Iron Gate Partners 5, Llc, V Tapio Construction ( 2017 )


Menu:
  •                                                                                              Filed
    Washington State
    Court of Appeals
    Division Two
    February 22, 2017
    IN THE COURT OF APPEALS OF THE STATE OF WASHINGTON
    DIVISION II
    IRON GATE PARTNERS 5, L.L.C.,                                      No. 47749-1-II
    Appellant,
    v.
    TAPIO CONSTRUCTION, INC.,                                   UNPUBLISHED OPINION
    Respondent,
    R.T. WHARTON & ASSOCIATES, INC.,
    A&A CONTRACTING, INC.,
    Defendants.
    JOHANSON, J. — Iron Gate Partners 5 LLC (Iron Gate) appeals the jury’s defense verdict
    and award of attorney fees in Iron Gate’s breach of contract action against Tapio Construction Inc.
    (Tapio). We reject Iron Gate’s argument that the performance guaranty made Tapio strictly liable
    for water intrusion into the facility. Therefore, we hold that the trial court did not err when it
    denied Iron Gate’s summary judgment motion, the motion in limine, and the CR 50 motions.
    However, based on the plain language of the contract and its execution context, we hold that the
    trial court erred when it awarded Tapio its attorney fees.
    No. 47749-1-II
    We affirm the trial court’s denial of Iron Gate’s summary judgment motion, motion in
    limine, and CR 50 motions and reverse the trial court’s attorney fee award to Tapio.
    FACTS
    I. BACKGROUND
    A. CONSTRUCTION OF THE FACILITY
    In 2006, Iron Gate contracted with Tapio, R.T. Wharton & Associates Inc. (Wharton), Kiwi
    Storage Systems (Kiwi),1 and others to design and build a 481-unit self-storage facility (the
    Facility) in Vancouver. Although Tapio holds a general contractor’s license, Tapio functioned as
    one of multiple contractors on the project. A master contract (the Contract), drafted by Iron Gate,
    governed Tapio’s work. Iron Gate entered into substantially the same contract with the other
    contractors.
    The Facility’s construction was completed in July 2007. The Facility included two parallel,
    two-story buildings, separated by an earthen berm. Atop the berm was a driveway aisle allowing
    second-story access to storage units. First-story access was available from the buildings’ outer
    sides at ground level. A few months after the facility’s completion, Iron Gate employees noticed
    standing water in the first-floor units.
    1
    A Tapio owner testified that Wharton, a structural engineer, designed the Facility and Kiwi built
    the Facility’s metal portions.
    2
    No. 47749-1-II
    B. CONTRACT TERMS
    Section 15 of the Contract included, relevant to this appeal, the following performance
    guaranty:
    Contractor warrants and guarantees to Owner . . . the satisfactory performance of
    the Work for a period of one (1) year from . . . the date of Completion. . . .
    Contractor agrees to repair or replace any or all Work, together with any other
    adjacent work, which may be displaced by so doing, to Owner’s satisfaction, that
    . . . fails to perform for one (1) year from the date of Completion.
    Clerk’s Papers (CP) at 55. “Addendum A” to the Contract defined “Work” as discrete tasks,
    including as item 1.3 a “[r]etaining wall package to include”
    [l]abor and materials to form concrete footings and walls. Furnish and install rebar
    package. Concrete pumping, concrete, place and finish. Furnish and install
    ecoline-r liquid applied membrane waterproofing and “miradrain system” with
    perforated drain pipe on building “A & B” retaining walls before back filling.
    CP at 57. The “Work” also included providing erosion control, a grading and excavation package,
    an underground utilities package, a building foundation package, concrete paving, and city street
    improvements. The “[b]uilding foundation package,” item 1.5, included furnishing and installing
    a “rebar package for cast in place concrete” and concrete on the second-floor deck. CP at 57.
    Regarding attorney fees, the Contract provided that “[i]n the event of litigation between
    the parties hereto . . . on account of the breach of or to enforce or interpret . . . the Contract . . .,
    the losing party shall pay all costs and reasonable attorney[] fees actually incurred by the
    prevailing party, including those on appeal.” CP at 55 (emphasis added).
    3
    No. 47749-1-II
    II. BREACH OF CONTRACT ACTION
    A. IRON GATE’S SUMMARY JUDGMENT MOTION
    In April 2011, Iron Gate sued Tapio for breach of contract.2 Arguing that Tapio had
    breached the performance guaranty in section 15 of the Contract, Iron Gate moved for summary
    judgment.    Iron Gate contended that because the performance guaranty’s language was
    unambiguous and Tapio had breached the guaranty, summary judgment was appropriate. Iron
    Gate argued that as a matter of law, water intrusion violated the performance guaranty, regardless
    of whether Tapio’s work caused the intrusion or the water came through defects created by other
    parties. Iron Gate claimed also that undisputed evidence revealed that Tapio had failed to properly
    install waterproofing components for the concrete retaining walls so that water intruded into the
    storage units. Tapio responded that the performance guaranty was not breached if others’ work
    caused the water intrusion and that there were genuine issues of material fact regarding whether
    the water intruded as a result of Tapio’s work.
    The trial court “appreciated [Iron Gate’s] argument” that regardless of fault, Tapio was
    liable under the performance guaranty, but the trial court disagreed with Iron Gate based on the
    Contract’s language. 1 Report of Proceedings (RP) at 38. The trial court denied Iron Gate’s
    summary judgment motion and ruled that summary judgment was inappropriate because it was
    unclear how the moisture had intruded into the storage units.
    2
    Iron Gate sued both Tapio and Wharton, and Tapio subsequently brought third party claims
    against A&A Contracting Inc. (A&A), Tapio’s subcontractor. The trial court ultimately dismissed
    both Wharton and A&A.
    4
    No. 47749-1-II
    B. IRON GATE’S MOTION IN LIMINE
    Before trial, Iron Gate moved to exclude evidence of the fault “of any other named or
    unnamed parties” except to support Tapio’s failure to mitigate defense. CP at 661. Iron Gate
    argued that the performance guaranty made the fault of those other than Tapio irrelevant. In
    response, Tapio contended that Iron Gate had to prove that Tapio’s alleged breach of warranty had
    caused water to get inside. The trial court denied3 the motion in limine because there were
    “questions of causation and [whether] there [was] moisture getting through and what is causing it
    to get through.” 2 RP (Apr. 4, 2014) at 68-69.
    C. JURY TRIAL
    1.        WATER INTRUSION EVIDENCE
    Iron Gate’s part-owner, Glen Aronson, testified that he noticed standing water, which he
    initially attributed to power washing, in the Facility’s interior within four months of the July 2007
    completion. An employee saw water intrusion in the first-floor units adjoining the berm beginning
    in the fall 2007. The water intruded mostly from the seam between the retaining wall and the floor
    and also from cracks in the retaining wall. In April 2009, the Facility’s managers alerted Aronson
    that there was an “issue with water intrusion” into the lower level units. 2 RP (Apr. 15, 2014) at
    283. During heavy rains, Aronson observed water streaming down the walls from cracks in the
    walls’ middles, from tieback holes in the walls, and from the walls’ top edges. The water intrusion
    slowed after Iron Gate employees caulked expansion joints between the second-floor units and the
    driveway.
    3
    The record on appeal does not contain a written ruling.
    5
    No. 47749-1-II
    Iron Gate’s expert testified that he saw cracks in the concrete at the driveway aisle slab’s
    edge on the second floor. Also, a structural expert observed floor-to-ceiling cracking on the first-
    floor units’ walls adjoining the berm caused by under-reinforced steel and improper jointing.
    Tim Yarnot, Tapio’s senior project manager, testified that the company hired A&A to apply
    the retaining-wall waterproofing called for by the Contract. John Tapio, a Tapio owner, testified
    that the Contract did not require Tapio to caulk exterior cold joints on the second floor because
    Iron Gate thought that Tapio’s price for that work was too high.
    A construction defect investigator testified that water entered the first-floor units through
    the construction joint between the vertical retaining wall and the horizontal pan deck. The pan
    deck was metal framing that Kiwi, not Tapio, had constructed.
    Michael Milakovich, Tapio’s water intrusion expert, observed water entering between the
    rebar and retaining wall, as well as through retaining wall cracks. Milakovich sprayed water at the
    base of a second-floor unit’s roll-up door and into the door jamb. In Milakovich’s opinion,
    rainwater intruded into the second floor through the unweatherproofed unit door jambs, which
    were Kiwi’s work, then migrated to the first floor. Water that intruded though the apron and
    driveway joint was able to “drop alongside the building” into the core drainage plane between the
    retaining wall drain mat and membrane. 7 RP at 779. Milakovich opined that he “[didn’t] think
    the walls [were] a problem in this . . . situation.” 8 RP at 853.
    2.     IRON GATE’S CR 50 MOTIONS
    Iron Gate moved for a directed verdict under CR 50(a) and (b). Iron Gate argued that the
    case involved only contract construction (determining the Contract terms’ legal effect), which was
    an issue for the trial court. Iron Gate reasoned that because Tapio’s work included all the concrete
    6
    No. 47749-1-II
    work and because water came through the concrete, Tapio breached the performance guaranty.
    The trial court denied both CR 50 motions.
    3.     JURY INSTRUCTIONS
    The trial court instructed the jury that Iron Gate had to prove, among other things, that the
    Contract’s terms included a “warranty and guaranty to Iron Gate that [Tapio’s] Work would
    satisfactorily perform” for one year after completion, that Tapio had breached the Contract, and
    that Tapio’s breach resulted in Iron Gate’s damages. CP at 1455.
    4.     VERDICT AND ATTORNEY FEE AWARD
    The jury returned a defense verdict, and the trial court awarded Tapio $125,000 in attorney
    fees as the prevailing party. The trial court found that Tapio did “actually incur” attorney fees and
    costs and concluded that this was so regardless of its insurance carrier’s involvement. CP at 1377.
    ANALYSIS
    I. SUMMARY JUDGMENT DENIAL
    Iron Gate’s underlying argument is that as a matter of law, the trial court erred when it
    declined to adopt Iron Gate’s broad reading of the guaranty provision.4 Iron Gate argues that the
    “iron-clad and strict” performance warranty “absolutely guarantee[d] against any water intrusion”
    so that as a matter of law, summary judgment for Iron Gate was appropriate. Br. of Appellant at
    1-2. Iron Gate contends that the trial court erred when it denied Iron Gate’s summary judgment
    4
    For instance, Iron Gate argues that this case asks whether a “strict performance guarantee” is
    “construed as a matter of law,” that “Iron Gate sought to enforce what it believed was a watertight
    guarantee,” and that Tapio unconditionally promised “that no water would intrude the storage
    units.” Br. of Appellant at 1-2, 6.
    7
    No. 47749-1-II
    motion because the undisputed fact that water intruded into the storage units established that Tapio
    breached the performance guaranty. We disagree.
    A. STANDARD OF REVIEW AND APPLICABLE LAW
    Where the trial court denies summary judgment due to a substantive legal issue, our
    standard of review is de novo. Washburn v. City of Federal Way, 
    169 Wn. App. 588
    , 609, 
    283 P.3d 567
     (2012) (quoting Univ. Vill. Ltd. Partners v. King County, 
    106 Wn. App. 321
    , 324, 
    23 P.3d 1090
     (2001)), aff’d, 
    178 Wn.2d 732
    , 
    310 P.3d 1275
     (2013).
    Contract interpretation is the process of ascertaining the parties’ intention.       Berg v.
    Hudesman, 
    115 Wn.2d 657
    , 663, 
    801 P.2d 222
     (1990). When the facts regarding the meaning of
    a contract provision are undisputed, interpretation is a matter of law. Mut. of Enumclaw Ins. Co.
    v. USF Ins. Co., 
    164 Wn.2d 411
    , 424 n.9, 
    191 P.3d 866
     (2008).
    Washington follows the “objective manifestation theory of contracts” under which we
    focus on the reasonable meaning of an agreement’s words rather than the parties’ unexpressed
    subjective intent. Hearst Commc’ns, Inc. v. Seattle Times Co., 
    154 Wn.2d 493
    , 503, 
    115 P.3d 262
    (2005). “We generally give words in a contract their ordinary, usual, and popular meaning unless
    the entirety of the agreement clearly demonstrates a contrary intent.” Hearst Commc’ns, Inc., 
    154 Wn.2d at 504
    . We view the contract as a whole and interpret particular language in context with
    other provisions. Viking Bank v. Firgrove Commons 3, LLC, 
    183 Wn. App. 706
    , 713, 
    334 P.3d 116
     (2014). And following the “context” rule adopted by Berg, we consider the context of the
    contract’s execution. Viking Bank, 183 Wn. App. at 713 (citing Berg, 
    115 Wn.2d at 666-69
    ).
    However, extrinsic evidence regarding contract execution may be used only to determine the
    meaning of specific words and terms and not to show an intention independent of the instrument
    8
    No. 47749-1-II
    or to vary, contradict, or modify the written word. Hearst Commc’ns, Inc, 
    154 Wn.2d at 503
    (quoting Hollis v. Garwall, Inc., 
    137 Wn.2d 683
    , 695-96, 
    974 P.2d 836
     (1999)).
    B. SUMMARY JUDGMENT INAPPROPRIATE
    Iron Gate contends that the guaranty is so broad that water intrusion into the Facility,
    regardless of fault or cause, breached the Contract as a matter of law and that the Contract called
    for Tapio to “waterproof” the building. Br. of Appellant at 6.
    We begin with the provisions at issue:         the performance guaranty, in which Tapio
    “guarantee[d] . . . the satisfactory performance of the Work for a period of one (1) year” and the
    addendum defining “Work.” CP at 55. “Work” comprised a series of discrete items, such as a
    retaining wall package, including concrete footings and walls and with membrane waterproofing
    and a MiraDRAIN system to be applied to the retaining walls. Another item was the building
    foundation package, including concrete for the second-floor deck. Notably, the only reference to
    waterproofing was to apply membrane waterproofing to the retaining walls.
    The reasonable meaning of the performance guaranty belies Iron Gate’s contention that
    any water intrusion into the Facility breached the Contract. No part of the guaranty provision or
    Addendum A promised that the entire Facility would be watertight or warranted against water
    intrusion into the storage units. Rather, under the provision’s plain language, Tapio guaranteed
    only the satisfactory performance of the discrete items of “Work” listed in Addendum A. Part of
    that guaranty promised the satisfactory performance of a membrane waterproofing system on the
    retaining walls. But a guaranty that a waterproofing membrane to be applied to the retaining walls
    would satisfactorily perform does not amount to a promise that the entire facility will be watertight.
    9
    No. 47749-1-II
    We hold that the ordinary, usual meaning of the performance guaranty unambiguously contradicts
    Iron Gate’s assertion that Tapio agreed to provide an entirely watertight facility.
    We look also to the context of the Contract’s execution to determine whether the parties
    objectively intended that Tapio would guarantee the entire Facility against water intrusion. See
    Hearst Commc’ns, Inc, 
    154 Wn.2d at 503
    ; Viking Bank, 183 Wn. App. at 713. Here, substantially
    the same contract was used with multiple contractors. Further, Tapio was not “the” general
    contractor, but was one of the multiple contractors, each hired to work on a portion of the project.
    And notably, the scope of work did not require Tapio to caulk exterior cold joints, a potential
    source of water intrusion.
    The context in which the parties executed the Contract shows that Tapio was responsible
    for discrete portions of the project, not for overseeing the entire project, which supports our holding
    that Tapio was not required to guarantee that the entire Facility would be watertight. Given that
    the parties expressly agreed that Tapio was not to waterproof exterior cold joints, the context
    further implies that the Contract did not guarantee that every discrete item of Tapio’s Work would
    be waterproof. For these reasons, we hold that both the language of the guaranty provision and
    the context in which the parties executed the Contract contradicts Iron Gate’s assertion that any
    water intrusion into the Facility breached the guaranty provision as a matter of law.
    Iron Gate relies upon Shopping Center Management Co. v. Rupp, 
    54 Wn.2d 624
    , 
    343 P.2d 877
     (1959), and Port of Seattle v. Puget Sound Sheet Metal Works, 
    124 Wash. 10
    , 
    213 P. 467
    (1923). But these cases, both decided before Berg’s objective intent test, do not support Iron
    Gate’s position.
    10
    No. 47749-1-II
    In both Shopping Center Management Co. and Port of Seattle, our Supreme Court
    considered whether the failure of work specifically described and guaranteed by the contract and
    caused by something other than the contractor’s defective workmanship was covered by the
    relevant guaranty.5 
    54 Wn.2d at 625, 629, 633
    ; 
    124 Wash. at 10-13
    . Here, however, Tapio did
    not specifically describe and guarantee the entire Facility, but only discrete items listed in
    Addendum A to the Contract. And Tapio’s defense was that work other than the Work described
    in the Contract resulted in the water intrusion.
    For these reasons, Iron Gate’s argument that as a matter of law, water intrusion into the
    Facility breached the performance guaranty fails, and we reject Iron Gate’s argument that the trial
    court should have granted summary judgment in Iron Gate’s favor. Because the performance
    guaranty is not as broad as Iron Gate contends, Tapio appropriately argued for denial of Iron Gate’s
    summary judgment motion on the basis that Tapio disputed the water intrusion’s source. The trial
    court properly denied the summary judgment motion based on these disputed facts’ existence.
    Thus, we affirm the trial court’s order denying summary judgment to Iron Gate.
    II. MOTION IN LIMINE’S DENIAL
    In a related argument, Iron Gate contends that the trial court erred when it denied Iron
    Gate’s motion in limine to exclude evidence of others’ fault. In particular, Iron Gate argues that
    the mere fact that Tapio’s Work did not satisfactorily perform meant that Tapio was liable under
    5
    In both cases, the described work’s failure breached the performance guaranty regardless of the
    reason that the work failed to satisfactorily operate. Shopping Ctr. Mgmt. Co., 
    54 Wn.2d at 633
    ;
    Port of Seattle, 
    124 Wash. at 13, 19
    .
    11
    No. 47749-1-II
    the performance guaranty, regardless of whether others’ work was also defective or unsatisfactory.
    We reject Iron Gate’s argument.
    We review evidentiary rulings, such as denial of a motion in limine, for abuse of discretion.
    Mut. of Enumclaw Ins. Co. v. Gregg Roofing, Inc., 
    178 Wn. App. 702
    , 728, 
    315 P.3d 1143
     (2013).
    A trial court abuses its discretion if its decision was manifestly unreasonable or exercised on
    untenable grounds or for untenable reasons. Gregg Roofing, 178 Wn. App. at 728. To prevail on
    a breach of contract claim, the party claiming breach must establish that the contract imposed a
    duty, the duty was breached, and the breach proximately caused the damages. C 1031 Props., Inc.
    v. First Am. Title Ins. Co., 
    175 Wn. App. 27
    , 33-34, 
    301 P.3d 500
     (2013) (quoting Nw. Indep.
    Forest Mfrs. v. Dep’t of Labor & Indus., 
    78 Wn. App. 707
    , 712, 
    899 P.2d 6
     (1995)).
    Here, Iron Gate filed a motion in limine that sought to exclude evidence of third party fault
    except as evidence of failure to mitigate and claimed that the performance guaranty was so broad
    that the fault of others was irrelevant. The trial court denied the motion in limine because there
    were “questions of causation and [whether] there [was] moisture getting through and what is
    causing it to get through.” 2 RP (Apr. 4, 2014) at 68-69.
    As discussed, Iron Gate is incorrect that water’s mere presence in the Facility breached the
    performance guaranty. Because the guaranty was not as broad as Iron Gate asserts, Tapio could
    defend by establishing that nonperformance of its Work had not caused the water intrusion.6 See
    C 1031 Props., 175 Wn. App. at 33-34. Because evidence of others’ fault was relevant to whether
    6
    The jury instructions reflected the causation element: they stated that Iron Gate had to prove that
    Iron Gate was damaged “as a result of Tapio’s breach.” CP at 1455. And it was an affirmative
    defense for Tapio to prove that the damages were due to the fault of parties other than Tapio.
    12
    No. 47749-1-II
    Tapio’s alleged breach resulted in the water intrusion, the trial court had tenable grounds and
    reasons to deny Iron Gate’s motion in limine. Accordingly, we affirm the motion’s denial.
    III. CR 50 MOTIONS’ DENIAL
    For similar reasons that Iron Gate contends the trial court erred when it denied the summary
    judgment motion, Iron Gate contends that the trial court erred when it denied Iron Gate’s CR 50
    motions for a directed verdict. We hold that Iron Gate’s arguments in this regard fail.
    We review de novo a CR 50 motion’s denial. Paetsch v. Spokane Dermatology Clinic,
    P.S., 
    182 Wn.2d 842
    , 848, 
    348 P.3d 389
     (2015). A CR 50 motion should be granted only when,
    viewing the evidence in the light most favorable to the nonmoving party, there is no competent
    and substantial evidence that supports the verdict. Paetsch, 
    182 Wn.2d at 848
     (quoting Indus.
    Indem. Co. of Nw. v. Kallevig, 
    114 Wn.2d 907
    , 915-16, 
    792 P.2d 520
     (1990)).
    Here, as discussed, the guaranty provision’s plain language contradicts Iron Gate’s
    assertion that Tapio guaranteed the Facility would be “watertight.” Br. of Appellant at 7. At the
    end of Iron Gate’s case-in-chief, the jury had competent and substantial evidence to find that the
    fact of water’s presence in the berm units alone did not breach the guaranty provision and thus did
    not support a verdict for Iron Gate. Accordingly, the trial court did not err when it denied Iron
    Gate’s first CR 50(a) motion.
    Additionally, Tapio provided competent and substantial evidence from which the jury
    could find that Tapio’s Work did not cause the water to intrude. For example, a Tapio expert
    testified that water entered the berm units through the construction joint between the vertical first-
    floor retaining wall and the horizontal pan deck; the pan deck was part of Kiwi’s, not Tapio’s,
    work. And another Tapio expert opined that the walls were not the “problem” causing water
    13
    No. 47749-1-II
    intrusion. 8 RP at 853. Because there was competent and substantial evidence to support the
    verdict for Tapio, the trial court did not err at the trial’s conclusion when it denied Iron Gate’s
    second CR 50(a) motion. We disagree with Iron Gate that the trial court erred when it denied Iron
    Gate’s CR 50 motions.
    IV. TRIAL COURT’S ATTORNEY FEE AWARD
    Iron Gate argues that because Tapio’s insurance carrier, not Tapio, incurred attorney fees,
    the trial court improperly awarded Tapio its attorney fees “‘actually’ incurred” under the Contract.
    Br. of Appellant at 25. Tapio responds that it is immaterial whether it was represented by insurance
    defense counsel because our courts consistently award attorney fees to prevailing parties
    represented by insurance counsel.7 We agree with Iron Gate.
    Attorney fees may be awarded only if authorized by contract, statute, or recognized
    equitable ground. Dave Johnson Ins., Inc. v. Wright, 
    167 Wn. App. 758
    , 783, 
    275 P.3d 339
     (2012).
    We review de novo whether a contractual provision authorizes an attorney fee award. Renfro v.
    Kaur, 
    156 Wn. App. 655
    , 667, 
    235 P.3d 800
     (2010). When we interpret a contract, we discern the
    parties’ intent from the contract as a whole and decline to read ambiguity into an otherwise clear
    and unambiguous contract. Mayer v. Pierce County Med. Bureau, Inc., 
    80 Wn. App. 416
    , 420,
    
    909 P.2d 1323
     (1995). We give words their ordinary, usual, and popular meaning, absent a clearly
    demonstrated contrary intent, and we prefer interpretations that do not render portions of the
    contract meaningless or ineffective. Hearst Commc’ns, Inc., 
    154 Wn.2d at 504
    ; GMAC v. Everett
    7
    Tapio does not analyze the “actually incurred” language or otherwise explain, based on contract
    principles, why we should read the provision to authorize Tapio its attorney fees.
    14
    No. 47749-1-II
    Chevrolet, Inc., 
    179 Wn. App. 126
    , 135, 
    317 P.3d 1074
     (2014) (quoting Seattle-First Nat’l Bank
    v. Westlake Park Assocs., 
    42 Wn. App. 269
    , 274, 
    711 P.2d 361
     (1985)).
    Here, Tapio obtained an attorney fee award under the Contract provision providing for
    attorney fees “actually incurred by the prevailing party.”8 CP at 55. Our analysis of whether the
    fee award to Tapio under this provision was correct begins with the ordinary, usual, and popular
    meaning of “actually incurred.” Hearst Commc’ns, Inc., 
    154 Wn.2d at 504
    . “Actually” means “in
    act or in fact,” and to “incur” is to “become liable or subject to.” WEBSTER’S THIRD NEW
    INTERNATIONAL DICTIONARY 22, 1146 (2002). Thus, the ordinary meaning of fees “actually
    incurred” by a prevailing party is those fees to which the party “in act or in fact became liable or
    subject.” The limitation on fees “incurred” by the modifier “actually” further supports our reading
    that the plain meaning of the provision at issue does not authorize an award of attorney fees to
    Tapio, who was represented by insurance defense counsel. See also Mills v. Fletcher, 
    229 S.W.3d 765
    , 767-69 (Tex. App. 2007) (analyzing the plain meaning of “actually incurred”).
    We look also to the context of the entire contract when we interpret a contractual provision.
    Viking Bank, 183 Wn. App. at 713. Here, we note that in some provisions, the Contract refers to
    “attorney[] fees” or “reasonable attorney[] fees” without limiting modifiers. CP at 49, 51, 52. In
    other provisions, the Contract limits recovery to “actual attorney[] fees” incurred. CP at 52. We
    decline to interpret the Contract in a way that renders meaningless this distinction between attorney
    fees and attorney fees actually incurred that we find reflected throughout the Contract. See GMAC,
    8
    Tapio also cited RCW 4.84.330, which provides that if a contract specifically allows attorney fee
    recovery to one party, the other party is also entitled to fees if it prevails. But the statute does not
    address the situation here, where the Contract does not “specifically provide” for attorney fees to
    either party if that party did not actually incur the fees. See RCW 4.84.330.
    15
    No. 47749-1-II
    179 Wn. App. at 135. Thus, the context of the Contract also supports our reading. For these
    reasons, we hold that the attorney fee provision at issue is unambiguous and does not authorize an
    attorney fee award to Tapio here.9
    V. APPELLATE ATTORNEY FEES
    Iron Gate requests an award of its attorney fees on appeal under the prevailing party fee
    provision in the Contract and RAP 18.1(a). Tapio requests that we affirm the trial court and grant
    Tapio its appellate attorney fees under the same provision. We decline to award either party its
    appellate fees.
    As discussed, we affirm the trial court’s denial of Iron Gate’s summary judgment motion,
    motion in limine, and CR 50 motions. Although Tapio is the prevailing party on appeal, we hold
    that the “actually incurred” language in the Contract’s attorney fees provision bars recovery where
    the prevailing party was represented by insurance defense counsel. Because Tapio fails to argue
    or explain how it “actually incurred” attorney fees on appeal, we decline to award Tapio its
    appellate attorney fees under the Contract.
    9
    We are not persuaded to the contrary by Tapio’s cited authority, none of which involves a
    prevailing party represented by insurance counsel who requested attorney fees under a contractual
    provision similar to that at issue here. See Harold Meyer Drug v. Hurd, 
    23 Wn. App. 683
    , 687-
    88, 
    598 P.2d 404
     (1979) (party’s representation by public legal services corporation and having
    paid no actual attorney fees immaterial to determination of reasonable legal fees under statute);
    Pub. Utils. Dist. 1 v. Crea, 
    88 Wn. App. 390
    , 396, 
    945 P.2d 722
     (1997) (attorney fees allowed
    under statute providing for reasonable attorney fees even if paid by an insurer). The only cited
    case involving contractually based attorney fees, Metropolitan Mortgage & Securities Co. v.
    Becker, provided for “reasonable attorney fees,” apparently without limiting fees for parties
    represented by in-house counsel. 
    64 Wn. App. 626
    , 632, 
    825 P.2d 360
     (1992).
    16
    No. 47749-1-II
    We affirm the trial court’s denial of Iron Gate’s summary judgment motion, motion in
    limine, and CR 50 motions, reverse the trial court’s attorney fee award to Tapio, and direct that
    both parties bear their own appellate attorney fees.
    A majority of the panel having determined that this opinion will not be printed in the
    Washington Appellate Reports, but will be filed for public record in accordance with RCW 2.06.040,
    it is so ordered.
    JOHANSON, J.
    We concur:
    WORSWICK, P.J.
    SUTTON, J.
    17