Sierra Club v. Donald Trump ( 2019 )


Menu:
  •                                FOR PUBLICATION                            FILED
    UNITED STATES COURT OF APPEALS                         JUL 3 2019
    MOLLY C. DWYER, CLERK
    U.S. COURT OF APPEALS
    FOR THE NINTH CIRCUIT
    SIERRA CLUB; SOUTHERN BORDER                     No.   19-16102
    COMMUNITIES COALITION,                                 19-16300
    Plaintiffs-Appellees,            D.C. No. 4:19-cv-00892-HSG
    Northern District of California,
    v.                                              Oakland
    DONALD J. TRUMP, in his official                 ORDER
    capacity as President of the United States; et
    al.,
    Defendants-Appellants.
    Before: CLIFTON, N.R. SMITH, and FRIEDLAND, Circuit Judges.
    Order by Judges Clifton and Friedland
    Dissent by Judge N.R. Smith
    CLIFTON and FRIEDLAND, Circuit Judges:
    This emergency proceeding arises from a challenge to a decision by the
    President and certain of his cabinet members (collectively, “Defendants”)1 to
    1
    When federal officials are parties to litigation, we usually refer to them
    collectively as “the Government.” That terminology seems inapt in this
    proceeding given that the question before us is whether the Executive Branch of
    the federal government is attempting to exercise authority that is allocated by the
    Constitution to the Legislative Branch of the federal government, and whether the
    Executive Branch is doing so without authorization from the Legislative Branch.
    “reprogram” funds appropriated by Congress to the Department of Defense
    (“DoD”) for Army personnel needs and to redirect those funds toward building a
    barrier along portions of our country’s southern border.
    This reprogramming decision was made after President Trump had
    repeatedly sought appropriations from Congress for the construction of a border
    barrier. Although Congress provided some funding for those purposes, it
    consistently refused to pass any measures that met the President’s desired funding
    level, creating a standoff that led to a 35-day partial government shutdown. The
    President signed the budget legislation that ended the shutdown, but he then
    declared a national emergency and pursued other means to get additional funding
    for border barrier construction beyond what Congress had appropriated. One of
    those means, and the one at issue in this emergency request for a stay, was a
    reprogramming of funds by DoD in response to a request by the Department of
    Homeland Security (“DHS”).
    Specifically, DoD relied on section 8005 of the Department of Defense
    Appropriations Act of 2019 and related provisions to reprogram approximately
    $2.5 billion, moving the funds from DoD to DHS, for the purpose of building
    And the House of Representatives, which is part of the Legislative Branch, has
    filed an amicus brief opposing the Executive Branch’s position. To avoid
    confusion, we therefore refer to the President and the cabinet members sued here
    collectively as “Defendants.”
    2
    border barriers in certain locations within Arizona, California, and New Mexico.
    Section 8005 authorizes the Secretary of Defense to transfer funds for military
    purposes if the Secretary determines that the transfer is “for higher priority items,
    based on unforeseen military requirements” and “the item for which funds are
    requested has [not] been denied by the Congress.” Pub. L. No. 115-245, § 8005,
    
    132 Stat. 2981
    , 2999 (2018) (hereinafter “section 8005”).
    The Sierra Club and the Southern Border Communities Coalition
    (collectively, “Plaintiffs”) sued Defendants to enjoin the reprogramming and the
    funds’ expenditure. They argued that the requirements of section 8005 had not
    been satisfied and that the use of the funds to build a border barrier was
    accordingly unsupported by any congressional appropriation and thus
    unconstitutional. A federal district court agreed with Plaintiffs and enjoined
    Defendants from using reprogrammed funds to construct a border barrier.
    Defendants now move for an emergency stay of the district court’s injunction.
    To rule on Defendants’ motion, we consider several factors, including
    whether Defendants have shown that they are likely to succeed on the merits of
    their appeal, the degree of hardship to each side that would result from a stay or its
    denial, and the public interest in granting or denying a stay.
    We conclude, first, that Defendants are not likely to succeed on the merits of
    their appeal. The Appropriations Clause of the Constitution provides that “No
    3
    Money shall be drawn from the Treasury, but in Consequence of Appropriations
    made by Law.” U.S. Const. art I., § 9, cl. 7. Defendants assert that, through
    section 8005, Congress authorized DoD to reprogram the funds at issue. We agree
    with Plaintiffs, however, that the requirements of section 8005 have not been met.
    Specifically, the need for which the funds were reprogrammed was not
    “unforeseen,” and it was an item for which funds were previously “denied by the
    Congress.” Defendants do not argue that their contrary interpretation of section
    8005 is entitled to any form of administrative deference, and we hold that no such
    deference would be appropriate in any event.
    Because section 8005 did not authorize DoD to reprogram the funds—and
    Defendants do not and cannot argue that any other statutory or constitutional
    provision authorized the reprogramming—the use of those funds violates the
    constitutional requirement that the Executive Branch not spend money absent an
    appropriation from Congress.
    Defendants contend that these Plaintiffs are unlikely to prevail because they
    lack a cause of action through which to challenge the reprogramming. We
    disagree. Plaintiffs either have an equitable cause of action to enjoin a
    constitutional violation, or they can proceed on their constitutional claims under
    the Administrative Procedure Act, or both. To the extent any zone of interests test
    4
    were to apply to Plaintiffs’ constitutional claims, we hold that it would be satisfied
    here.
    Considering the remaining factors relevant to Defendants’ request for a
    stay—the degree of hardship that may result from a stay or its denial, and the
    public interest at stake—we are not persuaded that a stay should be entered. There
    is a strong likelihood that Plaintiffs will prevail in this litigation, and Defendants
    have a correspondingly low likelihood of success on appeal. As for the public
    interest, we conclude that it is best served by respecting the Constitution’s
    assignment of the power of the purse to Congress, and by deferring to Congress’s
    understanding of the public interest as reflected in its repeated denial of more
    funding for border barrier construction. We therefore hold that a stay of the district
    court’s order granting Plaintiffs an injunction is not warranted.
    I.     Factual & Procedural Background
    President Trump has made numerous requests to Congress for funding for
    construction of a barrier on the U.S.-Mexico border. In his proposed budget for
    Fiscal Year 2018, for example, the President requested $2.6 billion for border
    security, including “funding to plan, design, and construct a physical wall along the
    southern border.” Office of Mgmt. & Budget, Exec. Office of the President,
    Budget of the United States Government, Fiscal Year 2018, at 18 (2017). Congress
    partially obliged, allocating in the 2018 Consolidated Appropriations Act $1.571
    5
    billion for border fencing, “border barrier planning and design,” and the
    “acquisition and deployment of border security technology.” Consolidated
    Appropriations Act, 2018, Pub. L. No. 115-141, div. F, tit. II, § 230(a), 
    132 Stat. 348
    , 616 (2018). Throughout 2018, House and Senate lawmakers introduced
    numerous bills that would have authorized or appropriated additional billions for
    border barrier construction. Specifically, Congress considered and rejected the
    Securing America’s Future Act of 2018, H.R. 4760, 115th Cong. § 1111 (2018)
    (instructing the Secretary of Homeland Security to take necessary actions to build a
    physical barrier on the southern border); the Border Security and Immigration
    Reform Act of 2018, H.R. 6136, 115th Cong. § 5101 (2018) (appropriating
    $16.625 billion for a border wall); the American Border Act, H.R. 6415, 115th
    Cong. § 4101 (2018) (same); the Fund and Complete the Border Wall Act, H.R.
    6657, 115th Cong. § 2 (2018) (creating a “Secure the Southern Border Fund” for
    appropriations for border barrier construction); the Build the Wall, Enforce the
    Law Act of 2018, H.R. 7059, 115th Cong. § 9 (2018) (again, appropriating
    $16.625 billion for a “border wall system”); the 50 Votes for the Wall Act, H.R.
    7073, 115th Cong. § 2 (2018) (establishing a “Border Wall and Security Trust
    Fund” of up to $25 billion to “construct a wall (including physical barriers and
    associated detection technology, roads, and lighting)” along the U.S.-Mexico
    border); and the WALL Act of 2018, S. 3713, 115th Cong. § 2 (2018)
    6
    (appropriating $25 billion for the construction of a border wall). Lawmakers spent
    countless hours considering these various proposals, but none ultimately passed.
    The situation reached an impasse in December 2018. During negotiations
    with Congress over an appropriations bill to fund various parts of the federal
    government for the remainder of the fiscal year, the President announced his
    unequivocal position that “any measure that funds the government must include
    border security.” C-SPAN, Farm Bill Signing (Dec. 20, 2018), https://www.c-
    span.org/video/?456189-1/president-government-funding-bill-include-money-
    border-wall. He declared that he would not sign any funding bill that did not
    allocate substantial funding for a physical barrier on the U.S.-Mexico border.
    Erica Werner et al., Trump Says He Won’t Sign Senate Deal to Avert Shutdown,
    Demands Funds for Border Security, Wash. Post (Dec. 21, 2018),
    https://wapo.st/2EIpkHu?tid=ss_tw&utm_term=.6e7c259f6857 (“Werner et al.”).
    The President also stated that he was willing to declare a national emergency and
    use other mechanisms to get the money he desired if Congress refused to allocate
    it. Remarks by President Trump in Meeting with Senate Minority Leader Chuck
    Schumer and House Speaker-Designate Nancy Pelosi, The White House (Dec. 11,
    2018, 11:40 A.M.), https://www.whitehouse.gov/briefings-statements/remarks-
    president-trump-meeting-senate-minority-leader-chuck-schumer-house-speaker-
    designate-nancy-pelosi/. On December 20, 2018, the House of Representatives
    7
    passed a continuing resolution that allocated $5.7 billion in border barrier funding.
    H.R. 695, 115th Cong. § 141 (2018) (“[T]here is appropriated for ‘U.S. Customs
    and Border Protection—Procurement, Construction, and Improvements’
    $5,710,357,000 for fiscal year 2019.”). But the Senate rejected the bill. The
    President could not reach an agreement with lawmakers on whether the spending
    bill would include border barrier funding, triggering what would become the
    nation’s longest partial government shutdown. Werner et al., supra; Mihir Zaveri
    et al., The Government Shutdown Was the Longest Ever. Here’s the History., N.Y.
    Times (Jan. 25, 2019), https://nyti.ms/2RATHG9.
    On January 6, 2019, during the shutdown, the President “request[ed] $5.7
    billion for construction of a steel barrier for the Southwest border” in a letter to the
    Senate Committee on Appropriations, explaining that the request “would fund
    construction of a total of approximately 234 miles of new physical barrier,”
    including in the top ten priority areas in the Border Security Improvement Plan
    created by Customs and Border Protection (“CBP”). Letter from Russell T.
    Vought, Acting Dir. of the Office of Mgmt. and Budget, to Richard Shelby,
    Chairman of the Senate Comm. on Appropriations (Jan. 6, 2019). This represented
    a $4.1 billion increase over the President’s February 2018 request for $1.6 billion
    for the Fiscal Year 2019 budget, which had been for the construction of “65 miles
    8
    of border wall in south Texas.” Office of Mgmt. & Budget, Exec. Office of the
    President, Budget of the U.S. Government, Fiscal Year 2019, 58 (2018).
    After 35 days, the government shutdown ended without an agreement
    providing increased border barrier funding. Remarks Delivered by President
    Trump on the Government Shutdown (Jan. 25, 2019),
    https://www.whitehouse.gov/briefings-statements/remarks-president-trump-
    government-shutdown/. Congress passed and the President signed a stopgap
    spending measure to reopen for three weeks the parts of the Government that had
    been shut down. H.R.J. Res. 28, 116th Cong. (2019). But the President made clear
    that he still intended to build a border barrier, with or without funding from
    Congress. As the Acting White House Chief of Staff explained, the President was
    prepared to both reprogram money and declare a national emergency to obtain a
    total sum “well north of $5.7 billion.” Gregg Re, Border Wall Talks Break Down
    Ahead of Second Possible Government Shutdown, Fox News (Feb. 10, 2019),
    https://fxn.ws/2SmNK0I.
    Congress passed the Consolidated Appropriations Act of 2019 (“CAA”) on
    February 14, 2019, which included the Department of Homeland Security
    Appropriations Act for Fiscal Year 2019. Pub. L. No. 116-6, div. A, 
    133 Stat. 13
    (2019). The CAA appropriated only $1.375 billion of the $5.7 billion the President
    had sought in border barrier funding and specified that the $1.375 billion was “for
    9
    the construction of primary pedestrian fencing . . . in the Rio Grande Valley
    Sector.” 
    Id.
     § 230(a)(1), 133 Stat. at 28. Congress also imposed several
    limitations on the use of those funds, including by not allowing construction within
    certain wildlife refuges and parks. Id. § 231, 133 Stat. at 28.
    The President signed the CAA into law the following day. Statement by the
    President, The White House (Feb. 15, 2019),
    https://www.whitehouse.gov/briefings-statements/statement-by-the-president-28/.
    He concurrently issued a proclamation under the National Emergencies Act, 
    50 U.S.C. §§ 1601-1651
    , “declar[ing] that a national emergency exists at the southern
    border of the United States.” Proclamation No. 9844, 
    84 Fed. Reg. 4949
     (Feb. 15,
    2019) (“Proclamation No. 9844”).
    Proclamation No. 9844 described “a border security and humanitarian crisis
    that threatens core national security interests” because the border served as a major
    entry point for criminals, gang members, and illicit narcotics and the number of
    family units entering the United States had recently increased. 
    Id.
     It declared that
    this “emergency situation” necessitated support from the Armed Forces. 
    Id.
     The
    proclamation made available to DoD “the construction authority provided in” 
    10 U.S.C. § 2808
    , which is limited to presidential declarations “that require[] use of
    the armed forces,” 
    id.
     § 2808(a).
    10
    An accompanying White House Fact Sheet explained that the President was
    “using his legal authority to take Executive action to secure additional resources”
    to build a border barrier. President Donald J. Trump’s Border Security Victory,
    The White House (Feb. 15, 2019), https://www.whitehouse.gov/briefings-
    statements/president-donald-j-trumps-border-security-victory/. It continued:
    “Including funding in Homeland Security appropriations, the Administration has
    so far identified up to $8.1 billion that will be available to build the border wall
    once a national emergency is declared and additional funds have been
    reprogrammed.” Id. The fact sheet specifically identified three funding sources:
    (1) “[a]bout $601 million from the Treasury Forfeiture Fund,” 
    31 U.S.C. § 9705
    (a); (2) “[u]p to $2.5 billion under the Department of Defense
    [reprogrammed] funds transferred [to DHS] for Support for Counterdrug
    Activities” pursuant to 
    10 U.S.C. § 284
     (“section 284”); 2 and (3) “[u]p to $3.6
    billion reallocated from [DoD] military construction projects under the President’s
    2
    Title 10, Chapter 15 of the U.S. Code describes various forms of military
    support for civilian law enforcement agencies. Within that chapter, section 284
    authorizes the Secretary of Defense to “provide support for the counterdrug
    activities . . . of any other department or agency of the Federal Government” if it
    receives a request from “the official who has responsibility for the counterdrug
    activities.” 
    10 U.S.C. §§ 284
    (a), 284(a)(1)(A). The statute permits, among other
    things, support for “[c]onstruction of roads and fences and installation of lighting
    to block drug smuggling corridors across international boundaries of the United
    States.” 
    Id.
     § 284(b)(7). DoD’s provision of support for other agencies pursuant to
    section 284 does not require the declaration of a national emergency.
    11
    declaration of a national emergency” pursuant to 
    10 U.S.C. § 2808
     (“section
    2808”), which provides that the Secretary of Defense may authorize military
    construction projects whenever the President declares a national emergency that
    requires use of the armed forces. 
    Id.
    The House and Senate adopted a joint resolution terminating the President’s
    declaration of a national emergency pursuant to Congress’s authority under 
    50 U.S.C. § 1622
    (a)(1). H.R.J. Res. 46, 116th Cong. (2019). The President vetoed
    the joint resolution, Veto Message to the House of Representatives for H.J. Res. 46,
    The White House (Mar. 15, 2019), https://www.whitehouse.gov/briefings-
    statements/veto-message-house-representatives-h-j-res-46/, and a vote in the House
    to override the veto fell short of the required two-thirds majority, 165 Cong. Rec.
    H2799, H2814-15 (2019).
    Almost immediately, executive branch agencies began to use the funds
    identified in Proclamation 9844 for border barrier construction. The same day the
    President issued the proclamation, the Department of the Treasury approved
    DHS’s December 2018 request to use treasury forfeiture funds to enhance border
    security infrastructure, providing up to $601 million in funding. 3 Letter from
    3
    The three funding sources the White House had identified were to “be used
    sequentially and as needed.” President Donald J. Trump’s Border Security
    Victory, The White House (Feb. 15, 2019). In other words, the government first
    began spending the treasury forfeiture funds, followed by DoD funding
    12
    David F. Eisner, Assistant Sec’y for Mgmt., U.S. Dep’t of the Treasury, to the
    House and Senate Appropriations Comms.’ Subcomms. on Fin. Servs. & Gen.
    Gov’t (Feb. 15, 2019). Then, on February 25, DHS submitted a request to DoD for
    assistance, pursuant to section 284, with construction of fences, roads, and lighting
    within eleven drug-smuggling corridors identified by DHS along the border.
    Memorandum re: Request for Assistance Pursuant to 
    10 U.S.C. § 284
     from
    Christina Bobb, Exec. Sec’y, DHS, to Capt. Hallock N. Mohler, Jr., Exec. Sec’y,
    DoD, (Feb. 25, 2019). In response to that request, on March 25, the Acting
    Secretary of Defense, Patrick Shanahan, approved the transfer of up to $1 billion in
    funds from DoD to DHS for the three highest priority drug-smuggling corridors:
    the Yuma Sector Project 1 and Yuma Sector Project 2 in Arizona, and the El Paso
    Sector Project 1 in New Mexico.4 Letter from Patrick M. Shanahan, Acting Sec’y
    of Def., DoD, to Kirstjen Nielsen, Sec’y of Homeland Sec., DHS (Mar. 25, 2019).
    To fund the approved projects, Shanahan invoked section 8005 of the
    Department of Defense Appropriations Act of 2019 and section 1001 of the John
    S. McCain National Defense Authorization Act (“NDAA”) for Fiscal Year 2019 to
    “reprogram” approximately $1 billion from Army personnel funds to the
    reprogrammed under section 8005 and transferred to DHS pursuant to section 284,
    and finally military construction funds reallocated under section 2808.
    4
    The U.S. Army Corps of Engineers, which is tasked with initial project
    scoping and construction, has since decided not to fund or construct Yuma Project
    2 under § 284.
    13
    counter-narcotics support budget, which Shanahan asserted then made those funds
    available for transfer to DHS pursuant to section 284. Section 8005 authorizes the
    Secretary of Defense to transfer up to $4 billion “of working capital funds of the
    Department of Defense or funds made available in this Act to the Department of
    Defense for military functions (except military construction).” The Secretary must
    first determine that “such action is necessary in the national interest” and obtain
    approval from the White House Office of Management and Budget. Section 8005
    further provides that the authority to transfer may only be used “for higher priority
    items, based on unforeseen military requirements, than those for which originally
    appropriated and in no case where the item for which funds are requested has been
    denied by the Congress.”5 It also imposes a “prompt[]” congressional notification
    requirement for all transfers made under its authority. Reprogramming of funds
    under section 8005 does not require the declaration of a national emergency.
    A memo from Shanahan asserted that the statutory requirements for
    reprogramming under section 8005 had been met: that the items to be funded were
    a higher priority than the Army personnel funds; that the need to provide support
    for the Yuma and El Paso Projects was “an unforeseen military requirement not
    5
    Equivalent language restricting the circumstances in which reprogramming
    is permitted has been included in defense appropriations statutes since 1974. See
    Pub. L. No. 93-238, § 735, 
    87 Stat. 1026
    , 1044 (1974); H.R. Rep. No. 93-662, at
    16 (1973).
    14
    known at the time of the FY 2019 budget request”; and that support for
    construction of the border barrier in these areas “ha[d] not been denied by
    Congress.” Memorandum re: Funding Construction in Support of the Department
    of Homeland Security Pursuant to 
    10 U.S.C. § 284
     from Patrick M. Shanahan,
    Acting Sec’y of Def., DoD, to Under Sec’y of Def. (Comptroller)/Chief Fin.
    Officer (Mar. 25, 2019). Specifically, DoD concluded that “Army personnel funds
    were available for transfer because expenditures for service member pay and
    compensation, retirements benefits, food, and moving expenses through the end of
    fiscal year 2019 [would] be lower than originally budgeted.” As required by
    section 8005, Shanahan also formally notified Congress of the reprogramming
    authorization, explaining that the reprogrammed funds were “required” so that
    DoD could provide DHS the support it requested under section 284.6
    The next day, both the House Committee on Armed Services and the House
    Committee on Appropriations formally disapproved of DoD’s section 8005
    reprogramming. The Armed Services Committee wrote in a letter to DoD that it
    “denie[d] this [reprogramming] request,” and that the committee “[did] not
    approve the proposed use of Department of Defense funds to construct additional
    6
    DoD had previously adhered to a “gentlemen’s agreement” with Congress
    where it sought approval from the relevant committees before reprogramming
    funds, rather than simply notifying them after the decision had been finalized.
    House Armed Services Committee Holds Hearing on Fiscal 2020 Defense
    Authorization, CQ Cong. Transcripts (Mar. 26, 2019).
    15
    physical barriers and roads or install lighting in the vicinity of the United States
    border.” Letter from Adam Smith, Chairman of the U.S. House of Representatives
    Comm. on Armed Servs., to David L. Norquist, Under Sec’y of Def., Comptroller,
    and Chief Fin. Officer (Mar. 26, 2019). The Appropriations committee similarly
    denied the reprogramming request. Letter from Peter J. Visclosky, Chairman of
    the Def. Subcomm. of the U.S. House of Representatives Comm. on
    Appropriations (Mar. 26, 2019).
    Officials at DoD and DHS pressed forward with reprogramming-enabled
    border barrier construction plans. In early April, DoD awarded contracts for work
    in the Yuma and El Paso Project areas, and the agencies began environmental
    planning and consultation. Contracts for Apr. 9, 2019, U.S. Dep’t of Def. (Apr. 9,
    2019), https://dod.defense.gov/News/Contracts/Contract-View/Article/1809986/.
    Meanwhile, Shanahan reported on May 8 that DoD and DHS had secured
    funding for DHS to build about 256 miles of border barrier using both treasury
    forfeiture funds and reprogrammed monies. Acting Defense Secretary Shanahan
    Testimony on Fiscal Year 2020 Budget Request (C-SPAN May 8, 2019),
    https://www.c-span.org/video/?460437-1/acting-defensesecretary-shanahan-
    testifies-2020-budget-request. DoD also reported selecting twelve companies to
    compete for up to $5 billion worth of border barrier construction contracts.
    Contracts for May 8, 2019, U.S. Dep’t of Def. (May 8, 2019),
    16
    https://dod.defense.gov/News/Contracts/Contract-View/Article/1842189/. On May
    9, Shanahan invoked section 8005 and section 1001 of the NDAA again—along
    with related reprogramming provisions, section 9002 of the Department of Defense
    Appropriations Act of 2019 and section 1512 of the NDAA 7—to authorize an
    additional $1.5 billion in reprogramming to fund four more projects.
    Memorandum re: Additional Support to the Dep’t of Homeland Security from
    Patrick M. Shanahan, Acting Sec’y of Def., DoD (May 9, 2019). The new
    projects, El Centro Project 1 and Tucson Sector Projects 1, 2, and 3, are located in
    California and Arizona. Around the same time, the President indicated that he
    expected to approve additional projects using funds authorized by the national
    emergency declaration pursuant to section 2808, although no concrete action has
    7
    Section 9002 of the Department of Defense Appropriations Act of 2019
    authorizes the Secretary of Defense to transfer up to $2 billion between the
    appropriations or funds made available to DoD if he determines “that such action is
    necessary in the national interest” and obtains approval from the Office of
    Management and Budget. Pub. L. No. 115-245, § 9002, 132 Stat 2981, 3042
    (2018). Section 9002 “is subject to the same terms and conditions as the authority
    provided in section 8005.” Id. Section 1512 of the NDAA likewise provides a
    special transfer authority for up to $3.5 billion upon determination that it is
    “necessary in the national interest,” and, under section 1001 of the NDAA, is
    subject to identical terms and conditions as 8005. Pub. L. No. 115-232, § 1512,
    
    132 Stat. 1636
    , 2096 (2018). Because it is uncontested that all of these
    reprogramming provisions are subject to section 8005’s requirements, we refer to
    these requirements collectively by reference to section 8005. See Order Granting
    in Part and Denying in Part Plaintiffs’ Motion for Partial Summary Judgment,
    Sierra Club v. Trump, No. 19-cv-00892-HSG, 
    2019 WL 2715422
    , at *2 (N.D. Cal.
    June 28, 2019).
    17
    been taken in that regard. See White House Memorandum on Sequencing of
    Border Barrier Construction Authorities (Mar. 4, 2019).
    On February 19, 2019, the Sierra Club and Southern Border Communities
    Coalition filed a lawsuit against Donald J. Trump, in his official capacity as
    President of the United States; Patrick M. Shanahan, in his official capacity as
    Acting Secretary of Defense; Kirstjen M. Nielsen, in her official capacity as
    Secretary of Homeland Security; and Steven Mnuchin, in his official capacity as
    Secretary of the Treasury (collectively, “Defendants,” see supra n.1).8 This
    lawsuit followed closely on the heels of a related action brought by a coalition of
    states against the same group of Defendants and others.
    Plaintiffs are two nonprofit organizations who sued on behalf of themselves
    and their members. The Sierra Club is dedicated to enjoyment of the outdoors and
    environmental protection, and it engages in advocacy and public education on
    issues such as habitat destruction, land use, and the human and environmental
    impact of construction projects, including the proposed construction of the border
    barrier. SBCC is a program of Alliance San Diego that brings together
    organizations from California, Arizona, New Mexico, and Texas to promote
    8
    The current Acting Secretary of Defense, Mark Esper, has been
    automatically substituted for Shanahan. The current Acting Secretary of
    Homeland Security, Kevin K. McAleenan, has been automatically substituted for
    Nielsen.
    18
    policies aimed at improving the quality of life in border communities, including
    border enforcement and immigration reform policies.
    Plaintiffs’ operative Complaint alleges that Defendants exceeded the scope
    of their constitutional and statutory authority by spending money in excess of what
    Congress allocated for border security; that Defendants’ actions violated separation
    of powers principles as well as the Appropriations Clause and Presentment Clause
    of the Constitution; and that Defendants failed to comply with the National
    Environmental Policy Act (“NEPA”), 
    42 U.S.C. § 4321
     et seq. Plaintiffs also
    allege that Defendants are acting ultra vires (without authority) in seeking to divert
    funding without statutory authority to do so.
    Plaintiffs allege that Defendants’ use of the reprogrammed funds would
    injure their members because the noise of construction, additional personnel, visual
    blight, and negative ecological effects that would accompany a border barrier and
    its construction would detract from their ability to hike, fish, enjoy the desert
    landscapes, and observe and study a diverse range of wildlife in areas near the
    U.S.-Mexico border. Plaintiffs also allege that they participated in the legislative
    process by “devot[ing] substantial staff and other resources towards legislative
    advocacy leading up to the appropriations bill passed by Congress in February
    2019, specifically directed towards securing Congress’s denial of substantial
    funding to the border wall.” The Complaint requests declaratory and permanent
    19
    injunctive relief to prevent construction of the border barrier using the funding at
    issue in the lawsuit.
    On April 4, Plaintiffs filed a motion for a preliminary injunction, asking the
    district court to enter a “preliminary injunction prohibiting Defendants and all
    persons associated with them from taking action to build a border wall using funds
    or resources from the Defense Department; and specifically enjoining construction
    of the wall segments in the . . . ‘Yuma Sector Projects 1 and 2 and El Paso Sector
    Project 1 [areas].’” In particular, Plaintiffs moved to enjoin Defendants from using
    DoD’s reprogramming authority in section 8005 to transfer funds from Army
    personnel into the counterdrug appropriations line, from subsequently using
    section 284 to divert those funds from DoD’s counterdrug appropriations line to be
    used by DHS for border barrier construction, from invoking section 2808 to divert
    funds appropriated to military construction projects, and from taking any further
    action before complying with NEPA’s procedural requirements. Plaintiffs argued
    that a preliminary injunction was necessary because Defendants had already
    diverted funds, and that Plaintiffs would be irreparably harmed if Defendants
    proceeded with their threatened construction during the pendency of the district
    court proceedings. After receiving briefing from both sides, the district court held
    a multiple-hour hearing on May 17, 2019.
    20
    On May 24, the district court issued an order granting the motion in part and
    denying it in part. Sierra Club v. Trump, No. 4:19-cv-00892-HSG, 
    2019 WL 2247689
     (N.D. Cal. May 24, 2019). After concluding that Plaintiffs had standing
    to bring their challenge, the district court held that Plaintiffs were entitled to a
    preliminary injunction with respect to the section 8005 reprogramming authority
    because they would likely succeed in arguing that Defendants acted ultra vires,
    they had demonstrated that they would be irreparably harmed, and the balance of
    equities weighed in their favor. Id. at *13-23, *27-28, *29. The court declined to
    rule on Plaintiffs’ likelihood of success on their section 2808 arguments, however,
    because Defendants had not yet disclosed a plan for diverting funds under that
    authority. Id. at *25, *28-29. Finally, the court concluded that Plaintiffs were
    unlikely to succeed on their NEPA argument. Id. at *26. It accordingly granted
    the following preliminary injunction:
    Defendants Patrick M. Shanahan, in his official capacity as Acting Secretary
    of Defense, Kevin K. McAleenan, in his official capacity as Acting
    Secretary of Homeland Security, Steven T. Mnuchin, in his official capacity
    as Secretary of the Department of the Treasury, and all persons acting under
    their direction, are enjoined from taking any action to construct a border
    barrier in the areas Defendants have identified as Yuma Sector Project 1 and
    El Paso Sector Project 1 using funds reprogrammed by DoD under Section
    8005 of the Department of Defense Appropriations Act, 2019.
    21
    Id. at 30.9
    Defendants filed a motion in the district court to stay the preliminary
    injunction pending appeal. The district court denied that motion, concluding that
    Defendants were unlikely to prevail on the merits and that the “request to proceed
    immediately with the enjoined construction would not preserve the status quo” but
    rather would “effectively moot [Plaintiffs’] claims.” Sierra Club v. Trump, No.
    4:19-cv-00892-HSG, 
    2019 WL 2305341
    , at *1 (N.D. Cal. May 30, 2019).
    On June 3, 2019, Defendants filed an emergency motion with this court
    requesting a stay pending appeal. Defendants implored our court to act as quickly
    as possible because they were incurring daily fees and penalties from contractors
    due to the suspension of construction and because, if the injunction remained in
    place, Defendants would need to begin the process of reprogramming the funds
    again by the end of June or else face the risk of being deprived of the use of those
    funds entirely. 10
    9
    The district court simultaneously denied the motion for a preliminary
    injunction in the related case brought by states, explaining that there was no
    likelihood of irreparable injury once it had granted the injunction in the Sierra
    Club case. See State v. Trump, No. 4:19-cv-00872-HSG, 
    2019 WL 2247814
    , at
    *17 (N.D. Cal. May 24, 2019).
    10
    We note that Defendants did not file any motion to expedite the appeal
    itself, and as explained below, actually filed a motion to delay the expedited
    briefing schedule our court had issued for the preliminary injunction appeal, asking
    us to let the parties wait until after further anticipated decisions in the district court
    and our court’s decision on their stay motion to propose a new briefing schedule
    that could govern “any” full appeal.
    22
    Initial briefing on the stay motion was completed on June 14, and we heard
    oral argument on June 20. On June 24, we requested supplemental briefing from
    the parties on issues that arose during oral argument but that had not been briefed.
    That briefing was completed on June 28.
    Meanwhile, proceedings continued in the district court. On May 29,
    Plaintiffs filed a motion for a supplemental preliminary injunction to block the
    additional planned construction in California and Arizona using funds
    reprogrammed under sections 8005 and 9002 of the Department of Defense
    Appropriations Act of 2019, as well as section 1512 of the 2019 NDAA. Plaintiffs
    acknowledged that the motion “present[ed] virtually identical legal questions
    regarding whether the proposed plan for funding border barrier construction
    exceeds the Executive Branch’s lawful authority” to the ones that the court had
    decided in its May 24 order granting in part Plaintiffs’ motion for a preliminary
    injunction. On June 12, 2019, Plaintiffs moved for partial summary judgment,
    seeking a permanent injunction based on the same arguments made in their initial
    and supplemental motions for a preliminary injunction. Defendants cross-moved
    for summary judgment, resting on the same arguments they had made against the
    preliminary injunction. Briefing on those motions was completed on June 24.
    On June 28, the district court issued an order granting in part and denying in
    part Plaintiffs’ motion for partial summary judgment, and denying Defendants’
    23
    cross-motion for partial summary judgment. Sierra Club v. Trump, No.
    4:19-cv-00892-HSG, 
    2019 WL 2715422
     (N.D. Cal. June 28, 2019). In that order,
    the court issued a permanent injunction prohibiting Defendants from using
    reprogrammed funds to construct a border barrier in the El Paso and Yuma Sectors
    (the subject of the initial preliminary injunction) as well as the more recently-
    announced El Centro and Tucson Sector areas (the subject of the motion for a
    supplemental preliminary injunction). 11 Id. at *6. The district court concluded that
    Plaintiffs’ legal challenge was meritorious, that Plaintiffs had shown that they
    would suffer irreparable harm absent a permanent injunction, and that the balance
    of hardships and the public interest supported a permanent injunction. Id. at *4-5.
    The court heeded Defendants’ request to certify the judgment for immediate
    11
    The terms of the permanent injunction are identical to those of the
    preliminary injunction, but it also covers funds reprogrammed under sections 8005
    and 9002 for construction in the El Centro and Tucson sectors. In full, the
    permanent injunction states:
    Defendants Mark T. Esper, in his official capacity as Acting Secretary of
    Defense, Kevin K. McAleenan, in his official capacity as Acting Secretary
    of Homeland Security, Steven T. Mnuchin, in his official capacity as
    Secretary of the Department of the Treasury, and all persons acting under
    their direction, are enjoined from taking any action to construct a border
    barrier in the areas Defendants have identified as El Paso Sector 1, Yuma
    Sector 1, El Centro Sector, and Tucson Sectors 1–3 using funds
    reprogrammed by DoD under Sections 8005 and 9002 of the Department of
    Defense Appropriations Act, 2019.
    Sierra Club, 
    2019 WL 2715422
    , at *6.
    24
    appeal, see Fed. R. Civ. P. 54(b), and it denied Defendants’ request to stay the
    injunction pending appeal. Id. at *5-6.
    Defendants filed an immediate notice of appeal from that decision. At
    Defendants’ request, we consolidated their new appeal with the pending appeal of
    the preliminary injunction. Defendants now seek a stay of the permanent
    injunction pending appeal, resting on the same arguments they made about the
    preliminary injunction because the underlying legal questions are identical.
    II.   Issues Not Before the Court
    Before turning to the merits, we highlight what is not at issue in this appeal.
    First, Defendants at oral argument acknowledged that they are “not challenging
    [Article III] standing for purposes of the stay motion.” Thus, Defendants do not
    dispute that Plaintiffs have suffered an “actual or imminent,” “concrete and
    particularized,” “injury in fact” that is “fairly traceable” to Defendants’ actions and
    that will “likely” be “redressed by a favorable decision.” Lujan v. Defs. of
    Wildlife, 
    504 U.S. 555
    , 560-61 (1992) (quotation marks and alterations omitted);
    Spokeo, Inc. v. Robins, 
    136 S. Ct. 1540
    , 1547 (2016). We have satisfied ourselves
    that Defendants’ assessment is correct. See Friends of the Earth, Inc. v. Laidlaw
    Envtl. Servs. (TOC), Inc., 
    528 U.S. 167
    , 180 (2000) (discussing a court’s sua
    sponte obligation to assure itself that it has jurisdiction before proceeding to the
    merits). Plaintiffs have alleged enough to satisfy the requirements for standing
    25
    under Article III at this stage of the litigation. 
    Id. at 181-83
     (holding that the
    plaintiffs’ injuries from environmental harm were sufficient for standing).
    Second, although Defendants may have access to other funding sources to
    build a border barrier, the only source at issue in this stay motion is section 8005
    reprogramming. 12 The district court’s preliminary injunction order discussed
    various other potential sources, including the Treasury Forfeiture Fund and money
    reallocated after a national emergency declaration for “military construction
    projects” under section 2808. Sierra Club v. Trump, No. 4:19-cv-00892-HSG,
    
    2019 WL 2247689
    , at *11 (N.D. Cal. May 24, 2019). The injunction, however,
    only concerns section 8005 reprogramming for border barrier construction in
    Yuma Sector Project 1, El Paso Sector 1, El Centro Sector 1, and Tucson Sectors
    1-3. We have not been asked to expand the scope of the injunction, and the parties
    have not addressed in this stay motion any non-section 8005 funding sources.
    Accordingly, our decision does not address any sources of funds Defendants might
    use to build a border barrier except those reprogrammed under section 8005.
    Third, as the district court observed in the preliminary injunction order,
    The case is not about whether the challenged border
    barrier construction plan is wise or unwise. It is not
    12
    As noted above, the parties do not contest that the related reprogramming
    provisions—section 9002 of the Department of Defense Appropriations Act of
    2019 and section 1512 of the NDAA—are subject to section 8005’s requirements.
    We accordingly refer to these requirements collectively by reference to section
    8005.
    26
    about whether the plan is the right or wrong policy
    response to existing conditions at the southern border of
    the United States. These policy questions are the subject
    of extensive, and often intense, differences of opinion,
    and this Court cannot and does not express any view as to
    them.
    Sierra Club, 
    2019 WL 2247689
    , at *1. Our consideration is limited to legal
    questions regarding the authority of the Executive Branch under the Constitution
    and under statutes enacted into law by Congress.
    III.   Justiciability
    Defendants have not argued that jurisdiction over this action is lacking. Nor
    have they asserted that Plaintiffs’ challenge to the section 8005 reprogramming
    presents a nonjusticiable “political question.” They have contended, however, that
    “[t]he real separation-of-powers concern is the district court’s intrusion into the
    budgeting process,” which “is between the Legislative and Executive Branches—
    not the judiciary.” We consider, therefore, whether it is appropriate for the courts
    to entertain Plaintiffs’ action in the first place. We conclude that it is.
    “Cases” and “controversies” that contain “a textually demonstrable
    constitutional commitment of the issue to a coordinate political department,” Baker
    v. Carr, 
    369 U.S. 186
    , 217 (1962), or “revolve around policy choices and value
    determinations constitutionally committed for resolution to the halls of Congress or
    the confines of the Executive Branch,” Japan Whaling Ass’n v. Am. Cetacean Soc.,
    
    478 U.S. 221
    , 230 (1986), present a “narrow exception” to our responsibility to
    27
    decide cases properly before us, Zivotofsky ex rel. Zivotofsky v. Clinton, 
    566 U.S. 189
    , 195 (2012).
    Nowhere does the Constitution grant Congress the exclusive ability to
    determine whether the Executive Branch has violated the Appropriations Clause.
    See Office of Pers. Mgmt. v. Richmond, 
    496 U.S. 414
    , 425 (1990). Nor does the
    Constitution leave the Executive Branch to police itself. Rather, the judiciary
    “appropriately exercises” its constitutional function “where the question is whether
    Congress or the Executive is ‘aggrandizing its power at the expense of another
    branch.’” Zivotofsky, 
    566 U.S. at 197
     (quoting Freytag v. Comm’r, 
    501 U.S. 868
    ,
    878 (1991)).
    The current action does not ask us to decide whether the projects for which
    Defendants seek to reprogram funds are worthy or whether, as a policy judgment,
    funds should be spent on them. Instead, we are asked whether the reprogramming
    of funds is consistent with the Appropriations Clause and section 8005. That “is a
    familiar judicial exercise.” Id. at 196.
    Chief Justice Marshall’s answer to “whether the legality of an act of the head
    of a department be examinable in a court of justice” or “only politically
    examinable” remains the same: “[W]here a specific duty is assigned by law, and
    individual rights depend upon the performance of that duty, . . . the individual who
    considers himself injured, has a right to resort to the laws of his country for a
    28
    remedy.” Marbury v. Madison, 5 U.S. (1 Cranch) 137, 165-66 (1803). Pursuant to
    its exclusive power of appropriation, Congress imposed on the Executive Branch a
    duty—contained in section 8005—not to transfer funds unless certain
    circumstances were present. As discussed above, see supra Section II, Defendants
    have not disputed that Plaintiffs have sufficiently alleged injuries that satisfy
    Article III’s standing requirement to enable them to pursue this action. Although
    “our decision may have significant political overtones,” Japan Whaling Ass’n, 
    478 U.S. at 230
    , “courts cannot avoid their responsibility merely ‘because the issues
    have political implications,’” Zivotofsky, 
    566 U.S. at 196
     (quoting INS v. Chadha,
    
    462 U.S. 919
    , 943 (1983)). In sum, it is appropriate for this action to proceed in
    federal court.
    IV.    Stay Standards
    We decide whether to issue a stay by considering four factors, reiterated by
    the Supreme Court in Nken v. Holder, 
    556 U.S. 418
     (2009):
    (1) whether the stay applicant has made a strong showing that he is
    likely to succeed on the merits; (2) whether the applicant will be
    irreparably injured absent a stay; (3) whether issuance of the stay will
    substantially injure the other parties interested in the proceeding; and
    (4) where the public interest lies.
    
    Id. at 434
     (quoting Hilton v. Braunskill, 
    481 U.S. 770
    , 776 (1987)). The first two
    factors “are the most critical,” and we only reach the last two “[o]nce an applicant
    satisfies the first two factors.” Id. at 434-35.
    29
    The requirement that an applicant for a stay make a “strong showing” may
    be explained at least in part by the fact that “[a] stay is not a matter of right, even if
    irreparable injury might otherwise result.” Id. at 433 (quoting Virginian Ry. Co. v.
    United States, 
    272 U.S. 658
    , 672 (1926)). Indeed, “[a] stay is an intrusion into the
    ordinary processes of administration and judicial review.” Id. at 427 (quotation
    marks omitted). Issuing a stay is therefore “an exercise of judicial discretion” not
    to be issued “reflexively,” but rather based on the circumstances of the particular
    case. Id. at 427, 433. “The party requesting a stay bears the burden of showing
    that the circumstances justify an exercise of that discretion.” Id. at 433-34. Here,
    Defendants carry those burdens because it is Defendants who have sought a stay.
    That being said, the unusual circumstances of this case complicate our
    typically restrained approach to assessing the merits in this procedural posture.
    When deciding whether to issue a stay, we usually speak about the merits in
    probabilistic “likelihood” terms, in part because we recognize that the “ordinary
    processes of administration and judicial review” best ensure “careful review and a
    meaningful decision.” Id. at 427 (quotation marks omitted). Particularly given a
    recent increase in emergency petitions asking for injunctive relief or stays of
    injunctive relief, we think it is especially important for courts to strive to follow the
    traditional process of judicial review. Otherwise, we are forced to decide “justice
    on the fly.” Id.
    30
    Here, however, both sides contend that we must evaluate the merits of this
    case now to preserve their interests—both agree that there is no time for the
    “ordinary” course of appellate review. 13 As Defendants represented in their
    briefing and again at oral argument, if the injunction remains in place, DoD’s
    authority to spend the remaining challenged funds on border barrier construction,
    or to redirect them for other purposes, will lapse. At the same time, as the district
    court noted, allowing Defendants to move forward with spending the funds will
    allow construction to begin, causing immediate, and likely irreparable, harm to
    Plaintiffs. Sierra Club v. Trump, No. 4:19-cv-00892-HSG, 
    2019 WL 2247689
    , at
    *27-28 (N.D. Cal. May 24, 2019). In either scenario, many of the issues in this
    case may become moot or largely moot before fuller litigation of the appeal can be
    completed. Accordingly, we proceed to evaluate the merits more fully than we
    otherwise might in response to a stay request.14
    13
    The dissent suggests that we should not be analyzing the merits at this
    stage because there will be a fuller appeal later. Dissent at 2 n.1. That argument
    depends on disbelieving Defendants’ assertions that the Executive Branch will lose
    its ability to spend the reprogrammed money by the beginning of July, if not
    earlier. To the extent Defendants’ representations about their imminent injury are
    not credible, Defendants certainly do not deserve the equitable relief of a stay.
    14
    In an appeal from a district court’s grant of a permanent injunction, we
    may “affirm the district court on any ground supported by the record.” Sony
    Computer Entm’t, Inc. v. Connectix Corp., 
    203 F.3d 596
    , 608 (9th Cir. 2000)
    (quoting Charley’s Taxi Radio Dispatch Corp. v. SIDA of Haw., Inc., 
    810 F.2d 869
    , 874 (9th Cir. 1987)). Evaluating whether Defendants have a likelihood of
    31
    V.     Likelihood of Success on the Merits
    In their operative Complaint, Plaintiffs framed their claim in various ways.
    Plaintiffs asserted constitutional claims based on violations of separation of powers
    principles, the Appropriations Clause, and the Presentment Clause; a claim that
    Defendants acted ultra vires; and a statutory claim under the Consolidated
    Appropriations Act of 2019. 15 Because we conclude that Plaintiffs’ claim is, at its
    core, one alleging a constitutional violation, we focus on that issue. More than one
    legal doctrine offers Plaintiffs a cause of action to raise that claim, and Plaintiffs’
    success under each depends on whether Defendants’ actions indeed violate the
    Constitution.
    A. Plaintiffs’ Constitutional Claim
    The Constitution’s Appropriations Clause provides that “No Money shall be
    drawn from the Treasury, but in Consequence of Appropriations made by Law.”
    U.S. Const. art. I, § 9, cl. 7. In addition to safeguarding “the public treasure, the
    common fund of all,” and providing “a most useful and salutary check upon . . .
    corrupt influence and public peculation,” it ensures that the “the executive [does
    not] possess an unbounded power over the public purse of the nation.” 3 Joseph
    success on appeal therefore requires assessing whether there are clear grounds for
    affirmance supported by the record.
    15
    Plaintiffs also separately asserted a NEPA claim. The parties have not
    made any arguments about the NEPA claim in these stay proceedings, so we do not
    address it.
    32
    Story, Commentaries on the Constitution of the United States § 1342 (Boston,
    Hilliard, Gray & Co. ed. 1833).
    This approach to the power of the purse comported with the Founders’
    “declared purpose of separating and dividing the powers of government,” namely
    “to ‘diffus[e] power the better to secure liberty.’” Bowsher v. Synar, 
    478 U.S. 714
    ,
    721 (1986) (alteration in original) (quoting Youngstown Sheet & Tube Co. v.
    Sawyer, 
    343 U.S. 579
    , 635 (1952) (Jackson, J., concurring)); see also INS v.
    Chadha, 
    462 U.S. 919
    , 949-50 (1983) (collecting sources and explaining the
    Founders’ belief in “the need to divide and disperse power in order to protect
    liberty”). In response to critiques that his proposed Constitution would
    dangerously concentrate power in a single central government, James Madison
    argued that the risk of abuse of such power was low because “the sword and purse
    are not to be given to the same member” of the government. 3 Debates in the
    Several State Conventions on the Adoption of the Federal Constitution 393
    (Jonathan Elliot ed., 2d ed. 1836). Instead, Madison explained that “[t]he purse is
    in the hands of the representatives of the people,” who “have the appropriation of
    all moneys.” 
    Id.
    Plaintiffs’ principal legal theory is that Defendants seek to spend funds for a
    different purpose than that for which Congress appropriated them, thereby
    33
    violating the Appropriations Clause.16 Defendants’ defense to this claim is that,
    through section 8005, Congress allowed Defendants to make this reallocation. If
    Defendants were correct that section 8005 allowed this spending reallocation,
    Plaintiffs’ claim would fail, because the spending would be consistent with
    Congress’s appropriation legislation. If section 8005 does not authorize the
    reallocation, however, then Defendants are acting outside of any statutory
    appropriation and are therefore spending funds contrary to Congress’s
    appropriations decisions. We believe Plaintiffs are correct that there is no statutory
    appropriation for the expenditures that are the subject of the injunction.
    Reprogramming and spending those funds therefore violates the Appropriations
    Clause.
    1. Section 8005’s Meaning
    Defendants argue that they are likely to prevail on appeal because Congress
    has authorized DoD to reprogram funds, the planned use of funds is consistent with
    that reprogramming authorization, and this spending is therefore authorized by an
    appropriation from Congress as the Appropriations Clause requires. We disagree.
    16
    Throughout this litigation, Plaintiffs’ claim has been framed in various
    ways. The lack of compliance with section 8005 has sometimes been labeled ultra
    vires as outside statutory authority or as outside the President’s Article II powers,
    and spending without an appropriation has been described as a violation of the
    Appropriations Clause. However their claim is labeled, Plaintiffs’ theory is
    ultimately the same.
    34
    DoD’s proposed expenditures are not authorized by the applicable reprogramming
    statute. They therefore are not “in Consequence of Appropriations made by Law.”
    U.S. Const. art. I, § 9, cl. 7.
    At bottom, this constitutional issue turns on a question of statutory
    interpretation. Section 8005 of the Department of Defense Appropriations Act of
    2019 provides that the Secretary of Defense may reprogram funds for certain
    military functions other than those for which they were initially appropriated, but it
    limits the Secretary’s ability to do so to a narrow set of circumstances. Pub. L. No.
    115-245, § 8005, 
    132 Stat. 2981
    , 2999 (2018).17 Transferred funds must address
    17
    Section 8005 provides, in relevant part:
    Upon determination by the Secretary of Defense that such action
    is necessary in the national interest, he may, with the approval of
    the Office of Management and Budget, transfer not to exceed
    $4,000,000,000 of working capital funds of the Department of
    Defense or funds made available in this Act to the Department of
    Defense for military functions (except military construction)
    between such appropriations or funds or any subdivision thereof,
    to be merged with and to be available for the same purposes, and
    for the same time period, as the appropriation or fund to which
    transferred: Provided, That such authority to transfer may not be
    used unless for higher priority items, based on unforeseen military
    requirements, than those for which originally appropriated and in
    no case where the item for which funds are requested has been
    denied by the Congress . . . Provided further, That no part of the
    funds in this Act shall be available to prepare or present a request
    to the Committees on Appropriations for reprogramming of funds,
    unless for higher priority items, based on unforeseen military
    requirements, than those for which originally appropriated and in
    35
    “higher priority items, based on unforeseen military requirements, than those for
    which originally appropriated.” 
    Id.
     And “in no case” may the Secretary use the
    funds “where the item for which reprogramming is requested has been denied by
    the Congress.” 
    Id.
     We conclude, as Plaintiffs argue, that those requirements are
    not satisfied.
    i.     “Unforeseen”
    Plaintiffs argue that the President’s repeated and unsuccessful requests for
    more border barrier funding make the request here obviously not unforeseen.
    Defendants assert in response, without citation, that “[a]n expenditure is
    ‘unforeseen’ . . . if DoD was not aware of the specific need when it made its
    budgeting requests.” Defendants contend that DoD could not have foreseen the
    “need to provide support” to DHS for border barrier construction in the relevant
    sectors when it made its budget requests for 2019, before DHS’s own budget was
    even finalized.
    Defendants mistakenly focus on the assertion that DoD “could not have
    anticipated that DHS would request specific support for roads, fences, and
    lighting.” Even assuming that is true, the fact remains that DHS came to DoD for
    funds because Congress refused to grant DHS itself those funds. And when
    no case where the item for which reprogramming is requested has
    been denied by the Congress.
    36
    properly viewed as applying to the broader “requirement” of a border wall, not to
    DHS’s specific need to turn to an entity other than Congress for funds, it is not
    credible that DoD did not foresee this requirement. The long history of the
    President’s efforts to build a border barrier and of Congress’s refusing to
    appropriate the funds he requested makes it implausible that this need was
    unforeseen.
    ii.   “Denied by the Congress”
    Even if there could be doubt about how to interpret “unforeseen,” it is clear
    that Congress denied this request. Because each of section 8005’s conditions must
    be satisfied for DoD’s reprogramming and spending to be constitutionally
    permissible, this conclusion alone undermines Defendants’ likelihood of success
    on the merits on appeal.
    Defendants urge that “an ‘item for which funds are requested’” refers to “a
    particular budget item” for section 8005 purposes, so “Congress’s decisions with
    respect to DHS’s more general request for border-wall funding [are] irrelevant.”
    But this interpretation, which would require that a specific funding request be
    explicitly rejected by Congress, is not compatible with the plain text of section
    8005. First, the statute refers to “item[s] . . . denied by the Congress,” not to
    funding requests denied by the Congress, suggesting that the inquiry centers on
    what DoD wishes to spend the funds on, not on the form in which Congress
    37
    considered whether to permit such spending. Second, Defendants give the term
    “denied” a meaning other than its “ordinary, contemporary, and common” one.
    United States v. Iverson, 
    162 F.3d 1015
    , 1022 (9th Cir. 1998). In common usage, a
    general denial of something requested can, and in this case does, encompass more
    specific or narrower forms of that request. To illustrate, if someone offered a new
    job asks her potential future employer for a larger compensation package than was
    included in the job offer and the request is denied, she has been denied a five
    percent higher salary even if her request did not specifically ask for that amount.
    As the district court noted, Defendants’ reading of section 8005 also would
    produce the perverse result that DoD could, by declining to present Congress with
    a particular line item to deny, reprogram funds for a purpose that Congress refused
    to grant another agency elsewhere in the budgeting process. 18 In other words, it
    would simply invite creative repackaging. But putting a gift in different wrapping
    paper does not change the gift. Identifying the request to Congress as having come
    previously from DHS instead of from DoD does not change what funding was
    requested for: a wall along the southern border.
    Construing section 8005 with an eye towards the ordinary and
    common-sense meaning of “denied,” real-world events in the months and years
    18
    That result would hardly comport with Congress’s stated desire in drafting
    the language currently in section 8005 “to tighten congressional control of the
    reprogramming process.” H.R. Rep. No. 93-662, at 16 (1973).
    38
    leading up to the 2019 appropriations bills leave no doubt that Congress considered
    and denied appropriations for the border barrier construction projects that DoD
    now seeks to finance using its section 8005 authority. Long before the emergency
    declaration and DoD’s reprogramming at issue here, the President made plain his
    desire to construct a border barrier, requesting $5.7 billion from Congress to do so.
    Throughout 2018, Congress considered multiple bills that would have supported
    construction of such a barrier; it passed none of them. See supra Section I.
    That DoD never specifically requested from Congress the specific sums at
    issue here for the specific purpose of counterdrug funding at the southern border
    (and that Congress therefore never had cause to deny that specific request) is of no
    moment. The amount to be appropriated for a border barrier occupied center stage
    of the budgeting process for months, culminating in a prolonged government
    shutdown that both the Legislative and Executive Branches clearly understood as
    hinging on whether Congress would accede to the President’s request for $5.7
    billion to build a border barrier.
    In sum, Congress considered the “item” at issue here—a physical barrier
    along the entire southern border, including in the Yuma, El Paso, Tucson, and El
    Centro sectors—and decided in a transparent process subject to great public
    scrutiny to appropriate less than the total amount the President had sought for that
    item. To call that anything but a “denial” is not credible.
    39
    2. Defendants’ Interpretation and Agency Deference
    Defendants did not argue in their briefing to the district court, their stay
    motion, or their supplemental briefing that their contrary interpretation of section
    8005 is entitled to agency deference. Even setting aside whether Defendants’
    failure to raise such an argument may operate as a waiver or forfeiture, we
    conclude that their position is unworthy of deference when evaluated under
    traditional standards for reviewing agency action.
    Under the two-step framework articulated in Chevron, U.S.A., Inc. v.
    Natural Resources Defense Council, Inc., 
    467 U.S. 837
     (1984), a reviewing court
    will often defer to an agency’s interpretation of an ambiguous statute administered
    by the agency. 
    Id. at 843
    . To determine whether the Chevron framework governs
    at all, however, there is a threshold “step zero” inquiry in which we ask whether “it
    appears that Congress delegated authority to the agency generally to make rules
    carrying the force of law, and [whether] the agency interpretation claiming
    deference was promulgated in the exercise of that authority.” United States v.
    Mead Corp., 
    533 U.S. 218
    , 226-27 (2001). “Delegation of such authority may be
    shown in a variety of ways, [such] as by an agency’s power to engage in
    adjudication or notice-and-comment rulemaking, or by some other indication of a
    comparable congressional intent.” 
    Id. at 227
    . And to evaluate whether the agency
    exercised its authority, we look to “the interpretive method used and the nature of
    40
    the question at issue,” considerations that may include “the interstitial nature of the
    legal question, the related expertise of the [a]gency, the importance of the question
    to administration of the statute, the complexity of that administration, and the
    careful consideration the [a]gency has given the question over a long period of
    time.” Barnhart v. Walton, 
    535 U.S. 212
    , 222 (2002). If we determine that (1)
    Congress did not intend to delegate interpretive authority to the agency, or (2) that
    the agency did not take the challenged action in exercise of that authority, we defer
    to the agency only to the extent that the agency’s reasoning is persuasive. Mead,
    
    533 U.S. at
    234 (citing Skidmore v. Swift & Co., 
    323 U.S. 134
     (1944)).
    Under this framework, DoD’s current interpretation of section 8005 is not
    entitled to deference. First, it does not appear that Congress intended to delegate to
    DoD the power to interpret section 8005. DoD’s authorizing and appropriating
    statutes do not contain an explicit grant of rulemaking power to the agency.
    Section 8005 could suggest a potential congressional intent to delegate to DoD the
    authority to interpret the phrase “higher priority items, based on unforeseen
    military requirements,” because these are subjects about which DoD has expertise.
    But the same is not true of the “denied by the Congress” limitation, given that DoD
    has no clear expertise in assessing what “denied by the Congress” might mean.
    Moreover, as discussed above, Congress’s intent in inserting the “denied by the
    41
    Congress” limitation in the first place was to tighten the fiscal reins and retain
    congressional control over the appropriations process. See supra n.18.
    Second, the agency has not advanced its interpretation in a manner that
    would typically trigger review under Chevron. There is no question that DoD did
    not conduct notice-and-comment rulemaking or other formalized procedures in
    interpreting section 8005. See Mead, 
    533 U.S. at 230
     (“[T]he overwhelming
    number of our cases applying Chevron deference have reviewed the fruits of
    notice-and-comment rulemaking or formal adjudication.”). Nor were there any
    other features in DoD’s interpretive process here that might otherwise justify
    Chevron deference. See Barnhart, 
    535 U.S. at 222
    . There is no indication that
    DoD’s decision was the product of “careful consideration . . . over a long period of
    time” or any other procedural rigor that would more closely approximate a formal
    rulemaking. 
    Id.
     On the contrary, DoD’s interpretation appears to have emerged in
    a matter of weeks. And to the extent that DoD has mustered further support for its
    interpretation during this litigation, that litigating position is not entitled to
    Chevron deference. Price v. Stevedoring Servs. of Am., Inc., 
    697 F.3d 820
    , 830
    (9th Cir. 2012) (en banc) (“Without a basis in agency regulations or other binding
    agency interpretations, there is usually no justification for attributing to an agency
    litigating position ‘the force of law.’” (quoting Mead, 
    533 U.S. at 227
    )).
    42
    Accordingly, we conclude that Chevron deference to DoD’s interpretation of
    section 8005 is not warranted.
    An agency action not entitled to Chevron deference may nevertheless carry
    persuasive weight based on the factors that the Supreme Court enumerated in
    Skidmore, 
    323 U.S. at 140
    . See Mead, 
    533 U.S. at 234-35
    . Under Skidmore, we
    look to “the thoroughness evident in [the agency’s] consideration, the validity of its
    reasoning, its consistency with earlier and later pronouncements, and all those
    factors which give it power to persuade.” 
    323 U.S. at 140
    .
    DoD’s interpretation of section 8005 does not warrant deference under
    Skidmore’s standards either. The two documents in the record that appear to
    contain DoD’s analysis of the section 8005 requirements—the official
    reprogramming action and a related memorandum to DoD’s comptroller—are
    entirely conclusory. The reprogramming action merely parrots the statute without
    analysis:
    This reprogramming action provides funding in support of higher
    priority items, based on unforeseen military requirements, than those
    for which originally appropriated; and is determined to be necessary
    in the national interest. It meets all administrative and legal
    requirements, and none of the items has previously been denied by the
    Congress.
    The memorandum contains little more, stating that “[t]he need to provide
    support . . . was . . . not known at the time of the [Fiscal Year] 2019 budget
    request” and that Congress had not denied funding for the items. The Supreme
    43
    Court has found unpersuasive under Skidmore agency determinations containing
    far more reasoning than that which we confront here. See Gonzales v. Oregon, 
    546 U.S. 243
    , 253-54 (2006) (rejecting as unpersuasive under Skidmore an interpretive
    rule announced by the Attorney General that “[i]ncorporat[ed] the legal analysis of
    a memorandum he had solicited from his Office of Legal Counsel”); Christensen v.
    Harris County, 
    529 U.S. 576
    , 581, 587 (2000) (rejecting as unpersuasive under
    Skidmore an interpretation in an opinion letter containing brief textual analysis and
    citation to operative regulations).
    Defendants’ interpretation also fails to rest on the sort of expertise that might
    inspire deference. See Gonzales, 
    546 U.S. at 269
     (“[Skidmore] deference here is
    tempered by the Attorney General’s lack of expertise in this area.”); cf. Kisor v.
    Wilkie, No. 18-15, 
    2019 WL 2605554
    , at *9 (U.S. June 26, 2019) (explaining that
    when an agency interprets its own regulation, its “interpretation must in some way
    implicate its substantive expertise” to be entitled to deference); compare Mead,
    
    533 U.S. at 235
     (“There is room at least to raise a Skidmore claim here, where . . .
    [the agency] can bring the benefit of specialized experience to bear on the subtle
    questions in this case.”).
    ***
    Without section 8005’s statutory authorization to reprogram funds for
    section 284 security measures, no congressional action permits Defendants to use
    44
    those funds to construct border barriers. “The President’s power . . . must stem
    either from an act of Congress or from the Constitution itself. There is no statute
    that expressly authorizes the President to [act] as he did here. Nor is there any act
    of Congress to which our attention has been directed from which such a power can
    fairly be implied.” Youngstown, 
    343 U.S. at 585
    . Defendants’ attempt to
    reprogram and spend these funds therefore violates the Appropriations Clause and
    intrudes on Congress’s exclusive power of the purse, for it would cause funds to be
    “drawn from the Treasury” not “in Consequence of Appropriations made by Law.”
    U.S. Const. art. I, § 9, cl. 7.
    B. Whether Plaintiffs Have a Cause of Action
    Defendants argue that none of the foregoing analysis matters because
    Plaintiffs lack a cause of action to challenge the reprogramming of funds at issue
    here. We disagree. Plaintiffs may bring their challenge through an equitable
    action to enjoin unconstitutional official conduct, or under the judicial review
    provisions of the Administrative Procedure Act (“APA”), 
    5 U.S.C. § 701
     et seq., as
    a challenge to a final agency decision that is alleged to violate the Constitution, or
    both. Either way, Plaintiffs have an avenue for seeking relief.
    1. Equitable Cause of Action
    The Supreme Court has “long held that federal courts may in some
    circumstances grant injunctive relief against” federal officials violating federal
    45
    law. Armstrong v. Exceptional Child Ctr., Inc., 
    135 S. Ct. 1378
    , 1384 (2015); see
    also Corr. Servs. Corp. v. Malesko, 
    534 U.S. 61
    , 74 (2001) (“[I]njunctive relief has
    long been recognized as the proper means for preventing entities from acting
    unconstitutionally.”). “The ability to sue to enjoin unconstitutional actions by state
    and federal officers is the creation of courts of equity, and reflects a long history of
    judicial review of illegal executive action, tracing back to England.” Armstrong,
    
    135 S. Ct. at 1384
    ; see also Grupo Mexicano de Desarrollo S.A. v. All. Bond Fund,
    Inc., 
    527 U.S. 308
    , 318-19 (1999) (“[T]he substantive prerequisites for obtaining
    an equitable remedy as well as the general availability of injunctive relief . . .
    depend on traditional principles of equity jurisdiction.” (quoting 11A Charles Alan
    Wright et al., Federal Practice and Procedure § 2941, at 31 (2d ed. 1995)).
    In Youngstown, for example, the Supreme Court heard a challenge to a
    wartime presidential order directing the Secretary of Commerce to seize and
    operate a majority of the nation’s steel mills. 
    343 U.S. at 582
    . Acting pursuant to
    the presidential order, the Secretary of Commerce issued possessory orders that
    required the seized companies to operate according to the Secretary’s direction. 
    Id. at 583
    . The plaintiff steel mill owners challenged the order as amounting to
    lawmaking, a function that “the Constitution has expressly confided to the
    Congress and not to the President.” 
    Id. at 582
    . The President contended that his
    order was “necessary to avert a national catastrophe.” 
    Id.
     In addressing the
    46
    dispute, the Court held that there was no statute that authorized the order, and that
    “[t]he order [could not] properly be sustained as an exercise of the President’s
    military power,” or any other constitutional grant of power to the President. 
    Id. at 587
    . The Court therefore held that “th[e] seizure order [could not] stand.” 
    Id. at 589
    .
    More recently, in Trump v. Hawaii, 
    138 S. Ct. 2392
     (2018), the Supreme
    Court heard a challenge to a presidential proclamation restricting the entry of
    certain foreign nationals into the United States on the ground that it violated the
    Establishment Clause of the First Amendment. 
    Id. at 2403
    . Plaintiffs were
    individuals who alleged that they were injured by being separated from relatives
    barred from entering the country. 
    Id. at 2416
    . Without discussing whether a cause
    of action existed to challenge the alleged constitutional violation, the Court
    reached the merits of the plaintiffs’ Establishment Clause claim. See 
    id. at 2416-17
    . The government had contended that the plaintiffs’ claims were not
    justiciable because the Establishment Clause did not give them a legally protected
    interest in the admission of particular foreign nationals, but the Court rejected this
    argument and proceeded to evaluate the merits of the plaintiffs’ claim. 
    Id. at 2416
    .
    Trump v. Hawaii and Youngstown therefore support the conclusion that Plaintiffs
    may seek equitable relief to remedy an alleged constitutional violation.
    47
    Consistent with these cases, our court allowed an equitable action to enforce
    the Appropriations Clause in United States v. McIntosh, 
    833 F.3d 1163
     (9th Cir.
    2016). In McIntosh, appellants were criminal defendants who had been federally
    indicted on marijuana-related offenses. Id. at 1168-69. They sought to enjoin their
    prosecutions, claiming that a congressional appropriations rider prohibited the
    Department of Justice (“DOJ”) from spending money on their prosecutions
    because their marijuana-related activities were licensed under state law. Id. at
    1169, 1177. We held that the defendant-appellants could properly “enjoin their
    prosecutions on the grounds that [DOJ] [was] prohibited from spending funds to
    prosecute them” if they could demonstrate that their conduct was authorized by
    state law and thus fell within what the appropriations rider was enacted to protect.
    Id. at 1169, 1174. As we explained: “Congress has enacted an appropriations rider
    that specifically restricts DOJ from spending money to pursue certain activities,”
    and it had acted within its “‘exclusive province’” in doing so. Id. at 1172 (quoting
    Tenn. Valley Auth. v. Hill, 
    437 U.S. 153
    , 194 (1978)). Once Congress has so acted,
    “it is for . . . the courts to enforce” its decisions. 
    Id.
     (quoting Tenn. Valley Auth.,
    
    437 U.S. at 194
    ). Contrary to the dissent’s characterization, we did not in
    McIntosh treat the alleged constitutional violation only “as a defense for criminal
    defendants.” Dissent at 21. Instead we held that “Appellants . . . can seek—and
    48
    have sought—to enjoin [an agency] from spending funds” contrary to Congress’s
    restrictions. McIntosh, 833 F.3d at 1172.
    Relying on Dalton v. Specter, 
    511 U.S. 462
     (1994), Defendants argue that
    there cannot be a constitutional cause of action here. Dalton involved a challenge
    to the President’s discretionary decision to agree to a specific military base closure
    included in a base closure package proposed by an independent commission
    pursuant to the Defense Base Closure and Realignment Act of 1990 (“DBCRA”).
    
    Id. at 464-66
    . The Supreme Court held that the plaintiff’s statutory challenge to
    the President’s decision failed because the statute gave the President unfettered
    discretion. 
    Id. at 474-76
    . The Court then also rejected the argument that because
    the President had allegedly violated the statute, he had acted unconstitutionally. 
    Id. at 472-74
    . In explanation, the Court stated that “every action by the President, or
    by another executive official, in excess of his statutory authority is [not] ipso facto
    in violation of the Constitution.” 
    Id. at 472
    . The Court did not say, however, that
    action in excess of statutory authority can never violate the Constitution or give
    rise to a constitutional claim. Statutory and constitutional claims are not mutually
    exclusive. Indeed, the Court went on in Dalton to state that Youngstown “cannot
    be read for the proposition that an action taken by the President in excess of his
    statutory authority necessarily violates the Constitution.” 
    Id. at 473
     (emphasis
    49
    added). There would have been no reason for the Court to include the word
    “necessarily” if the two claims were always mutually exclusive.
    In Dalton, the President’s authority was put at issue because of the
    contention that he had violated requirements set by DBCRA. It was only because
    Congress had enacted a statutory process for closing bases that the Court
    considered whether it could review the President’s compliance with DBCRA and
    ultimately concluded that it could not because the statute gave the President
    unreviewable discretion. 
    Id. at 474-76
    . It was in that context that the Court
    explained that an allegation that the President had not complied with the statute
    would not necessarily become a constitutional claim through an ultra vires theory.
    
    Id. at 472-73
    . Because DBCRA authorized unfettered discretion by the President
    to either approve or disapprove the package of base closures as a whole, the Court
    had no occasion to consider the constitutional implications of violating statutes,
    such as section 8005, that authorize executive action contingent on satisfaction of
    certain requirements.19 Here, unlike in Dalton, Plaintiffs’ claim is not one “simply
    alleging that the President has exceeded his statutory authority.” 
    Id.
     at 473
    19
    The dissent notes that when Congress appropriates funds in lump-sum
    amounts, and leaves it to the unfettered discretion of the agency to re-allocate
    funds, no judicial review is available. Dissent at 8 (citing Lincoln v. Vigil, 
    508 U.S. 182
    , 193 (1993)). That principle has no bearing here. Section 8005 does not
    involve a lump sum whose allocation is committed to the agency’s discretion, but
    instead imposes restrictions on when and for what purposes the agency may use
    reprogrammed funds.
    50
    (emphasis added). Rather, Plaintiffs claim that to the extent Defendants did not
    have statutory authority to reprogram the funds, they acted in violation of
    constitutional separation of powers principles because Defendants lack any
    background constitutional authority to appropriate funds—making Plaintiffs’ claim
    fundamentally a constitutional one.20 Dalton therefore does not foreclose
    Plaintiffs’ constitutional claim here. 21
    20
    Defendants rely on Harrington v. Schlesinger, 
    528 F.2d 455
     (4th Cir.
    1975), in which the Fourth Circuit held that the claims of several individual
    taxpayers who alleged that the government was spending money in violation of
    two statutes did not satisfy the test for taxpayer standing enunciated in Flast v.
    Cohen, 
    392 U.S. 83
     (1968), because they “present[ed] no constitutional challenge
    to any congressional appropriation,” Harrington, 
    528 F.2d at 457
    . Harrington is
    largely inapposite, because Plaintiffs do not rely on taxpayer standing here. The
    court in Harrington noted, however, that “[i]f there were a clear and flagrant
    violation of congressional limitations upon expenditures, a court in a taxpayer suit
    might find its intervention appropriate.” 
    Id. at 458
    . Thus, if Harrington has any
    persuasive value here, we think it is in suggesting that Plaintiffs do have a cause of
    action because, as we have discussed, there has been a clear violation of Congress’
    limits on expenditures.
    21
    The dissent suggests that Train v. City of New York, 
    420 U.S. 35
     (1975),
    supports the proposition that a claim attacking the Executive Branch’s reading of
    an appropriations statute sounds only in that statute and not in the Constitution.
    Dissent at 8-9. But the plaintiffs in Train argued not that the Executive Branch
    was spending money that Congress had never appropriated, rather that the
    Executive Branch was refusing to allot money Congress had specifically instructed
    it to spend. 
    420 U.S. at 42
    . There was thus no constitutional claim at issue in
    Train, and if there had been, it would have had nothing to do with the prohibitions
    on unauthorized spending imposed by the Appropriations Clause. The Supreme
    Court in Train considered only the statutory question whether an Executive Branch
    agency had failed to comply with a specific statutory mandate because that was the
    only issue in that case, not because the existence of a statute had any bearing on
    constitutional reviewability.
    51
    Defendants also cannot be right in their apparent contention that as long as
    an official identifies some statutory authorization for his actions, doing so makes
    any challenge to those actions statutory and precludes constitutional review. It
    cannot be that simply by pointing to any statute, governmental defendants can
    foreclose a constitutional claim. At the risk of sounding tautological, only if the
    statute actually permits the action can it even possibly give authority for that
    action. 22 For the reasons explained above, section 8005 does not permit the action
    here.
    Congress may, of course, limit a court’s equitable power to enjoin acts
    violating federal law. See Armstrong, 
    135 S. Ct. at 1385
     (explaining that an
    equitable remedy is not available where Congress has demonstrated an “intent to
    foreclose” that form of relief, as where a statutory provision (1) expressly provided
    a method of enforcing a substantive right, or (2) lacked a judicially administrable
    standard (quoting Verizon Md., Inc. v. Public Serv. Comm’n of Md., 
    535 U.S. 635
    ,
    647 (2002))). But Defendants do not argue that Congress has demonstrated any
    22
    Although in Youngstown the President conceded that no statute authorized
    his actions, and relied only on his Article II powers, 
    343 U.S. at 587
    , we do not see
    how Defendants’ willingness or unwillingness to concede that a particular statute
    does not authorize their actions should affect whether Plaintiffs in this case have a
    cause of action—particularly when, as we have discussed, we think it quite clear
    that section 8005 does not authorize the reprogramming. Thus, we do not think
    that the concession in Youngstown was determinative, or that the lack of a
    concession is determinative here.
    52
    such intent to limit equitable remedies here, and we have identified no statute that
    does so. Indeed, to foreclose a remedy for a constitutional violation, Congress
    must demonstrate its intent by “clear and convincing evidence.” Weinberger v.
    Salfi, 
    422 U.S. 749
    , 762 (1975) (quoting Johnson v. Robinson, 
    415 U.S. 361
    , 373
    (1974)); see also City of Chicago v. Int’l Coll. of Surgeons, 
    522 U.S. 156
    , 183
    (1997) (“[J]udicial review of [federal] administrative action is the rule, and
    nonreviewability an exception which must be demonstrated.” (alterations in
    original) (quoting Barlow v. Collins, 
    397 U.S. 159
    , 166 (1970)).
    2. Administrative Procedure Act Cause of Action
    Plaintiffs’ claim is also cognizable under the APA. The APA provides for
    judicial review of “[a]gency action made reviewable by statute and final agency
    action for which there is no other adequate remedy in a court.” 
    5 U.S.C. § 704
    .
    Here, Plaintiffs have a cause of action under the APA as long as there has been
    final agency action, and as long as Congress has not limited review of such actions
    through other statutes or committed them to agency discretion. Neither of these
    bars to APA relief is present here. See 
    5 U.S.C. §§ 701
    (a), 704, 706; Bennett v.
    Spear, 
    520 U.S. 154
    , 175 (1997).
    The APA mandates that a court “shall . . . hold unlawful and set aside
    agency action . . . found to be . . . contrary to constitutional right, power, privilege,
    or immunity.” 
    5 U.S.C. § 706
    (2)(B). Plaintiffs’ challenge is to a final agency
    53
    action and alleges that the action violates the Appropriations Clause, so it falls
    within the APA’s scope. 23
    Although section 701(a)(2) of the APA “preclude[s] judicial review of
    certain categories of administrative decisions,” this case does not involve such an
    “administrative decision traditionally regarded as committed to agency discretion.”
    Lincoln v. Vigil, 
    508 U.S. 182
    , 191-92 (1993). In their emergency stay motion and
    related supplemental briefing, Defendants do not argue that DoD’s actions were
    committed to “agency discretion by law,” so as to preclude review under the APA.
    We agree with Defendants’ implicit concession that this is not a case involving a
    “statute . . . drawn so that a court would have no meaningful standard against
    which to judge the agency’s exercise of discretion.” Heckler v. Chaney, 
    470 U.S. 821
    , 830 (1985).
    Any constitutional challenge that Plaintiffs may advance under the APA
    would exist regardless of whether they could also assert an APA claim that DoD’s
    23
    Defendants argue that DoD’s reprogramming action is not a final agency
    action in part because it “imposes no obligations and confers no rights upon
    plaintiffs.” Exec. Tan Br. at 14. But the question we must ask in determining
    finality is whether the agency action imposes obligations on the agency, not
    whether it imposes obligations on Plaintiffs. See Bennett, 
    520 U.S. at 177
     (holding
    that the challenged agency actions were final because they “alter[ed] the legal
    regime to which the action agency [wa]s subject” (emphasis added)). Here, as we
    have discussed, the reprogramming action purports to affect DoD’s legal right to
    use particular funds to build a border barrier instead of the purpose for which they
    were originally appropriated.
    54
    application of section 8005 was “in excess of statutory jurisdiction, authority, or
    limitations, or short of statutory right.” 
    5 U.S.C. § 706
    (2)(C); see Webster v. Doe,
    
    486 U.S. 592
    , 602-04 (1988) (holding that a plaintiff may raise under the APA a
    constitutional challenge to agency action even where the plaintiff lacks an avenue
    under the APA to argue that the same agency action is invalid for statutory or
    procedural reasons). If “Congress intends to preclude judicial review of
    constitutional claims[,] its intent to do so must be clear.” Webster, 487 U.S. at 603.
    Congress has not done so here.
    3. Survival of at Least One Cause of Action
    The dissent argues that Plaintiffs’ claim is necessarily one encompassed by
    the APA, and that the availability of an APA cause of action precludes Plaintiffs’
    equitable claim. We do not think that the APA forecloses Plaintiffs’ equitable
    claim. And even if it did, then for the reasons we have discussed, Plaintiffs would
    have an APA claim. Either way, it cannot be that both an equitable claim and an
    APA claim foreclose the other, leaving Plaintiffs with no recourse.
    It is true that the APA is the general mechanism by which to challenge final
    agency action. See Weyerhaeuser Co. v. U.S. Fish & Wildlife Serv., 
    139 S. Ct. 361
    , 370 (2018) (noting the “basic presumption of judicial review [created by the
    APA] for one ‘suffering legal wrong because of agency action’” (quoting Abbott
    Labs. v. Gardner, 
    387 U.S. 136
    , 140 (1967)). But this does not mean the APA
    55
    forecloses other causes of action. In Navajo Nation v. Department of the Interior,
    
    876 F.3d 1144
     (9th Cir. 2017), we explained that “a court is foreclosed by [APA
    section] 704 from entertaining claims brought under the APA seeking review of
    non-final agency action (and not otherwise permitted by law),” but that this final
    agency action limitation does not apply “to other types of claims (like . . .
    constitutional claims).” Id. at 1170.
    Likewise, in Presbyterian Church v. United States, 
    870 F.2d 518
     (9th Cir.
    1989), we allowed constitutional claims to proceed without even deciding whether
    an APA cause of action was available. There, plaintiff churches brought claims for
    injunctive relief against the United States, DOJ, and the Immigration and
    Naturalization Service (“INS”) and certain INS officials, alleging violations of
    their First and Fourth Amendment rights by INS agents’ surreptitious recording of
    their church services. 
    Id. at 520
    . The district court dismissed the plaintiffs’ claims
    as, in relevant part, barred by sovereign immunity. 
    Id. at 521
    . We reversed,
    holding that APA section 702 waived the government defendants’ sovereign
    immunity for claims seeking non-monetary relief. 
    Id. at 523-24
    . We further
    explained that this waiver of sovereign immunity was not limited to suits involving
    an “agency action” as defined under the APA. 
    Id. at 525
    . We therefore did not
    reach the question whether the actions challenged in that case were ones for which
    the APA would provide a cause of action. 
    Id.
     at 525 n.8. Rather, we remanded for
    56
    further analysis of standing and mootness, and, if the district court determined it
    had jurisdiction, for evaluation of the plaintiffs’ constitutional claims. 
    Id. at 529
    .
    Navajo Nation and Presbyterian Church clearly contemplate that claims
    challenging agency actions—particularly constitutional claims—may exist wholly
    apart from the APA.
    In fact, the APA provides for judicial review only of “[a]gency action made
    reviewable by statute and final agency action for which there is no other adequate
    remedy in a court.” 
    5 U.S.C. § 704
    . Here, no statute expressly makes Plaintiffs’
    claims reviewable, but, as we have explained, Plaintiffs do have an adequate
    remedy in a court: an equitable cause of action for injunctive relief. If either form
    of their claim precludes the other, it would therefore seem that their equitable
    claim to enjoin unconstitutional action would preclude their APA claim to enjoin
    unconstitutional action. But even if it is the other way around, these causes of
    action cannot possibly be the legal equivalent of baking soda and vinegar—when
    they come in contact, there is no reason to believe they both go up in smoke.
    C. Zone of Interests
    Defendants argue that even if a cause of action generally exists to challenge
    the reprogramming, Plaintiffs must satisfy a “zone of interests” test to establish
    that they, specifically, have a cause of action for the constitutional violation they
    allege here. Defendants argue that this test would apply to Plaintiffs’ claim
    57
    whether characterized as an equitable cause of action to enjoin a constitutional
    violation or as an APA claim. We are doubtful that a zone of interests test applies
    to Plaintiffs’ equitable cause of action. Although we recognize that the APA
    generally does carry a zone of interests test, there is some lack of clarity with
    respect to what that might look like in a constitutional context. We need not
    resolve these ambiguities in the case law, however, because we believe Plaintiffs
    fall within any zone of interests test that may apply.
    1. Applicability of a Zone of Interests Test
    Courts apply the zone of interests test to “determine, using traditional tools
    of statutory interpretation, whether a legislatively conferred cause of action
    encompasses a particular plaintiff’s claim.” Lexmark Int’l, Inc. v. Static Control
    Components, Inc., 
    572 U.S. 118
    , 127 (2014). To determine whether a plaintiff
    satisfies this test we ask whether the plaintiff’s “interests fall within the zone of
    interests protected by the law invoked.” Id. at 129 (quotation marks omitted). In
    answering this question, we recognize that “the breadth of the [applicable] zone of
    interests varies according to the provisions of law at issue.” Id. at 130 (quoting
    Bennett, 
    520 U.S. at 163
    ).
    The zone of interests test derives from the Supreme Court’s decision in
    Association of Data Processing Service Organizations, Inc. v. Camp, 
    397 U.S. 150
    (1970), where the Court articulated a limit on causes of action conferred by the
    58
    APA. But the Court clarified in Lexmark that the test “applies to all statutorily
    created causes of action . . . and that Congress is presumed to ‘legislate against the
    background of’ the zone-of-interests limitation, ‘which applies unless it is
    expressly negated.’” Lexmark, 572 U.S. at 129 (emphasis added) (quoting Bennett,
    
    520 U.S. at 163
    ). 24
    We are doubtful that any zone of interests test applies to Plaintiffs’ equitable
    cause of action to enjoin a violation of the Appropriations Clause, particularly after
    Lexmark.
    As an initial matter, we are skeptical that there could be a zone of interests
    requirement for a claim alleging that official action was taken in the absence of all
    authority, like that which Plaintiffs assert here. The D.C. Circuit’s decision in
    Haitian Refugee Center v. Gracey, 
    809 F.2d 794
     (D.C. Cir. 1987), explains why it
    does not make sense to treat such claims as carrying a zone of interests
    requirement. There, the court heard a challenge to a government program for
    24
    Many pre-Lexmark cases refer to the zone of interests test—and the
    broader question whether a particular plaintiff has a cause of action—as a part of
    the standing inquiry (and, more specifically, as a component of “prudential
    standing”). See Lexmark, 572 U.S. at 126-27. In Lexmark, however, the Court
    clarified that the zone of interests test does not go to a plaintiff’s standing but
    rather to whether the plaintiff has a cause of action. Id. at 127, 128 n.4. The Court
    suggested that holding otherwise would be “in some tension with [the Court’s]
    recent affirmation of the principle that ‘a federal court’s obligation to hear and
    decide’ cases within its jurisdiction ‘is virtually unflagging.’” Id. at 126 (quoting
    Sprint Commc’ns, Inc. v. Jacobs, 
    571 U.S. 69
    , 77 (2013).
    59
    intercepting ships carrying undocumented immigrants, in which the plaintiffs
    argued that the program exceeded authority granted by statute or the Constitution.
    Id. at 797-98. The court ultimately held that the plaintiffs lacked standing. Id. at
    800-01. But, citing Youngstown in its discussion, the D.C. Circuit noted that the
    plaintiffs were not required to “show that their interests [fell] within the zones of
    interests of the constitutional and statutory powers invoked by the President in
    order to . . . challenge the . . . program as ultra vires.” Id. at 811 n.14.
    “Otherwise,” the court explained, “a meritorious litigant, injured by ultra
    vires action, would seldom have standing to sue since the litigant’s interest
    normally will not fall within the zone of interests of the very statutory or
    constitutional provision that he claims does not authorize action concerning that
    interest.” Id. In other words, where the very claim is that no statutory or
    constitutional provision authorized a particular governmental action, it makes little
    sense to ask whether any statutory or constitutional provision was written for the
    benefit of any particular plaintiffs.
    Consistent with this logic, Youngstown did not apply a zone of interests test.
    Although we acknowledge that Youngstown was decided before the Supreme Court
    had formally articulated a zone of interests test, Youngstown did not address any
    similar concept, either. Rather, the Court held that the President had unlawfully
    intruded on the lawmaking function reserved to Congress without ever discussing
    60
    whether the plaintiffs, steel mill owners whose property was ordered to be seized,
    were the intended beneficiaries of the structural provisions in Article II.
    Similarly, in Clinton v. City of New York, 
    524 U.S. 417
     (1998), which
    addressed a Presentment Clause challenge, the Supreme Court said nothing about a
    zone of interests requirement. In that case, two sets of plaintiffs challenged the
    constitutionality of the Line Item Veto Act, which allowed the President to veto
    only particular provisions in enacted laws, rather than the entire law. 
    Id. at 420-21
    .
    One set of plaintiffs consisted of the City of New York, a hospital and two hospital
    associations, and unions representing hospital employees. 
    Id. at 425
    . Another
    consisted of a cooperative of Idaho potato growers, and an individual potato
    farmer. 
    Id.
     All the plaintiffs alleged that they were injured by the President’s
    cancellation of particular line items in the budget that would have inured to their
    financial benefit. 
    Id. at 421
    . The Supreme Court held that the Act violated the
    structural protections provided by the Presentment Clause, without asking whether
    the plaintiffs fell within any zone of interests of that clause. 
    Id. at 436-48
    .
    The Appropriations Clause likewise operates as a structural protection built
    into our constitutional system. Just as the Court in Clinton treated as sufficient that
    the plaintiffs were concretely injured as a result of the alleged Presentment Clause
    violation, we believe it is likely sufficient here that Plaintiffs would be concretely
    61
    injured by the alleged Appropriations Clause violation, and that no zone of
    interests test applies to their claim.
    Even if a zone of interests test may have been applied to some cases
    considering constitutional claims like Plaintiffs’ prior to Lexmark, we think that
    Lexmark has called into question its continuing applicability to constitutional
    claims. Lexmark focuses on Congress’s intent in creating statutory causes of
    action, casting doubt on Defendants’ argument that a zone of interests test has any
    role to play here, where Plaintiffs’ theory derives from the Constitution. The Court
    in Lexmark described the purpose of the zone of interests test as being to discern
    whether a statutory cause of action exists—specifically, “whether a legislatively
    conferred cause of action encompasses a particular plaintiff’s claim.” 572 U.S. at
    127. Because the Constitution was not created by any act of Congress, it is hard to
    see how the zone of interests test would even apply. 25
    25
    Defendants argue that an equitable cause of action to enjoin a
    constitutional violation is, at its root, a creation of statute, and is therefore
    encompassed within Lexmark’s references to causes of action created by statute.
    Although Defendants are correct that Congress granted federal courts equity
    jurisdiction by statute, see Grupo Mexicano, 
    527 U.S. at 318
     (“The Judiciary Act
    of 1789 conferred on the federal courts jurisdiction over all suits . . . in equity.”
    (quotation marks omitted)); see also 
    28 U.S.C. § 1331
     (“The district courts shall
    have original jurisdiction of all civil actions arising under the Constitution, laws, or
    treaties of the United States.”), we think it a stretch to conclude that the traditional
    equitable cause of action to enjoin a constitutional violation was therefore created
    by statute. Indeed, the lower federal courts are created entirely by statute, see An
    Act to Establish the Judicial Courts of the United States §§ 2-6, 
    1 Stat. 73
     (1789),
    62
    Indeed, in its recent decision in Tennessee Wine & Spirits Retailers Ass’n v.
    Thomas, No. 18-96, 
    2019 WL 2605555
     (U.S. June 26, 2019), in which the
    plaintiffs alleged a violation of the dormant Commerce Clause, the Supreme Court
    did not even mention the zone of interests test. Given that the Court did apply a
    zone of interests test in Boston Stock Exchange v. State Tax Commission, 
    429 U.S. 318
     (1977), a pre-Lexmark dormant Commerce Clause case, Tennessee Wine
    supports the idea that Lexmark has changed the landscape. See 
    429 U.S. at
    602
    n.3.
    For all of these reasons, we doubt that any zone of interests test applies to
    Plaintiffs’ equitable cause of action.
    We recognize that the Supreme Court has consistently applied a zone of
    interests test to causes of action arising under the APA. When the Court has
    applied the zone of interests test in APA actions, however, it has analyzed the zone
    of interests of the statute the agency is alleged to have violated, not any zone of
    interests of the APA itself. In Match-E-Be-Nash-She-Wish Band of Pottawatomi
    Indians v. Patchak, 
    567 U.S. 209
     (2012), for example, the Court examined an APA
    action alleging that the government had exceeded its statutory authority to take title
    but this does not mean that all constitutional claims filed in a federal district court
    are really statutory claims. See, e.g., Bivens v. Six Unknown Named Agents of Fed.
    Bureau of Narcotics, 
    403 U.S. 388
    , 397 (1971) (recognizing “a cause of action
    under the Fourth Amendment” for damages).
    63
    to a piece of property “for the purpose of providing land for Indians.” Id. at 211
    (quoting the Indian Reorganization Act, 
    25 U.S.C. § 465
     (2012) (current version at
    
    25 U.S.C. § 5108
    )). It concluded that the plaintiff, who lived near land that had
    been acquired by the Secretary of the Interior for an Indian tribe seeking to open a
    casino, was “arguably within the zone of interests to be protected or regulated by”
    the Indian Reorganization Act, which “authorize[d] the acquisition of property ‘for
    the purpose of providing land for Indians.’” Id. at 211-12, 224-26 (first quoting
    Ass’n of Data Processing Serv. Orgs., 397 U.S. at 153, then quoting 
    25 U.S.C. § 465
     (2012) (current version at 
    25 U.S.C. § 5108
    )). In so doing, it departed from
    the reasoning of the district court, which had concluded that the plaintiff fell
    outside the Act’s zone of interests because he was “not an Indian, nor [did] he
    purport to seek to protect or vindicate the interests of any Indians or Indian tribes.”
    Patchak v. Salazar, 
    646 F. Supp. 2d 72
    , 77 (D.D.C. 2009). And in Air Courier
    Conference of America v. American Postal Workers Union, 
    498 U.S. 517
     (1991),
    the Court asked whether postal workers bringing a claim under the APA were
    within the zone of interests protected by the Private Express Statutes on which
    their claims depended. 26
    26
    In Bennett, the Court noted that because the zone of interests test “varies
    according to the provisions of law at issue, . . . what comes within the zone of
    interests of a statute for purposes of obtaining judicial review . . . under the
    ‘generous review provisions’ of the APA may not do so for other purposes.” 520
    64
    Here, rather than looking at a statute underlying an APA action to determine
    the relevant zone of interests, we would need to look at the Appropriations Clause.
    Because, as we have discussed, we are doubtful that any zone of interests test
    applies to claims seeking to enjoin a violation of the Appropriations Clause, we
    think it is possible that the present type of APA claim is distinct from typical APA
    claims and that there is no zone of interests requirement here. We need not decide
    that question, however, because we believe that, even if a zone of interests test
    applied here, it would be satisfied.
    2. Whether Any Zone of Interests Test Is Satisfied
    Defendants argue that Plaintiffs cannot satisfy the zone of interests test
    because their claims fall outside the zone of interests of section 8005. Although
    Plaintiffs’ Complaint did assert a claim under section 8005, it also asserted
    constitutional claims, including a claim for a violation of the Appropriations
    Clause. To the extent any zone of interests test applies to that constitutional claim
    (whether brought in equity or under the APA), it requires us to ask whether
    Plaintiffs fall within the zone of interests of the Appropriations Clause, not of
    section 8005. And when the Supreme Court has applied a zone of interests test to
    U.S. at 163 (quoting Clark v. Sec. Indus. Ass’n, 
    479 U.S. 388
    , 400 n.16 (1987)).
    We read this not to suggest that a particular zone of interests test applies to all
    APA actions, but that when analyzing whether a plaintiff falls within the zone of
    interests of a particular statute, courts should be particularly lenient if a violation of
    that statute is being asserted through an APA claim.
    65
    claims about structural provisions of the Constitution, it has applied a very lenient
    version of that test.
    For example, in Boston Stock Exchange, the Court held that plaintiff
    businesses that alleged financial injury from a state tax that discriminated against
    out-of-state businesses fell within the zone of interests of the implied dormant
    Commerce Clause, which functions as a limit on a state’s power relative to that of
    Congress to regulate interstate commerce. 
    429 U.S. at
    320 n.3. Although the suit
    was not brought by Congress seeking to protect its Commerce Clause authority, or
    even by another state alleging harm from the defendant state’s tax law, the Court
    held that the plaintiffs were permitted to assert that the state defendant had acted in
    a manner that infringed on Congress’s constitutional authority. 
    Id.
    More recently, in McIntosh, we allowed criminal defendants charged with
    marijuana-related offenses to seek an injunction prohibiting DOJ from spending
    funds in violation of the Appropriations Clause. 833 F.3d at 1168, 1172. We
    explained: “When Congress has . . . expressly prohibit[ed] DOJ from spending
    funds on certain actions, federal criminal defendants may seek to enjoin the
    expenditure of those funds, and we may exercise jurisdiction over a district court’s
    direct denial of a request for such injunctive relief.” Id. at 1172-73. To the extent
    we implicitly applied a zone of interests test to the criminal defendants, it was not a
    restrictive one—indeed, our primary concern was to confirm that the defendants
    66
    had standing to challenge the Appropriations Clause violation (and we concluded
    they did). Id. at 1173-74.
    Accordingly, if Plaintiffs must fall within a zone of interests served by the
    constitutional provision they seek to vindicate, we are persuaded that they do. The
    Appropriations Clause is a vital instrument of separation of powers, which has as
    its aim the protection of individual rights and liberties—not merely separation for
    separation’s sake. See supra section V.A. As Justice Kennedy put it in Clinton:
    [I]f a citizen who is taxed has the measure of the tax or the decision to
    spend determined by the Executive alone, without adequate control by
    the citizen’s Representatives in Congress, liberty is threatened. . . .
    The individual loses liberty in a real sense if that instrument is not
    subject to traditional constitutional constraints.
    
    524 U.S. at 451
     (Kennedy, J., concurring). Because “individuals, too, are
    protected by the operations of separation of powers and checks and balances,” it
    follows that “they are not disabled from relying on those principles in otherwise
    justiciable cases and controversies.” Bond v. United States, 
    564 U.S. 211
    , 223
    (2011).
    Plaintiffs assert that if Defendants’ allegedly unconstitutional spending
    proceeds, they will suffer injuries to their environmental, professional, aesthetic,
    and recreational interests. Those individual rights and interests resemble myriad
    interests that the Supreme Court has concluded—either explicitly or tacitly—fall
    within any applicable zone of interests encompassed by structural constitutional
    67
    principles like separation of powers. See, e.g., Chadha, 
    462 U.S. at 935-36, 951-52
     (allowing a plaintiff with an interest in avoiding deportation to bring a
    constitutional claim based on bicameralism and presentment requirements); Bos.
    Stock Exch., 
    429 U.S. at
    602 n.3 (allowing a plaintiff stock exchange with an
    interest in avoiding a state tax to bring a claim enforcing Congress’s dominion over
    the regulation of interstate commerce). Plaintiffs’ claim that their rights or liberties
    were infringed by a violation of the Appropriations Clause therefore falls within
    any zone of interests required to enforce that clause’s provisions.
    VI.    The Remaining Stay Factors
    Our focus to this point has been on the first of the four factors to be
    considered in deciding a motion to stay, “whether the stay applicant has made a
    strong showing that he is likely to succeed on the merits.” Nken v. Holder, 
    556 U.S. 418
    , 434 (2009). The second factor, “whether the applicant will be
    irreparably injured absent a stay,” was identified in Nken together with the first
    factor as “the most critical.” 
    Id.
    The Supreme Court observed in Nken that the third and fourth factors—
    whether issuance of a stay will substantially injure other parties and where the
    public interest lies—“merge when the Government is the opposing party.” 
    Id. at 435
    . That case involved an application for a stay of removal by a noncitizen who
    was facing deportation. The motion before us presents a variant on that situation.
    68
    Here, it is Defendants who seek a stay, so the question whether Defendants will be
    irreparably injured absent a stay may, in practical terms, merge with consideration
    of the public interest.
    Public interest is a concept to be considered broadly. The Court noted in
    Nken, for example, that there is a public interest in “preventing aliens from being
    wrongfully removed,” but also that there is “always a public interest in prompt
    execution of removal orders.” 
    Id. at 436
    .
    Defendants have discussed these three remaining factors together in terms of
    the “equitable balance of harms.” There is logic in that, so we will do the same,
    considering the respective impacts on Defendants, Plaintiffs and others interested
    in the proceedings, and the general public.
    The primary harm cited by Defendants if a stay is not granted is that a “delay
    in the construction of border fencing pending appeal will create irreparable harm”
    because “deadly drugs [will] flow into this country in the interim.” They argue
    that CBP has recorded over 4,000 “drug-related events” between border crossings
    in the El Paso, El Centro, Tucson, and Yuma Sectors in Fiscal Year 2018 and cites
    CBP’s seizure of thousands of pounds of marijuana and lesser amounts of other
    illegal substances, including cocaine, heroin, methamphetamine, and fentanyl.
    We do not question in the slightest the scourge that is illegal drug trafficking
    and the public interest in combatting it. Our circuit includes several border states,
    69
    and our courts deal with no small number of cases involving illegal drugs crossing
    those states’ borders.
    Defendants have not actually spoken to the more relevant questions,
    however. What will be the impact of building the barriers they propose? Even
    more to the point, what would be the impact of delaying the construction of those
    barriers? If these specific leaks are plugged, will the drugs flow through
    somewhere else? We do not know, but the evidence before us does not support a
    conclusion that enjoining the construction of the proposed barriers until this appeal
    is fully resolved will have a significant impact.
    To begin with, the statistics cited by Defendants describe drug trafficking
    that CBP has detected with existing barriers and law enforcement efforts. They do
    not tell us how much gets through undetected or what additional amounts would be
    stopped by the proposed barriers.
    As Plaintiffs point out, according to the Drug Enforcement Administration’s
    most recent assessment, the “majority of the [heroin] flow is through [privately
    operated vehicles] entering the United States at legal ports of entry, followed by
    tractor-trailers, where the heroin is co-mingled with legal goods.” Drug
    Enforcement Admin., 2018 National Drug Threat Assessment 19 (2018),
    https://www.dea.gov/sites/default/files/2018-11/DIR-032-
    18%202018%20NDTA%20final%20low%20resolution.pdf. Only “a small
    70
    percentage of all heroin seized by [CBP] along the land border was between Ports
    of Entry.” 
    Id.
     Fentanyl transiting the southern border is likewise most commonly
    smuggled in “multi-kilogram loads” in vehicles crossing at legal ports of entry. Id.
    at 33. Defendants have not disputed these assessments.
    That does not lead to a conclusion that leaks should not be plugged. It does
    suggest, however, that Defendants’ claim that failing to stay the injunction pending
    appeal will cause significant irreparable harm is supported by much less than meets
    the eye. Congress could have appropriated funds to construct these barriers if it
    concluded that the expenditure was in the public interest, but it did not.
    For similar reasons, we are unmoved by Defendants’ contention that “the
    injunction threatens to permanently deprive DoD of its authorization to use the
    funds at issue to complete” the selected projects, including “approximately $1.1
    billion it has transferred for these projects but has not yet obligated via
    construction contracts,” because “the funding will likely lapse during the appeal’s
    pendency.” A lapse in funding does not mean that the money will disappear from
    the Treasury. The country will still have that money. It could be spent in the
    future, including through appropriations enacted by Congress for the next fiscal
    year. The lapse simply means that Defendants’ effort to justify spending those
    funds based on the appropriations act for the current fiscal year and the authority to
    reprogram funds under section 8005 may be thwarted.
    71
    Defendants’ identification of this lapse as a factor that should tip the balance
    of harms in their favor actually serves instead to illustrate the underlying weakness
    in their position. Defendants’ rush to spend this money is necessarily driven by
    their understanding that Congress did not appropriate requested funding for these
    purposes in the current budget and their expectation that Congress will not
    authorize that spending in the next fiscal year, either. The effort by Defendants to
    spend this money is not consistent with Congress’s power over the purse or with
    the tacit assessment by Congress that the spending would not be in the public
    interest.
    Finally, Defendants maintain that a stay is necessary because DoD “is
    incurring unrecoverable fees and penalties of hundreds of thousands of dollars to
    its contractors for each day that construction is suspended.” But that liability
    resulted from Defendants’ own decisions about how to proceed in the face of
    litigation. Plaintiffs filed their motion for a preliminary injunction on April 4,
    2019, and a hearing was held on May 17. When DoD awarded contracts on April
    9 for El Paso Project Sector 1, and May 15 for Yuma Project Sector 1 and Tucson
    Project Sectors 1-3, DoD knew this litigation was pending and that the district
    court had been asked to enter a preliminary injunction. Placing significant weight
    on financial obligations that Defendants knowingly undertook would, in effect,
    reward them for self-inflicted wounds.
    72
    Moving to the impacts on the Plaintiffs, Defendants denigrate those impacts
    as limited to “aesthetic and recreational injuries.” As noted above, see supra
    Section II, Defendants have elected not to dispute that Plaintiffs’ interests are
    sufficiently substantial to support Article III standing. Environmental injuries have
    been held sufficient in many cases to support injunctions blocking substantial
    government projects. The Supreme Court has observed that “[e]nvironmental
    injury, by its nature, can seldom be adequately remedied by money damages and is
    often permanent or at least of long duration, i.e., irreparable. If such injury is
    sufficiently likely, therefore, the balance of harms will usually favor the issuance
    of an injunction to protect the environment.” Amoco Prod. Co. v. Village of
    Gambell, 
    480 U.S. 531
    , 545 (1987).
    As to the public interest, we conclude that the public interest weighs
    forcefully against issuing a stay. The Constitution assigns to Congress the power
    of the purse. Under the Appropriations Clause, it is Congress that is to make
    decisions regarding how to spend taxpayer dollars. As we have explained, see
    supra Section V.C.2., the Appropriations Clause serves as a check by requiring
    that “not a dollar of [money in the Treasury] can be used in the payment of any
    thing not thus previously sanctioned” by Congress,” as “[a]ny other course would
    give to the fiscal officers a most dangerous discretion.” Reeside v. Walker, 
    52 U.S. 73
    272, 291 (1850). In the words of then-Judge Kavanaugh, the Appropriations
    Clause is
    a bulwark of the Constitution’s separation of powers
    among the three branches of the National Government. It
    is particularly important as a restraint on Executive
    Branch officers: If not for the Appropriations Clause, the
    executive would possess an unbounded power over the
    public purse of the nation; and might apply all its monied
    resources at his pleasure.
    U.S. Dep’t of Navy v. Fed. Labor Relations Auth., 
    665 F.3d 1339
    , 1347 (D.C. Cir.
    2012) (Kavanaugh, J.) (quotation marks omitted). The Clause prevents the
    Executive Branch from “even inadvertently obligating the Government to pay
    money without statutory authority.” 
    Id.
     The public interest in ensuring protection
    of this separation of powers is foundational and requires little elaboration. See
    supra Section V.A.
    Similarly, when Congress chooses how to address a problem, “[i]t is quite
    impossible . . . to find secreted in the interstices of legislation the very grant of
    power which Congress consciously withheld,” as doing so is “not merely to
    disregard in a particular instance the clear will of Congress,” but “to disrespect the
    whole legislative process and the constitutional division of authority between
    President and Congress.” Youngstown, 
    343 U.S. at 609
     (1952) (Frankfurter, J.,
    concurring). Congress did not appropriate money to build the border barriers
    Defendants seek to build here. Congress presumably decided such construction at
    74
    this time was not in the public interest. See id.; supra Section V.A.1.ii. It is not
    for us to reach a different conclusion.
    The public interest and the balance of hardships do not support granting the
    motion to stay.
    VII. Conclusion
    In his concurrence in Youngstown, Justice Jackson made eloquent comments
    that seem equally apt today:
    The essence of our free Government is “leave to live by no man’s
    leave, underneath the law”—to be governed by those impersonal forces
    which we call law. Our Government is fashioned to fulfill this concept so
    far as humanly possible. The Executive, except for recommendation and
    veto, has no legislative power. The executive action we have here originates
    in the individual will of the President and represents an exercise of authority
    without law. . . . With all its defects, delays and inconveniences, men have
    discovered no technique for long preserving free government except that the
    Executive be under the law, and that the law be made by parliamentary
    deliberations.
    Such institutions may be destined to pass away. But it is the duty of
    the Court to be last, not first, to give them up.
    
    343 U.S. at 654-55
     (Jackson, J., concurring).
    Heeding Justice Jackson’s words, we deny Defendants’ motion for a stay.
    75
    FILED
    Sierra Club v. Trump, Case Nos. 19-16102, 19-16300
    JUL 03 2019
    N.R. SMITH, Circuit Judge, dissenting:                                     MOLLY C. DWYER, CLERK
    U.S. COURT OF APPEALS
    The majority here takes an uncharted and risky approach—turning every
    question of whether an executive officer exceeded a statutory grant of power into a
    constitutional issue. This approach is in contradiction to the most fundamental
    concepts of judicial review. The majority has created a constitutional issue where
    none previously existed. See Dalton v. Specter, 
    511 U.S. 462
    , 472–74 (1994). We
    have no right to expand the Judiciary’s role in this manner and, as explained in
    greater detail below, the majority’s approach has been expressly rejected by the
    Supreme Court.
    Turning to the merits of the case before us, we are asked solely whether we
    should stay a permanent injunction prohibiting Defendants from transferring
    certain funds within the budget of the Department of Defense (DoD) to support
    counterdrug activities, while the parties await a final ruling on the merits of the
    permanent injunction order. We are not, as the majority claims, “evaluat[ing] the
    merits more fully that we otherwise might.” Maj. Op. at 31. In fact, the parties have
    expressly informed the court that they will be presenting an expedited briefing
    schedule for the merits panel by July 8, 2019, Dkt. No. 65 at 4—four days after the
    parties anticipate a decision from the current panel.1 Because Defendants have
    satisfied their burden to obtain the requested relief when Plaintiffs’ claim is
    properly cast as a statutory issue, the majority should grant Defendants’ motion to
    stay the permanent injunction until the matter is finally determined on appeal.
    In deciding whether to stay an injunction pending appeal, we must consider:
    “(1) whether the stay applicant has made a strong showing that [it] is likely to
    succeed on the merits; (2) whether the applicant will be irreparably injured absent a
    stay; (3) whether issuance of the stay will substantially injure the other parties
    interested in the proceeding; and (4) where the public interest lies,” Nken, 
    556 U.S. at 434
     (citation omitted). “[H]arm to the opposing party and weighing the public
    interest . . . merge when the Government” is one of the parties. 
    Id. at 435
    . Although
    “[t]he first two factors . . . are the most critical,” 
    id. at 434
    , we must “give serious
    consideration to the public interest factor,” Nat. Res. Def. Council, Inc. v. Winter,
    1
    The majority ignores this declaration. Maj. Op. at 31. The parties have
    asked us to expedite our decision, but they have not asked us to make a merits
    decision in contravention of traditional procedure. Nken v. Holder, 
    556 U.S. 418
    ,
    427 (2009) (recognizing that the “ordinary processes of administration and judicial
    review” best ensure “careful review and a meaningful decision” (citation omitted)).
    Whether an issue may become moot during the course of an appeal does not
    change the scope of our review for a motion to stay. Even though the parties rely
    on their previous briefs for purposes of this motion, they do not suggest that they
    do not have additional arguments for the merits of appeal. We should not be
    deciding the merits of these issues (potentially binding the merits panel).
    2
    
    502 F.3d 859
    , 863 (9th Cir. 2007). In any event, the decision to grant or deny a
    stay is discretionary. Nken, 
    556 U.S. at
    433–34. Here, each factor favors issuing a
    stay.2
    I.       Defendants are Likely to Succeed on the Merits
    The district court granted a permanent injunction in Plaintiffs’ favor based
    on a purported statutory claim under the DoD Appropriations Act for Fiscal Year
    2019, Pub. L. No. 115-245, §§ 8005, 9002, 
    132 Stat. 2981
    , 2999. See Permanent
    Injunction Order at 3–4, 6–8. The district court analyzed only whether Defendants
    exceeded their statutory authority under § 8005, without discussing whether they
    also separately violated any constitutional provision. See generally id.
    2
    Whether Defendants are likely to succeed on the merits of this appeal
    ultimately turns on whether the district court abused its discretion in issuing the
    permanent injunction. See La Quinta Worldwide LLC v. Q.R.T.M., S.A. de C.V.,
    
    762 F.3d 867
    , 879 (9th Cir. 2014). Thus, even though this is only a motion to stay,
    we review the district court’s grant of a permanent injunction for abuse of
    discretion, and we review its legal conclusions de novo. Aircraft Serv. Int’l, Inc. v.
    Int’l Bhd. of Teamsters, 
    779 F.3d 1069
    , 1072 (9th Cir. 2015) (en banc). “It is an
    abuse of discretion to apply the wrong legal standard.” United States v. Emmett,
    
    749 F.3d 817
    , 819 (9th Cir. 2014). As explained in greater detail below, the district
    court abused its discretion here by failing to analyze Plaintiffs’ claim under the
    Administrative Procedure Act. See, e.g., Permanent Injunction Order at 4 (“[T]he
    Court continues to find that the [zone of interests] test has no application in an
    ultra vires challenge, which operates outside of the APA framework.”). The
    majority does not defend the district court’s decision, but rules in Plaintiffs’ favor
    under a completely different—yet equally faulty—legal theory.
    3
    Nevertheless, the majority views Plaintiffs’ claim as, “at its core, one alleging a
    constitutional violation.” Maj. Op. at 32. As discussed below, viewing Plaintiffs’
    claim as alleging a statutory violation is the proper approach. Dalton, 
    511 U.S. at
    472–74.
    When their claim is properly viewed as alleging a statutory violation,
    Plaintiffs have no mechanism to challenge Defendants’ actions. Plaintiffs have
    neither an implied statutory cause of action under § 8005, nor an equitable cause of
    action. See generally Dalton, 
    511 U.S. at
    472–76. Nor do Plaintiffs have a cause of
    action to challenge the DoD’s § 8005 reprogramming under the Administrative
    Procedure Act (APA), as they fall outside of the zone of interests for such a claim.
    Consequently, Defendants have made a strong showing that they are likely to
    succeed on the merits of their appeal.
    1. Plaintiffs Claim Is Properly Viewed as Alleging a Statutory Violation
    Because we are allowed to affirm the permanent injunction “on any ground
    supported by the record,” Sony Comput. Entm’t, Inc. v. Connectix Corp., 
    203 F.3d 596
    , 608 (9th Cir. 2000) (citation omitted), the majority denies Defendants’ motion
    for a stay by re-characterizing Plaintiffs’ claim as a constitutional
    violation—despite the contrary ground relied on by the district court in its
    4
    decision3—which the majority now analyzes on the fly.
    The majority’s primary mistake is drawing no distinction between a claim
    that an agency is violating a statute and a claim that an agency is violating the
    Constitution:
    If section 8005 does not authorize the reallocation, however, then
    Defendants are acting outside of any statutory appropriation and are
    therefore spending funds contrary to Congress’s appropriations
    decisions. . . . The lack of compliance with section 8005 has sometimes
    been labeled ultra vires as outside statutory authority or as outside the
    President’s Article II powers, and spending without an appropriation has
    been described as a violation of the Appropriations Clause. However
    their claim is labeled, Plaintiffs’ theory is ultimately the same.
    Maj. Op. at 34 & n.16. This approach is flatly contradicted by Dalton and related
    cases, which clarified the distinction between “claims of constitutional violations
    and claims that an official has acted in excess of his statutory authority” and
    declared that “[o]ur cases do not support the proposition that every action by the
    President, or by another executive official, in excess of his statutory authority is
    3
    The district court construed Plaintiffs’ claim as an ultra vires action to
    enforce § 8005. Permanent Injunction Order at 4. It determined that principles of
    constitutional avoidance required it to first analyze whether § 8005 supported the
    reprogramming, and reach the constitutional analysis only if necessary. Sierra
    Club v. Trump, No. 19-CV-00892-HSG, 
    2019 WL 2247689
    , *18 (N.D. Cal. March
    24, 2019); Permanent Injunction Order at 5 (“[N]o new factual or legal arguments
    persuade the Court that its analysis in the preliminary injunction order was
    wrong.”). Thus, the court never conducted a constitutional analysis of this
    question.
    5
    ipso facto in violation of the Constitution.” Dalton, 
    511 U.S. at 472
    .
    Indeed, recasting Plaintiffs’ challenge—fundamentally a dispute about
    whether the DoD erred in deciding that the pre-conditions of § 8005 were met—as
    a constitutional claim against the DoD for violating the Appropriations Clause
    contradicts several lines of caselaw.
    First, Dalton clarifies that cases such as Youngstown Sheet & Tube Co. v.
    Sawyer, 
    343 U.S. 579
     (1952) involve constitutional violations, because “[t]he only
    basis of authority asserted was the [executive’s] inherent constitutional power.”
    Dalton, 
    511 U.S. at 473
    . In those instances, “the case necessarily turned on
    whether the Constitution authorized the [executive’s] actions,” only “[b]ecause no
    statutory authority was claimed.” 
    Id.
     (emphasis added).
    This is not that type of case. As noted by the majority, Plaintiffs’ claim
    entirely rises or falls on whether the DoD complied with the limitations in § 8005.
    Maj. Op. at 34 (“If Defendants were correct that section 8005 allowed this
    spending reallocation, Plaintiffs’ claim would fail, because the spending would be
    consistent with Congress’s appropriation legislation. If section 8005 does not
    authorize the reallocation, however, then Defendants are acting outside of any
    statutory appropriation and are therefore spending funds contrary to Congress’s
    appropriations decisions.”). The DoD offers no other source of authority besides a
    6
    statute. Accordingly, this case “concern[s] only issues of statutory interpretation”
    and “no constitutional question whatever is raised.” Dalton, 
    511 U.S. at
    474 n.6
    (emphasis added) (citation and internal quotation marks omitted).
    Second, applying Dalton to the Appropriations Clause context requires us to
    reject the majority’s logic, which relies on the assumption that every violation of
    an appropriations statute is necessarily a constitutional violation. In Dalton,
    Congress granted the President discretion to take certain actions, and the plaintiffs
    asserted that he had exceeded that authority. 
    Id. at 474
    . The plaintiffs further
    claimed that, because the President had exceeded his statutory authority, he had
    also violated the Constitution. 
    Id.
     That is precisely the majority’s approach in this
    case. See Maj. Op. at 51 (“Plaintiffs claim that to the extent Defendants did not
    have statutory authority to reprogram the funds, they acted in violation of
    constitutional separation of powers principles because Defendants lack any
    background constitutional authority to appropriate funds.”). The Supreme Court
    rejected this type of constitutional claim, flatly reminding us that “[t]he distinction
    between claims that an official exceeded his statutory authority, on the one hand,
    and claims that he acted in violation of the Constitution, on the other, is too well
    established to permit this sort of evisceration.” Dalton, 
    511 U.S. at 474
    .
    Finally, the distinction between an Appropriations Clause violation and a
    7
    non-constitutional “exceeding statutory authority” claim turns on the degree of
    discretion Congress has provided to the agency or President in appropriating funds.
    On the one hand, if Congress has entirely withdrawn agency discretion over the
    who, what, when, where, and why of agency spending, an Appropriations Clause
    violation may lie. See, e.g., United States v. McIntosh, 
    833 F.3d 1163
    , 1172, 1175
    (9th Cir. 2016). On the other hand, if Congress has merely appropriated a lump-
    sum amount and leaves it to the agency to re-allocate funds toward a particular
    statutory purpose, Congress has provided such discretion to the agency that, not
    only could there be no constitutional violation, a challenger does not even have a
    viable “exceeding statutory authority” claim.4 See Lincoln v. Vigil, 
    508 U.S. 182
    ,
    193 (1993). Section 8005, which appropriates funds to the DoD and makes
    allocating those funds incumbent on the Secretary’s determination of the “national
    interest” and other factors, falls somewhere in the middle. Unlike the
    appropriations language in McIntosh, which we observed “specifically restricts [the
    Department of Justice (DOJ)] from spending money to pursue certain activities,”
    833 F.3d at 1172 (emphasis added), or the non-discretionary “not to exceed” and
    “shall be allotted” language in Train v. City of New York, 
    420 U.S. 35
    , 42 (1975),
    4
    The statutory claims in Dalton ultimately failed on this basis. See Dalton,
    
    511 U.S. at
    474–76.
    8
    § 8005 provides some discretion over the who, what, when, where, and why of
    agency spending. Yet, unlike the virtually unfettered discretion of the agency to re-
    allocate funds towards particular statutory purposes in Lincoln, 
    508 U.S. at
    192–93, § 8005 constrains the discretion and the DoD is “not free simply to
    disregard statutory responsibilities.” Id. at 193 (emphasis added). Accordingly, the
    DoD’s reprogramming of funds is a judicially reviewable statutory claim. The
    majority overlooks these points.
    In attempting to distinguish Dalton, the majority misstates the chronology of
    the Supreme Court’s decision, claiming that “[t]he Supreme Court held that the
    plaintiff’s statutory challenge to the President’s decision failed because the statute
    gave the President unfettered discretion . . . [and] then also rejected the argument
    that because the President had allegedly violated the statute, he had acted
    unconstitutionally.” Maj. Op. at 49. However, the Supreme Court declared first that
    there was no constitutional issue, Dalton, 
    511 U.S. at
    472–74, and only thereafter
    determined that the plaintiffs’ statutory claim failed based on the President’s
    unfettered discretion, 
    id.
     at 474–76. Consequently, the Court’s conclusion that “no
    constitutional question whatever is raised” did not stem from its later conclusion
    that the President had, in fact, acted within his statutory authority in that case. 
    Id.
     at
    474 n.6; see also 
    id.
     at 476–77 (“In sum . . . [t]he claim that the President exceeded
    9
    his authority under the 1990 Act is not a constitutional claim, but a statutory one.
    Where a statute, such as the 1990 Act, commits decisionmaking to the discretion of
    the President, judicial review of the President’s decision is not available.”
    (emphasis added)).
    The majority also attempts to distinguish Dalton on the grounds that it “did
    not say . . . that action in excess of statutory authority can never violate the
    Constitution or give rise to a constitutional claim.” Maj. Op. at 49. Albeit true that
    claims alleging statutory violations and those alleging constitutional violations are
    not mutually exclusive, Dalton expressly discussed when the two may be asserted
    together—by pointing to cases where the constitutionality of the authorizing statute
    itself is called into question. Dalton, 
    511 U.S. at
    473 n.5; see, e.g., Chamber of
    Commerce of United States v. Reich, 
    74 F.3d 1322
    , 1325 (D.C. Cir. 1996)
    (determining that a claim raised a constitutional violation, because it alleged that
    the relevant statutory authority itself was “an unconstitutional delegation” of
    Congressional power). But Plaintiffs have not alleged that § 8005 is itself
    unconstitutional.
    The majority’s approach would turn our current system of administrative
    review on its head, directing courts in this circuit to deem unconstitutional any
    reviewable executive actions (i.e., any actions that are not entirely within the
    10
    actor’s discretion) that exceed a statutory grant of authority. Such an approach
    directly contradicts the Supreme Court’s declaration that “[o]ur cases do not
    support the proposition that every action by the President, or by another executive
    official, in excess of his statutory authority is ipso facto in violation of the
    Constitution.”5 Dalton, 
    511 U.S. at 472
    . For those reasons, the majority’s approach
    is flawed; no claim of a constitutional violation exists in this case.
    2. Plaintiffs have no Implied Statutory Claim
    Whether Plaintiffs have an implied statutory cause of action under § 8005
    turns on “whether Congress intended to create a private cause of action.”
    Karahalios v. Nat’l Fed’n of Fed. Emps., Local 1263, 
    489 U.S. 527
    , 532 (1989)
    (citation and internal quotation marks omitted).
    Here, “[t]here is no express suggestion” that Congress intended a direct
    judicial remedy for a § 8005 violation, and “neither the language nor the structure
    of the Act shows any congressional intent to provide a private cause of action to”
    judicially enforce such a violation. Id. at 532–33. Likewise, “[n]othing in the
    5
    The majority’s approach is also directly contradicted by the D.C. Circuit. In
    Mountain States Legal Foundation v. Bush, our sister circuit determined that “[n]o
    constitutional . . . claim is before us, as the President exercised his delegated
    powers under the Antiquities Act,” precisely because “that statute includes
    intelligible principles to guide the President’s actions.” 
    306 F.3d 1132
    , 1137 (D.C.
    Cir. 2002) (emphasis added).
    11
    legislative history of [§ 8005] has been called to our attention indicating that
    Congress contemplated direct judicial enforcement.” Id. at 533.
    Furthermore, § 8005 is directed not at private parties or individuals, but at
    the Secretary of Defense; creates no apparent individual rights, much less an
    individual remedy; and “lacks the sort of rights-creating language needed to imply
    a private right of action.” Armstrong v. Exceptional Child Ctr., Inc., 
    135 S. Ct. 1378
    , 1387 (2015).
    3. Plaintiffs have no APA Claim
    With Dalton limiting our ability to construe Plaintiffs’ claim as alleging a
    constitutional violation, and with no implied statutory cause of action to challenge
    the agency’s action as a violation of § 8005, Plaintiffs are left with challenging the
    DoD’s reprogramming under the APA as an “abuse of discretion,” “not in
    accordance with law,” or “in excess of statutory jurisdiction.” See 
    5 U.S.C. § 706
    (2)(A), (C). See Clouser v. Espy, 
    42 F.3d 1522
    , 1527 n.5 (9th Cir. 1994)
    (construing a plaintiff’s challenge to Forest Service rulings “as issued without
    statutory authority” to be “a claim challenging agency action ‘in excess of statutory
    jurisdiction, authority, or limitations, or short of statutory right’ under 
    5 U.S.C. § 706
    (2)(C)”). However, although the APA is the proper vehicle for challenging
    the DoD’s § 8005 reprogramming, Plaintiffs are not a proper party to bring such a
    12
    claim, as they fall outside § 8005’s zone of interests. The majority errs by
    fashioning an equitable claim to bypass the APA’s limitations.
    a. The APA is the Proper Vehicle for Challenging the DoD’s
    Action
    Where a statute imposes obligations on a federal agency but “does not give
    rise to a ‘private’ right of action against the federal government[,] [a]n aggrieved
    party may pursue its remedy under the APA.” San Carlos Apache Tribe v. United
    States, 
    417 F.3d 1091
    , 1096–99 (9th Cir. 2005) (explaining how a federal action is
    nearly always reviewable under the APA for conformity with statutory obligations
    even absent a “private right of action”). In other words, the APA opens the door for
    judicial review provided: (1) the agency’s action is “final,” 
    5 U.S.C. § 704
    ; (2) the
    statute imposing obligations on the federal agency does not “preclude judicial
    review,” 
    id.
     § 701(a)(1); and (3) the agency action is not “committed to agency
    discretion by law,” id. § 701(a)(2). See Weyerhaeuser Co. v. U.S. Fish & Wildlife
    Serv., 
    139 S. Ct. 361
    , 370 (2018). Each element is satisfied here.
    First, the agency’s action satisfies the test for “final agency action” for
    purposes of 
    5 U.S.C. § 704
    . The finality of an agency’s action turns on whether the
    decision represents the “consummation of the agency’s decisionmaking process”
    and whether it determines rights or obligations, or from which “legal consequences
    will flow.” Bennett v. Spear, 
    520 U.S. 154
    , 177–78 (1997) (citation omitted). After
    13
    approving the Department of Homeland Security’s (DHS) request for support
    under 
    10 U.S.C. § 284
    , the Secretary of Defense concluded support could be
    funded through the reprogramming of funds under § 8005. The Secretary found the
    § 8005 criteria were met. Following the necessary procedures, the DoD transferred
    the funds to the Drug Interdiction and Counter-Drug Activities, Defense,
    appropriation account. Because the DoD committed those funds for § 284(b)(7)
    support, “legal consequences [began to] flow.” See Bennett, 
    520 U.S. at 178
    (citation omitted). Indeed, Defendants acknowledge that the § 8005 transfer was
    necessary for authorizing support under § 284 and constructing the wall.
    Second, as explained above, § 8005 does not “preclude judicial review.” See
    
    5 U.S.C. § 701
    (a)(1). Further, neither party presented “clear and convincing
    evidence” that § 8005 precludes APA’s default remedy. See Abbott Labs. v.
    Gardner, 
    387 U.S. 136
    , 140–41 (1967), abrogated on other grounds by Califano v.
    Sanders, 
    430 U.S. 99
     (1977).
    Finally, the DoD’s reprogramming of funds under § 8005 is not “committed
    to agency discretion by law.” 
    5 U.S.C. § 701
    (a)(2). Defendants do not argue to the
    contrary, nor would such an argument succeed. The APA embodies a broad
    presumption of judicial review of agency action. Abbott Labs., 
    387 U.S. at
    140–41.
    Out of concern that “legal lapses and violations occur, and especially so when they
    14
    have no consequence,” Weyerhaeuser Co., 
    139 S. Ct. at 370
     (quoting Mach
    Mining, LLC v. EEOC, 
    135 S. Ct. 1645
    , 1652–53 (2015)), the Supreme Court
    “read[s] the [phrase ‘committed to agency discretion’] quite narrowly, restricting it
    to ‘those rare circumstances where the relevant statute is drawn so that a court
    would have no meaningful standard against which to judge the agency’s exercise
    of discretion.’” 
    Id.
     (quoting Lincoln, 
    508 U.S. at 191
    ).
    The appropriation scheme governing § 8005 allows the DoD to reprogram
    funds provided the transferred funds address “higher priority items, based on
    unforeseen military requirements, than those for which originally appropriated.”6
    § 8005. And “in no case” may the Secretary use the funds “where the item for
    which reprogramming is requested has been denied by the Congress.” Id. Thus, we
    do not confront one of those rare circumstances where a court would have no
    meaningful standard for judging the agency’s exercise of discretion. See
    Weyerhaeuser, 
    139 S. Ct. at
    371–72 (citing Lincoln, 
    508 U.S. at 191
    ); accord
    Citizens to Pres. Overton Park, Inc. v. Volpe, 
    401 U.S. 402
    , 413 (1971), abrogated
    on other grounds by Califano v. Sanders, 
    430 U.S. 99
     (1977). For example,
    whether the “item” to be funded by the reprogrammed funds was “denied” by
    Congress turns on a meaningful question of statutory interpretation—i.e., what
    6
    Section 9002 is subject to these same limitations.
    15
    does “item” and “denied” mean?7 This court is generally required to provide some
    deference to such an interpretation, depending on the circumstance, see Chevron,
    U.S.A., Inc. v. Nat. Res. Def. Council, Inc., 
    467 U.S. 837
     (1984); Skidmore v. Swift
    & Co., 
    323 U.S. 134
     (1944),8 but the phrase undoubtedly places a judicially
    reviewable constraint on the DoD’s actions.
    b. Plaintiffs are Not the Proper Party to Bring an APA Claim
    However, to bring a valid APA claim, Plaintiffs must establish that they “fall
    within the zone of interests protected by the law invoked.” Lexmark Int’l, Inc. v.
    Static Control Components, Inc., 
    572 U.S. 118
    , 129 (2014) (citation omitted). They
    have failed to do so.9
    7
    Unlike in Lincoln, the appropriation scheme governing Plaintiffs’ claims
    does not involve a lump-sum appropriation designed with merely a general,
    overarching goal and no specific strings attached to the money. 
    508 U.S. at
    189–92.
    8
    In determining whether Defendants violated § 8005, we should defer to the
    DoD’s interpretation under Skidmore. See Alaska Dep’t of Envtl. Conservation v.
    EPA, 
    540 U.S. 461
    , 487 (2004). Skidmore deference operates like a sliding scale,
    meaning the degree of deference we give the agency’s interpretation of a statute
    “depend[s] upon the thoroughness evident in its consideration, the validity of its
    reasoning, its consistency with earlier and later pronouncements, and all those
    factors which give it power to persuade, if lacking power to control.” Skidmore,
    
    323 U.S. at 140
    . We also consider whether the agency has changed its position or
    whether its interpretation “was framed for the specific purpose of aiding a party in
    this litigation.” Fed. Express Corp. v. Holowecki, 
    552 U.S. 389
    , 400 (2008).
    9
    Because the majority concludes Plaintiffs’ APA claim is constitutional, we
    (continued...)
    16
    The zone of interests test requires a court to determine whether, “in view of
    Congress’ evident intent to make agency action presumptively reviewable, a
    particular plaintiff should be heard to complain of a particular agency decision.”
    Clarke v. Sec. Indus. Ass’n, 
    479 U.S. 388
    , 399 (1987). “[T]he relevant zone of
    interests is not that of the APA itself, but rather the zone of interests to be protected
    or regulated by the statute that the plaintiff says was violated.” E. Bay Sanctuary
    Covenant v. Trump, 
    909 F.3d 1219
    , 1244 (9th Cir. 2018) (alteration omitted)
    (quoting Match-E-Be-Nash-She-Wish Band of Pottawatomi Indians v. Patchak,
    
    567 U.S. 209
    , 224 (2012)). “[W]e first discern the interests arguably to be
    protected by the statutory provision at issue; we then inquire whether the plaintiff’s
    interests affected by the agency action in question are among them.” Nat’l Credit
    Union Admin. v. First Nat’l Bank & Tr. Co., 
    522 U.S. 479
    , 492 (1998) (alteration
    and internal quotation marks omitted).
    Although, “in the APA context, . . . the test is not ‘especially demanding,’”
    Lexmark, 572 U.S. at 130, it “is not toothless,” Nw. Requirements Utils. v. FERC,
    9
    (...continued)
    disagree as to what zone of interests applies. However, as a statutory claim,
    Plaintiffs must fall within the zone of interests of § 8005. They have failed to do
    so. Because this claim should not be viewed as a constitutional claim under the
    Appropriations Clause, it is not necessary to decide whether Plaintiffs could (or
    would need to) fall within that zone of interests.
    17
    
    798 F.3d 796
    , 808 (9th Cir. 2015). “In cases where the plaintiff is not itself the
    subject of the contested regulatory action, the test denies a right of review if the
    plaintiff’s interests are so marginally related to or inconsistent with the purposes
    implicit in the statute that it cannot reasonably be assumed that Congress intended
    to permit the suit.” Clarke, 
    479 U.S. at 399
    . Even under this generous standard, we
    have found certain APA claims fail the zone of interests test.10 See, e.g., Ashley
    Creek Phosphate Co. v. Norton, 
    420 F.3d 934
    , 940 (9th Cir. 2005) (“[P]urely
    economic interests do not fall within [the National Environmental Policy Act’s
    (NEPA)] zone of interests” because “the zone of interests that NEPA protects [is]
    environmental.”); Havasupai Tribe v. Provencio, 
    906 F.3d 1155
    , 1166–67 (9th Cir.
    2018) (recognizing that the plaintiff’s environmental interests fell outside the
    Mining Act’s zone of interests, but within the Federal Land Policy and
    Management Act’s zone of interests); Nw. Requirements Utils., 798 F.3d at 809
    (determining zone of interests test not satisfied where the plaintiffs’ goals were
    likely to frustrate rather than further statutory objectives).
    10
    Plaintiffs cite the D.C. Circuit’s decision in Scheduled Airlines Traffic
    Offices, Inc. v. Department of Defense, 
    87 F.3d 1356
     (D.C. Cir. 1996) as
    “illustrat[ing] the expansive zone of interests for claims arising under statutes
    protecting Congress’s control over appropriations decisions.” However, that case
    merely applied the same zone of interests test that we do here to determine that the
    plaintiff’s economic interests were “sufficiently congruent” with the statute and fell
    within the zone of interests. 
    Id. at 1360
    .
    18
    Here, Plaintiffs’ interests fall outside § 8005’s zone of interests. Section
    8005 operates only to authorize the Secretary of Defense to transfer previously-
    appropriated funds between DoD accounts, based upon certain conditions and
    circumstances. This statute arguably protects Congress and those who would have
    been entitled to the funds as originally appropriated; and as a budgetary statute
    regarding the transfer of funds among DoD accounts, it arguably protects economic
    interests. Plaintiffs have not asserted that they would have been entitled to the
    funds but for the transfer, nor have they raised any other economic interests.
    Rather, they assert aesthetic, recreational, and generalized environmental interests
    that will be affected, not by the transfer of funds, but by the building of the border
    wall. Nothing in § 8005 requires that aesthetic, recreational, or environmental
    interests be considered before a transfer is made, nor does the statute even address
    such interests. At best, Plaintiffs’ interests are only “marginally related to . . . the
    purposes implicit in the statute [such] that it cannot reasonably be assumed that
    Congress intended to permit the suit,” Clarke, 
    479 U.S. at 399
    , and they fall
    outside § 8005’s zone of interests. Thus, Plaintiffs may not bring this APA claim,
    because their interests are not protected by the relevant statute.
    c. The Existence of an APA Claim Also Precludes an Equitable
    Constitutional Claim
    Even though these Plaintiffs lack a cause of action under the APA, this court
    19
    cannot save their claim by fashioning an “equitable” work-around to assert a
    constitutional claim, as the majority has done. Even if we ignored the discretion
    § 8005 provides to the DoD and thus could reframe Plaintiffs’ claim as a
    constitutional one, the APA’s “scope of review” provision would cover it. Those
    provisions provide that a reviewing court shall:
    [H]old unlawful and set aside agency action, findings, and conclusions
    found to be—
    (A) arbitrary, capricious, an abuse of discretion, or otherwise not
    in accordance with law;
    (B) contrary to constitutional right, power, privilege, or immunity;
    (C) in excess of statutory jurisdiction, authority, or limitations, or
    short of statutory right[.]
    
    5 U.S.C. § 706
    (2) (emphasis added). Where courts can review an agency action
    under the APA to ensure the agency has not abused its discretion, violated the
    Constitution, or otherwise operated outside its authority, we have no business
    devising additional “equitable” causes of action. Here, an avenue for challenging
    the DoD’s reprogramming action exists under the APA—just not for these
    Plaintiffs. Thus, there is no reason to resort to the extraordinary step of implying an
    equitable cause of action for these Plaintiffs.
    As the majority recognizes, “[t]he ability to sue to enjoin unconstitutional
    actions by state and federal officers is the creation of courts of equity.” See
    Armstrong, 
    135 S. Ct. at
    1384–85. However, this “judge-made remedy” does not
    20
    provide courts the unfettered power to enjoin executive action; our power “is
    subject to express and implied statutory limitations.” 
    Id. at 1385
    . The majority
    ignores this limitation, relying on inapposite cases to conclude that a federal
    court’s “equity” jurisdiction allows any would-be plaintiff to avoid proceeding
    under the APA. Maj. Op. at 46–47. That the Supreme Court considered challenges
    to a president’s action in Youngstown Sheet & Tube Co. v. Sawyer, 
    343 U.S. 579
    (1952) and Trump v. Hawaii, 
    138 S. Ct. 2392
     (2018) lends the majority no support;
    the APA does not apply to the President, see Dalton, 
    511 U.S. at 468
    , so no
    plaintiff would have an APA claim in those cases. Yet this case is about an agency
    action, and therefore the APA applies. Moreover, McIntosh arose in a very
    different context; our court did not “allow[] an equitable action to enforce the
    Appropriations Clause,” Maj. Op. at 48, we considered the Appropriations Clause
    as a defense for criminal defendants indicted for federal marijuana offenses,
    McIntosh, 833 F.3d at 1168 (“We are asked to decide whether criminal defendants
    may avoid prosecution for various federal marijuana offenses on the basis of a
    congressional appropriations rider that prohibits the United States Department of
    Justice from spending funds to prevent states’ implementation of their own medical
    marijuana laws.”). Allowing defendants to invoke constitutional principles as a
    defense is common, see, e.g., Bond v. United States, 
    564 U.S. 211
    , 225–26 (2011),
    21
    and distinguishable from the affirmative enforcement that the majority provides
    here.11
    The majority’s reliance on Armstrong highlights its fundamental
    misunderstanding of cases involving a court’s equitable power to enjoin acts
    violating federal law. Maj. Op. at 52–53. Congress has not displaced the possibility
    of judge-made equitable remedies against federal agencies through the APA, see
    Armstrong, 
    135 S. Ct. at 1385
    , it codified judicial review of agency action.12 Cf. W.
    Radio Servs. Co. v. U.S. Forest Serv., 
    578 F.3d 1116
    , 1123 (9th Cir. 2009) (“The
    fact that APA’s procedures are available where no other adequate alternative
    remedy exists further indicates Congress’s intent that courts should not devise
    11
    The majority misunderstands my point about the distinguishing features of
    McIntosh. Maj. Op. at 48. The question facing the McIntosh court was whether
    criminal defendants could halt their prosecutions by attacking how the DOJ was
    funding the prosecutions. 833 F.3d at 1172–73. All of the defendants “filed
    motions to dismiss or to enjoin on the basis of the rider.” Id. at 1170. In granting
    relief, the court stated that it “need not decide in the first instance exactly how the
    district courts should resolve claims that the DOJ is spending money to prosecute a
    defendant in violation of an appropriations rider. We therefore take no view on the
    precise relief required and leave that issue to the district courts in the first
    instance.” Id. at 1172 n.2. As such, McIntosh simply did not address or
    contemplate an injunction to enjoin spending funds parallel to the pending criminal
    proceedings.
    12
    Without supporting authority, the majority even suggests that the
    availability of an equitable cause of action would preclude an APA claim under the
    APA provision providing for judicial review when “there is no other adequate
    remedy in a court.” Maj. Op. at 57 (quoting 
    5 U.S.C. § 704
    ).
    22
    additional, judicially crafted default remedies.”); San Carlos Apache Tribe, 
    417 F.3d at
    1096–97 (“[C]reating a direct private action against the federal government
    makes little sense in light of the administrative review scheme set out in the
    APA.”).13
    The majority’s failure to channel Plaintiffs’ claims through the APA’s
    framework for challenging agency action will inevitably lead to peculiar results.
    What prevents future plaintiffs from simply challenging any agency action
    “equitably,” thereby avoiding the APA’s limited judicial review under the
    “arbitrary and capricious” standard, so that a court may substitute its own judgment
    for that of the agency? See 
    5 U.S.C. § 706
    (2)(A); Motor Vehicle Mfrs. Ass’n. of
    United States, Inc. v. State Farm Mut. Auto. Ins. Co., 
    463 U.S. 29
    , 43 (1983). The
    majority offers no reason to distort decades of administrative law practice to
    recognize Plaintiffs’ “equitable” action when the APA provides for review of the
    13
    The majority’s reliance on Navajo Nation v. Department of the Interior,
    
    876 F.3d 1144
     (9th Cir. 2017) and Presbyterian Church v. United States, 
    870 F.2d 518
     (9th Cir. 1989) is misplaced. Presbyterian Church reserved the determination
    of whether there was “agency action” within the meaning of the APA, 
    870 F.2d at
    525 n.8, meaning there was no “alternative” APA claim. Navajo Nation addressed
    the limits of the APA’s waiver of sovereign immunity, but offered no guidance
    about the propriety of bringing parallel claims espousing the same theory under
    two different causes of action (under the APA and “equitably”). 876 F.3d at
    1171–72. Thus, neither case stands for the proposition that, where (as here) an
    agency action is reviewable under the APA, Plaintiffs may bring a parallel
    “equitable” claim.
    23
    DoD’s reprogramming actions.
    Although it may seem unjust that Plaintiffs have no viable recourse for their
    asserted injuries, “[t]he judicial power of the United States conferred by Article III
    of the Constitution is upheld just as surely by withholding judicial relief where
    Congress has permissibly foreclosed it, as it is by granting such relief where
    authorized by the Constitution or by statute.” Dalton, 
    511 U.S. at 477
    . Plaintiffs’
    relief has been permissibly foreclosed here, and Defendants have accordingly
    demonstrated a strong likelihood of success on the merits of their appeal.
    II.   The Other Relevant Factors Also Favor a Stay
    To reemphasize, the issue before us is a motion to stay the district court’s
    injunction under Federal Rule of Appellate Procedure 8. We are limited to decide
    only whether a stay should be granted until the appeal on the merits is final.
    Although “[a] stay is not a matter of right, even if irreparable injury might
    otherwise result,” it is “an exercise of judicial discretion, and the propriety of its
    issue is dependent upon the circumstances of the particular case.” Nken, 
    556 U.S. at 433
     (citations, alteration, and quotation marks omitted). Here, the circumstances
    of this case merit our discretionary relief pending appeal.
    Even if Defendants had failed to show a strong likelihood of success on the
    merits, they “may be entitled to prevail if [they] can demonstrate a ‘substantial case
    24
    on the merits’ and the second and fourth factors [irreparable injury and public
    interest] militate in [their] favor.” Winter, 
    502 F.3d at 863
    . Because Plaintiffs have
    no viable claim for relief, Defendants have more than demonstrated a substantial
    case on the merits.14 Therefore, our panel must “give serious consideration” to the
    second and fourth factors. 
    Id.
    As to irreparable harm, Defendants argue that without a stay they will be
    prevented from ever using the enjoined funds to complete the identified projects
    addressed by the permanent injunction. Defendants are likely correct. The funding
    for those projects will lapse on September 30th, and even if Defendants prevail in
    this court’s final ruling, we could not order or permit Defendants to spend funds
    granted in a lapsed appropriation. See, e.g., City of Houston v. Dep’t of Hous. &
    Urban Dev., 
    24 F.3d 1421
    , 1424, 1426–27 (D.C. Cir. 1994). No one appears to
    dispute that this will likely be the practical consequence if a stay is denied.
    14
    As to the discretionary standard of review, the district court did not apply
    the second and fourth factors (for the short period of time for which this appeal
    would be pending) to the request for the permanent injunction. Thus, its factual
    findings are not clear as to the motion before us. It did have the occasion to apply
    these two factors in its analysis of the stay of the preliminary injunction. However,
    in its analysis of that stay, it chose to ignore these factors, concluding that,
    “[b]ecause the Court finds that Defendants have not met their burden to make a
    strong showing that they are likely to succeed on the merits of their appeal, the
    Court need not further address the other Nken factors.” Sierra Club v. Trump, No.
    19-CV-00892-HSG, 
    2019 WL 2305341
    , at *2 n.2 (N.D. Cal. May 30, 2019). This
    conclusion was an abuse of discretion. See Winter, 
    502 F.3d at 862
    .
    25
    Congress may opt to appropriate new funds for these projects in the future, but that
    possibility is irrelevant. Simply, the permanent injunction will certainly render
    Defendants unable to use the funds at issue here under § 284(b)(7). Thus, there is a
    “possibility that . . . corrective relief will [not] be available at a later date, in the
    ordinary course of litigation.” See Sampson v. Murray, 
    415 U.S. 61
    , 90 (1974).
    Therefore, Defendants have demonstrated that they will be irreparably injured if a
    stay is not issued. See 
    id.
    As to the public interest, Defendants argue that their interests in preventing
    drug trafficking easily outweigh Plaintiffs’ aesthetic, recreational, and generalized
    environmental injuries. In the narrow context of this stay motion, Defendants are
    correct. Even though environmental injuries may be significant in the long term,
    the injunction will only be stayed for a short period.15 If the DoD is precluded from
    obligating these funds in the 2019 fiscal year, it must forgo providing support
    under § 284(b)(7). Defendants have adequately demonstrated that the public
    interest weighs in their favor for supporting § 284(b)(7) for at least three reasons.16
    15
    As previously noted, the parties have suggested that an expedited briefing
    schedule will be requested. Given the need for a timely resolution of this case, this
    case should be resolved shortly.
    16
    Whether the district court appropriately balanced these interests when it
    issued the permanent injunction is not before us. Our inquiry is limited to the
    motion to stay, and the final determination on the balance on interests is one that
    (continued...)
    26
    First, no one disputes that Defendants have broad authority to carry out a
    variety of actions aimed at disrupting the cross-border flow of narcotics in the
    affected areas. Cf. United States v. Guzman-Padilla, 
    573 F.3d 865
    , 889 (9th Cir.
    2009). Nor does anyone dispute that Defendants are authorized by statute to
    construct fencing and other barriers for that purpose in the areas at issue in this
    lawsuit. See 
    10 U.S.C. § 284
    (b)(7). Nor even does anyone seriously dispute the
    DoD’s determination that drug trafficking along our southern border (including in
    the project areas at issue here) threatens the safety and security of our nation and
    its citizens. See Winter, 
    502 F.3d at 862
     (“We customarily give considerable
    deference to the Executive Branch’s judgment regarding foreign policy and
    national defense.” (citing Dep’t of Navy v. Egan, 
    484 U.S. 518
    , 529 (1988))); see
    also Franklin, 505 U.S. at 818. Given this significant national security interest, the
    public would benefit more from a stay that—while this appeal is pending—permits
    Defendants to effect the policies that it has determined are necessary to minimize
    that threat, than it would from a decision that hampers Defendants’ ability to
    combat this threat throughout the present appellate process.17
    16
    (...continued)
    the merits panel will ultimately decide.
    17
    The record does not reflect that Congress “denied” funding under § 284.
    The funds at issue here will be used solely to “provide support for the counterdrug
    (continued...)
    27
    Second, if the injunction is allowed to remain in effect, it will, for reasons
    outlined above, potentially cause irreparable harm to Defendants. On the other
    hand, the irreparable harm to Plaintiffs during this relatively short period (if a stay
    is granted) is less clear. Defendants have represented to this court that the projects
    at issue are needed to protect national security and must go forward even if there is
    a possibility that a merits panel may eventually order them to remove whatever
    was constructed while a stay was in place. This is not the sort of determination that
    courts will ordinarily second guess. See Winter, 
    502 F.3d at 862
    ; Franklin, 505
    U.S. at 818 (recognizing “the principle of judicial deference that pervades the area
    of national security”); see also Munaf v. Geren, 
    553 U.S. 674
    , 689 (2008) (“We
    therefore approach these questions cognizant that ‘courts traditionally have been
    17
    (...continued)
    activities.” § 284. The fact that there were numerous discussions surrounding the
    building of a wall, during the budgetary negotiations and the shut down of the
    government, does not alter what Congress set forth in its appropriations bill for the
    DoD. See Salazar v. Ramah Navajo Chapter, 
    567 U.S. 182
    , 200 (2012) (“An
    agency’s discretion to spend appropriated funds is cabined only by the ‘text of the
    appropriation,’ not by Congress’ expectations of how the funds will be spent, as
    might be reflected by legislative history.” (citation omitted)). Nowhere in the DoD
    Appropriations Act are there limitations on its ability to act under § 284. Moreover,
    the transfer of funds stays within the DoD’s allotted appropriations and does not
    increase the appropriations of the DHS. Even if we should look to all appropriation
    acts, the only limitations placed on the DHS “for the construction of pedestrian
    fencing” were for geographic areas and “funds made available by this Act or prior
    Acts.” See Pub. L. No. 116-6, § 231, 
    133 Stat. 13
    , 28. see also 
    id.
     § 232.
    28
    reluctant to intrude upon the authority of the Executive in military and national
    security affairs.’” (quoting Egan, 
    484 U.S. at 530
    )). It is difficult to determine that
    Plaintiffs’ inability to recreate in and otherwise enjoy this public land would
    outweigh the claimed national interests during the limited period of time the
    requested stay would be in place—especially considering Plaintiffs do not have a
    viable cause of action to challenge Defendants’ actions under § 8005.
    Third, the district court’s reasoning that the public interest does not favor
    Defendants, because the public has a generalized interest in ensuring that the
    Executive acts within the limits imposed by statute and by the Constitution, simply
    begs the question. If a court accepts the premise that Defendants exceeded
    statutory or constitutional limitations on its authority, then the public has an
    interest in seeing that the Executive Branch is “reined in.” However, if Defendants
    show that they did not exceed those bounds, then the public interest articulated by
    Plaintiffs and the district court has no merit. Moreover, when considering whether
    to grant a stay, the public interest factor cannot rise or fall on how the appeal is
    ultimately resolved on its merits. That analysis would collapse the public interest
    factor into the first element of the four-part test.
    In conclusion, because Defendants have more than demonstrated a
    substantial case on the merits, and because the second and fourth factors “militate
    29
    in [their] favor,” we should exercise our discretion and issue a stay pending the
    appeal of the district court’s permanent injunction. See Winter, 
    502 F.3d at 863
    . It
    makes little sense to tie Defendants’ hands while the appellate process plays out,
    especially given Plaintiffs’ lack of a viable claim and given the national security
    considerations present in this case.
    30
    

Document Info

Docket Number: 19-16102

Filed Date: 7/3/2019

Precedential Status: Precedential

Modified Date: 7/5/2019

Authorities (76)

Michael Harrington v. James H. Schlesinger , 528 F.2d 455 ( 1975 )

United States v. Guzman-Padilla , 573 F.3d 865 ( 2009 )

Natural Resources Defense Council, Inc. v. Winter , 502 F.3d 859 ( 2007 )

sony-computer-entertainment-inc-a-japanese-corporation-sony-computer , 203 F.3d 596 ( 2000 )

charleys-taxi-radio-dispatch-corporation-a-hawaii-corporation-plaintiff , 810 F.2d 869 ( 1987 )

The Presbyterian Church (u.s.a.) v. The United States of ... , 870 F.2d 518 ( 1989 )

United States Department of Navy v. Federal Labor Relations ... , 665 F.3d 1339 ( 2012 )

Scheduled Airlines Traffic Offices, Inc. v. Department of ... , 87 F.3d 1356 ( 1996 )

Mountain States Legal Foundation v. Bush , 306 F.3d 1132 ( 2002 )

United States v. Thomas E. Iverson, Sr. , 162 F.3d 1015 ( 1998 )

Western Radio Services Co. v. United States Forest Service , 578 F.3d 1116 ( 2009 )

leroy-clouser-and-sharon-clouser-owners-of-the-robert-e-mining-claims , 42 F.3d 1522 ( 1994 )

san-carlos-apache-tribe-a-federally-recognized-indian-tribe-velasquez , 417 F.3d 1091 ( 2005 )

ashley-creek-phosphate-co-v-gale-norton-secretary-united-states , 420 F.3d 934 ( 2005 )

Immigration & Naturalization Service v. Chadha , 103 S. Ct. 2764 ( 1983 )

Bowsher v. Synar , 106 S. Ct. 3181 ( 1986 )

City of Houston, Texas v. Department of Housing and Urban ... , 24 F.3d 1421 ( 1994 )

Chamber of Commerce of the United States v. Robert B. Reich,... , 74 F.3d 1322 ( 1996 )

Haitian Refugee Center v. James S. Gracey, Admiral/... , 809 F.2d 794 ( 1987 )

PATCHAK v. Salazar , 646 F. Supp. 2d 72 ( 2009 )

View All Authorities »