3.     Sale of EPC Promise
    The final alleged agreement involves the purportedly failed sale of Modern EPC to
    a French-based company named Technip in April 2009 for $16 million.           According to
    appellants’ brief, pursuant to Modern EPC’s offer of sale to Technip, Will promised to pay
    them $1 million each.
    Amos Claude Warner, Jr., former vice president of sales at Technip, testified in
    his deposition that Will pitched the idea of Technip buying Modern EPC for $15-16
    million, but Technip never purchased Modern EPC. According to Warner, Wright called
    him four days after the initial offer and told him that Will “pulled the plug” on the offer.
    Will testified that he remembered wanting to sell Modern EPC, but could not remember
    the exact asking price, and he also acknowledged that the sale never went through.
    Wright testified that Modern EPC was shut down on May 1, 2009. According to
    Wright, Modern EPC fired all of its employees, but kept a “handful of people for another
    week to tie up as many loose ends” as they could. Wright stated in his deposition that
    Casey asked him and Murphy to stay on for two weeks after May 1, 2009.
    7
    C.    Summary Judgment Proceeding
    Appellees collectively filed a traditional motion for summary judgment on each of
    appellants’ causes of action. Appellants filed a response, appellees filed a reply, and
    appellants filed a sur reply.       The trial court granted appellees’ motion for summary
    judgment on all of appellants’ claims and entered a final judgment which disposed of all
    claims, motions, defenses, and counterclaims presented in this case.            This appeal
    followed.
    II.      STANDARD OF REVIEW
    We review a trial court’s grant of summary judgment de novo.         Mid-Century Ins.
    Co. of Tex. v. Ademaj, 
    243 S.W.3d 618
    , 621 (Tex. 2007); Valence Op. Co. v. Dorsett,
    
    164 S.W.3d 656
    , 661 (Tex. 2005). When reviewing a summary judgment, we take as
    true all evidence favorable to the non-movant, and we indulge every reasonable
    inference and resolve any doubts in the non-movant’s favor.        
    Valence, 164 S.W.3d at 661
    (citing Provident Life & Acc. Ins. Co. v. Knott, 
    128 S.W.3d 211
    , 215 (Tex. 2003)).
    Under Texas Rule of Civil Procedure 166a(c), a party moving for summary judgment
    bears the burden to show that that no genuine issue of material fact exists and that it is
    entitled to a judgment as a matter of law.         TEX. R. CIV. P. 166a(c); see 
    Knott, 128 S.W.3d at 215
    –16. We may affirm a summary judgment only when the record shows
    that a movant has conclusively disproved at least one element of each of the plaintiff’s
    claims.     See Lear Siegler, Inc. v. Perez, 
    819 S.W.2d 470
    , 471 (Tex. 1991).    Issues not
    expressly presented to the trial court by written motion, answer or other response shall
    not be considered on appeal as a ground for reversal.      TEX. R. CIV. P. 166a(c).
    8
    III.     DISCUSSION
    By six issues, appellants assert that the trial court erred in granting appellees’
    motion for summary judgment.4 For the sake of clarity and organization, we will address
    these issues out of order.
    A.      Breach of Contract Claims
    By their sixth issue, appellants contend that the trial court erroneously granted
    summary judgment on their breach of contract actions.
    In Texas, the general rule has been that absent a specific agreement to the
    contrary, employment may be terminated by the employer or the employee at will, for
    good cause, bad cause, or no cause at all.                Montgomery County Hosp. Dist. v. Brown,
    
    965 S.W.2d 501
    , 502 (Tex. 1998). General statements do not justify the conclusion that
    the speaker intends by them to make a binding contract of employment.                         
    Id. Instead, for
    such a contract to exist, the employer must unequivocally indicate a definite intent to
    be bound not to terminate the employee except under clearly specified circumstances.
    
    Id. An employee
    who has no formal agreement with his employer cannot construct one
    out of indefinite comments, encouragements, or assurances.                        
    Id. Furthermore, oral
    promises modifying employment at-will are unenforceable under the Statute of Frauds if
    they cannot be performed in one year.               Id.; see TEX. BUS. & COM. CODE ANN. § 26.01
    (West 2009). An employment contract for an indefinite term is considered performable
    within one year.      
    Brown, 965 S.W.2d at 503
    (citing Bratcher v. Dozier, 
    346 S.W.2d 795
    ,
    4
    Appellants’ first issue is a catch-all issue that applies to all of the remaining issues. In it, they
    generally assert that the trial court reversibly erred in granting the motion for summary judgment. To the
    extent that it is considered a full issue for our review, it is overruled for reasons stated in this opinion.
    9
    796 (Tex. 1961)).    However, it would be unusual for oral assurances of employment for
    an indefinite term to be sufficiently specific and definite to modify an at-will relationship.
    
    Brown, 965 S.W.2d at 503
    .
    1. Five-Year Oral Employment Agreement
    We turn first to the alleged five-year oral employment contract between appellants
    and appellees.      Appellees assert that appellants failed to show that Modern EPC
    expressly and unequivocally agreed not to fire them except for clearly specified
    circumstances in order to overcome the at-will presumption articulated in Brown.         See
    
    id. We agree.
    Wright admitted in testimony that a written definition of his or Murphy’s
    employment status or terms of employment was not made.          Murphy also acknowledged
    that nothing from the August 13, 2007 negotiations was reduced to writing. While the
    record shows that Murphy testified that he did not understand his status to be that of an
    at-will employee because he “had a commitment from [Will],” this is not enough to
    overcome the at-will presumption.     See Ed Rachal Foundation v. D’Unger, 
    207 S.W.3d 330
    , 332 (Tex. 2006) (“[Plaintiff’s] personal understanding of his contract, or annual
    renewals of it in the past, do not unequivocally indicate that the Foundation intended to
    be bound throughout that term.”).     Furthermore, the record shows that both appellants
    signed an acknowledgement form attached to Modern EPC’s human resources manual,
    which expressly states that the nature of each of their employment relationships with
    Modern EPC was that of at-will employees. Accordingly, we hold that appellants were
    at-will employees.
    10
    We also conclude that the Statute of Frauds rendered this purported five-year oral
    employment agreement unenforceable as a matter of law.                      The issue of whether a
    contract comes within the statute of frauds is a question of law.              
    Bratcher, 346 S.W.2d at 796
    . The Statute of Frauds demands that an agreement which is not to be performed
    within one year from the date of making the agreement must be in a signed writing.                   See
    TEX. BUS. & COM. CODE ANN. § 26.01(a), (b)(6).            Appellants each clearly testified that the
    parties agreed to an employment agreement for a minimum term of five years. We take
    this evidence as true.      See 
    Dorsett, 164 S.W.3d at 661
    . Accordingly, this employment
    agreement came within the Statute of Frauds, and because the agreement was oral and
    not a signed writing, it was unenforceable.          See id.; 
    Brown, 965 S.W.2d at 503
    .5
    2. Phantom Equity Agreement and the Sale of Modern EPC Promise
    Next, we turn to the remaining alleged agreements.              Appellees assert that such a
    promise to pay appellants a commission was illusory and conditioned upon appellants’
    at-will employment, which was terminated prior to any conditions precedents of the
    agreement being met.         Again, we agree.
    At-will employees may contract with their employers on any matter except those
    which would limit the ability of either employer or employee to terminate the employment
    at will.    Light v. Centel Cellular Co. of Tex., 
    883 S.W.2d 642
    , 644 (Tex. 1994),
    abrogated on other grounds by Marsh USA Inc. v. Cook, 
    354 S.W.3d 764
    , 773–75 (Tex.
    5
    Appellants argue in their brief that the Statute of Frauds is inapplicable because more than a
    scintilla of evidence shows that an agreement could be performed within one year—for example, “Modern
    EPC could have had financial difficulties within one year of [appellee’s] promises.” Even assuming without
    deciding that the oral employment agreement at issue is performable within one year, we agree with
    appellees that such an alternative argument undermines appellants’ main argument that a five-year
    employment contract existed.
    11
    2011). Consideration for a promise, by either the employee or the employer in an at-will
    employment, cannot be dependent on a period of continued employment.             
    Light, 883 S.W.2d at 644
    .    Such a promise would be illusory because it fails to bind the promisor
    who always retains the option of discontinuing employment in lieu of performance.        
    Id. at 645.
    When illusory promises are all that support a purported bilateral contract, there
    is no contract. 
    Id. Here, we
    are not dealing with a purported bilateral contract, but rather a unilateral
    one. A unilateral contract is created by a promisor promising a benefit if the promisee
    performs.   Vanegas v. Am. Energy Svs., 
    302 S.W.3d 299
    , 303 (Tex. 2009) (internal
    citations omitted). The contract becomes enforceable when the promisee performs.
    
    Id. In this
    case, the Phantom Equity Agreement vested a five-percent equity share in
    appellants, after they completed five years of employment with Modern EPC. This
    provision made the agreement a unilateral one because it was a promise to pay
    appellants after each had been employees for at least five years.         See 
    Id. (citing 2
    JOSEPH M. PERILLO & HELEN HADJIYANNAKIS BENDER, CORBIN ON CONTRACTS § 6.2 (1995)
    (“[U]nilateral contract analysis is applicable to the employer's promise to pay a bonus or
    pension to an employee in case the latter continues to serve for a stated period.”)).
    The Phantom Equity Agreement also made clear that:            (1) the agreement is
    “meant to be an incentive [for appellants] to stay with Modern EPC for a minimum of 5
    years;” (2) that appellants’ employment status under the agreement remained at-will; and
    (3) in the event that Modern EPC was sold during the five-year vesting period, Wright
    and Murphy would be entitled to $1 million each.     But whether the promise was illusory
    12
    at the time it was made is irrelevant; what matters is whether the promise became
    enforceable by the time of the breach.         
    Id. We conclude
    that performance, on the
    appellants’ part, did not take place in order to make the unilateral Phantom Equity
    Agreement enforceable because appellants were no longer employed by Modern EPC
    after May 2007, which preceded the five-year vesting date outlined in the agreement.
    Stated another way, we hold that the Phantom Equity Agreement is unenforceable as a
    matter of law because it is illusory and performance has not taken place.
    Finally, appellees contend that the appellants’ claim of a purported promise by
    appellees to pay each appellant $1 million following the sale of Modern EPC fails as a
    matter of law because the payouts were based upon conditions precedent that did not
    occur. Again, we agree.
    A condition precedent may be either a condition to the formation of a contract or to
    an obligation to perform an existing agreement.          Hohenberg Bros. Co. v. George E.
    Gibbons & Co., 
    537 S.W.2d 1
    , 3 (Tex. 1976). Conditions precedent to an obligation to
    perform are those acts or events, which occur subsequently to the making of a contract,
    that must occur before there is a right to immediate performance and before there is a
    breach of contractual duty.       
    Id. In order
    to determine whether a condition precedent
    exists, the intention of the parties must be ascertained and that can be done only by
    looking at the entire contract.     Criswell v. European Crossroads Shopping Center, Ltd.,
    
    792 S.W.2d 945
    , 948 (Tex. 1990). Ordinarily, conditional language must be included to
    make performance specifically conditional.       
    Id. If no
    such language is used, the terms
    will be construed as a covenant in order to prevent forfeiture.       
    Id. Additionally, while
    13
    there is no requirement that such phrases be utilized, their absence is probative of the
    parties' intention that a promise be made, rather than a condition imposed.                    
    Id. The following
    relevant portion of the Phantom Equity Agreement controls this
    issue:
    Change of Control (during the 5 year vesting period):
    Description: Qualifying Event: During the 5 year vesting period
    The Modern Group, Ltd sells a majority and controlling
    interest in Modern EPC, Inc. (this does not include a
    forced sell by our bank/financial institution)
    — Qualifying event Payment:           The greater of
    $1,000,000 (one million dollar [sic]) or the FMV (see
    definition above) of the 5%
    — Payment will be made 90 days after the qualifying
    event
    This provision expressly contains conditional language—i.e. “qualifying event”—which
    makes Modern EPC’s obligation to pay Wright and Murphy $1 million specifically
    conditional upon the sale of a majority and controlling interest of Modern EPC, not by
    “forced sell by its bank or financial institution, during the five-year vesting period. The
    record is clear and undisputed that no sale took place, despite evidence that the sale of
    Modern EPC was being discussed, and even potentially being negotiated.                        Regardless,
    the “qualifying event,” or condition precedent, did not occur to require performance or to
    have a contractual duty breached.6 See Hohenberg Bros. 
    Co., 537 S.W.2d at 3
    .
    6
    Appellants argue that even if the condition precedent did not occur in this case, it does not affect
    our analysis concerning anticipatory breach or repudiation by appellees. For support, appellants direct us
    to Mar-Len, Inc. v. Gorman-Rupp Company, 
    795 S.W.2d 880
    , 887 (Tex. App.—Beaumont 1990, writ
    denied) and Carroll v. Wied, 
    572 S.W.2d 93
    , 97 (Tex. App.—Corpus Christi 1978, no writ). We agree that
    both cases apply to an analysis of anticipatory breach or repudiation, but nothing in the record supports a
    14
    After viewing the entire record in the light most favorable to the appellants,
    indulging every reasonable inference and resolving any doubts against the motion for
    summary judgment, we hold for the foregoing reasons that the trial court did not err in
    granting appellees’ summary judgment on appellants’ breach of contract cause of action.
    Accordingly, we overrule appellants’ sixth issue.
    B.      Tortious Interference Claims
    By their second issue, appellants assert that the trial court erred by granting
    summary judgment on their cause of action for tortious interference because it was not
    challenged in appellees’ motion for summary judgment.                  Appellants contend that they
    pleaded a cause of action for tortious interference in their live petition.            Appellees argue
    that appellants never pleaded a cause of action for tortious interference with a contract.
    Appellants’ live pleading shows that eight separate “counts,” or causes of actions,
    were pleaded, including one for breach of contract.             Under a heading entitled “Pleading
    to the Court, Only” embedded in the pleading of appellants’ breach of contract action,
    appellants inserted the following statement:
    Such action on the part of the [appellees] not only constituted a breach,
    anticipatory breach, and/or repudiation of the oral and written contracts
    which the Defendants had with Wright and Murphy, but in addition, such
    action on the part of the Crenshaws/Modern also tortiously interfered with
    reason for such an analysis to take place in this case. Repudiation or anticipatory breach is a positive
    and unconditional refusal to perform the contract in the future, expressed either before performance is due
    or after partial performance. Van Polen v. Wisch, 
    20 S.W.3d 510
    , 516 (Tex. App.—Houston [1st Dist.]
    2000, pet denied).
    Nothing in the record supports the theory by appellants that appellees anticipatorily breached or
    repudiated the contract to sell because there was no obligation to sell Modern EPC during the five-year
    vesting period. The Phantom Equity Agreement is clear and undisputed that the decision to sell Modern
    EPC during the five-year vesting period rested solely with The Modern Group, Ltd. Accordingly,
    appellants’ argument fails.
    15
    Wright and Murphy receiving the $2,000,000 to which they were
    contractually entitled, and would have received, but for the intentional acts
    of Defendants, including tortious acts, which effectively made the sale of
    Modern EPC impossible at that time.
    As a general rule, parties should give a “short statement of the cause of action
    [pleaded] sufficient to give fair notice of the claim involved.” See TEX. R. CIV. P. 47(a).
    In determining whether a cause of action was plead, plaintiff's pleadings must be
    adequate for the court to be able, from an examination of the plaintiff's pleadings alone,
    to ascertain with reasonable certainty and without resorting to outside information the
    elements of plaintiff's cause of action and the relief sought with sufficient information
    upon which to base a judgment. Stoner v. Thompson, 
    578 S.W.2d 679
    , 683 (Tex.
    1979).    Furthermore, each claim founded upon a separate transaction or occurrence
    and each defense other than denials shall be stated in a separate count or defense
    whenever a separation facilitates the clear presentation of the matters set forth.    TEX. R.
    CIV. P. 50.
    Assuming arguendo that appellants pleaded a cause of action for tortious
    interference in their live petition, such a claim would have failed as a matter of law.   The
    elements of a cause of action for tortious interference with a contract are:          (1) the
    existence of a contract subject to interference, (2) the occurrence of an act of
    interference that was willful and intentional, (3) the act was a proximate cause of the
    plaintiff's damage, and (4) actual damage or loss occurred.        Holloway v. Skinner, 
    898 S.W.2d 793
    , 795–96 (Tex. 1995). As discussed in Part III-A of this opinion, appellants
    cannot establish that an enforceable contract existed that would satisfy the first element
    of a tortious interference cause of action.   Accordingly, even if the trial court erroneously
    16
    granted summary judgment on that particular cause of action, such error was not
    reversible because the record conclusively disproves the existence of an enforceable
    contract to support a tortious interference action.      See id.; TEX. R. APP. P. 44.1(a).
    Appellants’ second issue is overruled.
    C.     Promissory Estoppel Claims
    By their third issue, appellants argue that the trial court erred in granting summary
    judgment against their promissory estoppel claims pursuant to appellees’ impermissible
    demurrer.    Appellees asserted in their motion for summary judgment, and contend
    again on appeal, that promissory estoppel is solely a defensive claim and cannot serve
    as a basis for affirmative relief.
    We first address appellants’ general demurrer argument.              The rules of civil
    procedure state that general demurrers shall not be used.       TEX. R. CIV. P. 90. Instead,
    the rule requires a party to file written special exceptions pointing out every defect,
    omission, or fault in a pleading either in form or in substance.      
    Id. Appellees assert
    that appellants waived this argument on appeal because it was not raised before the trial
    court. We agree. To preserve error for appellate review, a complaint must be made to
    the trial court by a timely request, objection, or motion that specifically states the grounds
    for the ruling that the complaining party sought from the trial court, and the trial court
    must rule or refuse to on the request, objection, or motion.    See TEX. R. APP. P. 33.1(a).
    We find that appellants did not properly preserve error for review on this issue.         See
    Vawter v. Garvey, 
    786 S.W.2d 263
    , 264 (Tex. 1990).
    Even assuming without deciding that appellants properly preserved error, we
    17
    would find such error harmless because promissory estoppel is defensive only and
    cannot constitute a basis for affirmative relief.7 See Stanley v. CitiFinancial Mortg. Co.,
    Inc., 
    121 S.W.3d 811
    , 820 (Tex. App.—Beaumont 2003, pet. denied). We overrule
    appellants’ third issue.
    D.       Fraud
    By their fourth issue, appellants contend that appellees failed to carry their
    summary judgment burden to conclusively negate all of appellants’ fraud claims.
    Appellants asserted a cause of action for common law fraud and fraudulent inducement
    regarding various “false and fraudulent” “promises, representations, and assurances”
    made by appellees to appellants.8
    Appellees first argue that appellants’ claims for fraudulent inducement fail as a
    matter of law because all of the alleged agreements at issue are unenforceable.9 We
    agree.       Proof that a party relied to its detriment on an alleged misrepresentation is an
    essential element of a fraud claim.           See Haase v. Glazner, 
    62 S.W.3d 795
    , 798 (Tex.
    7
    Because this case was transferred from our sister court in Beaumont, we decide it in accordance
    with the precedent of that court, but we note that the outcome would have been different had we not been
    required to decide this case pursuant to the Beaumont court’s precedent. See TEX. R. APP. P. 41.3; see,
    e.g., Reyna v. First Nat. Bank in Edinburg, 
    55 S.W.3d 58
    , 70 n. 4 (Tex. App.—Corpus Christi 2001, no pet.)
    (recognizing promissory estoppel as a valid cause of action for affirmative relief).
    8
    Appellants’ live petition asserts separate claims for common law fraud as well as fraud in the
    inducement. The elements to prove each claim, however, are the same. See DeSantis v. Wackenhut
    Corp., 
    793 S.W.2d 670
    , 688 (Tex. 1990) (stating that the elements for a fraudulent inducement claim are a
    material misrepresentation, which was false, and which was either known to be false when made or was
    asserted without knowledge of the truth, which was intended to be acted upon, which was relied upon, and
    which caused injury).
    9
    We disagree with appellants’ assertion that this argument was not raised by appellees at the trial
    court, and therefore, cannot be grounds for affirmance. The record shows that similar arguments were
    made by appellees in their motion for summary judgment.
    18
    2001).        However, without a binding agreement, there is no detrimental reliance, and
    thus no fraudulent inducement claim.               
    Id. In other
    words, when a party has not
    incurred a contractual obligation, it has not been induced to do anything.                   See 
    id. By applying
    our reasoning set forth in Part III-A of this opinion, we conclude that the lack of
    any contractual obligation is fatal to appellants’ fraudulent inducement claims.                 See 
    id. Appellants rely
    on Spoljaric v. Percival Tours, Inc. to argue that an at-will
    employee is not barred from suing an employer for fraudulent inducement. 10                            
    708 S.W.2d 432
    , 434–35 (Tex. 1986).                While Spoljaric’s holding may lend support to
    appellants’ contention, it is nevertheless distinguishable from the present appeal
    because in Spoljaric, the court held that the parties agreed to a bonus plan, which
    defeats the detrimental reliance issue addressed in Haase. See 
    id. Here, however,
    there was no such promise to pay appellants $1 million each without the sale of Modern
    EPC. As set forth above, such a promise was conditional and that condition did not
    occur so as to require performance or to impose a contractual duty on appellees, such
    that it supported appellants’ argument of detrimental reliance.
    Therefore, after viewing the entire record in the light most favorable to the
    appellants, we conclude that because no enforceable contracts or promises existed to
    create detrimental reliance, appellants’ fraud claims fail as a matter of law. We overrule
    appellants’ fourth issue.
    10
    At the time that this opinion was authored, the Texas Supreme Court was considering two
    certified questions from the United States Court of Appeals for the Fifth Circuit. See Sawyer et al. v. E.I.
    DuPont de Nemours & Co., Cause No. 12-0626. The relevant question submitted was whether at-will
    employees may bring fraud claims against their employer for loss of their employment. The Texas
    Supreme Court held oral argument on February 26, 2013 on the case, but has yet to issue a decision.
    19
    E.    Statutory Fraud
    By their fifth issue, appellants assert that the trial court reversibly erred by granting
    the motion for summary judgment on their statutory fraud claims.
    The relevant portion of section 27.01 of the business and commerce code states
    that fraud in a transaction involving real estate or stock in a corporation or joint stock
    company consists of a:
    (1)        false representation of a past or existing material fact, when the
    false representation is
    (A)       made to a person for the purpose of inducing that person
    to enter into a contract; and
    (B)       relied on by that person in entering into that contract; or
    (2)        false promise to do an act, when the false promise is
    (A) material;
    (B) made with the intention of not fulfilling it;
    (C) made to a person for the purpose of inducing that person to
    enter into a contract; and
    (D) relied on by that person in entering into that contract.
    TEX. BUS. & COM. CODE ANN. § 27.01(a) (West 2009).
    Appellants allege that Modern EPC promised them five-percent each in Modern
    EPC stock, but such a promise was false and fraudulent to hold appellees liable under
    section 27.01.     Appellees argue that section 27.01 does not apply to appellants’
    statutory fraud claims because the stock involved was unvested and subject to a
    condition precedent that did not occur. We agree with appellees.
    20
    Both Houston courts of appeals have held that stock options must vest in order to
    make section 27.01 an applicable cause of action.               See Beebe v. Compaq, 
    940 S.W.2d 304
    , 307 (Tex. App.—Houston [14th Dist.] 1997, no writ) (citing Stephanz v. Laird, 
    846 S.W.2d 895
    , 905 (Tex. App.—Houston [1st Dist.] 1993, writ denied)).                          The record
    contains undisputed evidence that the five-percent share of stocks were to vest in Wright
    and Murphy once each had completed five years of employment with Modern EPC or
    The Modern Group, Ltd.          Further, it is clear from the record that the stocks did not vest
    because Modern EPC was shut down prior to the completion of the five-year vesting
    period.11 Because appellants’ stocks did not vest, appellants cannot, as a matter of law,
    maintain a cause of action under section 27.01 of the business and commerce code.
    See 
    Stephanz, 846 S.W.2d at 905
    . We overrule appellants’ fifth issue.
    IV.     CONCLUSION
    We affirm the trial court’s judgment.
    __________________________
    GINA M. BENAVIDES,
    Justice
    Delivered and filed the
    30th day of August, 2013.
    11
    Appellants attempt to make an argument that section 27.01 applies to cases in which a party to a
    contract involving stock or real estate partially performs and cite to Wise v. Pena, 
    552 S.W.2d 196
    , 202
    (Tex. Civ. App.—Corpus Christi 1977, writ dism’d) for support. This argument was not made to the trial
    court, and we will not address it here. See TEX. R. CIV. P. 166a(c) (“Issues not expressly presented to the
    trial court by written motion, answer or other response shall not be considered on appeal as grounds for
    reversal.”).
    21