Mark Johnston v. OilTanking Houston, LP , 367 S.W.3d 412 ( 2012 )


Menu:
  • Affirmed and Opinion filed March 22, 2012.
    In The
    Fourteenth Court of Appeals
    ___________________
    NO. 14-11-00537-CV
    ___________________
    MARK JOHNSTON, Appellant,
    V.
    OILTANKING HOUSTON, L.P., Appellee.
    On Appeal from the 334th District Court
    Harris County
    Trial Court Cause No. 2009-74868
    OPINION
    Appellant Mark Johnston was injured while working for Rodgers Electrical
    Services, Inc., an independent contractor hired by appellee Oiltanking Houston, L.P., to
    perform various services on Oiltanking‘s premises. In one issue, Johnston contends that the
    trial court erred in granting summary judgment for Oiltanking. We affirm.
    I
    In March 2008, Johnston was working for Rodgers at Oiltanking‘s Houston
    facilities when he fell from an unsafe height. Oiltanking and Rodgers were parties to a
    ―Master Service Agreement‖ under which Rodgers, an independent contractor, agreed to
    provide miscellaneous civil, mechanical, marine construction, and maintenance services to
    Oiltanking upon request. The agreement had been in place since 1999.
    Before he fell, Johnston had been wiring programmable logic controllers. Johnston
    was standing in a cable tray some distance above the ground pulling cable for the
    controllers. He was not wearing a safety harness because Rodgers‘ employees told him
    they did not have one large enough for him. When Johnston began to climb down, he
    grabbed onto the cable tray and put his left foot down on the handrail that guarded the
    catwalk below. The cable tray rolled, and Johnston lost his balance and fell into a concrete
    pit, sustaining serious injuries.
    Johnston sued Oiltanking for negligence, alleging that he sustained damages as a
    result of allegedly dangerous conditions and activities conducted on Oiltanking‘s job site.
    Oiltanking answered and filed a combined traditional and no-evidence motion for
    summary judgment.
    In the summary-judgment motion, Oiltanking argued that Johnston was an
    employee of Rodgers, an independent contractor, and therefore Oiltanking was not
    responsible for Johnston‘s work-related injuries. Johnston responded that Oiltanking
    maintained contractual control of the premises under the master service agreement with
    Rodgers and had a duty to exercise reasonable control over activities on its premises.
    On May 20, 2011, the trial court granted Oiltanking‘s motion for summary
    judgment. Because we conclude that the trial court did not err when it granted a traditional
    motion for summary judgment, we need not discuss Oiltanking‘s no-evidence motion.
    2
    II
    A
    A traditional summary judgment is properly granted only when the movant
    establishes that there are no genuine issues of material fact and that it is entitled to
    judgment as a matter of law. Tex. R. Civ. P. 166a(c); Provident Life & Accident Ins. Co. v.
    Knott, 
    128 S.W.3d 211
    , 215–16 (Tex. 2003). A defendant moving for traditional summary
    judgment must conclusively negate at least one essential element of each of the plaintiff‘s
    causes of action or conclusively establish each element of an affirmative defense. Sci.
    Spectrum, Inc. v. Martinez, 
    941 S.W.2d 910
    , 911 (Tex. 1997).
    When reviewing a summary judgment, we take as true all evidence favorable to the
    nonmovant, and indulge every reasonable inference and resolve any doubts in the
    nonmovant‘s favor. Provident Life & Accident Ins. 
    Co., 128 S.W.3d at 215
    . Because the
    trial court‘s order does not specify the grounds for its summary judgment, we must affirm
    the summary judgment if any of the theories presented to the trial court and preserved for
    appellate review are meritorious. See 
    id. at 216.
    B
    Negligence consists of three essential elements: (1) a legal duty owed by one person
    to another; (2) a breach of that duty; and (3) damages proximately resulting from the
    breach. Duty is the threshold inquiry. Greater Houston Transp. Co. v. Phillips, 
    801 S.W.2d 523
    , 525 (Tex. 1990). Johnston alleges a negligent-activity claim, contending that
    Oiltanking breached a duty to exercise ordinary care in the operation of the job site and the
    cable tray.1
    1
    Although Johnston‘s petition could be read to include both a negligent-activity and a
    premises-defect claim, in response to Oiltanking‘s motion for summary judgment and on appeal Johnston
    takes the position that his claim is not one for premises defect. See Clayton W. Williams, Jr., Inc. v. Olivo,
    
    952 S.W.2d 523
    , 527 (Tex. 1997) (explaining that ―[a] general contractor in control of the premises may be
    3
    Generally, a premises owner or general contractor has no duty to ensure that an
    independent contractor safely performs his work. Hoechst-Celanese Corp. v. Mendez, 
    967 S.W.2d 354
    , 356 (Tex. 1998) (per curiam); Redinger v. Living, Inc., 
    689 S.W.2d 415
    , 418
    (Tex. 1985). 2 However, when the general contractor retains some control over the
    independent contractor‘s work, it must exercise that control with reasonable care. Dow
    Chem. Co. v. Bright, 
    89 S.W.3d 602
    , 607 (Tex. 2002); 
    Redinger, 689 S.W.2d at 418
    .
    Section 414 of the Restatement (Second) of Torts, which the Texas Supreme Court
    adopted in Redinger, explains this rule:
    One who entrusts work to an independent contractor, but who retains the
    control of any part of the work, is subject to liability for physical harm to
    others for whose safety the employer owes a duty to exercise reasonable
    care, which is caused by his failure to exercise his control with reasonable
    
    care. 689 S.W.2d at 418
    (quoting RESTATEMENT (SECOND) OF TORTS § 414 (1977)). The
    comments to section 414 of the Restatement further explain:
    In order for the rule stated in this Section to apply, the employer must have
    retained at least some degree of control over the manner in which the work is
    done. It is not enough that he has merely a general right to order the work
    stopped or resumed, to inspect its progress or to receive reports, to make
    suggestions or recommendations which need not necessarily be followed, or
    to prescribe alterations and deviations. Such a general right is usually
    reserved to employers, but it does not mean that the contractor is controlled
    as to his methods of work, or as to operative detail. There must be such a
    retention of a right of supervision that the contractor is not entirely free to do
    the work in his own way.
    liable for two types of negligence in failing to keep the premises safe: that arising from an activity on the
    premises, and that arising from a premises defect‖).
    2
    A premises owner and a general contractor both owe the same duties to an independent
    contractor‘s employees; therefore, cases considering these duties are used interchangeably. Koch Ref. Co. v.
    Chapa, 
    11 S.W.3d 153
    , 155 n.1 (Tex. 1999).
    4
    
    Mendez, 967 S.W.2d at 356
    (quoting RESTATEMENT (SECOND) OF TORTS ' 414 cmt. c
    (1977)).
    Some years after Redinger, the Texas Legislature enacted Chapter 95 of the Texas
    Civil Practice and Remedies Code as part of sweeping tort-reform legislation. See Dyall v.
    Simpson Pasadena Paper Co., 
    152 S.W.3d 688
    , 699 (Tex. App.—Houston [14th Dist.]
    2004, pet. denied). Chapter 95 provides that a property owner is not liable for personal
    injury, death, or property damage to a contractor, subcontractor, or an employee of a
    contractor or subcontractor who constructs, repairs, renovates, or modifies an
    improvement to real property, including personal injury, death, or property damage arising
    from the failure to provide a safe workplace unless:
    (1) the property owner exercises or retains some control over the manner in
    which the work is performed, other than the right to order the work to start
    or stop or to inspect progress or receive reports; and
    (2) the property owner had actual knowledge of the danger or condition
    resulting in the personal injury, death, or property damage and failed to
    adequately warn.
    Tex. Civ. Prac. & Rem. Code § 95.003. (emphasis added); Ellwood Tex. Forge Corp. v.
    Jones, 
    214 S.W.3d 693
    , 699–700 (Tex. App.—Houston [14th Dist.] 2007, pet. denied)
    (citing 
    Dyall, 152 S.W.3d at 699
    ). The effect of section 95.003 was to codify the Redinger
    court‘s adoption of section 414 of the Restatement and to further limit a property owner‘s
    liability by requiring a plaintiff to prove that the owner had actual knowledge of a
    dangerous condition. 
    Id. at 700.
    For purposes of our analysis, we focus solely on the
    control issue.
    A party can prove control through evidence of an agreement that ―explicitly assigns
    the premises owner a right to control‖ or by evidence that the ―owner actually exercised
    control over the manner in which the independent contractor‘s work was performed.‖ Dow
    Chem. Co. v. Bright, 
    89 S.W.3d 602
    , 606 (Tex. 2002); Ellwood Tex. Forge Corp., 
    214 5 S.W.3d at 699
    –700. Johnston does not allege or cite any evidence that Oiltanking exercised
    actual control over Rodgers‘ work. Therefore, we will determine whether Oiltanking
    contractually retained the type of control that would give rise to a legal duty owed to
    Rodgers‘ employees.
    When a party contractually retains a right of control over the independent
    contractor‘s work, the failure to exercise that control will not absolve the party‘s potential
    liability for an on-the-job injury to the independent contractor. See Elliott-Williams Co. v.
    Diaz, 
    9 S.W.3d 801
    , 804 (Tex. 1999); Pollard v. Mo. Pac. R.R., 
    759 S.W.2d 670
    , 670 (Tex.
    1988) (per curiam). It is the right of control, and not the actual exercise of control, which
    gives rise to a duty to see that an independent contractor performs work in a safe manner.
    
    Elliott-Williams, 9 S.W.3d at 804
    ; 
    Pollard, 759 S.W.2d at 670
    .
    The contractually retained right of control must be more than a general right. See
    
    Bright, 89 S.W.3d at 606
    . For a general contractor to be liable for its independent
    contractor‘s actions, it must have the right to control the means, methods, or details of the
    independent contractor‘s work. Id. (citing 
    Elliott-Williams, 9 S.W.3d at 804
    ). ―[T]he right
    to control the work must extend to the ‗operative detail‘ of the contractor‘s work.‖ Ellwood
    Texas Forge 
    Corp., 214 S.W.3d at 701
    (quoting Chi Energy, Inc. v. Urias, 
    156 S.W.3d 873
    , 880 (Tex. App.—El Paso 2005, pet. denied)). It is not enough that the owner has the
    right to order the work to stop and start or to inspect progress or receive reports. See Tex.
    Civ. Prac. & Rem. Code § 95.003(1); 
    Bright, 89 S.W.3d at 606
    .
    Further, the control must relate to the injury the negligence causes. 
    Elliott-Williams, 9 S.W.3d at 804
    . To prove that the general contractor breached an applicable duty of care,
    a nexus must be shown between the general contractor‘s retained control and the condition
    or activity that caused the injury. Shell Oil Co. v. Khan, 
    138 S.W.3d 288
    , 294 (Tex. 2004);
    
    Mendez, 967 S.W.2d at 357
    ; see also Clayton W. Williams, Jr., Inc. v. Olivo, 
    952 S.W.2d 523
    , 528 (Tex. 1997). Stated another way, the defendant‘s duty is commensurate with the
    6
    control it retains over the independent contractor‘s work. Gen. Elec. Co. v. Moritz, 
    257 S.W.3d 211
    , 214 (Tex. 2008); Mendez, 
    967 S.W.2d 357
    . It is not enough to show that the
    defendant controlled one aspect of the independent contractor‘s activities if its employee‘s
    injury arose from another. 
    Khan, 138 S.W.3d at 294
    .
    Determining whether a contract gives a right of control is generally a question of
    law for the court rather than a question of fact for the jury. 
    Bright, 89 S.W.3d at 606
    . We
    construe contracts as a whole in an effort to harmonize and give effect to all the provisions
    of the contract so that none will be rendered meaningless. 
    Khan, 138 S.W.3d at 292
    . No
    single provision taken alone will be given controlling effect; rather, all the provisions must
    be considered with reference to the whole instrument. 
    Id. C In
    his sole issue, Johnston contends the trial court erred in granting summary
    judgment because Oiltanking and Rodgers were parties to the master service agreement in
    which Oiltanking retained control over the ―timing and sequence‖ of Rodgers‘ work, and
    therefore Oiltanking owed a duty to Rodgers and Johnston to see that Rodgers‘s employees
    performed their work in a safe manner under Supreme Court of Texas‘s opinion in
    Redinger. 
    See 689 S.W.2d at 418
    (holding that general contractor was liable for actions of
    independent contractor when the general contractor retained ―the power to direct the order
    in which the work was to be done and to forbid the work being done in a dangerous
    manner‖).
    The specific provision on which Johnston relies provides as follows:
    III.   [Oiltanking‘s] REPRESENTATIVE
    [Rodgers] agrees to perform each phase of the work at the time and in
    the sequence requested by [Oiltanking‘s] Terminal Manager or his
    representative and subject to inspection continuously, or from time to time,
    by such Terminal Manager or his representative.
    7
    Johnston further contends that other terms in the agreement, when considered
    together, evidence Oiltanking‘s intent to reserve to itself a significant amount of control
    over the operative details of Rodgers‘ work, including the following:
    IV.    PERSONNEL
    In the event [Oiltanking] objects to any employee of [Rodgers],
    [Rodgers] shall remove such employee from [Oiltanking‘s] premises, but
    [Rodgers] shall have the exclusive right to hire and terminate its employees
    and may transfer or reassign any of its employees to other work of [Rodgers].
    ...
    V.     MATERIALS, SUPPLIES, TOOLS AND EQUIPMENT
    [Rodgers] will, if requested by [Oiltanking], furnish materials,
    supplies, tools and construction equipment required in the performance of
    work hereunder and will be compensated therefore in the manner hereinafter
    provided.
    ***
    VII.   INSPECTION
    A.     [Oiltanking] will provide an authorized representative prior to the
    commencement of any work hereunder who shall have authority to designate
    the work to be performed hereunder, to inspect such work and to determine
    questions which might arise between the parties relative to the execution of
    the work. The direction of the work by [Rodgers‘] employees shall be under
    the exclusive control of [Rodgers]. [Rodgers] shall assign a competent job
    superintendent who will deal with [Oiltanking‘s] duly authorized
    representative on matters relating to the work to be performed and its proper
    execution.
    B.    [Oiltanking] shall have the authority to stop the work whenever it
    deems such action necessary to secure the safe and proper performance of the
    work assignment.
    Johnston maintains that, taking the agreement as a whole, Oiltanking retained control over
    the details of Rodgers‘ work. Johnston also asserts that testimony of Oiltanking employees
    confirms that Oiltanking maintained contractual control over the worksite, including
    8
    Rodgers‘ work, because these employees either acknowledged Oiltanking‘s contractual
    rights or agreed that Oiltanking had exercised its contractual rights.3
    Johnston relies on Redinger’s language that liability may be imposed on a party who
    retains the right to ―direct the order in which the work [is] to be done.‖ 
    See 689 S.W.2d at 418
    . According to Johnston, Oiltanking‘s right to control the timing and sequence of
    Rodgers‘ work reflects ―precisely the language that the Redinger court and its progeny
    have held sufficient to demonstrate a landowner or general contractor‘s control over the
    operative details of an independent contractor‘s work.‖ In Redinger, there was evidence
    that the general contractor retained the power to direct the order in which the
    subcontractor‘s work was to be done and to forbid the performance of work in a dangerous
    manner. 
    Id. The general
    contractor ordered the activity which resulted in the injury and
    also coordinated the work done by the subcontractor. 
    Id. Based on
    these facts, the supreme
    court held that the general contractor owed a duty to exercise this control in a reasonable
    manner. 
    Id. By controlling
    the timing and sequence of Rodgers‘ work, Johnston asserts,
    Oiltanking likewise maintained control over Rodgers.
    We disagree with Johnston‘s argument because the right to schedule the timing and
    sequence of work is in the nature of a general right to coordinate the activities of
    contractors and others on its premises to complete a project. The right to direct when to
    start, stop, or resume work, or to prescribe alterations and deviations is not the type of
    supervisory control that would impose liability on the general contractor or premises
    owner. See RESTATEMENT (SECOND) OF TORTS § 414 cmt. c; 
    Mendez, 967 S.W.2d at 356
    ;
    
    Redinger, 689 S.W.2d at 418
    ; Ellwood Tex. Forge 
    Corp., 214 S.W.3d at 699
    . Oiltanking
    must have some latitude to tell its independent contractors what to do, in general terms, and
    3
    Oiltanking objects to testimony quoted from pages included in the appendix to Johnston‘s
    appellant brief that were not in the summary-judgment record. To the extent Johnston relies on documents
    or testimony not part of the record, we disregard it. See Guarjardo v. Conwell, 
    46 S.W.3d 862
    , 864 (Tex.
    2001); Nguyen v. Intertex, Inc., 
    93 S.W.3d 288
    , 293 (Tex. App.—Houston [14th Dist.] 2002, no pet.).
    9
    may do so without becoming subject to liability. See Koch Refining Co. v. Chapa, 
    11 S.W.3d 153
    , 156 (Tex. 1999).
    Further, the agreement expressly provides that Rodgers, not Oiltanking, is
    responsible for supervising and directing Rodgers‘ employees:
    II. INDEPENDENT CONTRACTOR
    A. [Rodgers] shall be an independent contractor with respect to all work
    performed hereunder, and neither [Rodgers] nor those employed by
    [Rodgers] to perform such work shall be deemed the agents, representatives,
    employees or servants of [Oiltanking] in the performance of such work or
    any part thereof, in any manner dealt with herein.
    B. [Rodgers] assumes full responsibility for supervising and directing its
    own employees. . . .
    Similarly, paragraph VII.A, on which Johnston in part relies, provides that the direction of
    the work by Rodgers‘s employees shall be under the ―exclusive control‖ of Rodgers.
    Moreover, Johnston makes no claim that Oiltanking‘s right to direct the timing and
    sequence of the work had anything to with his injuries. Instead, Johnston argues that
    Oiltanking‘s contractual right to control the timing and sequence of the work imposes on
    Oiltanking an unqualified duty to protect Rodgers‘ employees from injury; therefore, once
    Johnston demonstrates that his injury was work related, he was not also required to
    demonstrate a relationship between the injury and Oiltanking‘s right to control Rodgers‘
    work. Johnston asserts that to require such a showing would overstep the bounds of
    Redinger and conflict with those cases holding that once contractual control is shown, the
    actual exercise of that control becomes irrelevant. See Elliott-Williams 
    Co. 9 S.W.3d at 804
    ; 
    Pollard, 759 S.W.2d at 670
    .
    However, the Supreme Court of Texas has since made clear that there must be a
    nexus between the employer‘s retained control and the condition or activity that caused the
    injury. 
    Khan, 138 S.W.3d at 293
    –94; 
    Bright, 89 S.W.3d at 606
    ; 
    Mendez, 967 S.W.2d at 356
    ; see also Belteton v. Desco Steel Erectors & Concrete, Inc., 
    222 S.W.3d 600
    , 606
    10
    (Tex. App.—Houston [14th Dist.] 2007, no pet.). Many Texas cases have addressed
    whether a requirement that the independent contractor observe certain safety guidelines is
    sufficient control to give rise to a duty. 
    Belteton, 222 S.W.3d at 606
    . The Supreme Court of
    Texas has explained that a premises owner, by requiring an independent contractor to
    follow its safety rules and regulations, does not owe the independent contractor‘s
    employees a duty to ensure that the employees do nothing unsafe. 
    Mendez, 967 S.W.2d at 357
    –58. Instead, the premises owner assumes only a narrow duty to ensure that its rules or
    requirements do not unreasonably increase the probability and severity of injury. 
    Id. at 358.
    Applying the Supreme Court‘s reasoning to this case, even if Oiltanking‘s right to
    control the timing and sequence of Rodgers‘s work imposed a duty on it, the duty would
    not be an unqualified one, but rather a duty to see that its control of the timing and sequence
    of its independent contractor‘s work did not increase ―the probability or severity of the
    injury.‖ See 
    Mendez, 967 S.W.2d at 358
    . Johnston makes no claims that the timing and
    sequence of Rodgers‘ work increased the probability or severity of his injury. Thus, even if
    a duty existed, no breach of duty relating to that obligation has been asserted or shown.
    On the facts and circumstances presented here, we hold that as a matter of law the
    parties‘ agreement did not impose on Oiltanking a duty to ensure the safety of Rodgers‘
    employees‘ work because Oiltanking did not retain the right to control the means, methods,
    or details of Rodgers‘ work, and there is no nexus between the alleged duty and Johnston‘s
    damages. See 
    Khan, 138 S.W.3d at 293
    –94; 
    Bright, 89 S.W.3d at 606
    –07; 
    Mendez, 967 S.W.2d at 356
    ; 
    Chapa, 11 S.W.3d at 157
    ; see also Echartea v. Calpine Corp., No.
    14-10-00019-CV, 
    2011 WL 2684889
    , at *4 (Tex. App.—Houston [14th Dist.] July 12,
    2011, no pet.) (holding that contract specifying that general contractor would ―provide
    overall site coordination and make assignments and decisions that best effect overall safety
    and overall progress of the project‖ was insufficient to raise fact issue on control);
    Howerton v. Minn. Mining and Mfg., Inc., 
    133 S.W.3d 820
    , 825–27 (Tex. App.—Eastland
    11
    2004, no pet.) (holding that contract reserving to defendant the right to determine the
    sequence in which the independent contractor performed its work did not give rise to duty
    of care).
    Accordingly, the trial court did not err in granting Oiltanking‘s motion for summary
    judgment.
    ***
    We overrule Johnston‘s issue and affirm the trial court‘s judgment.
    /s/    Jeffrey V. Brown
    Justice
    Panel consists of Justices Frost, Brown, and McCally