Goddard College CU ( 2014 )


Menu:
  •                                       STATE OF VERMONT
    SUPERIOR COURT — ENVIRONMENTAL DIVISION
    {
    Goddard College Conditional Use                       {               Docket No. 175-12-11 Vtec
    {
    Goddard College Act 250 Reconsideration               {               Docket No. 173-12-12 Vtec
    {
    Decision on the Merits
    The two matters pending before the Court relate to a proposal by Goddard College
    (Goddard) to replace its current 23 independent heating systems for 23 college buildings with a
    single woodchip heating system on Goddard’s property in the Town of Plainfield, Vermont.
    This proposed development requires both local and state (Act 250) approval. In the first matter,
    Rhea Wilson appeals a decision of the Town of Plainfield Development Review Board (DRB)
    finding that the site plan approval criteria were satisfied and granting Goddard a conditional
    use permit to construct a central woodchip heating system and building (Municipal Appeal). In
    the second matter, Karen Bouffard, Yvonne Byrd, Sam Davis, Rick Levy, Ken Smith, Dan
    Towner, and Rhea Wilson (Act 250 Appellants) appeal a September 10, 2012 District 5
    Environmental Commission decision approving the construction of a woodchip heating system
    at Goddard, including a 2,469 square foot building, a woodchip storage area, distribution
    piping to 23 campus buildings, and an access roadway off of Vermont Route 214 (Act 250
    Appeal). We considered the two pending matters in a coordinated single merits hearing to
    promote expeditious and fair proceedings pursuant to Vermont Rules for Environmental Court
    Proceedings Rule 2(b).
    The Court conducted a site visit at the subject property and surrounding area on the
    morning of October 1, 2013, followed by a merits hearing at the Environmental Division in
    Berlin, Vermont. Appearing at the site visit and merits hearing were Appellants and their
    attorney, Erick E. Titrud, Esq., and Goddard and its attorneys, Elizabeth H. Catlin, Esq. and
    Geoffrey H. Hand, Esq. Although the Town of Plainfield (the Town), represented by Robert
    Halpert, Esq., was active in pre-trial proceedings, it did not attend or participate in the site visit
    or merits hearing.
    Based upon the evidence presented at trial, including that which was put into context by
    the site visit, the Court renders the following Findings of Fact and Conclusions of Law.
    1
    Findings of Fact
    1.    Goddard is a private educational institution approved by the Vermont Department of
    Education.
    2.    Goddard’s campus is located on a single lot of land, comprising approximately 117 acres,
    within the Town’s Rural Residential Zoning District.
    3.    Goddard proposes to construct a woodchip heating system, primarily housed in a new
    standalone building, to provide heat and hot water to the existing campus buildings (the
    Project).
    4.    As proposed, the woodchip boiler building will be approximately 2,500 square feet in size.
    The building will be 25 to 29.5 feet wide and 90 feet long. The building will have a pitched
    or hip roof with asphalt shingles and vertical wood siding.
    5.    The Project has an 82-foot east side setback from the center of Route 214 and a 161-foot
    setback from the north property line. Both the southern and western parcel boundaries
    are considerable distances from the Project.
    6.    Two large overhead doors, both 12 feet wide by 15 feet tall, are located toward the eastern
    end of the south-facing side of the building.
    7.    The building is otherwise residential in character.
    8.    No outdoor storage areas are associated with the proposed building.
    9.    The building will be dark or medium brown and is generally south facing. As viewed
    from the south, the western end of the building will be 20 feet high and the eastern end
    will be 23 feet high.
    10.   A 35-foot-tall corten steel chimney, 24 inches in outside diameter, will be located at the
    back, or north side, of the building. The chimney will be dark brown.
    11.   The proposed building will only house the woodchip heating system, including the
    woodchip storage bins; it will not be used for classrooms, office space, storage space, or
    any other institution uses.
    12.   The Project will burn woodchips to heat water that will be circulated through
    underground pipes to 23 other existing buildings on campus.
    13.   The 23 buildings are presently heated by individual oil fired systems.
    14.   The woodchip fired boiler is manufactured by Messersmith, which has a good reputation.
    15.   The Project’s boiler has a thermal efficiency of approximately 80%.
    2
    16.   Operation of the boiler is automated. The air/fuel ratio is continually adjusted to achieve
    thorough combustion. The unit uses a high temperature burn with both under fire and
    over fire successive stage burns, resulting in heightened thermal efficiency.
    17.   The Project will include an electrostatic precipitator (ESP) for added pollution control.
    Weise Environmental makes the ESP for Messersmith.
    18.   Ultrafine particles are less than 0.1 micron in size and are commonly generated by
    combustion, friction, and cooking.
    19.   The ESP equipment controls ultrafine particles.
    20.   The Project will accept deliveries of woodchips by tractor-trailer truck roughly once per
    week during colder seasons, with up to two deliveries per week during the coldest
    periods and less frequent deliveries during the summer. In total, Goddard expects the
    heating system to require roughly 36 tractor-trailer trips per year to supply woodchips.
    Woodchip deliveries will not take place on weekends or after 5:00 p.m. daily. Offloading
    of woodchips will take less than one-half hour to complete.
    21.   There are 10 to 15 other trucks presently on campus weekly, including kitchen supply
    delivery trucks, garbage trucks, and other supply trucks.
    22.   Woodchips will be delivered to one of the two overhead doors in the eastern section of the
    building. Trucks will unload chips using a “live bed” system that moves the chips off the
    truck without raising the truck bed. The trucks will leave the site after unloading the
    chips.
    23.   Chips will fall into a 14-foot-deep bin within the building. Chips will then be moved by
    conveyors to the boiler.
    24.   The Project will be accessed from Goddard’s main parking lot off Pitkin Road and Route
    214. The Project’s access drive will take the place of an existing fire truck access clearing
    off of Route 214.    The fire truck access will be permanently closed if the Project is
    constructed.
    25.   Existing trees will be retained to the east and north of the building. This will result in
    approximately 40 to 50 feet of treed buffer along most of Route 214.
    26.   Goddard will plant new trees and shrubs around three sides of the building and in the
    existing fire truck access area. Goddard will plant 50 evergreen trees along Route 214.
    These trees will range from 5 to 12 feet tall at planting. An additional 16 evergreens will
    be planted to the west of the building. Around the building, Goddard will plant 11
    deciduous trees and 19 native shrubs which will mature at 8 to 10 feet in height.
    3
    27.     Aboveground electric service will be provided to a pole approximately 20 feet east of the
    building. A 24-foot-wide-by-50-foot-long clearing in the trees will be required for this
    aboveground electric service.          This clearing will be planted with Arrowwood,
    Nannyberry, Viburnum, and Serviceberry.
    28.     Underground electric lines will connect the pole to the building. Spruce, Fir, and Hemlock
    trees, 8 to 10 feet tall at planting, will be planted between the last power pole and the
    building in the area of the underground electric lines.
    29.     The Project will not require any new employees.
    30.     During cold weather a vapor plume may be visible from the chimney.
    31.     Vermont is in attainment with all National Ambient Air Quality Standards (NAAQS).
    32.     The American Meteorological Society/Environmental Protection Agency Regulatory
    Model (AERMOD) was used to model air quality for the Project.               This modeling
    accounted for the topography of the Project area, meteorology, and building geometry,
    including air turbulence. Modeling also accounted for surrounding land uses and land
    cover. Additionally the modeling accounted for stack location, height, diameter, and
    volume, stack flow data obtained from the vender1, temperature, and fuel type
    (woodchips with bark). Finally, the model considered particulate pollutants PM10 and
    PM2.5 and NAAQS to protect human health and welfare.
    33.     Goddard modeled the Project operating at 100% capacity every hour of the year even
    though the Project is expected to typically operate at a lower capacity.
    34.     Meteorological data from the Edward F. Knapp State Airport in Berlin, Vermont was used
    for air quality modeling. The Vermont Air Quality and Climate Division would have
    required the use of this data for any modeling performed to satisfy state regulations;
    however, no such modeling is required pursuant to Vermont regulations.
    35.     The Project area may experience temperature inversions.
    36.     Noise from a similar facility having the same equipment manufacturer was monitored by
    Goddard’s noise impact expert.
    37.     Noise level data was collected near the woodchip storage room and boiler room.
    38.     Noise level data was also collected at an approximate distance of 75 feet from the side of a
    similar truck while the “live bed” system was operating. The majority of the noise from
    1   This equipment has had actual stack testing.
    4
    offloading woodchips comes from the truck’s engine which is revved to power hydraulics
    for the “live bed.”
    39.   This noise data was then used to model noise for the Project. The noise modeling software
    accounted for the architectural design of the Project building, USGA topographic data of
    the area, and the Project’s driveway location and gravel surface.
    40.   Modeling indicated noise levels for noise originating from the boiler plant itself of 15
    dB(A) Lmax (highest sound level measured during measurement time) at the eastern
    property line adjacent to Route 214 and 13 dB(A) Lmax at the north property line.
    41.   Modeling resulted in noise levels for noise originating from woodchip offloading of 61
    dB(A) Lmax at the east property line and 46 dB(A) Lmax at the north property line.
    42.   Background noise levels were monitored at the Project location. The typical background
    noise level is 46 dB(A) Leq (average sound pressure level/second).
    43.   The typical noise for a vehicle passing the Project site on Route 214 is 61 dB(A) Lmax.
    44.   Ken Smith lives to the east of the Project across Route 214 near Sugarwood Road. Mr.
    Smith’s exterior deck is approximately 70 feet from Route 214, and his house and exterior
    deck are approximately 180 to 225 feet from the Project.
    45.   Views from the Smith house across Route 214 toward the Project will include the front or
    south side of the Project building. The driveway and trucks will be partially screened
    from view. The Smith house presently has views of other campus buildings in this same
    general direction.
    46.   Daniel Towner and Yvonne Byrd live off Sugarwood Road east of the Project and
    immediately east of the Smith property. Their house is approximately 250 feet from the
    area of woodchip unloading.
    47.   The Towner/Byrd residence will have views of the Project from their property, but only
    from outside of the residence. Similar views are likely as one drives west on Sugarwood
    Road, especially viewing the project through the overhead power line clearing.
    48.   Karen Bouffard and Sam Davis live on Route 214 immediately north of the Project.
    49.   The Bouffard/Davis residence will also have views of the building through trees and
    other vegetation looking south from the residence.
    50.   Views of the Project building while traveling north on Route 214 are fairly limited in
    duration and occur through openings in vegetation.            Goddard proposes to leave
    substantial tree cover in place and to install considerable supplemental plantings to soften
    views.
    5
    51.     The most substantial view of the Project building is across Goddard’s main parking lot as
    one travels north on Route 214. Typical views include windows on the west end of the
    south-facing wall and the overhead doors on the eastern end of the building.              The
    overhead doors are larger features and have an industrial character; however, the
    proposed landscaping will soften views of the doors. Landscaping will also soften the
    view of the east side of the building. These views presently include existing campus
    buildings.
    Conclusions of Law
    I.        Scope of Review
    Because we decide two coordinated appeals in this decision, we first identify the scope
    of our review in each matter.           Our review is established by an appellant’s statement of
    questions. V.R.E.C.P. 5(f). The Act 250 Appellants raise four questions for our review:2
    1. Will the Project result in undue air pollution under Criterion 1?
    2. Will the Project’s emissions include ultrafine particulates in amounts dangerous to
    human health?
    3. Will the Project have an undue adverse effect on the aesthetics of the area under
    Criterion 8?
    4. Will the Project be in harmony with its surroundings and fit the context in which it is
    to be located, and if not, will its impact on the neighborhood be unduly adverse?
    In the Municipal Appeal, Rhea Wilson raises nine questions, however, in an April 20,
    2013 decision we concluded that within the Municipal Appeal our review is limited by how the
    Project is classified under the Plainfield Zoning Regulations (PZR) for the purpose of DRB
    review. The DRB reviewed Goddard’s project both as a commercial use, requiring site plan
    review, and as a light industry use, requiring conditional use review. We concluded that the
    Project is properly classified only as a light industry use under PZR § 2.8. The parties then
    stipulated that the only remaining issue in the Municipal Appeal is:
    Does the proposed wood chip heating system satisfy the requirements for
    approval as a Conditional Use – Light Industry under §§ 1.7 and 2.8 of the Town
    of Plainfield Zoning Regulations?
    2   We have rephrased the questions to conform to the Court’s de novo review.
    6
    The parties further agreed to strike from the Court’s review general standards 1, 3, 4,
    and 5 and specific standards 4 and 5 under PZR § 2.8, with qualifications on evidence that may
    nonetheless be presented. Thus, our review within the Municipal Appeal is limited to general
    standard 2 of PZR § 2.8, requiring that “the proposed use will not have an undue adverse effect
    on the character of the area affected, as defined by the purpose or purposes of the district in
    which the proposed project is located and the specifically stated policies and standards of the
    municipal plan,” and the following three specific standards of PZR § 2.8:
    1. The Development Review Board may require the installation, operation and
    maintenance of such devices and/or such methods of operation as may in the
    opinion of the board be reasonably required to prevent or reduce fumes, gas,
    dust, smoke, odor, noise, vibration, excessive light, or similar nuisance.
    Performance standards shall be as specified by the appropriate state
    regulatory agencies.
    2. The Development Review Board may impose such conditions regarding the
    extent of open spaces between the proposed use and surrounding properties
    as will tend to prevent injury which might result from the proposed use to
    surrounding properties and neighborhoods. The board shall not require
    more than double setback or double yards for the particular zoning district.
    3. Landscaping and fencing may be required to maintain district character and
    to screen the use from view from a public way.
    The parties then disputed whether 24 V.S.A. § 4413 further limits the Court’s review.
    Under § 4413, municipal regulation of educational institutions is limited to “location, size,
    height, building bulk, yards, courts, setbacks, density of buildings, off-street parking, loading
    facilities, traffic, noise, lighting, landscaping, and screening requirements.” The Court asked the
    parties to brief this issue, and the Town and Goddard submitted timely memoranda. In a
    September 19, 2013 Entry Order we concluded that although the Court will review Goddard’s
    proposal as a light industry conditional use as narrowed by the parties’ agreement, our review
    is further limited by § 4413(a).
    II.    Act 250 Review
    Question 1 - Criterion 1 Undue Air Pollution:
    Criterion 1 requires that a development “[w]ill not result in undue . . . air pollution.” 10
    V.S.A. § 6086(a)(1). Act 250 review of air pollution considers airborne contaminants, dust,
    fumes, and noise. Re: Pike Indus., Inc., No. 5R1415-EB, Findings of Fact, Conclusions of Law,
    7
    and Order, at 31 (Vt. Envtl. Bd. June 7, 2005) (“Noise, fumes, airborne contaminants, and dust
    are considered to be air pollution under Criterion 1.”).       Determining whether a project’s
    resulting air pollution is “undue” is a fact-specific inquiry that may depend on a series of
    factors, such as:
    the nature and amount of the pollution, a proposed project’s location and
    topography, prevailing winds, whether the pollutant complies with certain
    standards or recommended levels, and whether effective measures will be taken
    to mitigate the pollution.
    Id. Thus, the Project’s woodchip burning emissions, noise, and related air pollution factors,
    such as those listed above, must be considered.
    a. Emissions
    Goddard’s Messersmith woodchip fired boiler has a thermal efficiency of approximately
    80%. Operation of the boiler is automated, and the air/fuel ratio is continually adjusted to
    achieve thorough combustion. The unit also uses a high temperature burn with both under fire
    and over fire successive stage burns, resulting in heightened thermal efficiency. Messersmith
    has a good reputation in its industry, and operators of Messersmith boilers tend to be satisfied
    with equipment performance.
    Goddard proposes to include an electrostatic precipitator (ESP), not required by
    regulations, for added pollution control. An ESP is the best available control technology.
    Exhaust from the boiler enters the ESP, where an electric charge is introduced. Oppositely
    charged collection plates cause particulate material to fall out of the exhaust. The estimated ESP
    cost is between $100,000 and $150,000. Thus, the proposal to include the ESP significantly
    enhances the Project from an air pollution control perspective.
    The Project must comply with the National Emission Standards for Hazardous Air
    Pollutants (NESHAPS).       These federal regulations require placing the Project on the
    Environmental Protection Agency’s (EPA) inventory of air sources and tuning the boiler every
    24 months. As detailed more fully below, based upon the credible, uncontroverted testimony of
    Goddard’s air expert, the Project will comply with the NESHAPS.
    The Project need not comply with the National Ambient Air Quality Standards
    (NAAQS). Again, based upon the credible, uncontroverted testimony of Goddard’s air expert,
    Vermont is in attainment with all NAAQS and will continue to be so considering Vermont’s
    present background levels and the addition of the Project.
    8
    Goddard used the American Meteorological Society/Environmental Protection Agency
    Regulatory Model (AERMOD) and meteorological data from the Edward F. Knapp State
    Airport in Berlin, Vermont to model air quality for the Project.3 Goddard modeled the Project at
    100% capacity every hour of the year, however, the Project is expected to regularly operate at a
    much lower level, such as at 75% or 50% capacity. The 100% capacity modeling determined the
    maximum emissions level.      Goddard’s modeling with AERMOD accounted for the Project
    area’s topography, meteorology, and building geometry, including air turbulence. Modeling
    also accounted for surrounding land uses and land cover, as well as stack location, height,
    diameter, and volume, stack flow data obtained from the vender4, temperature, and fuel type
    (woodchips with bark). Finally, the modeling considered particulate pollutants PM10 and
    PM2.5 and NAAQS to protect human health and welfare. Results of the modeling showed that
    the addition of this Project to the area would not result in exceeding the NAAQS.
    Appellants are concerned about the effect of temperature inversions on air quality. The
    Project area may experience temperature inversions. Based upon the credible, uncontroverted
    testimony of Goddard’s air expert, Goddard’s modeling accounted for the possibility of
    temperature inversions and the NAAQS will not be exceeded in the event of such an inversion.
    Lastly, the Project may result in visible emissions from the stack during start up and on
    cooler mornings. The ESP will remove particulates that may be visible, so pollutants in the
    form of particulates will not be a component of emissions. Thus, visible emissions are limited to
    steam comprised of water vapor and will not contain pollutants.
    Goddard’s expert credibly opined that the emissions from the Project will be an overall
    improvement over the existing 23 oil boilers on campus. For these reasons, we conclude that
    the Project will not result in undue air pollution from emissions.
    b. Noise
    Noise from a proposed project can be so significant as to constitute air pollution under
    Criterion 1. Re: Bull’s-Eye Sporting Ctr., No. 5W0743-2-EB, Findings of Fact, Conclusions of
    Law, and Order, at 14 (Vt. Envtl. Bd. Feb. 27, 1997). “The test for undue air pollution caused by
    noise is whether the noise has ‘impacts rising above annoyance and aggravation to cause
    adverse health effects such as hearing damage.’” Id. (quoting Re: Talon Hill Gun Club Inc., No.
    3 The Vermont Air Quality and Climate Division would have required this data for any modeling,
    however, the Project is not subject to Vermont air regulation.
    4 This equipment has had actual stack testing.
    9
    9AO192-2-EB, Findings of Fact, Conclusions of Law, and Order, at 8 (Vt. Envtl. Bd., June 7,
    1995)). Noise analysis under Criterion 1 focuses primarily on the health and safety impacts of
    noise, rather than on its welfare and aesthetic impacts, which are considered under Criterion 8.
    Re: City of Montpelier and Ellery E. & Jennifer D. Packard, No. 5W0840-6-WFP, Findings of
    Fact, Conclusions of Law, and Order, at 21 (Vt. Envtl. Bd. May 22, 2000).
    The former Environmental Board reviewed many Act 250 applications for land use
    permits where noise was at issue. The resulting Environmental Board decisions established
    noise level thresholds or limits evidencing compliance or non-compliance with Criterion 1. We
    give prior Environmental Board decisions the same weight and consideration as prior decisions
    of this Court. 10 V.S.A. § 8504(m).
    When evaluating noise impacts under Criterion 1, the Environmental Board relied on
    the Environmental Protection Agency report, “Information on Levels of Environmental Noise
    Requisite to Protect Public Health and Welfare with an Adequate Margin of Safety,” No. 550/9-
    74-004, dated March 1974. See Re: Paul and Dale Percy, No. 5L0799-EB, Findings of Fact,
    Conclusions of Law, and Order, at 7–8, 17 (Vt. Envtl. Bd. Mar. 20, 1986). Specifically, the
    Environmental Board adopted EPA’s established adverse health impact standard of 70 dB(A)
    for 24 hours each day, 365 days a year, over a lifetime, as the level at which noise constitutes an
    unacceptable level of air pollution under Criterion 1. Re: Pike Indus., Inc. No. 5R1415-EB,
    Findings of Fact, Conclusions of Law, and Order, at 32 (Vt. Envtl. Bd. June 7, 2005).
    Furthermore, the Environmental Board has noted that “unsafe noise levels begin at around 90
    decibels” and that maximum noise levels considerably below that level do not constitute air
    pollution under Criterion 1.     Re: Wildcat Constr. Co., No. 6F0283-1-EB, Findings of Fact,
    Conclusions of Law, and Order at 7, 10 (Vt. Envtl. Bd. Oct. 4, 1991), aff'd, In re Wildcat Constr.
    Co., 
    160 Vt. 631
     (1993).
    Goddard completed noise modeling for the Project and provided its results. For noise
    originating from the boiler plant itself, modeling indicated noise levels of 15 dB(A) Lmax at the
    eastern property line adjacent to Route 214 and 13 dB(A) Lmax at the north property line. For
    noise originating from woodchip offloading, modeling indicated noise levels of 61 dB(A) Lmax
    at the east property line and 46 dB(A) Lmax at the north property line. Appellants did not
    provide any noise data or other measurements to contradict Goddard’s evidence. Appellants
    testified as to their own perception of noise generated at other woodchip boilers and from
    trucks offloading woodchips at other sites. Appellants testified that such noise was “offensive”
    and “deafening,” but provided no evidence of adverse health effects such as hearing damage.
    10
    We conclude that while noise from the Project operations might be apparent to
    Appellants, the noise will be less than the EPA-established adverse health impact standard of 70
    dB(A) for 24 hours each day, 365 days a year, over a lifetime. Several aspects of the Project will
    further reduce or eliminate any potential adverse health effects from noise. First, the woodchip
    deliveries, the loudest element of the Project, will occur approximately 36 times per year, will
    take an estimated 30 minutes or less to complete, and will be limited to weekdays before 5:00
    p.m. The noise levels in close proximity to the boiler equipment itself are estimated to be less
    than present background noise levels. As the distance from the equipment increases, sound
    levels decrease. Appellants’ houses are approximately 200 feet or more from the Project. Thus,
    the proposed Project noise will not cause adverse health effects and will therefore not constitute
    undue air pollution in violation of Criterion 1.
    The Project as proposed conforms to Act 250 Criterion 1.
    Question 2 - Ultrafine particles:
    Ultrafine particles are less than 0.1 micron in size and are commonly generated by
    combustion, friction, and cooking.         In its ESP literature, Weise Environmental, the ESP
    manufacturer for Messersmith, states that its equipment controls ultrafine particles. Goddard’s
    air expert also testified that ultrafine particles are controlled by the ESP, and Appellants
    provided no evidence to contradict this.
    Based upon the limited evidence before the Court, we conclude that the Project’s
    emissions will not contain ultrafine particulates in amounts dangerous to human health.
    Questions 3 and 4 - Criterion 8 Aesthetics:
    To receive an Act 250 land use permit, an applicant must provide evidence sufficient to
    enable the Court to find that the proposed project “[w]ill not have an undue adverse effect on
    the scenic or natural beauty of the area, aesthetics, historic sites or rare and irreplaceable natural
    areas.” 10 V.S.A. § 6086(a)(8). If an applicant satisfies the initial burden of production, then the
    ultimate burden of proving that a project does not conform to Criterion 8 rests upon the
    project’s opponents. 10 V.S.A. § 6088(b); In re Rivers Dev., Nos. 7-1-05 Vtec and 68-3-07 Vtec,
    slip op. at 33 (Vt. Envtl. Ct. Mar. 25, 2010) (Durkin, J.) (citing In re Route 103 Quarry, No. 205-10-
    05 Vtec, slip op. at 8 (Vt. Envtl. Ct. Nov. 22, 2006) (Durkin, J.), aff’d, 
    2008 VT 88
    , 
    184 Vt. 283
    ).
    The cornerstone of the Criterion 8 analysis is the question: “[w]ill the proposed project
    be in harmony with its surroundings—will it ‘fit’ the context within which it will be located?”
    11
    Re: Quechee Lakes Corp., Nos. 3W0411-EB and 3W0439-EB, Findings of Fact, Conclusions of
    Law, and Order, at 18 (Vt. Envtl. Bd. Nov. 4, 1985).
    We received no evidence of historic sites or rare or irreplaceable natural areas at the
    Project site or in the surrounding area. Furthermore, no suggestions were made at trial that the
    Project as proposed will interfere with any areas of scenic or natural beauty. We therefore limit
    our review under Criterion 8 to the Project’s aesthetic and noise impacts.
    A general analysis of aesthetic impacts can be subjective, but the Environmental Board
    established the two-part “Quechee test” to evaluate a project under Criterion 8. Quechee Lakes
    Corp., Nos. 3W0411-EB and 3W0439-EB, at 17 (quoting Re: Brattleboro Chalet Motor Lodge,
    Inc., No. 4C0581-EB, Findings of Fact, Conclusions of Law, and Order (Vt. Envtl. Bd. Oct. 17,
    1984)). First, we examine whether a proposed project may cause an adverse impact on the
    character of the area. 
    Id.
     If so, the Court then determines whether that impact will be “undue.”
    
    Id.
     The Vermont Supreme Court has approved the use of the Quechee test and we therefore
    employ it here. In re Rinkers, Inc., 
    2011 VT 78
    , ¶ 9, 
    190 Vt. 567
    .
    a. The character of the area.
    When considering the Project’s aesthetics and noise, the baseline “character of the area”
    includes existing buildings, noises traditionally emitted from the college and other nearby uses,
    and background noise from traffic on Route 214. The Project site will continue its historical use
    as a college institution. Goddard’s campus currently contains more than 23 buildings. Several
    properties in the area of the Project contain single family residences which are sparsely situated
    in relation to each other. Large trucks, including heating oil delivery trucks, currently make
    deliveries to the buildings on campus. The current heating oil delivery trucks delivering to the
    23 campus buildings will be replaced with woodchip delivery trucks delivering to the one
    woodchip boiler building. Additionally, 10 to 15 other trucks are presently on campus weekly,
    including kitchen supply delivery trucks, garbage trucks, and other supply trucks. The area
    also experiences loud noises, including lawn mowing and chain sawing. Considerable truck
    traffic also travels Route 214.
    Noise from the Route 214 traffic permeates the neighborhood, especially for the homes
    and college campus properties adjoining the highway.             While the Project area may be
    considered rural, it encompasses the well established college with buildings of varying sizes
    and Route 214 with its significant traffic. It is within this context that we consider whether the
    Project will cause an “adverse” impact on the character of the area.
    12
    b. Whether the aesthetic impact is “adverse” to the area’s character.
    The Project building is similar in scale, material, and form to existing college dormitories
    and buildings and residences in the area. The building is 23 feet high at its highest point and
    has a pitched or hipped roof. Its brown color and vertical wood siding will help the appearance
    of the building recede into its background of trees. Landscaping will also mitigate or soften
    visibility of the Project from public areas and decrease visibility of the building and its two
    overhead doors. Appellants assert that these overhead doors, each measuring 12 feet wide by
    15 feet tall, are out of context. Based on the building’s other residential characteristics and its
    institutional setting, however, we conclude that the overhead doors are not out of context.
    The chimney meets the maximum building height of 35 feet and it is fairly narrow at 24
    inches in diameter.    The brown chimney is also lower in height than surrounding trees.
    Nevertheless, the chimney is out of character, because no other large chimneys or stacks are
    located in the area.
    Views of the Project building while traveling north on Route 214 are fairly limited in
    duration and occur through small openings in vegetation. The most significant of these limited
    views is across the college’s main parking lot. Typical views include windows on the west end
    and the overhead doors on the eastern end of the building. These doors are more noticeable for
    their larger size and tend toward an industrial impression, however, landscaping will soften
    their visibility. Views of the building’s east side are also softened with landscaping. These
    views presently include existing campus buildings. Views of the Project while traveling south
    on Route 214 will be further limited and obscured by vegetation.
    Views from the Smith house east of the Project across Route 214 will include the front, or
    south side, of the Project building. The driveway and trucks will be partially screened from this
    view. The Smith house presently has views of other campus buildings in this same general
    direction. The Towner/Byrd residence will have views of the Project looking west from the
    property, but only from outside the residence. Similar views are likely as one drives west on
    Sugarwood Road, especially viewing the Project through the overhead power line clearing. The
    Bouffard/Davis residence will also have views of the building through trees and other
    vegetation looking south from the residence.
    Thus, because the Project will be visible from nearby residences and because the
    chimney stack is not in character with the area, we conclude that overall the Project will result
    in an adverse aesthetic impact to the area’s character.
    13
    c. Whether the aesthetic impact is “undue,” given the area’s character.
    Having concluded that the Project will result in an adverse aesthetic impact on the area’s
    character, we must address whether the impact is undue and therefore in conflict with Criterion
    8. 10 V.S.A. § 6086(a)(8).
    The Environmental Board noted that “the word ‘adverse’ means unfavorable, opposed,
    hostile” to the character of the area. Quechee Lakes Corp., Nos. 3W0411-EB and 3W0439-EB, at
    17. The Environmental Board also established that an adverse impact would be considered
    “undue” if any one of the three following questions is answered in the affirmative: (1) Does the
    project violate a clear, written community standard intended to preserve the aesthetics or
    scenic, natural beauty of the area?; (2) Does the project offend the sensibilities of the average
    person?; or (3) Has the applicant failed to take generally available mitigating steps that a
    reasonable person would take to improve the harmony of the proposed project with its
    surroundings? Quechee Lakes Corp., Docket Nos. 3W0411-EB and 3W0439-EB, at 19–20.
    Based upon the evidence received at trial, we conclude that there is no clear written
    community standard intended to preserve the aesthetics of the Project area.          The Town’s
    regulations establish three non-contiguous rural residential districts, one of which contains
    Goddard College. The rural residential districts are not governed by any aesthetic standards,
    and the goals and strategies within the Town Plan’s land use section contain no specifics for this
    location or use. Meanwhile, the Town Plan’s energy section contains a strong objective to move
    away from fossil fuels toward wood. The Project is a move in this direction. We therefore
    conclude that the Project does not violate any clear, written community standard.
    We next conclude that the Project will not offend the sensibilities of the average person
    and that it will not be shocking or offensive. While neighboring Appellants testified as to how
    they expect the Project to be offensive and how potential views from specific locations may
    shock them, we must consider the Project’s impacts from the perspective of an average person.
    As discussed above, there will be brief views of the Project from Route 214 and some views
    from surrounding residences.      Under present-day conditions, there are views of multiple
    campus buildings of different sizes and power lines in the area. The Project, and specifically the
    building, is similar in scale, material, and form to existing structures. Thus, we conclude that
    the sensibilities of the average person would not be offended or shocked by the addition of the
    Project.
    Lastly, we conclude that the Project’s design is compatible with its surroundings. Again,
    although it is not an exact match to existing neighboring buildings, the overall design of the
    14
    Project building is similar to other campus buildings and surrounding residences. The Project
    building has two large overhead doors and a tall chimney, however, the building is otherwise
    residential in character. Its brown color will help the building appearance recede into its
    background of trees. Goddard has also taken reasonable steps in building design to address the
    context of the Project, including proposing to retain much of the vegetation while planting
    substantial supplemental landscaping. Landscaping will mitigate or soften visibility of the
    Project from public areas and decrease visibility of the building and its doors. We therefore
    conclude that Goddard has taken all reasonable generally available mitigating steps.
    In sum, although we conclude that some of the Project’s aesthetic impacts may be
    adverse, we also conclude that none of the aesthetic impacts will be “undue.”
    d. Whether the noise impact is “adverse” to the area’s character.
    Noise impacts are also evaluated using the two-step Quechee test for “undue” adverse
    impact on the character of the area. The question of whether noise produced by the Project is
    out of character with its setting is a qualitative determination, involving an examination of both
    the type of noise that the Project will generate and neighboring land uses. RE: Hannaford Bros.
    Co., No. 4C0238-5-EB, Findings of Fact, Conclusions of Law, and Order, at 16 (Vt. Envtl. Bd.
    Apr. 9, 2002); Re: Barre Granite Quarries, LLC, No. 7C1079 (Revised)-EB, Findings of Fact,
    Conclusions of Law, and Order, at 79-80 (Vt. Envtl. Bd. Dec. 8, 2000) (internal citations omitted).
    First, we consider whether the Project would have an “adverse impact” by reviewing the
    nature of the Project’s surroundings, the compatibility of the Project’s design with those
    surroundings, and the locations from which the Project can be heard. See Hannaford Bros., No.
    4C0238-5-EB, at 14–18 (analyzing a project under Criterion 8 for potential adverse effect of noise
    and signage on aesthetics); Barre Granite Quarries, LLC, No. #7C1079 (Revised)-EB, at 79–80.
    These factors must be weighed collectively in deciding whether the proposed project is in
    harmony with—or “fits”—its surroundings.
    As detailed above, the area is comprised of a college campus, residential properties,
    Route 214, and rural wooded areas. Goddard’s Project operations will generate noise from the
    boiler operations, truck traffic, and woodchip offloading, which will be the loudest noise.
    Considerable truck traffic is already present in the area, as delivery trucks use Route 214 and
    campus roadways. The current heating oil trucks that deliver to 23 campus buildings will be
    replaced by woodchip delivery trucks that deliver to one boiler building. Additionally, 10 to 15
    15
    other trucks are presently on campus weekly, including kitchen supply delivery trucks, garbage
    trucks, and other supply trucks.
    Woodchip offloading noise will be intermittent and somewhat new to the area.
    Woodchip delivery trucks are tractor trailers. The trucks are equipped with a “live bed” which
    is comprised of three inch wide slats that move forward and backward in alternating directions,
    causing the chips to move toward the back of the truck bed until the chips fall off. The live bed
    is powered by hydraulics running off of the truck engine. When the truck is unloaded, the
    engine is revved up to power the hydraulics. A majority of the sound from unloading chips is
    from the power take-off of the engine and therefore the weight of the truck or woodchips
    during unloading is relatively immaterial.           Even though the area already experiences
    institutional building noise and truck traffic noise from the college campus and Route 214,
    including oil deliveries, we conclude that the woodchip offloading noise would produce an
    adverse impact.
    e. Whether the noise impact is “undue,” given the area’s character.
    Having concluded that the Project’s noise will have an adverse impact, the Court must
    consider whether the adverse effect is undue. Hannaford Bros. Co., No. 4C0238-5-EB, at 15.
    We again use the following factors to determine whether an adverse effect is undue: (1)
    Does the project violate a clear, written community standard intended to preserve the aesthetics
    or scenic, natural beauty of the area?; (2) Does the project offend the sensibilities of the average
    person?; and (3) Has the applicant failed to take generally available mitigating steps that a
    reasonable person would take to improve the harmony of the proposed project with its
    surroundings? Quechee Lakes Corp., Nos. 3W0411-EB and 3W0439-EB, at 19–20.
    The parties did not provide any evidence of community standards related to noise or
    noise levels. As Appellants have the burden to show that a project does not conform to
    Criterion 8, we conclude that the noise from the proposed project does not violate any
    community standard.
    We next consider whether the noise will be so out of character with its surroundings or
    so significantly diminish the qualities of the area as to be offensive or shocking to the average
    person. Re: Pike Indus., Inc., No. 1R0807-EB, Findings of Fact, Conclusions of Law, and Order,
    at 18–19 (Vt. Envtl. Bd. June 25, 1998). As discussed above, adding more sporadic noise to an
    area that already experiences such noise would produce an adverse effect. We cannot say,
    however, that the adverse effect is “shocking or offensive to the average person.” Residents in
    16
    the area have previously been exposed to sporadic truck noise from Route 214 and the noise
    from existing campus activities, so any additional noise—although adverse—is not unduly so.
    In reaching this conclusion we rely, in part, on prior Act 250 approvals that concluded
    that noise from a proposed project does not have undue adverse impacts on aesthetics where it
    is limited to no more than 55 dB(A) Lmax at surrounding residences and no more than 70 dB(A)
    Lmax at the property line. Barre Granite Quarries, LLC, No. 7C1079 (Revised)-EB, at 81–82; see
    also Re: Alpine Stone Corp., ADA Chester Corp. and Ugo Quazzo, No. 2S1103-EB, Findings of
    Fact, Conclusions of Law, and Order, at 32 (Vt. Envtl. Bd., Feb. 4, 2002) (noise from a proposed
    quarry does not have undue adverse impact on aesthetics where the noise is limited to 55 dB(A)
    Lmax at areas of frequent human use).
    Noise from a similar facility having the same equipment manufacturer and similar truck
    deliveries was monitored by Goddard’s noise impact expert. The expert collected noise level
    data near the woodchip storage room and boiler room and also at a point approximately 75 feet
    from the side of a truck during operation of the “live bed” system. This noise data was input
    into noise modeling software to project noise for the Project. The noise modeling software
    accounted for the architectural design of the Project building, USGA topographic data of the
    area, and the Project’s driveway location and gravel surface. Modeling indicated noise levels
    for noise originating from the boiler plant itself of 15 dB(A) Lmax at the eastern property line
    adjacent to Route 214 and 13 dB(A) Lmax at the north property line. Modeling resulted in noise
    levels for noise originating from chip offloading of 61 dB(A) Lmax at the east property line and
    46 dB(A) Lmax at the north property line. Background noise levels were also monitored at the
    Project location, indicating that the typical background noise level is 46(A) dB Leq (average
    sound pressure level/second). Meanwhile, the typical noise level for a vehicle passing the
    Project site on Route 214 is 61 dB(A) Lmax. Thus, the building and plant operation noise is
    projected to be below background levels. Noise levels from woodchip deliveries are expected to
    be equal to traffic noise levels from Route 214. Furthermore, truck noise already exists in this
    area, and the woodchip trucks will be replacing the oil trucks.
    Although backup alarms were recognized as a noise source, they were not evaluated for
    specific noise levels from woodchip deliveries. There will be a limited number of deliveries,
    estimated at 36 per year, and the deliveries and chip offloading events will be limited in
    duration. The amount of time that trucks will be backing up is even further limited. It is
    estimated that trucks will back up for approximately 10 seconds for each delivery. Assuming 36
    17
    deliveries annually, the backup alarm noise will sound a total of 360 seconds, or 6 minutes,
    annually.
    Appellants testified to their observation of woodchip offloading by a similar truck at an
    electric generating plant and at a school in areas different from the proposed Project site. The
    unloading process took 18 to 20 minutes to complete. The noise of offloading was described as
    the revving of a large diesel engine. Although there was testimony of sound level measuring
    with an iPhone application, no noise level data was offered into evidence by Appellants.
    From within the neighboring residence closest to the Project site, Mr. Smith presently
    hears trucks, including trash and oil trucks completing deliveries on the campus, and general
    traffic noise. Mr. Smith also presently hears oil truck deliveries when the truck’s engines
    accelerate to offload oil.
    Goddard has also proposed mitigating steps likely to reduce the level or impact of noise
    from the Project. Specifically, the Project will be shielded by trees and vegetation to the north,
    east, and south. Woodchip deliveries will take place approximately 36 times per year and are
    expected to last less than a half hour each. Deliveries will only occur on weekdays before 5:00
    p.m. This restricted delivery frequency, duration, and timeframe will mitigate the impact of
    noise.
    Considering the evidence before the Court, including the type and frequency of Project
    noise and neighboring land uses, we conclude that the Project “fits” within the area and there
    will be no undue adverse noise impacts from the Project. As noted above, Appellants have
    provided no evidence of noise levels or other data demonstrating that noise levels from the
    Project will cause an undue adverse aesthetic impact. See 10 V.S.A. § 6088(b) (placing ultimate
    burden of showing a project’s nonconformance to Criterion 8 on the project’s opponents). We
    conclude that the Project as proposed conforms to Act 250 Criterion 8.
    III.     Municipal Review
    As discussed above, our review within the Municipal Appeal is limited to general
    standard 2 of PZR § 2.8, requiring that “the proposed use will not have an undue adverse effect
    on . . . the character of the area affected, as defined by the purpose or purposes of the district in
    which the proposed project is located and the specifically stated policies and standards of the
    municipal plan,” and the following three specific standards of PZR § 2.8:
    1. The Development Review Board may require the installation, operation and
    maintenance of such devices and/or such methods of operation as may in the
    18
    opinion of the board be reasonably required to prevent or reduce fumes, gas,
    dust, smoke, odor, noise, vibration, excessive light, or similar nuisance.
    Performance standards shall be as specified by the appropriate state
    regulatory agencies.
    2. The Development Review Board may impose such conditions regarding the
    extent of open spaces between the proposed use and surrounding properties
    as will tend to prevent injury which might result from the proposed use to
    surrounding properties and neighborhoods. The board shall not require
    more than double setback or double yards for the particular zoning district.
    3. Landscaping and fencing may be required to maintain district character and
    to screen the use from view from a public way.
    Pursuant to 24 V.S.A. § 4413, we further limit our Municipal review to the following:
    location, size, height, building bulk, yards, courts, setbacks, density of buildings,
    off-street parking, loading facilities, traffic, noise, lighting, landscaping, and
    screening requirements.
    As analyzed at length above, we conclude that the Project will not have an undue
    adverse effect on the character of the area affected, as defined by the purpose or purposes of the
    district in which the proposed project is located and the specifically stated policies and
    standards of the municipal plan. Thus, the Project complies with general standard 2 of PZR §
    2.8.
    The Project will include an electrostatic precipitator (ESP) as added pollution control for
    the Project, even though such equipment is not required by regulation. As such, we conclude
    that PZR § 2.8 specific standard 1, allowing the DRB, or this Court on appeal, to require devices
    to prevent or reduce fumes, dust, smoke and the like, is satisfied without additional devices.
    We also conclude that additional open space is not appropriate or required for the
    Project to comply with PZR § 2.8 specific standard 2. Pursuant to the PZR, the required setback
    for the Project in this district is 50 feet. The Project has an 82-foot east side setback from the
    center of Route 214 and a 161-foot setback from the north property line. Both the southern and
    western parcel boundaries are considerable distances from the Project. Thus, the Project meets
    dimensional requirements and additional open space is not warranted.
    Goddard proposes to retain significant tree cover and other vegetation and to install
    supplemental plantings. As analyzed above in our Act 250 review, we conclude that the
    character of the district is maintained and views from public ways are sufficiently screened.
    Therefore, specific standard 3 of PZR § 2.8 is satisfied.
    We therefore conclude that the Project complies with PZR § 2.8, pursuant to our review
    as limited by the parties in this matter and as limited by 24 V.S.A. § 4413.
    19
    Conclusion
    For all the reasons discussed above, we conclude that the Project emissions will not
    result in undue air pollution. Additionally, the proposed Project noise will not cause adverse
    health effects and is, therefore, not air pollution in violation of Criterion 1. Thus, the Project
    complies with Act 250 Criterion 1.
    We also conclude that the aesthetic impacts from the Project will not be “undue,” even
    though we find that some of those aesthetic impacts may be adverse. On the whole, the
    woodchip offloading noise would produce an adverse effect; however, we conclude that the
    Project “fits” within the area and that there will be no undue adverse noise impacts from the
    Project. Thus, the Project conforms to Act 250 Criterion 8.
    With respect to our Municipal review, we conclude that the Project will not have an
    undue adverse effect on the character of the area affected, and thus, the Project complies with
    general standard 2 of PZR § 2.8. We also conclude that PZR § 2.8 specific standard 1, allowing
    the DRB, or this Court on appeal, to require devices to prevent or reduce fumes, dust, smoke
    and the like, is satisfied without additional devices beyond the proposed ESP. Regarding PZR §
    2.8 specific standard 2, we conclude that additional open space is not appropriate or required
    for compliance. Lastly, we conclude that the character of the district is maintained and views
    from public ways are sufficiently screened, and therefore, specific standard 3 of PZR § 2.8 is
    satisfied. In total, the Project complies with PZR § 2.8, pursuant to our review as limited by the
    parties and 24 V.S.A. § 4413.
    Finally, we conclude that the Project’s emissions will not include ultrafine particulates in
    amounts dangerous to human health.
    A Judgment Order accompanies this Decision. This completes the current proceedings before
    this Court.
    Done at Berlin, Vermont this 6th day of January, 2014.
    Thomas G. Walsh, Environmental Judge