Craig & Kelly Turner v. Gordon Baldwin ( 2020 )


Menu:
  •                                                                                                Filed
    Washington State
    Court of Appeals
    Division Two
    October 13, 2020
    IN THE COURT OF APPEALS OF THE STATE OF WASHINGTON
    DIVISION II
    CRAIG and KELLY TURNER,                                             No. 52470-8-II
    Appellants,
    v.
    GORDON BALDWIN, NORMAN SIMON,                                UNPUBLISHED OPINION
    BARBARA SIMON, MARK TAYLOR,
    SARAH TAYLOR, PIERCE COUNTY, and
    STATE OF WASHINGTON SHORELINES
    HEARINGS BOARD,
    Respondents,
    And
    WASHINGTON STATE DEPARTMENT OF
    ECOLOGY,
    Respondents Below.
    SUTTON, A.C.J. — Craig and Kelly Turner appeal a superior court order affirming a
    Shoreline Hearings Board decision denying their application for permits under the Shoreline
    Management Act of 1971 (SMA) to construct a single-use pier/dock, boathouse, and boatlift on
    the northeast shoreline of Hale Passage at Point Fosdick in Pierce County. The Turners argue that
    the Board’s findings are not supported by substantial evidence, the findings do not support the
    Board’s conclusions of law, and the decision is clearly erroneous, arbitrary, and capricious. They
    also argue that Pierce County’s Shoreline Master Program (PCC SMP) and regulations as applied
    violate their fundamental constitutionally protected rights to build a pier/dock at this location. We
    No. 52470-8-II
    hold that the superior court and the Board did not err as the findings are supported by substantial
    evidence, they support the Board’s conclusions of law to deny the permits, and are not clearly
    erroneous, arbitrary, or capricious.1 We also hold that the Turners do not have a fundamental right
    to build the proposed pier/dock at this location. Both the Turners and some of the respondents
    request appellate attorney fees and costs. We agree with the respondents, and award Gordon
    Baldwin, Norman and Barbara Simon, and Mark and Sarah Taylor reasonable appellate attorney
    fees and costs, and we deny the Turners’ request.
    FACTS
    I. SHORELINE DEVELOPMENT
    The Turners own a single-family residence on Hale Passage at Point Fosdick in Gig Harbor.
    The property has 100 feet of shoreline frontage and a bulkhead approximately four feet high. The
    Turners applied for a substantial development permit and a conditional use permit to: (1) construct
    a 150-foot long by 8-foot wide single-use pier/dock; (2) place a 20-foot long by 10-foot wide
    boatlift at the south end of the proposed pier/dock; and (3) construct a 192-square-foot boathouse
    landward of the existing bulkhead.2 The proposed pier/dock would be located at the northeast
    shore of Hale Passage at Point Fosdick, across from Fox Island.
    Under the PCC SMP, the Turners needed to obtain a shoreline development permit for the
    proposed pier/dock and a conditional use permit for the boatlift and boathouse. PCC 20.56.030,
    1
    Based on our holding, we decline to consider the Turners’ challenges to findings of fact 3, 7, 15,
    22, 23, 25, and 27.
    2
    They also wanted to remove an existing hot tub and construct an integrated swimming pool and
    hot tub, but these items are not issues on appeal.
    2
    No. 52470-8-II
    20.72.030-.040. Shoreline development permit applications are subject to Washington State’s
    SMA, chapter 90.58 RCW, its policies, and regulations.
    After reviewing the Turners’ permit application, a Pierce County Hearings Examiner
    approved a shoreline development permit for the proposed pier/dock, pool, and hot tub; approved
    a conditional use permit for the boatlift at the end of the pier/dock; but denied a permit for the
    boathouse. As required, the Washington State Department of Ecology reviewed and approved the
    conditional use permit for the boatlift, but because the County denied a conditional use permit for
    the boathouse, the Department of Ecology rendered no decision on this aspect of the proposal. The
    Taylors, who own adjoining shoreline property immediately to the east, and Baldwin and the
    Simons, who own the two shoreline properties immediately to the west, appealed the County’s
    decision approving the pier/dock and the boatlift. The Turners cross-appealed the County’s denial
    of a conditional use permit for the boathouse, and the Taylors intervened to oppose the boathouse
    appeal. The three shoreline appeals were consolidated.3
    II. PROCEDURE
    A. THE BOARD’S FINDINGS, CONCLUSIONS, AND DECISION
    On appeal, the Board reversed the County’s approval of the proposed pier/dock, and found
    that it was not a preferred use under the PCC SMP, the regulations, or SMA policies. The Board
    further found that the proposed pier/dock and boathouse did not satisfy the criteria for a shoreline
    development permit under the PCC SMP, the regulations, or the SMA policies. The Board ruled
    3
    Respondent Department of Ecology filed a brief only related to whether the Turners’ proposed
    boathouse is a water dependent use or an accessory use under the PCC SMP and the SMA.
    3
    No. 52470-8-II
    that the proposed pier/dock failed to satisfy three separate and independent criteria under PCC
    20.56.040(A). In sum, the Board found that (1) the proposed pier/dock would obstruct and impair
    marine oriented recreation areas and thus, the second part of the first criteria under PCC
    20.56.040(A)(1) was not satisfied; (2) reasonable moorage alternatives to the proposed pier/dock
    exist for the Turners, and thus, PCC 20.56.040(A)(5) criteria was not satisfied; (3) the intensity of
    the Turners’ intended use of the proposed pier/dock was not compatible with the surrounding
    environment and land and water uses, and thus, PCC 20.56.040(A)(7) criteria was not satisfied;
    and (4) the Turners’ proposed boathouse was not a water dependent accessory use, and thus, it did
    not qualify for a conditional shoreline permit under PCC 20.62.050(D)(2).
    1. The Proposed Pier/Dock and Boatlift4
    The Board concluded that the proposed pier/dock “will obstruct or impair marine oriented
    recreation” and found that this shoreline is regularly used by boaters, rowers, kayakers and
    swimmers to navigate around the extreme waterward end of the proposed project. Clerk’s Papers
    (CP) at 589 (conclusion of law (CL) 17).
    The Turners own their private tidelands. The beach in this area consists of sand and pea
    gravel and is regularly used by many beach walkers who visit or live along or near this shoreline.
    The Turners have allowed beach walkers to cross regularly onto their shoreline and they testified
    that they would continue to do so.
    4
    Although the proposed boatlift requires a separate permit and is therefore a separate issue, we
    discuss the boatlift and the proposed pier/dock together because the boatlift can only exist if the
    pier/dock exists.
    4
    No. 52470-8-II
    Pierce County Planning and Land Services staff evaluated the impacts to marine oriented
    recreation from the proposed pier/dock and concluded that:
    [M]arine oriented recreation will incur an impact as the approval of the [pier/]dock
    could result in rowers/kayakers and swimmers traveling further into deeper[,] open
    waters of Hale Passage to navigate around the extreme waterward end of the
    [pier/dock]. In addition, if approved, it will create a perception to a beach walker
    that beach access is limited in this area.
    CP at 579 (findings of fact (FF) 35) (internal quotation marks omitted).
    There are no docks for over six miles to the east and one mile to the west of the Turners’
    proposed pier/dock; it would be the first of its type along this stretch of shoreline. Pierce County
    Planning and Land Services staff acknowledge that the proposed pier/dock is out of character for
    the area.
    The Turners’ proposed pier/dock would be situated at the southern tip of Point Fosdick
    which is exposed to weather events and subject to strong southerly tidal currents and waves,
    particularly during winter storms. It is also within a heavily trafficked waterway used by
    recreational boaters, paddleboarders, rowers, and kayakers. As a matter of safety, paddleboarders,
    rowers, and kayakers hug the shoreline around the point to avoid the strong tidal currents and
    waves as there are no shoals or reefs there. A pier/dock protruding 150 feet from the shoreline at
    this location would force paddleboarders, rowers, and kayakers to paddle further out into the
    deeper waters to navigate around the pier/dock, exposing them to the dangers presented by the
    strong tidal currents and waves they are currently able to avoid.
    Pierce County Planning and Land Services staff concluded that although the project
    complies with the PCC SMP and regulations, they had reservations about the proposed pier/dock
    5
    No. 52470-8-II
    at this shoreline location because it is an uninterrupted seven-mile stretch of shoreline. Pierce
    County Planner Mojgan Carlson commented:
    [T]his shoreline area is free from docks. A dock structure with a boatlift could
    result in a permanent view obstruction to all neighboring properties. In addition,
    during the majority of daily low tides, moorage of a boat will not be feasible
    because it will ground out. With the aid of the proposed boatlift, vessels will remain
    in the tidelands and will create a view impact more consistent with storage than
    moorage. The intent of the code is to protect view aesthetics: therefore staff
    believes that construction of a permanent dock will change the nature of the
    shoreline character in this area and would damage the natural landscape of the
    shoreline.
    [T]he proposed dock, if approved, will change the structure free character of the
    shoreline in this area.
    [T]he immediate surrounding properties are not considered high bank waterfront
    sites and as such if the dock is approved, it will be the only dock in the immediate
    vicinity of the site that will be highly visible to the neighboring properties.
    Therefore, [Pierce County Planning and Land Services staff] believes that
    construction of a permanent dock will permanently create a view obstruction to
    adjacent residences as well as public view and enjoyment of a natural shoreline
    area.
    CP at 578 (FF 33) (internal quotation marks omitted) (internal citations omitted).
    The proposed pier/dock would also impair the views of Mount Rainer and the Olympics
    for the Taylors.
    2. Reasonable Moorage Alternatives
    The Board next concluded that “a number of reasonable moorage alternatives to a single
    use [pier/dock] do exist even if the Turners find them less convenient. Therefore, the Turners’
    proposed single use [pier/dock] is inconsistent with PCC 20.56.040[(A)(5)].” CP at 587 (CL 15).
    The Turners as sole owners, through Harbor Point Holdings, LLC, acquired shoreline property
    including a house, a shed, and a pier/dock located on the Gig Harbor waterfront with
    6
    No. 52470-8-II
    accompanying Department of Natural Resources aquatic lease rights for the adjacent tidelands.
    This property is a 15-minute drive from their home, is already improved, and has been used for
    private recreational boat moorage by lease.
    At the time of the hearing before the Pierce County Hearing Examiner, neither the Pierce
    County Planner nor the Hearings Examiner were aware of the Turners’ purchase of the Gig Harbor
    waterfront property through Harbor Point Holdings, LLC. Carlson testified that had she known,
    she would not have approved a single-use pier/dock when private moorage was a reasonable
    alternative.
    The Board found that the Turners could also utilize a mooring buoy, in conjunction with a
    dinghy, to moor and access their boat, just as the previous property owners and their neighbors
    have successfully done for many years. Finally, the Board found that the Turners could utilize one
    of the multiple commercial moorage facilities in Gig Harbor or the moorage facility at the nearby
    Day Island Marina as their neighbors and predecessor owners have done. The Turners testified
    that they did explore other alternatives, but concluded that the options were at locations that were
    either too expensive or inconvenient.
    3. Impediment To Public Uses
    The Board concluded that,
    [T]his beach is regularly used by the public for walking. There is currently a seven
    mile stretch of beach that is unimpaired with piers[/docks] and provides the public
    with an excellent place to enjoy a long walk on the beach with beautiful views of
    the water, the Olympics, and Mount Rainier. Furthermore, the near shore water in
    this area is heavily used for [recreational] boating, kayaking, and paddleboarding.
    CP at 590 (CL 21). The Board concluded that “The proposed pier[/dock] would present an
    impediment to all of these public uses.” CP at 590 (CL 21).
    7
    No. 52470-8-II
    4. Cumulative Impacts
    The Board concluded that the proposed pier/dock at this location would likely have
    cumulative impacts because the proposed use is disfavored under the PCC SMP. It also concluded
    that the proposed pier/dock at this location would degrade aesthetic uses, set a precedent for future
    similar large single-use piers/docks here, take away from community uses including beach
    walkers, kayakers, paddleboarders, and recreational boaters would be lost, and unduly impact the
    neighbors’ water views.
    5. Boathouse and Boatlift
    The Board concluded that the proposed boathouse at this location is not a water dependent
    accessory use, would impair the Taylors’ views, and is not necessary for its intended use of kayak
    and paddleboard storage. Thus, the Board affirmed the County’s denial of the conditional use
    permit for the boathouse. The Board denied the conditional use permit for the proposed boatlift
    because the boatlift was only feasible if attached to the proposed pier/dock.
    The proposed boathouse would be located 5 feet landward from the Turners’ bulkhead, at
    a height of 18.5 feet. The Turners informed the Hearing Examiner that they would relocate the
    proposed boathouse further upland to address the Taylors’ view concerns. While a precise location
    was not disclosed at the time, they submitted a revised plan after the hearing. Under the revised
    plan, the boathouse would be located 22 feet from the bulkhead and the height reduced to 12 feet.
    The new location however did not mitigate the proposed boathouse’s view impacts to the
    Taylors. It would still substantially obstruct the Taylors water view and completely obstruct their
    view of the Olympic Mountains. After visiting the site as part of the Board proceedings, the Pierce
    County Planner determined that the proposed boathouse would impact the Taylors’ view.
    8
    No. 52470-8-II
    Although labeled a boathouse, the Turners acknowledged that the boathouse would largely
    be used as a pool house. The proposed structure was to be situated on the opposite side and upland
    from the proposed pier/dock, but in very close proximity to a planned swimming pool and outdoor
    shower. The Turners also intended to use the boathouse as storage for their kayaks, life jackets,
    fishing equipment, and the like.
    B. APPEAL TO SUPERIOR COURT
    After the Board’s decision, the Turners filed a petition for judicial review under the
    Administrative Procedures Act (APA)5 to the Pierce County Superior Court. The superior court
    affirmed the Board’s decision. The Turners appeal the superior court order affirming the Board’s
    decision denying their application for permits under the SMA to construct a single-use pier/dock,
    boathouse, and boatlift.
    ANALYSIS
    I. LEGAL PRINCIPLES
    The APA governs our review of the Board’s decision.           RCW 34.05.570(1); RCW
    90.58.180(3). “We sit in the same position as the superior court and apply the APA to the
    administrative record.” Cornelius v. Dep’t. of Ecology, 
    182 Wn.2d 574
    , 585, 
    344 P.3d 199
     (2015).
    We will grant relief from a decision if we determine that it is arbitrary and capricious, clearly
    erroneous based on the entire record, not supported by substantive evidence, or violates
    constitutional principles, such as due process. Superior Refuse Removal, Inc. v. Utilities & Transp.
    Comm’n, 
    81 Wn. App. 43
    , 48, 
    913 P.2d 818
     (1996). “The burden of demonstrating the invalidity
    5
    Ch. 34.05 RCW.
    9
    No. 52470-8-II
    of agency action is on the party asserting invalidity”—here, the Turners. RCW 34.05.570(1)(a).
    “We review questions of law and an agency’s application of the law to the facts de novo, but we
    give the agency’s interpretation of the law great weight where the statute is within the agency’s
    special expertise. Cornelius, 182 Wn.2d at 585.
    We will overturn the Board’s decision if it is clearly erroneous based on the entire record.
    Cornelius, 182 Wn.2d at 585. We do not reweigh the “credibility of witnesses or substitute our
    judgment” for the agency’s regarding a finding of fact. Port of Seattle v. Pollution Control Hr’gs
    Bd., 
    151 Wn.2d 568
    , 588, 
    90 P.3d 659
     (2004).
    We will overturn the Board’s decision if it is “arbitrary or capricious.” RCW 34.05.570;
    Cornelius, 182 Wn.2d at 615. A decision is arbitrary or capricious if it constitutes willful and
    unreasoning action in disregard of facts and circumstances. Port of Seattle, 
    151 Wn.2d at 589
    .
    Even if a different conclusion may have been reached, a decision will not be considered arbitrary
    or capricious if there is “room for two opinions” and the action taken is upon honest and due
    consideration. Buechel v. Dep’t. of Ecology, 
    125 Wn.2d 196
    , 202, 
    884 P.2d 910
     (1994). We also
    will overturn a Board’s decision if it violates due process. Superior Refuse Removal, 81 Wn. App.
    at 48.
    II. SUBSTANTIAL DEVELOPMENT PERMIT CRITERION
    The Board, in its discretion, must balance the impacts of the Turners’ proposed pier/dock
    with the rights of the private shoreline property owners, here the neighbors. The Board must then
    determine if the Turner’s proposed pier/dock meets the following relevant substantial development
    permit criterion applied to a single-use pier/dock, consistent with the PCC SMP policies:
    10
    No. 52470-8-II
    The granting of a Substantial Development Permit is dependent upon the County
    reviewing authority’s determination that the proposed project is consistent with the
    policies of the Master Program and with the following [substantial development
    permit] criteria:
    1. Important navigational routes or marine oriented recreation areas will not be
    obstructed or impaired;
    2. Views from surrounding properties will not be unduly impaired;
    3. Ingress-Egress as well as the use and enjoyment of the water or beach on
    adjoining property is not unduly restricted or impaired;
    4. Public use of the surface waters below ordinary high water shall not be unduly
    impaired;
    5. A reasonable alternative such as joint use, commercial or public moorage
    facilities does not exist or is not likely to exist in the near future;
    6. The use or uses of any proposed dock, pier or float requires, by common and
    acceptable practice, a Shoreline location in order to function;
    7. The intensity of the use or uses of any proposed dock, pier and/or float shall be
    compatible with the surrounding environment and land and water uses.
    PCC 20.56.040(A).
    Relevant here, the Board found that the Turners’ proposed pier/dock did not meet the
    permit criteria 1, 5, and 7. These regulatory provisions and WAC 173-27-150(1)(c) expressly
    condition permit approval upon demonstration by the applicant that their proposal is consistent
    with the PCC SMP policies and the permit criteria. The Turners have the burden to prove that the
    Board’s findings are not supported by substantial evidence and are, thus, clearly erroneous.
    Whatcom County v. Hirst, 
    186 Wn.2d 648
    , 667, 
    381 P.3d 1
     (2016); RCW 34.05.570(1)(a). They
    fail to meet this burden. We address below the Board’s findings and conclusions regarding permit
    criteria 1, 5, and 7.
    11
    No. 52470-8-II
    III. PROPOSED PIER/DOCK
    The Turners argue that the proposed pier/dock is a favored water-dependent joint use
    pier/dock, and thus, as a preferred use, it is conditionally allowed under the PCC SMP and the
    SMA, and does not violate the compatibility standard in PCC 20.56.040(A) and PCC 20.56.010(J).
    They also argue that the Board ignored the SMA policies in RCW 90.58.020 which control the
    Board’s interpretation of the local PCC policies which disfavor single-use piers/docks. We hold
    that the Board’s findings are supported by substantial evidence, are not clearly erroneous based on
    the record, and they support the Board’s conclusions that the proposed pier/dock is for residential
    single-use which is a disfavored use under the applicable law.
    The SMA establishes a comprehensive scheme of shoreline regulation and requires local
    governments to develop “shoreline master programs” to regulate shoreline development consistent
    with the goals and polices of the SMA. Buechel, 
    125 Wn.2d at 203
    . Any shoreline development
    in Washington must be consistent with the SMA and the relevant local SMP, here Pierce County’s.
    RCW 90.58.140(1).6
    The Department of Ecology reviews and approves an SMP and determines that it is
    consistent with the SMA. Ch. 173-26 WAC; See RCW 90.58.090. Once approved by the
    Department of Ecology, the SMPs are the regulations that apply to activities within that shoreline
    jurisdiction and become part of the State Master Program, which includes all local SMPs. RCW
    90.58.030(3)(d); RCW 90.58.100(1). The Department of Ecology also reviews deviations from
    6
    The legislature amended RCW 90.58.140 in 2019. LAWS OF 2019, ch. 225, § 1. Because these
    are not relevant here, we cite to the current version of the statute.
    12
    No. 52470-8-II
    an SMP that can only be authorized through variance permits or conditional use permits. RCW
    90.58.140(10).
    RCW 90.58.020 provides that, in instances where alterations to the natural shoreline are
    authorized, priority shall be given to
    [S]ingle-family residences and their appurtenant structures, ports, shoreline
    recreational uses including but not limited to parks, marinas, piers, and other
    improvements facilitating public access to shorelines of the state, industrial and
    commercial developments which are particularly dependent on their location on or
    use of the shorelines of the state and other development that will provide an
    opportunity for substantial numbers of the people to enjoy the shorelines of the
    state.
    The SMA does not specifically refer to private residential piers/docks as preferred uses.
    A. SINGLE-USE PIER/DOCK
    The Turners claim their proposal is to construct a joint-use pier/dock. We disagree because
    as the Board correctly determined the proposed pier/dock is a single-use residential pier/dock.
    PCC’s SMP regulations define “single use pier or dock” and “joint use pier or dock” under
    PCC SMP 20.56.010:
    I. Single Use Pier or Dock. “Single Use Pier or Dock” shall mean a dock or pier
    including a gangway and/or float which is intended for the private noncommercial
    use of one individual or family
    J. Joint Use Pier or Dock. “Joint Use Pier or Dock” shall mean a pier or dock
    including a gangway and/or float which is intended for the private, noncommercial
    use of not more than four waterfront building lot owners, at least one boundary of
    whose building lots lies within 1,000 feet of the boundary of the lot on which the
    joint use pier or dock is to be constructed.
    (Emphasis in original.)
    The Board found that the proposed pier/dock was intended for residential use by one single
    family—the Turners. The neighbors declined to join the Turners to construct this proposed
    13
    No. 52470-8-II
    pier/dock as a joint use pier/dock. The Board determined that this residential, single-use pier/dock
    was a “disfavored use” under the PCC SMP. CP at 593 (CL 30). We agree that the Board correctly
    found that the proposed pier/dock was a single-use pier/dock and that this finding is supported by
    substantial evidence and thus, it is not clearly erroneous based by the entire record.
    B. THE PROPOSED PIER/DOCK WOULD OBSTRUCT OR IMPAIR MARINE ORIENTED RECREATION
    1. Undue Obstruction
    Applying criterion 1, the Board concluded that the single-use 150-foot residential pier/dock
    proposed on this unencumbered, low bank shoreline would obstruct or impair important marine
    oriented recreational areas. The Board concluded that:
    Swimmers, paddleboarders, and kayakers will be required to either go around or
    under the pier[/dock] depending upon the level of the tide. The currents in Hale
    Passage are stronger further from shore and can be frightening even for experienced
    kayakers. . . . Fishing and other boats currently come close into the shore as they
    round the point and they will have to avoid the pier[/dock]. . . . After decades
    without any piers[/docks] on this shoreline, it would be a safety hazard for boaters
    who are not expecting to find a pier[/dock] 150 feet out from the shore. The Board
    notes that this criteria does not require that the impairment be undue; the question
    is simply whether marine oriented recreation areas will “be obstructed or impaired.”
    CP at 588-89 (CL 17) (quoting PCC 20.56.040(A)(1)).
    The Turners argue that the Board’s conclusion is not supported by substantial evidence and
    thus, it is clearly erroneous based on the entire record. We disagree.
    This particular shoreline along Hale Passage, situated at the southern-most point of the Gig
    Harbor Peninsula, is unique. It is unique not just because of the current absence of impeding
    structures, but also because it is exposed to the weather, subjected to strong currents and waves,
    and along a thoroughfare that is heavily trafficked by boaters, kayakers, and paddleboarders.
    Recreational boaters regularly hug the shoreline, and a pier/dock protruding 150-feet into the water
    14
    No. 52470-8-II
    would pose an unexpected hazard as boaters cut around Point Fosdick. To avoid the 150-foot
    pier/dock, paddleboarders, kayakers, and rowers also would be forced to paddle further into the
    open waters and expose themselves to the strong currents and wave action they could otherwise
    avoid.
    While the Turners presented some competing testimony, the Board weighed the totality of
    the evidence to find that this proposed pier/dock would obstruct or impair marine oriented
    recreation in light of the characteristics of this particular shoreline, the conditions of the water at
    this particular shoreline, and the public recreational uses of this particular shoreline.
    Unlike other permit criteria, PCC 20.56.040(A)(l) does not require a showing of “undue”
    impairment. Though the impairment presented in this unique context does readily rise to the level
    of “undue,” the proposed single-use residential pier/dock fails to satisfy criterion (1), which
    prohibits obstruction or impairment of important marine oriented recreational areas. The Turners
    argue that the Board should have considered the 5 mile per hour near shore speed limit. Even if
    considered, the Board’s finding is still supported by substantial evidence, that the proposed
    pier/dock would obstruct or impair important marine oriented recreational areas.
    Because the Board’s findings are supported by substantial evidence and are not clearly
    erroneous based on the entire record, they support the Board’s conclusion that the proposed
    pier/dock would obstruct or impair marine oriented recreation.
    2. The Turners Have Reasonable Mooring Alternatives
    PCC 20.56.040(A)(5) provides that a permit may only be approved if “[a] reasonable
    alternative such as joint use, commercial or public moorage facilities does not exist or is not likely
    to exist in the near future.” Applying criterion 5, the Board determined that the Turners have three
    15
    No. 52470-8-II
    reasonable alternatives to the proposed residential pier/dock: a mooring buoy, a public mooring
    facility, or the pier/dock owned by their wholly owned LLC.
    As to criterion 5, the Board concluded the following:
    14.
    The Turners currently own property on the Gig Harbor waterfront that
    includes private moorage. The Turners contend this moorage is not a reasonable
    alternative because the two berths at their pier[/dock] are currently leased to others
    and expanding the facility would take time and money. The Board is not persuaded
    by this argument. The Turners have not presented any persuasive reason why they
    could not choose to change their leasing arrangements and moor their own boat at
    their Gig Harbor waterfront pier[/dock] if they chose to do so. Mr. Turner testified
    that the leases could be terminated upon 90 days’ notice. When the Turners
    purchase a boat, if they wish to continue to allow their tenants to use their Gig
    Harbor moorage, they can moor their boat at a nearby marina like some of their
    other neighbors. Alternatively, the Turners could moor their boat at a mooring
    buoy like Dr. Baerg, the previous owner of the property. The Board concludes that
    a mooring buoy is a workable alternative for this shoreline property. The previous
    owner of the Turner property testified that he was able to use a mooring buoy for
    his boats in Hale Passage.
    15.
    Here, the Board concludes that a number of reasonable moorage alternatives
    to a single use pier[/dock] do exist even if the Turners find them less convenient.
    Therefore, the Turners’ proposed single use pier is inconsistent with PCC
    [20.56.040(A)(5)].
    CP at 587 (emphasis added) (footnote omitted) (internal citations omitted).
    a. A Buoy is a Reasonable Alternative to a Pier/Dock
    The Turners argue that a mooring buoy cannot be a reasonable alternative to a pier/dock
    because (1) a mooring buoy is not a listed alternative in the PCC SMP; (2) they wish to moor their
    boat near their home year round; (3) a mooring buoy is inconvenient; and (4) they intend to use
    the proposed pier/dock for other purposes than just mooring and boating access because they also
    16
    No. 52470-8-II
    want to view the shoreline, fish, picnic, and entertain. The Board correctly rejected these
    arguments.
    PCC 20.56.040(A)(5) does not provide an exhaustive list of alternatives. The PCC uses
    the phrase “such as” as a precursor to the alternatives listed. Moreover, the PCC SMP policies,
    which must be considered when applying the permit criteria expressly identify buoys as a preferred
    alternative to a single-use residential pier/dock. PCC SMP pier policy (d) explicitly discourages
    use of piers/docks associated with single-family residences, while policy (f) encourages the use of
    mooring buoys as an alternative to piers/docks in front of single-family residences.          Any
    interpretation that PCC 20.56.040(A)(5) does not include a buoy as a potential reasonable mooring
    alternative to a pier/dock for a single-family would contravene the PCC SMP policies the
    regulation is supposed to implement.
    Here, the Board heard testimony by persons who regularly boat along this shoreline that,
    due to the strong winds and currents, the boating season generally runs from April to September.
    Thus, using a pier/dock to moor a boat year round is not practical at this location. A mooring buoy
    is an available and appropriate alternative during the boating season, and the method was
    successfully used by the Turners’ neighbors and the prior owners of their property.
    Further, the Board has held previously that an applicant must demonstrate that a pier/dock
    is actually needed for moorage, not that it is simply more convenient. Walker v. San Juan County,
    No. 09-012, at 29 (Wash. Shorelines Hr’gs Bd. Aug. 27, 2010). It has also held that the feasibility
    of available reasonable alternatives should be evaluated without regard to individual age or
    physical limitations. Walker, SHB No. 09-012, at 28.
    17
    No. 52470-8-II
    Piers/docks gain their status as appropriate shoreline structures because they can provide
    access to watercraft. See WAC 173-26-201(2)(d) (“the act establishes policy that preference be
    given to uses that are unique to or dependent upon a shoreline location.”); see also WAC 173-26-
    231(3)(b) (“New piers and docks shall be allowed only for water dependent uses or public access.
    As used here, a [pier/]dock associated with a single-family residence is a water-dependent use
    provided that it is designed and intended as a facility for access to watercraft and otherwise
    complies with the provisions of this section.”). Here, fishing, picnicking, viewing the shoreline
    and partying can occur during the year without a pier/dock as the Board correctly concluded.
    b. The Turners’ Private Pier/Dock is a Reasonable Alternative To a Single-Use Pier
    The Board concluded in relevant part that “[t]he Turners have not presented any persuasive
    reason why they could not choose to change their leasing arrangements and moor their own boat
    at their Gig Harbor waterfront pier[/dock] if they chose to do so,” referring to the commercial
    pier/dock property owned by Harbor Point Holdings, LLC as a reasonable alternative. CP at 587
    (CL 14). The Board also concluded that the Turners could “moor their boat at a nearby marina
    like some of their other neighbors” or “could moor their boat at a mooring buoy like” other
    property owners. CP at 587 (CL 14). The Turners argue that this conclusion ordered them to
    disregard Harbor Point Holdings separate legal status and would require them to raid its holdings
    to satisfy personal interests. We disagree.
    The Board did not direct Harbor Point Holdings to take any action. It simply concluded
    that the Turners, as the sole members of the LLC, could choose to utilize the Harbor Point Holdings
    pier/dock for mooring their own boat. The Board correctly identified that choice as only one of
    several reasonable alternatives to the proposed pier/dock which were available to the Turners.
    18
    No. 52470-8-II
    The Board’s findings are supported by substantial evidence and they support the Board’s
    conclusion that reasonable alternatives to a single-use residential pier/dock exist.
    C. THE INTENSITY OF THE USE OF THE PROPOSED PIER/DOCK               IS   NOT COMPATIBLE   WITH THE
    SURROUNDING ENVIRONMENT AND LAND AND WATER USE
    The Board found that, under PCC 20.56.040(A)(7), the intensity of the use of the proposed
    pier/dock was not compatible with the surrounding environment and land and water uses at this
    location. The Turners argue that this finding is not supported by substantial evidence, is clearly
    erroneous, arbitrary and capricious, and does not consider PCC SMP policies. We disagree.
    PCC SMP pier policy (d) discourages use of piers/docks associated with single-family
    residences. PCC SMP pier policy (e) provides that “In considering any pier, considerations such
    as environmental impact, navigational impact, existing pier density, parking availability, and
    impact on adjacent proximate land ownership should be considered,” referring to PCC
    20.56.040(A)(7).
    The Board considered these policies and determined that the existing pier/dock density is
    zero because there are no existing piers or docks within miles. Building the proposed pier/dock
    would be wholly out of character for the area. It could also pave the way for more single-use
    piers/docks, taking this shoreline in the opposite direction of all the noted pier policies. A 150-
    foot pier/dock extending from a 3.5 foot bulkhead over waters with uniquely strong tidal currents
    and waves would also interfere with the many other public marine recreational uses of this
    shoreline. The Board’s findings are supported by substantial evidence and in turn support its
    conclusion that the intensity of the use of the proposed pier/dock is not compatible with the
    surrounding environment and land and water uses.
    19
    No. 52470-8-II
    The Turners also argue that the status of first pier/dock of its type along this shoreline is
    not by itself determinative, citing Innskeep v. San Juan County, No. 98-033 (Wash. Shorelines
    Hr’gs Bd. Apr. 16, 1999), and May v. Robertson, 
    153 Wn. App. 57
    , 
    218 P.3d 211
     (2010). We
    agree that first pier/dock status is not determinative, but it is a factor the Board could and did
    correctly consider. Further, Innskeep and May are distinguishable because they both addressed
    joint-use piers/docks. Here, the applicable PCC SMP policies and regulations were applied by the
    Board with consideration given to all the specific facts related to the proposed pier/dock, including
    that it would be the first pier/dock of this type on an expansive stretch of shoreline that is regularly
    used by the public.
    In sum, the Board concluded that the proposed pier/dock was inconsistent with the PCC
    SMP policies on piers and failed to meet three separate permit criteria under PCC 20.56.040(A)(1),
    (5), and (7). As a result, the Board reversed the County’s decision approving the pier/dock
    shoreline development permit. The Board’s findings are supported by substantial evidence and
    they support the Board’s conclusion that the intensity of the use of the proposed pier/dock is not
    compatible with the surrounding environment and the land and water uses. Thus, we hold that the
    Board did not err.
    IV. THE PROPOSED BOATHOUSE IS NOT A WATER DEPENDENT ACCESSORY USE
    The Board also determined that the proposed boathouse was not a water dependent
    accessory use because it would be used for storage and would impact the Taylors’ views of the
    water and their view of the Olympic Mountains from one window in one direction within their
    home, but not other views of the Olympics.
    20
    No. 52470-8-II
    The Turners argue that the Board erred in applying the conditional use permit criteria to
    their proposed boathouse. They argue that the proposed boathouse (1) was a water dependent use
    and that minimal view impairment is not a sufficient reason to justify denying a permit; (2) should
    be permitted outright as an accessory use; and (3) is exempt from the conditional use permit
    regulations as it is an appurtenance to their house.7 We disagree.
    For lot lines abutting the ordinary high-water line such as the Turner’s residential property,
    PCC 20.62.050(C) requires a 50-foot setback from a lawfully established bulkhead in which
    development may not occur. PCC 20.62.050(D)(2) allows a property owner to construct a “water
    dependent accessory use” within the setback so long as the property owner obtains a conditional
    use permit. PCC 20.62.050(D)(2) states in relevant part:
    Any water dependent accessory use may be allowed within the 50 foot setback upon
    the issuance of a Conditional Use Permit. The issuance of a Conditional Use
    Permit shall be predicated upon a determination that the project will be consistent
    with the following Conditional Use criteria, and the Conditional Use criteria listed
    in WAC 173-14-140, and will cause no reasonable adverse effects on the
    environment and other uses.
    Conditional Use Criteria:
    a. Views from surrounding properties will not be unduly impaired.
    (Emphasis added.) An applicant seeking such a permit must meet the statewide conditional use
    permit review criteria, WAC 173-27-160(1), which requires the applicant to demonstrate the
    following relevant factors:
    (a) That the proposed use is consistent with the policies of RCW 90.58.020 and the
    master program;
    7
    The Department of Ecology filed a brief to clarify the law on water dependent accessory use
    because it had not reviewed the proposed boathouse because the permit was denied. The Taylors
    adopt and incorporate the Department’s arguments.
    21
    No. 52470-8-II
    (b) That the proposed use will not interfere with the normal public use of public
    shorelines;
    (c) That the proposed use of the site and design of the project is compatible with
    other authorized uses within the area and with uses planned for the area under the
    comprehensive plan and shoreline master program;
    (d) That the proposed use will cause no significant adverse effects to the shoreline
    environment in which it is to be located; and
    (e) That the public interest suffers no substantial detrimental effect.
    Thus, to qualify for a conditional use permit for the boathouse, the Turners’ proposed
    boathouse must be a water dependent accessory use and it cannot unduly impair views from
    surrounding properties. As the Board correctly determined, the Turners fail to meet these
    conditional shoreline permit criteria.
    First, the Board found that the proposed boathouse was not a water dependent use. “Water
    dependent uses” are “[a]ll uses which cannot exist in any other location and are dependent on the
    water by reason of the intrinsic nature of the operation.” PCC 20.04.670. “Boathouse” is defined
    at PCC 20.04.030 as “[a] covered or enclosed moorage space.” Neither PCC SMP nor the
    statewide SMP or chapter 173-26 WAC regulations designate single-family residences as water
    dependent uses.
    The Turners admit that “the boathouse will be used for storage,” not to moor a boat, and
    not as “[a] covered or enclosed moorage space.” Br. of Appellant at 41; PCC 20.04.030. As the
    Board properly found “[b]ecause this structure is not planned to be used for boat moorage it does
    not need to be within the setback from the bulkhead or even in a shoreline location.” CP at 596
    (CL 35). The Board’s finding is supported by substantial evidence and it supports its conclusion
    22
    No. 52470-8-II
    that the Turners have not shown any water dependent need for building their proposed boathouse
    within the 50-foot shoreline setback.
    Second, the Board found that the Turners’ proposed boathouse is not permitted outright
    because it is not an accessory use. The Turners rely on PCC 20.62.040(A)(1)(c)(2) to argue that
    the boathouse should be considered an accessory to their residence, like a shed or storage facility,
    and should therefore be permitted outright. But that provision of the PCC SMP provides that any
    sheds or storage facilities can only be constructed outside any applicable setback.              PCC
    20.62.040(A)(1)(c)(2). It is undisputed that the Turners propose to locate their boathouse within
    the 50-foot setback; therefore, it must comply with state and local conditional use permit review
    criteria and it fails to do so. See PCC 20.62.050(D)(2); WAC 173-27-160.
    Next, the Turners argue that the proposed boathouse is a normal “appurtenance” to their
    residence and thus, the boathouse is exempt from the requirements for a shoreline substantial
    development permit. Br. of Appellant at 41. We disagree.
    The PCC SMP explicitly requires a conditional use permit for any construction within the
    50-foot setback. PCC 20.62.050(D)(2). The exemptions do not apply to the proposed boathouse.
    A boathouse is not considered an “appurtenance” that is exempt from a substantial development
    permit. The statewide shoreline permit guidelines provide in relevant part:
    An “appurtenance” is necessarily connected to the use and enjoyment of a single-
    family residence and is located landward of the ordinary high water mark and the
    perimeter of a wetland. On a statewide basis, normal appurtenances include a
    garage; deck; driveway; utilities; fences; installation of a septic tank and drainfield
    and grading which does not exceed two hundred fifty cubic yards and which does
    not involve placement of fill in any wetland or water-ward of the ordinary high
    water mark. Local circumstances may dictate additional interpretations of normal
    appurtenances which shall be set forth and regulated within the applicable master
    program.
    23
    No. 52470-8-II
    WAC 173-27-040(2)(g). The Turners’ proposed boathouse is therefore not an “appurtenance”
    under the PCC SMP or statewide regulations.
    The Board’s findings are supported by substantial evidence and they support its conclusion
    that the boathouse is not a water dependent accessory use or an appurtenance required to be within
    the 50-foot setback from the bulkhead. Thus, we hold that the Turners’ argument fails.
    V. CONSTITUTIONAL CLAIM
    The Turners assert an “as applied” challenge to the Board’s decision, claiming that they
    have a fundamental right to construct a pier/dock at this location, citing Maytown Sand & Gravel,
    LLC v. Thurston County.8 Br. of Appellant at 45-46. The Taylors argue that the Turners failed to
    satisfy the permit criteria and thus, they do not have a fundamental right to build the pier/dock,
    and that the Turners do not analyze how the applicable PCC SMP, regulations, and the SMA
    policies as applied to them are unconstitutionally vague. We hold that the Turners’ constitutional
    claim fails.
    Maytown held that under the Fourteenth Amendment, “property” encompasses more than
    just tangible physical property, and a permit applicant has a cognizable property interest “‘when
    there are articulable standards that constrain the decision-making process.’” 191 Wn.2d at 431
    (quoting Durland v. San Juan County, 
    182 Wn.2d 55
    , 71, 
    340 P.3d 191
     (2014). In other words, a
    permit applicant has a constitutionally-protected right to develop the land where the permit
    applicant has satisfied the necessary preconditions.
    8
    
    191 Wn.2d 392
    , 
    423 P.3d 223
     (2018), abrogated on other grounds by Yim v. City of Seattle, 
    194 Wn.2d 682
    , 
    451 P.3d 694
     (2019).
    24
    No. 52470-8-II
    The Turners first claim that they satisfied the permit criteria and thus, they have a
    fundamental right to build the proposed pier/dock and boathouse at this location. But, as discussed
    above, the Board correctly concluded that the Turners proposed pier/dock and boathouse are not
    preferred uses and they failed to satisfy the permit criteria.
    The Turners next claim that the Board’s decision was arbitrary because it relied on
    unarticulated criteria, the boating and nearshore recreation, speculative impacts, and added “dock
    density” to the approval permit criteria. But the Turners fail to sufficiently explain how the permit
    criteria are arbitrary. The Turners may disagree with the Board’s findings, but their disagreement
    does not establish that the findings are not supported by substantial evidence, or that the Board
    misapplied the applicable shoreline law to the specific facts here. Moreover, the Board weighed
    the evidence and the credibility of witnesses, which we do not reweigh on appeal. Port of Seattle,
    
    151 Wn.2d at 588
    . Even if a different conclusion may have been reached, the Board’s decision
    will not be considered arbitrary or capricious if there is “room for two opinions” and the action
    taken is upon honest and due consideration. Buechel, 
    125 Wn.2d at 202
    .
    The Turners next argue that the Board’s decision conflicts with RCW 90.58.020’s standard
    for a water dependent use and allowance for a pier/dock “‘designed and conducted in a manner to
    minimize, insofar as practical, any resultant damage to the ecology and environment of the
    shoreline area and any interference with the public’s use of the water.’” Br. of Appellant at 48
    (quoting RCW 90.58.020). They claim that the proposed pier/dock
    25
    No. 52470-8-II
    does not have any discernable environmental impacts to the aquatic habitat or
    species that rely upon it and [thus it] is deemed a water dependent preferred
    reasonable use. Within that context, governmental authority is limited by RCW
    90.58.020 since alterations to the natural condition must be recognized and allowed
    if impacts are minimized.
    Br. of Appellant at 46.
    The Board’s decision does not conflict with RCW 90.58.020. As discussed above, the
    Board correctly found that the proposed pier/dock is not a preferred use, nor is the proposed
    boathouse a water dependent accessory use. The Board correctly noted that the Turners’ argument,
    that a single-use residential pier/dock is a preferred use under RCW 90.58.020, has been previously
    rejected in Samson v. City of Bainbridge Island, 
    149 Wn. App. 33
    , 50-51, 
    202 P.3d 334
     (2009).
    Because the Turners failed to meet all permit criteria, unlike the permit applicant in
    Maytown Sand and Gravel, 191 Wn.2d at 431, the Turners do not have a fundamental right to
    build the proposed pier/dock and boathouse at this location. Thus, we hold that their constitutional
    claim fails.
    ATTORNEY FEES AND COSTS
    The Turners and Baldwin, the Simons, and the Taylors request appellate attorney fees and
    costs under RAP 18.1(a) and RCW 4.84.370(1) as the prevailing parties. We award Baldwin, the
    Simons, and the Taylors, reasonable appellate attorney fees and costs, and we deny the Turners’
    request.
    RAP 18.1(a) allows the award of reasonable attorney fees and costs on appeal if the
    applicable law grants the party the right to recover them. The applicable law in this case, RCW
    4.84.370(1), directs this court to award attorney fees and costs “to the prevailing party or
    26
    No. 52470-8-II
    substantially prevailing party on appeal . . . of a decision by a county, city, or town to . . . deny a .
    . . shoreline permit.”
    RCW 4.84.370(1)(a) provides that “The prevailing party on appeal was the prevailing or
    substantially prevailing party before the county, city, or town, or in a decision involving a
    substantial development permit under chapter 90.58 RCW, the prevailing party on appeal was the
    prevailing party or the substantially prevailing party before the shoreline[s] hearings board.” RCW
    4.84.370(1)(b) provides that “The prevailing party on appeal was the prevailing party or
    substantially prevailing party in all prior judicial proceedings.” Baldwin, the Simons, and the
    Taylors, meet both definitions of a prevailing party under the applicable law because they prevailed
    at all earlier stages of this case and prevail on appeal.
    Accordingly, we award Baldwin, the Simons, and the Taylors, reasonable appellate
    attorney fees and costs and deny the Turners’ request.
    CONCLUSION
    We hold that the Board’s findings are supported by substantial evidence and they support
    the Board’s conclusions to deny the Turners a shoreline development permit for the proposed
    pier/dock and boathouse, and thus the Board did not error and we affirm the superior court’s
    decision affirming the Board. We award Baldwin, the Simons, and the Taylors reasonable
    appellate attorney fees and costs and deny the Turners’ request.
    27
    No. 52470-8-II
    A majority of the panel having determined that this opinion will not be printed in the
    Washington Appellate Reports, but will be filed for public record in accordance with RCW 2.06.040,
    it is so ordered.
    Sutton, A.C.J.
    We concur:
    Worswick, J.
    Melnick, J.
    28