Martin County, Florida v. Department of Transportation ( 2018 )


Menu:
  •                                          UNITED STATES DISTRICT COURT
    FOR THE DISTRICT OF COLUMBIA
    INDIAN RIVER COUNTY, FLORIDA 1 et
    al,
    Plaintiffs,
    Case No. 18-cv-00333 (CRC)
    v.
    DEPARTMENT OF TRANSPORTATION
    et al,
    Defendants.
    TABLE OF CONTENTS
    I.     Background ................................................................................................................... 3
    A.        Factual Background............................................................................................... 3
    1.      The proposed project ......................................................................................... 3
    2.      The Secretary’s bond allocation ........................................................................ 4
    3.      The environmental review process .................................................................... 5
    B.        Procedural Background ......................................................................................... 7
    II.         Analysis..................................................................................................................... 9
    A.        The Bond Allocation ............................................................................................. 9
    1.      Section 142(m) ................................................................................................ 11
    2.      Section 147(f) .................................................................................................. 24
    B.        NEPA Compliance .............................................................................................. 35
    1.      Public-safety effects of the project .................................................................. 38
    2.      Effects of vessel queuing at railroad bridges over navigable waters ............... 49
    3.      Alternatives to the route and the use of moveable bridges .............................. 55
    4.      Noise impacts .................................................................................................. 59
    5.      Changes to freight operations .......................................................................... 66
    III.        Conclusion .............................................................................................................. 72
    1
    This case was captioned Martin County et al v. Department of Transportation et al in all
    previous filings. The Court has adjusted the case name to reflect Martin County’s voluntary
    dismissal. See Joint Stipulation of Dismissal, ECF No. 48.f
    MEMORANDUM OPINION
    AAF Holdings, Inc. (“AAF”) plans to construct and operate an express passenger railway
    connecting Orlando and Miami, Florida. The initial segment of the line between Miami and
    West Palm Beach is currently operational. The extension of the line to Orlando is still in the
    planning stages. To help AAF finance the extension, the U.S. Department of Transportation has
    allocated $1.15 billion in federally tax-exempt bonds to be issued by a Florida economic
    development agency.
    The planned extension of the railway will run through Indian River County on Florida’s
    Treasure Coast. The County and its Emergency Services District (together, “Indian River
    County” or “Plaintiff”) have long objected to the project. In this, its second lawsuit challenging
    the project, Indian River County seeks summary judgment on two grounds. First, it contends
    that the Department of Transportation exceeded its authority in allocating the bonds because the
    project is not eligible to receive tax-exempt funding under two separate provisions of the Internal
    Revenue Code. Second, the County maintains that the Federal Railway Administration (“FRA”)
    violated the Administrative Procedure Act (“APA”) and the National Environmental Policy Act
    (“NEPA”) by conducting a flawed and incomplete review of the public health and safety
    consequences of the project. Defendants the Department of Transportation, its component FRA,
    and several of its officers (together, “federal Defendants,” “the Department,” or “FRA”) filed a
    cross motion for summary judgment, as did AAF, which has intervened as a defendant. Because
    the Department’s allocation met the tax code’s requirements and the FRA’s review complied
    with NEPA, the Court will deny Indian River County’s motion for summary judgment and grant
    the federal Defendants’ and AAF’s.
    2
    I.   Background
    A. Factual Background
    1. The proposed project
    AAF is in the process of constructing a private passenger train service that will ultimately
    provide service between Miami and Orlando. Phase I of the project currently operates from
    Miami to West Palm Beach. AR 65115–16. Phase II will run from West Palm Beach north
    along Florida’s east coast to Cocoa and then west and inland to Orlando. 
    Id. AAF plans
    to lay a
    second track along a 128.5 mile stretch of single-track train corridor owned by the Florida East
    Coast Railway (“FECR”) from West Palm Beach north to Cocoa. AR 65115. This track is
    currently used only by freight trains, some of which carry hazardous materials, but historically
    was used by both freight and passenger trains. AR 73914. This corridor is referred to in the
    record and by the parties as either the FECR Corridor or the N-S Corridor. AR 65115. The N-S
    Corridor bisects Indian River County. AR 73572. AAF also proposes constructing a new 40-
    mile track that would connect Cocoa and Orlando. This stretch of track is referred to as the E-W
    Corridor. AR 65115.
    AAF plans to operate thirty-two passenger trains per day in addition to the FECR freight
    trains that now run along the N-S Corridor. AR 65116. These trains would run through Indian
    River County for twenty-one miles. AR 73753. There are thirty “grade crossings” in the
    County. 
    Id. A grade
    crossing is an intersection where the railway crosses a road or path at the
    same level or grade, rather than an intersection where trains cross over or under the road using an
    overpass or tunnel. In addition to these grade crossings, the trains will traverse bridges that are
    either fixed or moveable (i.e., draw bridges). Two of these moveable bridges are at issue in this
    case: the St. Lucie River Bridge and the Loxahatchee River Bridge. AR 73915. When these
    3
    bridges are in the “down” position, trains can cross over but boats on the river cannot cross
    under.
    2. The Secretary’s bond allocation
    AAF is partially financing the railway project through private activity bonds (“PABs”)
    issued by the Florida Development Finance Corporation (“FDFC”), an agency of the State of
    Florida. Congress has authorized the United States Department of Transportation to allocate tax-
    exempt authority to PABs used to finance specific types of transportation projects. See 26
    U.S.C. § 142(m)(2)(C). AAF initially applied for a PAB allocation in August 2014. In
    December 2014, the Department of Transportation approved that application and provisionally
    allocated $1.75 billion in tax-exempt PABs for the project. See Indian River Cty. v. Rogoff
    (“Indian River Cty. I”), 
    110 F. Supp. 3d 59
    , 65 (D.D.C. 2015). AAF planned to use these PABs
    to finance both phases of the railway.
    In November 2016, the Department, at AAF’s request, withdrew the provisional
    allocation and replaced it with a $600 million allocation of PAB authority to finance only Phase I
    of the project. See Indian River Cty. v. Rogoff (“Indian River Cty. III”), 
    254 F. Supp. 3d 15
    , 17–
    18 (D.D.C. 2017). Then, in December 2017, AAF applied for a new allocation of $1.15 billion
    in PAB authority to finance Phase II of the project. See AR 74220–62. As part of its
    application, AAF represented that the project had received $9 million in Title 23 federal funds,
    disbursed by Florida’s Department of Transportation for highway-rail crossings along the rail
    corridor. AR 74235. AAF included in its application a resolution by FDFC approving the issue
    of bonds to finance the project. AR 74240–53. That resolution concluded that the bond issue
    had received requisite public approval for tax-exempt status because a designee of the State’s
    Governor had approved their issue after a properly noticed public hearing. AR 74242–44.
    4
    AAF’s application highlighted that the bonds had already received this public approval. AR
    74221. Further, AAF included in its application a bond counsel validity opinion, by the law firm
    Greenberg Traurig, which concluded that “interest on the Bonds . . . is excludable from gross
    income for purposes of federal income taxation under existing laws as enacted and construed[.]”
    AR 74256.
    The Department approved the application and provisionally allocated $1.15 billion in
    PAB authority on December 20, 2017. AR 74324–26. Its provisional allocation letter
    conditioned final allocation on several requirements, including compliance with all applicable
    federal laws, as well as “a final bond counsel tax and validity opinion . . . issued at the time of
    the closing of the bond issue in substantially the form provided with the application.” AR 74324.
    While FDFC will issue the bonds, AAF is responsible for marketing and selling them to
    investors. The parties have represented that the bonds will be marketed in the next several
    weeks.
    3. The environmental review process
    AAF originally sought federal loan funding for the project through the Railroad
    Rehabilitation and Improvement Financing (“RRIF”) program. RRIF loans are subject to NEPA
    review. 49 C.F.R. § 260.35. FRA reviewed the potential environmental impacts of the project
    under NEPA. AR 73636. With respect to Phase I, FRA issued a Finding of No Significant
    Impact in 2013. AR 73570. FRA then began preparing an Environmental Impact Statement
    (“EIS”) for Phase II. AR 73571. It held five public scoping meetings in May 2013 and received
    248 comments in response to those meetings and more than 160 comments in the subsequent
    seventeen months. AR 74155–56. As required, FRA coordinated with federal, state, local, and
    tribal governments, including Indian River County. AR 74157–59.
    5
    FRA completed a draft EIS in September 2014. AR 74164. The draft attracted some
    15,400 public comments. 
    Id. During the
    comment period, FRA also held eight public meetings,
    
    id., which were
    attended by over 2,500 people, AR 74165. FRA issued a Final Environmental
    Impact Statement (“FEIS”) in August 2015. See AR 73568. FRA subsequently received
    additional comments on the FEIS, including from Plaintiff. AR 65154. When AAF withdrew its
    RRIF loan application in 2015, FRA decided to not issue a Record of Decision (“ROD”). AR
    65118. After AAF re-filed an RRIF application in 2017, FRA resumed the NEPA process and
    published the ROD in December 2017. AR 65109–65. Appendix C to the ROD provides
    responses to the comments on the FEIS. See AR 65154; AR 65266–300.
    The FEIS selects AAF’s preferred route as the best alternative for the project and
    determines that no further environmental review is necessary. AR 73578. The FEIS itself is 646
    pages long and separately includes numerous appendices including maps and analyses of noise
    impacts, navigation patterns, and more. The FEIS and ROD outline the purpose of and need for
    the project, the alternatives considered, the affected environment, the potential environmental
    consequences of the project and reasonable alternatives, and the historic properties affected by
    the project. The FEIS also includes a chapter on measures that would avoid, minimize, or
    mitigate impacts that would result from the project. AAF has committed to implementing a
    series of mitigation measures during both the construction and operation phases of the project.
    As part of the NEPA process, AAF retained the environmental consulting firm Vanasse
    Hangen Brustlin (“VHB”) as a third-party advisor to FRA. This arrangement was memorialized
    in an agreement between FRA, VHB, and AAF. See AR 1045–62. Under that agreement,
    VHB’s “scope of work, approach, and activities shall be under the sole supervision, direction,
    and control of the FRA.” AR 1046. AAF also hired its own consultant, Amec Foster Wheeler
    6
    (“Amec”). In general, Amec conducted initial technical work, which it then submitted to VHB
    and FRA for review and comment. AR 897–98; see also AR 1062. The record includes a series
    of technical memoranda produced by Amec on issues like noise and vibration. See, e.g., AR
    61081–238 (Amec’s “Technical Memorandum No. 5 Noise and Vibration for AAF Passenger
    Rail Project”). The record also reflects significant back-and-forth regarding those memoranda
    between VHB and FRA on the one hand and Amec and AAF on the other. See, e.g., AR 1083–
    87, 1305–43, 1561–62, 7302–06, 7349–51 (charts setting forth VHB/FRA comments on Amec
    technical memoranda and Amec/AAF responses).
    B. Procedural Background
    As noted above, this is the second time Indian River County has sued in this Court to
    prevent or delay the Secretary of Transportation’s allocation of tax-exempt bond issuance
    authority to finance the AAF project. In 2015, both Indian River County and nearby Martin
    County, through which the proposed railway would also run, sought (among other relief) a
    preliminary injunction vacating the Secretary’s authorization of the tax exemption, which
    allocated PAB authority for both phases of the project. See Indian River Cty. 
    I, 110 F. Supp. 3d at 66
    . Both counties alleged violations of NEPA, the National Historic Preservation Act
    (“NHPA”), and the Department of Transportation Act (“DTA”), each of which sets forth certain
    procedural requirements for major federal actions. Martin County also alleged a violation of
    § 142 of the Internal Revenue Code. There, as here, AAF intervened as a defendant. Initially,
    the Court concluded that the counties had failed to show that their asserted injuries—public-
    safety hazards and harms to environmental and historic sites from the construction and operation
    of the railway—were traceable to the Secretary’s action or redressable by the Court.
    Specifically, while the counties had shown that the cost of financing the project would increase
    7
    without the Secretary’s allocation of tax-exemptions, they were unable to show “that these costs
    would significantly increase the likelihood that AAF would abandon the project[.]” 
    Id. at 71.
    In
    short, the plaintiffs had failed to show that if the Court were to grant them precisely what they
    asked for, the project would cease and their harms would be remedied. The Court also held that
    the counties’ alleged procedural injury—stemming from the purported failure to conduct an
    appropriate environmental review—was insufficient to confer standing absent some tethering to
    a substantive injury sufficient for standing. 
    Id. at 73.
    The Court thus denied the counties’
    motions because they had not established standing to sue. See 
    id. Following Indian
    River County I, the Court granted the counties permission to conduct
    jurisdictional discovery to demonstrate that, but for the PAB allocation, AAF would not
    complete the railway. Subsequently, the Department of Transportation moved to dismiss the
    counties’ suits. The Court concluded that through jurisdictional discovery, the counties had
    shown “that invalidating [the Department’s] decision to authorize . . . PABs would significantly
    increase the likelihood that AAF would not complete . . . the project.” Indian River Cty. v.
    Rogoff (“Indian River Cty. II”), 
    201 F. Supp. 3d 1
    , 4 (D.D.C. 2016). Further, the Court found
    that the plaintiffs had alleged sufficient facts to demonstrate that the AAF project qualified as
    “major federal action” triggering certain requirements under NEPA, NHPA, and DTA. 
    Id. at 20.
    Consequently, it denied the motion to dismiss those claims. It did, however, dismiss Martin
    County’s claim that the PAB allocation violated § 142 of the Internal Revenue Code, concluding
    that the County’s asserted injuries fell outside the zone of interests that Congress sought to
    protect in § 142. 
    Id. at 21.
    Following the Court’s decision in Indian River County II that the counties had stated
    valid claims, AAF withdrew its application for a PAB allocation. It replaced that application,
    8
    which had sought to use the bonds to finance both phases of the project, with an application for a
    smaller allocation to be used only for Phase I. Because Phase I dealt only with a portion of the
    proposed railway that did not run through the plaintiff counties, the Court dismissed the cases at
    moot. Indian River Cty. 
    III, 254 F. Supp. 3d at 22
    .
    Since then, AAF applied for an allocation to help finance Phase II, which the Department
    of Transportation provisionally approved. Indian River County, initially joined by Martin
    County and a group of concerned citizens, has again sued. They contend that the PAB allocation
    violated two provisions of the Internal Revenue Code and that FRA did not comply with its
    requirements under NEPA. AAF again intervened as a defendant. The parties all moved for
    summary judgment. The Court held a hearing on these motions on November 27, 2018. Shortly
    before this hearing, Martin County and the citizens group reached a settlement with the federal
    Defendants and AAF and, therefore, are no longer plaintiffs in the case.
    II.   Analysis
    A. The Bond Allocation
    To facilitate Phase II of the AAF railway, the Secretary of Transportation provisionally
    allocated tax-exempt authority to $1.15 billion in PABs to be issued to finance the project. The
    Secretary of Transportation’s allocation is subject to review under the APA. 5 U.S.C. §§ 702,
    706. Chevron, U.S.A. v. NRDC, 
    467 U.S. 837
    (1984), establishes a two-part inquiry to
    determine whether an agency has arrived at a permissible interpretation of the law it is charged
    with administering. First, if a law directly addresses the precise question at issue, Congress’s
    directive controls. 
    Id. at 842–43.
    Second, if the statute is silent or ambiguous regarding the
    matter at hand, “the question for the court is whether the agency’s interpretation is based on a
    permissible construction of the statute in light of its language, structure, and purpose.” Nat’l
    9
    Treasury Emps. Union v. Fed. Labor Relations Auth., 
    754 F.3d 1031
    , 1042 (D.C. Cir. 2014)
    (quoting AFL-CIO v. Chao, 
    409 F.3d 377
    , 384 (D.C. Cir. 2005)). The court must defer to any
    reasonable agency interpretation, Loving v. IRS, 
    742 F.3d 1013
    , 1016 (D.C. Cir. 2014), which
    need not be the one “deemed most reasonable by the courts[,]” Entergy Corp. v. Riverkeeper,
    Inc., 
    556 U.S. 208
    , 218 (2009).
    Indian River County contends that the Secretary’s allocation violated two provisions of
    the Internal Revenue Code. A brief overview of the statutory scheme contextualizes these
    challenges and the Department and AAF’s responses. Congress has authorized interest earned
    on certain types of PABs to be exempted from federal taxation. See 26 U.S.C. §§ 103, 141.
    Because this exemption allows the bondholder to keep all the interest, bond issuers can sell the
    bond at a lower interest rate. A PAB must be a “qualified bond” in order for it to be tax-exempt.
    
    Id. § 103.
    Section 141 outlines certain types of PABs that can constitute “qualified bond[s],”
    including “exempt facility bond[s].” 
    Id. § 141(e)(1)(A).
    Under § 142(a), a bond is an “exempt
    facility bond” if at least 95% of proceeds from its issue are used to finance one of fifteen
    enumerated categories of projects. 
    Id. § 142(a).
    One such category is “qualified highway or
    surface freight transfer facilities.” 
    Id. § 142(a)(15).
    Section 142(m) defines “qualified highway
    or surface freight transfer facilities,” 
    id. § 142(m)(1),
    and authorizes the Secretary of
    Transportation, “in such manner as [she] determines appropriate,” 
    id. § 142(m)(2)(C),
    to allocate
    up to $15 billion of PAB authority to eligible projects, 
    id. § 142(m)(2)(A).
    Put simply, Congress
    has enacted a mechanism through which the Secretary can allocate tax exemptions to bonds used
    to finance construction of, or improvements to, certain types of facilities. These exemptions
    lower the cost of selling the bonds, better enabling state and local governments to finance the
    projects.
    10
    The Secretary’s allocation is necessary, but not sufficient, for a bond to be tax-exempt
    because it finances a “qualified highway or surface freight transfer facilit[y].” 
    Id. § 142(m)(2)(A).
    The Internal Revenue Code also establishes other requirements for PABs to be
    considered “qualified” and thus tax-exempt. See 
    id. § 141(e)(3).
    These include a requirement
    that bonds used to finance a facility must be approved by both “the governmental unit . . . which
    issued such bond,” 
    id. § 147(f)(2)(A)(i),
    and “each governmental unit having jurisdiction over
    the area” in which any bond-financed facility is located, 
    id. § 147(f)(2)(A)(ii).
    In this case, Indian River County alleges first that the Secretary violated the statute
    because the AAF passenger railway is ineligible for a PAB allocation under § 142(m). The
    County also contends that, in any event, because it has not approved the bond issue as § 147(f)
    requires, the PABs cannot be tax exempt. The Court turns to each of these statutory provisions.
    1. Section 142(m)
    Indian River County alleges that the Secretary’s allocation of PAB authority to the AAF
    railway violated 26 U.S.C. § 142(m). It contends that because the project is not an eligible
    “qualified highway or surface freight transfer facilit[y],” the Secretary exceeded her statutory
    powers in allocating PAB authority to the project. In the last round of litigation, Martin County
    raised a similar argument, which the Court rejected as going beyond the “zone of interests”
    protected by § 142. See Indian River Cty. 
    II, 201 F. Supp. 3d at 20
    –21. Both the federal
    Defendants and Intervenor-Defendant ask the Court to reach the same result this time around.
    Alternatively, they argue that the allocation complied with § 142. For the following reasons, the
    Court concludes that Indian River County has shown that its asserted interests arguably fall
    within the zone of interests Congress sought to protect in § 142, but that its claim fails on the
    merits.
    11
    a. Zone of Interests
    Before the Court reaches the substance of Indian River County’s § 142 claim, it “must
    . . . inquire whether the plaintiff[] fall[s] within the class of persons whom Congress has
    authorized to sue under the Administrative Procedure Act.” Mendoza v. Perez, 
    754 F.3d 1002
    ,
    1016 (D.C. Cir. 2014). To do so, it must determine whether Indian River County’s “grievance
    . . . arguably fall[s] within the zone of interests protected or regulated by the statutory provision
    . . . invoked in the suit,” in this case § 142. 
    Id. (quoting Bennett
    v. Spear, 
    520 U.S. 154
    , 162
    (1997)). This inquiry “is not meant to be especially demanding” and “forecloses suit only when
    a plaintiff’s ‘interests are so marginally related to or inconsistent with the purposes implicit in
    the statute that it cannot reasonably be assumed that Congress intended to permit the suit.’”
    Match-E-Be-Nash-She-Wish Band of Pottawatomi Indians v. Patchak, 
    567 U.S. 209
    , 225 (2012)
    (quoting Clarke v. Sec. Industry Ass’n, 
    479 U.S. 388
    , 399 (1987)).
    When Martin County advanced its § 142 claim in the last round of litigation, the Court
    concluded that it had not cleared this hurdle. In that instance, like Indian River County does
    here, Martin County asserted interests in public safety, environmental protection, and historic
    preservation. Indian River Cty. 
    II, 201 F. Supp. 3d at 21
    . It relied on SAFETEA, Pub. L. 109–
    59, 119 Stat. 1144 (2005)—the legislation through which Congress amended § 142 to add PAB
    authorization for “qualified highway or surface freight transfer facilities”—to contend that
    Congress sought to protect these interests when it amended § 142. See Indian River Cty. 
    II, 201 F. Supp. 3d at 20
    –21. But as the Court explained at the time, SAFETEA is a “massive statute
    with many objectives” and its relevant amendments to § 142 were “but a tiny component of the
    overall legislation.” 
    Id. at 21.
    As such, it would have been—and remains—too dilutive of the
    zone of interests test to allow a plaintiff to challenge an allocation under § 142(m) based on an
    12
    interest advanced anywhere in SAFETEA. 
    Id. at 20
    (citing Tax Analysts & Advocates v.
    Blumenthal, 
    566 F.2d 130
    , 141 (D.C. Cir. 1977)). Instead, “the relevant unit of analysis” for
    conducting the inquiry is § 142 itself. 
    Id. And because
    “Martin County present[ed] no real
    argument that its interests [were] more than marginally related [to] those protected or regulated
    by Section 142 itself,” but rather “place[d] all its eggs in the SAFETEA basket instead,” 
    id. at 21,
    the Court dismissed the claim.
    In this litigation, Indian River County has advanced stronger arguments, focusing
    appropriately on the interests at stake in § 142 itself. Indian River County contends that these
    interests are illuminated by § 147(f), which requires State or local government approval for
    certain PABs to qualify for tax exemption. “In applying the zone-of-interests test, [courts] do
    not look at the specific provision said to have been violated in complete isolation[.]” Fed’n for
    Am. Immigration Reform, Inc. (“FAIR”) v. Reno, 
    93 F.3d 897
    , 903 (D.C. Cir. 1996). At the
    same time, courts must police the extent to which they look beyond the provision invoked to
    ensure that casting a wider net does not “deprive the zone-of-interests test of virtually all
    meaning.” Air Courier Conference of Am. v. Am. Postal Workers Union, 
    498 U.S. 517
    , 530
    (1991). Accordingly, a court must limit its analysis to the provision invoked for suit, as clarified
    by any provisions to which it bears an “integral relationship.” See, e.g., 
    FAIR, 93 F.3d at 904
    .
    In this case, then, the Court must first determine whether § 147(f) bears an integral relationship
    with § 142, the provision upon which Indian River County sues.
    The Court concludes that the two provisions do bear an integral relationship. They form
    adjacent requirements for PABs used to finance certain categories of facilities to qualify for tax-
    exempt status: § 142 enumerates the types of facilities, and § 147(f) ensures public approval and
    13
    democratic accountability for their construction. 2 Absent § 147(f) approval, PABs used to
    finance a § 142 facility cannot be tax-exempt; and PABs approved pursuant to § 147(f) are not
    tax-exempt unless they are used to finance a § 142 facility. Cf. Wash. All. of Tech. Workers v.
    DHS, 
    156 F. Supp. 3d 123
    , 135 (D.D.C 2015) (holding that provisions share an integral
    relationship in part because they perform an “interlocking task”).
    Most importantly, each requirement evinces a common purpose: ensuring that when the
    public fisc forgoes revenue through tax-exempt bonds, those bonds are used to benefit the public.
    As the Court explained in Indian River County II: “Congress enacted 26 U.S.C. § 142 in
    general, and Sections 142(a)(1) and 142(m) in particular, to create a tax benefit to support the
    development and construction of certain kinds of projects with significant public benefits and a
    demonstrated need for financial 
    assistance.” 201 F. Supp. 3d at 21
    . When Congress added
    § 142(m) to the Internal Revenue Code in 2005, it did so against the backdrop of § 147(f), which
    it had first added to the Code in 1982 in a clear effort to ensure public benefit from tax-exempt
    bonds. As the Senate Finance Committee Report explained at the time:
    The committee believes that new restrictions are needed on [bonds] to help
    eliminate inappropriate uses and to help restore the benefit of tax-exempt financing
    2
    The fact that each provision specifically deals with “facilities” is important. Indian
    River County relies in part on the fact that § 142 and § 147 share a common subpart of the
    Internal Revenue Code, which governs PABs eligibility. Courts have often found provisions
    contained in a common subsection to be integrally related. See, e.g., Int’l Union of Bricklayers
    & Allied Craftsmen v. Meese, 
    761 F.2d 798
    , 804–05 (D.C. Cir. 1985); Save Jobs USA v. DHS,
    
    210 F. Supp. 3d 1
    , 11–12 (D.D.C. 2016). But a common subpart is less instructive where, as
    here, the PABs subpart has multifarious purposes and covers several different types of bonds.
    But § 142 and § 147 each governs the use of bonds to finance facilities in particular, evincing a
    closer relationship than § 142 shares with, for example, the rules governing mortgage bonds that
    are also contained in that subpart. The Court’s conclusion is not that the two bear an integral
    relationship simply because they share a common subpart, but because they both deal with a
    common activity regulated by that subpart. Thus, contrary to Defendants’ contentions, the
    Court’s conclusion that the two provisions bear an integral relationship does not license any
    plaintiff whose interests are protected by any provision within the subpart to challenge a
    § 142(m) allocation.
    14
    for traditional governmental purposes. However, the committee believes that, in
    general, state and local governments are best suited to determine the appropriate
    uses of [bonds]. The committee believes that providing tax exemptions for the
    interest on certain [bonds] may serve legitimate purposes in some
    instances provided that the elected representatives of the state or local
    governmental unit determine after public input that there will be substantial public
    benefit from issuance of the obligations[.]
    S. Rep. No. 97-494(I), at 168 (1982).
    This suggests a common purpose: § 142 reflects congressional judgment about the types
    of projects that benefit the public enough to warrant tax-exempt financing, and § 147(f) creates a
    mechanism of democratic accountability by which the public can confirm that a particular
    project does indeed confer public benefit. Cf. Nat’l Petrochemical & Refiners Ass’n v. EPA,
    
    287 F.3d 1130
    , 1148 (D.C. Cir. 2002) (holding that provisions shared an integral relationship
    because one helped “accomplish[] one of the express goals” of the other).
    The same legislative history and interlocking purpose compel the Court to reconsider its
    holding in Indian River County II that local governments fall outside § 142’s zone of interests.
    Indian River County has properly focused its attention not on SAFETEA as a whole, but on
    § 142 itself and its purpose of “support[ing] the development and construction of certain kinds of
    projects with significant public benefits[.]” Indian River Cty. 
    II, 201 F. Supp. 3d at 21
    . By
    demonstrating that § 142 and § 147(f) bear an integral relationship, the County has illuminated
    § 142 in a way that suggests Congress’s intent was indeed to allow State and local governments
    to ensure public benefit would accrue from projects financed by tax-exempt bonds. And because
    it appears from the legislative history that Congress gave some deference to State and local
    governments’ assessment of public benefit, Indian River County’s asserted interests at least
    arguably fall within the zone of interests protected by § 142. Accordingly, the Court concludes
    that Indian River County has plausibly stated a claim under that provision.
    15
    b. The merits of the County’s Section 142(m) claim
    Moving to the merits of Indian River County’s § 142 claim, the County contends that the
    Secretary’s allocation is inconsistent with the statute because Phase II is not a “qualified highway
    or surface freight transfer facilit[y],” 26 U.S.C. § 142(a)(15), and thus is ineligible for an
    allocation of PAB authority. The Court concludes that the Secretary’s allocation conformed to
    the statutory requirements and was a reasonable exercise of her discretion. It will therefore grant
    summary judgment on this issue to the Department and AAF.
    Section 142 defines “qualified highway or surface freight transfer facilities” to include
    “any surface transportation project which receives Federal assistance under title 23, United
    States Code[.]” 
    Id. § 142(m)(1)(A).
    The Secretary allocated PAB authority after concluding that
    the project fell within this definition. Indian River County challenges that allocation, contending
    that § 142(m)(1)(A) does not encompass the project and it was thus ineligible for an allocation.
    Specifically, the County contends that, when read in proper context, a “surface transportation
    project” means only a highway project, which necessarily precludes an allocation to any rail
    project. It also maintains that if the term “any surface transportation project” did encompass rail
    projects, the AAF project has not received Title 23 federal assistance. The Court addresses each
    point in turn.
    i. Whether the AAF project is a “surface transportation project” within
    the meaning of § 142(m)(1)(A)
    The plain meaning of § 142(m)(1)(A) is unambiguous. It defines “qualified highway or
    surface freight transfer facilities” to include “any surface transportation project[.]” 26 U.S.C.
    § 142(m)(1)(A). Because Congress did not specify what “surface transportation” means, the
    ordinary meaning of the phrase controls. See, e.g., Johnson v. United States, 
    559 U.S. 133
    , 138
    (2010). The dictionary definition of “surface transport” is “the movement of people or goods by
    16
    road, train, or ship, rather than by plane.” Cambridge Business English Dictionary (2011). This
    plainly includes rail projects. Defining “surface transportation” to include rail comports with its
    use elsewhere in federal law. For example, in SAFTEA, the legislation through which Congress
    enacted § 142(m), a provision in another portion of the bill defined “surface transportation
    system” to include “freight and intercity passenger bus and rail infrastructure and facilities.”
    SAFETEA § 1909(b)(14), Pub. L. 109–59, 119 Stat. 1476 (2005). The Surface Transportation
    Board—a congressionally created agency—is particularly notable: its charge includes
    jurisdiction over rail issues. See generally, ICC Termination Act of 1995, Pub. L. 104-88, 109
    Stat. 803 (1995); Surface Transportation Board Reauthorization Act of 2014, Pub. L. 114-110,
    129 Stat. 2228 (2014). There is no need to belabor the point with more examples: the dictionary
    definition of “surface transportation,” the phrase’s meaning in other areas of law, and its ordinary
    usage all indicate that § 142(m)(1)(A) includes rail projects.
    Congress’s use of “any” further indicates as much: “Read naturally, the word ‘any’ has
    an expansive meaning, that is, ‘one or some indiscriminately of whatever kind.’” United States
    v. Gonzales, 
    520 U.S. 1
    , 5 (1997) (quoting Webster’s Third New International Dictionary 97
    (1976)). The Supreme Court has explained that when interpreting a statutory provision,
    “Congress’ use of ‘any’ to modify ‘other law enforcement officer’ is most naturally read to mean
    law enforcement officers of whatever kind.” Ali v. Fed. Bureau of Prisons, 
    552 U.S. 214
    , 220
    (2008). The same principle applies here: Congress’s use of “any” to modify “surface
    transportation project” is most naturally read to mean surface transportation projects of whatever
    kind—including rail projects.
    Indian River County nonetheless insists that the plain text of § 142(m)(1)(A) cannot be
    read in isolation and that its context indicates that it refers only to highway projects. Relying on
    17
    the principle of noscitur a sociis—a word is known by the company it keeps—the County
    highlights several contextual clues to contend that when Congress said “any surface
    transportation project,” it was actually referring only to highways.
    First, the County notes that § 142(m)(1)(A) must be read in light of the word “highway”
    in the phrase that it is defining: “qualified highway or surface freight transfer facilities.” 26
    U.S.C. § 142(m)(1) (emphasis added). Because another portion of § 142(m)(1) deals with
    surface freight transfer facilities, see 26 U.S.C. § 142(m)(1)(C), Plaintiff contends,
    § 142(m)(1)(A) must deal with the “highway . . . facilities.” But that argument is unavailing in
    the face of Congress’s chosen definition. In interpreting a statute, courts defer to Congress’s
    definition of a statutory provision, even if that definition is at odds with the ordinary meaning.
    See, e.g., Digital Realty Trust, Inc. v. Somers, 
    138 S. Ct. 767
    , 776–77 (2018). Thus, even
    accepting Plaintiff’s premise, it was Congress’s prerogative to define “highway . . . facilities” as
    encompassing more than highways. And, as discussed, that is plainly what it did when it defined
    the term to include “any surface transportation project.”
    Second, Indian River County notes that when Congress added “qualified highway or
    surface freight transfer facilities” to § 142, the statute already listed fourteen other types of
    facilities eligible for PABs financing. See 26 U.S.C. § 142(a). Plaintiff insists that the fact that
    this list already included railway facilities—in the form of “high-speed intercity rail facilities,”
    
    id. § 142(a)(11),
    and “mass commuting facilities,” 
    id. § 142(a)(3)—Congress’s
    inclusion of
    “qualified highway . . . facilities” must be understood to preclude passenger rail projects. As an
    initial matter, the original list did not encompass all rail projects. “[M]ass commuting facilities”
    do not encompass longer passenger rail services that connect distant cities to one another.
    Likewise, “high-speed intercity rail facilities” include only passenger trains capable of 150 mile-
    18
    per-hour maximum speeds, 
    id. § 142(i)(1),
    which excludes slower trains (including those AAF is
    using). In other words, the list to which Congress added “qualified highway or surface freight
    transfer facilities” encompassed some types of passenger rail projects, but not all. It would make
    perfect sense and would not be duplicative for Congress to add a provision covering other types
    of rail projects. Nor would it supplant those provisions. While the types of railways
    encompassed by “mass commuting facilities” and “high-speed intercity rail facilities” fall into
    the ambit of “any surface transportation project,” they do not necessarily also receive Title 23
    funds as § 142(m)(1)(A) requires.
    Third, Indian River County points to the fact that § 142(m)(1)(A)’s limiting provision
    references Title 23—i.e., that a surface transportation project constitutes a “qualified highway or
    surface freight transfer facilit[y]” only if it “receives Federal assistance under title 23, United
    States Code[.]” 
    Id. § 142(m)(1)(A).
    Title 23 is a portion of the U.S. Code entitled “Highways.”
    This detail, Plaintiff insists, further demonstrates that “any surface transportation project” must
    refer only to highways—especially since later in the provision, Congress included in its
    definition of “qualified highway or surface freight transfer facilities” certain types of facilities
    that receive funding under either Title 23 or Title 49, which addresses railroads. See 
    id. § 142(m)(1)(C).
    According to Plaintiff, the exclusion of a reference to Title 49 in
    § 142(m)(1)(A), when it was included in § 142(m)(1)(C), means that § 142(m)(1)(A)’s reference
    to Title 23 indicates that it extends only to highway projects. But while Title 23 does deal
    generally with highways, it also contains provisions authorizing funds for non-highway
    transport, including passenger rail. See, e.g., 23 U.S.C. § 601(a)(12). Consequently, the
    reference to Title 23 is not as strong a contextual clue as Plaintiff suggests and is insufficient to
    supplant Congress’s capacious definition, notwithstanding the fact that the Title 23 is called
    19
    “Highways.” Cf. United States v. Spencer, 
    720 F.3d 363
    , 367 (D.C. Cir. 2013) (embracing “the
    wise rule that the title of a statute and the heading of a section cannot limit the plain meaning of
    the text” (citation omitted)).
    Indian River County also invokes the canon expressio unius est exclusio alterius—that
    “expressing one item of an associated group or series excludes another left unmentioned,”
    Chevron U.S.A., Inc. v. Echazabal, 
    536 U.S. 73
    , 80 (2002) (citation and internal alteration
    omitted). The County suggests that because other portions of § 142(m) reference non-highway
    surface transport, § 142(m)(1)(A) cannot be interpreted to include such transport. Section
    142(m) includes both “any project for an international bridge or tunnel for which an
    international entity authorized under Federal or State law is responsible,” 26 U.S.C.
    § 142(m)(1)(B), and “any facility for the transfer of freight from truck to rail or rail to truck,” 
    id. § 142(m)(1)(C),
    among “qualified highway and surface freight transfer facilities,” provided they
    receive appropriate funding. But their inclusion does not imply an exclusion of non-highway
    projects from “any surface transportation project[.]” The D.C. Circuit has repeatedly indicated
    that “[t]he expressio unius canon is a ‘feeble helper in an administrative setting, where Congress
    is presumed to have left to reasonable agency discretion questions that it has not directly
    resolved.’” Adirondack Med. Ctr. v. Sebelius, 
    740 F.3d 692
    , 697 (D.C. Cir. 2014)
    (quoting Cheney R.R. Co. v. I.C.C., 
    902 F.2d 66
    , 68–69 (D.C. Cir. 1990)). In particular, “when
    countervailed by a broad grant of authority contained within the same statutory scheme, the
    canon is a poor indicator of Congress’ intent.” 
    Id. (citing Creekstone
    Farms Premium Beef,
    L.L.C. v. Dep’t of Agric., 
    539 F.3d 492
    , 500 (D.C. Cir. 2008)). Here, Congress granted the
    Department wide discretion, allowing it to allocate PAB authority among facilities “in such
    manner as the Secretary determines appropriate.” 26 U.S.C. § 142(m)(2)(C). Plaintiff’s
    20
    invocation of expressio unius est exclusio alterius is thus misplaced and does little to undermine
    the Secretary’s interpretation, particularly in light of § 142(m)(1)(A)’s plain, capacious language.
    Put simply, if Congress had intended for the addition of “qualified highway or surface
    freight transfer facilities” to cover only highway projects, it would have made that clear. For
    example, it could have defined “qualified highway . . . facilities” to include only highway surface
    transportation projects, instead of “surface transportation project[s].” It did not do so. Instead, it
    used a definition that referred to “any surface transportation project,” evincing broad inclusion.
    As such, the Court has little trouble concluding that § 142(m) supports the Secretary’s
    allocation of PAB authority to a passenger rail project, assuming it receives Title 23 funds. 3
    ii. Whether the project received Title 23 funding
    Indian River County also contends that Phase II was ineligible for a PAB allocation
    because the project has not “receive[d] Federal assistance under title 23, United States Code,” as
    required by § 142(m)(1)(A).
    Here, the Secretary approved the allocation based on an application submitted by AAF.
    The application contains the following information concerning Title 23 funding:
    The planning process for All Aboard Florida started in December 2011. Since then,
    approximately $9 million from Section 130 of U.S. Code Title 23 has been invested
    in the entire corridor to improve railway-highway grade crossings and prepare the
    corridor for growth in rail traffic. Future investments from the Section 130 program
    are planned for future calendar years. The Florida Department of Transportation
    administers the Section 130 program on behalf of the State of Florida.
    AR 74235; see also AR 73549–62.
    3
    The plain text of the statute is enough to support the Secretary’s action, but it bears
    noting that this is not the first instance in which the Department allocated PAB authority to a
    passenger railway. The Department has previously allocated such authority to Maryland’s
    Purple Line light rail project and Denver’s Eagle Commuter Rail project. See Private Activity
    Bonds, US Dep’t of Transp. Build America Bureau,
    https://www.transportation.gov/buildamerica/programs-services/pab (last visited Dec. 24, 2018).
    21
    Indian River County objects that this Title 23 funding went to FECR, the freight railway
    line on whose tracks AAF’s passenger trains will run. In other words, the County contends that
    FECR, not AAF, received the Title 23 funding and AAF merely benefitted from it. As an initial
    matter, § 142(m)(1)(A) requires that PABs be allocated to a “project which receives Federal
    assistance under title 23, United States Code[.]” 26 U.S.C. § 142(m)(1)(A) (emphasis added).
    Nothing in this provision requires that the project proponent—here, AAF—receive Title 23
    funds. Nor does anything require the bond-financed project to be the exclusive beneficiary of
    those funds. The Department has long interpreted the statute to allow for PAB allocation to
    projects based on direct benefits from Title 23 spending. It highlights examples in which it has
    allocated PAB authority to a light rail project based on Title 23 funding to upgrade an adjoining
    trail, and to freight transfer facilities based on Title 23 funding to upgrade nearby highways and
    bridges. See Fed. Defs.’ MSJ at 24 (citing Decl. of Paul Baumer ¶ 7, Martin Cty. v. Dep’t of
    Transp., No. 15-cv-632-CRC (D.D.C. May 15, 2015), ECF No. 19-2). Thus, the Department’s
    long-standing interpretation of § 142(m)(1)(A) is consistent with the Secretary’s allocation of
    PAB authority to AAF’s project. And nothing in the statutory text precludes that interpretation,
    notwithstanding the facts that Title 23 funding went to FECR rather than AAF and that FECR, in
    addition to AAF, benefited from the funding.
    But at the same time, as the Department has tacitly acknowledged, see Hr’g Tr. at 64:9–
    23, the statutory requirement that a project receive Title 23 funding cannot be construed so
    broadly as to allow the Department to bootstrap a project into PAB eligibility based solely on an
    incidental and unintentional benefit from the funds. In other words, the record must support the
    conclusion that the funds were disbursed to benefit the project.
    22
    The record here supports the Secretary’s conclusion that the project received Title 23
    funding. Florida’s Department of Transportation disbursed approximately $9 million to account
    for increased rail traffic on the FECR railway after AAF commenced planning its project. AR
    74235, 73549–62. To be sure, there were planned increases in FECR freight traffic as well, but
    the record indicates that a disproportionate amount of the Title 23 funding was disbursed only
    after the AAF project began. Over the ten-year period from 2005 through 2014, the railway
    received approximately $21 million dollars in Title 23 funding, approximately 43% of which
    came in the three years following the commencement of AAF’s planning. AR 73549–62. Given
    that the AAF project received substantial attention in Florida, the Court is skeptical that the
    State’s Department of Transportation disbursed (and increased) this Title 23 funding without the
    knowledge—if not purpose—of benefitting the project. In short, the record indicates that this is
    not an instance in which the AAF project was such an ancillary or unintended beneficiary of the
    funds as to prevent the Secretary from concluding that it had “receive[d] Federal assistance under
    title 23[.]” 26 U.S.C. § 142(m)(1)(A). Between these facts and the deferential nature of its
    review, the Court cannot accept Indian River County’s contentions.
    Indian River County also alleges that the Department inappropriately interpreted
    § 142(m)(1)(A) to allow PAB authority to finance the entire railway corridor based on the
    expenditure of Title 23 funds for discrete highway-rail crossings along that corridor. The
    Secretary’s conclusion—that the highway-rail crossings sufficed to render the whole corridor
    eligible for PAB allocation—is consistent with longstanding Department interpretation of what
    constitutes a “project” for purposes of § 142(m)(1)(A). Immediately following SAFETEA’s
    passage, the Federal Highway Administration (“FHA”) wrote to the IRS to indicate its view that
    “the most reasonable reading . . . permits the proceeds of [PABs] authorized by this provision to
    23
    be used on the entire transportation facility that is being financed and constructed even though
    only a portion of that facility receives Federal assistance under title 23.” AR 73546. FHA
    explained that a narrower reading of “project” would cause States, which disburse Title 23 funds,
    to sprinkle the funds along whole facilities in order to make them eligible for PAB allocation,
    rather than continuing the practice of using them at discrete portions of facilities. AR 73546–47.
    Concluding that Congress did not intend § 142(m)(1)(A) to change disbursement practices, FHA
    interpreted the provision to reflect a broader definition of “project” than just the specific portion
    of a facility financed by Title 23 funding. FHA’s analysis reflects a reasonable assessment of
    congressional intent and the statutory text, and the Secretary’s interpretation of § 142(m)(1)(A)
    in this case conforms to it.
    The Court therefore concludes that Phase II of the AAF railway is a project that received
    Title 23 funding. Because it is also a surface transportation project, the Court will grant
    summary judgment to the federal Defendants and Intervenor-Defendant on this claim.
    2. Section 147(f)
    Indian River County also challenges the use of PABs as a violation of 26 U.S.C. § 147(f),
    which establishes public approval requirements before bonds can be “qualified” to receive tax-
    exempt status. The County insists that unless and until it approves the PABs, they do not
    constitute qualified bonds. The Department of Transportation asks the Court to dismiss this
    claim as improperly presented. AAF, for its part, contends that Indian River County’s claim fails
    on the merits because the State of Florida approved issuance of the bonds in accordance with
    § 147(f)’s requirements, which obviated the need for approval by all counties through which the
    railway runs. The Court will address each argument in turn, reaching the merits of the Plaintiff’s
    claim and granting summary judgment to the federal Defendants and Intervenor-Defendant.
    24
    a. Failure to state a claim
    The Department asks the Court to dismiss Indian River County’s § 147(f) claim because
    the Secretary “is not required to investigate whether Section 147’s requirements have been met
    before [she] makes a PAB allocation.” Fed. Defs.’ MSJ at 27. It explains the Secretary’s
    responsibilities under the statutory scheme begin and end with § 142: she must determine only
    whether a project is a “qualified highway or surface freight transfer facility” and, if so, whether
    to allocate to that project a portion of the $15 billion in tax-exempt PABs authorized by
    Congress. Section 147, the Department contends, presents a wholly distinct requirement for
    PABs to qualify for tax-exempt status into which the Secretary need not inquire before allocating
    PABs. Consequently, according to the Department, even if Indian River County’s allegations
    regarding § 147(f) were true, they would have no bearing on the legality of the allocation but
    would concern only an assessment of the future tax liability of bondholders.
    While it does not appear that the statutory scheme imposes any obligation on the
    Secretary to police § 147(f) compliance, the record indicates that the Secretary did consider such
    compliance in this particular instance. AAF’s application for a PAB allocation highlighted its
    view that § 147(f)’s requirements had been met by Florida’s approval. AR 74221 (“AAF has
    already successfully completed the necessary hearings and approvals required under” § 147(f).).
    As part of the application, AAF submitted two documents indicating as much. First, it provided
    a resolution by the FDFC, the Florida governmental entity responsible for issuing the bonds,
    approving their planned issue. AR 74240–53. The resolution included FDFC’s finding that
    § 147(f) requirements were satisfied by a properly noticed public hearing held in Tallahassee and
    subsequent approval by a Florida official delegated powers by the State’s Governor. AR 74242–
    44. Second, AAF submitted a proposed bond counsel tax and validity opinion by the law firm
    25
    Greenberg Traurig, based on its review of the record and applicable laws. AR 74254–57. That
    opinion determined that “interest on the Bonds . . . is excludable from gross income for purposes
    of federal income taxation under existing laws as enacted and construed[.]” AR 74256. The
    Department invited submission of both documents. While there are no formal requirements for
    PAB allocation applications, the Department has indicated that “to facilitate [its] consideration of
    [an] application,” applicants “may wish” to include, among other information, “a copy of a
    resolution . . . authorizing the issuance of a specific issue of obligations,” and a “Form of Bond
    Counsel Opinion or date by which a draft letter will be provided.” 71 Fed. Reg. 642, 643 (Jan. 5,
    2006). Put simply, applicants wishing to receive serious consideration for an allocation would be
    wise to provide documentation that would analyze and support the tax-exempt nature of the
    bonds, should allocation be provided.
    Importantly, the Department’s provisional PAB allocation in this case conditioned final
    allocation on the bond counsel’s opinion. It explained that final allocation was based on several
    requirements, the first of which was “a final bond counsel tax and validity opinion . . . issued at
    the time of the closing of the bond issue in substantially the form provided with the application.”
    AR 74324. That condition indicates that the Department sought assurances that the allocation it
    made would involve bonds otherwise compliant with tax-exemption requirements. It also
    indicates that the Department was satisfied with bond counsel’s analysis, which assumes § 147(f)
    compliance by virtue of its conclusion that the bonds are tax exempt.
    The Court’s analysis here is informed by the nature of the allocation. Even accepting the
    Department’s contention that it is not responsible for policing compliance with § 147(f), the fact
    remains that it is responsible for allocating highly-sought-after tax-benefits from a finite pool. In
    this case, the Department has used $1.15 billion of the $15 billion in that pool to support Phase II
    26
    of the project. The Court is skeptical that the Department would formally allocate $1.15 billion
    in bond authority absent some confidence that the bonds would indeed be tax-exempt.
    Otherwise, the Department would be wasting nearly ten percent of the finite resource Congress
    empowered it to administer. The bonds here will be issued and offered for sale imminently, and
    the Department has given no indication that they are legally infirm. It has not questioned the
    bond counsel opinion that the bonds will be properly tax-exempt. It has not suggested that the
    bonds fail to comply with any “applicable Federal law,” a further condition of the final
    allocation. See AR 74325. In short, it appears that the Department has implicitly concluded that
    the State-level public approval satisfied § 147(f) requirements. Moreover, in this litigation, the
    Department has embraced AAF’s view that the State-level public approval satisfied those
    requirements. See Fed. Defs.’ Reply at 10 (“Thus, here, the State of Florida’s approval is
    sufficient to satisfy Section 147(f).”).
    It bears emphasizing that the Court’s holding on this issue is fact bound. The Court’s
    conclusion is not that the statutory scheme requires the Department of Transportation to police
    compliance with § 147(f) or any other requirement for tax exemption. Nor can the Court
    conclude that the Department makes assessments of § 147(f) compliance for every allocation.
    Rather, it concludes only that, in this particular case, the Department has interpreted § 147(f) as
    satisfied—an assessment rooted in AAF’s application and supporting materials, the
    Department’s provisional allocation letter and the conditions it enumerated, the fact that the
    bonds will be issued imminently and the Department has not raised any § 147(f) concerns, and
    the Department’s position in this litigation that AAF’s arguments on the merits are correct.
    Under these circumstances, then, the Court finds it appropriate to reach the merits of the
    County’s § 147(f) claim.
    27
    b. Section 147(f) merits
    While Indian River County has stated a valid claim under § 147(f), the claim is not
    meritorious, and the Court will grant summary judgment to the federal Defendants and AAF.
    For PABs to be “qualified” and thus tax-exempt, § 147(f) requires public approval by:
    (i) the governmental unit—
    (I) which issued such bond, or
    (II) on behalf of which such bond was issued, and
    (ii) each governmental unit having jurisdiction over the area in which any
    facility, with respect to which financing is to be provided from the net
    proceeds of such issue, is located (except that if more than 1 governmental
    unit within a State has jurisdiction over the entire area within such State in
    which such facility is located, only 1 such unit need approve such issue).
    26 U.S.C. § 147(f)(2)(A). Subsections (i) and (ii) are commonly known as “issuer approval” and
    “host approval,” respectively. In this case, FDFC, a State-level agency, issued the bonds after
    concluding that § 147(f)’s requirements had been met. Specifically, it cited a noticed public
    hearing held in Tallahassee, followed by approval by a Florida State official who was “the
    designee of the Governor of the State of Florida, the applicable elected representative to approve
    the [bond] issuance.” AR 74243–44; see also, 26 U.S.C. § 147(f)(2)(B) (requiring “a public
    hearing following reasonable public notice”); AAF’s MSJ, Ex. 1 (memorandum from Florida
    Governor authorizing approval on his behalf).
    Indian River County does not dispute that the issuer approval complied with § 147(f)(i).
    Nor does it dispute that because the State issued the bonds, its issuer approval was tantamount to
    host approval by the State. See 26 C.F.R. § 5f.103-2(c)(3). The County’s claim, rather, is that
    the State’s approval alone was insufficient to satisfy § 147(f)(2)(A)(ii) without approval at the
    county level as well.
    Indian River County contends that the plain text of § 147(f)(2)(A)(ii) unambiguously
    requires the County to approve the bond issue before the bonds achieve qualified status. It
    28
    maintains that because it is a “governmental unit having jurisdiction over the area in which” the
    railway “is located,” its approval is necessary unless the parenthetical exception applies. And the
    exception does not apply, the County argues, because Phase II runs through five counties, so this
    is not an instance in which “more than 1 governmental unit . . . has jurisdiction over the entire
    area . . . in which [the] facility is located.” 26 U.S.C. § 147(f)(2)(A)(ii).
    But even without the parenthetical exception, § 147(f)(2)(A)(ii) is ambiguous in its
    requirement that “each governmental unit having jurisdiction” over the relevant area approve the
    bond issue. Congress did not define the term “governmental unit” beyond indicating that it
    excludes the federal government. See 26 U.S.C. § 150(a)(2). So, the term “governmental unit”
    could conceivably encompass everything from the State to its counties to school boards and
    dogcatchers.
    Hoping to sidestep ambiguity in the term “governmental unit,” Plaintiff urges the Court
    to apply a limiting principle implicit in § 147(f), noting that approval requirements are satisfied
    by approval “by the applicable elected representative” of a government unit, which includes “an
    elected legislative body of such unit” or “the chief elected executive officer.” 26 U.S.C.
    § 147(f)(2)(E). This provision, according to Plaintiff, clarifies that “governmental unit” in this
    context unambiguously means an entity with an elected legislature or chief executive. See Hr’g
    Tr. at 47:14–16. But those provisions go to the mechanisms by which a governmental unit may
    approve, not to the definition of “governmental unit” itself. See 26 U.S.C. § 147(f)(2)(B).
    Section 147(f) also anticipates situations in which a governmental unit may not have an
    “applicable elected representative,” 
    id. § 147(f)(2)(E)(ii),
    which betrays the contention that
    Congress defined the term “governmental unit” to include only governmental entities with
    elected legislative bodies or chief executives. Further, even if the Court were to accept
    29
    Plaintiff’s contention, it would not render the statutory text unambiguous: local school boards,
    sheriffs, and other entities are often elected to exercise legislative or executive authority, and
    each would constitute a “governmental unit” absent further clarification. See 26 C.F.R. § 5f.103-
    2(e) (clarifying that “[i]f multiple elected legislative bodies of a governmental unit have
    independent legislative authority, . . . the body with the more specific authority relating to the
    issue is the only legislative body” whose approval suffices); 
    id. § 5f.103-2(h)(7)
    (discussing
    example implicating elected school board).
    Even setting aside these types of entities, Indian River County’s position would mean that
    every single city and town through which Phase II runs would have to approve the bonds’
    issuance in order for them to be tax exempt, even if all of the counties encompassing those
    jurisdictions approved the issue. Congress passed § 147(f) to promote democratic accountability
    and safeguard State and local governments’ input on projects as a means of ensuring tax
    exemptions benefit the public. Affordable Hous. Dev. Corp. v. City of Fresno, 
    433 F.3d 1182
    ,
    1193 (9th Cir. 2006). But it is hard to imagine that its chosen mechanism would yield a result in
    which a single town could pocket veto a significant public infrastructure project notwithstanding
    the assent of the State and county governments.
    The absurdity of Plaintiff’s view is further revealed by its interpretation of
    § 147(f)(2)(A)(ii)’s parenthetical exception “that if more than 1 governmental unit within a State
    has jurisdiction over the entire area within such State in which such facility is located, only 1
    such unit need approve such issue.” Plaintiff reads this to mean that State approval alone
    suffices only in such a situation. But that would mean a State could approve a facility over local
    government objections only if the local government had jurisdiction over the entire facility.
    Under Plaintiff’s view, if, for example, the facility were entirely within Indian River County,
    30
    Florida’s approval would suffice, even if Indian River County opposed it, because both Florida
    and the County would share jurisdiction over the entire area. But, because Phase II spans four
    other counties within the State, Florida’s approval is insufficient. It would be a bizarre outcome,
    to say the least, if a State could approve financing of a facility over a political subdivision’s
    objection if the facility were located entirely within that subdivision but could not do so when the
    facility traverses multiple subdivisions. Why would Congress empower a county to override its
    State’s desire to finance a facility in every instance except those in which it is uniquely affected?
    This only compounds the absurdity of Plaintiff’s reading of the non-parenthetical portion of
    § 147(f) to require assent from every single local government through which Phase II runs. The
    Court cannot accept this reading. Cf. Griffin v. Oceanic Contractors, Inc., 
    458 U.S. 564
    , 575
    (1982) (explaining that statutory interpretations that “would produce absurd results are to be
    avoided if alternative interpretations consistent with the legislative purpose are available”).
    In short, there is substantial ambiguity in the requirement of approval by “each
    governmental unit” with jurisdiction over the facility. In the face of such ambiguity, the Court
    considers whether the Department’s implicit interpretation—that the State’s approval alone
    satisfied § 147(f)(2)(A)(ii)—“is based on a permissible construction of the statute in light of its
    language, structure, and purpose.” Nat’l Treasury Emps. 
    Union, 754 F.3d at 1042
    (quoting AFL-
    
    CIO, 409 F.3d at 384
    ). There are several indications that it was a permissible construction of the
    statute.
    First, the legislative history indicates that, notwithstanding ambiguous statutory language,
    Congress intended State approval to suffice in situations like this. The Conference Committee
    reports included language “intend[ed] to clarify the application of the rule requiring a public
    31
    hearing and approval by an elected official or legislative body in order to issue [PABs].” The
    reports explained:
    Where the facilities are located entirely within the geographic jurisdiction of the
    issuing governmental unit, only one public hearing and approval are required even
    though the facilities may be located in several different subdivisions of the issuing
    governmental unit.
    ...
    For example, where a governor of a state is to approve the issuance of bonds for
    facilities located in that state (even though located in several counties), only the
    state is required to have a public hearing on the bond issue.
    H.R. Rep. No. 97-760, at 517 (1982) (Conf. Rep.); S. Rep. No. 97-530, at 517 (1982) (Conf.
    Rep.).
    The example is precisely on point. Here, Florida’s Governor, through his representative,
    approved the issuance of bonds for the facilities. Per the Conference Committee reports, that
    approval suffices and the fact that the facilities run through several political subdivisions of the
    State does not undermine its sufficiency.
    Second, the Department’s implicit acceptance of the sufficiency of the State’s approval is
    consistent with IRS regulations implementing § 147(f). Those regulations define “governmental
    unit” to mean “a State, territory, a possession of the United States, the District of Columbia, or
    any political subdivision thereof.” 26 C.F.R. § 5f.103-2(g)(1). Plugging the relevant part of that
    definition into § 147(f) yields a requirement of approval by “each State or political subdivision
    thereof having jurisdiction” over the relevant area. This phrase by itself doesn’t answer the key
    question one way or the other, because it is not immediately clear what work the word “or” does
    in this context. It could signify that every unit with jurisdiction—whether a State or its political
    subdivision—must approve the issue; it could also signify that each State with jurisdiction, or
    each political subdivision with jurisdiction, must approve the issue.
    32
    Fortunately, the same IRS regulations provide examples that answer any lingering
    questions and confirm that it is the latter. Example 5 is particularly instructive:
    County M proposes to issue an industrial development bond to finance a project
    located partly within the geographic jurisdiction of County M and partly within the
    geographic jurisdiction of County N. Both counties are located in State X. The
    part of the project in County N is also located partly within the geographic
    jurisdiction of City O and partly within the geographic jurisdiction of City P. Under
    the provisions [implementing issuer approval], County M must give issuer
    approval. Additionally, under the provisions [implementing host approval], either
    State X, County N, or both Cities O and P, must give host approval.
    
    Id. § 5f.103-2(h)(5).
    This example removes any doubt that a higher-level government unit’s approval suffices
    to satisfy § 147(f)(2)(A)(ii), whether or not its political subdivisions approve. That is why
    County N’s approval obviates the need for Cities O and P to give their own approval, and why
    State X’s approval obviates the need for County N’s approval.
    Given clear legislative intent and the long-standing regulations interpreting the statute,
    the Court concludes that it is reasonable to interpret § 147(f)(2)(A)(ii) as satisfied by State-level
    approval in this instance. This is also consistent with Congress’s purpose, which was to build in
    some level of democratic accountability to ensure that tax-exempt bonds finance only those
    projects that actually benefit the public. That goal is achieved if every area in which a facility is
    located falls within the constituency of an approver.
    This reading of the statute is not inconsistent with § 147(f)(2)(A)(ii)’s parenthetical
    exception, on which Plaintiff heavily relies as the sole exception where State approval suffices.
    The regulatory examples help clarify that this exception is designed to permit approval by a
    lower-level government without the need for higher-level approval. In one of the examples,
    “State X proposes to issue an industrial development bond to finance a facility located partly
    within the geographic jurisdiction of State X and partly within the geographic jurisdiction of
    33
    State Y,” with the “portion of the facility located in State Y . . . entirely within the geographic
    jurisdiction of City Z.” 26 C.F.R. § 5f.103-2(h)(7). In this instance, “either State Y or City Z
    must give host approval as that part of the facility to be located outside State X will be entirely
    within the geographic jurisdiction of each unit.” 
    Id. In other
    words, the lower-level government
    need not wait for higher-level authority to approve such a project but does not possess veto
    power if the two share jurisdiction. This is consistent with the view that the statute means each
    State with jurisdiction, or its political subdivision with jurisdiction, must approve the issue.
    To avoid doubt and facilitate this understanding, the IRS’s regulations further provide
    that “if property to be financed . . . is located within two or more governmental units but not
    entirely within either of such units, each portion of the property which is located entirely within
    the smallest respective governmental units may be treated as a separate facility.” 
    Id. § 5f.103-
    2(c)(3). This clarifies why, in Example 5, once County M gave issuer approval (which doubled
    as host approval), County N’s approval sufficed absent State X’s approval, even though it did not
    have jurisdiction over the entire area. Each portion could be treated as a discrete facility so the
    portion in County N was entirely within the jurisdiction of both State X and County N, allowing
    County N alone to give host approval. Likewise, it clarifies why Cities O and P could both give
    host approval without waiting for either County N or State X. Either the State, or its political
    subdivision with jurisdiction, must approve the bond issue
    In sum, reading § 147(f)(2)(A)(ii)’s parenthetical exception to empower a local
    government to approve a facility without waiting for the State is consistent with the
    congressional purpose of financing facilities that benefit the public while ensuring democratic
    accountability. Once a local government with jurisdiction over the entire facility concludes that
    it is worthwhile, it would make little sense to force it to wait for the State to act. The exception
    34
    is a mechanism for facilitating local government assent to a project in the face of State
    intransigence. Plaintiff’s interpretation, on the other hand, would turn a shield into a sword and
    allow a local government to veto a State’s approval.
    Plaintiff’s understanding of § 147(f) would yield absurd results and runs head first into
    the Conference reports in which Congress announced its intention that “where a governor of a
    state is to approve the issuance of bonds for facilities located in that state (even though located in
    several counties), only the state is required to have a public hearing on the bond issue.” H.R.
    Rep. No. 97-760, at 517 (1982) (Conf. Rep.); S. Rep. No. 97-530, at 517 (1982) (Conf. Rep.).
    The Secretary’s implicit conclusion that these PABs comply with § 147(f)’s public
    approval requirement is consistent with longstanding IRS regulations. Those regulations, in turn,
    effectuate Congress’s clearly expressed intent and are a reasonable interpretation of the statute.
    The Court will therefore grant summary judgment to the federal Defendants and Intervenor-
    Defendant on this issue.
    B. NEPA Compliance
    Indian River County also alleges that the environmental review for Phase II conducted by
    FRA did not comply with the National Environmental Policy Act (“NEPA”), 42 U.S.C. § 4321 et
    seq.
    NEPA requires federal agencies to take a “hard look” at the environmental consequences
    of significant actions they propose to undertake. Theodore Roosevelt Conservation P’ship v.
    Salazar (“Theodore Roosevelt Conservation P’Ship II”), 
    661 F.3d 66
    , 75 (D.C. Cir. 2011)
    (quoting Nevada v. Dep’t of Energy, 
    457 F.3d 78
    , 92–93 (D.C. Cir. 2006)). NEPA has two
    goals: it “places upon an agency the obligation to consider every significant aspect of the
    environmental impact of a proposed action[,]” and “it ensures that the agency will inform the
    35
    public that it has indeed considered environmental concerns in its decisionmaking process.”
    Balt. Gas & Elec. Co. v. NRDC, 
    462 U.S. 87
    , 97 (1983) (citations and quotation marks omitted).
    NEPA is “‘essentially procedural,’ designed to ensure ‘fully informed and well-considered
    decision[s]’ by federal agencies” rather than “particular results.” Del. Riverkeeper Network v.
    FERC, 
    753 F.3d 1304
    , 1309–10 (D.C. Cir. 2014) (first quoting Vt. Yankee Nuclear Power Corp.
    v. NRDC, 
    435 U.S. 519
    , 558 (1978); then quoting Dep’t of Transp. v. Pub. Citizen, 
    541 U.S. 752
    , 756–57 (1989)).
    NEPA’s core is the requirement that an agency prepare an Environmental Impact
    Statement (“EIS”) for any proposed major federal action “significantly affecting the quality of
    the human environment[.]” 4 42 U.S.C. § 4332(C). An EIS must detail the foreseeable
    environmental impact of the proposed action, unavoidable adverse impacts, alternatives to the
    proposed action, and any irreversible commitments of resources. 
    Id. Understandably, preparing
    an EIS is a significant undertaking: the agency must not only publish its analysis for public
    review and comment but must also consult with other agencies that offer specific expertise. Id.;
    40 C.F.R. §§ 1502.9, 1506.6. Finally, an EIS must be completed before the agency irretrievably
    commits federal resources to the project so that the NEPA review serves its purpose of ensuring
    that the environmental consequences are considered during the early stages of planning. See
    Andrus v. Sierra Club, 
    442 U.S. 347
    , 351 (1979).
    Because NEPA does not provide an independent cause of action, plaintiffs bring their
    NEPA claims under the general review provision of the APA. 5 U.S.C. §§ 702, 706. Under the
    APA, a court may only set aside agency actions that are “arbitrary, capricious, an abuse of
    4
    As explained above, the Court previously held that the Secretary’s first PAB allocation
    constituted a major federal action. See Indian River Cty. 
    II, 201 F. Supp. 3d at 21
    . The parties
    do not question whether the Secretary’s latest allocation also qualifies as such.
    36
    discretion, or otherwise not in accordance with law.” 
    Id. § 706(2)(A).
    This means that the
    agency’s NEPA decision must “comply with ‘principles of reasoned decisionmaking, NEPA’s
    policy of public scrutiny, and [the Council on Environmental Quality’s] regulations.’” Del.
    Riverkeeper 
    Network, 753 F.3d at 1313
    (quoting Found. on Econ. Trends v. Heckler, 
    756 F.2d 143
    , 154 (D.C. Cir. 1985)). More specifically, “the agency must examine the relevant data and
    articulate a satisfactory explanation for its action including a rational connection between the
    facts found and the choice made.” 
    Id. (quoting Motor
    Vehicle Mfrs. Ass’n of the U.S. v. State
    Farm Mut. Auto. Ins., 
    463 U.S. 29
    , 43 (1983)). Like in other APA challenges, a decision is not
    proper under NEPA “if the agency has relied on factors which Congress has not intended it to
    consider, entirely failed to consider an important aspect of the problem, offered an explanation
    for its decision that runs counter to the evidence before the agency, or is so implausible that it
    could not be ascribed to a difference in view or the product of agency expertise.” 
    Id. (quoting State
    Farm, 463 U.S. at 43
    ). In short, the agency’s NEPA review must be the “product of
    ‘reasoned decisionmaking.’” 
    Id. (quoting State
    Farm, 463 U.S. at 43
    ).
    Indian River County challenges five separate aspects of FRA’s NEPA review. It
    contends that FRA failed to adequately analyze: (1) the public-safety consequences of more and
    faster trains traveling along the rail line; (2) the impact of boats having to queue at closed
    railroad bridges waiting for trains to pass; (3) the available route and bridge alternatives; (4) the
    anticipated noise generated by the trains; and (5) the projected increase in freight train speeds
    due to planned track enhancements. A common theme of the County’s complaints is that FRA
    did not analyze certain issues in a manner or with a level of detail that it would have preferred,
    and failed to comply with NEPA’s “look before leaping” directive by deferring necessary studies
    37
    until after the NEPA process. With those broad critiques in mind, the Court will address the five
    alleged deficiencies in turn.
    1. Public-safety effects of the project
    Under NEPA, an agency must take a “hard look” at any impact the proposed action may
    have on “public health or safety.” Standing Rock Sioux Tribe v. U.S. Army Corps of Engineers,
    
    255 F. Supp. 3d 101
    , 123 (D.D.C. 2017) (first quoting Robertson v. Methow Valley Citizens
    Council, 
    490 U.S. 332
    , 350 (1989); then quoting 40 C.F.R. § 1508.27(b)(2)). And, where safety
    information is incomplete or not available, the agency must disclose that such information “is
    lacking.” 40 C.F.R. § 1502.22.
    Indian River County contends that FRA failed to adequately consider several risks to
    public safety by deferring necessary safety studies until after the NEPA process was complete.
    Specifically, the County highlights what it perceives are inadequacies with respect to pedestrian
    safety, train collisions, and delays experienced by emergency responders waiting at crossings for
    trains to pass. Pls.’ MSJ at 11. FRA and AAF counter that the agency thoroughly examined the
    project’s public-safety impacts using the information available, considered and responded to
    numerous public comments regarding safety, and incorporated mandatory mitigation
    requirements in the FEIS. Based on its review, FRA concluded that the project would have an
    overall positive effect on public health and safety because the project includes planned track
    improvements and safety enhancements and would result in more people using trains rather than
    cars, leading to safer roads with fewer accidents and less pollution. AR 73589.
    The Court starts with Plaintiff’s underlying concern that the agency abdicated its
    responsibility to conduct an independent public safety evaluation by deferring any “hard look”
    until after the NEPA process is complete and “shuffl[ing]” responsibility to respond to public-
    38
    safety concerns “off to AAF.” Pls.’ MSJ at 11. In support of that contention, the County relies
    on a response from AAF that was ultimately incorporated into the FEIS: “Consistent with FRA
    safety requirements, which are not part of the NEPA process, AAF will develop a Hazard
    Analysis and System Safety Program Plan prior to the start of the operations.” AR 38707,
    73658. Plaintiff protests that NEPA is a “look before you leap” statute, requiring the agency to
    conduct a thorough investigation of the significant safety and environmental impacts before
    taking a major federal action. Hr’g Tr. at 13:17–14:3. In the County’s view, had FRA
    “looked”—that is, conducted a safety analysis as part of the NEPA process—it would have
    disclosed and more specifically addressed the three specific safety issues identified above.
    The trouble for the County is that FRA does not contend that the Hazard Analysis and
    System Safety Program Plan (“SSP Plan”), prepared pursuant to FRA regulations, 5 replaces
    NEPA. Rather, these are two separate requirements. Under NEPA, FRA must take a hard look
    at the safety impacts of the project, and that is what FRA did. The agency considered and
    disclosed a wide number of safety impacts of the project based on the information available at
    the time and then reasonably concluded that the increased safety risks from more and faster
    trains could be mitigated. These mitigation measures include grade-crossing improvements;
    installation of Positive Train Control (“PTC”)—a system of dynamically monitoring and
    controlling train movements—across both passenger and freight trains; construction of fencing in
    locations along the line where pedestrians are more likely to cross the tracks illegally; and
    coordination with local officials regarding emergency vehicles. AR 74056–58. So while the
    County is correct that the future SSP Plans “do not obviate the need for the hard look and public
    5
    See 49 C.F.R. § 270.103.
    39
    airing that NEPA demands,” Pls.’ Reply at 8, FRA independently met its NEPA obligations in
    this regard.
    The Court now moves to Indian River County’s more specific safety concerns.
    a. Pedestrian safety
    Indian River County first contends that FRA and AAF overlooked serious risks to
    pedestrian safety at both “formal” and “informal” crossings. Before discussing these arguments,
    it is helpful to define some of these train terms. Pedestrians cross train tracks at either “formal”
    or “informal” crossings. Formal crossings are those that pedestrians are supposed to use. We all
    recognize them: pathways or roads, signage, and signals indicating when a train is coming and
    when it is safe to cross. Informal crossings are the opposite, ones that pedestrians are not
    supposed to use but sometimes do. Informal crossings will be somewhere on the “mainline” of
    the railroad—that is, anywhere along the tracks other than at the formal, at-grade crossings—
    where a pedestrian can scamper across. Finally, pedestrians can cross tracks legally or illegally.
    A pedestrian crosses legally by waiting, at a formal crossing, for the “all clear” and complying
    with the signals. One crosses the tracks illegally by either jaywalking at a formal crossing or
    “trespassing” across the tracks at an informal crossing.
    i. Formal crossings
    With respect to formal crossings, Indian River County originally contended that AAF’s
    planned grade-crossing improvements were only voluntary and that any mitigation requirements
    were contingent on localities agreeing to pay for ongoing maintenance. Pls.’ MSJ at 16. Both
    FRA and AAF have clarified, however, that despite some ambiguity in the FEIS, the grade-
    crossing improvements are mandatory mitigation measures. See Fed. Defs.’ MSJ at 31–32; AAF
    40
    MSJ at 12. 6 Accordingly, AAF will be required to “implement and fund initial grade crossing
    safety enhancements identified in the Diagnostic Team Report.” AR 74137; see also AR 74054
    (FEIS concluding that the project “would result in enhancing public safety with improvements to
    grade crossing signal equipment for vehicular and pedestrian traffic”). And it is AAF that will
    pay the cost of making these initial grade-crossing safety improvements. AR 73718. Based on
    these representations, the County’s “concern that the grade-crossing improvements will not be
    implemented at all has been put to rest.” Pls.’ Reply at 11. 7
    And these improvements are extensive. The required safety features are the result of a
    diagnostic safety review, a thorough study of 349 total grade crossings conducted by FRA’s
    Office of Railroad Safety–Highway Rail Crossing and Trespasser Program Division, in which
    Indian River County participated. AR 73718–19. The diagnostic team made a series of
    crossing-related recommendations, all of which were adopted. See AR 74137. These measures
    include implementing sidewalk gates in particular locations, formal pedestrian crossings
    wherever sidewalks exist on either side of the tracks, PTC along the entire project, and four
    quadrant gates (which consist of automatic flashing light signals and gates) at grade crossings.
    AR 73718–24; see also AR 49371–85. Thus, contrary to the County’s concerns, the FEIS
    6
    For example, although the FEIS states that AAF will implement the crossing
    improvements “in conjunction with county and municipal execution of amendments to existing
    crossing license agreements,” AR 73589, FRA has assured Indian River County that this does
    “not precondition the grade crossing enhancements” on any such amendments, Fed. Defs.’ MSJ
    at 32.
    7
    Who will bear the cost of maintaining these grade crossings remains an open question
    subject to some combination of state law and future negotiations. The Court need not resolve
    this question, however, because it is beyond the scope of whether FRA reasonably concluded
    that the required mitigation measures were sufficient to address the safety concerns of
    reintroducing passenger trains to the FECR corridor.
    41
    requires AAF to implement a variety of safety measures and improvements at formal crossings to
    ensure pedestrian safety.
    ii. Informal crossings
    With respect to informal crossings, the County insists that even if FRA reviewed the
    safety risks at formal at-grade crossings, it completely overlooked the risk to trespassing
    pedestrians on the mainline. Pls.’ MSJ at 13; Pls.’ Reply at 3. Plaintiff says that these
    pedestrians risk being blind-sided by high-speed passenger trains, which can be hard to see and
    harder still to hear until too late. Pls.’ MSJ at 13. It argues that “there is no ‘existing analysis’ in
    the FEIS, or elsewhere in the record, of the safety impacts of the Project on pedestrians on the
    FECR corridor outside of formal grade crossings.” Pls.’ Reply at 7.
    The record demonstrates otherwise. The FEIS expressly considers the possibility of
    trespassers—including pedestrians who cross on the mainline at “informal” crossings or against
    signals at formal grade-crossings—and proposes mitigation measures to address the problem. 8
    The suggested approach is two-fold: encouraging pedestrians to use formal crossings and
    erecting fencing to prevent them from using informal ones.
    First, encouraging pedestrians to use formal crossings. As explained above, the FEIS and
    ROD require AAF to implement a series of improvements to grade crossings, including
    pedestrian gates, paths to connect sidewalks on either side of the tracks, and flashing lights. The
    FEIS is clear that one reason to require these improvements is to encourage pedestrians to use
    8
    FRA argues that the Court should not address the County’s concerns about pedestrian
    safety along the mainline because pedestrians who trespass at informal crossings “engage in an
    unlawful activity.” Fed. Defs.’ Reply at 12. However, the problem of informal crossings, legal
    or not, is “reasonably foreseeable” and therefore must be considered. See Comm. of 100 on
    Federal City v. Foxx, 
    87 F. Supp. 3d 191
    , 214 (D.D.C. 2015). In any event, the FEIS addresses
    it. The Court will too.
    42
    formal crossings: “The infrastructure and safety improvements that are incorporated in the
    Project will reduce illegal and unsafe trespass on the rail line, and improve safety for area
    residents by adding sidewalks at grade crossings.” AR 73657. This statement in the FEIS is
    consistent with the recommendations of FRA’s on-site engineering field report, which expressed
    concerns in 2014 that AAF was not seriously committed to implementing necessary security
    measures. See AR 48371. That field report was shared with the diagnostic team which, as
    described above, produced a report that set forth the mitigation measures that AAF will be
    required to implement. The field report explained:
    Trespassing is an epidemic along this corridor. Rather than encourage it, it is
    recommended per my field notes at those particular locations—[“certain locations
    along the corridor in which sidewalks are present on both sides of the railroad right-
    of-way, but do not follow through”]—to equip sidewalk approaches with a visual
    and gated barrier. This is to provide safe passage of pedestrians through a very
    active rail line and prevents them from walking into an open railway corridor; or
    directing them onto the street—irrespective if there is an agreement or not.
    AR 49373. In light of this discussion, it cannot be said that FRA did not analyze the underlying
    problem of pedestrian crossings and come up with at least one response: create formal crossings
    where pedestrians are most likely to cross (i.e., where there are sidewalks on either side of the
    tracks).
    FRA also adopted another response: fencing to keep pedestrians from running across the
    tracks at informal crossings. The FEIS explains that the FECR Corridor already has fencing in
    “specific areas” where trespassing has been a problem. AR 73858. Among other safety
    features—like warning signs, flashing signals, a public-awareness program coordinated with
    Florida Operation Lifesaver, and PTC—the project will either improve existing fencing or add
    fencing where it is lacking:
    For the E-W Corridor standard FDOT highway fencing, or its equivalent, will be
    added throughout the length of the corridor where the track is at-grade that will
    43
    restrict and seal the railroad right-of-way from public access. . . . Fencing on the
    N-S Corridor would be upgraded based on existing public access locations and the
    potential for conflicts with the increased train frequency.
    AAF will conduct [Right of Way] Field Surveys to observe, document, and provide
    recommendations to minimize trespassing by employing fencing, warning signage,
    public outreach/information, and other appropriate measures as required.
    AR 74059. The FEIS does not specify the “specific designs” for the fencing, explaining that
    fencing will be added “where an FRA hazard analysis review determines that fencing is required
    for safety; this will be in populated areas where restricting access to the rail corridor is necessary
    for safety.” AR 73717; see also AR 74059 (“Fencing on the N-S Corridor would be upgraded
    based on existing public access locations and the potential for conflicts with increased train
    frequency. Specific designs for fencing will be developed as the project advances.”).
    Conceding, perhaps, that the FEIS considers trespassing, the County nonetheless
    contends that FRA failed to take a hard look at the problem in two ways. Neither contention is
    persuasive.
    First, the County suggests that the FEIS understates the risks pedestrians face by relying
    on “stale and limited data on the history of accidents involving FECR trains.” Pls.’ Reply at 3.
    The FEIS indicates that between 2007 and 2011—when only freight trains were running on the
    N-S Corridor—there were ten total fatalities “not at grade crossings” between Cocoa and Miami.
    AR 73856 (Table 4.4.4-2). These deaths could have involved “a range of accident types,
    including derailments, accidents between trains, trains and humans, or between trains and objects
    on the tracks.” 
    Id. The County
    retorts that “the reality” of trespasser fatalities “is starkly
    different” than that presented in Table 4.4.4-2. Pls.’ Reply at 3. Relying on data pulled from the
    same database used to create Table 4.4.4-2, the County argues that during that same period in
    that same stretch of corridor, there were actually 58 fatalities. Decl. of Philip E. Karmel, ECF
    44
    No. 37-1 & Ex. 1 to Karmel Decl. But Plaintiff’s data does not sufficiently call into question
    FRA’s decision to rely on the particular data the agency chose to use. See Sierra Club v. FERC,
    
    867 F.3d 1357
    , 1368 (D.C. Cir. 2017) (“[T]he agency’s choice among reasonable analytical
    methodologies is entitled to deference.” (citation omitted)). Plaintiff offers its data to shore up
    its concerns about pedestrian safety specifically on the mainline, but the data does not appear to
    distinguish between fatalities on the mainline and at grade-crossings. Table 4.4.4-2, by contrast,
    does, isolating the relevant data by presenting only mainline trespasser fatalities. Thus,
    Plaintiff’s data is both over-inclusive and less relevant to answering the question the County
    poses regarding trespasser fatalities along the mainline. Accordingly, the County’s data does not
    directly undermine that used in the FEIS. 9
    And second, the County contends that by not identifying specific locations or designs for
    fencing until “sometime after project approval,” FRA again “kicks the can down the road” on
    safety issues. Pls.’ MSJ at 13 (citing AR 74059). According to the County, “artful language
    about future ‘recommendations’ being included in a post-approval study by AAF does not pass
    muster . . . under NEPA.” Pls.’ MSJ at 14.
    NEPA, however, does not require the level of detail the County seeks. As the Supreme
    Court has cautioned, “there is a fundamental distinction [] between a requirement that mitigation
    be discussed in sufficient detail to ensure that environmental consequences have been fairly
    evaluated . . . and a substantive requirement that a complete mitigation plan be actually
    formulated and adopted.” 
    Robertson, 490 U.S. at 352
    . “[I]t would be inconsistent with NEPA’s
    reliance on procedural mechanisms—as opposed to substantive, result-based standards—to
    9
    Because the Court finds Plaintiff’s data less relevant to the question at hand, it need not
    resolve the parties’ dispute over whether that data constitutes extra-record evidence that should
    not be considered by the Court at all.
    45
    demand the presence of a fully developed plan that will mitigate environmental harm before an
    agency can act.” 
    Id. at 353.
    In City of Alexandria v. Slater (“Slater”), 
    198 F.3d 862
    (D.C. Cir.
    1999), for example, the D.C. Circuit considered whether the Federal Highway Administration’s
    approval of plans to replace the Woodrow Wilson Bridge in Washington, D.C., complied with
    NEPA. The Circuit disagreed with the district court’s conclusion that the agency’s discussion of
    adverse environmental effects and related mitigation measures was too “terse” to satisfy NEPA.
    
    Id. at 869–70.
    While the “discussion might have been more thorough,” more was not required.
    
    Id. at 870.
    The agency acknowledged that constructing a new bridge would affect traffic flow on
    nearby streets and could delay delivery of emergency services; the agency also “offer[ed] a range
    of mitigation strategies,” such as maintaining “some access” on roads and notifying the public of
    temporary road closings. 
    Id. This was
    enough: “Perhaps [the plaintiffs] would prefer the
    [agency] to set forth in the final EIS a comprehensive plan detailing precisely which streets will
    be closed, and which alternative routes will be established, but that is not mandated by NEPA.”
    
    Id. (citing Robertson,
    490 U.S. at 353). Here, too, FRA acknowledged potential adverse effects
    the project could have on pedestrian safety, offered a range of mitigation strategies, and required
    AAF to implement those strategies. NEPA demands no more.
    b. Train-on-train collisions
    Next, the risk of train accidents. The County maintains that the “FEIS contains no
    analysis of whether the Project will adversely affect public safety by increasing the likelihood of
    train-on-train collisions.” Pls.’ MSJ at 17. Not so. As the County itself acknowledges, the FEIS
    identifies the risk of train-on-train accidents and concludes that the installation of PTC and other
    measures will mitigate that risk. 
    Id. (quoting AR
    74056). The question, then, is whether this
    was a sufficiently “hard look” at the problem.
    46
    It was. The FEIS discloses that the reintroduction of high-speed passenger trains to the
    existing freight traffic on the N-S Corridor “may increase the frequency of opportunities for
    conflict between trains.” AR 74056. The FEIS also concludes that “safety improvements at
    crossings, an upgraded PTC system, enhanced security, and improved communications among
    emergency responders would be a beneficial effect, serving to minimize potential conflicts and
    their consequences.” 
    Id. It explains
    that “PTC is a system designed to prevent train-to-train
    collisions, derailments caused by excessive speeds, unauthorized train movements in work zones,
    and the movements of trains through switches left in the wrong position.” AR 73731 (emphasis
    added). And it points out that PTC, which is required on all new passenger lines in the United
    States, see 49 U.S.C. § 20157(a)(1), “will be interoperable between the AAF and FECR trains,”
    AR 73731.
    In addition to PTC and improvements to the FECR tracks, the FEIS notes that AAF will
    implement other measures to decrease the risk of collision, including “a passenger train
    emergency preparation plan, safety and security certification plan, and several FECR safety
    procedures.” AR 74056. And because there are “no anticipated changes in the frequency or
    quantity of hazardous materials to be transported” on the corridor, the FEIS concludes that these
    safety precautions will reduce the risk that a freight train involved in an accident will spill
    hazardous materials. AR 74060. Relatedly, the FEIS emphasizes that under the project,
    “[h]azardous materials would continue to be transported consistent with applicable statutes, rules
    and regulations.” Id.; AR 65275.
    In light of these improvements and safety measures, the government draws an apt parallel
    to the undersigned’s decision in Committee of 100 on Federal City v. Foxx, 
    87 F. Supp. 3d 191
    (D.D.C. 2015). Fed. Defs.’ Reply at 15. In that case, the plaintiffs alleged that the relevant
    47
    agency failed to evaluate the impact of rail accidents resulting from a proposed train tunnel
    renovation project in Washington, D.C. Committee of 
    100, 87 F. Supp. 3d at 215
    . The Court
    acknowledged that there might be a risk of derailment but concluded that because such a “risk of
    an accident exists today,” the plaintiffs had failed to show that “the newly-constructed tunnels
    will foreseeably increase the risk of an accident as compared to current operations.” 
    Id. Instead, the
    agency had reasonably concluded that tunnel modernization would actually decrease the risk
    of accidents. 
    Id. So, too,
    here: FRA acknowledged the risk of derailment or collision but
    explained its conclusion that the risk would be mitigated through PTC and other measures. 10
    That was sufficient under NEPA.
    c. Emergency vehicles
    Finally, the County contends that FRA failed to take the requisite hard look at the adverse
    impact the project could have on emergency vehicle response times. In simple terms, it is
    concerned that emergency responders—that is, EMTs, firefighters, and police—may be unduly
    delayed either because their routes will be detoured to avoid project-related construction or
    because they’ll have to wait more frequently for trains to pass formal crossings. The County
    believes the FEIS should have (1) disclosed the specific location of road closures that could
    impede emergency responders during construction and (2) addressed the impact that more
    10
    The County insists that FRA does “not take issue” with a risk assessment prepared by
    former-plaintiff Martin County which hypothesizes that thousands of people could be put at risk
    in the event of a train-on-train accident involving hazardous materials. Pls.’ Reply at 9. The
    record, however, clearly demonstrates that Martin County raised this specific risk assessment in
    its comments on the FEIS and that FRA responded, citing the implementation of PTC as a means
    of “significantly reducing the probability of collisions between trains.” AR 65275. Under the
    rule of reason, FRA did not need to go into more detail regarding Martin County’s study given
    that it disclosed the risk of train-on-train collisions and concluded that the risk could be mitigated
    by PTC and mandatory compliance with federal regulations.
    48
    frequent train traffic and related grade-crossing closures will have on response times. Pls.’ MSJ
    at 21–22.
    Several parts of the record reveal that the FEIS took the requisite hard look at both issues.
    The FEIS clearly discloses the risk that project construction could interfere with emergency
    vehicle traffic. AR 74036. Critically, the FEIS also identifies how “to minimize disruption and
    to maintain emergency access” during construction: AAF will coordinate planned closures and
    detours with local emergency responders. Id.; AR 73659, 73914–15. While it is true that the
    FEIS does not specify, as the County wishes, the particular roads that will be closed and when,
    Slater is again instructive: “Perhaps [the County] would prefer [FRA] to set forth in the final
    EIS a comprehensive plan detailing precisely which streets will be closed, and which alternative
    routes will be established, but that is not mandated by NEPA.” 
    Slater, 198 F.3d at 870
    (citing
    
    Robertson, 490 U.S. at 353
    ). The FEIS also clearly discloses the risk that more frequent train
    traffic will require more grade-crossing closures that could affect emergency response times
    should a vehicle have to wait at a crossing for a train to go by. AR 73659. But after disclosing
    the risk, the FEIS concludes that “the delays are expected to be minimal, as the passenger trains
    should clear a typical crossing in less than a minute.” 
    Id. Thus, FRA
    disclosed the two potential
    impacts, and concluded that one would be minimal and the other mitigated. These findings
    satisfy NEPA’s procedural requirements.
    2. Effects of vessel queuing at railroad bridges over navigable waters
    Plaintiff next turns to the project’s impact on boats waiting or queuing to cross through
    the draw bridges at the St. Lucie and Loxahatchee rivers over which the N-S Corridor track runs.
    When a train passes over one of these bridges, the bridges obviously must be in the “down”
    position. And because the bridges are not particularly high, boats cannot pass underneath when
    49
    trains cross over. By adding thirty-two passenger trains daily to the existing freight traffic, these
    bridges naturally will be in the down position much more often.
    The County concedes that FRA discloses that the project would lead to increased wait
    times at the bridges but contends that the agency failed to take a hard look at the impact that
    these longer wait times would have on public safety and the environment. Pls.’ MSJ at 27–28.
    The County describes a slew of boats waiting for the bridges to go up, idling their engines during
    the wait to hold their place in the queue against the current, all the while consuming more fuel,
    producing more pollution, and endangering marine life. While the Court agrees with Plaintiff
    that these kinds of potential effects are not to be downplayed, it concludes that FRA performed
    an adequate analysis of vessel wait times for purposes of NEPA.
    The FEIS relies on the 2014 and 2015 Navigation Discipline Reports prepared by Amec.
    See FEIS Appendices 4.1.3-B1 & 4.1.3-B2 (AR 49486–671). Based on these reports and
    extensive navigation modeling analyses, the FEIS discloses that the project will increase vessel
    queuing time at the moveable bridges as a result of increased train traffic. AR 73934. For
    example, the average weekday closure time at the St. Lucie River Bridge is projected to be 6.6
    hours under the 2016 No-Action Alternative 11 and 9.8 hours under the Project Alternative. AR
    73920 (Table 5.1.3-4). An additional three hours of bridge closures may seem like a lot but FRA
    cautions that the more relevant figure is the average wait time per closing rather than the total
    closure time per day. The average non-zero wait time 12 for boats is projected to be 6.9 minutes
    11
    Under the No-Action Alternative, the project does not go forward and freight
    operations increase by approximately five to seven percent based on current projected growth.
    AR 73919.
    12
    “Average non-zero wait time” measures the average of only boats that must wait for
    some period of time. This is in contrast to “average wait time,” which measures the average of
    boats that must wait as well as those that wait for zero minutes, thus lowering the average.
    50
    under the No-Action Alternative and 8.6 minutes under the Project Alternative. AR 73927. The
    FEIS also acknowledges that “[i]n the absence of mitigation, the potentially increased queue
    lengths and durations could adversely affect boater safety . . . .” AR 73934. The FEIS proceeds
    to explain, however, that “AAF has committed to implementing mitigation measures . . . that will
    reduce queuing and associated safety concerns by providing mariners with a fixed schedule of
    bridge closures and durations.” 
    Id. In other
    words, the agency studied the issue and estimated
    that the project will increase the wait time of boaters who experience any delay by 1.7 minutes
    on average, and proposed reducing wait times by requiring AAF to notify boaters when the
    bridges would be open so that they could plan accordingly.
    The County essentially demands a closer analysis of the safety and environmental
    impacts of increased wait times for boats than that described above. However, under the
    applicable “‘rule of reason’ standard, such detailed second-guessing of an agency’s choices is not
    the proper role of this Court.” WildEarth Guardians v. Bureau of Land Mgmt., 
    8 F. Supp. 3d 17
    ,
    33 (D.D.C. 2014) (citation omitted). After all, “it is of course always possible to explore a
    subject more deeply and to discuss it more thoroughly, but the line-drawing decisions
    necessitated by this fact of life are vested in the agencies, not the courts.” 
    Id. (cleaned up)
    (quoting WildEarth Guardians v. Salazar, 
    880 F. Supp. 2d 77
    , 88 (D.D.C. 2012)); see also N.
    Slope Borough v. Andrus, 
    642 F.2d 589
    , 600 (D.C. Cir. 1980) (“[T]he decision of how much
    detail to include is one for the agency itself, guided by a ‘rule of reason.’” (citation omitted)).
    Applying the rule of reason, the Court concludes that FRA reasonably drew the lines where it did
    and was not obliged to go into more detail regarding the impacts of vessel queuing.
    As an initial matter, FRA advanced a reasonable basis for its conclusion that the
    projected increased vessel queuing would not be as dramatic as the initial navigational modeling
    51
    analyses conducted by Amec suggested. The agency believed the analyses conservatively
    estimated wait times for three reasons. First, “[t]he model uses a conservative value of 40
    seconds as the minimum gap time between all boats approaching the crossing.” AR 49638; see
    also AR 49640. However, the FEIS found that “the observed time is almost half that.” AR
    49640 (emphasis added). Second, in response to comments on the draft EIS, Amec and FRA
    updated their analysis in the 2015 Navigation Discipline Report to rely on data regarding
    summer rather than winter boat traffic. AR 49635, 73917, 74042. There is significantly more
    boat traffic during the summer than winter, which means that the anticipated vessel wait times
    will be lower for much of the year. 
    Id. And third,
    the model is run using two scenarios—one in
    which boats can travel through the crossings simultaneously in opposite directions and one in
    which they cannot. While the U.S. Coast Guard suggests that simultaneous boat crossing is not
    considered “safe or prudent,” AR 38780, FRA found that “small and medium-sized boats have
    been observed traveling through the crossings simultaneously in opposite directions—only larger
    boats, such as commercial vessels, require one-way passage,” AR 49638.
    The County advances three criticisms of FRA’s analysis and conclusion that wait times
    will not be too severe. First, it suggests that the modeling should not have considered the
    “passing allowed” scenario in light of the Coast Guard’s warning. Pls.’ Reply at 15–16.
    However, as Amec emphasized in its Report, “a system with no boats passing is not
    representative of observed conditions.” AR 49645; see also AR 49638. It was reasonable for the
    FEIS to present the modeling results based on data consistent with observed conditions.
    Second, the County asserts that FRA unreasonably and without explanation focused on
    the “80th percentile” volume of boat arrivals, ignoring the busiest days of boat traffic represented
    by the 90th percentile volume and underestimating vessel queuing and its attendant negative
    52
    effects. However, the record is clear that FRA made a reasoned choice to use the 80th percentile.
    This value refers to “the value that exceeds 80% of the wait times of all boats, etc. For example,
    if the [80th percentile] wait time of all boats was 11.7 minutes, this means that 80% of the boats
    waited 11.7 minutes or less and 20% waited longer than 11.7 minutes.” AR 49640. In other
    words, the 80th percentile value represents a “typical high volume day.” AR 73917. FRA
    decided to focus on the 80th percentile rather than daily averages in response to comments that
    the draft EIS had “underestimated impacts . . . by using average day values.” AR 38687. Those
    commenters suggested using “a methodology similar to traffic analysis,” such as using 80th
    percentile values, instead. 
    Id. The 2015
    updated analysis bears this out: As an example, for the
    St. Lucie River crossing, the average wait for all boats is 5.1 minutes, the average wait for
    delayed boats is 8.6 minutes, and the 80th percentile wait is 14.1 minutes. AR 49645. Thus,
    FRA made the reasonable choice to use the 80th percentile value rather than the average value
    (which would underestimate wait times) or the 90th percentile value (which would exceed a
    “typical high volume day”) as a more realistic measure of boat traffic. The Court has no basis to
    second guess that decision.
    And third, the County faults FRA for failing to factor in the role of “hazardous currents.”
    Pls.’ MSJ at 27–28. Commenters on the draft EIS also expressed concern that the modeling did
    not reflect realistic boating behavior because it “assume[s] that boats could safely hold their
    positions in a queue, regardless of tides, currents, vessel wake, and other factors.” AR 73916.
    But FRA disclosed this assumption—“[t]he model does not account for the complex interaction
    of tides, currents, vessel wake, and boater behavior”—and explained that the model “represents
    the most realistic situation of boat arrivals and bridge operations possible using modeling
    technology.” 
    Id. In other
    words, FRA said it did the best it could with available modeling
    53
    technology and conceded that it was not perfect. This was “sufficiently thorough to comply with
    NEPA.” See WildEarth 
    Guardians, 8 F. Supp. 3d at 34
    (concluding that agency’s “analysis
    complies with the ‘rule of reason’ in light of the information available to the agency” where it
    “candidly disclosed that no appropriate model exists to accurately predict” specific impact raised
    by plaintiffs and “instead relied on available modeling data”); cf. Comm. of 
    100, 87 F. Supp. 3d at 218
    (explaining that an agency need not “employ the best, most cutting-edge methodologies”
    (quoting Theodore Roosevelt Conservation P’Ship v. Salazar (“Theodore Roosevelt
    Conservation P’Ship I”), 
    616 F.3d 497
    , 511 (D.C. Cir. 2010)). The County does not suggest a
    readily-available alternative modeling technique.
    FRA also reasonably concluded that most of the vessel queuing—overstated as FRA
    believed it was—could be mitigated, likewise supporting the agency’s decision not to delve
    deeper into the safety impacts of queuing. The modeling analysis “does not take into
    consideration any of the mitigation strategies” that AAF will be required to implement to reduce
    queue times. AR 49648. Those mitigation requirements include a publicly-available set
    schedule for bridge closures, notification signs with countdowns to help boaters plan trips
    accordingly, increased communication with local authorities during holidays and special events,
    and a “coordination plan” with the U.S. Coast Guard. AR 74138–39. The FEIS ultimately
    concludes that these mitigation measures “will reduce queuing and associated safety concerns.”
    Id.; see also AR 49648 (2015 Navigation Discipline Report concluding that “[i]f these strategies
    are used by the boating community, the non-zero wait times”—that is, the waiting time for boats
    that actually experience some delay—“will decrease and any potential impact to the industry can
    be significantly avoided”). This makes sense: If boaters know when the bridges will be opened
    or closed, they can plan accordingly to avoid waits.
    54
    Under the rule of reason, then, the FEIS’s discussion of vessel queuing and its related
    effects was adequate under NEPA. While the County may want a more detailed analysis of each
    environmental and safety impact, FRA reasonably drew the line, concluding that such analysis
    was not necessary given that the initial projected wait times were conservative and that most wait
    times could be mitigated.
    3. Alternatives to the route and the use of moveable bridges
    “At the ‘heart’ of the EIS is the agency’s evaluation of the potential environmental
    impacts of all ‘reasonable alternatives’ for completing the action.” Theodore Roosevelt
    Conservation P’ship 
    II, 661 F.3d at 69
    (quoting 
    Slater, 198 F.3d at 866
    ); 40 C.F.R. § 1502.14.
    “The range of reasonable alternatives must include ‘technically and economically practical or
    feasible’ alternatives,” and “is ‘delimit[ed]’ by the agency’s reasonably defined goals for the
    proposed action,” Theodore Roosevelt Conservation P’Ship 
    II, 661 F.3d at 69
    (alteration in
    original) (first quoting 43 C.F.R. § 46.420(b); then quoting 
    Slater, 198 F.3d at 867
    ). Both the
    agency’s definition of its goals and its selection of alternatives are also reviewed under the “rule
    of reason”: “as long as the agency ‘look[s] hard at the factors relevant to the definition of
    purpose,’ we generally defer to the agency’s reasonable definition of objectives.” 
    Id. (alteration in
    original) (quoting Citizens Against Burlington, Inc. v. Busey, 
    938 F.2d 190
    , 195–96 (D.C. Cir.
    1991)). And, as long as “the agency’s objectives are reasonable,” a court “will uphold the
    agency’s selection of alternatives that are reasonable in light of those objectives.” 
    Id. (citing Citizens
    Against 
    Burlington, 938 F.2d at 196
    ; 
    Slater, 198 F.3d at 867
    ).
    Indian River County contends that FRA shirked its duty to meaningfully consider
    alternatives by unreasonably deferring to AAF in two instances. The record, however,
    55
    demonstrates otherwise. FRA properly considered AAF’s goals for the project within reason and
    independently verified information provided by the company.
    a. Alternative routes
    The County first complains that FRA narrowly defined the purpose of the project to
    mirror AAF’s goals. This, in turn, led FRA to select “AAF’s preferred corridor without
    adequately considering alternatives,” including what the County suggested in a comment to the
    FEIS as a more appropriate route that would have avoided populated areas and aging railroad
    bridges. Pls.’ MSJ at 29–30; AR 64683.
    Because the goals of a project delineate the universe of reasonable alternatives, the Court
    begins with FRA’s stated goals for the project. See Union Neighbors United, Inc. v. Jewell, 
    831 F.3d 564
    , 575 (D.C. Cir. 2016). FRA defined the goal of the project as follows: to “provide
    reliable and convenient intercity passenger rail transportation between Orlando and Miami,
    Florida (the Project Corridor), by extending (in Phase II) the previously reviewed Phase I AAF
    passenger rail service between West Palm Beach and Miami and by maximizing the use of
    existing transportation corridors.” AR 73662; AR 65119. In other words, the goal is to provide
    efficient rail transportation between Orlando and Miami without having to lay too many new
    tracks. FRA also considered AAF’s central economic goal—that the project be “sustainable as a
    private commercial enterprise.” AR 73672, 73674; AR 65119. Contrary to the County’s
    suggestion, considering AAF’s goals was entirely appropriate: Congress “expect[ed] agencies to
    consider an applicant’s wants when the agency formulates the goals of its own proposed action.”
    Citizens Against 
    Burlington, 938 F.2d at 199
    .
    FRA’s decision to evaluate alternatives “primarily in light of whether they could be
    constructed and operated in accordance with AAF’s financial model,” AR 73685; AR 65120,
    56
    was also appropriate: “[W]here a federal agency is not the sponsor of a project, ‘the Federal
    government’s consideration of alternatives may accord substantial weight to the preferences of
    the applicant and/or sponsor in the siting and design of the project.’” City of Grapevine, Tex. v.
    Dep’t of Transp., 
    17 F.3d 1502
    , 1506 (D.C. Cir. 1994) (quoting Citizens Against 
    Burlington, 938 F.2d at 197
    ).
    FRA considered four alternative routes, including the preferred FECR route, for
    connecting Orlando and West Palm Beach. AR 15741; AR 73680–84. As relevant here, FRA
    concluded that an alternative, inland route using tracks owned and operated by CSX
    Transportation was not feasible for a variety of reasons: AAF did not have the operating rights
    needed for the CSX-owned route; it would need to purchase or lease land to create a new rail
    connector between the FECR route and the CSX route to connect Phases I and II; the route
    would require extensive upgrades to the track, grade crossings, and new infrastructure; trip times
    using the CSX route would exceed the 3 hour and 15 minute target for the project; and the CSX
    route would result in the highest potential adverse direct and indirect impacts to wetlands and
    protected species compared to the other routes. AR 15757, 15760, 15765; AR 73681, 73686.
    In response to the FEIS, the County proposed as another alternative the so-called “K
    Branch” route, which would partially run on CSX tracks. See AR 64683. FRA responded to this
    suggestion in Appendix C to the ROD by explaining that the K Branch route “would not meet
    the project purpose and need for the same reasons that the CSX alternative was dismissed in the
    EIS”—that is, the “route is controlled in part by CSX, and FRA concluded that it was not
    reasonable to assume that AAF could secure operating rights.” AR 65266. Moreover, “the lack
    of control over operations and the longer route length would result in trip times exceeding the
    approximately 3-hour run time[] that is part of AAF’s purpose.” 
    Id. 57 This
    response makes clear that FRA did not, as the County argues, “refuse[] to consider”
    the K Branch route. See Pls.’ Reply at 21. FRA considered the alternative, concluded it was not
    feasible for the same reasons as another infeasible alternative, and said as much. The case law
    does not require more. See Friends of Capital Crescent Trail v. Fed. Transit Admin., 
    877 F.3d 1051
    , 1063 (D.C. Cir. 2017) (“Agencies need not reanalyze alternatives previously rejected,
    particularly when an earlier analysis of numerous reasonable alternatives was incorporated into
    the final analysis and the agency has considered and responded to public comment favoring
    other alternatives.”). As in Friends of Capital Crescent Trail, “[r]equiring more detail on rejected
    alternatives would elevate form over function.” 
    Id. at 1064.
    b. Bridge alternatives
    Second, Plaintiff contends that FRA did not independently review and verify AAF’s
    assertions, presented in the FEIS at Table 3.3-14, that it was not feasible to construct alternatives
    to the existing bridges at the St. Lucie and Loxahatchee Rivers that would not result in increased
    vessel queuing. Pls.’ Reply at 18; AR 73728. To advance its point, the County emphasizes that
    AAF “prepared the one-page table” of bridge alternatives “and there is nothing in the record to
    indicate that anyone at FRA reviewed the information before copying it verbatim into the FEIS.”
    Pls.’ Reply at 18.
    But it is not dispositive that AAF or its consultant (rather than FRA) prepared the chart so
    long as FRA conducted an “independent review” of the information before including it in the
    FEIS. See Comm. of 
    100, 87 F. Supp. 3d at 211
    . There is a “presumption of regularity accorded
    to agencies in performing their duties.” 
    Id. (quoting Sierra
    Club v. Costle, 
    657 F.2d 298
    , 334
    (D.C. Cir. 1984)). The County fails to rebut that presumption with any evidence that FRA failed
    58
    to independently consider reasonable alternatives for the bridges. In fact, the record supports
    FRA’s assertion that it independently considered the bridge alternatives.
    FRA posed 123 questions to AAF regarding the draft EIS. AR 38897. One of these
    focused on alternatives to the two moveable bridges. FRA commented that the “FEIS should
    evaluate other bridge options,” including higher moveable bridges and fixed bridges that could
    support passenger and/or freight trains. AR 38930. In response, AAF prepared a chart that
    walked through those possible alternatives for the St. Lucie River and Loxahatchee River
    Bridges. Ultimately, the chart explains that the four alternatives are not feasible for a variety of
    reasons. AR 38931–32. And, contrary to the County’s assertion that FRA simply copied and
    pasted this chart into the FEIS with no independent analysis, FRA replied to AAF’s responses in
    an email: “we’ve done a preliminary review of the materials that AAF has provided in response
    to our questions. On the whole, these seem to answer the questions. We’re having our technical
    experts do further review on the analyses . . . .” AR 39151 (emphasis added). And finally, FRA
    emphasized throughout the FEIS that “[a]s required by NEPA, FRA has reviewed the
    alternatives analysis, required AAF to evaluate alternatives other than the proposed action, and
    has verified the analyses.” AR 73674. FRA’s “statement[s] that it performed an independent
    review” of the materials provided by AAF “is afforded a presumption of validity, which
    [Plaintiff] ha[s] not rebutted.” Comm. of 
    100, 87 F. Supp. 3d at 212
    . Rather, the record
    evidence contradicts the County’s contention that FRA failed to independently evaluate and
    verify the analysis undertaken by AAF regarding bridge alternatives.
    4. Noise impacts
    The County next argues that FRA’s analysis was inadequate under NEPA because, it
    contends, the agency failed to follow applicable guidance on evaluating the noise impacts of a
    59
    rail project. Pls.’ MSJ at 30. Plaintiff identifies what it believes are two fundamental departures
    from agency guidance: FRA conducted a general, rather than detailed, noise analysis and FRA
    calculated, rather than measured, existing noise levels, which led the agency to omit a key source
    of noise in its analysis.
    The ROD says that “[n]oise and vibration have been assessed according to guidelines
    specified in FRA’s High-Speed Ground Transportation Noise and Vibration Impact Assessment
    guidance manual [and] the Federal Transit Administration’s (FTA) Noise and Vibration Impact
    Assessment guidance manual.” AR 65131. The FRA manual “provides guidance and procedures
    for the assessment of potential noise and vibration impacts resulting from proposed high-speed
    ground transportation [] projects.” AR 13032. 13 The FTA manual does the same “for projects
    with conventional train speeds below 90 mph.” 
    Id. Both manuals
    outline three levels of analysis
    that may be used to determine the noise impact of a proposed project: an initial screening
    procedure, a general noise assessment, and a detailed noise analysis. AR 13068, 13071, 13094;
    FTA, Transit Noise and Vibration Impact Assessment (“FTA Manual”) (May 2006), at 1-4. 14
    True to their names, the general noise assessment involves applying more “simplified models to
    estimate train noise,” AR 13071, while the detailed noise analysis uses “more refined
    procedures . . . to predict project noise and evaluate mitigation measures” on a “site-specific”
    level, AR 13094–95. The level of detail of the analysis affects when the analysis is typically
    13
    This reference to high-speed ground transportation projects is not to be confused with
    “high-speed intercity rail facilities” referenced in 26 U.S.C. § 142(i)(1), 
    discussed supra
    , which
    applies only to passenger trains capable of 150 mile-per-hour maximum speeds. FRA’s manual
    “is intended for projects with train speeds of 90–250 mph,” AR 13032, which includes AAF’s
    project.
    14
    Available at:
    https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/FTA_Noise_and_Vibration_Manual.pdf.
    60
    done: the general noise assessment can be conducted during the “early stages in the project
    development,” AR 13068, while the detailed noise analysis will usually be conducted after “the
    preliminary engineering has been initiated, and the preparation of an environmental document
    (usually an Environmental Impact Statement) has begun,” AR 13094. Here, the agency
    conducted a general noise assessment while preparing the FEIS and concluded that, with the
    mitigation measures it required AAF to take, the project would actually result in less noise
    overall. AR 73953. It nonetheless required AAF to conduct a detailed noise analysis once
    “advanced engineering” is available for the project. AR 65133.
    The County argues that this approach represents an arbitrary departure from agency
    guidance. The D.C. Circuit has sent mixed signals as to “[w]hether an agency must account for a
    departure” from its non-binding guidance. See Friends of Blackwater v. Salazar, 
    691 F.3d 428
    ,
    435 (D.C. Cir. 2012) (describing the question as “not entirely clear” and citing conflicting
    authority). In Sitka Sound Seafoods, Inc. v. NLRB, 
    206 F.3d 1175
    (D.C. Cir. 2000), for
    example, it explained that because the guidance in question “does not bind the Board,” “the
    relevant question is whether, quite apart from the [guidance], the Board acted unreasonably.” 
    Id. at 1182.
    In Edison Electric Institute v. EPA, 
    391 F.3d 1267
    (D.C. Cir. 2004), by contrast, the
    Circuit stated that “the real question is whether [the agency] adequately accounted for any
    departures” from non-binding guidance because “any deviation from [such guidance] is not per
    se arbitrary and capricious.” 
    Id. at 1269
    & n.3.
    But whether an agency is required to merely act reasonably or adequately account for
    departures from non-binding guidance, the Court concludes that FRA’s approach in this case
    comports with NEPA. As FRA explains, the noise-assessment manuals are “inherently flexible,
    and do not require the use of a particular level of analysis.” Fed. Defs.’ MSJ at 43. The County
    61
    does not contest that the relevant guidance is non-binding. In addition, the agency has explained
    why it prepared only a general assessment for purposes of the FEIS. According to the ROD,
    “Noise and Vibration Impacts for the north-south corridor relied on the [applicable guidance]
    methodologies appropriate for the level of design of the alternatives evaluated in the FEIS.” AR
    65132. Critically, “[b]ecause advanced engineering is now available for the north-south route,
    AAF will conduct [a] Detailed Noise and Vibration Assessment throughout the corridor.” 
    Id. Thus, the
    agency explained that it relied on a general noise assessment rather than detailed one
    because that was the level of analysis that was feasible at the time the FEIS was prepared. And
    the agency took the additional step of requiring AAF to conduct the more detailed analysis once
    more information became available and the more comprehensive analysis was feasible. While
    the agency certainly could have discussed the present infeasibility of a detailed analysis in more
    detail, the Court concludes that it has done enough to satisfy NEPA.
    The County also argues that FRA unreasonably departed from agency guidance by
    calculating, rather than measuring, noise. Agency guidance explains that where, as here, “the
    proposed high-speed rail project corridor is to be shared with an existing rail transit
    corridor . . . noise measurements at representative locations along the corridor are essential to
    estimate noise accurately.” AR 13080. This does not appear contingent on whether the agency
    conducts a general assessment or detailed analysis. Contrary to the guidance, Amec, the
    consultant that prepared the underlying technical memorandum that forms the basis of the noise
    information included in the FEIS, did not measure existing noise along the N-S Corridor. AR
    61110. Instead, it calculated existing noise based on a variety of variables and then compared its
    calculations to the observed noise measurements of a 2010 Environment Assessment (“EA”) for
    Amtrak along the same corridor. 
    Id. In response
    to a comment from VHB and FRA regarding
    62
    the need to measure existing noise, Amec and AAF explained that “[e]xisting noise
    measurements for existing rail line operations (i.e., freight) have been completed through recent,
    previous studies. . . . Calculated noise levels were compared to analogous measured noise levels
    as verification of accuracy, with good agreement.” AR 1325. But again, whether an agency is
    required to act reasonably or also adequately account for any departures from guidance, the FRA
    has adequately explained why it did not separately measure noise—Amec and FRA could
    validate their calculations based on recent noise measurements along the same corridor. The
    County’s two counterarguments do not undermine this conclusion.
    First, the County argues that by failing to measure existing noise, FRA omitted a key
    source of noise as a variable in its assessment of current noise levels: the use of warning horns
    along the mainline. Pls.’ Reply at 23. To establish a baseline for its noise analysis, Amec
    modeled current noise by focusing only on existing freight operations, the primary source of
    noise along the N-S Corridor. AR 73772. As explained above, Amec calculated existing noise
    and then validated its calculations by comparing them to the measured noise in the 2010 Amtrak
    EA. AR 61110. Table 3-3 of the Amec noise analysis presents the difference between the
    calculated noise exposure and the observed noise exposure from the 2010 EA. 
    Id. There is
    almost no difference between calculated and observed noise for crossings; there is, however, a
    sizable difference between calculated and observed noise for the mainline. 
    Id. What accounts
    for this difference on the mainline? Amec assumed that trains would only
    sound their warning horns at or near crossings, not on the mainline. 
    Id. “However, based
    on
    documentation within the Amtrak EA, warning horns were observed at both the mainline and
    crossing monitoring locations.” 
    Id. Amec acknowledged
    that “[i]f warning horns were added to
    the calculated noise exposure for mainline conditions, noise levels would be the same as
    63
    calculated noise exposure for crossing conditions” and thus “within 1 dBA of the observed noise
    levels.” 
    Id. Amec did
    not explain why it assumed trains would sound their horns at crossings
    but not on the mainline.
    The FEIS also does not explain why it likewise focuses exclusively on the use of warning
    horns at formal crossings. According to the FEIS, along the N-S Corridor, “noise impacts [from
    the project] would primarily be due to the increased frequency of warning horns use at at-grade
    crossings.” AR 73950 (emphasis added). To mitigate this noise, the FEIS notes that “AAF has
    committed to installing stationary wayside horns at each of the 117 grade crossings between
    Cocoa and West Palm Beach where severe, unmitigated impacts would occur using locomotive-
    mounted horns.” AR 73942. Wayside horns—which are pole-mounted horns that are quieter
    than train horns and sound only at the crossings—have “been shown to substantially reduce the
    noise footprint” at an intersection “without compromising safety at the grade crossing.” 
    Id. The FEIS
    concludes that adding these horns at grade crossings “will eliminate all severe noise
    impacts for residential and institutional receptors along the N-S Corridor.” AR 73950 (emphasis
    added). This, says FRA, means that the Project will actually make grade crossings quieter than
    existing conditions (by 7 to 8 dBA) and will lead to a slight increase (by 0.2 to 0.3 dBA) along
    the mainline. AR 73953.
    The County argues that FRA’s conclusion overlooks the unmitigated noise from warning
    horns on the mainline. It turns out this is partially true. Both the agency and AAF confirmed at
    the hearing that the noise analysis did not take into account the use of warning horns along the
    mainline. Hr’g Tr. at 28:22–29:1; 
    id. at 38:8–12.
    Even so, this omission is not fatal to the
    agency’s satisfaction of its NEPA obligations. Like any agency, FRA’s actions are “entitled to a
    presumption of regularity” and, if the Court “can ‘reasonably discern’ the agency’s path, it
    64
    should uphold the agency’s decision.” Weiss v. Kempthorne, 
    580 F. Supp. 2d 184
    , 188 (D.D.C.
    2008) (first quoting Citizens to Preserve Overton Park, Inc. v. Volpe, 
    401 U.S. 402
    , 415 (1971);
    then quoting Pub. Citizen, Inc. v. FAA, 
    988 F.2d 186
    , 197 (D.C. Cir. 1993)).
    Although the agency certainly could have been clearer, the Court is able to reasonably
    discern the agency’s rationale for not including the use of warning horns on the mainline as a
    variable in its noise analysis. As explained above, the FEIS concludes that “noise impacts [from
    the project] would primarily be due to the increased frequency of warning horns use at at-grade
    crossings.” AR 73950. Implicit in this conclusion is that other sources of noise, including the
    use of warning horns along the mainline, were not significant contributors of noise. Although
    the agency neglected to expressly articulate why, the record suggests that the agency concluded
    mainline warning horns were not a significant source of noise because they would be used only
    rarely and randomly. In response to one of the County’s noise-related comments on the FEIS,
    FRA explained that “[t]rain-mounted horns may still need to be sounded at all locations along
    the rail corridor under emergency conditions.” AR 65289. This implies that the agency
    concluded that the use of mainline warning horns was both rare (because they would be sounded
    only in emergencies) and difficult to measure (because emergencies are unpredictable). This is
    consistent with counsel for AAF’s representation at the hearing that the use of warning horns on
    the mainline is “a random immeasurable event” in response to unpredictable trespassing along
    the line. Hr’g Tr. at 39:17.
    Under the rule of reason, the Court must consider the “practical limitations on the
    agency’s analysis,” including “the information available at the time” as well as the availability of
    appropriate modeling. See Wilderness Soc’y v. Salazar, 
    603 F. Supp. 2d 52
    , 61 (D.D.C. 2009)
    (citing Transmission Access Policy Study Grp. v. FERC, 
    225 F.3d 667
    , 736 (D.C. Cir. 2000); N.
    65
    Slope 
    Borough, 642 F.2d at 600
    ); WildEarth 
    Guardians, 8 F. Supp. 3d at 34
    . Applying that
    principle, it makes sense for the agency to assume in its noise analysis that trains would use their
    warning horns on the mainline only in unpredictable “emergency conditions.” Although the
    agency could have been more explicit in its reasoning, the Court can nevertheless discern why
    FRA did not consider the use of mainline warning horns.
    Second, the County argues that Amec and FRsA overlooked the effect that a new
    “turnout” (that is, an additional line of track that allows a slower moving train to pull off the
    mainline to let a faster moving train pass) would have on the historic Lyric Theater in Martin
    County. But as AAF points out, FRA expressly considered the noise impact to historic sites like
    the theater and concluded “there will be no noise impacts” after the required mitigation. See
    AAF’s Reply at 12; AR 74070, 74073 (Table 5.4.5-3). FRA responded similarly after receiving
    comments on the FEIS regarding the theater from Martin County. See AR 65276.
    5. Changes to freight operations
    Finally, the County contends that FRA expressly declined to consider the potential
    impacts of an increase in the speed of freight trains caused by the project’s infrastructure
    improvements. Pls.’ MSJ at 23–26. This argument lacks support in the record. In its comment
    about general effects on community character, Indian River County also expressed concern about
    freight trains, explaining that “freight operations can be anticipated to intensify with the Project,
    and the speed of freight trains will increase to up to 70 mph.” AR 65268. FRA responded that
    the number of freight trains running along the N-S Corridor was higher as recently as 2006 and
    that “[a]ny potential changes to the existing freight operations along the FECR Corridor are
    outside the scope of this FEIS.” 
    Id. This response
    should not be taken to mean that FRA
    “specifically declined to consider” freight trains in the FEIS. See Pls.’ Reply at 12. Rather, it
    66
    merely reflects that changes to existing freight operations—that is, the number of freight trains
    running—were not part of the federal action proposed. And even if changes to existing freight
    operations or speeds were not specifically planned, they were anticipated and discussed in the
    FEIS.
    The FEIS explains that the “addition of passenger rail service” to the N-S Corridor,
    where freight trains currently run, “would require modifying the mostly single-track system to a
    mostly double track system, which would be used by both passenger and freight operations. This
    will improve freight efficiency by increasing average operating speeds.” AR 73907; see also AR
    73733 (Table 3.3-16 depicting average freight train speed in Indian River County as 38.57 mph
    under the “No-Action Alternative” and 43.45 mph under the project); AR 73906 (explaining that
    under the No-Action Alternative, “freight speeds would not increase”). The FEIS ultimately
    concludes that this increased efficiency means “the Project would have beneficial impacts on
    future freight traffic along the N-S Corridor.” AR 73907.
    Perhaps conceding that the FEIS at least discloses the potential for faster freight trains,
    the County faults FRA for not considering four negative impacts of project-related changes to
    freight operations: (1) the public-safety effect of faster freight trains, (2) increased noise and
    vibrations from faster freight trains, (3) the potential shift of freight traffic from day to night to
    accommodate the passenger-train schedule, and (4) the threat to the structural stability of the
    older St. Lucie River Bridge from faster freight trains. Pls.’ MSJ at 24. The Court addresses
    these potential effects in turn.
    a. Public-safety impacts of faster freight trains
    First, as 
    explained supra
    Section II.B(1)(b), FRA determined that the project would have
    an overall beneficial effect on safety because AAF would be required to introduce a variety of
    67
    safety features, including a Positive Train Control system interoperable between passenger and
    freight trains as well as improved grade crossings. The agency was not required to separately
    analyze the public-safety ramifications of marginally faster (by 5 mph on average) freight trains
    given that these safety measures would benefit both passenger and freight trains, which the
    agency acknowledged would be moving at increased speeds.
    b. Noise and vibration impacts of faster freight trains
    Second, FRA offers two responses to the County’s argument that its noise and vibration
    analysis overlooked an increase in freight speed: first, quite simply, the analysis did take “into
    account the characteristics of future passenger and freight rail operations, including speed,” Fed.
    Defs.’ MSJ at 37; and second, in any event, faster freight trains would not have “a significant
    impact on overall noise conditions” because FRA concluded that warning horns are the
    predominant cause of noise along the N-S Corridor, Fed. Defs.’ Reply at 18. FRA’s first
    argument is belied by the record but its disregard for noise from faster freight trains is harmless
    largely because of its second argument.
    The record is clear that FRA’s noise analysis does not consider the incremental noise
    increase from faster freight trains. Rather, the analysis takes into account freight trains only to
    establish the baseline level of noise based on calculated current freight operations. See AR
    61108. The FEIS as well focuses on freight trains only to calculate the baseline, not as a
    potential source of additional noise based on an incremental increase in speed. That document
    discloses that the Project will “result in long-term noise and vibration adverse impacts,”
    including “along the N-S Corridor due to the increase (greater than doubling) of vibration events
    as a result of adding passenger train service to the existing freight operations.” AR 73942
    (emphasis added).
    68
    The County raised its concern that the noise and vibration analysis does not account for
    faster freight trains in their comments on the FEIS. See AR 65289. It explained, “[t]he increases
    in freight train average operating speeds and maximum operating speeds as a direct result of the
    Project can be expected to increase noise and vibration. . . . None of these Project effects were
    taken into account in the general [noise] assessment.” 
    Id. FRA’s response
    is similar to the one it
    advances here: “The FEIS addresses this issue as follows: . . . ‘freight operations are expected to
    continue with a planned annual growth of 3 percent. This continued growth will likely result in
    marginal increases in noise levels through possible increases in train speed, frequency, and
    length.’” 
    Id. (alterations in
    original) (quoting AR 73951). But critically, the FEIS cites to the
    No-Action Alternative, not the impact of the project and its attendant increase in freight train
    speed. FRA concluded that in the absence of the project, predicted growth in freight operations
    would lead to some changes in those operations’ noise impact. But again, FRA’s response
    demonstrates that the parties have been talking past each other on the specific issue of
    incremental noise increases from faster freight trains as a result of the project since the comment
    period on the FEIS.
    The Court must therefore determine whether this omission was prejudicial. Under the
    APA, the Court “shall” take into account “the rule of prejudicial error.” 5 U.S.C. § 706. “[T]he
    inquiry into whether a NEPA plaintiff suffered prejudice is well established in the relevant
    precedent.” Standing Rock Sioux 
    Tribe, 301 F. Supp. 3d at 74
    (citing, e.g., Pub. Employees for
    Envtl. Responsibility v. Hopper, 
    827 F.3d 1077
    , 1087–88 (D.C. Cir. 2016)); see also 
    Nevada, 457 F.3d at 90
    .
    The Court concludes that the agency’s failure to take into account potential incremental
    increases in noise from slightly faster freight trains was harmless. The reason is two-fold. First,
    69
    the FEIS anticipates that freight trains are to go only approximately 5 mph faster because of the
    Project. See AR 73733 (Table 3.3-16 reflecting a 4.88 mph increase in speed for freight trains
    traveling through Indian River County and a 5.30 mph increase in speed for freight trains
    traveling through Martin County). The County fails to convince the Court that this slight
    increase in speed would lead to a significant increase in noise. And second, the FEIS concludes
    that the main source of noise from the project would be the “increased frequency of warning
    horn use at at-grade crossings” rather than train-related noise. AR 73950. Indeed, the FEIS
    concluded that noise on the mainline would increase only marginally (by 0.2 to 0.3 dBA) from
    the addition of 32 high-speed passenger trains per day, AR 73953, suggesting that noise from the
    trains themselves pales in comparison to that of their horns at crossings.
    c. Noise impacts of nighttime freight trains
    Third, in response to Indian River County’s comment on the FEIS that adding passenger
    trains “is likely to shift freight trains to nighttime hours due to scheduling conflicts,” FRA
    explained that “[f]uture passenger and freight train operations and the period of the day they are
    anticipated to occur has been analyzed based on FECR’s anticipated future passenger and freight
    demands.” AR 65289. The County fails to provide evidence that, contrary to this response, the
    noise analysis ignored the anticipated train schedule. Instead, Plaintiff points to Table 5.2.2-1, a
    table setting forth the “Proposed Passenger Rail Operations” which assumes two passenger trains
    per night and does not discuss freight trains. AR 73944. That this specific table does not reflect
    the timing of freight traffic does not prove that the agency did not do so at all. In fact, the Amec
    report clearly demonstrates that the noise analysis contemplated at least some nighttime freight
    traffic. That report explains that “[a]ccording to historical trends . . . , approximately half of the
    freight operations occur at night (10 pm to 7 am) and half during the day (7 am to 10 pm).” AR
    70
    61109. Table 3-1 on that same page presents the “2016 Projected Existing Conditions Rail
    Operations (North-South Corridor),” which contemplates 11 freight trains per night. 
    Id. d. St.
    Lucie River Bridge and faster freight trains
    And fourth, the County faults FRA for not including “discussion of the vibration impacts
    to the structural stability of the St. Lucie Bridge from the increased use and train speeds.” Pls.’
    MSJ at 24. But an agency need not discuss an impact that is “merely conceivable” and, at its
    worst, minimal: AAF determined that the bridge is “structurally sound,” AR 73727, and in any
    event, freight trains were projected to go just 5 mph faster over the bridge.
    *       *        *
    Agency action is rarely perfect. But NEPA does not demand perfection. Instead, it
    requires that an agency take a “hard look” at the reasonably foreseeable impacts of a proposed
    major federal action. The extensive FEIS, appendices, comment responses, and Record of
    Decision together demonstrate that FRA met that requirement here. The Court will therefore
    grant Defendants’ and Intervenor-Defendant’s motions for summary judgment on Indian River’s
    NEPA claim, and deny the County’s motion for summary judgment on that claim.
    71
    III. Conclusion
    For the foregoing reasons, the Court will grant Defendants’ Motion for Summary
    Judgment, grant Intervenor-Defendant’s Motion for Summary Judgment, and deny Plaintiff’s
    Motion for Summary Judgment. A separate Order shall accompany this Memorandum Opinion.
    ________________________
    Date: December 24, 2018                                  CHRISTOPHER R. COOPER
    United States District Judge
    72
    

Document Info

Docket Number: Civil Action No. 2018-0333

Judges: Judge Christopher R. Cooper

Filed Date: 12/24/2018

Precedential Status: Precedential

Modified Date: 12/25/2018

Authorities (34)

Federation for American Immigration Reform, Inc. v. Janet ... , 93 F.3d 897 ( 1996 )

THEODORE ROOSEVELT CONSERVATION v. Salazar , 616 F.3d 497 ( 2010 )

Theodore Roosevelt Conservation Partnership v. Salazar , 661 F.3d 66 ( 2011 )

City of Alexandria, Virginia,appellees v. Rodney E. Slater, ... , 198 F.3d 862 ( 1999 )

citizens-against-burlington-inc-v-james-b-busey-iv-administrator , 938 F.2d 190 ( 1991 )

Public Citizen, Inc., Aviation Consumer Action Project, and ... , 988 F.2d 186 ( 1993 )

City of Grapevine, Texas v. Department of Transportation, ... , 17 F.3d 1502 ( 1994 )

foundation-on-economic-trends-v-margaret-m-heckler-secretary-of-the , 756 F.2d 143 ( 1985 )

American Federation of Labor & Congress of Industrial ... , 409 F.3d 377 ( 2005 )

Edison Electric Institute v. Environmental Protection Agency , 391 F.3d 1267 ( 2004 )

Sitka Sound Seafoods, Inc. v. National Labor Relations Board , 206 F.3d 1175 ( 2000 )

cheney-railroad-company-inc-v-interstate-commerce-commission-and-the , 902 F.2d 66 ( 1990 )

north-slope-borough-v-cecil-d-andrus-secretary-of-the-department-of-the , 642 F.2d 589 ( 1980 )

National Petrochemical & Refiners Association v. ... , 287 F.3d 1130 ( 2002 )

Entergy Corp. v. Riverkeeper, Inc. , 129 S. Ct. 1498 ( 2009 )

International Union of Bricklayers and Allied Craftsmen v. ... , 761 F.2d 798 ( 1985 )

Creekstone Farms Premium Beef, L.L.C v. Department of ... , 539 F.3d 492 ( 2008 )

Griffin v. Oceanic Contractors, Inc. , 102 S. Ct. 3245 ( 1982 )

Wilderness Society v. Salazar , 603 F. Supp. 2d 52 ( 2009 )

Weiss v. Kempthorne , 580 F. Supp. 2d 184 ( 2008 )