the City of San Antonio, (Appellant/Cross-Appellee) v. Kopplow Development, Inc., (Appellee/Cross-Appellant) ( 2010 )


Menu:
  •                                                 OPINION
    No. 04-09-00403-CV
    The CITY OF SAN ANTONIO,
    Appellant/Cross-Appellee
    v.
    KOPPLOW DEVELOPMENT, Inc.,
    Appellee/Cross-Appellant
    From the 131st Judicial District Court, Bexar County, Texas
    Trial Court No. 2004-CI-08167
    Honorable John D. Gabriel, Jr., Judge Presiding
    Opinion by:       Phylis J. Speedlin, Justice
    Sitting:          Karen Angelini, Justice
    Phylis J. Speedlin, Justice
    Rebecca Simmons, Justice
    Delivered and Filed: November 3, 2010
    AFFIRMED IN PART; REVERSED AND RENDERED IN PART
    In this statutory condemnation case, the City of San Antonio appeals a judgment rendered
    in favor of Kopplow Development, Inc., arguing the evidence is legally insufficient to support
    the jury’s verdict awarding Kopplow remainder damages. Kopplow has also filed a cross-appeal
    in which it contends the trial court erred in excluding certain evidence. We affirm the trial
    court’s judgment in part, and reverse the judgment in part and render judgment that Kopplow
    take nothing on its claim for remainder damages.
    04-09-00403-CV
    BACKGROUND
    Kopplow Development owns approximately 18.451 acres of land at the southeast corner
    of the intersection of Culebra Road and NW Loop 410 in San Antonio. At or around the time
    Kopplow purchased the property, Kopplow also obtained a 16-foot wide non-exclusive utility
    easement and a 25-foot wide temporary construction easement from Southwest Research
    Institute, primarily to obtain gravity sewer service to its property.
    As part of a public works project, the City of San Antonio planned and constructed the
    Regional Storm Water Detention Facility (the “Detention Facility” or “Detention Project”) for
    the Leon Creek watershed located south of Kopplow’s property. On January 16, 2004, the City
    obtained a 207.513-acre drainage easement from Southwest Research Institute to construct the
    Detention Facility.    Kopplow’s 16-foot wide non-exclusive utility easement and the City’s
    drainage easement overlap. As part of the Detention Facility, the City constructed a concrete
    “inflow wall” across a portion of Southwest Research Institute’s property where the two parties’
    easements overlap. In a ten-year storm, the inflow wall protects Kopplow’s property from
    flooding. The inflow wall is 735 feet high. The lowest top bank elevation on Kopplow’s
    property is 741 feet. The City constructed a 24-inch sleeve in the inflow wall to allow for
    extension of a future sewer line on Kopplow’s property.
    Aside from the inflow wall, the Detention Project also consists of two other components:
    a spillway and a large berm, or dam, located to the south of Kopplow’s property. The berm is
    located approximately 1700 feet south of Kopplow’s property, and is 748 feet at its maximum
    height. The City concedes that this berm may make Kopplow’s property, a quarter of which is
    located in the 100-year floodplain, susceptible to flooding in the future. The following diagram
    -2-
    04-09-00403-CV
    illustrates the locations of the various components of the Detention Facility and Kopplow’s
    property.
    Kopplow
    Property
    Inflow Wall
    Spillway
    Berm
    On May 27, 2004, Kopplow filed an inverse condemnation suit against the City alleging
    that the entire Detention Facility would subject Kopplow’s property to flooding in the event of a
    100-year flood, and sought an injunction against the building of the inflow wall on Kopplow’s
    non-exclusive easement. On June 25, 2004, the City filed its answer and counterclaim for
    statutory condemnation.         The counterclaim for statutory condemnation solely concerns the
    construction of the inflow wall upon the 16-foot non-exclusive easement.
    The case proceeded to a jury trial in March 2009. At trial, testimony was presented
    regarding the impact of the inflow wall on Kopplow’s property. Robert Browning, the City’s
    chief storm water engineer, testified that the purpose of the Detention Project was to detain storm
    water and reduce flooding downstream. He stated that the project consists of three independent
    components: the inflow wall; the emergency overflow spillway; and the protection berm. When
    asked whether the inflow wall causes Kopplow’s property to flood in a 100-year flood,
    -3-
    04-09-00403-CV
    Browning answered, “No, the inflow wall does not impact the floodplain line on his property.”
    Browning added that although the project as a whole causes the level of the 100-year floodplain
    to be two feet higher on Kopplow’s property, the inflow wall does not have anything to do with
    the potential flooding. He stated that the wall merely controls when the water enters the basin
    during a 100-year event. Browning stated that removing the inflow wall would have an impact
    on the downstream property, but not on Kopplow’s property. Browning testified that it is the
    large berm that causes water to go on Kopplow’s property during a 100-year flood, not the
    inflow wall.
    Dennis Rion, a civil engineer whose firm assisted Kopplow in developing the land,
    testified that the purpose of the City’s Detention Facility is to reduce the water surface elevation
    and potential flooding downstream.        He stated that the effect of the Detention Project on
    Kopplow’s property is an increase of 2.16 feet in elevation in a 100-year flood event. Rion
    stated there is “no doubt” that the increase of a 100-year storm on Kopplow’s property is caused
    by the City’s Detention Facility. On rebuttal, Rion was specifically asked what would happen if
    the City had not built the inflow wall. He answered, “[I]n a hundred year storm . . . it’s intuitive
    to me that the water surface elevation on [Kopplow’s] property wouldn’t change much if that
    inflow wall was there or not, but it is a critical part of the detention pond.”
    Lynn Eckmann, a real estate appraiser, testified that the value of the easement taken by
    the City (on which the inflow wall was built) was $4,600. She also stated that the inflow wall
    did not damage the remainder of Kopplow’s fee property. Eckmann elaborated that the 24-inch
    sleeve constructed in the inflow wall allowed Kopplow to extend its sewer line and develop its
    18 acres.   Eckmann stated that the storm water facility as a whole increased the ultimate
    development floodplain on Kopplow’s property by 2.16 feet. She opined that if Kopplow
    -4-
    04-09-00403-CV
    hypothetically had to fill the remainder property with two feet of fill, damages in the amount of
    $408,400 would be warranted. She assigned zero damages to Kopplow’s remainder property
    based on the City’s taking of the easement. Kopplow’s appraiser, David Bolton, testified that the
    difference in value between the whole property before taking and the remainder after taking was
    $815,000.
    The charge asked the jury three questions:
    1. On June 25, 2004, what was the fair market value of the part taken?
    2. Does the City’s use of the part taken proximately cause damages to the
    remainder?
    3. On June 25, 2004, what was the difference between the fair market value of
    the remainder before the taking and the fair market value of the remainder after
    the taking?
    During deliberations, the jury sent the following note to the trial court:
    Do we have to consider the inflow wall only (inflow wall/part taken) when
    answering #2; or do we consider the SW Regional Detention Facility as a whole?
    Or is this a question we (as the jury) have to answer.
    The court instructed the jury to consider the evidence and instructions and to continue
    deliberating. The jury found that as of the date of the taking, the value of the part taken (i.e., the
    inflow wall built across Kopplow’s easement) was $4,600, that the use of the part taken was a
    proximate cause of damages to the remainder, and that the remainder had been damaged in the
    amount of $690,000. The trial court rendered judgment on the jury’s verdict. The City moved
    for a new trial and for judgment notwithstanding the verdict (JNOV); the trial court denied the
    motion for JNOV, and the motion for new trial was overruled by operation of law. Both parties
    appealed.
    -5-
    04-09-00403-CV
    DISCUSSION
    The City brings four issues on appeal: (1) there is no evidence, or the evidence is
    factually insufficient, to support the jury’s affirmative answer to Question No. 2 because the
    evidence is undisputed that the City’s use of Kopplow’s easement causes no damages to
    Kopplow’s remainder; (2) because the evidence is undisputed that the City’s use of Kopplow’s
    easement causes no damages to Kopplow’s remainder, the jury’s answer to Question No. 3 can
    only be zero; (3) notwithstanding the first two issues, the Campbell 1 rule precludes remainder
    damages in the statutory condemnation case of Kopplow’s easement; and (4) any claim for
    damages based on a claim of inverse condemnation is premature. We first address whether the
    evidence at trial was sufficient to support the jury’s affirmative answer to Question No. 2.
    Standard of Review: Legal and Factual Sufficiency
    “The final test for legal sufficiency must always be whether the evidence at trial would
    enable reasonable and fair-minded people to reach the verdict under review.” City of Keller v.
    Wilson, 
    168 S.W.3d 802
    , 827 (Tex. 2005). In reviewing a legal sufficiency challenge, we view
    the evidence in the light favorable to the verdict, crediting favorable evidence if reasonable
    jurors could, and disregarding contrary evidence unless reasonable jurors could not. 
    Id. at 807.
    Evidence is legally insufficient when the record discloses: (1) a complete absence of evidence of
    a vital fact; (2) the court is barred by rules of law or of evidence from giving weight to the only
    evidence offered to prove a vital fact; (3) the evidence offered to prove a vital fact is no more
    than a mere scintilla; or (4) the evidence establishes conclusively the opposite of a vital fact. 
    Id. at 810.
    In a factual sufficiency review, we consider all the evidence supporting and contradicting
    the jury’s finding. Plas-Tex, Inc. v. U.S. Steel Corp., 
    772 S.W.2d 442
    , 445 (Tex. 1989). We set
    1
    Campbell v. United States, 
    266 U.S. 368
    (1924).
    -6-
    04-09-00403-CV
    aside the jury’s verdict only if it is so contrary to the overwhelming weight of the evidence as to
    be clearly wrong and unjust. Cain v. Bain, 
    709 S.W.2d 175
    , 176 (Tex. 1986).
    Damages to Kopplow’s Remainder
    The Texas Constitution provides: “No person’s property shall be taken, damaged or
    destroyed for or applied to public use without adequate compensation being made. . . .” TEX
    CONST. art. I, § 17. When an entire tract of property is condemned, the landowner is entitled to
    payment of the local market value of the property. TEX. PROP. CODE ANN. § 21.042(b) (West
    Supp. 2010). When only a part of a person’s property is taken, however, the constitution
    requires adequate compensation both for the part taken and “severance damages” to the
    remainder. State v. Schmidt, 
    867 S.W.2d 769
    , 772 (Tex. 1993). Accordingly, section 21.042(c)
    of the Property Code provides:
    If a portion of a tract or parcel of real property is condemned, the special
    commissioners shall determine the damage to the property owner after estimating
    the extent of the injury and benefit to the property owner, including the effect of
    the condemnation on the value of the property owner’s remaining property.
    TEX. PROP. CODE ANN. § 21.042(c) (West Supp. 2010).
    Severance damages are determined by “ascertaining the difference between the market
    value of the remainder of the tract immediately before the taking and the market value of the
    remainder of the tract immediately after the appropriation, taking into consideration the nature of
    the improvement, and the use to which the land taken is to be put.” 
    Schmidt, 867 S.W.2d at 772
    (quoting State v. Carpenter, 
    126 Tex. 604
    , 
    89 S.W.2d 194
    , 197 (1936)). Severance damages are
    not recoverable, however, where “the diminution in value of the remainder [is] caused by the
    acquisition and use of adjoining lands of others for the same undertaking.” 
    Schmidt, 867 S.W.2d at 778
    (quoting Campbell v. United States, 
    266 U.S. 368
    , 372 (1924)). The Schmidt court held
    that the “Campbell rule” should control unless the condemnee can show:
    -7-
    04-09-00403-CV
    (1) the land taken from the condemnee landowner was indispensable to the . . .
    project;
    (2) the land taken constituted a substantial (not inconsequential) part of the tract
    devoted to the project; and
    (3) the damages resulting to the land not taken from the use of the land taken
    were inseparable from those to the same land flowing from the condemnor
    government’s use of its adjoining land in the . . . project.
    
    Schmidt, 867 S.W.2d at 778
    (quoting United States v. 15.65 Acres of Land, 
    689 F.2d 1329
    , 1332
    (9th Cir. 1982)).
    In Schmidt, the State took a strip of frontage property from the landowners as part of a
    project to modify Highway 183 into a controlled access highway. 
    Id. at 770-71.
    The project
    called for Highway 183 to be elevated, thereby reducing the visibility and convenience of access
    to the landowners’ property. 
    Id. at 771.
    The property owners claimed additional compensation
    for decreased market value of the remainder tract due to impaired visibility and accessibility. 
    Id. at 772.
    The court denied recovery of severance damages, stating that the claimed diminution of
    value was due entirely to the State’s modifications to Highway 183 and not to the use of the strip
    taken from the landowners. 
    Id. at 778.
    The court further emphasized that although the parts
    taken were indispensible to the entire project, they did not constitute a substantial part of the
    property devoted to the project, and the damages resulting to the remaining tracts were not
    inseparable from those caused by the taking. 
    Id. at 779.
    Therefore, the Campbell rule prevented
    the landowners from recovering severance damages. 
    Id. at 778-79.
    Here, the City maintains that the undisputed evidence refutes Kopplow’s claim that the
    easement taken will cause the Kopplow property to flood an additional two feet in the event of a
    hypothetical 100-year flood. In support of its argument, the City relies on the testimony of
    Browning and Eckmann, who both unequivocally stated that the inflow wall did not cause
    damages to Kopplow’s remainder property, and the testimony of Rion, who stated that the water
    -8-
    04-09-00403-CV
    surface elevation on Kopplow’s property would be the same in a 100-year storm whether or not
    the inflow wall was present. Both Browning and Rion stated that in a 100-year flood, the inflow
    wall would be underwater by ten feet, and would not hold any water in such an event. The City
    argues that in the face of such unequivocal evidence, the jury must have improperly considered
    the impact of the entire Detention Facility on Kopplow’s remainder property when answering
    Question No. 2, as evidenced by its note to the trial court.
    In addition, the City contends that the Campbell rule applies, and therefore prevents
    Kopplow from recovering severance damages. The City concedes that the easement taken was
    indispensible to the Detention Facility project; however, it maintains that the inflow wall is not a
    substantial part of the property devoted to the project and Kopplow’s remainder damages are not
    inseparable from those caused by the taking. See 
    Schmidt, 867 S.W.2d at 778
    . Because the
    entire Detention Project consisted of over 200 acres, the easement condemned by the City to
    build the inflow wall constituted a small fraction of the property devoted to the project.
    Moreover, the potential increased flooding to the remainder was caused by the berm, not the
    inflow wall. Thus, the City argues that Kopplow cannot meet its burden under the exception to
    the Campbell rule. See 
    id. Kopplow responds
    that it is entitled to severance damages because the condemnation
    caused special damage to its property that prevents development of the property without
    extensive reclamation. Kopplow contends that the instant situation is nearly identical to the facts
    in State v. McCarley, 
    247 S.W.3d 323
    (Tex. App.—Austin 2007, pet. denied). In McCarley, the
    State took a “corner clip” consisting of 836 square feet from the landowner for a highway
    expansion project. 
    Id. at 328.
    The evidence at trial demonstrated that the taking altered the
    drainage on the remainder property and made it impossible for the landowner to obtain the
    -9-
    04-09-00403-CV
    permits necessary to develop it. 
    Id. at 324.
    The Austin Court of Appeals upheld the award of
    remainder damages, holding that the damages arose from the use of the corner clip itself, and not
    from the State’s use of the existing right-of-way or other property. 
    Id. at 330.
    We find McCarley distinguishable, however, because in that case the evidence clearly
    showed that the part taken caused damages to the remainder property. See 
    id. In contrast,
    after
    reviewing the evidence in this case, it is undisputed that the part taken did not cause damages to
    Kopplow’s remainder property. Thus, we agree with the City that the evidence is legally
    insufficient to support the jury’s affirmative answer to Question No. 2. See City of 
    Keller, 168 S.W.3d at 810
    (evidence is legally insufficient when the record discloses a complete absence of
    evidence of a vital fact). Further, we agree that pursuant to Campbell, Kopplow is not entitled to
    compensation for the potential damage to the uncondemned portion of its property resulting from
    the berm, because the berm is not on land acquired from Kopplow by condemnation. 
    Schmidt, 867 S.W.2d at 778
    -79. Accordingly, we sustain the City’s first issue, and reverse the award of
    remainder damages to Kopplow.
    We next address the City’s contention that Kopplow’s inverse condemnation claim is
    premature. Although Kopplow plead for damages for inverse condemnation, it now contends
    that a separate inverse action was not appropriate or necessary in light of the already pending
    statutory condemnation proceeding because it was entitled to recover for all reasonably
    foreseeable damages naturally flowing from the statutory condemnation action. See City of La
    Grange v. Pieratt, 
    142 Tex. 23
    , 
    175 S.W.2d 243
    , 246 (1943) (“In a proceeding for the
    condemnation of a part of a tract of land for street or road purposes, it is presumed that the
    amount of damages allowed covers all lawful elements of damages, whether direct or
    consequential, that could reasonably have been foreseen and determined at the time of
    - 10 -
    04-09-00403-CV
    condemnation; and where a part of a tract of land is condemned for street or road purposes, the
    owner cannot recover in a subsequent proceeding for consequential damages to the remainder of
    the land which he ought reasonably have foreseen and presented in the condemnation
    proceeding.”). Assuming Kopplow did pursue an inverse claim at trial, 2 the City contends that
    such a claim is not yet ripe, and can be pursued in the future. A “taking” by flooding is a
    specific type of inverse condemnation. In Tarrant Regional Water Dist. v. Gragg, 
    151 S.W.3d 546
    , 555 (Tex. 2004), the Texas Supreme Court held that isolated instances of increased flooding
    do not amount to a taking; rather, repeated increased flooding is required. The City argues that,
    to date, Kopplow’s property has not flooded, and if it were to flood, Kopplow could seek legal
    redress at that time. See Allen v. City of Texas City, 
    775 S.W.2d 863
    , 866 (Tex. App.—Houston
    [1st Dist.] 1989, writ denied) (“A cause of action for damaging land does not lie for anticipated
    future damages that have not yet occurred, but accrues at the time land is actually damaged, and
    is governed by the two-year statute of limitations.”).
    Kopplow responds that it did not seek damages merely for future flooding, but also for
    the inability to develop its remainder property absent an expensive reclamation project, which
    constituted an injury that accrued prior to trial. Kopplow further contends that it cannot bring a
    valid inverse condemnation claim in the future if the property at issue was the subject of a
    previous, proper statutory condemnation action. See Dahl ex rel. Dahl v. State, 
    92 S.W.3d 856
    ,
    861-62 (Tex. App.—Houston [14th Dist.] 2002, no pet.).
    2
    “In an inverse-condemnation suit, a property owner seeks compensation for a taking that has allegedly already
    occurred and requests just compensation from the government. The general elements of an inverse condemnation
    are: ‘(1) an intentional act of a government entity; (2) accomplished for a public purpose; (3) that damages or takes
    property from a private citizen.’” State, Tex. Water Development Bd. v. Hearts Bluff Game Ranch, Inc., 
    313 S.W.3d 479
    , 486 (Tex. App.—Austin 2010, pet. filed). “The essence of an inverse condemnation proceeding is that the
    government has intentionally taken or unreasonably interfered with an owner’s use of property and the property
    owner is attempting to recover compensation for the lost or impaired rights.” State v. Brownlow, No. 08-0551, 
    2010 WL 3365948
    , at *2 (Tex. Aug. 27, 2010).
    - 11 -
    04-09-00403-CV
    We agree that Kopplow’s inverse condemnation claim is premature. In order for flooding
    (and any reclamation associated with raising a floodplain) to amount to a physical taking, the
    flooding must be repeated. In Howard v. City of Kerrville, 
    75 S.W.3d 112
    , 117 (Tex. App.—San
    Antonio 2002, pet. denied), this court held that no physical taking had occurred where the
    construction of a dam raised the landowner’s floodplain and subjected him to potential flooding.
    “In the case of flood-water impacts, recurrence is a probative factor in determining the extent of
    the taking and whether it is necessarily incident to authorized government activity, and therefore
    substantially certain to occur.” 
    Gragg, 151 S.W.3d at 555
    . A single flood event does not
    generally rise to the level of a taking.    
    Id. “The recurrence
    requirement assures that the
    government is not held liable for taking property when a project’s adverse impacts, and by
    implication its benefit to the public, are too temporal or speculative to warrant compensation.”
    
    Id. Further, we
    are not persuaded that Kopplow is barred from bringing a subsequent inverse
    condemnation claim. The Dahl court held that the appellants’ inverse condemnation claim was
    defective where the appellants’ pleadings demonstrated that their inverse condemnation claim
    covered the identical property lawfully condemned by the State in a previous proceeding. 
    Dahl, 92 S.W.3d at 862-63
    . Here, in contrast, the property for which Kopplow seeks remainder
    damages is not the identical property that was condemned by the City. As discussed earlier, the
    City took an easement on which to build the inflow wall, while Kopplow seeks compensation for
    damage to the remainder of his 18-acre fee property.
    In conclusion, we affirm the portion of the trial court’s judgment awarding Kopplow
    $4,600 as compensation for the part taken by the City. We reverse the portion of the trial court’s
    - 12 -
    04-09-00403-CV
    judgment awarding Kopplow $690,000 for remainder damages, and render judgment that
    Kopplow take nothing on its claim for remainder damages.
    CROSS-APPEAL
    Kopplow presents two issues in its cross-appeal: (1) the trial court erred in excluding
    evidence of the value of the whole property before considering the benefit of Kopplow’s vested
    right to develop the property in accordance with its existing site development permit; and (2) the
    trial court erred in submitting a proximate cause question, because compensability of remainder
    property damages is a question of law for the court. Due to our holding that the evidence is
    legally insufficient to support the jury’s award of remainder damages, we conclude that any issue
    related to damages is moot. Because the City’s use of the condemned property did not cause
    damages to Kopplow’s remainder, there can be no compensation for damage to the remainder.
    Kopplow’s issues on its cross-appeal are therefore overruled.
    CONCLUSION
    Based on the foregoing analysis, we affirm the portion of the trial court’s judgment
    awarding Kopplow $4,600 as compensation for the part taken by the City. We reverse the
    portion of the trial court’s judgment awarding Kopplow $690,000 for remainder damages, and
    render judgment that Kopplow take nothing on its claim for remainder damages.
    Phylis J. Speedlin, Justice