Cincinnati Bell Telephone Co., L.L.C. v. J.K. Meurer Corp. , 2022 Ohio 540 ( 2022 )


Menu:
  • [Cite as Cincinnati Bell Telephone Co., L.L.C. v. J.K. Meurer Corp., 
    2022-Ohio-540
    .]
    IN THE COURT OF APPEALS
    FIRST APPELLATE DISTRICT OF OHIO
    HAMILTON COUNTY, OHIO
    CINCINNATI BELL                 TELEPHONE             :      APPEAL NO. C-210139
    COMPANY, LLC,                                                TRIAL NO. 20CV-08867
    :
    Plaintiff-Appellee,
    :
    vs.                                                             O P I N I O N.
    :
    J.K. MEURER CORPORATION,
    :
    Defendant-Appellant.
    Civil Appeal From: Hamilton County Municipal Court
    Judgment Appealed From Is: Affirmed
    Date of Judgment Entry on Appeal: February 25, 2022
    McCaslin, Imbus, & McCaslin and Michael P. Cussen, for Plaintiff-Appellee,
    Gary F. Franke Co., LPA, Gary F. Franke and William M. Bristol, for Defendant-
    Appellant.
    OHIO FIRST DISTRICT COURT OF APPEALS
    BOCK, Judge.
    {¶1}   Defendant-appellant J.K. Meurer Corporation (“J.K. Meurer”) was
    repaving a driveway when it sliced underground utility lines belonging to plaintiff-
    appellee Cincinnati Bell Telephone Company, LLC (“Cincinnati Bell”). J.K. Meurer
    appeals the trial court’s judgment of $10,393.73 in favor of Cincinnati Bell. For the
    following reasons, we affirm the trial court’s judgment.
    I.      Facts and Procedure
    {¶2}   J.K. Meurer is a pavement contractor. In June 2019, J.K. Meurer was
    hired to repave a driveway adjoining 2924 and 2920 Burnett Avenue (“Burnett
    Driveway”) in Cincinnati, Ohio. Cincinnati Bell provides services to Burnett Avenue
    through underground utility cables.
    {¶3}   On June 24, 2019, Cincinnati Bell received service complaints from
    customers on Burnett Avenue. Cincinnati Bell discovered damage to its cables
    connected to the Burnett Driveway. Cincinnati Bell replaced the damaged cables and
    billed J.K. Meurer for the repair costs. Cincinnati Bell filed negligence claims against
    J.K Meurer for allegedly damaging Cincinnati Bell’s underground utility lines during
    the excavation and removal of the driveway surface. J.K. Meurer denied the
    allegations. The case proceeded to a bench trial.
    {¶4}   At trial, Cincinnati Bell entered multiple documents into evidence,
    including a damage cable report, damage billing records, a repair call log, and a cable
    run diagram of the investigation and repair of the damaged utility lines beneath the
    Burnett Driveway. Artis Hickman, Cincinnati Bell’s manager who investigated the
    damages, testified that he had discovered damage to the utility lines and
    photographed a newly paved driveway. According to Hickman, the cables “had to be
    replaced because [the Burnett Driveway] was paved over.”
    2
    OHIO FIRST DISTRICT COURT OF APPEALS
    {¶5}   Robert Wayne Reid, the J.K. Meurer manager who repaved the
    Burnett Driveway, testified that J.K. Meurer did not contact the Ohio Utility
    Protection Service (“OUPS”) to locate or mark underground cables. To repave the
    driveway, Reid used a Bobcat affixed with a “grinder” to loosen the existing asphalt
    and “take it out.” Reid “didn’t think [J.K. Meurer] needed to” call OUPS because J.K.
    Meurer “wasn’t going as deep as the wire was supposed to be.” But in the course of
    grinding the existing asphalt, his equipment struck an underground cable. Reid
    notified a supervisor when he became aware of the damage to the cable.
    {¶6}   As for damages, Cincinnati Bell entered an invoice into evidence that
    identified its expenses incurred repairing the damaged utility line. Tom Paolucci, the
    director of accounting for Cincinnati Bell, testified that repair work cost $10,393.73,
    calculated under the rules promulgated by the Public Utility Commission of Ohio.
    Cincinnati Bell tracked repair costs through a damage billing number. The costs of
    repairs included internal labor, material, and charges from a subcontractor.
    {¶7}   Following the close of Cincinnati Bell’s case, J.K. Meurer moved for a
    directed verdict, asserting that Cincinnati Bell failed to prove the elements of
    negligence. The trial court deferred ruling on the motion.
    {¶8}   J.K. Meurer’s vice president, Mitch Meurer, testified that he was
    present when Reid struck the cable under the Burnett Driveway. Mr. Meurer was
    unaware that the line “was alive because it was buried so shallow.” After his company
    damaged the line, Mr. Meurer contacted the owner of the 2924 and 2920 Burnett
    Avenue properties to find out which utility companies serviced those buildings and if
    any residents experienced any service interruptions. Mr. Meurer tes did not contact
    OUPS because he believed it was his customer’s responsibility to report the damage
    3
    OHIO FIRST DISTRICT COURT OF APPEALS
    to the cable. When “nobody had reported any problems,” J.K. Meurer paved over the
    damaged line.
    {¶9}    The trial court found J.K. Meurer negligent and entered judgment for
    Cincinnati Bell. The trial court determined that J.K. Meurer was excavating as
    defined by R.C. 3781.25(I). The trial court concluded that “R.C. 3781.28 obligated
    [J.K. Meurer] to contact OUPS before excavating” and JK Meurer breached that duty
    when it failed to contact OUPS. The trial court awarded $10,393.73 to Cincinnati
    Bell.
    {¶10} J.K. Meurer appeals.
    II.    Law and Analysis
    {¶11} J.K. Meurer raises two assignments of error. First, it contends that
    Cincinnati Bell failed to satisfy its burden of proof for the elements of negligence.
    {¶12} While J.K. Meurer does not identify a standard of review, we review a
    judgment following a bench trial to determine if its judgment is against the manifest
    weight of the evidence. Eastley v. Volkman, 
    132 Ohio St.3d 328
    , 
    2012-Ohio-2179
    ,
    
    972 N.E.2d 517
    , ¶ 12. Under a manifest-weight standard, “we weigh the evidence and
    all reasonable inferences, consider the credibility of the witnesses, and determine
    whether in resolving conflicts in the evidence, the trial court clearly lost its way and
    created such a manifest miscarriage of justice that its judgment must be reversed and
    a new trial ordered.” Id. at ¶ 20.
    A. J.K. Meurer Excavated the Burnett Driveway
    {¶13} As an initial matter, we must determine whether J.K. Meurer was
    excavating when it repaired the Burnett Driveway.
    4
    OHIO FIRST DISTRICT COURT OF APPEALS
    {¶14} An excavator is “the contractor or other person who is responsible for
    making the excavation.” R.C. 3781.25(J). Excavation means “the use of tools,
    powered equipment, or explosives to move earth, rock, or other materials in order to
    penetrate or bore or drill into the earth, or to demolish any structure whether or not
    it is intended that the demolition will disturb the earth.” R.C. 3781.25(I).
    {¶15} J.K. Meurer characterizes its work as “grinding blacktop,” which it
    distinguishes from excavation. J.K. Meurer used a “grinder” on the Burnett
    Driveway. Its employees testified that the company removed the existing asphalt
    from the Burnett Driveway. Thus, J.K. Meurer used powered equipment to remove
    materials. The central issue is whether J.K. Meurer’s equipment demolished a
    structure.
    {¶16} Ohio law has not addressed the contours of the term “excavation”
    under the common law or R.C. 3781.25. Our review of the case law has unearthed
    only one case discussing a contractor’s removal of a sidewalk as an excavation. GTE
    Tel. Operations v. J&H Reinforcing & Structural Erectors, 4th Dist. Scioto No.
    01CA2808, 
    2002-Ohio-2553
    , ¶ 15 (finding a company’s “preconstruction meeting”
    with utility representatives complied with the spirit of R.C. 3781.28(A) and satisfied
    the duty to ascertain the location of utility cables).
    {¶17} Cincinnati Bell argues that grinding asphalt falls under the statutory
    definition of excavating. This raises a question of statutory construction and presents
    an issue of law that we review de novo. Vontz v. Miller, 
    2016-Ohio-8477
    , 
    111 N.E.3d 452
    , ¶ 26 (1st Dist.). We first look to the statutory language to determine its meaning.
    Cincinnati Community Kollel v. Testa, 
    135 Ohio St.3d 219
    , 
    2013-Ohio-396
    , 985
    N.E.1236, ¶ 25. If the statute’s meaning is clear, definite, and unambiguous, we apply
    the statute as written. WCI, Inc. v. Ohio Liquor Control Comm., 
    116 Ohio St.3d 547
    ,
    5
    OHIO FIRST DISTRICT COURT OF APPEALS
    
    2008-Ohio-88
    , 
    880 N.E.2d 901
    , ¶ 19. Words and phrases left undefined in a statute
    “are to be given their common, ordinary, and accepted meaning.” State v. Black, 
    142 Ohio St.3d 332
    , 
    2015-Ohio-513
    , 
    30 N.E.3d 918
    , ¶ 39, citing Wachendorf v. Shaver,
    
    149 Ohio St. 231
    , 
    78 N.E.2d 370
     (1948), paragraph five of the syllabus. Statutory
    context, rules of grammar, and common usage all guide our interpretation. R.C. 1.42.
    {¶18} Following an objective examination of the statute, if “a definitive
    meaning proves elusive,” courts may look beyond the statutory language and apply
    rules of statutory construction. State v. Porterfield, 
    106 Ohio St.3d 5
    , 2005-Ohio-
    3095, 
    829 N.E.2d 690
    , ¶ 11. Two common-sense principles of statutory construction
    are relevant here. The principle of noscitur a sociis provides that “words grouped in a
    list should be given related meaning.” Dole v. United Steelworkers of Am., 
    494 U.S. 26
    , 36, 
    110 S.Ct. 929
    , 
    108 L.Ed.2d 23
     (1990). According to this principle, the
    meaning of an unclear word may be derived from surrounding words. Wray v. Albi
    Holdings, PLL, 1st Dist. Hamilton No. C-200381, 
    2021-Ohio-3920
    , ¶ 13, citing
    Sunoco, Inc. (R & M) v. Toledo Edison Co., 
    129 Ohio St.3d 397
    , 
    2011-Ohio-2720
    , 
    953 N.E.2d 285
    , ¶ 43. Similarly, the principle of ejusdem generis dictates that, when a
    general word follows an enumerated list of specific objects, we interpret the general
    word in a manner consistent with the specific objects. Wray at ¶ 14.
    {¶19} The statutory context of R.C. Chapter 3781 tells us that the Burnett
    Driveway was a “structure.” Under R.C. 3781.25(I), an excavation consists of the
    demolition of “any structure whether or not it is intended that the demolition will
    disturb the earth.” Elsewhere in the chapter, the Revised Code discusses the duty to
    notify OUPS for any project that requires excavation. See R.C. 3781.27(A) and
    3781.28(E). A project is “an improvement requiring excavation.” R.C. 3781.25(S).
    6
    OHIO FIRST DISTRICT COURT OF APPEALS
    {¶20} An improvement is “any construction, reconstruction, improvement,
    enlargement, alteration, or repair of a building, highway, drainage system, water
    system, road, street, alley, sewer, ditch, sewage disposal plant, water works, and all
    other structures or works of any nature.” R.C. 3781.25(U). Reading the word
    “structure” in harmony with “highway,” “water system,” “road,” “street,” “alley,” and
    “sewer” indicates that a driveway is a structure as used throughout R.C. Chapter
    3781. When we consider the shared characteristics of the words preceding
    “structure,” mainly “road,” “street,” and “alley,” it is apparent that “structure” refers
    to a private driveway.
    {¶21} Therefore, we find that J.K. Meurer’s use of powered equipment to
    move materials and demolish the existing driveway constitutes an excavation.
    B. Negligence
    {¶22} To prove negligence, a party must establish a duty, a breach of that
    duty, and an injury caused by that breach. Mussivand v. David, 
    45 Ohio St.3d 314
    ,
    318, 
    544 N.E.2d 265
     (1989), citing Di Gildo v. Caponi, 
    18 Ohio St.2d 125
    , 
    247 N.E.2d 732
     (1969). The existence of a legal duty is a question of law for the courts and
    reviewed de novo. Wallace v. Ohio Dept. of Commerce, 
    96 Ohio St.3d 266
    , 2002-
    Ohio-4210, 
    773 N.E.2d 1018
    , ¶ 22, citing Mussivand at 318.
    {¶23} A legal duty “may be established by common law, by legislative
    enactment, or by the particular circumstances of a given case.” Shepherd v. City of
    Cincinnati, 
    168 Ohio App.3d 444
    , 
    2006-Ohio-4286
    , 
    960 N.E.2d 808
    , ¶ 14 (1st Dist.),
    citing Chambers v. St. Mary’s School, 
    82 Ohio St.3d 563
    , 565, 
    697 N.E.2d 198
    (1998), citing Eisenhuth v. Moneyhon, 
    161 Ohio St. 367
    , 
    119 N.E.2d 440
     (1954),
    paragraph one of the syllabus.
    7
    OHIO FIRST DISTRICT COURT OF APPEALS
    1. J.K. Meurer was Negligent Per Se
    {¶24} Cincinnati Bell argues that J.K. Meurer’s violation of R.C. 3781.28(A)
    constitutes per se negligence. When a statute establishes a “ ‘positive and definite
    standard of care’ ” and supplants the common law standard of care, “ ‘a violation of
    that statute constitutes negligence per se.’ ” Sikora v. Wenzel, 
    88 Ohio St.3d 493
    ,
    496, 
    727 N.E.2d 1277
     (2000), quoting Chambers at 565, quoting Eisenhuth at 374-
    375. A statutory violation is negligence per se when the statute’s “positive and
    definitive standard of care” can be objectively applied to all who engage in the
    particular activity, and the resulting injury is the kind the statute was designed to
    prevent. Boyd v. Moore, 
    184 Ohio App.3d 16
    , 
    2009-Ohio-5039
    , 
    919 N.E.2d 283
    , ¶
    13-20 (2d Dist.), citing Chambers at 656. The practical effect of a statutory violation
    as negligence per se is that a statutory violation satisfies the breach and duty
    elements of negligence. Lang v. Holly Hill Motel, Inc., 
    122 Ohio St.3d 120
    , 2009-
    Ohio-2495, 
    909 N.E.2d 120
    , ¶ 15. A plaintiff must still prove causation and damages.
    Sikora at 496, citing Chambers at 565.
    {¶25} R.C. 3781.28(A) states, in relevant part, that an “excavator shall notify
    [OUPS] of the location of the excavation site and the date on which excavation is
    planned to commence.” As discussed, J.K. Meurer excavated the Burnett Driveway
    and conceded that it did not notify OUPS before doing so.
    {¶26} We note that J.K. Meurer argues that “the sole reason for the line
    being damaged” was Cincinnati Bell’s “failure to place the line at the required depth
    of eighteen inches.” J.K. Meurer presents no rule, case law, or statute that excuses an
    excavator’s failure to comply with R.C. 3781.28(A) based on the expected depth of
    utility lines.
    8
    OHIO FIRST DISTRICT COURT OF APPEALS
    {¶27} In Boyd, the court held that a violation of R.C. 3781.28(A) constitutes
    negligence per se. Boyd, 
    184 Ohio App.3d 16
    , 
    2009-Ohio-5039
    , 
    919 N.E.2d 283
    , at ¶
    24. The court reasoned that R.C. 3781.28(A) establishes a positive and definitive
    standard of care for excavators by requiring excavators to contact OUPS before
    excavating. Id. at ¶ 14. Courts can objectively discern violations of that duty. Id. The
    court found that the legislature codified R.C. 3781.28(A) to prevent underground
    utilities line damage and utility service disruption. Id. at ¶ 23.
    {¶28} We agree with the Boyd court—a violation of the duty established by
    R.C. 3781.28(A) constitutes negligence per se. J.K. Meurer violated that duty when it
    failed to contact OUPS before it excavated the Burnett Driveway and damaged the
    utility line. Accordingly, J.K. Meurer’s violation of R.C. 3781.28(A) satisfies the duty
    and breach elements of negligence.
    2. Causation
    {¶29} J.K. Meurer asserts that Cincinnati Bell failed to prove that J.K.
    Meurer caused the damage to Cincinnati Bell’s utility lines.
    {¶30} A defendant is liable under a theory of negligence only for damages
    caused by a breach of its duty. Hester v. Dwivedi, 
    89 Ohio St.3d 575
    , 583, 
    733 N.E.2d 1161
     (2000). Specifically, the defendant’s conduct or omission must be both the
    actual cause and proximate cause of the harm. Walls v. Durani, 1st Dist. Hamilton
    No. C-200167, 
    2021-Ohio-4329
    , ¶ 7.
    {¶31} The standard test for actual causation is a “but for” test. Anderson v.
    St. Francis St. George Hosp., 
    77 Ohio St.3d 82
    , 84, 
    671 N.E.2d 225
     (1996).
    Accordingly, J.K. Meurer’s conduct is the actual cause of the damage if the damage
    would not have occurred but for J.K. Meurer’s conduct. Rieger v. Giant Eagle, Inc.,
    
    157 Ohio St.3d 512
    , 
    2019-Ohio-3745
    , 
    138 N.E.3d 1121
    , ¶ 12, citing Anderson at 84-85.
    9
    OHIO FIRST DISTRICT COURT OF APPEALS
    {¶32} Next, J.K. Meurer’s conduct must be the proximate cause of the
    damage. Proximate causation means “some reasonable connection between the act
    or omission of the defendant and the damage the plaintiff has suffered.” Queen City
    Terminals v. Gen. Am. Transp. Corp., 
    73 Ohio St.3d 609
    , 618, 
    653 N.E.2d 661
    (1995), quoting Keeton, Dobbs, Keeton, & Owen, Prosser and Keeton on the Law of
    Torts, Section 41, 263 (5th Ed.1984). The harm must be foreseeable, meaning the
    harm was the natural and probable consequence of the act. Mussivand, 45 Ohio
    St.3d at 321, 
    544 N.E.2d 265
    .
    {¶33} The trial court found that the costs of repairing the damage to the
    utility lines resulted from J.K. Meurer’s negligence. J.K. Meurer contends that proof
    of causation requires expert testimony due to the use of machinery and Cincinnati’s
    regulation of underground utility lines. Expert testimony is necessary to prove
    “causation between a plaintiff’s injuries and the defendant’s conduct” when the
    issues of causation involve a scientific inquiry. Clough v. Watkins, 4th Dist.
    Washington No. 19CA20, 
    2020-Ohio-3446
    , ¶ 32, citing Darnell v. Eastman, 
    23 Ohio St.2d 13
    , 
    261 N.E.2d 114
     (1970), syllabus. But when “the cause and effect relationship
    is ‘so apparent as to be matters of common knowledge,’ then expert testimony is
    unnecessary.” Clough at ¶ 32, citing Darnell at syllabus.
    {¶34} We find that the cause-and-effect relationship between J.K. Meurer’s
    conduct and the damage to Cincinnati Bell’s underground utilities is “so apparent”
    that it requires no expert testimony. The testimony and documentary evidence
    support the trial court’s conclusion that J.K. Meurer’s negligence was the actual
    cause of the damage to Cincinnati Bell’s utility lines. Cincinnati Bell presented
    testimony that the company was able to identify where the underground cables were
    located on Burnett Avenue and mark those locations. Cincinnati Bell introduced a
    10
    OHIO FIRST DISTRICT COURT OF APPEALS
    diagram from its database identifying the location of cables buried under Burnett
    Avenue. J.K. Meurer employees testified that the company took no precautionary
    steps before excavating and subsequently damaging underground utility cables in the
    course of its excavation. The damage to Cincinnati Bell’s underground utility cables
    was foreseeable.
    {¶35} Therefore, the trial court’s determination that J.K. Meurer’s conduct
    actually and proximately caused the damage to Cincinnati Bell’s utility lines was not
    against the manifest weight of the evidence.
    3. Damages
    {¶36} Finally, J.K. Meurer challenges the trial court’s damages finding. The
    court explained that Cincinnati Bell “retained a third party to repair the line and the
    driveway, incurring expenses totaling $10,393.73.” J.K. Meurer argues that
    Cincinnati Bell failed to present evidence that the repair costs were reasonable or
    necessary, or that the costs were for the damage to its utility line on Burnett Avenue.
    We disagree.
    {¶37} The purpose of awarding damages is to make an injured party whole.
    MCI Communications Servs. v. Barrett Paving Materials, Inc., 1st Dist. Hamilton
    No. C-100806, 
    2012-Ohio-1700
    , ¶ 14, citing Pryor v. Webber, 
    23 Ohio St.2d 104
    , 
    263 N.E.2d 235
     (1970), paragraph one of the syllabus. Damages include both direct and
    indirect costs. Ohio Edison Co. v. Royer, 
    2018-Ohio-75
    , 
    92 N.E.3d 912
    , ¶ 28 (9th
    Dist.). A utility company may be awarded direct and indirect costs “ ‘when the
    accuracy of the costs is reasonably established and the indirect costs are calculated in
    accordance with the accounting principles mandated by [the Public Utility
    Commission of Ohio].’ ” 
    Id.,
     citing State Edison Co. v. Roman, 9th Dist. Lorain No.
    97CA006735, 
    1998 Ohio App. LEXIS 4320
    , *4-5 (Sept. 16, 1998).
    11
    OHIO FIRST DISTRICT COURT OF APPEALS
    {¶38} Cincinnati Bell presented testimony that replacing the damaged utility
    line was necessary “because it was paved over.” Cincinnati Bell presented an itemized
    invoice to show the material, labor, and subcontractor costs for the repairs. Further,
    Paolucci, the head of Cincinnati Bell’s accounting department, testified that the
    invoice was prepared under the rules established by the Public Utility Commission of
    Ohio. According to Paolucci and Hickman, the damage bill and invoice reflected the
    costs tracked throughout Cincinnati Bell’s system related to repairing the damaged
    utility lines on Burnett Avenue. Paolucci testified that Cincinnati Bell hired a
    subcontractor to repair the utility line. Further, Paolucci testified that in-network
    managers approved all third-party costs related to the repairs. Considering this
    evidence, the costs were reasonably established and consistent with the trial court’s
    conclusion that Cincinnati Bell incurred $10,393.73 in damages.
    {¶39} In light of the testimony and documentary evidence presented at trial,
    the lower court’s judgment was not against the manifest weight of the evidence. We
    overrule J.K. Meurer’s first assignment of error.
    C. Directed Verdict
    {¶40} In its second assignment of error, J.K. Meurer contends the trial court
    erred by not granting its motion for a directed verdict. This court reviews a trial
    court’s decision to deny a motion for a directed verdict de novo. White v. Leimbach,
    
    131 Ohio St.3d 21
    , 
    2011-Ohio-6238
    , 
    959 N.E.2d 1033
    , ¶ 22, citing Goodyear Tire &
    Rubber Co. v. Aetna Cas. & Sur. Co., 
    95 Ohio St.3d 512
    , 
    2002-Ohio-2842
    , 
    769 N.E.2d 835
    , ¶ 4. A directed verdict is appropriate when, after construing the evidence
    most strongly in favor of the nonmoving party, “reasonable minds could come to but
    one conclusion,” that no evidence of substantive probative value exists in favor of the
    nonmoving party and that the nonmoving party failed to adduce any evidence on the
    12
    OHIO FIRST DISTRICT COURT OF APPEALS
    essential elements of the claim. White at ¶ 22, citing Goodyear at ¶ 3, quoting Civ.R.
    50(A)(4).
    {¶41} J.K. Meurer argues that Cincinnati Bell presented no evidence of a
    breach of duty, or that any negligence proximately caused Cincinnati Bell’s damaged
    utility lines. But as discussed above, Cincinnati Bell proved that J.K. Meurer
    excavated the Burnett Driveway as defined in R.C. 3781.25(I) without notifying
    OUPS, damaged a utility line, and proximately caused Cincinnati Bell’s damages. The
    trial court appropriately denied J.K. Meurer’s motion for a directed verdict. J.K.
    Meurer’s second assignment of error is overruled.
    III.   Conclusion
    {¶42} The evidence produced at trial supported the trial court’s denial of J.K.
    Meurer’s motion for a directed verdict and the court’s award of $10,393.73 to
    Cincinnati Bell. We therefore overrule J.K. Meurer’s two assignments of error and
    affirm the trial court’s judgment.
    Judgment affirmed.
    CROUSE, P.J., and WINKLER, J., concur.